{{#Wiki_filter:JPM- ANO-2-JPM-NRC-CCP01 PAGE 1 | {{#Wiki_filter:JPM- ANO-2-JPM-NRC-CCP01 PAGE 1 OF 5 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 6 DATE: | ||
SYSTEM/DUTY AREA: | SYSTEM/DUTY AREA: Pressurizer Level Control System TASK: Shifting Lead Charging Pump JTA#: 20045510401 KA VALUE RO: 3.5 SRO: 3.7 KA | ||
Pressurizer Level Control System TASK: | |||
3.5 SRO: | |||
3.7 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
011 A2.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH: | |||
011 A2.04 APPROVED FOR ADMINISTRATION TO: | |||
X SRO: | |||
X TASK LOCATION: | |||
X OUTSIDE CR: | |||
BOTH: | |||
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
PLANT SITE: | PLANT SITE: SIMULATOR: Perform LAB: | ||
POSITION EVALUATED: RO: SRO: | |||
SIMULATOR: | ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE: LAB: | ||
Perform LAB: | TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 5 Minutes REFERENCE(S): OP 2104.002 Rev 038-01-0 EXAMINEE'S NAME: SSN: - - | ||
EVALUATOR'S NAME: | |||
POSITION EVALUATED: RO: | |||
SRO: | |||
ACTUAL TESTING ENVIRONMENT: | |||
X PLANT SITE: | |||
LAB: | |||
TESTING METHOD: | |||
PERFORM: | |||
X APPROXIMATE COMPLETION TIME IN MINUTES: | |||
5 Minutes REFERENCE(S): | |||
OP 2104.002 | |||
SSN: | |||
EVALUATOR'S NAME: | |||
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: | ||
SATISFACTORY: | SATISFACTORY: UNSATISFACTORY: | ||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED__________________________________ DATE: _____________________ | |||
Start Time | |||
Stop Time | |||
Total Time SIGNED__________________________________ | |||
DATE: _____________________ | |||
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | ||
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | ||
TASK PERFORMANCE AIDS: | JPM- ANO-2-JPM-NRC-CCP01 PAGE 2 OF 5 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | ||
OP 2104.002 | JPM INITIAL TASK CONDITIONS: WCO has requested Charging Pump 2P36B be stopped to perform oil level check. THIS IS AN ALTERNATE SUCCESS PATH JPM. | ||
TASK STANDARD: Shift lead charging pump. | |||
TASK PERFORMANCE AIDS: OP 2104.002 SIMULATOR SETUP: Select "B" as lead charging pump and trigger 2P36C Plunger Break CVC2P36CBRK. 2P36C aligned to green bus. | |||
JPM- ANO-2-JPM-NRC-CCP01 PAGE 3 OF 5 JOB PERFORMANCE MEASURE INITIATING CUE: | |||
The SS/CRS directs, "Shift lead charging pump to 2P36C using OP 2104.002 Section 8.1. Seal water pump has been running for 15 minutes." | |||
JPM- ANO-2-JPM-NRC-CCP01 PAGE 3 | CRITICAL ELEMENTS (C): 2 PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
The SS/CRS directs, "Shift lead charging pump to 2P36C using OP 2104.002 Section 8.1. Seal water pump has been running for 15 minutes." CRITICAL ELEMENTS (C): | : 1. Place selected pump handswitch On 2C09, placed 2HS-4853-2 to N/A SAT UNSAT to START. START. Observed red light ON and green light OFF. | ||
2 PERFORMANCE CHECKLIST STANDARDS (Circle One) 1.Place selected pump handswitch | (C) 2. Check Charging Flow goes up ~44 On 2C09, checked Charging Flow N/A SAT UNSAT gpm. (2FIS-4863) and reports flow indicates 60 gpm. | ||
: 3. Did not get expected response, Placed 2HS-4853-2 to AUTO or N/A SAT UNSAT therefore secure 2P36C. STOP. Observed red light OFF and green light ON. | |||
and green light OFF. | EXAMINEERS CUE: | ||
indicates 60 gpm. | |||
Placed 2HS-4853-2 to AUTO or STOP. Observed red light OFF and | |||
green light ON. | |||
Act as CRS and direct examinee to select 2P36A as lead charging pump. | Act as CRS and direct examinee to select 2P36A as lead charging pump. | ||
4.Place selected pump handswitch | : 4. Place selected pump handswitch On 2C09, placed 2HS-4832-1 to N/A SAT UNSAT to START. START. Observed red light ON and green light OFF. | ||
: 5. Check Charging Flow goes up ~44 On 2C09, checks Charging Flow N/A SAT UNSAT gpm. (2FIS-4863) flow indicates ~88 gpm. | |||
green light OFF. | : 6. Place Charging Pump Select On 2C09, placed Charging Pump N/A SAT UNSAT Switch (2HS-4868) to selected lead Select handswitch (2HS-4868) to pump. PMP B&C position. | ||
: 7. Verify previous lead pump stops. Checked 2P36B stopped. Observed N/A SAT UNSAT red light OFF and green light ON. | |||
: 8. Check Charging Flow lowers On 2C09, checks Charging Flow N/A SAT UNSAT | |||
~44 gpm. (2FIS-4863) flow indicates ~44 gpm. | |||
: 9. Place selected pump handswitch On 2C09, placed 2HS-4832-1 to N/A SAT UNSAT to AUTO. AUTO. | |||
END | |||
JPM- ANO-2-JPM-NRC-CCP01 PAGE 4 OF 5 JOB PERFORMANCE MEASURE QUESTION ANSWER | |||
JPM- ANO-2-JPM-NRC-CCP01 PAGE 5 OF 5 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: | |||
WCO has requested Charging Pump 2P36B be stopped to perform oil level checks. | WCO has requested Charging Pump 2P36B be stopped to perform oil level checks. | ||
INITIATING CUE: | INITIATING CUE: | ||
The SS/CRS directs, "Shift lead charging pump to 2P36C using OP 2104.002 Section 8.1. Seal water pump has been running for 15 minutes."}} | The SS/CRS directs, "Shift lead charging pump to 2P36C using OP 2104.002 Section 8.1. Seal water pump has been running for 15 minutes."}} |
Latest revision as of 06:44, 24 November 2019
ML003716744 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 04/24/2000 |
From: | NRC Region 4 |
To: | |
References | |
-RFPFR | |
Download: ML003716744 (5) | |
Text
JPM- ANO-2-JPM-NRC-CCP01 PAGE 1 OF 5 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 6 DATE:
SYSTEM/DUTY AREA: Pressurizer Level Control System TASK: Shifting Lead Charging Pump JTA#: 20045510401 KA VALUE RO: 3.5 SRO: 3.7 KA
REFERENCE:
011 A2.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 5 Minutes REFERENCE(S): OP 2104.002 Rev 038-01-0 EXAMINEE'S NAME: SSN: - -
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED__________________________________ DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
JPM- ANO-2-JPM-NRC-CCP01 PAGE 2 OF 5 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: WCO has requested Charging Pump 2P36B be stopped to perform oil level check. THIS IS AN ALTERNATE SUCCESS PATH JPM.
TASK STANDARD: Shift lead charging pump.
TASK PERFORMANCE AIDS: OP 2104.002 SIMULATOR SETUP: Select "B" as lead charging pump and trigger 2P36C Plunger Break CVC2P36CBRK. 2P36C aligned to green bus.
JPM- ANO-2-JPM-NRC-CCP01 PAGE 3 OF 5 JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, "Shift lead charging pump to 2P36C using OP 2104.002 Section 8.1. Seal water pump has been running for 15 minutes."
CRITICAL ELEMENTS (C): 2 PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 1. Place selected pump handswitch On 2C09, placed 2HS-4853-2 to N/A SAT UNSAT to START. START. Observed red light ON and green light OFF.
(C) 2. Check Charging Flow goes up ~44 On 2C09, checked Charging Flow N/A SAT UNSAT gpm. (2FIS-4863) and reports flow indicates 60 gpm.
- 3. Did not get expected response, Placed 2HS-4853-2 to AUTO or N/A SAT UNSAT therefore secure 2P36C. STOP. Observed red light OFF and green light ON.
EXAMINEERS CUE:
Act as CRS and direct examinee to select 2P36A as lead charging pump.
- 4. Place selected pump handswitch On 2C09, placed 2HS-4832-1 to N/A SAT UNSAT to START. START. Observed red light ON and green light OFF.
- 5. Check Charging Flow goes up ~44 On 2C09, checks Charging Flow N/A SAT UNSAT gpm. (2FIS-4863) flow indicates ~88 gpm.
- 6. Place Charging Pump Select On 2C09, placed Charging Pump N/A SAT UNSAT Switch (2HS-4868) to selected lead Select handswitch (2HS-4868) to pump. PMP B&C position.
- 7. Verify previous lead pump stops. Checked 2P36B stopped. Observed N/A SAT UNSAT red light OFF and green light ON.
- 8. Check Charging Flow lowers On 2C09, checks Charging Flow N/A SAT UNSAT
~44 gpm. (2FIS-4863) flow indicates ~44 gpm.
- 9. Place selected pump handswitch On 2C09, placed 2HS-4832-1 to N/A SAT UNSAT to AUTO. AUTO.
END
JPM- ANO-2-JPM-NRC-CCP01 PAGE 4 OF 5 JOB PERFORMANCE MEASURE QUESTION ANSWER
JPM- ANO-2-JPM-NRC-CCP01 PAGE 5 OF 5 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
WCO has requested Charging Pump 2P36B be stopped to perform oil level checks.
INITIATING CUE:
The SS/CRS directs, "Shift lead charging pump to 2P36C using OP 2104.002 Section 8.1. Seal water pump has been running for 15 minutes."