Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20210L1501999-08-0404 August 1999 Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20093K6011995-10-17017 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,modifying TS to Allow Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20092J4171995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J2951995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2421995-09-0101 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087G3421995-03-30030 March 1995 Application for Amends to Licenses NPF-4 & NPF-7, Re Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operation in Order to Refurbish Isolated Svc Water Headers ML20080Q5421995-03-0202 March 1995 Application for Amends to Licenses NPF-4 & NPF-7,changing TS Associated W/Type a Testing Requirements Specified in App J to 10CFR50 ML20080B6801994-11-29029 November 1994 Application for Amends to Licenses NPF-4 & NPF-7,updating Environ Protection Plans to Reflect Current Obligations to Commonwealth of VA & Revise Portions of Transmission Corridor rights-of-way Erosion Control Program ML20076L5751994-10-25025 October 1994 Application for Amends to Licenses NPF-4 & NPF-7,extending Functional Surveillance Testing Frequency for Hydrogen Recombiners from Once Per 6 Months to Once Per 18 Months ML20069P3851994-06-16016 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,revising TS Re Removal of Unnecessary EDG Surveillance Requirements,Per GL 93-05 ML20069K2371994-06-0909 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,relocating TS Tables of Response Time Limits for RTS & ESFAS from TS to Station Controlled Documents,Per GL 93-08 ML20065K0981994-04-15015 April 1994 Application for Amends to Licenses NPF-4 & NPF-7,modifying P/T Operating Limitations During Heatup & Cooldown & LTOP Sys Pressure Setpoints & Enabling Temps for Units 1 & 2. Nonproprietary Westinghouse Rept WCAP-13831,Rev 1 Encl ML20065E1531994-03-30030 March 1994 Application for Amends to NPF-4 & NPF-7,revising High Head Safety Injection Flow Balance Surveillance Requirements by Removing Specific Numerical Values & Replacing W/Broader Requirement to Ensure HHSI Rate Meet LOCA Criteria ML20064F9681994-03-0909 March 1994 Correction to 930716 Proposed TS Change,Modifying TS to Conform W/Recent Changes to 10CFR20,correcting Administrative Error on TS Bases Page B 3/4 7-7 for Unit 2 as Issued by Amend 159 to License NPF-7 on 940217 ML20064C1531994-03-0101 March 1994 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Unnecessary EDG Surveillance Requirements in Accordance W/Gl 93-05 & NUREG-1366 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20058M0581993-12-10010 December 1993 Application for Amends to Licenses NPF-4 & NPF-7,modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 ML20058C4491993-11-19019 November 1993 Application for Amend to Licenses NPF-4 & NPF-7,allowing Use of Solid Rods or Zirconium Alloy or Stainless Steel Filler Rods to Replace Fuel Rods Which Have Been Identified as Failed & Deleting Individual Fuel Rod U Weight Limit ML20059K1271993-11-10010 November 1993 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Simulated Reactor Coolant Pump Seal Injection Flow Requirement for Flow Balancing of High Head Safety Injection Lines ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML20045G7591993-07-0808 July 1993 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Deleting Requirement to Periodically Review Certain Administrative & Technical Procedures ML20045G6831993-07-0202 July 1993 Application for Amends to Licenses NPF-4 & NPF-7 Modifying Table 4.4-1 of TS 4.4.5.1 to Reduce Minimum Number of SGs Required to Be Opened for Insp During First Insp (I.E.,Refueling Outage)Following SG Replacement 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20210L1501999-08-0404 August 1999 Application for Amends to Licenses NPF-4 & NPF-7,ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification Time ML20206N3601999-05-0606 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels ML20206G8271999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,deleting &/Or Relocating Addl primary-to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206G8641999-05-0303 May 1999 Application for Amends to Licenses NPF-4 & NPF-7,increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20195J4351998-11-18018 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9291998-11-10010 November 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising TSs to Clarify Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20236U8611998-07-28028 July 1998 Application for Amend to Licenses NPF-4 & NPF-7,revising EDG Section to Be Consistent W/Station Procedures Associated W/ Steady State Conditions & W Nuclear Safety Advisory Ltr,Nsal 93-022 ML20236U8571998-07-28028 July 1998 Application for Amend to Licenses NPF-04 & NPF-07,revising TS 3/4.1.2 Re RWST & Boron Concentration Ph Range Bases Change ML20236U8261998-07-28028 July 1998 Application for Amends to Licenses NPF-4 & NPF-7,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20217E8931998-03-25025 March 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Frequency of EDGs & Establishing Configuration Risk Mgt Program to Support Risk Informed Tech Specs ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML20202C3281998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Testing Requirements for Reactor Trip Bypass Breaker ML20202C5621998-02-0303 February 1998 Application for Amends to Licenses NPF-4 & NPF-7,modifying Insp Requirements & Frequency for RCP Flywheels & Eliminating Insp Requirements for Unit 1,reactor Coolant Flow Straighteners ML20199H3661997-11-18018 November 1997 Application for Amends to Licenses NPF-4 & NPF-7,permitting Quarterly Testing of Turbine Governor & Throttle Valves. Non-proprietary Tr,Rev 1 to WCAP-14733 & Proprietary Tr,Rev 1 to WCAP-14732,encl.Proprietary Rept Withheld ML20199A1411997-11-0505 November 1997 Application for Amends to Licenses NPF-4 & NPF-7, Respectively.Amends Will Provide Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20149F1201997-07-17017 July 1997 Amends 205 & 186 to Licenses NPF-4 & NPF-7,respectively, Addressing Proposed Temporary (Limit by Time Duration) TS Changes for Svc Water Sys Refurbishment ML20141F3691997-05-14014 May 1997 Application for Amends to Licenses NPF-4 & NPF-7,revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided in TS 3/4.7.1.7 ML20132E6091996-12-17017 December 1996 Application for Amends to Licenses NPF-4 & NPF-7,requesting Temporary Changes to Service Water Sys Piping Repair and Refurbishment ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML20134H0001996-11-0606 November 1996 Application for Amends to Licenses NPF-4 & NPF-7,modifying Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20107L3881996-04-25025 April 1996 Application for Amends to Licenses NPF-4 & NPF-7,providing Suppl Info That Clarifies TS to Allow Switching of Charging & low-head SI Pumps During Unit Shutdown Conditions ML20101F7891996-03-21021 March 1996 Application for Amends to Licenses NPF-4 & NPF-7,clarifying Requirements for Testing Charcoal Adsorbent in Waste Gas Charcoal Filter Sys,Cr Emergency Habitability Sys & Safeguard Area Ventilation Sys ML20097C0001996-01-31031 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Revising Current Minimum EDG Fuel Oil Day Tank Vol & Allowing Credit to Be Taken for Surveillance Testing Performed During Power to Satisfy SR Required in Shutdown ML20097J4281996-01-30030 January 1996 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Modifying Table 3.2.-1 TS 3.2.5 to Increase Minimum Allowable RCS Total Flow Rate from 284,000 Gpm & 275,000 Gpm to 295,000 Gpm ML20096G9811996-01-23023 January 1996 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML20094N7881995-11-20020 November 1995 Application for Amends to Licenses NPF-4 & NPF-7,permitting Use of 10CFR50 App J,Option B,performance-based Containment Leakage Rate Testing ML20094D0131995-10-25025 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Inoperability ML20093K6011995-10-17017 October 1995 Application for Amends to Licenses NPF-4 & NPF-7,modifying TS to Allow Both Containment Personnel Airlock Doors to Remain Open During Refueling Operations ML20093K5851995-10-17017 October 1995 Application for Amend to License NPF-7,modifying Table 4.4-1 of TS 4.4.5.1 to Reduce from Two to One Min Number of SGs Required to Be Inspected During First ISI Following SG Replacement ML20092J4171995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,increasing Surveillance Test Interval & Extending Visual & Surface Insps for Turbine Reheat Stop & Intercept Valves ML20092J2951995-09-19019 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,revising Maximum Allowable Power Range Neutron Flux High Setpoints for Operation W/Inoperable MSSV ML20092A2421995-09-0101 September 1995 Application for Amends to Licenses NPF-4 & NPF-7,allowing Single Outage of Up to 14 Days for Each EDG Once Every 18 Months ML20087G3421995-03-30030 March 1995 Application for Amends to Licenses NPF-4 & NPF-7, Re Two Svc Water Loops to Be Isolated from Component Cooling Water Heat Exchangers During Power Operation in Order to Refurbish Isolated Svc Water Headers ML20080Q5421995-03-0202 March 1995 Application for Amends to Licenses NPF-4 & NPF-7,changing TS Associated W/Type a Testing Requirements Specified in App J to 10CFR50 ML20080B6801994-11-29029 November 1994 Application for Amends to Licenses NPF-4 & NPF-7,updating Environ Protection Plans to Reflect Current Obligations to Commonwealth of VA & Revise Portions of Transmission Corridor rights-of-way Erosion Control Program ML20076L5751994-10-25025 October 1994 Application for Amends to Licenses NPF-4 & NPF-7,extending Functional Surveillance Testing Frequency for Hydrogen Recombiners from Once Per 6 Months to Once Per 18 Months ML20069P3851994-06-16016 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,revising TS Re Removal of Unnecessary EDG Surveillance Requirements,Per GL 93-05 ML20069K2371994-06-0909 June 1994 Application for Amends to Licenses NPF-4 & NPF-7,relocating TS Tables of Response Time Limits for RTS & ESFAS from TS to Station Controlled Documents,Per GL 93-08 ML20065K0981994-04-15015 April 1994 Application for Amends to Licenses NPF-4 & NPF-7,modifying P/T Operating Limitations During Heatup & Cooldown & LTOP Sys Pressure Setpoints & Enabling Temps for Units 1 & 2. Nonproprietary Westinghouse Rept WCAP-13831,Rev 1 Encl ML20065E1531994-03-30030 March 1994 Application for Amends to NPF-4 & NPF-7,revising High Head Safety Injection Flow Balance Surveillance Requirements by Removing Specific Numerical Values & Replacing W/Broader Requirement to Ensure HHSI Rate Meet LOCA Criteria ML20064F9681994-03-0909 March 1994 Correction to 930716 Proposed TS Change,Modifying TS to Conform W/Recent Changes to 10CFR20,correcting Administrative Error on TS Bases Page B 3/4 7-7 for Unit 2 as Issued by Amend 159 to License NPF-7 on 940217 ML20064C1531994-03-0101 March 1994 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Unnecessary EDG Surveillance Requirements in Accordance W/Gl 93-05 & NUREG-1366 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML20058M0581993-12-10010 December 1993 Application for Amends to Licenses NPF-4 & NPF-7,modifying Surveillance Frequency of Auxiliary Feedwater Sys Pumps from Monthly to Quarterly Per Generic Ltr 93-05 ML20058C4491993-11-19019 November 1993 Application for Amend to Licenses NPF-4 & NPF-7,allowing Use of Solid Rods or Zirconium Alloy or Stainless Steel Filler Rods to Replace Fuel Rods Which Have Been Identified as Failed & Deleting Individual Fuel Rod U Weight Limit ML20059K1271993-11-10010 November 1993 Application for Amends to Licenses NPF-4 & NPF-7,eliminating Simulated Reactor Coolant Pump Seal Injection Flow Requirement for Flow Balancing of High Head Safety Injection Lines ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML20045G7591993-07-0808 July 1993 Application for Amends to Licenses NPF-4 & NPF-7, Respectively,Deleting Requirement to Periodically Review Certain Administrative & Technical Procedures 1999-08-04
[Table view] |
Text
, - - - - . _
! '. y j 1
, VIRGINIA EtecTHIC ann PownH CourAxy Ricnw oxo, Vino NIA 23261 November 10, 1993 i
U.S. Nuclear Regulatory Commission Serial No.93-732 l Attention: Document Control Desk NL&P/MAE: RO ;
50-338 Washington, DC. 20555 Docket Nos.
r 50-339 License Nos. NPF-4 l NPF-7 :
'l Gentlemen:
VIRGINIA ELEC'RIC AND POWER COMPANY ,
NORTH ANNA POWER STATION UNITS 1 and 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGES !
HIGH HEAD SAFETY INJECTION FLOW BALANCING Pursuant to 10 CFR_50.90, the Virginia Electric and Power Company requests amendments, in the form of changes to the Technical Specifications, to Facility l Operating License Nos. NPF-4 and NPF-7 for North Anna Power Station Units 1 and 2, respectively. The proposed changes will eliminate the simulated reactor coolant pump ;
sea! injection flow requirement for the flow balancing of the high head safety injection lines.
This Technical Specification change is requested on an emergency basis in accordance with 10 CFR 50.S1 (a) (5). The basis for an emergency change request is !
included as Attachment 1. A discussion of the proposed changes is provided in :
Attachment 2. The proposed changes are presented in Attachment 3. ,
It has been determined that the proposed Technical Specifications changes do not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant i hazards consideration as defined in 10 CFR 50.92. The basis for our determination that these changes do not involve a significant hazards consideration is provided in Attachment 4. The proposed Technical Specifications changes have beeri reviewed ;
and approved by the Station Nuclear Safety and Operating Committee and the i Management Safety Review Committee. j Should you have any questions or require additional information, please contact us. ;
i Very truly yours, -l W. L. Stewart Senior Vice President - Nuclear Attachments 9311150194 931110 P yDR ADOCK 05000338 I PDR L
I i
cc: U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323 M. R. D. McWhorter NRC Senior Resident inspector ;
North Anna Power Station Commissioner Department of Health Room 400 ;
109 Governor Street l Richmond, Virginia 23219 l
.j r
-I i
F i
h l
i i
m---m. -
-r -
% ry -me,*.---y . , -e-- , .., - - . ,y. ,.y.-,%%,.. ...,,y.,_,, , , , , , . ,,~ ,,,, , . , , , , ,.g_, , y,,,.,,y,,,g,_ y.,,,_,,,,, ,,,,,, ,,,
COMMONWEALTH OF VIRGINIA )
)
COUNTY OF HENRICO ).
The foregoing document was acknowledged before me, in and for the County.and Commonwealth aforesaid, today by R. F. Saunders, who is Assistant Vice President -
Nuclear Operations, for W. L. Stewart who is Senior Vice' President - Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the dccument.
are true to the best of his knowledge and belief.
Acknowledged before me this //7 day of Myrn4ns,193 My Commission Expires: 1 d'/+ 3 / 199k.
6 NH Y L Notary'Pdblic
~
i G
4 1
(SEAL)
L
i t
Attachment 1 Basis For An Emergency Change Request
BASIS FOR EMERGENCY CHANGE REQUEST NRC regulations (10 CFR 50.91 (a)(5)) require that whenever an emergency situation j
exists, a licensee must explain why this emergency situation occurred and why it could not avoid this situation, and the Commission will assess the licensee's reasons for j failing to file an application sufficiently in advance of that event. An emergency situation exists when the Commission's failure to act in a timely way would result in derating or-1 shutdown of a nuclear plant, or in prevention of either resumption of operation or of .
increase in power output up to the plant's licensed power level, in such cases, the Commission may issue a license amendment involving no significant hazards consideration without prior notice and opportunity for a hearing or for public comment.
Also, in such cases, the regulations require that the Commission be particularly sensitive to environmental considerations. Our discussion of why this proposed change meets the conditions necessary for emergency consideration is provided below. '
, Whv Emeroencv Situation Occurred and Could Not Be Avoided
} At 09:30 hours and again at 14:45 hours on November 8,1993, North Anna Unit 2 entered an action statement to be in hot standby-within six hours as required by ;
Technical Specification 3.0.3. It had been determined that Technical Specification 3.5.2, which requires two operable HHSI pumps, could not be met. The HHSI pumps j were determined to be inoperable because the total pump _ flow rate required by Technical Specification 4.5.2.h.1.b may not have been met. The limitation on seal ,
injection flow specified by Technical Specification 4.5.2.h.1.c contributed to this ;
determ.ination.
i f Whv Emeroency Situation Exists On November 8,1993, the NRC verbally approved an enforcement discretion to '
eliminate the simulated reactor coolant pump seal injection flow requirement of 2 48.3 gpm in Technical Specification 4.5.2.h.1.c. Virginia Electric and Power Company letter ?
dated November 9,1993 (Serial No.93-727) documented the requested enforcement i
discretion and committed to promptly submitting an Emergency Technical Specification :
change request. Consistent with NRC policy on enforcement discretion, a licensee shall l submit an Emergency Technical Specification change to permanently implement a change initially supported through NRC's exercise of enforcement discretion. As ;
defined in 10CFR50.91, NRC's failure to act on the proposed change would result in the r shutdown of North Anna Unit 2, and thus an emergency situation exists.
We have determined that the proposed Technical Specification changes invclve no significant hazards consideration. Therefore, we conclude that the condition in 10 CFR 1 50.91 (a)(5) regarding issuance only of a license amendment involving no significant i hazards consideration is met.
l Environmental Considerations Approval of a Technical Specification change as described above will not change the types of any effluents that may be released offsite, nor create a significant increase in individual or cumulative occupational radiation exposure.
2 i
i e
I s
4 4
L 4
i e
i j
u J
i i
1 i
1 Attachment 2 ,
4 i
Discussion of Changes 4
4 4
i
{
i d
i
l a
l l
a i
e 1
i f
1 t'
I l
I l i j n j l
l I
I l
l 1
- l. . :
i i ;
I DISCUSSION OF CHANGES INTRODUCTION North Anna Unit 1 and 2 Technical Specification 4.5.2.h.1 specifies surveillance requirements for the flow balancing of the high head safety injection lines. Achieving an acceptable flow balance assures that adequate core cooling and negative reactivity is provided to mitigate the consequences of design basis accidents. Item a) under this surveillance requirement specifies that the sum of the injection line flow rates, ' excluding :
the highest flow rate is 2 359 gpm with a single pump running. Item b) under this surveillance requirement specifies that the total charging /high head safety injection (HHSI) pump flow rate with a single pump running is s 660 gpm. Item c) under this i I surveillance requirement specifies that a value of 248.3 gpm be used to simulate reactor coolant pump seal injection flow during cold leg injection balancing.
The requirement to specify a simulated seal injection flow rate was added August 4, 1993 by License Amendment Nos.171 and 151 for Units 1 and 2 respectively. This requirement has been determined to be unnecessary and has, in practice, inhibited our ability to meet the minimum and maximum flow rate specifications. These proposed Technical Specification changes would allow the elimination of the simulated reactor ,
coolant pump seal injection flow requirement in Technical Specification 4.5.2.h.1.c and i make minor editorial changes to Technical Specifications 4.5.2.h.1.a and b to improve the readability.
BACKGROUND i At 09:30 hours and again at 14:45 hours on November 8,1993, North Anna Unit 2 entered an action statement to be in hot standby within six hours as required by Technical Specification 3.0.3. It had been determined that Technical Specification 3.5.2, which requires two operable HHSI pumps, could not be met. The HHSl pumps ,
were determined to be inoperable because the total pump flow rate required by '
Technical Specification 4.5.2.h.1.b may not have been met. In addition, the limitation on seal injection flow specified by Technical Specification 4.5.2.h.1.c contributed to this determination. On the same day, this condition was discussed with the NRC.
Enforcement discretion was requested for 1) a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period to readjust the seal injection flows to the reactor coolant pumps in order to meet the total pump flow rate in Technical Specification 4.5.2.h.1.b of s 660 gpm, and 2) to eliminate the simulated reactor coolant pump seal injection flow requirement of Technical Specification 4.5.2.h.1.c of 2 48.3 gpm. The requested enforcement discretion was verbally approved by Mr. G. C. Lainas of the NRC on November 8,1993. Virginia Electric and Power Company letter dated November 9,1993 (Serial No.93-727) documented the requested enforcement discretion and committed to promptly submitting an Emergency Technical Specification change request.
The need for enforcement discretion, and consequently the proposed Technical Specification changes, is due in part to an unintended consequence of a previous l license amendment issued on August 4,1993 involving Technical Specification ;
i
I 4.5.2.h.1. That license amendment added, as item c, a specific range of calculated !
values for seal injection flow to be used during the actual flow balancing process. Prior ;
to this amendment, the specific flowrate had not appeared in the Technical '
Specifications. It was believed that by specifying the value in the Technical l
Specifications, a more complete picture of the flow balance process would be provided ;
in the document. The primary purpose of seal injection flow is to provide the required minimum seal flows specified by the reactor coolant pump vendor. These f!aws are. ,
adjustable and may be changed due to plant operations and pump seal conditions.' ,
When the Reactor Coolant System (RCS) is depressurized during the design basis. i accident, the differential pressure between the safety injection flow header and the RCS increases and causes the seal injection flow to increase. The accident analysis takes :
no credit for this flow, and it is presumed to be lost. By meeting Technical '
Specifications 4.5.2.h.1.a and b, the limits of safety analysis are met with margin. The i requirement to specify a simulated seal injection flow rate has, in practice, inhibited our i ability to meet the minimum and maximum flow rate specifications. The proposed Technical Specification changes do not affect the ability of the HHSI system to perform its intended safety function.
SPECIFIC CHANGES ,
The Technical Specification changes described herein apply to North Anna Units 1 and
- 2. The proposed changes delete Technical Specification 4.5.2.h.1.c. Minor editorial-changes are then made to Technical Specifications 4.5.2.h.1.a and b. to reflect the E deletion of 4.5.2.h.1.c and improve the readability on the remaining specifications.
SAFETY SIGNIFICANCE I A safety evaluation has been performed for the propose ~d Technical Specification I changes. By meeting Technical Specifications 4.5.2.h.1.a and b, the limits of safety .
analysis are met with margin. The proposed Technical Specification changes do not j affect the ability of the HHSl system to perform its intended safety function. '
r Continued operation of North Anna Power Station in accordance with the proposed ;
Technical Specification changes will not: !
- 1. Involve an increase in the probability or consequences of an accident or malfunction previously evaluated. The proposed Technical Specification j changes continue to require that with one HHSI pump running, the sum of the flows through the two lowest flow branch lines shall be 2 359 gpm and the total i HHS1 pump flow rate shall be 5; 660 gpm. These requirements ensure the i correct flow balance alignment and flow rates required to meet the' safety !
analysis.
t Likewise, the consequences of the accidents or malfunctions previously !
) evaluated will not increase as a result of the proposed Technical Specification changes. The system performance will remain bounded by the existing safety 1 analysis for all postulated accident conditions. j t
e l
I I
- 2. ' Create the possibility of a new or different kind of accident or malfunction from $
any previously evaluated. The proposed Technical Specification changes will not affect the capability of the HHSI System to perform its intendo function. 3 The proposed Technical Specification changes are bounded by the existing safety analysis and do not involve operation of plant equipment in a different -
manner from which it was designed to operate. Since a new failure mode is not ,
created, a new or different type of accident or malfunction is not created. !
- 3. Involve a reduction in a margin of safety. The system performance will remain '!
bounded by the existing safety analysis at the specified flow rates, therefore, ;
safety margins are not reduced.