| {{#Wiki_filter:Omaha 4101 Woolworth Avenue DEPARTMENT OF VETERANS AFFAIRS Omaha NE 68105-1873 NEBRASKA-WESTERN IOWA HEALTH CARE SYSTEM Lincoln 600 S 7 0 th Street | | {{#Wiki_filter:Omaha 4101 Woolworth Avenue DEPARTMENT OF VETERANS AFFAIRS Omaha NE 68105-1873 NEBRASKA-WESTERN IOWA HEALTH CARE SYSTEM Lincoln 600 S 7 0 th Street I-. ' Lincoln NE 68510-2493 Grand Island 2201 N Broadwell Avenue Grand Island NE 68803-2196 March 2, 2009 In Reply Refer To: 636/151 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: 2008 Annual Operating Report for the Alan J. Blotcky Reactor Facility, License R-57, Docket # 50-131 This annual operating report is being submitted in compliance with technical specification 6.7.1, "Annual Operating Report". |
| .
| |
| I-. ' Lincoln NE 68510-2493 Grand Island 2201 N Broadwell Avenue Grand Island NE 68803-2196 March 2, 2009 In Reply Refer To: 636/151 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: 2008 Annual Operating Report for the Alan J. Blotcky Reactor Facility, License R-57, Docket # 50-131 This annual operating report is being submitted in compliance with technical specification 6.7.1, "Annual Operating Report". | |
| Summary of Reactor Operating Experience during 2008. | | Summary of Reactor Operating Experience during 2008. |
| The reactor remained shutdown with no fuel onsite throughout 2008. The reactor was permanently shutdown on 11/5/2001. All fuel was transferred to the USGS TRIGA facility during June of 2002. The fission chambers used in the reactor's nuclear instrumentation system were transferred to USGS during December 2002. The reactor's Am-Be neutron sources were removed from the reactor facility and transferred to the Department of Energy's Off-Site Source Recovery Program on 7/24/2003 Unscheduled Shutdowns The reactor was maintained in a scheduled se'cured shutdown condition throughout 2008. | | The reactor remained shutdown with no fuel onsite throughout 2008. The reactor was permanently shutdown on 11/5/2001. All fuel was transferred to the USGS TRIGA facility during June of 2002. The fission chambers used in the reactor's nuclear instrumentation system were transferred to USGS during December 2002. The reactor's Am-Be neutron sources were removed from the reactor facility and transferred to the Department of Energy's Off-Site Source Recovery Program on 7/24/2003 Unscheduled Shutdowns The reactor was maintained in a scheduled se'cured shutdown condition throughout 2008. |
Latest revision as of 14:39, 12 March 2020
|
---|
Category:Annual Operating Report
MONTHYEARML15057A0562015-02-0202 February 2015 Alan J. Blotcky Reactor Facility - 2014 Annual Operating Report ML13077A3962013-02-27027 February 2013 2012 Annual Operating Report for the Alan J. Blotcky Reactor Facility ML12075A1752012-03-0101 March 2012 Submittal of Annual Operating Report in Compliance with Technical Specification 6.7.1 ML1108006222011-03-0101 March 2011 2010 Annual Operating Report for the Alan J. Blotcky Reactor Facility ML1008400442010-03-12012 March 2010 2009 Annual Operating Report for the Alan J. Blotcky Reactor Facility ML0908503582009-03-0202 March 2009 2008 Annual Operating Report for the Alan J. Blotcky Reactor Facility ML0707902212007-03-0505 March 2007 Annual Operating Report for the Alan J. Blotcky Reactor Facility for 2006 ML0609401452006-03-27027 March 2006 2005 Annual Operating Report for Alan J. Blotcky Reactor Facility ML0521301392005-07-22022 July 2005 Omaha Department of Veterans Affairs Reply to Notice of Violation ML0518004482005-06-0909 June 2005 2004 Annual Operating Report for the Alan J. Blotcky Reactor Facility ML0409601112004-03-23023 March 2004 Submittal of the 2003 Annual Operating Report for the Alan J. Blotcky Reactor Facility ML0309204432003-03-24024 March 2003 2002 Annual Operating Report for Alan J. Blotcky Reactor Facility 2015-02-02
[Table view] Category:Letter
MONTHYEARML16217A4592016-08-0101 August 2016 State of Ne, Dept. of Veteran Affairs, Submittal of Amendment No. 10 to Indemnity Agreement No. D-8 ML16173A0932016-07-22022 July 2016 Dept of Veterans Affairs, Nebraska-Western Iowa Health Care System - Cover Letter for Notice of License Termination for License R-57, Alan J. Blotcky Reactor Facility ML16068A2532016-02-29029 February 2016 Request for License Termination for the Alan J. Blotcky Reactor Facility IR 05000131/20150012015-11-12012 November 2015 IR 05000131/2015001, September 21-23, 2015, State of Ne, Dept of Veteran Affiars ML15299A3842015-10-15015 October 2015 Request for License Termination for the Alan J. Blotcky Reactor Facility, License R-57 ML14290A4862015-06-0303 June 2015 Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures ML15057A0562015-02-0202 February 2015 Alan J. Blotcky Reactor Facility - 2014 Annual Operating Report ML15012A2792015-01-13013 January 2015 Change in U.S NRC Staff Project Management for the U.S. Department of Veterans Affairs Alan J. Blotcky Reactor Facility ML14318A8062015-01-0808 January 2015 Letter to E. Kingston VA Dp Approval ML14335A5972014-11-12012 November 2014 Letter Providing Clarification to Section 7.3.3 of the Alan J. Blotcky Reactor Facility Decommissioning Plan (Final Revised) May 2014 ML14273A4802014-09-16016 September 2014 in Compliance of Technical Specification 6.7.2.2 Notification of Level 1 and Level 2 Personnel Changes for the Alan J. Blotcky Reactor Facility ML14150A4052014-05-21021 May 2014 Request for License Termination for the Alan J. Blotcky Reactor Facility, License R-57, Docket # 50-131 ML14121A3612014-04-14014 April 2014 Request for Revisions to the Alan J Blotcky Facility Emergency Plan ML14111A3002014-04-0707 April 2014 in Compliance of Technical Specification 6.7.2.2 Notification of Level 1 and Level 2 Personnel Changes for the Alan J. Blotcky Reactor Facility ML14069A4102014-02-27027 February 2014 Submittal of 2013 Annual Operating Report for the Alan J. Blotcky Reactor Facility ML14057A4782014-02-10010 February 2014 Request to Rescind Prior Requests. Two Requests Dated January 14, 2010 and One Dated August 5, 2010 ML13262A2862013-07-0202 July 2013 Notification of Level 1 and Level 2 Personnel Changes for the Alan J. Blotcky Reactor Facility, in Compliance of Technical Specification 6.7.2.2 ML13200A0182013-07-0202 July 2013 Notification of Personnel Changes Update ML13141A4622013-05-10010 May 2013 Request for License Termination for the Alan J. Blotcky Reactor Facility ML13077A3962013-02-27027 February 2013 2012 Annual Operating Report for the Alan J. Blotcky Reactor Facility ML12348A0592012-11-27027 November 2012 Dept. of Veteran Affairs Letter in Compliance of Technical Specification 6.7.2.2 Notification of Level 1 and Level 2 Personnel Changes for the Alan J. Blotcky Reactor Facility ML12124A3192012-06-12012 June 2012 M. Mylan Ltr. Issuance of Federal Register Notice Regarding Proposed Decommissioning Plan and License Amendment Request ML12075A2022012-03-0808 March 2012 Request for License Termination for the Alan J. Blotcky Reactor Facility ML12075A1752012-03-0101 March 2012 Submittal of Annual Operating Report in Compliance with Technical Specification 6.7.1 ML12011A1812011-12-23023 December 2011 in Compliance of Technical Specification 6.7.2.2 Notification of Level 1 and Level 2 Personnel Changes for the Alan J. Blotcky Reactor Facility ML11250A0562011-08-15015 August 2011 Request for Additional Information Regarding Alan J. Blotcky Reactor Facility Decommissioning Plan IR 05000131/20110012011-06-0606 June 2011 IR 05000131-11-001; 05/16-19/2011; Department of Veterans Affairs, Nebraska-Western Iowa Health Care System; Routine, Announced Inspection of Licensed Activities ML11104A0612011-04-0707 April 2011 Department of Veterans Affairs, Nebraska-Western Iowa Health Care System, Submittal of Work Plan for Pre-decommissioning Activities Scheduled to Start 04/25/2011 at the Omaha VA Hospital for Alan J. Blotcky Reactor Facility ML1109400412011-03-28028 March 2011 Notification of Level 1 Personnel Change Update ML1108006222011-03-0101 March 2011 2010 Annual Operating Report for the Alan J. Blotcky Reactor Facility ML1032102352010-11-0909 November 2010 Department of Veterans Affairs, Nebraska-Western Iowa Health Care System, Request for Additional Information Regarding Alan J. Blotcky Reactor Facility Decommissioning Plan ML1022501112010-08-0505 August 2010 Us Dept of Veterans Affairs, Nebraska-Western Iowa Health Care System, Request Change to Technical Specifications ML1012502252010-04-12012 April 2010 Department of Veterans Affairs, Nebraska-Western Iowa Health Care System, Reply to a Notice of Unresolved Item ML1008400442010-03-12012 March 2010 2009 Annual Operating Report for the Alan J. Blotcky Reactor Facility ML1006406642010-03-0101 March 2010 Us Dept. of Veterans Affairs, Nebraska-Western Iowa Health Care System, Reply to a Notice of Violation ML1003612222010-02-0505 February 2010 IR 05000131-09-001, on 12/01 - 12/09/09, for Department of Veterans Affairs, Nebraska-Western Iowa Health Care System and Notice of Violation IR 05000131/20090012010-02-0505 February 2010 IR 05000131-09-001, on 12/01 - 12/09/09, for Department of Veterans Affairs, Nebraska-Western Iowa Health Care System and Notice of Violation ML1002204642010-01-14014 January 2010 Request to Change Technical Specifications 6.2.1 (1) ML1002204652010-01-14014 January 2010 Request Exemption from Emergency Plan Requirements ML1002204622009-12-21021 December 2009 Letter Regarding Compliance of Technical Specification 6.7.2.2 Notification of Level 1 and Level 2 Personnel Changes for the Alan J. Blotcky Reactor Facility ML0908503582009-03-0202 March 2009 2008 Annual Operating Report for the Alan J. Blotcky Reactor Facility ML0810804522008-05-13013 May 2008 Ltr. to Al. Washko, Request for Additional Information Regarding Alan J. Blotcky Reactor Facility Decommissioning Plan ML0707902212007-03-0505 March 2007 Annual Operating Report for the Alan J. Blotcky Reactor Facility for 2006 ML0702200022007-01-26026 January 2007 National Organization of Test, Research and Training Reactors(Trtr) Input on Fingerprinting Requirements for Unescorted Access to Research and Test Reactors ML0629800772006-10-23023 October 2006 E-mail to Research and Test Reactor from M. Mendonca Draft Directors Decision on Uncontrolled/Unmonitored Releases ML0626904282006-09-28028 September 2006 Change in NRC Project Management for Veterans Affairs Medical Center Reactor Facilities ML0613805842006-05-0202 May 2006 Transmittal of Characterization Reports Appendices B, C, D, E and F ML0611400542006-04-0606 April 2006 Alan J. Blotcky Reactor Facility Omaha Veterans Administration Medical Center Characterization Survey Report, February 2003, Revision 0 ML0609401452006-03-27027 March 2006 2005 Annual Operating Report for Alan J. Blotcky Reactor Facility IR 05000131/20062012006-03-23023 March 2006 NRC IR 50-131/2006-201, on 2/21-22/2006 Veterans Administration Medical Center Triga Reactor Facility 2016-08-01
[Table view] |
Text
Omaha 4101 Woolworth Avenue DEPARTMENT OF VETERANS AFFAIRS Omaha NE 68105-1873 NEBRASKA-WESTERN IOWA HEALTH CARE SYSTEM Lincoln 600 S 7 0 th Street I-. ' Lincoln NE 68510-2493 Grand Island 2201 N Broadwell Avenue Grand Island NE 68803-2196 March 2, 2009 In Reply Refer To: 636/151 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: 2008 Annual Operating Report for the Alan J. Blotcky Reactor Facility, License R-57, Docket # 50-131 This annual operating report is being submitted in compliance with technical specification 6.7.1, "Annual Operating Report".
Summary of Reactor Operating Experience during 2008.
The reactor remained shutdown with no fuel onsite throughout 2008. The reactor was permanently shutdown on 11/5/2001. All fuel was transferred to the USGS TRIGA facility during June of 2002. The fission chambers used in the reactor's nuclear instrumentation system were transferred to USGS during December 2002. The reactor's Am-Be neutron sources were removed from the reactor facility and transferred to the Department of Energy's Off-Site Source Recovery Program on 7/24/2003 Unscheduled Shutdowns The reactor was maintained in a scheduled se'cured shutdown condition throughout 2008.
Maior preventative and corrective maintenance No major safety related maintenance was performed during 2008.
Changes, Tests and Experiments There were no changes, tests or experiments conducted during 2008.
Radioactive Effluents No radioactive effluents were associated with the AJBRF were released or discharged beyond the effective control of the Medical Center during 2008.
,Environmental Surveys No additional environmental surveys wereconducted during 2008. ,
ýjKtb()f
Radiation Exposures There were no radiation exposures received by AJBRF personnel or visitors exceeding 25% of allowable limits during 2008.
75rector AkL-WASH DEBRA ROMBERGER Associate Chief of Staff/Research ASBRF On Site Manager Cc: TED SMITH