ML19057A478: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/20/2019
| issue date = 03/20/2019
| title = Transmittal, Annual Review of Self-Guarantee for Financial Assurance for the Massachusetts Institute of Technology
| title = Transmittal, Annual Review of Self-Guarantee for Financial Assurance for the Massachusetts Institute of Technology
| author name = Naquin T D
| author name = Naquin T
| author affiliation = NRC/NMSS/DFCSE/FLB
| author affiliation = NRC/NMSS/DFCSE/FLB
| addressee name = Ruiz I
| addressee name = Ruiz I
Line 9: Line 9:
| docket = 05000020, 07000938
| docket = 05000020, 07000938
| license number = R-037, SNM-0986
| license number = R-037, SNM-0986
| contact person = Naquin T D
| contact person = Naquin T
| case reference number = EPID L-2018-DFA-0009
| case reference number = EPID L-2018-DFA-0009
| package number = ML19057A442
| package number = ML19057A442
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 20, 2019 Mr. Israel Ruiz Executive Vice President and Treasurer Massachusetts Institute of Technology 77 Massachusetts Avenue Building 4-204 Cambridge, MA 02139-4307
-0001   March 20, 2019 Mr. Israel Ruiz Executive Vice President and Treasurer Massachusetts Institute of Technology 77 Massachusetts Avenue Building 4
-204 Cambridge, MA 02139
-4307


==SUBJECT:==
==SUBJECT:==
ANNUAL SELF
ANNUAL SELF-GUARANTEE, SPECIAL NUCLEAR MATERIALS LICENSE SNM-986 AND RESEARCH REACTOR LICENSE R-37 (ENTERPRISE PROJECT IDENTIFICATION CODE: L-2018-DFA-0009)
-GUARANTEE, SPECIAL NUCLEAR MATERIALS LICENSE SNM-986 AND RESEARCH REACTOR LICENSE R-37 (ENTERPRISE PROJECT IDENTIFICATION CODE
: L-2018-DFA-0009)


==Dear Mr. Ruiz:==
==Dear Mr. Ruiz:==


By letter dated September 27, 2018 (Agencywide Documents Access and Management System  
By letter dated September 27, 2018 (Agencywide Documents Access and Management System
[ADAMS] Accession Number ML18284A321
[ADAMS] Accession Number ML18284A321), you submitted to the U.S. Nuclear Regulatory Commission (NRC) a document with a Certified Amount of Financial Assurance and associated Annual Self-Guarantee Test for Special Nuclear Materials license SNM-986, and Research Reactor license R-37 for the Massachusetts Institute of Technology (ADAMS ML18284A321).
), you submitted to the U.S. Nuclear Regulatory Commission (NRC) a document with a Certified Amount of Financial Assurance and associated Annual Self
Your letter was received on October 4, 2018 (ADAMS ML18288A293) and accepted for detailed review on November 16, 2018 (ADAMS ML19002A056). The Risk and Technical Analysis Branch of the Division of Decommissioning, Uranium Recovery, and Waste Processing in the Office of Nuclear Material Safety and Safeguards conducted the technical review of the adequacy of the submittal for SNM-986. The Financial Projects Branch of the Division of Licensing Projects in the Office of Nuclear Reactor Regulation reviewed the portion of the submittal applicable to R-37.
-Guarantee Test for Special Nuclear Materials license SNM
The NRC staff concludes that the self-guarantee meets or exceeds the financial test criteria for a non-profit university that issues bonds, is acceptable for providing decommissioning funding assurance, and complies with Title 10 of the Code of Federal Regulations (10 CFR) Paragraphs 70.25(f)(2) and 50.75(e)(1)(iii)(C), Appendix E to 10 CFR Part 30, and is consistent with NUREG-1757, Volume 3, Rev. 1. Safety Evaluation Reports for the analysis of both the materials and reactor licenses are enclosed.
-986 , and Research Reactor license R-37 for the Massachusetts Institute of Technology (ADAMS ML18284A321). Your letter was received on October 4, 2018 (ADAMS ML18288A293) and accepted for detailed review on November 16, 2018 (ADAMS ML19002A056). The Risk and Technical Analysis Branch of the Division of Decommissioning, Uranium Recovery, and Waste Processing in the Office of Nuclear Material Safety and Safeguards conducted the technical review of the adequacy of the submittal for SNM
This is a reminder that the self-guarantee must be submitted within 90 days of the close of the fiscal year. The requirements are established by the Final Decommissioning Planning Rule and the guidance provided in NUREG-1757, Volume 3, Rev. 1.
-986. The Financial Projects Branch of the Division of Licensing Projects in the Office of Nuclear Reactor Regulation reviewed the portion of the submittal applicable to R-37. The NRC staff concludes that the self-guarantee meets or exceeds the financial test criteria for a non-profit university that issues bonds, is acceptable for providing decommissioning funding assurance, and complies with Title 10 of the Code of Federal Regulations (10 CFR) Paragraphs 70.25(f)(2) and 50.75(e)(1)(iii)(C), Appendix E to 10 CFR Part 30, and is consistent with NUREG-1757, Volume 3, Rev. 1. Safety Evaluation Reports for the analysis of both the materials and reactor licenses are enclosed. This is a reminder that the self
In accordance with 10 CFR Section 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from ADAMS. ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-guarantee must be submitted within 90 days of the close of the fiscal year. The requirements are established by the Final Decommissioning Planning Rule and the guidance provided in NUREG
-1757, Volume 3, Rev. 1.
In accordance with 10 CFR Section 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from ADAMS. ADAMS is accessible from th e NRC web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
I. Ruiz 2  If you have any questions regarding this matter, please feel free to contact me at 301-415-7352 or via e-mail at:  Tyrone.Naquin@nrc.gov
.        Sincerely,        /RA/        Tyrone D. Naquin, Project Manager Fuel Facility Licensing Branch      Division of Fuel Cycle Safety, Safeguards,        and Environmental Review Office of Nuclear Material Safety and Safeguards Docket No s. 70-938 , 50-0020 License No
: s. SNM-986, R-37  Enclosure s: 1. Safety Evaluation Report, SNM-986 2. Safety Evaluation Report, R
-37 


ML19057A442 (P), ML19057A478 (L)
I. Ruiz                                        2 If you have any questions regarding this matter, please feel free to contact me at 301-415-7352 or via e-mail at: Tyrone.Naquin@nrc.gov.
  *via email OFFICE FCSE/FFLB FCSE/FFLB DUWP/RTAB FCSE/FFLB FCSE/FFLB NAME TNaquin* TBrockington
Sincerely,
* CMcKenney JZimmerman TNaquin DATE 0 2/ 28 /2019 03/12/2019 03/13/2019 03/19/2019 03/ 20 /2019}}
                                            /RA/
Tyrone D. Naquin, Project Manager Fuel Facility Licensing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos. 70-938, 50-0020 License Nos. SNM-986, R-37
 
==Enclosures:==
: 1. Safety Evaluation Report, SNM-986
: 2. Safety Evaluation Report, R-37
 
ML19057A442 (P), ML19057A478 (L)             *via email OFFICE   FCSE/FFLB       FCSE/FFLB DUWP/RTAB       FCSE/FFLB     FCSE/FFLB NAME     TNaquin*       TBrockington* CMcKenney   JZimmerman       TNaquin DATE   02/ 28 /2019     03/12/2019   03/13/2019 03/19/2019   03/ 20 /2019}}

Latest revision as of 01:06, 20 October 2019

Transmittal, Annual Review of Self-Guarantee for Financial Assurance for the Massachusetts Institute of Technology
ML19057A478
Person / Time
Site: 07000938, MIT Nuclear Research Reactor
Issue date: 03/20/2019
From: Ty Naquin
NRC/NMSS/DFCSE/FLB
To: Ruiz I
Massachusetts Institute of Technology (MIT)
Naquin T
Shared Package
ML19057A442 List:
References
EPID L-2018-DFA-0009
Download: ML19057A478 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 20, 2019 Mr. Israel Ruiz Executive Vice President and Treasurer Massachusetts Institute of Technology 77 Massachusetts Avenue Building 4-204 Cambridge, MA 02139-4307

SUBJECT:

ANNUAL SELF-GUARANTEE, SPECIAL NUCLEAR MATERIALS LICENSE SNM-986 AND RESEARCH REACTOR LICENSE R-37 (ENTERPRISE PROJECT IDENTIFICATION CODE: L-2018-DFA-0009)

Dear Mr. Ruiz:

By letter dated September 27, 2018 (Agencywide Documents Access and Management System

[ADAMS] Accession Number ML18284A321), you submitted to the U.S. Nuclear Regulatory Commission (NRC) a document with a Certified Amount of Financial Assurance and associated Annual Self-Guarantee Test for Special Nuclear Materials license SNM-986, and Research Reactor license R-37 for the Massachusetts Institute of Technology (ADAMS ML18284A321).

Your letter was received on October 4, 2018 (ADAMS ML18288A293) and accepted for detailed review on November 16, 2018 (ADAMS ML19002A056). The Risk and Technical Analysis Branch of the Division of Decommissioning, Uranium Recovery, and Waste Processing in the Office of Nuclear Material Safety and Safeguards conducted the technical review of the adequacy of the submittal for SNM-986. The Financial Projects Branch of the Division of Licensing Projects in the Office of Nuclear Reactor Regulation reviewed the portion of the submittal applicable to R-37.

The NRC staff concludes that the self-guarantee meets or exceeds the financial test criteria for a non-profit university that issues bonds, is acceptable for providing decommissioning funding assurance, and complies with Title 10 of the Code of Federal Regulations (10 CFR) Paragraphs 70.25(f)(2) and 50.75(e)(1)(iii)(C), Appendix E to 10 CFR Part 30, and is consistent with NUREG-1757, Volume 3, Rev. 1. Safety Evaluation Reports for the analysis of both the materials and reactor licenses are enclosed.

This is a reminder that the self-guarantee must be submitted within 90 days of the close of the fiscal year. The requirements are established by the Final Decommissioning Planning Rule and the guidance provided in NUREG-1757, Volume 3, Rev. 1.

In accordance with 10 CFR Section 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from ADAMS. ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

I. Ruiz 2 If you have any questions regarding this matter, please feel free to contact me at 301-415-7352 or via e-mail at: Tyrone.Naquin@nrc.gov.

Sincerely,

/RA/

Tyrone D. Naquin, Project Manager Fuel Facility Licensing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket Nos.70-938, 50-0020 License Nos. SNM-986, R-37

Enclosures:

1. Safety Evaluation Report, SNM-986
2. Safety Evaluation Report, R-37

ML19057A442 (P), ML19057A478 (L) *via email OFFICE FCSE/FFLB FCSE/FFLB DUWP/RTAB FCSE/FFLB FCSE/FFLB NAME TNaquin* TBrockington* CMcKenney JZimmerman TNaquin DATE 02/ 28 /2019 03/12/2019 03/13/2019 03/19/2019 03/ 20 /2019