05000440/FIN-2009003-07: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 12: Line 12:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71121.01
| Inspection procedure = IP 71121.01
| Inspector = B Dickson, M Phalen, W Slawinskim, Wilk M, Marshfield M, Phalen D, Jones M, Franke J, Bashore R, Leidy J, Cameron R, Murray C, Tilton J, Coroju-Sandi
| Inspector = B Dickson, M Phalen, W Slawinskim, Wilkm Marshfield, M Phalen, D Jones, M Franke, J Bashore, R Leidy, J Cameron, R Murray, C Tilton, J Coroju-Sandin
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  

Latest revision as of 20:37, 20 February 2018

07
Site: Perry FirstEnergy icon.png
Report IR 05000440/2009003 Section 2OS1
Date counted Jun 30, 2009 (2009Q2)
Type: URI: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71121.01
Inspectors (proximate) B Dickson
M Phalen
W Slawinskim
Wilkm Marshfield
M Phalen
D Jones
M Franke
J Bashore
R Leidy
J Cameron
R Murray
C Tilton
J Coroju-Sandin
INPO aspect
'