ML18025A857: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML18025A857
| number = ML18025A857
| issue date = 03/05/2018
| issue date = 03/05/2018
| title = Audit Summary Memo Nuscale Chapter 4, 5 and 9
| title = Audit Summary Memo NuScale Chapter 4, 5 and 9
| author name = Bavol B
| author name = Bavol B
| author affiliation = NRC/NRO/DNRL/LB1
| author affiliation = NRC/NRO/DNRL/LB1
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY  PROPRIETARY INFORMATION OFFICIAL USE ONLY  PROPRIETARY INFORMATION March 5, 2018 MEMORANDUM TO: Samuel S. Lee, Chief Licensing Branch 1 Division of New Reactor Licensing  
{{#Wiki_filter:OFFICIAL USE ONLY  PROPRIETARY INFORMATION March 5, 2018 MEMORANDUM TO:           Samuel S. Lee, Chief Licensing Branch 1 Division of New Reactor Licensing Office of New Reactors FROM:                     Bruce M. Bavol, Project Manager /RA/
 
Licensing Branch 1 Division of New Reactor Licensing Office of New Reactors
Office of New Reactors FROM: Bruce M. Bavol, Project Manager
  /RA/ Licensing Branch 1 Division of New Reactor Licensing  
 
Office of New Reactors  


==SUBJECT:==
==SUBJECT:==
Line 26: Line 22:


==SUMMARY==
==SUMMARY==
FOR NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION CHAPTER 4, "REACTOR"; CHAPTER 5, "REACTOR COOLANT AND CONNECTING SYSTEMS"; AND CHAPTER 9, "AUXILIARY SYSTEMS" The U.S. Nuclear Regulatory Commission staff conducted an audit May 3, 2017, to November 29, 2017. The purpose of this regulatory audit of NuScale Power, LLC's (NuScale) subject line chapters was to: (1) gain a better understanding of the NuScale design; (2) verify information; (3) identify information that will require docketing to support the basis of the licensing or regulatory decision; and (4) review related documentation and non-docketed information to evaluated conformance with regulatory guidance.
FOR NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION CHAPTER 4, REACTOR; CHAPTER 5, REACTOR COOLANT AND CONNECTING SYSTEMS; AND CHAPTER 9, AUXILIARY SYSTEMS The U.S. Nuclear Regulatory Commission staff conducted an audit May 3, 2017, to November 29, 2017. The purpose of this regulatory audit of NuScale Power, LLCs (NuScale) subject line chapters was to: (1) gain a better understanding of the NuScale design; (2) verify information; (3) identify information that will require docketing to support the basis of the licensing or regulatory decision; and (4) review related documentation and non-docketed information to evaluated conformance with regulatory guidance.
 
The enclosed audit summary describes the content of the review, identifies the audit participants, and audit exit observations.
The enclosed audit summary describes the content of the review, identifies the audit participants, and audit exit observations.
Docket No. 52-048 Document transmitted herewith contains sensitive unclassified
 
Docket No. 52-048  


==Enclosures:==
==Enclosures:==
: 1. Audit Summary - (Non-Proprietary)
information. When separated from the
: 2. Audit Summary - (Proprietary) cc w/encl.: DC NuScale Power, LLC Listserv (w/o Enclosure 2)  
: 1. Audit Summary - (Non-Proprietary)                         enclosure, this document is DECONTROLLED.
: 2. Audit Summary - (Proprietary) cc w/encl.: DC NuScale Power, LLC Listserv (w/o Enclosure 2)
CONTACT: Bruce M. Bavol, NRO/DNRL 301-415-6715 OFFICIAL USE ONLY  PROPRIETARY INFORMATION


CONTACT:  Bruce M. Bavol, NRO/DNRL          301-415-6715Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is "DECONTROLLED."
OFFICIAL USE ONLY  PROPRIETARY INFORMATION
OFFICIAL USE ONLY  PROPRIETARY INFORMATION OFFICIAL USE ONLY  PROPRIETARY INFORMATION  


==SUBJECT:==
==SUBJECT:==
Line 43: Line 38:


==SUMMARY==
==SUMMARY==
FOR NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION CHAPTER 4, "REACTOR"; CHAPTER 5, "REACTOR COOLANT AND CONNECTING SYSTEMS"; AND CHAPTER 9, "AUXILIARY SYSTEMS
FOR NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION CHAPTER 4, REACTOR; CHAPTER 5, REACTOR COOLANT AND CONNECTING SYSTEMS; AND CHAPTER 9, AUXILIARY SYSTEMS DISTRIBUTION:
 
PUBLIC SLee, NRO BBavol, NRO RidsOgcMailCenter BKaras, NRO JSchmidt GCranston, NRO TDrzewiecki, NRO RidsAcrsAcnwMailCenter RidsNroDsra ADAMS Accession Number:
DISTRIBUTION:
Pkg: ML18025B040 Memo: ML18025A857 Enclosure No. 2: ML1802B006                 *via email         NRO-002 OFFICE NRO/DNRL/LB1: PM     NRO/DNRL/LB1: LA     NRO/DNRL/LB1: PM NAME   BBavol             MMoore               BBavol DATE     01/22/18             1/17/18             02/14/18 OFFICIAL RECORD COPY OFFICIAL USE ONLY  PROPRIETARY INFORMATION}}
PUBLIC SLee, NRO BBavol, NRO RidsOgcMailCenter  
 
BKaras, NRO JSchmidt GCranston, NRO TDrzewiecki, NRO RidsAcrsAcnwMailCenter RidsNroDsra
 
ADAMS Accession Number: Pkg: ML18025B040 Memo: ML18025A857 Enclosure No. 2: ML1802B006  
  *via email NRO-002 OFFICE NRO/DNRL/LB1: PM NRO/DNRL/LB1: LA NRO/DNRL/LB1: PM NAME BBavol MMoore BBavol DATE   01/22/18     1/17/18     02/14/18 OFFICIAL RECORD COPY}}

Latest revision as of 15:01, 2 December 2019

Audit Summary Memo NuScale Chapter 4, 5 and 9
ML18025A857
Person / Time
Site: NuScale
Issue date: 03/05/2018
From: Bavol B
NRC/NRO/DNRL/LB1
To: Samson Lee
NRC/NRO/DNRL/LB1
Bavol B
References
Download: ML18025A857 (2)


Text

OFFICIAL USE ONLY PROPRIETARY INFORMATION March 5, 2018 MEMORANDUM TO: Samuel S. Lee, Chief Licensing Branch 1 Division of New Reactor Licensing Office of New Reactors FROM: Bruce M. Bavol, Project Manager /RA/

Licensing Branch 1 Division of New Reactor Licensing Office of New Reactors

SUBJECT:

AUDIT

SUMMARY

FOR NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION CHAPTER 4, REACTOR; CHAPTER 5, REACTOR COOLANT AND CONNECTING SYSTEMS; AND CHAPTER 9, AUXILIARY SYSTEMS The U.S. Nuclear Regulatory Commission staff conducted an audit May 3, 2017, to November 29, 2017. The purpose of this regulatory audit of NuScale Power, LLCs (NuScale) subject line chapters was to: (1) gain a better understanding of the NuScale design; (2) verify information; (3) identify information that will require docketing to support the basis of the licensing or regulatory decision; and (4) review related documentation and non-docketed information to evaluated conformance with regulatory guidance.

The enclosed audit summary describes the content of the review, identifies the audit participants, and audit exit observations.

Docket No.52-048 Document transmitted herewith contains sensitive unclassified

Enclosures:

information. When separated from the

1. Audit Summary - (Non-Proprietary) enclosure, this document is DECONTROLLED.
2. Audit Summary - (Proprietary) cc w/encl.: DC NuScale Power, LLC Listserv (w/o Enclosure 2)

CONTACT: Bruce M. Bavol, NRO/DNRL 301-415-6715 OFFICIAL USE ONLY PROPRIETARY INFORMATION

OFFICIAL USE ONLY PROPRIETARY INFORMATION

SUBJECT:

AUDIT

SUMMARY

FOR NUSCALE POWER, LLC DESIGN CERTIFICATION APPLICATION CHAPTER 4, REACTOR; CHAPTER 5, REACTOR COOLANT AND CONNECTING SYSTEMS; AND CHAPTER 9, AUXILIARY SYSTEMS DISTRIBUTION:

PUBLIC SLee, NRO BBavol, NRO RidsOgcMailCenter BKaras, NRO JSchmidt GCranston, NRO TDrzewiecki, NRO RidsAcrsAcnwMailCenter RidsNroDsra ADAMS Accession Number:

Pkg: ML18025B040 Memo: ML18025A857 Enclosure No. 2: ML1802B006 *via email NRO-002 OFFICE NRO/DNRL/LB1: PM NRO/DNRL/LB1: LA NRO/DNRL/LB1: PM NAME BBavol MMoore BBavol DATE 01/22/18 1/17/18 02/14/18 OFFICIAL RECORD COPY OFFICIAL USE ONLY PROPRIETARY INFORMATION