i ;, f Of- .- NIHOINIA ELECTIllC AND POWT lt COMPANY Ricitwoxo,VinotutA enent | |||
, i February 14,1991 o | |||
i LU.S. N'uclear Regulatory Commission Serial No.: 91 057 | |||
' Attention: Document Control Desk NL&P/RMN Washington, D.C. 20555 ' Docket Nos.: 50 338 q | |||
50 339 License Nos.: NPF 4 N PF , , | |||
Gentlemen: | |||
1^ ' | |||
VIRGINIA- ELECTRIC' ANu POWER COMPANY NORTH ANNA' POWER STATION UNITS 1 AND 2 ' | |||
= PROPOSED- TECHNICAL SPECIFICATION CHANGES AUXILIARY FEEDWATER PUMP TESTING Pursuant 10:10 CFRl 50.90, the Virginla= Electric and Power Company requests Lamen.dments, in the form?of changes to the Technical Specifications, to Operating | |||
' License Numbers NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2, respectively,' j 1The' proposed changes to the North Anna Units 1 and 2 Technical Specifice,tions will allow improvements to.the monthly auxiliary feedwater pump tests. These changes-are !ntended to replace our December 28,1989 request (letter serial nusbar 89-833). | |||
;NRC Bulletin 88-04 " Safety Related Pump Loss" identified uncerns with hydraulic instability in pumps operating near their shut off heads, in our August 8,1988 reply to | |||
- that bulletin we committed to disassembling and inspecting the auxiliary feedwater ' | |||
, . pumps and to mir,!mize operation at low flow. The inspections indicated that some - , | |||
idegradation had occurred which was not revealed by the high pressure-low flow 4 testing. The pumps have since been overhauled and our. quarterly ASME Section XI | |||
' testing procedures have been revised to allow full flow tests. . A new full flow recirculation line was added during the latest Unit 2 refueling outage and is being , | |||
installed during the current Unit 1 outage to permit full flow testing e' power without affecting the steam' generators or normal feedwater regulation. Ou, quarterly Section 4 Xl testing is now done at flow conditions near the pump's best efficiency point. This lost p,ovides early warning of degradation and is similar to conditions when the pump p Lis perfc rming its safety function. If the monthly test could be done under similar p conditions, safety we. Id be enhanced because there would be less pump wear and more effective testing. | |||
G l od | |||
" '9102210237 910214 ' | |||
. DR ADoCK 0500 8 ggy | |||
. . . m . . _. ._._ _ _ . . . .- _ . _ . fh | |||
. . _Li_ ~ y n ' | |||
: h 1. ; 3 s ' | |||
This does not affect our MERITS submittal, tharefore a MERITS change is not attached. | |||
LThe proposed; changes are provided in Attachments 1 and 2. A discussion of the | |||
. L proposed changes:with the technical justification and safety evaluation of the | |||
. proposed changes is provided in Attachment 3.- | |||
Th!s requestihas been.' reviewed by the Station Nuclear Safety and Operating | |||
-Committee;and the Management Safety Review Committee. It has been determined that this request does not involve an unreviewed safety question as defined in 10 CFR | |||
< " 50.59 o_r a significant hazards consideration as defined in 10 CFR 50.92. The basis for jour determinglon that no significant hazards consideration is involved is presented in | |||
' Attachment 4. | |||
Because of the need .to revise procedures, please allow us 60 days to implement | |||
:these changes from the' dates of issuance. Should you have any questions or require l | |||
' additional information, please contact us at your earliest convenience. | |||
> Very truly ud2;rs, | |||
.) | |||
-f r/ | |||
W.' L. Ste | |||
/ rt .@ | |||
7 ; | |||
Senior Vich President - Nuclear | |||
. l | |||
? Attachments 4 1. . Proposed Technical Specification Change for North Anna Unit 1 i2. Proposed Technical Specification Change for. North Anna Unit 2 rt > | |||
: 3. Discussion of Proposed Changes: , | |||
14.110 CFR 50.92 Evaluation cc:' LU.S.~ Nuclear _ Regulatory Corrmiss on | |||
< ; Region il | |||
, s | |||
- 101 Madetta Street, N.W. : | |||
Suite 2900-LAtlanta, GA- 30323 Mr. M. S. Lesser | |||
,. -NRC Senior. Resident inspector 1 North Anna Power Stdion 3 | |||
Commissioner. | |||
-Department of Health j | |||
Room 400 109 Governor Street | |||
,g Richmond, Virginia .23219 I | |||
r | |||
+ - lA~ - - - , , , - , , . . < , - - . . | |||
. - -w ,, , , ,, w e , | |||
i' q . . | |||
s E COMMONWEALTH OF VIRGINIA ) | |||
# ) | |||
. COUNTYOFHENRICO ) | |||
, Ths . foregoing.. document was -.. acknowledged _ before me, in -and. for the-County and; Commonwealth aforesaid, today by. E. W. Harrell, who is Vice | |||
- President - 1 Nuclear -- Operations, for W. L. Stewart, who is Senior Vice' c | |||
. President.- Nuclear, of xVirginia Electric and Power Company. He is duly j authorized, to executeLand file the foregoing document in behalf of that c | |||
Company,' .andLthe. statements in the document are true to the best of his k.nowledge and belief. | |||
' Acknowledged : before me' this. ./ day of t. //IAaat , 19_f_/ | |||
ii..y Commission ; Expires . | |||
/~ f//n 3/ , 19 W . | |||
d ; | |||
i~ | |||
d | |||
_ 1[ ,h/iff_ ~ | |||
Notary Public l | |||
1 | |||
, u I | |||
1, i= | |||
). , | |||
s (SEAL) l | |||
(!, | |||
I J g , -}} |
Latest revision as of 09:16, 21 December 2020
ML20066H670 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 02/14/1991 |
From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
Shared Package | |
ML20066H678 | List: |
References | |
91-057, 91-57, IEB-88-004, IEB-88-4, NUDOCS 9102210237 | |
Download: ML20066H670 (3) | |
Text
- y -
i ;, f Of- .- NIHOINIA ELECTIllC AND POWT lt COMPANY Ricitwoxo,VinotutA enent
, i February 14,1991 o
i LU.S. N'uclear Regulatory Commission Serial No.: 91 057
' Attention: Document Control Desk NL&P/RMN Washington, D.C. 20555 ' Docket Nos.: 50 338 q
50 339 License Nos.: NPF 4 N PF , ,
Gentlemen:
1^ '
VIRGINIA- ELECTRIC' ANu POWER COMPANY NORTH ANNA' POWER STATION UNITS 1 AND 2 '
= PROPOSED- TECHNICAL SPECIFICATION CHANGES AUXILIARY FEEDWATER PUMP TESTING Pursuant 10:10 CFRl 50.90, the Virginla= Electric and Power Company requests Lamen.dments, in the form?of changes to the Technical Specifications, to Operating
' License Numbers NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2, respectively,' j 1The' proposed changes to the North Anna Units 1 and 2 Technical Specifice,tions will allow improvements to.the monthly auxiliary feedwater pump tests. These changes-are !ntended to replace our December 28,1989 request (letter serial nusbar 89-833).
- NRC Bulletin 88-04 " Safety Related Pump Loss" identified uncerns with hydraulic instability in pumps operating near their shut off heads, in our August 8,1988 reply to
- that bulletin we committed to disassembling and inspecting the auxiliary feedwater '
, . pumps and to mir,!mize operation at low flow. The inspections indicated that some - ,
idegradation had occurred which was not revealed by the high pressure-low flow 4 testing. The pumps have since been overhauled and our. quarterly ASME Section XI
' testing procedures have been revised to allow full flow tests. . A new full flow recirculation line was added during the latest Unit 2 refueling outage and is being ,
installed during the current Unit 1 outage to permit full flow testing e' power without affecting the steam' generators or normal feedwater regulation. Ou, quarterly Section 4 Xl testing is now done at flow conditions near the pump's best efficiency point. This lost p,ovides early warning of degradation and is similar to conditions when the pump p Lis perfc rming its safety function. If the monthly test could be done under similar p conditions, safety we. Id be enhanced because there would be less pump wear and more effective testing.
G l od
" '9102210237 910214 '
. DR ADoCK 0500 8 ggy
. . . m . . _. ._._ _ _ . . . .- _ . _ . fh
. . _Li_ ~ y n '
- h 1. ; 3 s '
This does not affect our MERITS submittal, tharefore a MERITS change is not attached.
LThe proposed; changes are provided in Attachments 1 and 2. A discussion of the
. L proposed changes:with the technical justification and safety evaluation of the
. proposed changes is provided in Attachment 3.-
Th!s requestihas been.' reviewed by the Station Nuclear Safety and Operating
-Committee;and the Management Safety Review Committee. It has been determined that this request does not involve an unreviewed safety question as defined in 10 CFR
< " 50.59 o_r a significant hazards consideration as defined in 10 CFR 50.92. The basis for jour determinglon that no significant hazards consideration is involved is presented in
' Attachment 4.
Because of the need .to revise procedures, please allow us 60 days to implement
- these changes from the' dates of issuance. Should you have any questions or require l
' additional information, please contact us at your earliest convenience.
> Very truly ud2;rs,
.)
-f r/
W.' L. Ste
/ rt .@
7 ;
Senior Vich President - Nuclear
. l
? Attachments 4 1. . Proposed Technical Specification Change for North Anna Unit 1 i2. Proposed Technical Specification Change for. North Anna Unit 2 rt >
- 3. Discussion of Proposed Changes: ,
14.110 CFR 50.92 Evaluation cc:' LU.S.~ Nuclear _ Regulatory Corrmiss on
< ; Region il
, s
- 101 Madetta Street, N.W. :
Suite 2900-LAtlanta, GA- 30323 Mr. M. S. Lesser
,. -NRC Senior. Resident inspector 1 North Anna Power Stdion 3
Commissioner.
-Department of Health j
Room 400 109 Governor Street
,g Richmond, Virginia .23219 I
r
+ - lA~ - - - , , , - , , . . < , - - . .
. - -w ,, , , ,, w e ,
i' q . .
s E COMMONWEALTH OF VIRGINIA )
- )
. COUNTYOFHENRICO )
, Ths . foregoing.. document was -.. acknowledged _ before me, in -and. for the-County and; Commonwealth aforesaid, today by. E. W. Harrell, who is Vice
- President - 1 Nuclear -- Operations, for W. L. Stewart, who is Senior Vice' c
. President.- Nuclear, of xVirginia Electric and Power Company. He is duly j authorized, to executeLand file the foregoing document in behalf of that c
Company,' .andLthe. statements in the document are true to the best of his k.nowledge and belief.
' Acknowledged : before me' this. ./ day of t. //IAaat , 19_f_/
ii..y Commission ; Expires .
/~ f//n 3/ , 19 W .
d ;
i~
d
_ 1[ ,h/iff_ ~
Notary Public l
1
, u I
1, i=
). ,
s (SEAL) l
(!,
I J g , -