| issue date = 10/30/1997
| issue date = 10/30/1997
| title = Forwards LER 97-010-00 Re Inadequacy of App R Analysis. Commitments Made by Util,Listed
| title = Forwards LER 97-010-00 Re Inadequacy of App R Analysis. Commitments Made by Util,Listed
| author name = PALMISANO T J
| author name = Palmisano T
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ti') Consumels October 30, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT -:31 :'; s 76.J :?296 ; _y :--s..: ]J]5 Thoma* J. Palmisano Site Vice President LICENSEE EVENT REPORT 97-010 -INADEQUACY RESULTS IN A CONDITION OUTSIDE THE DESIGN BASIS OF THE PLANT Licensee Event Report (LER) 97-010 is attached.
{{#Wiki_filter:Consumels Energy~                                                                                                                                  i I
This event is reportable to the NRC in accordance with 10 CFR 50.73(a)(2)(ii)(B) as a condition outside the plant design basis. This condition was found during a planned review of the 10 CFR 50, Appendix R program engineering analyses.
                                                                                            -:31 :';   s 76.J :?296
This review determined an analysis contained errors which could potentially place the plant in a scenario which was not addressed with approved procedures.
                                                                                            ; _y   *;~. :~  :--s..: ]J]5 Thoma* J. Palmisano Site Vice President October 30, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT LICENSEE EVENT REPORT 97-010 - INADEQUACY IN'8H,13J.:J~.QJ2S~fi~NALYSIS RESULTS IN A CONDITION OUTSIDE THE DESIGN BASIS OF THE PLANT Licensee Event Report (LER) 97-010 is attached. This event is reportable to the NRC in accordance with 10 CFR 50.73(a)(2)(ii)(B) as a condition outside the plant design basis. This condition was found during a planned review of the 10 CFR 50, Appendix R program engineering analyses. This review determined an analysis contained errors which could potentially place the plant in a scenario which was not addressed with approved procedures.
In 1994, an Appendix R Enhancement Plan was established at Palisades to ( I reconstitute Appendix R design bases. Implementing this Plan resulted in the * *
In 1994, an Appendix R Enhancement Plan was established at Palisades to reconstitute Appendix R design bases. Implementing this Plan resulted in the
* I development of a number of new engineering analyses.
(
This LER condition was identified during validation of these analyses; an effort which is ongoing. i I
II development of a number of new engineering analyses. This LER condition was identified during validation of these analyses; an effort which is ongoing.
ti')
~~~


==SUMMARY==
==SUMMARY==
OF COMMITMENTS This letter contains two new commitments and no revisions to existing commitments. -f' !) { ,V -0'-0 _,.,.,...,..--*  
OF COMMITMENTS
./ 1. A revision to the circuit and raceway schedule and to the schematic diagram will 0 8 be completed to identify the cable in the Atmospheric Steam Dump Valves (ASDV) circuit that is routed from control panel EC01 to control panel EC 12. ::o: r ,I \ h \)-{
~~-
.. *.)__, "Q "'. ; ,! -, A ft._ --O'-D.tn "l' \_ ;,., ':.:* . .) .
0'-0 This letter contains two new commitments and no revisions to existing commitments.                                       -f'         !) {
.___: .---*-. \ \ I Ill\\\ ll\\\ \l\11 \lUI ll\11 \l\lll Ill 1\ll
_,.,.,...,..--* ./
* IQ IQ 7
                                                                                                                                                      ,V -
: 2. The Appendix R Engineering Analysis will be updated with the results of the evaluation that four ASDVs and the Turbine Bypass Valve (TBV) could possibly *open in the postulated fire scenario.
~~        1.             A revision to the circuit and raceway schedule and to the schematic diagram will 08                      be completed to identify the cable in the Atmospheric Steam Dump Valves
Thomas J. Palmisano Site Vice-President CC Administrator, Region 111, USNRC Project Manager, NRR, USNRC NRC Resident Inspector  
~<                      (ASDV) circuit that is routed from control panel EC01 to control panel EC 12.
-Palisades Attachment 2}}
::o:
"Q           "'. ;   ,! -,
r ,I A\ ft._h \)-{ -~-~-~"--
                                                                .*.)__,
O'-D.tn "l' \_ ;,., ':.:* ..)     .___:. *~<*'-*
                                          .---*- .                                                                           ~
IIll\\\ ll\\\ \l\11 \lUI ll\11 \l\lllIll 1\ll
                                                      \          \
* IQ   IQ       7
 
2
: 2.     The Appendix R Engineering Analysis will be updated with the results of the evaluation that four ASDVs and the Turbine Bypass Valve (TBV) could possibly
      *open in the postulated fire scenario.
      ~;;YL~
Thomas J. Palmisano Site Vice-President CC     Administrator, Region 111, USNRC Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Attachment}}

Latest revision as of 10:02, 3 February 2020

Forwards LER 97-010-00 Re Inadequacy of App R Analysis. Commitments Made by Util,Listed
ML18067A756
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/30/1997
From: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18067A757 List:
References
NUDOCS 9711050108
Download: ML18067A756 (2)


Text

{{#Wiki_filter:Consumels Energy~ i I

                                                                                            -:31 :';   s 76.J :?296
                                                                                           ; _y    *;~. :~  :--s..: ]J]5 Thoma* J. Palmisano Site Vice President October 30, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT LICENSEE EVENT REPORT 97-010 - INADEQUACY IN'8H,13J.:J~.QJ2S~fi~NALYSIS RESULTS IN A CONDITION OUTSIDE THE DESIGN BASIS OF THE PLANT Licensee Event Report (LER) 97-010 is attached. This event is reportable to the NRC in accordance with 10 CFR 50.73(a)(2)(ii)(B) as a condition outside the plant design basis. This condition was found during a planned review of the 10 CFR 50, Appendix R program engineering analyses. This review determined an analysis contained errors which could potentially place the plant in a scenario which was not addressed with approved procedures.

In 1994, an Appendix R Enhancement Plan was established at Palisades to reconstitute Appendix R design bases. Implementing this Plan resulted in the ( II development of a number of new engineering analyses. This LER condition was identified during validation of these analyses; an effort which is ongoing. ti') ~~~

SUMMARY

OF COMMITMENTS ~~- 0'-0 This letter contains two new commitments and no revisions to existing commitments. -f'  !) { _,.,.,...,..--* ./

                                                                                                                                                     ,V -

~~ 1. A revision to the circuit and raceway schedule and to the schematic diagram will 08 be completed to identify the cable in the Atmospheric Steam Dump Valves ~< (ASDV) circuit that is routed from control panel EC01 to control panel EC 12.

o:

"Q "'. ; ,! -, r ,I A\ ft._h \)-{ -~-~-~"--

                                                               .*.)__,

O'-D.tn "l' \_ ;,., ':.:* ..) .___:. *~<*'-*

                                         .---*- .                                                                           ~

IIll\\\ ll\\\ \l\11 \lUI ll\11 \l\lllIll 1\ll

                                                      \          \
  • IQ IQ 7

2

2. The Appendix R Engineering Analysis will be updated with the results of the evaluation that four ASDVs and the Turbine Bypass Valve (TBV) could possibly
      *open in the postulated fire scenario.
     ~;;YL~