NL-09-1803, Response to NRC Generic Letter 2008-01, Response to Requests for Additional Information: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 88: Line 88:
Attachments 1, 2 and 6
Attachments 1, 2 and 6
                                                         -----            --------                            -,-----                                                                c------    ----------------
                                                         -----            --------                            -,-----                                                                c------    ----------------
Max Pipe                                                                                                                                        Allowable Monitor                Westinghouse One Line                                                  00    Pipe 10                        Floor                Access                        Monitoring            Monitoring                  Void Size Point #  System  P&IO  One Line DWQ Location  Room        Description  Vent Valves          [in]      [in]      Isometric          EI    Line EI    Needs  Insulated                    Method          Frequency                    [Cu. Ft.]  Questions/Comments F067 SOC                                                                                                                                        SYSTEM 1        1E11  H16329  10036099        1  DRYWELL          SUCTION          TBD          20.00  19.000          S01286        TBD      156'-6"    TBD          Y                      VENT              DRAIN                      TBD FPCHX                                                                                                                                                            SYSTEM                                SPECTACLE FLANGE JUST 2        1E11  H16329  10036099        2    ROOM      FPC SUCTION          TBD          8.625    7.981          S00236        158'      186'      NONE          N
Max Pipe                                                                                                                                        Allowable Monitor                Westinghouse One Line                                                  00    Pipe 10                        Floor                Access                        Monitoring            Monitoring                  Void Size Point #  System  P&IO  One Line DWQ Location  Room        Description  Vent Valves          [in]      [in]      Isometric          EI    Line EI    Needs  Insulated                    Method          Frequency                    [Cu. Ft.]  Questions/Comments F067 SOC                                                                                                                                        SYSTEM 1        1E11  H16329  10036099        1  DRYWELL          SUCTION          TBD          20.00  19.000          S01286        TBD      156'-6"    TBD          Y                      VENT              DRAIN                      TBD FPCHX                                                                                                                                                            SYSTEM                                SPECTACLE FLANGE JUST 2        1E11  H16329  10036099        2    ROOM      FPC SUCTION          TBD          8.625    7.981          S00236        158'      186'      NONE          N UT            DRAIN                      TBD      ABOVE FLOOR PUMP SIDE                                                                                                                                          SYSTEM 3        1E11  H16329  10036099        3    NE DIAG            F006D        TBD          20.00  19.000          S01211        95'      106'      TBD          Y                          UT            DRAIN                      TBD PUMP SIDE                                                                                                                                          SYSTEM 4        1E11  H16329  10036099        4    NE DIAG            F006B        TBD          20.00  19.000          S01259        95'      106'      TBD          Y  --------
                                                                                                                                                                      -----
UT            DRAIN TBD F083 FLUSH                                                                                                                                          SYSTEM 5        1E11  H16329  10036099        5      TBD        SUPPLY SOC          TBD          1.050    0.742          SOO060        130'    136'-11"    TBD          Y                      VENT              DRAIN                      TBD    -------
UT            DRAIN                      TBD      ABOVE FLOOR PUMP SIDE                                                                                                                                          SYSTEM 3        1E11  H16329  10036099        3    NE DIAG            F006D        TBD          20.00  19.000          S01211        95'      106'      TBD          Y                          UT            DRAIN                      TBD PUMP SIDE                                                                                                                                          SYSTEM 4        1E11  H16329  10036099        4    NE DIAG            F006B        TBD          20.00  19.000          S01259        95'      106'      TBD          Y  --------
COMMON SOC                                                                                                                                            SYSTEM 6        1E11  H16329  10036099        6    TORUS            SUCTION          TBD          20.00  19.000 123'-4"    TBD  -----
UT            DRAIN
                                                                                                                                                                                                              --------
TBD F083 FLUSH                                                                                                                                          SYSTEM 5        1E11  H16329  10036099        5      TBD        SUPPLY SOC          TBD          1.050    0.742          SOO060        130'    136'-11"    TBD          Y                      VENT              DRAIN                      TBD    -------
COMMON SOC                                                                                                                                            SYSTEM 6        1E11  H16329  10036099        6    TORUS            SUCTION          TBD          20.00  19.000
                                                                                                      -------
123'-4"    TBD  -----
Y                          UT            DRAIN                      TBD F008TO F009                                                                                                                                          SYSTEM                                F008 IN DRYWELL ACCESS; 7        1E11  H16329  10036099        7  DRYWELL    -----
Y                          UT            DRAIN                      TBD F008TO F009                                                                                                                                          SYSTEM                                F008 IN DRYWELL ACCESS; 7        1E11  H16329  10036099        7  DRYWELL    -----
SOC      NONE          20.00  19.000          SOO033        130'      135'      NONE          Y                      VENT              DRAIN                      TBD      F009 IN DRYWELL F016ACONT                                                                                                                                                                    ATTACH      OUTSIDE MG SET ROOMS 1E11  H16330  10036003        1  RX BLDG        SPRAY O/B            Y          16.00  15.250          SOO037        158'      160'      NONE          Y                      VENT              MONTH                        6(3)    ON FLOOR 8
SOC      NONE          20.00  19.000          SOO033        130'      135'      NONE          Y                      VENT              DRAIN                      TBD      F009 IN DRYWELL F016ACONT                                                                                                                                                                    ATTACH      OUTSIDE MG SET ROOMS 1E11  H16330  10036003        1  RX BLDG        SPRAY O/B            Y          16.00  15.250          SOO037        158'      160'      NONE          Y                      VENT              MONTH                        6(3)    ON FLOOR 8
om          F010 FLUSH                                                                                                                                          SYSTEM                    ATTACH 6(3)
om          F010 FLUSH                                                                                                                                          SYSTEM                    ATTACH 6(3)
EAST WALL INTO OW 9      1E11  H16330  10036003        2    ACCESS            SUPPLY
EAST WALL INTO OW 9      1E11  H16330  10036003        2    ACCESS            SUPPLY Y          4.500    4.026          SOO052        130'      137'      SCAFF          Y                          UT            DRAIN                              ACCESS om          F010 FLUSH                                                                                                                                          SYSTEM                    ATTACH 6(3)
                                                                -----
Y          4.500    4.026          SOO052        130'      137'      SCAFF          Y                          UT            DRAIN                              ACCESS om          F010 FLUSH                                                                                                                                          SYSTEM                    ATTACH 6(3)
EAST WALL INTO OW 10      1E11  H16330  10036003        3    ACCESS            SUPPLY          Y          4.500    4.026          SOO052        130'      137'      SCAFF          Y                          UT            DRAIN                              ACCESS QUARTERI om                                                                                                                                          FLUSHI            SYSTEM                    ATTACH 6(3) 11        1E11 H16330  10036003        4    ACCESS                            TBD          20.00  19.000          S01184        130'      138'-9"    TBD          Y                          UT            DRAIN                              TOP OF DRYWELL ACCESS PUMP SIDE                                                                                                                                          SYSTEM 12        1E11 H16330  10036003        5    SE DIAG              F006A        TBD          20.00  19.000          SOO034        95'        97'      TBD          Y                          UT            DRAIN                      TBD      F006A ON GRATING 95' RHR AHX                                                                                                                                          SYSTEM STEAMCOND                                                                                                                            UTI              DRAINI                  ATTACH 10036003        6    SE DIAG          (CAPPED)          TBD        20.00  19.000          SOO036        118'    122'-6"    NONE          Y                  FLUSH(1)          QUARTER                        6(3)    BACK CORNER 118' i
EAST WALL INTO OW 10      1E11  H16330  10036003        3    ACCESS            SUPPLY          Y          4.500    4.026          SOO052        130'      137'      SCAFF          Y                          UT            DRAIN                              ACCESS QUARTERI om                                                                                                                                          FLUSHI            SYSTEM                    ATTACH 6(3) 11        1E11 H16330  10036003        4    ACCESS                            TBD          20.00  19.000          S01184        130'      138'-9"    TBD          Y                          UT            DRAIN                              TOP OF DRYWELL ACCESS PUMP SIDE                                                                                                                                          SYSTEM 12        1E11 H16330  10036003        5    SE DIAG              F006A        TBD          20.00  19.000          SOO034        95'        97'      TBD          Y                          UT            DRAIN                      TBD      F006A ON GRATING 95' RHR AHX                                                                                                                                          SYSTEM STEAMCOND                                                                                                                            UTI              DRAINI                  ATTACH 10036003        6    SE DIAG          (CAPPED)          TBD        20.00  19.000          SOO036        118'    122'-6"    NONE          Y                  FLUSH(1)          QUARTER                        6(3)    BACK CORNER 118' i
13        1E11 H16330 ATTACH      INVERTED "U" AT 1E11          10036003        7    SE DIAG        UIS F048A          Y          20.00  19.000          SOO036        107'    116'-1 "  SCAFF          Y                    FLUSH            QUARTER                        6(3)  CONFLUENCE OF "A" & "C" 14            H16330 PUMP SIDE                                                                                                                                          SYSTEM 15        1E11 H16330  10036003        8    SE DIAG            F006C      NONE          24.00  22.876          SOO034        107'      113'      NONE          Y                          UT            DRAIN                      TBD    BEHIND 1T41-B002A F034ATO 16        1E11 H16330  10036003        9    SE DIAG            D005A        TBD          20.00  19.000          SOO036        95'      104'-1"    SCAFF          Y                    FLUSH
13        1E11 H16330 ATTACH      INVERTED "U" AT 1E11          10036003        7    SE DIAG        UIS F048A          Y          20.00  19.000          SOO036        107'    116'-1 "  SCAFF          Y                    FLUSH            QUARTER                        6(3)  CONFLUENCE OF "A" & "C" 14            H16330 PUMP SIDE                                                                                                                                          SYSTEM 15        1E11 H16330  10036003        8    SE DIAG            F006C      NONE          24.00  22.876          SOO034        107'      113'      NONE          Y                          UT            DRAIN                      TBD    BEHIND 1T41-B002A F034ATO 16        1E11 H16330  10036003        9    SE DIAG            D005A        TBD          20.00  19.000          SOO036        95'      104'-1"    SCAFF          Y                    FLUSH QUARTER                        TBD    ABOVE MOTORS ON 95' CAP ON COND      Y - GOES                                                                                                                                                      ATTACH      ISO SHOWS VENT AT 193',
                                                                                                                                                                                            -------  ---
QUARTER                        TBD    ABOVE MOTORS ON 95' CAP ON COND      Y - GOES                                                                                                                                                      ATTACH      ISO SHOWS VENT AT 193',
10037019        1  RX BLDG            MAKEUP    TOINSTR            4.500    4.026          SOO054        185'      193'      NONE          N                      VENT              MONTH                        6(3)  TOP 2" CAN'T BE VENTED 17        1E11 H16329                                                                                                                                                                                      ----    ------- ...:~-;;----
10037019        1  RX BLDG            MAKEUP    TOINSTR            4.500    4.026          SOO054        185'      193'      NONE          N                      VENT              MONTH                        6(3)  TOP 2" CAN'T BE VENTED 17        1E11 H16329                                                                                                                                                                                      ----    ------- ...:~-;;----
FPCHX                                                                                                                                                            SYSTEM                    ATTACH    BELOW SPECTACLE 1E11 H16329  10037019        2    ROOM              TO FPC          N          8.625    7.981          SOO054        185'      185'      NONE          N                          UT            DRAIN                      6(3)  FLANGE 18 F016B TO    Y-HARD                                                              146'-                                                            SYSTEM                    ATTACH 1E11          10037019        3  RX BLDG              F021B      PIPED          16.00  15.250          S01169        130'      8.5"      SCAFF        Y                          UT            DRAIN                      6(3) 19            H16329                                                              -------
FPCHX                                                                                                                                                            SYSTEM                    ATTACH    BELOW SPECTACLE 1E11 H16329  10037019        2    ROOM              TO FPC          N          8.625    7.981          SOO054        185'      185'      NONE          N                          UT            DRAIN                      6(3)  FLANGE 18 F016B TO    Y-HARD                                                              146'-                                                            SYSTEM                    ATTACH 1E11          10037019        3  RX BLDG              F021B      PIPED          16.00  15.250          S01169        130'      8.5"      SCAFF        Y                          UT            DRAIN                      6(3) 19            H16329                                                              -------
Line 113: Line 103:


Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""
Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""
Attachments 1, 2 and 6
Attachments 1, 2 and 6 Max Pipe                                                                                              Allowable Monitor                Westinghouse One Line                                          00    Pipe 10            Floor          Access            Monitoring        Monitoring          Void Size Point # System  P&ID  One Line Dwg Location  Room        Description  Vent Valves  [in]    [in]  Isometric  EI  LineEI  Needs  Insulated  Method          Frequency            (Cu. Ft.)          Questions/Comments F007B TO                                                                                                                  ATTACH              MAY BE ABLE TO STAND 22  1E11  H16329  10037D19      6    NE DIAG              C002B      N      3.500  3.068    SOO049    87'      93  SCAFF      Y      FLUSH            QUARTER                6(3)            ON PUMP DISCHARGE PIPE SYSTEM CAPONTOPB          N (R.V.                                                                  UTI              DRAIN/          ATTACH              CAP ON INSIDE TORUS 23  1E11  H16329  10037D19      7    NE DIAG                  HX  F055B)    14.00  13.250    SOO038    118'    122  NONE        Y      FLUSH(1)          QUARTER                6(3)            ROOM WALL AT D005B                                                                                                                  ATTACH 24  1E11  H16329  10037D19      8    NE DIAG          ORIFICE    NONE      20.00  19.000    SOO038    96'    104  SCAFF      Y      FLUSH            QUARTER                6(3)            ABOVE PUMP MOTORS C002B/D                                                                                                SYSTEM            ATTACH              AT CONFLUENCE OF C002B 25  1E11  H16329  10037D19      9    NE DIAG      DISCHARGE    1E11 F3028  20.00  19.000    SOO038  107'    116  SCAFF      Y        UT                DRAIN                6(3)            ANDD CST SUCTION                                                    92'-7                                        SYSTEM                                PIPE STUB CAPPED; OPEN 26  1E21  H16331  10036D97      1    SE DIAG              F002A    NONE      14.00  13.625    SOO073    87'    1/2"  SCAFF      N        UT                DRAIN              0.13              F002TOVENT CST SUCTION                                                    92'-7                                        SYSTEM 27  1E21  H16331  10036D97      2    NE DIAG              F002B    NONE      14.00  13.625      TBD    87'    1/2"  SCAFF      N        UT                DRAIN              0.18            1E21F002B MGSET        CST SUPPLY                                                                                                                    ATTACH 28  1E21  H16331  10036D98      1      RM1A                F030A      TBD    2.375    1.939    S01315    158' 173'-10"  TBD        N      FLUSH              CYCLE                6(3)
                                                          -------------                                                                                                    -------------
Max Pipe                                                                                              Allowable Monitor                Westinghouse One Line                                          00    Pipe 10            Floor          Access            Monitoring        Monitoring          Void Size Point # System  P&ID  One Line Dwg Location  Room        Description  Vent Valves  [in]    [in]  Isometric  EI  LineEI  Needs  Insulated  Method          Frequency            (Cu. Ft.)          Questions/Comments F007B TO                                                                                                                  ATTACH              MAY BE ABLE TO STAND 22  1E11  H16329  10037D19      6    NE DIAG              C002B      N      3.500  3.068    SOO049    87'      93  SCAFF      Y      FLUSH            QUARTER                6(3)            ON PUMP DISCHARGE PIPE SYSTEM CAPONTOPB          N (R.V.                                                                  UTI              DRAIN/          ATTACH              CAP ON INSIDE TORUS 23  1E11  H16329  10037D19      7    NE DIAG                  HX  F055B)    14.00  13.250    SOO038    118'    122  NONE        Y      FLUSH(1)          QUARTER                6(3)            ROOM WALL AT D005B                                                                                                                  ATTACH 24  1E11  H16329  10037D19      8    NE DIAG          ORIFICE    NONE      20.00  19.000    SOO038    96'    104  SCAFF      Y      FLUSH            QUARTER                6(3)            ABOVE PUMP MOTORS C002B/D                                                                                                SYSTEM            ATTACH              AT CONFLUENCE OF C002B 25  1E11  H16329  10037D19      9    NE DIAG      DISCHARGE    1E11 F3028  20.00  19.000    SOO038  107'    116  SCAFF      Y        UT                DRAIN                6(3)            ANDD
                                                                                                        ---------
CST SUCTION                                                    92'-7                                        SYSTEM                                PIPE STUB CAPPED; OPEN 26  1E21  H16331  10036D97      1    SE DIAG              F002A    NONE      14.00  13.625    SOO073    87'    1/2"  SCAFF      N        UT                DRAIN              0.13              F002TOVENT CST SUCTION                                                    92'-7                                        SYSTEM 27  1E21  H16331  10036D97      2    NE DIAG              F002B    NONE      14.00  13.625      TBD    87'    1/2"  SCAFF      N        UT                DRAIN              0.18            1E21F002B MGSET        CST SUPPLY                                                                                                                    ATTACH 28  1E21  H16331  10036D98      1      RM1A                F030A      TBD    2.375    1.939    S01315    158' 173'-10"  TBD        N      FLUSH              CYCLE                6(3)
                                                                                                                                                             ~~~~~~- ~~~~
                                                                                                                                                             ~~~~~~- ~~~~
CONDENSATE TRANSFER                                                                                                                    ATTACH 29  1E21  H16331  10036D98      2    RX BLDG    SUPPLY F030B        TBD    2.375    1.939    S01312    158'  174'-3"  TBD        N      FLUSH              CYCLE                6(3)            BEHIND P005 PANEL CS A INJ LINE                                                                                                                ATTACH              OUTSIDE MG SET 30  1E21  H16331  10036D98      3    RX BLDG    D003A - F005A      TBD    10.75  10.020    SOO075    158'  172'-9"  TBD        N        VENT              MONTH                6(3)            PLATFORM CS B INJ LINE D003B TO                                                                                                                  ATTACH 31  1E21  H16331  10036D98      4    RX BLDG              F005B  1E21F013B  10.75  10.020      TBD    158'  172'-9"  TBD        N        VENT              MONTH                6(3)            RWCU HX PLATFORM
CONDENSATE TRANSFER                                                                                                                    ATTACH 29  1E21  H16331  10036D98      2    RX BLDG    SUPPLY F030B        TBD    2.375    1.939    S01312    158'  174'-3"  TBD        N      FLUSH              CYCLE                6(3)            BEHIND P005 PANEL CS A INJ LINE                                                                                                                ATTACH              OUTSIDE MG SET 30  1E21  H16331  10036D98      3    RX BLDG    D003A - F005A      TBD    10.75  10.020    SOO075    158'  172'-9"  TBD        N        VENT              MONTH                6(3)            PLATFORM CS B INJ LINE D003B TO                                                                                                                  ATTACH 31  1E21  H16331  10036D98      4    RX BLDG              F005B  1E21F013B  10.75  10.020      TBD    158'  172'-9"  TBD        N        VENT              MONTH                6(3)            RWCU HX PLATFORM
Line 128: Line 114:


Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""
Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""
Attachments 1, 2 and 6
Attachments 1, 2 and 6 UTOR  SYSTEM              IN TORUS SOUTHI 40        1E51        H16334            10037001    3i )
                -------                                      ----------                                                                                                              --------------  -----------
UTOR  SYSTEM              IN TORUS SOUTHI 40        1E51        H16334            10037001    3i )
4 RCIC    CST SUCTION    NONE        6"        6.065"      H16108 87'  108' -7" SCAFF      Y  FLUSH  DRAIN  0.29        SOUTHWEST SYSTEM ATTACH        MAY BE REACHED FROM 1E41        H16332            10037000    21(4)        HPCI    DISCHARGE    1E41F3004    14"      12.500"    H16869 87'  95'-10"  SCAFF      N  FLUSH  DRAIN    6(3)      NEARBY STAIRS 41 SYSTEM ATTACH 42        1E11B        H16329            10037019    43(4)        RHRB    DISCHARGE      NONE        16"      15.250"    H16837 117' 119'-6"  NONE        Y  FLUSH  DRAIN    6(3)      NORTHEAST DIAGONAL
4 RCIC    CST SUCTION    NONE        6"        6.065"      H16108 87'  108' -7" SCAFF      Y  FLUSH  DRAIN  0.29        SOUTHWEST SYSTEM ATTACH        MAY BE REACHED FROM 1E41        H16332            10037000    21(4)        HPCI    DISCHARGE    1E41F3004    14"      12.500"    H16869 87'  95'-10"  SCAFF      N  FLUSH  DRAIN    6(3)      NEARBY STAIRS 41 SYSTEM ATTACH 42        1E11B        H16329            10037019    43(4)        RHRB    DISCHARGE      NONE        16"      15.250"    H16837 117' 119'-6"  NONE        Y  FLUSH  DRAIN    6(3)      NORTHEAST DIAGONAL
                                       '-------------                                                          -------  --------------                                                                                i
                                       '-------------                                                          -------  --------------                                                                                i piping IS pertormed dUring lUll pump (2)Une is partially vented during each monthly TS surveillance.
                                ----
                                                      - -    --
piping IS pertormed dUring lUll pump (2)Une is partially vented during each monthly TS surveillance.
(3)See maximum allowable void volume table in Attachment 6.
(3)See maximum allowable void volume table in Attachment 6.
(4)This location is detailed in Attachment 4 of Westinghouse Report LTR-SEE-III-08-140, rev. 1
(4)This location is detailed in Attachment 4 of Westinghouse Report LTR-SEE-III-08-140, rev. 1


Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""
Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""
Attachments 1, 2 and 6
Attachments 1, 2 and 6 Max Pipe                                                                                                                  Allowable Monitor                  Westinghouse  One Line                                                OD    Pipe ID            Floor    Line          Access                              Monitoring                    Void Size Point # System  P&ID    One Line Dwg  Location  Room        Description Vent Valves          [il1]    [In]  Isometric    EI      EI            Needs            Insulated          Method            Frequency  (Cu. Ft.)                    Questions/Comments DISCHARGE                                                                                                                                      SYSTEM  ATTACH FV022                  19.000    S31755    107'    114'-8"        SCAFF.                  Y              UT                DRAIN      6(3)              CONFLUENCE OF C002NC 1      2E11A  H26015        10037D04    1      NE DIAG          C002A                      20.00                                                                                                                          -------  '---------- -------
        -----          ------                  ----                                  -------                        ----                  --,---                                                        -----                        ,---------    ---
Max Pipe                                                                                                                  Allowable Monitor                  Westinghouse  One Line                                                OD    Pipe ID            Floor    Line          Access                              Monitoring                    Void Size Point # System  P&ID    One Line Dwg  Location  Room        Description Vent Valves          [il1]    [In]  Isometric    EI      EI            Needs            Insulated          Method            Frequency  (Cu. Ft.)                    Questions/Comments DISCHARGE                                                                                                                                      SYSTEM  ATTACH FV022                  19.000    S31755    107'    114'-8"        SCAFF.                  Y              UT                DRAIN      6(3)              CONFLUENCE OF C002NC 1      2E11A  H26015        10037D04    1      NE DIAG          C002A                      20.00                                                                                                                          -------  '---------- -------
RHR A STEAM COND LINE                                                                                                                                      SYSTEM (CAPPED) AT                                                                                                                    UTI                DRAINI  ATTACH                CAP ON TORUS ROOM 118'    123'-8"          NONE                  Y            FLUSH(1)          QUARTER      6(3)              WALL 2      2E11A H26015        10037D04    2      NE DIAG        B001A HX      NONE          16.00  15.250    S28396 NORTH END DW ACCESS, DW                                                                                                                                                      SYSTEM  ATTACH                LLRT CONNECTION BELOW F017A          TBD        24.00  22.876    S31899    130'    134'-6"          NONE                  Y              UT                DRAIN      6(3)              F017 3      2E11A H26015        10037D04    3      ACCESS                                                                      -----
RHR A STEAM COND LINE                                                                                                                                      SYSTEM (CAPPED) AT                                                                                                                    UTI                DRAINI  ATTACH                CAP ON TORUS ROOM 118'    123'-8"          NONE                  Y            FLUSH(1)          QUARTER      6(3)              WALL 2      2E11A H26015        10037D04    2      NE DIAG        B001A HX      NONE          16.00  15.250    S28396 NORTH END DW ACCESS, DW                                                                                                                                                      SYSTEM  ATTACH                LLRT CONNECTION BELOW F017A          TBD        24.00  22.876    S31899    130'    134'-6"          NONE                  Y              UT                DRAIN      6(3)              F017 3      2E11A H26015        10037D04    3      ACCESS                                                                      -----
SOUTH END DW ACCESS, DW                                                                                                                                                      SYSTEM  ATTACH                LLRT CONNECTION BELOW 2E11F058B          24.00  22.876    S28472    130'    134'-6"          NONE                  Y              UT                DRAIN      6(3)              F017 4      2E11B H26014        10037D04    4      ACCESS            F017B                                                                                                                      ----
SOUTH END DW ACCESS, DW                                                                                                                                                      SYSTEM  ATTACH                LLRT CONNECTION BELOW 2E11F058B          24.00  22.876    S28472    130'    134'-6"          NONE                  Y              UT                DRAIN      6(3)              F017 4      2E11B H26014        10037D04    4      ACCESS            F017B                                                                                                                      ----
Line 149: Line 128:
_IB[)_                                                      -------- 1-----
_IB[)_                                                      -------- 1-----
VERTICAL PIPING UNDER                                                                                                                                      SYSTEM  ATTACH                RWCU HX ROOM INSIDE 16.00    15.250  S31425    158'    169'          SCAFF.                  N              UT                DRAIN      6(3)              DOOR 7B      2E11B H26014        10037D04    7    RWCU HX            F016B        F036B F023 HEAD                                                                                                                                              ATTACH                EAST SIDE BY HI POINT HARD PIPE          4.500    4.026    S31419    185'    193'          SCAFF.                  Y              VENT                MONTH      6(3)              VENTS 8      2E11B H26014        10037D04    8    RX BLDG            SPRAY F067 RECIRC                                                                                                                                      SYSTEM                        JUST OFF 147' GRATING IN 9      2E11 H26015        10037D04    1          DW    SUCTION SDC            TBD        20.00    19.000  S28478    147'    154'-6"        SCAFF.                  Y              UT                DRAIN  --
VERTICAL PIPING UNDER                                                                                                                                      SYSTEM  ATTACH                RWCU HX ROOM INSIDE 16.00    15.250  S31425    158'    169'          SCAFF.                  N              UT                DRAIN      6(3)              DOOR 7B      2E11B H26014        10037D04    7    RWCU HX            F016B        F036B F023 HEAD                                                                                                                                              ATTACH                EAST SIDE BY HI POINT HARD PIPE          4.500    4.026    S31419    185'    193'          SCAFF.                  Y              VENT                MONTH      6(3)              VENTS 8      2E11B H26014        10037D04    8    RX BLDG            SPRAY F067 RECIRC                                                                                                                                      SYSTEM                        JUST OFF 147' GRATING IN 9      2E11 H26015        10037D04    1          DW    SUCTION SDC            TBD        20.00    19.000  S28478    147'    154'-6"        SCAFF.                  Y              UT                DRAIN  --
TBD                DW SYSTEM                        EVEN WITH GRATING ON 10      2E11B H26014        10037D04    2      SE DIAG    BELOW F006D          NONE          20.00    19.000  S28406    107'    107'          SCAFF.                  Y              UT                DRAIN    TBD                107' SYSTEM                          ON 97' GRATING (MAY NEED 11      2E11B H26014        10037D04    3      SE DIAG    BELOWEQ()6~          NONE
TBD                DW SYSTEM                        EVEN WITH GRATING ON 10      2E11B H26014        10037D04    2      SE DIAG    BELOW F006D          NONE          20.00    19.000  S28406    107'    107'          SCAFF.                  Y              UT                DRAIN    TBD                107' SYSTEM                          ON 97' GRATING (MAY NEED 11      2E11B H26014        10037D04    3      SE DIAG    BELOWEQ()6~          NONE 20.00    19.000  S28412    107'    110'            NONE
                                                                          -------
20.00    19.000  S28412    107'    110'            NONE
_____ - _c_:-=--  ---
_____ - _c_:-=--  ---
Y              UT                DRAIN    TBD                TQ COME FROM BELOW)
Y              UT                DRAIN    TBD                TQ COME FROM BELOW)
SYSTEM 12      2E11A H26015        10037D04    4      NE DIAG    BELOW F006A          NONE          20.00    19.000  S28398    107'    112'            NONE                  Y              UT                DRAIN    TBD SYSTEM                          BACK CORNER NEED 13      2E11A H26015        10037D04    5      NE DIAG    BELOW F006C          NONE          20.00    19.000  $£839L    107'    107'          SCAFF.                  Y              UT                DRAIN    TBD                SCAFF FROM 97' SYSTEM 14      2E11 H26015        10037D04    6          DW      F008 TO F009
SYSTEM 12      2E11A H26015        10037D04    4      NE DIAG    BELOW F006A          NONE          20.00    19.000  S28398    107'    112'            NONE                  Y              UT                DRAIN    TBD SYSTEM                          BACK CORNER NEED 13      2E11A H26015        10037D04    5      NE DIAG    BELOW F006C          NONE          20.00    19.000  $£839L    107'    107'          SCAFF.                  Y              UT                DRAIN    TBD                SCAFF FROM 97' SYSTEM 14      2E11 H26015        10037D04    6          DW      F008 TO F009 NONE          20.00    19.000  S28478    127'    135'          SCAFF.                  Y              UT
                                                          -----
NONE          20.00    19.000  S28478    127'    135'          SCAFF.                  Y              UT
                                                                                                                                                                                             ------------ 1---
                                                                                                                                                                                             ------------ 1---
DRAIN    TBD SYSTEM 15      2E21A H26018        10037D07    1      NE DIAG        E21F002A        NONE          14.00    13.250  S27015    97'      100'            NONE                  N              UT                DRAIN    TBD SYSTEM 16      2E21B H26018        10037D07    2      SE DIAG          F002B        NONE          14.00    13.250  S26991    97'      100            NONE                  N              UT                DRAIN    TBD CS2A                                                                                                                                      SYSTEM INJECTION                                                                                                                  UTI                DRAINI  ATTACH VENT(2)                        6(3) 17      2E21A H26018        10037D07    3      RX BLDG            LINE        NONE          10.7    10.020    TBD      158'    171 '-3"        NONE                  N
DRAIN    TBD SYSTEM 15      2E21A H26018        10037D07    1      NE DIAG        E21F002A        NONE          14.00    13.250  S27015    97'      100'            NONE                  N              UT                DRAIN    TBD SYSTEM 16      2E21B H26018        10037D07    2      SE DIAG          F002B        NONE          14.00    13.250  S26991    97'      100            NONE                  N              UT                DRAIN    TBD CS2A                                                                                                                                      SYSTEM INJECTION                                                                                                                  UTI                DRAINI  ATTACH VENT(2)                        6(3) 17      2E21A H26018        10037D07    3      RX BLDG            LINE        NONE          10.7    10.020    TBD      158'    171 '-3"        NONE                  N
Line 170: Line 145:
COMMON 21      2E41      H26020      10037D05          1      HPCI        SUCTION          NONE        14    13.25    H26839        87'    92'-6"      NONE          N      FLUSH(1)  QUARTER      TBD                                I VENTI    MONTHI    ATTACH 22      2E41      H26020      10037D05          2      TORUS      DISCHARGE        NONE        14      12.5    H26840        114'  109'-6"      NONE          Y      FLUSH    QUARTER        6(3)        OUTER CATWALK BAY 2 SYSTEM                    S.E.DIAGONAL AGAINST 23      2E51      H26023      10037D06          1    TORUS      RHR SUCTION        FV101        4    4.026    H26844        87'  107'-9"        YES          Y        UT      DRAIN      TBD          TORUS WALL DISCHARGE I                                                                                                                  ATTACH 24      2E51      H26023      10037D06          2    TORUS          FEED          NONE        4    3.826    H26845        114'  123'-0"        YES          Y      FLUSH(1)  QUARTER        6(3)          INNER TORUS BAY 9 CONDENSATE 25      2E51      H26024      10037D06          3    RCIC DIAG  PUMP RETURN        NONE        2    1.939    S31014        87'    90'-4"      NONE          Y      FLUSH    QUARTER      0.02 TORUS                                                                                                          SYSTEM 26      2E51      H26023      10037D06          4    RCICDIAG      SUCTION          NONE        6    6.065    H26844        87'  89'-5"        NONE          Y        UT      DRAIN      0.03 SYSTEM    ATTACH          UPSTREAM OF FLOW 27    2E11A      H26015      10037D04        42(4)  NE DIAG    DISCHARGE        NONE        24    22.876"  H26820        117'  121'-5"      NONE          Y      FLUSH      DRAIN        6(3)        ORIFICE 2E11 N014A SDC SUCTION                                                                                              UTOR      SYSTEM 28    2E11A      H26015      10037D04        50(4)  NE DIAG      TO C002C        NONE        20    19.000"  H26819        115'  115'-1"    LADDER          Y      FLUSH      DRAIN      0.58 UTOR      SYSTEM 29      2E51      H26023      10037D06      24A1B(4)  TORUS      CST SUCTION        NONE        6    6.065"    H26844        87'  108'-7"      SCAFF          Y      FLUSH      DRAIN      0.09 UTOR      SYSTEM    ATTACH 30      2E51      H26023      10037D06        34(4)  RCIC DIAG    DISCHARGE        NONE        4    5.761"    H26845        87'  104'-1"      SCAFF          Y      FLUSH      DRAIN        6(3)
COMMON 21      2E41      H26020      10037D05          1      HPCI        SUCTION          NONE        14    13.25    H26839        87'    92'-6"      NONE          N      FLUSH(1)  QUARTER      TBD                                I VENTI    MONTHI    ATTACH 22      2E41      H26020      10037D05          2      TORUS      DISCHARGE        NONE        14      12.5    H26840        114'  109'-6"      NONE          Y      FLUSH    QUARTER        6(3)        OUTER CATWALK BAY 2 SYSTEM                    S.E.DIAGONAL AGAINST 23      2E51      H26023      10037D06          1    TORUS      RHR SUCTION        FV101        4    4.026    H26844        87'  107'-9"        YES          Y        UT      DRAIN      TBD          TORUS WALL DISCHARGE I                                                                                                                  ATTACH 24      2E51      H26023      10037D06          2    TORUS          FEED          NONE        4    3.826    H26845        114'  123'-0"        YES          Y      FLUSH(1)  QUARTER        6(3)          INNER TORUS BAY 9 CONDENSATE 25      2E51      H26024      10037D06          3    RCIC DIAG  PUMP RETURN        NONE        2    1.939    S31014        87'    90'-4"      NONE          Y      FLUSH    QUARTER      0.02 TORUS                                                                                                          SYSTEM 26      2E51      H26023      10037D06          4    RCICDIAG      SUCTION          NONE        6    6.065    H26844        87'  89'-5"        NONE          Y        UT      DRAIN      0.03 SYSTEM    ATTACH          UPSTREAM OF FLOW 27    2E11A      H26015      10037D04        42(4)  NE DIAG    DISCHARGE        NONE        24    22.876"  H26820        117'  121'-5"      NONE          Y      FLUSH      DRAIN        6(3)        ORIFICE 2E11 N014A SDC SUCTION                                                                                              UTOR      SYSTEM 28    2E11A      H26015      10037D04        50(4)  NE DIAG      TO C002C        NONE        20    19.000"  H26819        115'  115'-1"    LADDER          Y      FLUSH      DRAIN      0.58 UTOR      SYSTEM 29      2E51      H26023      10037D06      24A1B(4)  TORUS      CST SUCTION        NONE        6    6.065"    H26844        87'  108'-7"      SCAFF          Y      FLUSH      DRAIN      0.09 UTOR      SYSTEM    ATTACH 30      2E51      H26023      10037D06        34(4)  RCIC DIAG    DISCHARGE        NONE        4    5.761"    H26845        87'  104'-1"      SCAFF          Y      FLUSH      DRAIN        6(3)
           ~~      ~              ~
           ~~      ~              ~
                                                - --
piping IS pertormed dunng tUIl pump
piping IS pertormed dunng tUIl pump
                                                             --                                                  ~~~~-  ~~~~~~~-~~~~ ~~~~~~~~
                                                             --                                                  ~~~~-  ~~~~~~~-~~~~ ~~~~~~~~
Line 254: Line 228:
Attachments 1, 2 and 6
Attachments 1, 2 and 6
                                                         -----            --------                            -,-----                                                                c------    ----------------
                                                         -----            --------                            -,-----                                                                c------    ----------------
Max Pipe                                                                                                                                        Allowable Monitor                Westinghouse One Line                                                  00    Pipe 10                        Floor                Access                        Monitoring            Monitoring                  Void Size Point #  System  P&IO  One Line DWQ Location  Room        Description  Vent Valves          [in]      [in]      Isometric          EI    Line EI    Needs  Insulated                    Method          Frequency                    [Cu. Ft.]  Questions/Comments F067 SOC                                                                                                                                        SYSTEM 1        1E11  H16329  10036099        1  DRYWELL          SUCTION          TBD          20.00  19.000          S01286        TBD      156'-6"    TBD          Y                      VENT              DRAIN                      TBD FPCHX                                                                                                                                                            SYSTEM                                SPECTACLE FLANGE JUST 2        1E11  H16329  10036099        2    ROOM      FPC SUCTION          TBD          8.625    7.981          S00236        158'      186'      NONE          N
Max Pipe                                                                                                                                        Allowable Monitor                Westinghouse One Line                                                  00    Pipe 10                        Floor                Access                        Monitoring            Monitoring                  Void Size Point #  System  P&IO  One Line DWQ Location  Room        Description  Vent Valves          [in]      [in]      Isometric          EI    Line EI    Needs  Insulated                    Method          Frequency                    [Cu. Ft.]  Questions/Comments F067 SOC                                                                                                                                        SYSTEM 1        1E11  H16329  10036099        1  DRYWELL          SUCTION          TBD          20.00  19.000          S01286        TBD      156'-6"    TBD          Y                      VENT              DRAIN                      TBD FPCHX                                                                                                                                                            SYSTEM                                SPECTACLE FLANGE JUST 2        1E11  H16329  10036099        2    ROOM      FPC SUCTION          TBD          8.625    7.981          S00236        158'      186'      NONE          N UT            DRAIN                      TBD      ABOVE FLOOR PUMP SIDE                                                                                                                                          SYSTEM 3        1E11  H16329  10036099        3    NE DIAG            F006D        TBD          20.00  19.000          S01211        95'      106'      TBD          Y                          UT            DRAIN                      TBD PUMP SIDE                                                                                                                                          SYSTEM 4        1E11  H16329  10036099        4    NE DIAG            F006B        TBD          20.00  19.000          S01259        95'      106'      TBD          Y  --------
                                                                                                                                                                      -----
UT            DRAIN TBD F083 FLUSH                                                                                                                                          SYSTEM 5        1E11  H16329  10036099        5      TBD        SUPPLY SOC          TBD          1.050    0.742          SOO060        130'    136'-11"    TBD          Y                      VENT              DRAIN                      TBD    -------
UT            DRAIN                      TBD      ABOVE FLOOR PUMP SIDE                                                                                                                                          SYSTEM 3        1E11  H16329  10036099        3    NE DIAG            F006D        TBD          20.00  19.000          S01211        95'      106'      TBD          Y                          UT            DRAIN                      TBD PUMP SIDE                                                                                                                                          SYSTEM 4        1E11  H16329  10036099        4    NE DIAG            F006B        TBD          20.00  19.000          S01259        95'      106'      TBD          Y  --------
COMMON SOC                                                                                                                                            SYSTEM 6        1E11  H16329  10036099        6    TORUS            SUCTION          TBD          20.00  19.000 123'-4"    TBD  -----
UT            DRAIN
                                                                                                                                                                                                              --------
TBD F083 FLUSH                                                                                                                                          SYSTEM 5        1E11  H16329  10036099        5      TBD        SUPPLY SOC          TBD          1.050    0.742          SOO060        130'    136'-11"    TBD          Y                      VENT              DRAIN                      TBD    -------
COMMON SOC                                                                                                                                            SYSTEM 6        1E11  H16329  10036099        6    TORUS            SUCTION          TBD          20.00  19.000
                                                                                                      -------
123'-4"    TBD  -----
Y                          UT            DRAIN                      TBD F008TO F009                                                                                                                                          SYSTEM                                F008 IN DRYWELL ACCESS; 7        1E11  H16329  10036099        7  DRYWELL    -----
Y                          UT            DRAIN                      TBD F008TO F009                                                                                                                                          SYSTEM                                F008 IN DRYWELL ACCESS; 7        1E11  H16329  10036099        7  DRYWELL    -----
SOC      NONE          20.00  19.000          SOO033        130'      135'      NONE          Y                      VENT              DRAIN                      TBD      F009 IN DRYWELL F016ACONT                                                                                                                                                                    ATTACH      OUTSIDE MG SET ROOMS 1E11  H16330  10036003        1  RX BLDG        SPRAY O/B            Y          16.00  15.250          SOO037        158'      160'      NONE          Y                      VENT              MONTH                        6(3)    ON FLOOR 8
SOC      NONE          20.00  19.000          SOO033        130'      135'      NONE          Y                      VENT              DRAIN                      TBD      F009 IN DRYWELL F016ACONT                                                                                                                                                                    ATTACH      OUTSIDE MG SET ROOMS 1E11  H16330  10036003        1  RX BLDG        SPRAY O/B            Y          16.00  15.250          SOO037        158'      160'      NONE          Y                      VENT              MONTH                        6(3)    ON FLOOR 8
om          F010 FLUSH                                                                                                                                          SYSTEM                    ATTACH 6(3)
om          F010 FLUSH                                                                                                                                          SYSTEM                    ATTACH 6(3)
EAST WALL INTO OW 9      1E11  H16330  10036003        2    ACCESS            SUPPLY
EAST WALL INTO OW 9      1E11  H16330  10036003        2    ACCESS            SUPPLY Y          4.500    4.026          SOO052        130'      137'      SCAFF          Y                          UT            DRAIN                              ACCESS om          F010 FLUSH                                                                                                                                          SYSTEM                    ATTACH 6(3)
                                                                -----
Y          4.500    4.026          SOO052        130'      137'      SCAFF          Y                          UT            DRAIN                              ACCESS om          F010 FLUSH                                                                                                                                          SYSTEM                    ATTACH 6(3)
EAST WALL INTO OW 10      1E11  H16330  10036003        3    ACCESS            SUPPLY          Y          4.500    4.026          SOO052        130'      137'      SCAFF          Y                          UT            DRAIN                              ACCESS QUARTERI om                                                                                                                                          FLUSHI            SYSTEM                    ATTACH 6(3) 11        1E11 H16330  10036003        4    ACCESS                            TBD          20.00  19.000          S01184        130'      138'-9"    TBD          Y                          UT            DRAIN                              TOP OF DRYWELL ACCESS PUMP SIDE                                                                                                                                          SYSTEM 12        1E11 H16330  10036003        5    SE DIAG              F006A        TBD          20.00  19.000          SOO034        95'        97'      TBD          Y                          UT            DRAIN                      TBD      F006A ON GRATING 95' RHR AHX                                                                                                                                          SYSTEM STEAMCOND                                                                                                                            UTI              DRAINI                  ATTACH 10036003        6    SE DIAG          (CAPPED)          TBD        20.00  19.000          SOO036        118'    122'-6"    NONE          Y                  FLUSH(1)          QUARTER                        6(3)    BACK CORNER 118' i
EAST WALL INTO OW 10      1E11  H16330  10036003        3    ACCESS            SUPPLY          Y          4.500    4.026          SOO052        130'      137'      SCAFF          Y                          UT            DRAIN                              ACCESS QUARTERI om                                                                                                                                          FLUSHI            SYSTEM                    ATTACH 6(3) 11        1E11 H16330  10036003        4    ACCESS                            TBD          20.00  19.000          S01184        130'      138'-9"    TBD          Y                          UT            DRAIN                              TOP OF DRYWELL ACCESS PUMP SIDE                                                                                                                                          SYSTEM 12        1E11 H16330  10036003        5    SE DIAG              F006A        TBD          20.00  19.000          SOO034        95'        97'      TBD          Y                          UT            DRAIN                      TBD      F006A ON GRATING 95' RHR AHX                                                                                                                                          SYSTEM STEAMCOND                                                                                                                            UTI              DRAINI                  ATTACH 10036003        6    SE DIAG          (CAPPED)          TBD        20.00  19.000          SOO036        118'    122'-6"    NONE          Y                  FLUSH(1)          QUARTER                        6(3)    BACK CORNER 118' i
13        1E11 H16330 ATTACH      INVERTED "U" AT 1E11          10036003        7    SE DIAG        UIS F048A          Y          20.00  19.000          SOO036        107'    116'-1 "  SCAFF          Y                    FLUSH            QUARTER                        6(3)  CONFLUENCE OF "A" & "C" 14            H16330 PUMP SIDE                                                                                                                                          SYSTEM 15        1E11 H16330  10036003        8    SE DIAG            F006C      NONE          24.00  22.876          SOO034        107'      113'      NONE          Y                          UT            DRAIN                      TBD    BEHIND 1T41-B002A F034ATO 16        1E11 H16330  10036003        9    SE DIAG            D005A        TBD          20.00  19.000          SOO036        95'      104'-1"    SCAFF          Y                    FLUSH
13        1E11 H16330 ATTACH      INVERTED "U" AT 1E11          10036003        7    SE DIAG        UIS F048A          Y          20.00  19.000          SOO036        107'    116'-1 "  SCAFF          Y                    FLUSH            QUARTER                        6(3)  CONFLUENCE OF "A" & "C" 14            H16330 PUMP SIDE                                                                                                                                          SYSTEM 15        1E11 H16330  10036003        8    SE DIAG            F006C      NONE          24.00  22.876          SOO034        107'      113'      NONE          Y                          UT            DRAIN                      TBD    BEHIND 1T41-B002A F034ATO 16        1E11 H16330  10036003        9    SE DIAG            D005A        TBD          20.00  19.000          SOO036        95'      104'-1"    SCAFF          Y                    FLUSH QUARTER                        TBD    ABOVE MOTORS ON 95' CAP ON COND      Y - GOES                                                                                                                                                      ATTACH      ISO SHOWS VENT AT 193',
                                                                                                                                                                                            -------  ---
QUARTER                        TBD    ABOVE MOTORS ON 95' CAP ON COND      Y - GOES                                                                                                                                                      ATTACH      ISO SHOWS VENT AT 193',
10037019        1  RX BLDG            MAKEUP    TOINSTR            4.500    4.026          SOO054        185'      193'      NONE          N                      VENT              MONTH                        6(3)  TOP 2" CAN'T BE VENTED 17        1E11 H16329                                                                                                                                                                                      ----    ------- ...:~-;;----
10037019        1  RX BLDG            MAKEUP    TOINSTR            4.500    4.026          SOO054        185'      193'      NONE          N                      VENT              MONTH                        6(3)  TOP 2" CAN'T BE VENTED 17        1E11 H16329                                                                                                                                                                                      ----    ------- ...:~-;;----
FPCHX                                                                                                                                                            SYSTEM                    ATTACH    BELOW SPECTACLE 1E11 H16329  10037019        2    ROOM              TO FPC          N          8.625    7.981          SOO054        185'      185'      NONE          N                          UT            DRAIN                      6(3)  FLANGE 18 F016B TO    Y-HARD                                                              146'-                                                            SYSTEM                    ATTACH 1E11          10037019        3  RX BLDG              F021B      PIPED          16.00  15.250          S01169        130'      8.5"      SCAFF        Y                          UT            DRAIN                      6(3) 19            H16329                                                              -------
FPCHX                                                                                                                                                            SYSTEM                    ATTACH    BELOW SPECTACLE 1E11 H16329  10037019        2    ROOM              TO FPC          N          8.625    7.981          SOO054        185'      185'      NONE          N                          UT            DRAIN                      6(3)  FLANGE 18 F016B TO    Y-HARD                                                              146'-                                                            SYSTEM                    ATTACH 1E11          10037019        3  RX BLDG              F021B      PIPED          16.00  15.250          S01169        130'      8.5"      SCAFF        Y                          UT            DRAIN                      6(3) 19            H16329                                                              -------
Line 279: Line 243:


Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""
Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""
Attachments 1, 2 and 6
Attachments 1, 2 and 6 Max Pipe                                                                                              Allowable Monitor                Westinghouse One Line                                          00    Pipe 10            Floor          Access            Monitoring        Monitoring          Void Size Point # System  P&ID  One Line Dwg Location  Room        Description  Vent Valves  [in]    [in]  Isometric  EI  LineEI  Needs  Insulated  Method          Frequency            (Cu. Ft.)          Questions/Comments F007B TO                                                                                                                  ATTACH              MAY BE ABLE TO STAND 22  1E11  H16329  10037D19      6    NE DIAG              C002B      N      3.500  3.068    SOO049    87'      93  SCAFF      Y      FLUSH            QUARTER                6(3)            ON PUMP DISCHARGE PIPE SYSTEM CAPONTOPB          N (R.V.                                                                  UTI              DRAIN/          ATTACH              CAP ON INSIDE TORUS 23  1E11  H16329  10037D19      7    NE DIAG                  HX  F055B)    14.00  13.250    SOO038    118'    122  NONE        Y      FLUSH(1)          QUARTER                6(3)            ROOM WALL AT D005B                                                                                                                  ATTACH 24  1E11  H16329  10037D19      8    NE DIAG          ORIFICE    NONE      20.00  19.000    SOO038    96'    104  SCAFF      Y      FLUSH            QUARTER                6(3)            ABOVE PUMP MOTORS C002B/D                                                                                                SYSTEM            ATTACH              AT CONFLUENCE OF C002B 25  1E11  H16329  10037D19      9    NE DIAG      DISCHARGE    1E11 F3028  20.00  19.000    SOO038  107'    116  SCAFF      Y        UT                DRAIN                6(3)            ANDD CST SUCTION                                                    92'-7                                        SYSTEM                                PIPE STUB CAPPED; OPEN 26  1E21  H16331  10036D97      1    SE DIAG              F002A    NONE      14.00  13.625    SOO073    87'    1/2"  SCAFF      N        UT                DRAIN              0.13              F002TOVENT CST SUCTION                                                    92'-7                                        SYSTEM 27  1E21  H16331  10036D97      2    NE DIAG              F002B    NONE      14.00  13.625      TBD    87'    1/2"  SCAFF      N        UT                DRAIN              0.18            1E21F002B MGSET        CST SUPPLY                                                                                                                    ATTACH 28  1E21  H16331  10036D98      1      RM1A                F030A      TBD    2.375    1.939    S01315    158' 173'-10"  TBD        N      FLUSH              CYCLE                6(3)
                                                          -------------                                                                                                    -------------
Max Pipe                                                                                              Allowable Monitor                Westinghouse One Line                                          00    Pipe 10            Floor          Access            Monitoring        Monitoring          Void Size Point # System  P&ID  One Line Dwg Location  Room        Description  Vent Valves  [in]    [in]  Isometric  EI  LineEI  Needs  Insulated  Method          Frequency            (Cu. Ft.)          Questions/Comments F007B TO                                                                                                                  ATTACH              MAY BE ABLE TO STAND 22  1E11  H16329  10037D19      6    NE DIAG              C002B      N      3.500  3.068    SOO049    87'      93  SCAFF      Y      FLUSH            QUARTER                6(3)            ON PUMP DISCHARGE PIPE SYSTEM CAPONTOPB          N (R.V.                                                                  UTI              DRAIN/          ATTACH              CAP ON INSIDE TORUS 23  1E11  H16329  10037D19      7    NE DIAG                  HX  F055B)    14.00  13.250    SOO038    118'    122  NONE        Y      FLUSH(1)          QUARTER                6(3)            ROOM WALL AT D005B                                                                                                                  ATTACH 24  1E11  H16329  10037D19      8    NE DIAG          ORIFICE    NONE      20.00  19.000    SOO038    96'    104  SCAFF      Y      FLUSH            QUARTER                6(3)            ABOVE PUMP MOTORS C002B/D                                                                                                SYSTEM            ATTACH              AT CONFLUENCE OF C002B 25  1E11  H16329  10037D19      9    NE DIAG      DISCHARGE    1E11 F3028  20.00  19.000    SOO038  107'    116  SCAFF      Y        UT                DRAIN                6(3)            ANDD
                                                                                                        ---------
CST SUCTION                                                    92'-7                                        SYSTEM                                PIPE STUB CAPPED; OPEN 26  1E21  H16331  10036D97      1    SE DIAG              F002A    NONE      14.00  13.625    SOO073    87'    1/2"  SCAFF      N        UT                DRAIN              0.13              F002TOVENT CST SUCTION                                                    92'-7                                        SYSTEM 27  1E21  H16331  10036D97      2    NE DIAG              F002B    NONE      14.00  13.625      TBD    87'    1/2"  SCAFF      N        UT                DRAIN              0.18            1E21F002B MGSET        CST SUPPLY                                                                                                                    ATTACH 28  1E21  H16331  10036D98      1      RM1A                F030A      TBD    2.375    1.939    S01315    158' 173'-10"  TBD        N      FLUSH              CYCLE                6(3)
                                                                                                                                                             ~~~~~~- ~~~~
                                                                                                                                                             ~~~~~~- ~~~~
CONDENSATE TRANSFER                                                                                                                    ATTACH 29  1E21  H16331  10036D98      2    RX BLDG    SUPPLY F030B        TBD    2.375    1.939    S01312    158'  174'-3"  TBD        N      FLUSH              CYCLE                6(3)            BEHIND P005 PANEL CS A INJ LINE                                                                                                                ATTACH              OUTSIDE MG SET 30  1E21  H16331  10036D98      3    RX BLDG    D003A - F005A      TBD    10.75  10.020    SOO075    158'  172'-9"  TBD        N        VENT              MONTH                6(3)            PLATFORM CS B INJ LINE D003B TO                                                                                                                  ATTACH 31  1E21  H16331  10036D98      4    RX BLDG              F005B  1E21F013B  10.75  10.020      TBD    158'  172'-9"  TBD        N        VENT              MONTH                6(3)            RWCU HX PLATFORM
CONDENSATE TRANSFER                                                                                                                    ATTACH 29  1E21  H16331  10036D98      2    RX BLDG    SUPPLY F030B        TBD    2.375    1.939    S01312    158'  174'-3"  TBD        N      FLUSH              CYCLE                6(3)            BEHIND P005 PANEL CS A INJ LINE                                                                                                                ATTACH              OUTSIDE MG SET 30  1E21  H16331  10036D98      3    RX BLDG    D003A - F005A      TBD    10.75  10.020    SOO075    158'  172'-9"  TBD        N        VENT              MONTH                6(3)            PLATFORM CS B INJ LINE D003B TO                                                                                                                  ATTACH 31  1E21  H16331  10036D98      4    RX BLDG              F005B  1E21F013B  10.75  10.020      TBD    158'  172'-9"  TBD        N        VENT              MONTH                6(3)            RWCU HX PLATFORM
Line 294: Line 254:


Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""
Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""
Attachments 1, 2 and 6
Attachments 1, 2 and 6 UTOR  SYSTEM              IN TORUS SOUTHI 40        1E51        H16334            10037001    3i )
                -------                                      ----------                                                                                                              --------------  -----------
UTOR  SYSTEM              IN TORUS SOUTHI 40        1E51        H16334            10037001    3i )
4 RCIC    CST SUCTION    NONE        6"        6.065"      H16108 87'  108' -7" SCAFF      Y  FLUSH  DRAIN  0.29        SOUTHWEST SYSTEM ATTACH        MAY BE REACHED FROM 1E41        H16332            10037000    21(4)        HPCI    DISCHARGE    1E41F3004    14"      12.500"    H16869 87'  95'-10"  SCAFF      N  FLUSH  DRAIN    6(3)      NEARBY STAIRS 41 SYSTEM ATTACH 42        1E11B        H16329            10037019    43(4)        RHRB    DISCHARGE      NONE        16"      15.250"    H16837 117' 119'-6"  NONE        Y  FLUSH  DRAIN    6(3)      NORTHEAST DIAGONAL
4 RCIC    CST SUCTION    NONE        6"        6.065"      H16108 87'  108' -7" SCAFF      Y  FLUSH  DRAIN  0.29        SOUTHWEST SYSTEM ATTACH        MAY BE REACHED FROM 1E41        H16332            10037000    21(4)        HPCI    DISCHARGE    1E41F3004    14"      12.500"    H16869 87'  95'-10"  SCAFF      N  FLUSH  DRAIN    6(3)      NEARBY STAIRS 41 SYSTEM ATTACH 42        1E11B        H16329            10037019    43(4)        RHRB    DISCHARGE      NONE        16"      15.250"    H16837 117' 119'-6"  NONE        Y  FLUSH  DRAIN    6(3)      NORTHEAST DIAGONAL
                                       '-------------                                                          -------  --------------                                                                                i
                                       '-------------                                                          -------  --------------                                                                                i piping IS pertormed dUring lUll pump (2)Une is partially vented during each monthly TS surveillance.
                                ----
                                                      - -    --
piping IS pertormed dUring lUll pump (2)Une is partially vented during each monthly TS surveillance.
(3)See maximum allowable void volume table in Attachment 6.
(3)See maximum allowable void volume table in Attachment 6.
(4)This location is detailed in Attachment 4 of Westinghouse Report LTR-SEE-III-08-140, rev. 1
(4)This location is detailed in Attachment 4 of Westinghouse Report LTR-SEE-III-08-140, rev. 1


Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""
Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""
Attachments 1, 2 and 6
Attachments 1, 2 and 6 Max Pipe                                                                                                                  Allowable Monitor                  Westinghouse  One Line                                                OD    Pipe ID            Floor    Line          Access                              Monitoring                    Void Size Point # System  P&ID    One Line Dwg  Location  Room        Description Vent Valves          [il1]    [In]  Isometric    EI      EI            Needs            Insulated          Method            Frequency  (Cu. Ft.)                    Questions/Comments DISCHARGE                                                                                                                                      SYSTEM  ATTACH FV022                  19.000    S31755    107'    114'-8"        SCAFF.                  Y              UT                DRAIN      6(3)              CONFLUENCE OF C002NC 1      2E11A  H26015        10037D04    1      NE DIAG          C002A                      20.00                                                                                                                          -------  '---------- -------
        -----          ------                  ----                                  -------                        ----                  --,---                                                        -----                        ,---------    ---
Max Pipe                                                                                                                  Allowable Monitor                  Westinghouse  One Line                                                OD    Pipe ID            Floor    Line          Access                              Monitoring                    Void Size Point # System  P&ID    One Line Dwg  Location  Room        Description Vent Valves          [il1]    [In]  Isometric    EI      EI            Needs            Insulated          Method            Frequency  (Cu. Ft.)                    Questions/Comments DISCHARGE                                                                                                                                      SYSTEM  ATTACH FV022                  19.000    S31755    107'    114'-8"        SCAFF.                  Y              UT                DRAIN      6(3)              CONFLUENCE OF C002NC 1      2E11A  H26015        10037D04    1      NE DIAG          C002A                      20.00                                                                                                                          -------  '---------- -------
RHR A STEAM COND LINE                                                                                                                                      SYSTEM (CAPPED) AT                                                                                                                    UTI                DRAINI  ATTACH                CAP ON TORUS ROOM 118'    123'-8"          NONE                  Y            FLUSH(1)          QUARTER      6(3)              WALL 2      2E11A H26015        10037D04    2      NE DIAG        B001A HX      NONE          16.00  15.250    S28396 NORTH END DW ACCESS, DW                                                                                                                                                      SYSTEM  ATTACH                LLRT CONNECTION BELOW F017A          TBD        24.00  22.876    S31899    130'    134'-6"          NONE                  Y              UT                DRAIN      6(3)              F017 3      2E11A H26015        10037D04    3      ACCESS                                                                      -----
RHR A STEAM COND LINE                                                                                                                                      SYSTEM (CAPPED) AT                                                                                                                    UTI                DRAINI  ATTACH                CAP ON TORUS ROOM 118'    123'-8"          NONE                  Y            FLUSH(1)          QUARTER      6(3)              WALL 2      2E11A H26015        10037D04    2      NE DIAG        B001A HX      NONE          16.00  15.250    S28396 NORTH END DW ACCESS, DW                                                                                                                                                      SYSTEM  ATTACH                LLRT CONNECTION BELOW F017A          TBD        24.00  22.876    S31899    130'    134'-6"          NONE                  Y              UT                DRAIN      6(3)              F017 3      2E11A H26015        10037D04    3      ACCESS                                                                      -----
SOUTH END DW ACCESS, DW                                                                                                                                                      SYSTEM  ATTACH                LLRT CONNECTION BELOW 2E11F058B          24.00  22.876    S28472    130'    134'-6"          NONE                  Y              UT                DRAIN      6(3)              F017 4      2E11B H26014        10037D04    4      ACCESS            F017B                                                                                                                      ----
SOUTH END DW ACCESS, DW                                                                                                                                                      SYSTEM  ATTACH                LLRT CONNECTION BELOW 2E11F058B          24.00  22.876    S28472    130'    134'-6"          NONE                  Y              UT                DRAIN      6(3)              F017 4      2E11B H26014        10037D04    4      ACCESS            F017B                                                                                                                      ----
Line 315: Line 268:
_IB[)_                                                      -------- 1-----
_IB[)_                                                      -------- 1-----
VERTICAL PIPING UNDER                                                                                                                                      SYSTEM  ATTACH                RWCU HX ROOM INSIDE 16.00    15.250  S31425    158'    169'          SCAFF.                  N              UT                DRAIN      6(3)              DOOR 7B      2E11B H26014        10037D04    7    RWCU HX            F016B        F036B F023 HEAD                                                                                                                                              ATTACH                EAST SIDE BY HI POINT HARD PIPE          4.500    4.026    S31419    185'    193'          SCAFF.                  Y              VENT                MONTH      6(3)              VENTS 8      2E11B H26014        10037D04    8    RX BLDG            SPRAY F067 RECIRC                                                                                                                                      SYSTEM                        JUST OFF 147' GRATING IN 9      2E11 H26015        10037D04    1          DW    SUCTION SDC            TBD        20.00    19.000  S28478    147'    154'-6"        SCAFF.                  Y              UT                DRAIN  --
VERTICAL PIPING UNDER                                                                                                                                      SYSTEM  ATTACH                RWCU HX ROOM INSIDE 16.00    15.250  S31425    158'    169'          SCAFF.                  N              UT                DRAIN      6(3)              DOOR 7B      2E11B H26014        10037D04    7    RWCU HX            F016B        F036B F023 HEAD                                                                                                                                              ATTACH                EAST SIDE BY HI POINT HARD PIPE          4.500    4.026    S31419    185'    193'          SCAFF.                  Y              VENT                MONTH      6(3)              VENTS 8      2E11B H26014        10037D04    8    RX BLDG            SPRAY F067 RECIRC                                                                                                                                      SYSTEM                        JUST OFF 147' GRATING IN 9      2E11 H26015        10037D04    1          DW    SUCTION SDC            TBD        20.00    19.000  S28478    147'    154'-6"        SCAFF.                  Y              UT                DRAIN  --
TBD                DW SYSTEM                        EVEN WITH GRATING ON 10      2E11B H26014        10037D04    2      SE DIAG    BELOW F006D          NONE          20.00    19.000  S28406    107'    107'          SCAFF.                  Y              UT                DRAIN    TBD                107' SYSTEM                          ON 97' GRATING (MAY NEED 11      2E11B H26014        10037D04    3      SE DIAG    BELOWEQ()6~          NONE
TBD                DW SYSTEM                        EVEN WITH GRATING ON 10      2E11B H26014        10037D04    2      SE DIAG    BELOW F006D          NONE          20.00    19.000  S28406    107'    107'          SCAFF.                  Y              UT                DRAIN    TBD                107' SYSTEM                          ON 97' GRATING (MAY NEED 11      2E11B H26014        10037D04    3      SE DIAG    BELOWEQ()6~          NONE 20.00    19.000  S28412    107'    110'            NONE
                                                                          -------
20.00    19.000  S28412    107'    110'            NONE
_____ - _c_:-=--  ---
_____ - _c_:-=--  ---
Y              UT                DRAIN    TBD                TQ COME FROM BELOW)
Y              UT                DRAIN    TBD                TQ COME FROM BELOW)
SYSTEM 12      2E11A H26015        10037D04    4      NE DIAG    BELOW F006A          NONE          20.00    19.000  S28398    107'    112'            NONE                  Y              UT                DRAIN    TBD SYSTEM                          BACK CORNER NEED 13      2E11A H26015        10037D04    5      NE DIAG    BELOW F006C          NONE          20.00    19.000  $£839L    107'    107'          SCAFF.                  Y              UT                DRAIN    TBD                SCAFF FROM 97' SYSTEM 14      2E11 H26015        10037D04    6          DW      F008 TO F009
SYSTEM 12      2E11A H26015        10037D04    4      NE DIAG    BELOW F006A          NONE          20.00    19.000  S28398    107'    112'            NONE                  Y              UT                DRAIN    TBD SYSTEM                          BACK CORNER NEED 13      2E11A H26015        10037D04    5      NE DIAG    BELOW F006C          NONE          20.00    19.000  $£839L    107'    107'          SCAFF.                  Y              UT                DRAIN    TBD                SCAFF FROM 97' SYSTEM 14      2E11 H26015        10037D04    6          DW      F008 TO F009 NONE          20.00    19.000  S28478    127'    135'          SCAFF.                  Y              UT
                                                          -----
NONE          20.00    19.000  S28478    127'    135'          SCAFF.                  Y              UT
                                                                                                                                                                                             ------------ 1---
                                                                                                                                                                                             ------------ 1---
DRAIN    TBD SYSTEM 15      2E21A H26018        10037D07    1      NE DIAG        E21F002A        NONE          14.00    13.250  S27015    97'      100'            NONE                  N              UT                DRAIN    TBD SYSTEM 16      2E21B H26018        10037D07    2      SE DIAG          F002B        NONE          14.00    13.250  S26991    97'      100            NONE                  N              UT                DRAIN    TBD CS2A                                                                                                                                      SYSTEM INJECTION                                                                                                                  UTI                DRAINI  ATTACH VENT(2)                        6(3) 17      2E21A H26018        10037D07    3      RX BLDG            LINE        NONE          10.7    10.020    TBD      158'    171 '-3"        NONE                  N
DRAIN    TBD SYSTEM 15      2E21A H26018        10037D07    1      NE DIAG        E21F002A        NONE          14.00    13.250  S27015    97'      100'            NONE                  N              UT                DRAIN    TBD SYSTEM 16      2E21B H26018        10037D07    2      SE DIAG          F002B        NONE          14.00    13.250  S26991    97'      100            NONE                  N              UT                DRAIN    TBD CS2A                                                                                                                                      SYSTEM INJECTION                                                                                                                  UTI                DRAINI  ATTACH VENT(2)                        6(3) 17      2E21A H26018        10037D07    3      RX BLDG            LINE        NONE          10.7    10.020    TBD      158'    171 '-3"        NONE                  N
Line 336: Line 285:
COMMON 21      2E41      H26020      10037D05          1      HPCI        SUCTION          NONE        14    13.25    H26839        87'    92'-6"      NONE          N      FLUSH(1)  QUARTER      TBD                                I VENTI    MONTHI    ATTACH 22      2E41      H26020      10037D05          2      TORUS      DISCHARGE        NONE        14      12.5    H26840        114'  109'-6"      NONE          Y      FLUSH    QUARTER        6(3)        OUTER CATWALK BAY 2 SYSTEM                    S.E.DIAGONAL AGAINST 23      2E51      H26023      10037D06          1    TORUS      RHR SUCTION        FV101        4    4.026    H26844        87'  107'-9"        YES          Y        UT      DRAIN      TBD          TORUS WALL DISCHARGE I                                                                                                                  ATTACH 24      2E51      H26023      10037D06          2    TORUS          FEED          NONE        4    3.826    H26845        114'  123'-0"        YES          Y      FLUSH(1)  QUARTER        6(3)          INNER TORUS BAY 9 CONDENSATE 25      2E51      H26024      10037D06          3    RCIC DIAG  PUMP RETURN        NONE        2    1.939    S31014        87'    90'-4"      NONE          Y      FLUSH    QUARTER      0.02 TORUS                                                                                                          SYSTEM 26      2E51      H26023      10037D06          4    RCICDIAG      SUCTION          NONE        6    6.065    H26844        87'  89'-5"        NONE          Y        UT      DRAIN      0.03 SYSTEM    ATTACH          UPSTREAM OF FLOW 27    2E11A      H26015      10037D04        42(4)  NE DIAG    DISCHARGE        NONE        24    22.876"  H26820        117'  121'-5"      NONE          Y      FLUSH      DRAIN        6(3)        ORIFICE 2E11 N014A SDC SUCTION                                                                                              UTOR      SYSTEM 28    2E11A      H26015      10037D04        50(4)  NE DIAG      TO C002C        NONE        20    19.000"  H26819        115'  115'-1"    LADDER          Y      FLUSH      DRAIN      0.58 UTOR      SYSTEM 29      2E51      H26023      10037D06      24A1B(4)  TORUS      CST SUCTION        NONE        6    6.065"    H26844        87'  108'-7"      SCAFF          Y      FLUSH      DRAIN      0.09 UTOR      SYSTEM    ATTACH 30      2E51      H26023      10037D06        34(4)  RCIC DIAG    DISCHARGE        NONE        4    5.761"    H26845        87'  104'-1"      SCAFF          Y      FLUSH      DRAIN        6(3)
COMMON 21      2E41      H26020      10037D05          1      HPCI        SUCTION          NONE        14    13.25    H26839        87'    92'-6"      NONE          N      FLUSH(1)  QUARTER      TBD                                I VENTI    MONTHI    ATTACH 22      2E41      H26020      10037D05          2      TORUS      DISCHARGE        NONE        14      12.5    H26840        114'  109'-6"      NONE          Y      FLUSH    QUARTER        6(3)        OUTER CATWALK BAY 2 SYSTEM                    S.E.DIAGONAL AGAINST 23      2E51      H26023      10037D06          1    TORUS      RHR SUCTION        FV101        4    4.026    H26844        87'  107'-9"        YES          Y        UT      DRAIN      TBD          TORUS WALL DISCHARGE I                                                                                                                  ATTACH 24      2E51      H26023      10037D06          2    TORUS          FEED          NONE        4    3.826    H26845        114'  123'-0"        YES          Y      FLUSH(1)  QUARTER        6(3)          INNER TORUS BAY 9 CONDENSATE 25      2E51      H26024      10037D06          3    RCIC DIAG  PUMP RETURN        NONE        2    1.939    S31014        87'    90'-4"      NONE          Y      FLUSH    QUARTER      0.02 TORUS                                                                                                          SYSTEM 26      2E51      H26023      10037D06          4    RCICDIAG      SUCTION          NONE        6    6.065    H26844        87'  89'-5"        NONE          Y        UT      DRAIN      0.03 SYSTEM    ATTACH          UPSTREAM OF FLOW 27    2E11A      H26015      10037D04        42(4)  NE DIAG    DISCHARGE        NONE        24    22.876"  H26820        117'  121'-5"      NONE          Y      FLUSH      DRAIN        6(3)        ORIFICE 2E11 N014A SDC SUCTION                                                                                              UTOR      SYSTEM 28    2E11A      H26015      10037D04        50(4)  NE DIAG      TO C002C        NONE        20    19.000"  H26819        115'  115'-1"    LADDER          Y      FLUSH      DRAIN      0.58 UTOR      SYSTEM 29      2E51      H26023      10037D06      24A1B(4)  TORUS      CST SUCTION        NONE        6    6.065"    H26844        87'  108'-7"      SCAFF          Y      FLUSH      DRAIN      0.09 UTOR      SYSTEM    ATTACH 30      2E51      H26023      10037D06        34(4)  RCIC DIAG    DISCHARGE        NONE        4    5.761"    H26845        87'  104'-1"      SCAFF          Y      FLUSH      DRAIN        6(3)
           ~~      ~              ~
           ~~      ~              ~
                                                - --
piping IS pertormed dunng tUIl pump
piping IS pertormed dunng tUIl pump
                                                             --                                                  ~~~~-  ~~~~~~~-~~~~ ~~~~~~~~
                                                             --                                                  ~~~~-  ~~~~~~~-~~~~ ~~~~~~~~

Latest revision as of 06:30, 12 March 2020

Response to NRC Generic Letter 2008-01, Response to Requests for Additional Information
ML093480120
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/14/2009
From: Ajluni M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-08-001, NL-09-1803
Download: ML093480120 (16)


Text

Southern Nucieat Operating Company, Inc SOUTHERN COMPANY A

December 14, 2009 Docket Nos.: 50-321 NL-09-1B03 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Response to NRC Generic Letter 200B-01 Response to Requests for Additional Information Ladies and Gentlemen:

On October 10, 200B (NL-OB-1340) SNC submitted the nine-month response to Generic Letter 2008-01 and on August 24, 2009 (NL-09-1 067) SNC submitted for the Edwin I Hatch Nuclear Plant(HNP) Unit 2 post-outage response to Nuclear Regulatory Commission (NRC) Generic Letter 2008-01. In a letter dated November 5, 2009 the NRC submitted a request for additional information concerning the latter response referenced above. The requested response date was 45 days from the calendar date of the letter.

The enclosure to this letter contains the SNC response to the referenced NRC request for additional information.

This letter contains an NRC commitment.

u.s Nuclear Regulat01Y Commission NL-09-J803 Page 2 Mr. M. J. Ajluni states he is Nuclear Licensing Manager of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and to the best of his knowledge and belief, the facts set forth in this letter are true.

If you have any questions, please advise.

Sincerely,

~~~

M. J. Ajluni Manager, Nuclear Licensing Sworn to and subscribed before me this -LL day of f1u,~ ,2009.

~oJf~~ Notary Public My commission expires: ///0 t.//J.o13 MJA/PAHliac

Enclosures:

1. RAI Responses to NRC.
2. Regulatory Commitment for Submitting TS Change after TSTF Approval by NRC.
3. Attachments 1,2, and 6 of 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems."

U.S Nuclear Regulatory Commission NL-09-1803 Page 3 cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. D. R. Madison, Vice President Hatch Ms. P. M. Marino, Vice President Engineering RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Ms. D. N. Wright, NRR Project Manager Hatch Mr. E. D. Morris, Senior Resident Inspector - Hatch

Edwin I Hatch Nuclear Plant Response to NRC Generic letter 2008-01 Response to Requests for Additional Information Enclosure 1 RAI Responses to NRC

Enclosure I RAJ Responses to NRC REQUEST FOR ADDITIONAL INFORMATION Guidance on Nuclear Regulatory Commission (NRC) staff expectations is provided by Reference 1 which is generally consistent with Nuclear Energy Institute (NEI) guidance provided to industry in Reference 2 as clarified in later NEI communications. The NRC staff recommends that the licensee consult Reference 1 when responding to the following RAls:

1. Provide a regulatory commitment and a schedule for applying the Technical Specification Task Force (TSTF) process to any Technical Specification (TS) changes resulting from GL 2008-01.

Response: SNC has provided a regulatory commitment in Enclosure 2 to review any TSTF issued by the NRC concerning gas intrusion. SNC will either submit a technical specification change based on the TSTF or submit a plant specific technical specification change for Plant Hatch within a year after the issuance of an NRC approved TSTF concerning gas intrusion.

2. SNC letter dated August 24, 2009 states that the procedure, 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems" was implemented on November 19, 2008. The NRC staff requests the following additional information relative to this procedure:

a) Summarize the monitored locations along with the associated surveillance methods:

Response: Details for monitoring method and frequency along with point details for each monitoring location are provided in 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems," Attachments 1,2, and 6. A copy of these attachments is included as Enclosure 3.

b) Discuss the surveillance intervals for the monitored locations, including justifications for surveillance intervals greater than a month; Response: The applicable system piping was reviewed as per Generic Letter 2008-01 and critical locations were identified where voids could accumulate and the venting process could be challenged. The review concluded that none of the critical locations have active gas accumulation mechanisms.

The Hatch Monitoring Program is focused around these critical locations. The monitoring takes credit for the monthly activity that is performed by Operations as per the Technical Specification surveillance for venting of ECCS systems. The program also takes credit for dynamic flushing that occurs as a result of the quarterly ECCS flow surveillances. All of the monitored locations are vented or dynamically flushed anytime that the section of piping is drained such as for maintenance activities. Confirmatory UT inspections are performed on some locations to ensure the venting or flushing was successful.

The surveillance intervals for the monitored locations are contained in Attachments 1 and 2 of Enclosure 3. Justification for frequencies longer than monthly are based on the lack of an active gas accumUlation mechanism, dynamic flushing as a result of quarterly flow surveillances, and confirmatory UT inspections are performed on some locations to ensure the venting or flushing was successful.

E1-1

Enclosure 1 RAI Responses to NRC Procedure, 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems" provides an allowance to modify this frequency based on the results of previous gas monitoring results. If a void is identified during the routine monitoring, the frequency is evaluated to determine if an increase (or shorter monitoring period) is warranted.

c) Provide the surveillance criteria.

The surveillance acceptance criteria are specified in 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems," Attachments 1,2, and 6. A copy of these attachments is included as Enclosure 3.

d) Discuss actions to be taken if surveillance criteria are not met.

Response: Plant procedure, 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems," requires that for any identified voids that exceed the allowable size, a condition report is initiated and the Operations Shift Manager and/or the Shift Supervisor is immediately notified. If any voids are identified at any monitoring point that does not have an approved maximum allowable limit, either a formal evaluation will be performed or the void will be removed by venting or flushing. The impact on system operability will be addressed as a result of normal processing of the condition report by the on-shift operations personnel. In addition, Engineering personnel are immediately notified to perform an evaluation.

e) State whether all voids identified will be quantified, recorded, and entered into the Corrective Action Program (CAP).

Response: Per plant procedure, 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems," all identified voids, including the measured size, are recorded in a data package and a condition report generated to enter the information into the Corrective Action Program.

3. Describe any process improvements made to guard against gas intrusion due to inadvertent draining, system realignments, incorrect maintenance procedures, or other evolutions.

Plant evolutions involving system re-alignment or specific component manipulation that could result in inadvertent draining or inadvertent gas intrusion are controlled by plant procedures and performed only by trained plant staff. This includes system draining, tagouts, and system restoration fill and vent activities.

The HNP plant procedures applicable to these evolutions (Operations, Maintenance, and Instrument and Controls) were independently reviewed for improvements that could be made to address issues related to Generic Letter 2008-01. The review included such areas as vent scope, proper system vent sequence, precautions and limitations, potential gas accumulation mechanisms, documentations of voids identified, etc. From this review, resulting recommendations were evaluated by the plant staff and incorporated into the procedures as deemed appropriate.

Simplified piping elevation drawings were created as aids to be used by Operations and Engineering personnel to develop vent and/or ultrasonic testing (UT) plans.

E1-2

Enclosure 1 RAI Responses to NRC Additional vents have been added in Hatch Unit 2 piping locations that were determined not to have adequate venting capability. Vents will be added to Hatch Unit 1 in similar locations during the Spring 2010 refueling outage.

Operations, maintenance, and engineering personnel have been trained on the issues related to gas accumulation, including the potential causes and impact. This training also included the procedural changes described above.

4. Training was not identified in the GL but is considered to be a necessary part of applying procedures and other activities when addressing the issues identified in the GL Briefly discuss training.

Response: Training on Gas Accumulation and Management has been provided into the HNP continuing training process and provided to Operations and Maintenance personnel as part of the response to INPO SER 02-05, "Gas Intrusion in Safety Systems." This training focused on the potential for gas accumulation mechanisms and negative impact of voiding on system performance and reliability.

Several Operations and Engineering procedures have been developed or revised as a result of the response activities to Generic Letter 2008-01. When any station procedure is modified, an assessment for training needs and change management is required in accordance with HNP procedure DI-TRN-61-1006, "Training Request Worksheet."

In addition, selected site personnel have been trained and qualified on the use of UT equipment to perform void detection.

SNC is an active participant in the NEI Gas Accumulation Team, which is currently coordinating with the Institute of Nuclear Power Operations in the development of generic training modules for gas accumulation and management. These training modules target the Engineering, Operations, and Maintenance disciplines. The first module has been received by HNP and will be evaluated in the first quarter of 2010 for incorporation into the site personnel training processes in a version tailored to meet the station needs as per DI-TRN 61-1006, "Training RequestWorksheef." As the remainder of the training modules are completed and become available to the industry, SNC will evaluate them for applicability to HNP. Pending release of remaining products. the schedule for such planned training has not yet been determined.

REFERENCES

Riley, Nuclear Energy Institute, ML091390637, May 28,2009.

  • Riley, James H., "Generic Letter (GL) 2008-01 , "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Contain Spray Systems Evaluation and 3 Month Response Template," Letter to Administrative Points of Contact from Director, Engineering Nuclear Generation Division, Nuclear Energy Institute, Enclosure 2, "Generic Letter 2008-01 Response Guidance," March 20, 2008.

E1-3

Edwin I Hatch Nuclear Plant Response to NRC Generic letter 2008-01 Response to requests for Additional Information Enclosure 2 Regulatory Commitment

Enclosure 2 RAJ Responses to NRC NRC Commitment Type Scheduled One-Time Action Completion Date SNC will either submit X Within one year after a technical NRC Issuance specification based on the TSTF or submit a plant specific technical specification change for Plant Hatch within a year after the issuance of an NRC approved TSTF concerning gas intrusion.

E2-1

Edwin I Hatch Nuclear Plant Response to NRC Generic letter 2008-01 Response to requests for Additional Information Enclosure 3 42EI\I-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1 , 2 and 6

Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1, 2 and 6


-------- -,----- c------ ----------------

Max Pipe Allowable Monitor Westinghouse One Line 00 Pipe 10 Floor Access Monitoring Monitoring Void Size Point # System P&IO One Line DWQ Location Room Description Vent Valves [in] [in] Isometric EI Line EI Needs Insulated Method Frequency [Cu. Ft.] Questions/Comments F067 SOC SYSTEM 1 1E11 H16329 10036099 1 DRYWELL SUCTION TBD 20.00 19.000 S01286 TBD 156'-6" TBD Y VENT DRAIN TBD FPCHX SYSTEM SPECTACLE FLANGE JUST 2 1E11 H16329 10036099 2 ROOM FPC SUCTION TBD 8.625 7.981 S00236 158' 186' NONE N UT DRAIN TBD ABOVE FLOOR PUMP SIDE SYSTEM 3 1E11 H16329 10036099 3 NE DIAG F006D TBD 20.00 19.000 S01211 95' 106' TBD Y UT DRAIN TBD PUMP SIDE SYSTEM 4 1E11 H16329 10036099 4 NE DIAG F006B TBD 20.00 19.000 S01259 95' 106' TBD Y --------

UT DRAIN TBD F083 FLUSH SYSTEM 5 1E11 H16329 10036099 5 TBD SUPPLY SOC TBD 1.050 0.742 SOO060 130' 136'-11" TBD Y VENT DRAIN TBD -------

COMMON SOC SYSTEM 6 1E11 H16329 10036099 6 TORUS SUCTION TBD 20.00 19.000 123'-4" TBD -----

Y UT DRAIN TBD F008TO F009 SYSTEM F008 IN DRYWELL ACCESS; 7 1E11 H16329 10036099 7 DRYWELL -----

SOC NONE 20.00 19.000 SOO033 130' 135' NONE Y VENT DRAIN TBD F009 IN DRYWELL F016ACONT ATTACH OUTSIDE MG SET ROOMS 1E11 H16330 10036003 1 RX BLDG SPRAY O/B Y 16.00 15.250 SOO037 158' 160' NONE Y VENT MONTH 6(3) ON FLOOR 8

om F010 FLUSH SYSTEM ATTACH 6(3)

EAST WALL INTO OW 9 1E11 H16330 10036003 2 ACCESS SUPPLY Y 4.500 4.026 SOO052 130' 137' SCAFF Y UT DRAIN ACCESS om F010 FLUSH SYSTEM ATTACH 6(3)

EAST WALL INTO OW 10 1E11 H16330 10036003 3 ACCESS SUPPLY Y 4.500 4.026 SOO052 130' 137' SCAFF Y UT DRAIN ACCESS QUARTERI om FLUSHI SYSTEM ATTACH 6(3) 11 1E11 H16330 10036003 4 ACCESS TBD 20.00 19.000 S01184 130' 138'-9" TBD Y UT DRAIN TOP OF DRYWELL ACCESS PUMP SIDE SYSTEM 12 1E11 H16330 10036003 5 SE DIAG F006A TBD 20.00 19.000 SOO034 95' 97' TBD Y UT DRAIN TBD F006A ON GRATING 95' RHR AHX SYSTEM STEAMCOND UTI DRAINI ATTACH 10036003 6 SE DIAG (CAPPED) TBD 20.00 19.000 SOO036 118' 122'-6" NONE Y FLUSH(1) QUARTER 6(3) BACK CORNER 118' i

13 1E11 H16330 ATTACH INVERTED "U" AT 1E11 10036003 7 SE DIAG UIS F048A Y 20.00 19.000 SOO036 107' 116'-1 " SCAFF Y FLUSH QUARTER 6(3) CONFLUENCE OF "A" & "C" 14 H16330 PUMP SIDE SYSTEM 15 1E11 H16330 10036003 8 SE DIAG F006C NONE 24.00 22.876 SOO034 107' 113' NONE Y UT DRAIN TBD BEHIND 1T41-B002A F034ATO 16 1E11 H16330 10036003 9 SE DIAG D005A TBD 20.00 19.000 SOO036 95' 104'-1" SCAFF Y FLUSH QUARTER TBD ABOVE MOTORS ON 95' CAP ON COND Y - GOES ATTACH ISO SHOWS VENT AT 193',

10037019 1 RX BLDG MAKEUP TOINSTR 4.500 4.026 SOO054 185' 193' NONE N VENT MONTH 6(3) TOP 2" CAN'T BE VENTED 17 1E11 H16329 ---- ------- ...:~-;;----

FPCHX SYSTEM ATTACH BELOW SPECTACLE 1E11 H16329 10037019 2 ROOM TO FPC N 8.625 7.981 SOO054 185' 185' NONE N UT DRAIN 6(3) FLANGE 18 F016B TO Y-HARD 146'- SYSTEM ATTACH 1E11 10037019 3 RX BLDG F021B PIPED 16.00 15.250 S01169 130' 8.5" SCAFF Y UT DRAIN 6(3) 19 H16329 -------

OW F015B TO SYSTEM ATTACH 1E11 H16329 10037019 4 ACCESS F0178 NONE 24.00 22.876 SOO039 130' 138'-9" SCAFF Y VENT DRAIN 6(3) TOP DRYWELL ACCESS 20 ----- --- -------

OW F3031 COND SYSTEM ATTACH 1E11 10037019 ACCESS MAKEUP 1E11F3031 4.500 4.026 130' 136 SCAFF Y UT DRAIN 6(3) VENT IN DRYWELL ACCESS 21 H16329 5 ------- ------ --,--'-------------~- ---

Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1, 2 and 6 Max Pipe Allowable Monitor Westinghouse One Line 00 Pipe 10 Floor Access Monitoring Monitoring Void Size Point # System P&ID One Line Dwg Location Room Description Vent Valves [in] [in] Isometric EI LineEI Needs Insulated Method Frequency (Cu. Ft.) Questions/Comments F007B TO ATTACH MAY BE ABLE TO STAND 22 1E11 H16329 10037D19 6 NE DIAG C002B N 3.500 3.068 SOO049 87' 93 SCAFF Y FLUSH QUARTER 6(3) ON PUMP DISCHARGE PIPE SYSTEM CAPONTOPB N (R.V. UTI DRAIN/ ATTACH CAP ON INSIDE TORUS 23 1E11 H16329 10037D19 7 NE DIAG HX F055B) 14.00 13.250 SOO038 118' 122 NONE Y FLUSH(1) QUARTER 6(3) ROOM WALL AT D005B ATTACH 24 1E11 H16329 10037D19 8 NE DIAG ORIFICE NONE 20.00 19.000 SOO038 96' 104 SCAFF Y FLUSH QUARTER 6(3) ABOVE PUMP MOTORS C002B/D SYSTEM ATTACH AT CONFLUENCE OF C002B 25 1E11 H16329 10037D19 9 NE DIAG DISCHARGE 1E11 F3028 20.00 19.000 SOO038 107' 116 SCAFF Y UT DRAIN 6(3) ANDD CST SUCTION 92'-7 SYSTEM PIPE STUB CAPPED; OPEN 26 1E21 H16331 10036D97 1 SE DIAG F002A NONE 14.00 13.625 SOO073 87' 1/2" SCAFF N UT DRAIN 0.13 F002TOVENT CST SUCTION 92'-7 SYSTEM 27 1E21 H16331 10036D97 2 NE DIAG F002B NONE 14.00 13.625 TBD 87' 1/2" SCAFF N UT DRAIN 0.18 1E21F002B MGSET CST SUPPLY ATTACH 28 1E21 H16331 10036D98 1 RM1A F030A TBD 2.375 1.939 S01315 158' 173'-10" TBD N FLUSH CYCLE 6(3)

~~~~~~- ~~~~

CONDENSATE TRANSFER ATTACH 29 1E21 H16331 10036D98 2 RX BLDG SUPPLY F030B TBD 2.375 1.939 S01312 158' 174'-3" TBD N FLUSH CYCLE 6(3) BEHIND P005 PANEL CS A INJ LINE ATTACH OUTSIDE MG SET 30 1E21 H16331 10036D98 3 RX BLDG D003A - F005A TBD 10.75 10.020 SOO075 158' 172'-9" TBD N VENT MONTH 6(3) PLATFORM CS B INJ LINE D003B TO ATTACH 31 1E21 H16331 10036D98 4 RX BLDG F005B 1E21F013B 10.75 10.020 TBD 158' 172'-9" TBD N VENT MONTH 6(3) RWCU HX PLATFORM

~ ~~~~~~~~~-

SYSTEM UTI DRAINI 32 1E41 H16332 10037DOO 1 HPCI CST SUCTION F3001 16.00 15.5" H16868 119' 123'-0" NONE N FLUSH QUARTER 0.88 SYSTEM TORUS UTI DRAINI 33 1E41 H16332 10037DOO 2 HPCI SUCTION NONE 16.00 15" H16868 87' 90'-1" NONE N FLUSH(1) QUARTER 0.10 SYSTEM UTI DRAINI 34 1E41 H16332 10037DOO N/A TORUS DISCHARGE 1E41F3008 14.00 13.00 H16869 123' 123'-6" NONE Y VENT MONTH 4.061 VENT\~}I MONTHI ATTACH 35 1E51 H16334 10037D01 1 TORUS DISCHARGE NONE 4" 3.624" H16874 114' 123'-11" SCAFF N FLUSH(1) QUARTER 6(3) INNER CATWALK BAY 1

~~~~~~~

SYSTEM CONDENSATE 93'-6 UTI DRAINI 36 1E51 H16335 10037D01 2 RCIC PUMP RETURN NONE 2" 2.067" S01466 87' 7/16" SCAFF N QUARTER FLUSH 0.03 TORUS 89'-8 SYSTEM 37 1E51 H16334 10037D01 3 RCIC SUCTION NONE 6" 6.065" H16873 87' 7/8" NONE N UT DRAIN 0.02 SYSTEM UTI DRAIN/ ATTACH 38 1E51 H16334 10037D01 4 RCIC DISCHARGE NONE 4" 3.826" H16874 87' 104'-11" SCAFF N FLUSH QUARTER 6(3)

SYSTEM INNER CATWALK @

39 1E21 H16331 10036D97 10(4) CSA CST SUCTION 1E21F127 14" 13.25" H16121 117' 121'-2" TBD N UT DRAIN 0.73 COLUMN LINES R6-RJ

Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1, 2 and 6 UTOR SYSTEM IN TORUS SOUTHI 40 1E51 H16334 10037001 3i )

4 RCIC CST SUCTION NONE 6" 6.065" H16108 87' 108' -7" SCAFF Y FLUSH DRAIN 0.29 SOUTHWEST SYSTEM ATTACH MAY BE REACHED FROM 1E41 H16332 10037000 21(4) HPCI DISCHARGE 1E41F3004 14" 12.500" H16869 87' 95'-10" SCAFF N FLUSH DRAIN 6(3) NEARBY STAIRS 41 SYSTEM ATTACH 42 1E11B H16329 10037019 43(4) RHRB DISCHARGE NONE 16" 15.250" H16837 117' 119'-6" NONE Y FLUSH DRAIN 6(3) NORTHEAST DIAGONAL

'------------- ------- -------------- i piping IS pertormed dUring lUll pump (2)Une is partially vented during each monthly TS surveillance.

(3)See maximum allowable void volume table in Attachment 6.

(4)This location is detailed in Attachment 4 of Westinghouse Report LTR-SEE-III-08-140, rev. 1

Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1, 2 and 6 Max Pipe Allowable Monitor Westinghouse One Line OD Pipe ID Floor Line Access Monitoring Void Size Point # System P&ID One Line Dwg Location Room Description Vent Valves [il1] [In] Isometric EI EI Needs Insulated Method Frequency (Cu. Ft.) Questions/Comments DISCHARGE SYSTEM ATTACH FV022 19.000 S31755 107' 114'-8" SCAFF. Y UT DRAIN 6(3) CONFLUENCE OF C002NC 1 2E11A H26015 10037D04 1 NE DIAG C002A 20.00 ------- '---------- -------

RHR A STEAM COND LINE SYSTEM (CAPPED) AT UTI DRAINI ATTACH CAP ON TORUS ROOM 118' 123'-8" NONE Y FLUSH(1) QUARTER 6(3) WALL 2 2E11A H26015 10037D04 2 NE DIAG B001A HX NONE 16.00 15.250 S28396 NORTH END DW ACCESS, DW SYSTEM ATTACH LLRT CONNECTION BELOW F017A TBD 24.00 22.876 S31899 130' 134'-6" NONE Y UT DRAIN 6(3) F017 3 2E11A H26015 10037D04 3 ACCESS -----

SOUTH END DW ACCESS, DW SYSTEM ATTACH LLRT CONNECTION BELOW 2E11F058B 24.00 22.876 S28472 130' 134'-6" NONE Y UT DRAIN 6(3) F017 4 2E11B H26014 10037D04 4 ACCESS F017B ----

RHR B STEAM COND LINE SYSTEM (CAPPED) AT UTI DRAINI ATTACH NONE 16.00 15.250 TBD 118' 123' NONE Y FLUSH(1) QUARTER 6(3) CAPPED IN DIAGONAL 5 2E11B H26014 10037D04 5 SE DIAG B001B HX 1------ -------

C002B/D ATTACH UPSIDE DOWN U AT FV021 20.00 19.000 S31754 107' 114' SCAFF. Y FLUSH QUARTER 6(3) CONFLUENCE 6 2E11B H26014 10037D04 6 SE DIAG CONFLUENCE VERTICAL NOT PIPING UNDER SYSTEM ATTACH 16.00 15.250 TBD 130' TBD TBD UT DRAIN 6(3) 7A 2E11A H26014 10037D04 SHOWN TBD F016A TBD -----

_IB[)_ -------- 1-----

VERTICAL PIPING UNDER SYSTEM ATTACH RWCU HX ROOM INSIDE 16.00 15.250 S31425 158' 169' SCAFF. N UT DRAIN 6(3) DOOR 7B 2E11B H26014 10037D04 7 RWCU HX F016B F036B F023 HEAD ATTACH EAST SIDE BY HI POINT HARD PIPE 4.500 4.026 S31419 185' 193' SCAFF. Y VENT MONTH 6(3) VENTS 8 2E11B H26014 10037D04 8 RX BLDG SPRAY F067 RECIRC SYSTEM JUST OFF 147' GRATING IN 9 2E11 H26015 10037D04 1 DW SUCTION SDC TBD 20.00 19.000 S28478 147' 154'-6" SCAFF. Y UT DRAIN --

TBD DW SYSTEM EVEN WITH GRATING ON 10 2E11B H26014 10037D04 2 SE DIAG BELOW F006D NONE 20.00 19.000 S28406 107' 107' SCAFF. Y UT DRAIN TBD 107' SYSTEM ON 97' GRATING (MAY NEED 11 2E11B H26014 10037D04 3 SE DIAG BELOWEQ()6~ NONE 20.00 19.000 S28412 107' 110' NONE

_____ - _c_:-=-- ---

Y UT DRAIN TBD TQ COME FROM BELOW)

SYSTEM 12 2E11A H26015 10037D04 4 NE DIAG BELOW F006A NONE 20.00 19.000 S28398 107' 112' NONE Y UT DRAIN TBD SYSTEM BACK CORNER NEED 13 2E11A H26015 10037D04 5 NE DIAG BELOW F006C NONE 20.00 19.000 $£839L 107' 107' SCAFF. Y UT DRAIN TBD SCAFF FROM 97' SYSTEM 14 2E11 H26015 10037D04 6 DW F008 TO F009 NONE 20.00 19.000 S28478 127' 135' SCAFF. Y UT


1---

DRAIN TBD SYSTEM 15 2E21A H26018 10037D07 1 NE DIAG E21F002A NONE 14.00 13.250 S27015 97' 100' NONE N UT DRAIN TBD SYSTEM 16 2E21B H26018 10037D07 2 SE DIAG F002B NONE 14.00 13.250 S26991 97' 100 NONE N UT DRAIN TBD CS2A SYSTEM INJECTION UTI DRAINI ATTACH VENT(2) 6(3) 17 2E21A H26018 10037D07 3 RX BLDG LINE NONE 10.7 10.020 TBD 158' 171 '-3" NONE N


~-=

MONTH D003A I

Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1, 2 and 6

~~~~~~~-

c-~~~~~ ~~~~- ~~~

Max Pipe Allowable Monitor Westinghouse One Line OD PlpelD Floor Line Access Monitoring Void Size Point # System P&ID One Line Dw~ Location Room Description Vent Valves [in] [in] Isometric EI EI Needs Insulated Method Frequency~ (Cu. Ft.) Questions/Comments CS2B SYSTEM INJECTION UTI DRAINI ATTACH 18 2E21B H26018 10037D07 4 RWCU HX LINE NONE 10.75 10.020 TBD 158' 171'-3" SCAFF. N VENT(2) MONTH 6(3) D003B CS2A DISCHARGE SYSTEM ATTACH 19 2E21A H26018 10037D07 5 NE DIAG LINE NONE 12.75 12.090 TBD 118' 123'-2" NONE N UT DRAIN 6(3) F015A CS2B DISCHARGE SYSTEM ATTACH 20 2E21B H26018 10037D07 6 SE DIAG LINE NONE 12.75 12.090 TBD 118' 123'-2" NONE N UT DRAIN 6(3) F015B

~- I-----~~~~~ ~ ~

COMMON 21 2E41 H26020 10037D05 1 HPCI SUCTION NONE 14 13.25 H26839 87' 92'-6" NONE N FLUSH(1) QUARTER TBD I VENTI MONTHI ATTACH 22 2E41 H26020 10037D05 2 TORUS DISCHARGE NONE 14 12.5 H26840 114' 109'-6" NONE Y FLUSH QUARTER 6(3) OUTER CATWALK BAY 2 SYSTEM S.E.DIAGONAL AGAINST 23 2E51 H26023 10037D06 1 TORUS RHR SUCTION FV101 4 4.026 H26844 87' 107'-9" YES Y UT DRAIN TBD TORUS WALL DISCHARGE I ATTACH 24 2E51 H26023 10037D06 2 TORUS FEED NONE 4 3.826 H26845 114' 123'-0" YES Y FLUSH(1) QUARTER 6(3) INNER TORUS BAY 9 CONDENSATE 25 2E51 H26024 10037D06 3 RCIC DIAG PUMP RETURN NONE 2 1.939 S31014 87' 90'-4" NONE Y FLUSH QUARTER 0.02 TORUS SYSTEM 26 2E51 H26023 10037D06 4 RCICDIAG SUCTION NONE 6 6.065 H26844 87' 89'-5" NONE Y UT DRAIN 0.03 SYSTEM ATTACH UPSTREAM OF FLOW 27 2E11A H26015 10037D04 42(4) NE DIAG DISCHARGE NONE 24 22.876" H26820 117' 121'-5" NONE Y FLUSH DRAIN 6(3) ORIFICE 2E11 N014A SDC SUCTION UTOR SYSTEM 28 2E11A H26015 10037D04 50(4) NE DIAG TO C002C NONE 20 19.000" H26819 115' 115'-1" LADDER Y FLUSH DRAIN 0.58 UTOR SYSTEM 29 2E51 H26023 10037D06 24A1B(4) TORUS CST SUCTION NONE 6 6.065" H26844 87' 108'-7" SCAFF Y FLUSH DRAIN 0.09 UTOR SYSTEM ATTACH 30 2E51 H26023 10037D06 34(4) RCIC DIAG DISCHARGE NONE 4 5.761" H26845 87' 104'-1" SCAFF Y FLUSH DRAIN 6(3)

~~ ~ ~

piping IS pertormed dunng tUIl pump

-- ~~~~- ~~~~~~~-~~~~ ~~~~~~~~

(2)Une is partially vented during each monthly TS surveillance.

(3)See maximum allowable void volume table in Attachment 6.

(4)This location is detailed in Attachment 4 of Westinghouse Report LTR-SEE-III-08-141, rev. 1

Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1, 2 and 6 TOTAL ALLOWABLE VOLUME(2)

LOAD LOAD INCLUDED MONITORING RELIEF VALVE RELIEF VALVE SYSTEM SUPPORT SUPPORT LOCATIONS(1) LIFTING [in 3] LIFTING [tel DAMAGE [in 3] DAMAGE [tt 3 ]

lEllA 8,9,10,11,13,14 10746.3 6.219 7403.3 4.284 lEl1B 17,18,19,20,21,22,23,24,25 9976.8 5.774 9976.8 5.774 lE11B @ FPC 17,18,19,21,22,23,24,25 3276.8 1.896 5876.8 3.401 1E21A 28,30 934.2 0.541 994.2 0.575 lE21B 29,31 1014.2 0.587 1034.2 0.598 1E41 N/A N/A 2218.7 1.284 lE51 34,37 N/A N/A 2342.6 1.356 2El1A 1,2,3,7A 14062.8 8.138 15462.8 8.948 2E11B 4,5,6,7B 9362.8 5.418 9262.8 5.360 2E11B @ F023 4,5,6,7B,8 5576.8 3.227 6093.8 3.527 2E21A 17,19 270.0 0.156 910.0 0.527 2E21B 18,20 300.0 0.174 1000.0 0.579 2E41 22 N/A N/A 3518.7 2.036 2E51 24 N/A N/A 4895.6 2.833 Due to the nature of pump start (pressure wave) and void collapse water hammer phenomena, the sum of all the voids the discharge piping must be used.

(2)The left hand columns provide the void size required to potentially lift the system discharge relief valve due to water hammer related pressure spikes. The right hand columns provide the void size required to potentially damage piping supports due to excessive water hammer related loading. The lower of the given values should be used as the system maximum total allowable void volume. In general, this is the volume associated with relief valve lifting.

Text

Southern Nucieat Operating Company, Inc SOUTHERN COMPANY A

December 14, 2009 Docket Nos.: 50-321 NL-09-1B03 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Response to NRC Generic Letter 200B-01 Response to Requests for Additional Information Ladies and Gentlemen:

On October 10, 200B (NL-OB-1340) SNC submitted the nine-month response to Generic Letter 2008-01 and on August 24, 2009 (NL-09-1 067) SNC submitted for the Edwin I Hatch Nuclear Plant(HNP) Unit 2 post-outage response to Nuclear Regulatory Commission (NRC) Generic Letter 2008-01. In a letter dated November 5, 2009 the NRC submitted a request for additional information concerning the latter response referenced above. The requested response date was 45 days from the calendar date of the letter.

The enclosure to this letter contains the SNC response to the referenced NRC request for additional information.

This letter contains an NRC commitment.

u.s Nuclear Regulat01Y Commission NL-09-J803 Page 2 Mr. M. J. Ajluni states he is Nuclear Licensing Manager of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and to the best of his knowledge and belief, the facts set forth in this letter are true.

If you have any questions, please advise.

Sincerely,

~~~

M. J. Ajluni Manager, Nuclear Licensing Sworn to and subscribed before me this -LL day of f1u,~ ,2009.

~oJf~~ Notary Public My commission expires: ///0 t.//J.o13 MJA/PAHliac

Enclosures:

1. RAI Responses to NRC.
2. Regulatory Commitment for Submitting TS Change after TSTF Approval by NRC.
3. Attachments 1,2, and 6 of 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems."

U.S Nuclear Regulatory Commission NL-09-1803 Page 3 cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. D. R. Madison, Vice President Hatch Ms. P. M. Marino, Vice President Engineering RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Ms. D. N. Wright, NRR Project Manager Hatch Mr. E. D. Morris, Senior Resident Inspector - Hatch

Edwin I Hatch Nuclear Plant Response to NRC Generic letter 2008-01 Response to Requests for Additional Information Enclosure 1 RAI Responses to NRC

Enclosure I RAJ Responses to NRC REQUEST FOR ADDITIONAL INFORMATION Guidance on Nuclear Regulatory Commission (NRC) staff expectations is provided by Reference 1 which is generally consistent with Nuclear Energy Institute (NEI) guidance provided to industry in Reference 2 as clarified in later NEI communications. The NRC staff recommends that the licensee consult Reference 1 when responding to the following RAls:

1. Provide a regulatory commitment and a schedule for applying the Technical Specification Task Force (TSTF) process to any Technical Specification (TS) changes resulting from GL 2008-01.

Response: SNC has provided a regulatory commitment in Enclosure 2 to review any TSTF issued by the NRC concerning gas intrusion. SNC will either submit a technical specification change based on the TSTF or submit a plant specific technical specification change for Plant Hatch within a year after the issuance of an NRC approved TSTF concerning gas intrusion.

2. SNC letter dated August 24, 2009 states that the procedure, 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems" was implemented on November 19, 2008. The NRC staff requests the following additional information relative to this procedure:

a) Summarize the monitored locations along with the associated surveillance methods:

Response: Details for monitoring method and frequency along with point details for each monitoring location are provided in 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems," Attachments 1,2, and 6. A copy of these attachments is included as Enclosure 3.

b) Discuss the surveillance intervals for the monitored locations, including justifications for surveillance intervals greater than a month; Response: The applicable system piping was reviewed as per Generic Letter 2008-01 and critical locations were identified where voids could accumulate and the venting process could be challenged. The review concluded that none of the critical locations have active gas accumulation mechanisms.

The Hatch Monitoring Program is focused around these critical locations. The monitoring takes credit for the monthly activity that is performed by Operations as per the Technical Specification surveillance for venting of ECCS systems. The program also takes credit for dynamic flushing that occurs as a result of the quarterly ECCS flow surveillances. All of the monitored locations are vented or dynamically flushed anytime that the section of piping is drained such as for maintenance activities. Confirmatory UT inspections are performed on some locations to ensure the venting or flushing was successful.

The surveillance intervals for the monitored locations are contained in Attachments 1 and 2 of Enclosure 3. Justification for frequencies longer than monthly are based on the lack of an active gas accumUlation mechanism, dynamic flushing as a result of quarterly flow surveillances, and confirmatory UT inspections are performed on some locations to ensure the venting or flushing was successful.

E1-1

Enclosure 1 RAI Responses to NRC Procedure, 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems" provides an allowance to modify this frequency based on the results of previous gas monitoring results. If a void is identified during the routine monitoring, the frequency is evaluated to determine if an increase (or shorter monitoring period) is warranted.

c) Provide the surveillance criteria.

The surveillance acceptance criteria are specified in 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems," Attachments 1,2, and 6. A copy of these attachments is included as Enclosure 3.

d) Discuss actions to be taken if surveillance criteria are not met.

Response: Plant procedure, 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems," requires that for any identified voids that exceed the allowable size, a condition report is initiated and the Operations Shift Manager and/or the Shift Supervisor is immediately notified. If any voids are identified at any monitoring point that does not have an approved maximum allowable limit, either a formal evaluation will be performed or the void will be removed by venting or flushing. The impact on system operability will be addressed as a result of normal processing of the condition report by the on-shift operations personnel. In addition, Engineering personnel are immediately notified to perform an evaluation.

e) State whether all voids identified will be quantified, recorded, and entered into the Corrective Action Program (CAP).

Response: Per plant procedure, 42EN-MON-001-0, "Monitoring and Trending of Gas Accumulation in Safety Injection Systems," all identified voids, including the measured size, are recorded in a data package and a condition report generated to enter the information into the Corrective Action Program.

3. Describe any process improvements made to guard against gas intrusion due to inadvertent draining, system realignments, incorrect maintenance procedures, or other evolutions.

Plant evolutions involving system re-alignment or specific component manipulation that could result in inadvertent draining or inadvertent gas intrusion are controlled by plant procedures and performed only by trained plant staff. This includes system draining, tagouts, and system restoration fill and vent activities.

The HNP plant procedures applicable to these evolutions (Operations, Maintenance, and Instrument and Controls) were independently reviewed for improvements that could be made to address issues related to Generic Letter 2008-01. The review included such areas as vent scope, proper system vent sequence, precautions and limitations, potential gas accumulation mechanisms, documentations of voids identified, etc. From this review, resulting recommendations were evaluated by the plant staff and incorporated into the procedures as deemed appropriate.

Simplified piping elevation drawings were created as aids to be used by Operations and Engineering personnel to develop vent and/or ultrasonic testing (UT) plans.

E1-2

Enclosure 1 RAI Responses to NRC Additional vents have been added in Hatch Unit 2 piping locations that were determined not to have adequate venting capability. Vents will be added to Hatch Unit 1 in similar locations during the Spring 2010 refueling outage.

Operations, maintenance, and engineering personnel have been trained on the issues related to gas accumulation, including the potential causes and impact. This training also included the procedural changes described above.

4. Training was not identified in the GL but is considered to be a necessary part of applying procedures and other activities when addressing the issues identified in the GL Briefly discuss training.

Response: Training on Gas Accumulation and Management has been provided into the HNP continuing training process and provided to Operations and Maintenance personnel as part of the response to INPO SER 02-05, "Gas Intrusion in Safety Systems." This training focused on the potential for gas accumulation mechanisms and negative impact of voiding on system performance and reliability.

Several Operations and Engineering procedures have been developed or revised as a result of the response activities to Generic Letter 2008-01. When any station procedure is modified, an assessment for training needs and change management is required in accordance with HNP procedure DI-TRN-61-1006, "Training Request Worksheet."

In addition, selected site personnel have been trained and qualified on the use of UT equipment to perform void detection.

SNC is an active participant in the NEI Gas Accumulation Team, which is currently coordinating with the Institute of Nuclear Power Operations in the development of generic training modules for gas accumulation and management. These training modules target the Engineering, Operations, and Maintenance disciplines. The first module has been received by HNP and will be evaluated in the first quarter of 2010 for incorporation into the site personnel training processes in a version tailored to meet the station needs as per DI-TRN 61-1006, "Training RequestWorksheef." As the remainder of the training modules are completed and become available to the industry, SNC will evaluate them for applicability to HNP. Pending release of remaining products. the schedule for such planned training has not yet been determined.

REFERENCES

Riley, Nuclear Energy Institute, ML091390637, May 28,2009.

  • Riley, James H., "Generic Letter (GL) 2008-01 , "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Contain Spray Systems Evaluation and 3 Month Response Template," Letter to Administrative Points of Contact from Director, Engineering Nuclear Generation Division, Nuclear Energy Institute, Enclosure 2, "Generic Letter 2008-01 Response Guidance," March 20, 2008.

E1-3

Edwin I Hatch Nuclear Plant Response to NRC Generic letter 2008-01 Response to requests for Additional Information Enclosure 2 Regulatory Commitment

Enclosure 2 RAJ Responses to NRC NRC Commitment Type Scheduled One-Time Action Completion Date SNC will either submit X Within one year after a technical NRC Issuance specification based on the TSTF or submit a plant specific technical specification change for Plant Hatch within a year after the issuance of an NRC approved TSTF concerning gas intrusion.

E2-1

Edwin I Hatch Nuclear Plant Response to NRC Generic letter 2008-01 Response to requests for Additional Information Enclosure 3 42EI\I-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1 , 2 and 6

Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1, 2 and 6


-------- -,----- c------ ----------------

Max Pipe Allowable Monitor Westinghouse One Line 00 Pipe 10 Floor Access Monitoring Monitoring Void Size Point # System P&IO One Line DWQ Location Room Description Vent Valves [in] [in] Isometric EI Line EI Needs Insulated Method Frequency [Cu. Ft.] Questions/Comments F067 SOC SYSTEM 1 1E11 H16329 10036099 1 DRYWELL SUCTION TBD 20.00 19.000 S01286 TBD 156'-6" TBD Y VENT DRAIN TBD FPCHX SYSTEM SPECTACLE FLANGE JUST 2 1E11 H16329 10036099 2 ROOM FPC SUCTION TBD 8.625 7.981 S00236 158' 186' NONE N UT DRAIN TBD ABOVE FLOOR PUMP SIDE SYSTEM 3 1E11 H16329 10036099 3 NE DIAG F006D TBD 20.00 19.000 S01211 95' 106' TBD Y UT DRAIN TBD PUMP SIDE SYSTEM 4 1E11 H16329 10036099 4 NE DIAG F006B TBD 20.00 19.000 S01259 95' 106' TBD Y --------

UT DRAIN TBD F083 FLUSH SYSTEM 5 1E11 H16329 10036099 5 TBD SUPPLY SOC TBD 1.050 0.742 SOO060 130' 136'-11" TBD Y VENT DRAIN TBD -------

COMMON SOC SYSTEM 6 1E11 H16329 10036099 6 TORUS SUCTION TBD 20.00 19.000 123'-4" TBD -----

Y UT DRAIN TBD F008TO F009 SYSTEM F008 IN DRYWELL ACCESS; 7 1E11 H16329 10036099 7 DRYWELL -----

SOC NONE 20.00 19.000 SOO033 130' 135' NONE Y VENT DRAIN TBD F009 IN DRYWELL F016ACONT ATTACH OUTSIDE MG SET ROOMS 1E11 H16330 10036003 1 RX BLDG SPRAY O/B Y 16.00 15.250 SOO037 158' 160' NONE Y VENT MONTH 6(3) ON FLOOR 8

om F010 FLUSH SYSTEM ATTACH 6(3)

EAST WALL INTO OW 9 1E11 H16330 10036003 2 ACCESS SUPPLY Y 4.500 4.026 SOO052 130' 137' SCAFF Y UT DRAIN ACCESS om F010 FLUSH SYSTEM ATTACH 6(3)

EAST WALL INTO OW 10 1E11 H16330 10036003 3 ACCESS SUPPLY Y 4.500 4.026 SOO052 130' 137' SCAFF Y UT DRAIN ACCESS QUARTERI om FLUSHI SYSTEM ATTACH 6(3) 11 1E11 H16330 10036003 4 ACCESS TBD 20.00 19.000 S01184 130' 138'-9" TBD Y UT DRAIN TOP OF DRYWELL ACCESS PUMP SIDE SYSTEM 12 1E11 H16330 10036003 5 SE DIAG F006A TBD 20.00 19.000 SOO034 95' 97' TBD Y UT DRAIN TBD F006A ON GRATING 95' RHR AHX SYSTEM STEAMCOND UTI DRAINI ATTACH 10036003 6 SE DIAG (CAPPED) TBD 20.00 19.000 SOO036 118' 122'-6" NONE Y FLUSH(1) QUARTER 6(3) BACK CORNER 118' i

13 1E11 H16330 ATTACH INVERTED "U" AT 1E11 10036003 7 SE DIAG UIS F048A Y 20.00 19.000 SOO036 107' 116'-1 " SCAFF Y FLUSH QUARTER 6(3) CONFLUENCE OF "A" & "C" 14 H16330 PUMP SIDE SYSTEM 15 1E11 H16330 10036003 8 SE DIAG F006C NONE 24.00 22.876 SOO034 107' 113' NONE Y UT DRAIN TBD BEHIND 1T41-B002A F034ATO 16 1E11 H16330 10036003 9 SE DIAG D005A TBD 20.00 19.000 SOO036 95' 104'-1" SCAFF Y FLUSH QUARTER TBD ABOVE MOTORS ON 95' CAP ON COND Y - GOES ATTACH ISO SHOWS VENT AT 193',

10037019 1 RX BLDG MAKEUP TOINSTR 4.500 4.026 SOO054 185' 193' NONE N VENT MONTH 6(3) TOP 2" CAN'T BE VENTED 17 1E11 H16329 ---- ------- ...:~-;;----

FPCHX SYSTEM ATTACH BELOW SPECTACLE 1E11 H16329 10037019 2 ROOM TO FPC N 8.625 7.981 SOO054 185' 185' NONE N UT DRAIN 6(3) FLANGE 18 F016B TO Y-HARD 146'- SYSTEM ATTACH 1E11 10037019 3 RX BLDG F021B PIPED 16.00 15.250 S01169 130' 8.5" SCAFF Y UT DRAIN 6(3) 19 H16329 -------

OW F015B TO SYSTEM ATTACH 1E11 H16329 10037019 4 ACCESS F0178 NONE 24.00 22.876 SOO039 130' 138'-9" SCAFF Y VENT DRAIN 6(3) TOP DRYWELL ACCESS 20 ----- --- -------

OW F3031 COND SYSTEM ATTACH 1E11 10037019 ACCESS MAKEUP 1E11F3031 4.500 4.026 130' 136 SCAFF Y UT DRAIN 6(3) VENT IN DRYWELL ACCESS 21 H16329 5 ------- ------ --,--'-------------~- ---

Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1, 2 and 6 Max Pipe Allowable Monitor Westinghouse One Line 00 Pipe 10 Floor Access Monitoring Monitoring Void Size Point # System P&ID One Line Dwg Location Room Description Vent Valves [in] [in] Isometric EI LineEI Needs Insulated Method Frequency (Cu. Ft.) Questions/Comments F007B TO ATTACH MAY BE ABLE TO STAND 22 1E11 H16329 10037D19 6 NE DIAG C002B N 3.500 3.068 SOO049 87' 93 SCAFF Y FLUSH QUARTER 6(3) ON PUMP DISCHARGE PIPE SYSTEM CAPONTOPB N (R.V. UTI DRAIN/ ATTACH CAP ON INSIDE TORUS 23 1E11 H16329 10037D19 7 NE DIAG HX F055B) 14.00 13.250 SOO038 118' 122 NONE Y FLUSH(1) QUARTER 6(3) ROOM WALL AT D005B ATTACH 24 1E11 H16329 10037D19 8 NE DIAG ORIFICE NONE 20.00 19.000 SOO038 96' 104 SCAFF Y FLUSH QUARTER 6(3) ABOVE PUMP MOTORS C002B/D SYSTEM ATTACH AT CONFLUENCE OF C002B 25 1E11 H16329 10037D19 9 NE DIAG DISCHARGE 1E11 F3028 20.00 19.000 SOO038 107' 116 SCAFF Y UT DRAIN 6(3) ANDD CST SUCTION 92'-7 SYSTEM PIPE STUB CAPPED; OPEN 26 1E21 H16331 10036D97 1 SE DIAG F002A NONE 14.00 13.625 SOO073 87' 1/2" SCAFF N UT DRAIN 0.13 F002TOVENT CST SUCTION 92'-7 SYSTEM 27 1E21 H16331 10036D97 2 NE DIAG F002B NONE 14.00 13.625 TBD 87' 1/2" SCAFF N UT DRAIN 0.18 1E21F002B MGSET CST SUPPLY ATTACH 28 1E21 H16331 10036D98 1 RM1A F030A TBD 2.375 1.939 S01315 158' 173'-10" TBD N FLUSH CYCLE 6(3)

~~~~~~- ~~~~

CONDENSATE TRANSFER ATTACH 29 1E21 H16331 10036D98 2 RX BLDG SUPPLY F030B TBD 2.375 1.939 S01312 158' 174'-3" TBD N FLUSH CYCLE 6(3) BEHIND P005 PANEL CS A INJ LINE ATTACH OUTSIDE MG SET 30 1E21 H16331 10036D98 3 RX BLDG D003A - F005A TBD 10.75 10.020 SOO075 158' 172'-9" TBD N VENT MONTH 6(3) PLATFORM CS B INJ LINE D003B TO ATTACH 31 1E21 H16331 10036D98 4 RX BLDG F005B 1E21F013B 10.75 10.020 TBD 158' 172'-9" TBD N VENT MONTH 6(3) RWCU HX PLATFORM

~ ~~~~~~~~~-

SYSTEM UTI DRAINI 32 1E41 H16332 10037DOO 1 HPCI CST SUCTION F3001 16.00 15.5" H16868 119' 123'-0" NONE N FLUSH QUARTER 0.88 SYSTEM TORUS UTI DRAINI 33 1E41 H16332 10037DOO 2 HPCI SUCTION NONE 16.00 15" H16868 87' 90'-1" NONE N FLUSH(1) QUARTER 0.10 SYSTEM UTI DRAINI 34 1E41 H16332 10037DOO N/A TORUS DISCHARGE 1E41F3008 14.00 13.00 H16869 123' 123'-6" NONE Y VENT MONTH 4.061 VENT\~}I MONTHI ATTACH 35 1E51 H16334 10037D01 1 TORUS DISCHARGE NONE 4" 3.624" H16874 114' 123'-11" SCAFF N FLUSH(1) QUARTER 6(3) INNER CATWALK BAY 1

~~~~~~~

SYSTEM CONDENSATE 93'-6 UTI DRAINI 36 1E51 H16335 10037D01 2 RCIC PUMP RETURN NONE 2" 2.067" S01466 87' 7/16" SCAFF N QUARTER FLUSH 0.03 TORUS 89'-8 SYSTEM 37 1E51 H16334 10037D01 3 RCIC SUCTION NONE 6" 6.065" H16873 87' 7/8" NONE N UT DRAIN 0.02 SYSTEM UTI DRAIN/ ATTACH 38 1E51 H16334 10037D01 4 RCIC DISCHARGE NONE 4" 3.826" H16874 87' 104'-11" SCAFF N FLUSH QUARTER 6(3)

SYSTEM INNER CATWALK @

39 1E21 H16331 10036D97 10(4) CSA CST SUCTION 1E21F127 14" 13.25" H16121 117' 121'-2" TBD N UT DRAIN 0.73 COLUMN LINES R6-RJ

Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1, 2 and 6 UTOR SYSTEM IN TORUS SOUTHI 40 1E51 H16334 10037001 3i )

4 RCIC CST SUCTION NONE 6" 6.065" H16108 87' 108' -7" SCAFF Y FLUSH DRAIN 0.29 SOUTHWEST SYSTEM ATTACH MAY BE REACHED FROM 1E41 H16332 10037000 21(4) HPCI DISCHARGE 1E41F3004 14" 12.500" H16869 87' 95'-10" SCAFF N FLUSH DRAIN 6(3) NEARBY STAIRS 41 SYSTEM ATTACH 42 1E11B H16329 10037019 43(4) RHRB DISCHARGE NONE 16" 15.250" H16837 117' 119'-6" NONE Y FLUSH DRAIN 6(3) NORTHEAST DIAGONAL

'------------- ------- -------------- i piping IS pertormed dUring lUll pump (2)Une is partially vented during each monthly TS surveillance.

(3)See maximum allowable void volume table in Attachment 6.

(4)This location is detailed in Attachment 4 of Westinghouse Report LTR-SEE-III-08-140, rev. 1

Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1, 2 and 6 Max Pipe Allowable Monitor Westinghouse One Line OD Pipe ID Floor Line Access Monitoring Void Size Point # System P&ID One Line Dwg Location Room Description Vent Valves [il1] [In] Isometric EI EI Needs Insulated Method Frequency (Cu. Ft.) Questions/Comments DISCHARGE SYSTEM ATTACH FV022 19.000 S31755 107' 114'-8" SCAFF. Y UT DRAIN 6(3) CONFLUENCE OF C002NC 1 2E11A H26015 10037D04 1 NE DIAG C002A 20.00 ------- '---------- -------

RHR A STEAM COND LINE SYSTEM (CAPPED) AT UTI DRAINI ATTACH CAP ON TORUS ROOM 118' 123'-8" NONE Y FLUSH(1) QUARTER 6(3) WALL 2 2E11A H26015 10037D04 2 NE DIAG B001A HX NONE 16.00 15.250 S28396 NORTH END DW ACCESS, DW SYSTEM ATTACH LLRT CONNECTION BELOW F017A TBD 24.00 22.876 S31899 130' 134'-6" NONE Y UT DRAIN 6(3) F017 3 2E11A H26015 10037D04 3 ACCESS -----

SOUTH END DW ACCESS, DW SYSTEM ATTACH LLRT CONNECTION BELOW 2E11F058B 24.00 22.876 S28472 130' 134'-6" NONE Y UT DRAIN 6(3) F017 4 2E11B H26014 10037D04 4 ACCESS F017B ----

RHR B STEAM COND LINE SYSTEM (CAPPED) AT UTI DRAINI ATTACH NONE 16.00 15.250 TBD 118' 123' NONE Y FLUSH(1) QUARTER 6(3) CAPPED IN DIAGONAL 5 2E11B H26014 10037D04 5 SE DIAG B001B HX 1------ -------

C002B/D ATTACH UPSIDE DOWN U AT FV021 20.00 19.000 S31754 107' 114' SCAFF. Y FLUSH QUARTER 6(3) CONFLUENCE 6 2E11B H26014 10037D04 6 SE DIAG CONFLUENCE VERTICAL NOT PIPING UNDER SYSTEM ATTACH 16.00 15.250 TBD 130' TBD TBD UT DRAIN 6(3) 7A 2E11A H26014 10037D04 SHOWN TBD F016A TBD -----

_IB[)_ -------- 1-----

VERTICAL PIPING UNDER SYSTEM ATTACH RWCU HX ROOM INSIDE 16.00 15.250 S31425 158' 169' SCAFF. N UT DRAIN 6(3) DOOR 7B 2E11B H26014 10037D04 7 RWCU HX F016B F036B F023 HEAD ATTACH EAST SIDE BY HI POINT HARD PIPE 4.500 4.026 S31419 185' 193' SCAFF. Y VENT MONTH 6(3) VENTS 8 2E11B H26014 10037D04 8 RX BLDG SPRAY F067 RECIRC SYSTEM JUST OFF 147' GRATING IN 9 2E11 H26015 10037D04 1 DW SUCTION SDC TBD 20.00 19.000 S28478 147' 154'-6" SCAFF. Y UT DRAIN --

TBD DW SYSTEM EVEN WITH GRATING ON 10 2E11B H26014 10037D04 2 SE DIAG BELOW F006D NONE 20.00 19.000 S28406 107' 107' SCAFF. Y UT DRAIN TBD 107' SYSTEM ON 97' GRATING (MAY NEED 11 2E11B H26014 10037D04 3 SE DIAG BELOWEQ()6~ NONE 20.00 19.000 S28412 107' 110' NONE

_____ - _c_:-=-- ---

Y UT DRAIN TBD TQ COME FROM BELOW)

SYSTEM 12 2E11A H26015 10037D04 4 NE DIAG BELOW F006A NONE 20.00 19.000 S28398 107' 112' NONE Y UT DRAIN TBD SYSTEM BACK CORNER NEED 13 2E11A H26015 10037D04 5 NE DIAG BELOW F006C NONE 20.00 19.000 $£839L 107' 107' SCAFF. Y UT DRAIN TBD SCAFF FROM 97' SYSTEM 14 2E11 H26015 10037D04 6 DW F008 TO F009 NONE 20.00 19.000 S28478 127' 135' SCAFF. Y UT


1---

DRAIN TBD SYSTEM 15 2E21A H26018 10037D07 1 NE DIAG E21F002A NONE 14.00 13.250 S27015 97' 100' NONE N UT DRAIN TBD SYSTEM 16 2E21B H26018 10037D07 2 SE DIAG F002B NONE 14.00 13.250 S26991 97' 100 NONE N UT DRAIN TBD CS2A SYSTEM INJECTION UTI DRAINI ATTACH VENT(2) 6(3) 17 2E21A H26018 10037D07 3 RX BLDG LINE NONE 10.7 10.020 TBD 158' 171 '-3" NONE N


~-=

MONTH D003A I

Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1, 2 and 6

~~~~~~~-

c-~~~~~ ~~~~- ~~~

Max Pipe Allowable Monitor Westinghouse One Line OD PlpelD Floor Line Access Monitoring Void Size Point # System P&ID One Line Dw~ Location Room Description Vent Valves [in] [in] Isometric EI EI Needs Insulated Method Frequency~ (Cu. Ft.) Questions/Comments CS2B SYSTEM INJECTION UTI DRAINI ATTACH 18 2E21B H26018 10037D07 4 RWCU HX LINE NONE 10.75 10.020 TBD 158' 171'-3" SCAFF. N VENT(2) MONTH 6(3) D003B CS2A DISCHARGE SYSTEM ATTACH 19 2E21A H26018 10037D07 5 NE DIAG LINE NONE 12.75 12.090 TBD 118' 123'-2" NONE N UT DRAIN 6(3) F015A CS2B DISCHARGE SYSTEM ATTACH 20 2E21B H26018 10037D07 6 SE DIAG LINE NONE 12.75 12.090 TBD 118' 123'-2" NONE N UT DRAIN 6(3) F015B

~- I-----~~~~~ ~ ~

COMMON 21 2E41 H26020 10037D05 1 HPCI SUCTION NONE 14 13.25 H26839 87' 92'-6" NONE N FLUSH(1) QUARTER TBD I VENTI MONTHI ATTACH 22 2E41 H26020 10037D05 2 TORUS DISCHARGE NONE 14 12.5 H26840 114' 109'-6" NONE Y FLUSH QUARTER 6(3) OUTER CATWALK BAY 2 SYSTEM S.E.DIAGONAL AGAINST 23 2E51 H26023 10037D06 1 TORUS RHR SUCTION FV101 4 4.026 H26844 87' 107'-9" YES Y UT DRAIN TBD TORUS WALL DISCHARGE I ATTACH 24 2E51 H26023 10037D06 2 TORUS FEED NONE 4 3.826 H26845 114' 123'-0" YES Y FLUSH(1) QUARTER 6(3) INNER TORUS BAY 9 CONDENSATE 25 2E51 H26024 10037D06 3 RCIC DIAG PUMP RETURN NONE 2 1.939 S31014 87' 90'-4" NONE Y FLUSH QUARTER 0.02 TORUS SYSTEM 26 2E51 H26023 10037D06 4 RCICDIAG SUCTION NONE 6 6.065 H26844 87' 89'-5" NONE Y UT DRAIN 0.03 SYSTEM ATTACH UPSTREAM OF FLOW 27 2E11A H26015 10037D04 42(4) NE DIAG DISCHARGE NONE 24 22.876" H26820 117' 121'-5" NONE Y FLUSH DRAIN 6(3) ORIFICE 2E11 N014A SDC SUCTION UTOR SYSTEM 28 2E11A H26015 10037D04 50(4) NE DIAG TO C002C NONE 20 19.000" H26819 115' 115'-1" LADDER Y FLUSH DRAIN 0.58 UTOR SYSTEM 29 2E51 H26023 10037D06 24A1B(4) TORUS CST SUCTION NONE 6 6.065" H26844 87' 108'-7" SCAFF Y FLUSH DRAIN 0.09 UTOR SYSTEM ATTACH 30 2E51 H26023 10037D06 34(4) RCIC DIAG DISCHARGE NONE 4 5.761" H26845 87' 104'-1" SCAFF Y FLUSH DRAIN 6(3)

~~ ~ ~

piping IS pertormed dunng tUIl pump

-- ~~~~- ~~~~~~~-~~~~ ~~~~~~~~

(2)Une is partially vented during each monthly TS surveillance.

(3)See maximum allowable void volume table in Attachment 6.

(4)This location is detailed in Attachment 4 of Westinghouse Report LTR-SEE-III-08-141, rev. 1

Enclosure 3 42EN-MON-001-0 "Monitoring and Trending of Gas Accumulation in Safety Injection Systems""

Attachments 1, 2 and 6 TOTAL ALLOWABLE VOLUME(2)

LOAD LOAD INCLUDED MONITORING RELIEF VALVE RELIEF VALVE SYSTEM SUPPORT SUPPORT LOCATIONS(1) LIFTING [in 3] LIFTING [tel DAMAGE [in 3] DAMAGE [tt 3 ]

lEllA 8,9,10,11,13,14 10746.3 6.219 7403.3 4.284 lEl1B 17,18,19,20,21,22,23,24,25 9976.8 5.774 9976.8 5.774 lE11B @ FPC 17,18,19,21,22,23,24,25 3276.8 1.896 5876.8 3.401 1E21A 28,30 934.2 0.541 994.2 0.575 lE21B 29,31 1014.2 0.587 1034.2 0.598 1E41 N/A N/A 2218.7 1.284 lE51 34,37 N/A N/A 2342.6 1.356 2El1A 1,2,3,7A 14062.8 8.138 15462.8 8.948 2E11B 4,5,6,7B 9362.8 5.418 9262.8 5.360 2E11B @ F023 4,5,6,7B,8 5576.8 3.227 6093.8 3.527 2E21A 17,19 270.0 0.156 910.0 0.527 2E21B 18,20 300.0 0.174 1000.0 0.579 2E41 22 N/A N/A 3518.7 2.036 2E51 24 N/A N/A 4895.6 2.833 Due to the nature of pump start (pressure wave) and void collapse water hammer phenomena, the sum of all the voids the discharge piping must be used.

(2)The left hand columns provide the void size required to potentially lift the system discharge relief valve due to water hammer related pressure spikes. The right hand columns provide the void size required to potentially damage piping supports due to excessive water hammer related loading. The lower of the given values should be used as the system maximum total allowable void volume. In general, this is the volume associated with relief valve lifting.