{{#Wiki_filter:March 23, 2012
{{#Wiki_filter:UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON rch 23, 2012


==SUBJECT:==
==SUBJECT:==
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -NRC SECURITY INSPECTION REPORT 05000528/2012404, 05000529/2012404 AND 05000530/2012404
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
NRC SECURITY INSPECTION REPORT 05000528/2012404, 05000529/2012404 AND 05000530/2012404


==Dear Mr. Edington:==
==Dear Mr. Edington:==
On March 1, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 1, 2012, with Mr. D. Mims, Vice President, Nuclear Regulatory Affairs and Oversight, and other members of your staff.
On March 1, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 1, 2012, with Mr. D. Mims, Vice President, Nuclear Regulatory Affairs and Oversight, and other members of your staff.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
 
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


No findings were identified during this inspection.
No findings were identified during this inspection.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.


UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


Sincerely,
Sincerely,
/RA/
/RA/
Michael C. Hay, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-528, 50-529, 50-530 License No.: NPF-41, NPF-51, NPF-74  
Michael C. Hay, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-528, 50-529, 50-530 License No.: NPF-41, NPF-51, NPF-74 Nonpublic Enclosure:
 
NRC Inspection Report 05000528/2012404, 05000529/2012404 and 05000530/2012404 w/Attachment: Supplemental Information cc w/enclosure:
Nonpublic Enclosure: NRC Inspection Report 05000528/2012404, 05000529/2012404 and 05000530/2012404 w/Attachment: Supplemental Information  
Mr. Randall Bramlett Department Leader, Nuclear Security Programs Arizona Public Service Co.


cc w/enclosure: Mr. Randall Bramlett Department Leader, Nuclear Security Programs Arizona Public Service Co. P.O. Box 52034, MS 7002 Phoenix, AZ 85072-2034 cc w/o enclosure via Electronic Distribution
P.O. Box 52034, MS 7002 Phoenix, AZ 85072-2034 cc w/o enclosure via Electronic Distribution
}}
}}

Latest revision as of 06:23, 12 November 2019

NRC Security Inspection Report 05000528-12-404, 05000529-12-404 and 05000530-12-404
ML12083A248
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/23/2012
From: Hay M
Plant Support Branch-1
To: Edington R
Arizona Public Service Co
References
IR-12-404
Download: ML12083A248 (3)


Text

UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON rch 23, 2012

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

NRC SECURITY INSPECTION REPORT 05000528/2012404, 05000529/2012404 AND 05000530/2012404

Dear Mr. Edington:

On March 1, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 1, 2012, with Mr. D. Mims, Vice President, Nuclear Regulatory Affairs and Oversight, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Michael C. Hay, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-528, 50-529, 50-530 License No.: NPF-41, NPF-51, NPF-74 Nonpublic Enclosure:

NRC Inspection Report 05000528/2012404, 05000529/2012404 and 05000530/2012404 w/Attachment: Supplemental Information cc w/enclosure:

Mr. Randall Bramlett Department Leader, Nuclear Security Programs Arizona Public Service Co.

P.O. Box 52034, MS 7002 Phoenix, AZ 85072-2034 cc w/o enclosure via Electronic Distribution