Braidwood: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
Line 9: | Line 9: | ||
|ISFSI docket=07200073 | |ISFSI docket=07200073 | ||
|mapping location=41° 14' 34.19" N, 88° 13' 44.44" W | |mapping location=41° 14' 34.19" N, 88° 13' 44.44" W | ||
|company=Exelon | |company=Constellation | ||
|company history={{company history | |||
|transfer from=Exelon | |||
|transfer to=Constellation | |||
|transfer date=February 2, 2022 | |||
|transfer record=ML22021B659 | |||
}} | |||
|wikipedia=Braidwood Nuclear Generating Station | |wikipedia=Braidwood Nuclear Generating Station | ||
|site unit={{Site unit | |site unit={{Site unit |
Latest revision as of 19:05, 22 March 2022
Plant | |
---|---|
Company | Constellation |
Where | Braidwood, Illinois |
Regulatory | |
Region | NRC Region 3 |
ISFSI docket | 07200073 |
Company History | |
Exelon->Constellation (February 2, 2022) | |
wikipedia link | |
Docket | 05000456 |
---|---|
License | NPF–72 |
Licensed Power Level (Thermal) | 3645 MWt |
Unit type | Westinghouse PWR 4-Loop |
Containment | Ambient Pressure |
Ultimate Heat Sink | Kankakee River |
Status | |
Commission | 07/02/1987 |
NRC Website | |
Docket | 05000457 |
---|---|
License | NPF–77 |
Licensed Power Level (Thermal) | 3645 MWt |
Unit type | Westinghouse Four-Loop |
Containment | Ambient Pressure |
Ultimate Heat Sink | Kankakee River |
Status | |
Commission | 05/20/1988 |
NRC Website | |