ML17313A293: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/17/1998 | | issue date = 03/17/1998 | ||
| title = Forwards Rev 2 to Unit 2 First Yr ISI Program. Document Reflects Final Status of ISI Program Requirements & Contains Addl Relief Requests for Insps Determined to Be Impractical | | title = Forwards Rev 2 to Unit 2 First Yr ISI Program. Document Reflects Final Status of ISI Program Requirements & Contains Addl Relief Requests for Insps Determined to Be Impractical | ||
| author name = | | author name = Ide W | ||
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR | | author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR | ||
| addressee name = | | addressee name = | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CATEGORY 1 REGULA'l'INFORMATION DISTRIBUTIO | {{#Wiki_filter:CATEGORY 1 REGULA'l' INFORMATION DISTRIBUTIO . SYSTEM (RIDS) | ||
.SYSTEM (RIDS) | ACCESSION NBR:9803250395 DOC.DATE: 98/03/17 NOTARIZED: NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH. NAME AUTHOR AFFILIATION IDE,W.E. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) | ||
==SUBJECT:== | ==SUBJECT:== | ||
Forwards"PVNGS Unit 2 first 10 year inservice insp program rev 2.'" | Forwards "PVNGS Unit 2 first 10 year inservice insp program rev 2.'" | ||
Inservice/Testing/Relief | DISTRIBUTION CODE: A047D TITLE: OR COPIES RECEIVED:LTR Submittal: Inservice/Testing/Relief from ENCL ~ SIZE: | ||
ASME Code - GL-89-04 | |||
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 P;ll Commitment. | + A T | ||
Innmefton. | NOTES:Standardized plant. 05000529 E | ||
Eneyy. | RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 CLIFFORD,J 1 1 INTERNAL: A 1 1 AEOD/S PD/RAB 1 1 FILE CENTER 1 1 NRR/DE/EMEB 1 1 | ||
-ABSTRACT 1 1 OGC/HDS2 1 0 RES/DET/EIB 1 1 RES/DET/EMMEB 1 1 EXTERNAL: LITCO'ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 D | |||
0 C | |||
E NOTE TO ALI "RIDS" RECIPIENTS: | |||
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 | |||
P; ll | |||
Commitment. Innmefton. Eneyy. | |||
William E. Ide Mail Station 7605 Palo Verde Nuclear Vice President TEL 602/393-6116 P.O. Box 52034 Generating Station Nuclear Engineering FAX 602/393-6077 Phoenix, AZ 85072-2034 102-04096 -WEI/AKK/MLG March 17, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 | |||
==Dear Sirs:== | ==Dear Sirs:== | ||
==Subject:== | ==Subject:== | ||
Palo Verde Nuclear Generating Station (PVNGS)Unit 2 Docket No.STN 60-629 Unit 2 First 10 Year lnservice Inspection Program Revision Enclosed is revision 2 of the Unit 2 First 10 Year Interval ISI Program.This document reflects the final status of ISI program requirements and contains additional relief requests for inspections determined to be impractical. | Palo Verde Nuclear Generating Station (PVNGS) | ||
Included with this revision is an updated record of revisions, revised pages to the program (with change bars), and an update to the relief requests.The revision is submitted pursuant to the requirements of 10 CFR 50.55a (g)(4)and 10 CFR 50.55a (g)(5)(iv). | Unit 2 Docket No. STN 60-629 Unit 2 First 10 Year lnservice Inspection Program Revision Enclosed is revision 2 of the Unit 2 First 10 Year Interval ISI Program. This document reflects the final status of ISI program requirements and contains additional relief requests for inspections determined to be impractical. Included with this revision is an updated record of revisions, revised pages to the program (with change bars), and an update to the relief requests. The revision is submitted pursuant to the requirements of 10 CFR 50.55a (g)(4) and 10 CFR 50.55a (g)(5)(iv). Approval of the relief requests is requested. | ||
Approval of the relief requests is requested. | The following commitments to the NRC are contained in this letter: | ||
The following commitments to the NRC are contained in this letter: Complete 100%examination of Closure Head Studs, Nuts, and Washers.2 Complete Radiograph on UV654.If full coverage cannot be obtained, an additional valve or valves will be examined.3 Examine an adjacent integrally welded attachment to the attachment for SG-52-H5 during the next refueling outage.4 Portions of Pressurizer longitudinal welds not inspected during U2R7 will be inspected during U2R8.5 Evaluate U1 RCP flange inspection results to determine potential impact on U2 RCPs.;'t'>4i V~i.tt/8032503'F5 9803i7C(PDR ADQCK 05000529 6 P DR~i | Complete 100% examination of Closure Head Studs, Nuts, and Washers. | ||
2 Complete Radiograph on UV654. If full coverage cannot be obtained, an additional valve or valves will be examined. | |||
3 Examine an adjacent integrally welded attachment to the attachment for SG-52-H5 during the next refueling outage. | |||
4 Portions of Pressurizer longitudinal welds not inspected during U2R7 will be inspected during U2R8. | |||
5 Evaluate U1 RCP flange inspection results to determine potential impact on U2 RCPs. | |||
;'t'> 4i V~ i. | |||
tt/8032503'F5 9803i7C( | |||
PDR ADQCK 05000529 6 P DR~i | |||
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 Page 2 Please contact Mr. Scott Bauer at (602) 393-5978 if you have any questions or would like additional information regarding this matter. | |||
Sincerely, WEI/AKK/MLG/rlh Enclosure cc: E. W. Merschoff K. E. Perkins J. W. Clifford J. H. Moorman | |||
fl I | |||
f.}} |
Latest revision as of 08:44, 29 October 2019
ML17313A293 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 03/17/1998 |
From: | Ide W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
Shared Package | |
ML17313A294 | List: |
References | |
102-04096-WEI-A, 102-4096-WEI-A, NUDOCS 9803250395 | |
Download: ML17313A293 (6) | |
Text
CATEGORY 1 REGULA'l' INFORMATION DISTRIBUTIO . SYSTEM (RIDS)
ACCESSION NBR:9803250395 DOC.DATE: 98/03/17 NOTARIZED: NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH. NAME AUTHOR AFFILIATION IDE,W.E. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards "PVNGS Unit 2 first 10 year inservice insp program rev 2.'"
DISTRIBUTION CODE: A047D TITLE: OR COPIES RECEIVED:LTR Submittal: Inservice/Testing/Relief from ENCL ~ SIZE:
+ A T
NOTES:Standardized plant. 05000529 E
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 CLIFFORD,J 1 1 INTERNAL: A 1 1 AEOD/S PD/RAB 1 1 FILE CENTER 1 1 NRR/DE/EMEB 1 1
-ABSTRACT 1 1 OGC/HDS2 1 0 RES/DET/EIB 1 1 RES/DET/EMMEB 1 1 EXTERNAL: LITCO'ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 D
0 C
E NOTE TO ALI "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13
P; ll
Commitment. Innmefton. Eneyy.
William E. Ide Mail Station 7605 Palo Verde Nuclear Vice President TEL 602/393-6116 P.O. Box 52034 Generating Station Nuclear Engineering FAX 602/393-6077 Phoenix, AZ 85072-2034 102-04096 -WEI/AKK/MLG March 17, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN 60-629 Unit 2 First 10 Year lnservice Inspection Program Revision Enclosed is revision 2 of the Unit 2 First 10 Year Interval ISI Program. This document reflects the final status of ISI program requirements and contains additional relief requests for inspections determined to be impractical. Included with this revision is an updated record of revisions, revised pages to the program (with change bars), and an update to the relief requests. The revision is submitted pursuant to the requirements of 10 CFR 50.55a (g)(4) and 10 CFR 50.55a (g)(5)(iv). Approval of the relief requests is requested.
The following commitments to the NRC are contained in this letter:
Complete 100% examination of Closure Head Studs, Nuts, and Washers.
2 Complete Radiograph on UV654. If full coverage cannot be obtained, an additional valve or valves will be examined.
3 Examine an adjacent integrally welded attachment to the attachment for SG-52-H5 during the next refueling outage.
4 Portions of Pressurizer longitudinal welds not inspected during U2R7 will be inspected during U2R8.
5 Evaluate U1 RCP flange inspection results to determine potential impact on U2 RCPs.
- 't'> 4i V~ i.
tt/8032503'F5 9803i7C(
PDR ADQCK 05000529 6 P DR~i
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001 Page 2 Please contact Mr. Scott Bauer at (602) 393-5978 if you have any questions or would like additional information regarding this matter.
Sincerely, WEI/AKK/MLG/rlh Enclosure cc: E. W. Merschoff K. E. Perkins J. W. Clifford J. H. Moorman
fl I
f.