|
|
(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 07/08/2014 | | | issue date = 07/08/2014 |
| | title = Request for Withholding Information from Public Disclosure Associated with Affidavit Executed on April 28, 2014, by Mr. Philip A. Opsal of Areva Inc. | | | title = Request for Withholding Information from Public Disclosure Associated with Affidavit Executed on April 28, 2014, by Mr. Philip A. Opsal of Areva Inc. |
| | author name = Beltz T A | | | author name = Beltz T |
| | author affiliation = NRC/NRR/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/DORL/LPLIII-1 |
| | addressee name = Fili K D | | | addressee name = Fili K |
| | addressee affiliation = Northern States Power Co, Xcel Energy | | | addressee affiliation = Northern States Power Co, Xcel Energy |
| | docket = 05000263 | | | docket = 05000263 |
| | license number = DPR-022 | | | license number = DPR-022 |
| | contact person = Beltz T A | | | contact person = Beltz T |
| | case reference number = TAC MF2479 | | | case reference number = TAC MF2479 |
| | document type = Letter, Proprietary Information Review | | | document type = Letter, Proprietary Information Review |
| | page count = 3 | | | page count = 3 |
| | project = TAC:MF2479 | | | project = TAC:MF2479 |
| | stage = Other | | | stage = Withholding Request Acceptance |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Karen D. Fili Site Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 8, 2014 Northern States Power Company | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 8, 2014 Karen D. Fili Site Vice President Northern States Power Company - Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362 |
| -Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| MONTICELLO NUCLEAR GENERATING PLANT (MNGP) -REQUEST FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF2479) | | MONTICELLO NUCLEAR GENERATING PLANT (MNGP) -REQUEST FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF2479) |
|
| |
|
| ==Dear Mrs. Fili:== | | ==Dear Mrs. Fili:== |
| By letter to the U.S. Nuclear Regulatory Commission dated July 15, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13200A 185), Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, submitted a license amendment request application to allow operation using AREVA Atrium 1 OXM fuel. In a letter dated May 9, 2014 (ADAMS Package Accession No. ML 14132A191), NSPM submitted to NRC errata discovered in its July 15, 2013, application. | | |
| These errata were identified by AREVA engineers revising and revalidating the safety analyses for the Extended Flow Window license amendment request which NSPM plans to submit in 2014. The letter included, as Enclosure 3, an affidavit dated April 28, 2014, executed by Philip A. Opsal, Manager, Product Licensing, for AREVA Inc., requesting that information designated proprietary in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Part 2, Section 2.390. Enclosure 2 of the May 9, 2014, letter provides the corrections to AREVA reports that were included in the July 15, 2013, application. | | By letter to the U.S. Nuclear Regulatory Commission dated July 15, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13200A185), |
| The affidavit stated that information submitted in Enclosure 2 should be considered exempt from mandatory public disclosure for the following reasons: a. The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREV A. b. The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability. | | Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, submitted a license amendment request application to allow operation using AREVA Atrium 1OXM fuel. |
| We have reviewed the AREVA affidavit in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the information sought to be withheld in the submittal, contains proprietary commercial information and should be K. Fili withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended. Enclosure 1 of the May 9, 2014, letter provides non-proprietary corrections to AREVA reports included in the July 15, 2013, application, and have been placed in the NRC's Public Document Room and added to the NRC Library at ADAMS Accession No. ML 14132A197. | | In a letter dated May 9, 2014 (ADAMS Package Accession No. ML14132A191), NSPM submitted to NRC errata discovered in its July 15, 2013, application. These errata were identified by AREVA engineers revising and revalidating the safety analyses for the Extended Flow Window license amendment request which NSPM plans to submit in 2014. The letter included, as Enclosure 3, an affidavit dated April 28, 2014, executed by Philip A. Opsal, Manager, Product Licensing, for AREVA Inc., requesting that information designated proprietary in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Part 2, Section 2.390. of the May 9, 2014, letter provides the corrections to AREVA reports that were included in the July 15, 2013, application. The affidavit stated that information submitted in should be considered exempt from mandatory public disclosure for the following reasons: |
| Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. | | : a. The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA. |
| If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | | : b. The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability. |
| If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. | | We have reviewed the AREVA affidavit in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the information sought to be withheld in the submittal, contains proprietary commercial information and should be |
| In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | | |
| | K. Fili withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. of the May 9, 2014, letter provides non-proprietary corrections to AREVA reports included in the July 15, 2013, application, and have been placed in the NRC's Public Document Room and added to the NRC Library at ADAMS Accession No. ML14132A197. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| If you have any questions regarding this matter, I may be reached at (301) 415-3049. | | If you have any questions regarding this matter, I may be reached at (301) 415-3049. |
| Docket No. 50-263 cc: Mr. Alan Meginnis, Manager Product Licensing AREVA Inc. 2101 Horn Rapids Road Richland, WA 99354 Additional Distribution via Listserv K. Fili withheld from public disclosure. | | Docket No. 50-263 cc: Mr. Alan Meginnis, Manager Product Licensing AREVA Inc. |
| Therefore, Enclosure 2, which is marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended. Enclosure 1 of the May 9, 2014, letter provides non-proprietary corrections to AREVA reports included in the July 15, 2013, application, and have been placed in the NRC's Public Document Room and added to the NRC Library at ADAMS Accession No. ML 14132A197.
| | 2101 Horn Rapids Road Richland, WA 99354 Additional Distribution via Listserv |
| Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. | | |
| If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. | | ML14132A197. |
| If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. | | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. | | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| If you have any questions regarding this matter, I may be reached at (301) 415-3049. | | If you have any questions regarding this matter, I may be reached at (301) 415-3049. |
| Docket No. 50-263 cc: Mr. Alan Meginnis, Manager Product Licensing AREVA Inc. 2101 Horn Rapids Road Richland, WA 99354 Sincerely, IRA/ Terry A. Beltz, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Additional Distribution via Listserv DISTRIBUTION:
| | Sincerely, IRA/ |
| PUBLIC LPL3-1 Reading RidsAcrsAcnw_MaiiCTR Resource RidsNrrDorllpl3-1 Resource ADAMS Accession No.: ML14155A177 OFFICE LPL3-1/PM LPL3-1/LA NAME TBeltz MHenderson DATE 06/5/14 06/12/14 RidsNrrLAMHenderson Resource RidsNrrDssSrxb Resource RidsNrrDssSnpb Resource RidsNrrPMMonticello Resource SRXB/BC SNPB/BC (A) CJackson JDean 06/24/14 06/27/14 OFFICIAL RECORD COPY RidsRgn3MaiiCenter Resource BParks, NRR/DSS/SRXB MPanicker, NRR/DSS/SNPB LPL3-1/BC LPL3-1/PM RCa rison TBeltz 07/3/14 07/8/14}} | | Terry A. Beltz, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc: Mr. Alan Meginnis, Manager Product Licensing AREVA Inc. |
| | 2101 Horn Rapids Road Richland, WA 99354 Additional Distribution via Listserv DISTRIBUTION: |
| | PUBLIC RidsNrrLAMHenderson Resource RidsRgn3MaiiCenter Resource LPL3-1 Reading RidsNrrDssSrxb Resource BParks, NRR/DSS/SRXB RidsAcrsAcnw_MaiiCTR Resource RidsNrrDssSnpb Resource MPanicker, NRR/DSS/SNPB RidsNrrDorllpl3-1 Resource RidsNrrPMMonticello Resource ADAMS Accession No.: ML14155A177 OFFICE LPL3-1/PM LPL3-1/LA SRXB/BC SNPB/BC (A) LPL3-1/BC LPL3-1/PM NAME TBeltz MHenderson CJackson JDean RCa rison TBeltz DATE 06/5/14 06/12/14 06/24/14 06/27/14 07/3/14 07/8/14}} |
Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARL-MT-14-022, the Comprehensive Methodology for Challenging BWR Fuel Assembly and Core Design Used at Framatome Anp2002-10-10010 October 2002 the Comprehensive Methodology for Challenging BWR Fuel Assembly and Core Design Used at Framatome Anp Project stage: Other ML13247A4522013-09-0404 September 2013 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance Review License Amendment Request to Transition to Areva Atrium 10XM Fuel & Areva Safety Analysis Methodology Project stage: Acceptance Review ML13353A3662013-12-18018 December 2013 NRR E-mail Capture - Monticello Nuclear Generating Plant - Request for Additional Information NRC Staff Review of Areva Fuel Transition License Amendment Request Project stage: Approval L-MT-14-003, Enclosures 2 & 3 to L-MT-14-003, ANP-3286NP, Rev. 0, Responses to RAI from Srxb on MNGP Transition to Areva Fuel & Areva Atrium 10XM Fuel Transition - Response to Requests for Additional Information2014-01-31031 January 2014 Enclosures 2 & 3 to L-MT-14-003, ANP-3286NP, Rev. 0, Responses to RAI from Srxb on MNGP Transition to Areva Fuel & Areva Atrium 10XM Fuel Transition - Response to Requests for Additional Information Project stage: Response to RAI ML14035A2982014-01-31031 January 2014 Areva Atrium 10XM Fuel Transition - Response to Request for Additional Information Project stage: Response to RAI ML14077A3022014-03-12012 March 2014 Areva Atrium 10XM Fuel Transition - Response to Request for Additional Information Project stage: Request ML14090A0052014-03-27027 March 2014 NRR E-mail Capture - Monticello Nuclear Generating Plant - NRC Staff Request for Additional Information (Follow-up Question) Areva Fuel Transition License Amendment Request Project stage: RAI L-MT-14-033, Areva Atrium 10XM Fuel Transition - Supplement to Describe the Effect of Local Power Range Monitor Surveillance Grace Period2014-04-29029 April 2014 Areva Atrium 10XM Fuel Transition - Supplement to Describe the Effect of Local Power Range Monitor Surveillance Grace Period Project stage: Supplement L-MT-14-041, ANP-3304NP, Rev. 0, Areva Response to NRC Follow-Up on Srxb RAI-6: ASME Overpressure Analysis.2014-05-0909 May 2014 ANP-3304NP, Rev. 0, Areva Response to NRC Follow-Up on Srxb RAI-6: ASME Overpressure Analysis. Project stage: Other ML14132A1942014-05-0909 May 2014 Areva Atrium 10XM Fuel Transition - Response to Request for Additional Information Project stage: Response to RAI L-MT-14-042, Areva Atrium 10XM Fuel Transition - Errata Re License Amendment Request2014-05-0909 May 2014 Areva Atrium 10XM Fuel Transition - Errata Re License Amendment Request Project stage: Request ML14155A1672014-07-0808 July 2014 Request for Withholding Information from Public Disclosure Associated with Affidavit Executed on January 23, 2014, by Mr. Alan B. Meginnis of Areva Np, Inc. Project stage: Withholding Request Acceptance ML14155A1692014-07-0808 July 2014 Request for Withholding Information from Public Disclosure Associated with Affidavit Executed on April 22, 2014, by Mr. Alan B. Meginnis of Areva Inc. Project stage: Withholding Request Acceptance ML14155A1772014-07-0808 July 2014 Request for Withholding Information from Public Disclosure Associated with Affidavit Executed on April 28, 2014, by Mr. Philip A. Opsal of Areva Inc. Project stage: Withholding Request Acceptance ML15154A4772015-06-0505 June 2015 Safety Evaluation Regarding License Amendment No. 188 Associated with Areva Atrium 10XM Fuel Transition (TAC No. MF2479) - (Redacted) Project stage: Approval ML15072A1412015-06-0505 June 2015 Issuance of Amendment No. 188 Regarding Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methods Project stage: Approval L-MT-15-091, Submittal of 2015 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462015-12-22022 December 2015 Submittal of 2015 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 Project stage: Request L-MT-16-027, Annual Report of Changes in Areva Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462016-05-24024 May 2016 Annual Report of Changes in Areva Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 Project stage: Other 2014-03-27
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 IR 05000263/20244012024-05-30030 May 2024 Public - Monticello Nuclear Generating Plant - Cyber Security Inspection Report 05000263/2024401 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24135A1902024-05-14014 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report IR 05000263/20240102024-05-13013 May 2024 Age-Related Degrading Inspection Report 05000263/2024010 ML24127A1472024-05-0909 May 2024 Letter to Mille Lacs Band- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renew. Application ML24128A0042024-05-0909 May 2024 Letter to Minnesota State Historic Preservation Office- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000263/20240012024-04-29029 April 2024 Plan - Integrated Inspection Report 05000263/2024001 L-MT-24-012, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component ML24115A2922024-04-25025 April 2024 Sec106 Tribal, Jensvold, Kevin-Upper Sioux Community ML24115A2912024-04-25025 April 2024 Sec106 Tribal, Jacskon, Sr., Faron-Leech Lake Band of Ojibwe ML24115A2882024-04-25025 April 2024 Sec106 Tribal, Fairbanks, Michael-White Earth Nation.Docx ML24115A3032024-04-25025 April 2024 Sec106 Tribal, Taylor, Louis-Lac Courte Oreilles Band of Lake Superior Chippewa Indians ML24115A3052024-04-25025 April 2024 Sec106 Tribal, Vanzile, Jr., Robert-Sokaogon Chippewa Community ML24115A3012024-04-25025 April 2024 Sec106 Tribal, Seki, Darrell-Red Lake Nation ML24115A2872024-04-25025 April 2024 Sec106 Tribal, Dupuis, Kevin-Fond Du Lac Band of Lake Superior Chippewa ML24115A3002024-04-25025 April 2024 Sec106 Tribal, Rhodd, Timothy-Iowa Tribe of Kansas and Nebraska ML24115A2962024-04-25025 April 2024 Sec106 Tribal, Larsen, Robert-Lower Sioux Indian Community ML24115A2932024-04-25025 April 2024 Sec106 Tribal, Johnson, Grant-Prairie Island Indian Community ML24115A2892024-04-25025 April 2024 Sec106 Tribal, Fowler, Thomas-St. Croix Chippewa of Wisconsin ML24115A3022024-04-25025 April 2024 Sec106 Tribal, Stiffarm, Jeffrey-Fort Belknap Indian Community ML24115A3072024-04-25025 April 2024 Sec106 Tribal, Williams, Jr., James-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24115A2942024-04-25025 April 2024 Sec106 Tribal, Johnson, John-Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24115A3062024-04-25025 April 2024 Sec106 Tribal, Wassana, Reggie-Cheyenne and Arapaho Tribes ML24115A2992024-04-25025 April 2024 Sec106 Tribal, Renville, J. Garret-Sisseton Wahpeton Oyate of the Lake Travers Reservation ML24115A2902024-04-25025 April 2024 Sec106 Tribal, Jackson-Street, Lonna-Spirit Lake Nation ML24115A2952024-04-25025 April 2024 Sec106 Tribal, Kakkak, Gena-Menominee Indian Tribe of Wisconsin ML24115A2972024-04-25025 April 2024 Sec106 Tribal, Miller, Cole-Shakopee Mdewakanton Sioux Community ML24115A2982024-04-25025 April 2024 Sec106 Tribal, Reider, Anthony-Flandreau Santee Sioux Tribe ML24106A1102024-04-24024 April 2024 Mille Lacs Band of Ojibwe -Monticello Sec106 Tribal ML24115A2792024-04-24024 April 2024 Sec106 Tribal, Blaker, Doreen-Keweenaw Bay Indian Community 2024-08-05
[Table view] Category:Proprietary Information Review
MONTHYEARML23115A4172023-04-28028 April 2023 Requesting for Withholding Information from Public Disclosure for Monticello Nuclear Generating Plant Core Operating Limits Report (COLR) for Cycle31, Revision 2 ML22187A2912022-08-0303 August 2022 Request for Withholding Information from Public Disclosure Monticello Nuclear Generating Plant ML21277A2952021-11-0808 November 2021 Request for Withholding Information from Public Disclosure ML21013A4542021-01-21021 January 2021 Request for Withholding Information from Public Disclosure ML16243A4602016-09-15015 September 2016 Request for Withholding Information from Public Disclosure ML16160A0862016-06-13013 June 2016 Request for Withholding Information from Public Disclosure ML15301A0942015-12-0707 December 2015 Request for Withholding Information from Public Disclosure from Areva Inc. Associated with the Areva Extended Flow Window License Amendment Request ML15301A5502015-11-30030 November 2015 Request for Withholding Information from Public Disclosure from Westinghouse Associated with Submittal of Power Ascension Testing Results for Replacement Steam Dryer ML15140A1472015-09-28028 September 2015 Request for Withholding Information from Public Disclosure (GE-Hitachi LLC) Associated with the Areva Extended Flow Window License Amendment Request ML15140A1242015-09-28028 September 2015 Request for Withholding Information from Public Disclosure from Areva Inc. Associated with the Areva Extended Flow Window License Amendment Request ML14155A1692014-07-0808 July 2014 Request for Withholding Information from Public Disclosure Associated with Affidavit Executed on April 22, 2014, by Mr. Alan B. Meginnis of Areva Inc. ML14155A1772014-07-0808 July 2014 Request for Withholding Information from Public Disclosure Associated with Affidavit Executed on April 28, 2014, by Mr. Philip A. Opsal of Areva Inc. ML14155A1672014-07-0808 July 2014 Request for Withholding Information from Public Disclosure Associated with Affidavit Executed on January 23, 2014, by Mr. Alan B. Meginnis of Areva Np, Inc. ML13239A0842013-10-0808 October 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavits Executed on March 14, 2013, by Linda Dolan and June 12, 2013, by Kurt Edsinger of ML13239A0762013-10-0808 October 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on March 14, 2013, by Linda C. Dolan of GE-Hitachi ML13239A0022013-10-0808 October 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on January 14, 2013, by James F. Harrison of GE-Hitachi ML13239A0822013-09-30030 September 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavits Executed on March 19, 20, 21, 25 & 27, 2013, by Bradley F. Maurer of Westinghouse ML13239A1092013-09-30030 September 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on July 16, by James A. Gresham of Westinghouse ML13239A0892013-09-30030 September 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavits Executed on July 31 and August 1, 2013, by Hank A. Sepp and James A. Gresham of Westinghouse ML13239A0612013-09-30030 September 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on March 14, 2013, by Bradley F. Maurer of Westinghouse ML13239A0482013-09-30030 September 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on March 7, 2013, by James A. Gresham of Westinghouse ML13239A0152013-09-30030 September 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on February 20, 2013, by Bradley F. Maurer of Westinghouse ML13009A0122013-01-25025 January 2013 Request for Withholding of Proprietary Information from Public Disclosure Enclosure 1 of Letter Dated November 30, 2012 ML12240A1232012-09-13013 September 2012 Letter Approving Withholding from Public Disclosure of Submitted Proprietary Information ML12214A5862012-08-0707 August 2012 Letter Approving Withholding from Public Disclosure of Certain Submitted Information Regarding the Nordic Replacement Steam Dryer ML11325A4262011-11-30030 November 2011 Letter Approving Withholding from Public Disclosure Two Documents Containing Proprietary Information Submitted in the Licensee'S 11/11/2011 Letter ML11125A0222011-05-26026 May 2011 Withholding of Submitted Proprietary Information from Public Disclosure ML1104809152011-03-0909 March 2011 Letter Regarding Request for Withholding Proprietary Information from Public ML1101902042011-02-0808 February 2011 Request for Withholding for Proprietary Information from Public Disclosure ML1027706892010-11-0101 November 2010 Withholding Information from Public Disclosure ML1020400512010-07-30030 July 2010 Withholding of Submitted Proprietary Information from Public Disclosure ML1018909152010-07-30030 July 2010 Determination That Appendix 4 of Enclosure 1 of 6/30/10 Submittal Contains Proprietary Information ML1003202292010-02-16016 February 2010 Determination That Attachment 3 Contains Proprietary Information and Is Withheld from Public Disclosure ML0928105542009-10-20020 October 2009 Determination That Submitted Information Is Proprietary and Is Withheld from Public Disclosure ML0926502282009-09-28028 September 2009 Request for Withholding Information from Public Disclosure ML0926109182009-09-28028 September 2009 Request for Withholding Information from Public Disclosure ML0926101052009-09-28028 September 2009 Request for Withholding Information from Public Disclosure ML0922902502009-08-26026 August 2009 Approves Withholding of Proprietary Information in 08/12/2009 Letter from Public Disclosure ML0921608892009-08-14014 August 2009 Request for Withholding Information from Public Disclosure ML0911404702009-05-0707 May 2009 Determination That Submitted Information Can Be Withheld from Public Disclosure ML0905002592009-03-0303 March 2009 Letter to Approve Request to Withhold Document Containing Proprietary Information from Public Disclosure ML0835706102009-01-26026 January 2009 Letter Conveying Determination That Enclosure 11 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Is Withheld from Public Disclosure ML0835901272009-01-14014 January 2009 Letter Conveying Determination That Enclosure 5 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Withheld from Public Disclosure ML0830106242008-11-12012 November 2008 Letter to Determine Withholding Proprietary Information from Public Disclosure ML0814802652008-07-11011 July 2008 Request for Withholding Information from Public Disclosure ML0815600232008-06-16016 June 2008 Withholding from Public Disclosure, 03/31/2008 Application for Extended Power Uprate Amendment Enclosure 1 Mechanical and Civil Engineering Branch Questions and Responses (Proprietary). ML0809805822008-04-30030 April 2008 Request for Withholding Information from Public Disclosure ML0809804572008-04-14014 April 2008 Determining of Proprietary Information in Enclosure 5 of 3/31/08 Application for Extended Power Uprate Amendment ML0805706482008-03-21021 March 2008 Request for Withholding Information from Public Disclosure ML0727506332007-10-31031 October 2007 (MNGP) - Request for Withholding Information from Public Disclosure 2023-04-28
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 8, 2014 Karen D. Fili Site Vice President Northern States Power Company - Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT (MNGP) -REQUEST FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF2479)
Dear Mrs. Fili:
By letter to the U.S. Nuclear Regulatory Commission dated July 15, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13200A185),
Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, submitted a license amendment request application to allow operation using AREVA Atrium 1OXM fuel.
In a letter dated May 9, 2014 (ADAMS Package Accession No. ML14132A191), NSPM submitted to NRC errata discovered in its July 15, 2013, application. These errata were identified by AREVA engineers revising and revalidating the safety analyses for the Extended Flow Window license amendment request which NSPM plans to submit in 2014. The letter included, as Enclosure 3, an affidavit dated April 28, 2014, executed by Philip A. Opsal, Manager, Product Licensing, for AREVA Inc., requesting that information designated proprietary in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Part 2, Section 2.390. of the May 9, 2014, letter provides the corrections to AREVA reports that were included in the July 15, 2013, application. The affidavit stated that information submitted in should be considered exempt from mandatory public disclosure for the following reasons:
- a. The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA.
- b. The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability.
We have reviewed the AREVA affidavit in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the information sought to be withheld in the submittal, contains proprietary commercial information and should be
K. Fili withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. of the May 9, 2014, letter provides non-proprietary corrections to AREVA reports included in the July 15, 2013, application, and have been placed in the NRC's Public Document Room and added to the NRC Library at ADAMS Accession No. ML14132A197.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-3049.
Docket No. 50-263 cc: Mr. Alan Meginnis, Manager Product Licensing AREVA Inc.
2101 Horn Rapids Road Richland, WA 99354 Additional Distribution via Listserv
ML14132A197.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-3049.
Sincerely, IRA/
Terry A. Beltz, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc: Mr. Alan Meginnis, Manager Product Licensing AREVA Inc.
2101 Horn Rapids Road Richland, WA 99354 Additional Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrLAMHenderson Resource RidsRgn3MaiiCenter Resource LPL3-1 Reading RidsNrrDssSrxb Resource BParks, NRR/DSS/SRXB RidsAcrsAcnw_MaiiCTR Resource RidsNrrDssSnpb Resource MPanicker, NRR/DSS/SNPB RidsNrrDorllpl3-1 Resource RidsNrrPMMonticello Resource ADAMS Accession No.: ML14155A177 OFFICE LPL3-1/PM LPL3-1/LA SRXB/BC SNPB/BC (A) LPL3-1/BC LPL3-1/PM NAME TBeltz MHenderson CJackson JDean RCa rison TBeltz DATE 06/5/14 06/12/14 06/24/14 06/27/14 07/3/14 07/8/14