ML15175A402: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(8 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15175A402
| number = ML15175A402
| issue date = 06/23/2015
| issue date = 06/23/2015
| title = Browns Ferry Nuclear Plant - Notification Of Licensed Operator Initial Examination 05000259/2015302, 05000260/2015302, and 05000296/2015302
| title = Notification of Licensed Operator Initial Examination 05000259/2015302, 05000260/2015302, and 05000296/2015302
| author name = McCoy G J
| author name = Mccoy G
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Shea J W
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000259, 05000260, 05000296
| docket = 05000259, 05000260, 05000296
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000259/2015302]]
See also: [[see also::IR 05000259/2015302]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::June 23, 2015]]
                                NUCLEAR REGULATORY COMMISSION
                                                REGION II
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                      ATLANTA, GEORGIA 30303-1257
                                            June 23, 2015
Mr. Joseph W. Shea
Vice President, Nuclear Licensing
Tennessee Valley Authority
1101 Market Street, LP 3D-C
Chattanooga, TN 37402-2801
SUBJECT:       BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF LICENSED
                OPERATOR INITIAL EXAMINATION 05000259/2015302, 05000260/2015302,
                AND 05000296/2015302
Dear Mr. Shea:
In a telephone conversation on June 17, 2015 between Mr. D. Binkley, Initial License Training
Supervisor, Mr. J. Viera, Chief Under Instruction, and Mr. P. Capehart, Senior Operations
Engineer, arrangements were made for the administration of licensing examinations at Browns
Ferry Nuclear Plant during the week of November 16, 2015. The written examination is
scheduled to be administered during the week of November 23, 2015. The on-site preparatory
week is scheduled for the week of October 19, 2015.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 10, of NUREG-1021, Operator Licensing Examination Standards for
Power Reactors. The NRCs regional office will discuss with your staff any changes that might
be necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by August 10, 2015. Mr. P. Capehart, provided the written examination outline to your
staff in March 2015. The written examinations, operating tests, and supporting reference
materials identified in Attachment 3 to ES-201 will be due by September 17, 2015. Pursuant to
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
authorized representative of the facility licensee shall approve the examinations, and tests
before they are submitted to the Commission for review and approval. All materials shall be
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or
safeguards information in your response be contained in a separate enclosure and appropriately
marked. Any delay in receiving the required examination and reference materials, or the
submittal of inadequate or incomplete materials, may cause the examinations to be
rescheduled.
To conduct the requested written examinations and operating tests, it will be necessary for your
staff to provide adequate space and accommodations in accordance with ES-402, and to make
the simulation facility available on the dates noted above. In accordance with ES-302, your staff


Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
J. Shea                                        2
should retain the original simulator performance data (e.g., system pressures, temperatures,
and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 2500 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, writing the
examinations, and completing and reviewing the collection of information. Send comments on
any aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov and
to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),
Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available
electronically for public inspection in the NRCs Public Document Room or from the Publicly
Available Records (PARS) component of the NRCs Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page
of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.


SUBJECT: BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000259/2015302, 05000260/2015302, AND 05000296/2015302
J. Shea                                        3
Thank you for your cooperation in this matter. Mr. D. Binkley has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. J. Viera at (404) 997-4643, (Internet
E-mail: Joseph.Viera@nrc.gov), Mr. P. Capehart at (404) 997-4483, (Internet E-mail:
Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).
                                                Sincerely,
                                                /RA/
                                                Gerald J. McCoy, Chief
                                                Operations Branch 1
                                                Division of Reactor Safety
Docket Nos.: 50-259, 50-260, and 50-296
License Nos.: DPR-33, DPR-52, and DPR-68
cc: Distribution via Listserv


==Dear Mr. Shea:==
In a telephone conversation on June 17, 2015 between Mr. D. Binkley, Initial License Training Supervisor, Mr. J. Viera, Chief Under Instruction, and Mr. P. Capehart, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at Browns Ferry Nuclear Plant during the week of November 16, 2015. The written examination is scheduled to be administered during the week of November 23, 2015. The on-site preparatory week is scheduled for the week of October 19, 2015.


As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
_________________________                   SUNSI REVIEW COMPLETE   FORM 665 ATTACHED
 
OFFICE             RII:DRS       RII:DRS       RII:DRS
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by August 10, 2015. Mr. P. Capehart, provided the written examination outline to your staff in March 2015. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by September 17, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations, and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
SIGNATURE         JXV3 VIA       PGC1 VIA EMAIL GJM1
 
                  EMAIL
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
NAME               JVIERA         PCAPEHART     JMcCOY
 
DATE                   6/23/2015       6/22/2015   6/23/2015       6/ /2015     6/ /2015     6/ /2015     6/ /2015
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
E-MAIL COPY?         YES     NO   YES       NO   YES       NO   YES   NO     YES   NO   YES   NO     YES     NO
 
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),
Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. D. Binkley has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. J. Viera at (404) 997-4643, (Internet E-mail: Joseph.Viera@nrc.gov), Mr. P. Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).
 
Sincerely,/RA/ Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-259, 50-260, and 50-296 License Nos.: DPR-33, DPR-52, and DPR-68
 
cc: Distribution via Listserv Thank you for your cooperation in this matter. Mr. D. Binkley has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. J. Viera at (404) 997-4643, (Internet E-mail: Joseph.Viera@nrc.gov), Mr. P. Capehart at (404) 997-4483, (Internet E-mail: Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).
 
Sincerely,/RA/ Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-259, 50-260, and 50-296 License Nos.: DPR-33, DPR-52, and DPR-68
 
cc: Distribution via Listserv
 
PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER:_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE JXV3 VIA EMAILPGC1 VIA EMAILGJM1 NAME JVIERA PCAPEHART JMcCOY DATE 6/23/2015 6/22/2015 6/23/2015 6/ /2015 6/ /2015 6/ /2015 6/ /2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\BROWNS FERRY EXAMINATIONS\BF 2015-302 INITIAL EXAM (PHIL)\CORRESPONDENCE\2015-302 CORPORATE NOTIFICATION LETTER.DOCX
}}
}}

Latest revision as of 23:53, 4 December 2019

Notification of Licensed Operator Initial Examination 05000259/2015302, 05000260/2015302, and 05000296/2015302
ML15175A402
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/23/2015
From: Gerald Mccoy
Division of Reactor Safety II
To: James Shea
Tennessee Valley Authority
References
50-259/15-302, 50-260/15-302, 50-296/15-302
Download: ML15175A402 (4)


See also: IR 05000259/2015302

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

June 23, 2015

Mr. Joseph W. Shea

Vice President, Nuclear Licensing

Tennessee Valley Authority

1101 Market Street, LP 3D-C

Chattanooga, TN 37402-2801

SUBJECT: BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000259/2015302, 05000260/2015302,

AND 05000296/2015302

Dear Mr. Shea:

In a telephone conversation on June 17, 2015 between Mr. D. Binkley, Initial License Training

Supervisor, Mr. J. Viera, Chief Under Instruction, and Mr. P. Capehart, Senior Operations

Engineer, arrangements were made for the administration of licensing examinations at Browns

Ferry Nuclear Plant during the week of November 16, 2015. The written examination is

scheduled to be administered during the week of November 23, 2015. The on-site preparatory

week is scheduled for the week of October 19, 2015.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in Revision 10, of NUREG-1021, Operator Licensing Examination Standards for

Power Reactors. The NRCs regional office will discuss with your staff any changes that might

be necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by August 10, 2015. Mr. P. Capehart, provided the written examination outline to your

staff in March 2015. The written examinations, operating tests, and supporting reference

materials identified in Attachment 3 to ES-201 will be due by September 17, 2015. Pursuant to

Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an

authorized representative of the facility licensee shall approve the examinations, and tests

before they are submitted to the Commission for review and approval. All materials shall be

complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or

safeguards information in your response be contained in a separate enclosure and appropriately

marked. Any delay in receiving the required examination and reference materials, or the

submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled.

To conduct the requested written examinations and operating tests, it will be necessary for your

staff to provide adequate space and accommodations in accordance with ES-402, and to make

the simulation facility available on the dates noted above. In accordance with ES-302, your staff

J. Shea 2

should retain the original simulator performance data (e.g., system pressures, temperatures,

and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, writing the

examinations, and completing and reviewing the collection of information. Send comments on

any aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov and

to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),

Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRCs Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page

of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

J. Shea 3

Thank you for your cooperation in this matter. Mr. D. Binkley has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. J. Viera at (404) 997-4643, (Internet

E-mail: Joseph.Viera@nrc.gov), Mr. P. Capehart at (404) 997-4483, (Internet E-mail:

Phillip.Capehart@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).

Sincerely,

/RA/

Gerald J. McCoy, Chief

Operations Branch 1

Division of Reactor Safety

Docket Nos.: 50-259, 50-260, and 50-296

License Nos.: DPR-33, DPR-52, and DPR-68

cc: Distribution via Listserv

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS RII:DRS

SIGNATURE JXV3 VIA PGC1 VIA EMAIL GJM1

EMAIL

NAME JVIERA PCAPEHART JMcCOY

DATE 6/23/2015 6/22/2015 6/23/2015 6/ /2015 6/ /2015 6/ /2015 6/ /2015

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO