|
---|
Category:Letter
MONTHYEARML24220A1502024-10-0909 October 2024 Examination Report Letter No. 50-020/OL-24-02 Massachusetts Institute of Technology ML24220A1512024-10-0909 October 2024 Examination Result Letter No 50 020 OL 24 02 Massachusetts Institute of Technology IR 05000020/20242012024-09-12012 September 2024 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000020/2024201 ML24199A1082024-07-23023 July 2024 Examination Confirmation Letter No. 50-020/OL-24-02, Massachusetts Institute of Technology ML24052A2102024-06-0606 June 2024 Examination Result Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology ML24127A1012024-04-26026 April 2024 Mit - Update of Professor Ian A. Waitz Named as Mit Vice President for Research ML24127A1002024-04-24024 April 2024 Mit - Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor ML24094A0482024-03-29029 March 2024 Mit Nuclear Reactor Lab., Annual Report for 2023, Per Technical Specification 7.7.1 ML24081A1642024-03-11011 March 2024 Massachusetts Institute of Technology, NF-0343 & NW-0681 - Submittal of Rescinding Notice of Cancellation ML24022A0972024-01-22022 January 2024 Massachusetts Institute of Technology– Change of Facility Backup Project Manager ML23354A1442024-01-0505 January 2024 Examination Confirmation Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology IR 05000020/20232032023-11-21021 November 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023203 ML23242A3382023-11-0606 November 2023 Examination Report Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23242A3392023-11-0606 November 2023 Examination Result Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology IR 05000020/20232012023-10-12012 October 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023201 IR 05000020/20232022023-09-27027 September 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000020/2023202 ML23194A0412023-07-11011 July 2023 Mit Research Reactor - Duties of Reactor Superintendent ML23103A2632023-05-10010 May 2023 Examination Confirmation Letter No. 50-020/OL-23-01 Massachusetts Institute of Technology ML23094A1102023-03-30030 March 2023 Massachusetts Institute of Technology (Mit), Submittal of Annual Report for 2022, Technical Specification 7.7.1 ML23072A0242023-03-0707 March 2023 Mit, Nuclear Reactor Lab., Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor IR 05000020/20222012023-02-0707 February 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2022201 ML22189A0492022-07-25025 July 2022 Examination Confirmation Letter No.50-020/OL-22-02, Massachusetts Institute of Technology ML22095A2412022-03-31031 March 2022 Annual Report for the Mit Research Reactor for the Period from January 1, 2021, to December 31, 2021 ML22062B0422022-02-10010 February 2022 Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21328A2342021-11-29029 November 2021 Examination Confirmation Letter No. 50-020/OL-22-01, Massachusetts Institute of Technology IR 05000020/20212032021-11-0909 November 2021 Massachusetts Institutes of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2021203 IR 05000020/20212012021-09-30030 September 2021 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000020/2021201 ML21186A0032021-07-16016 July 2021 Examination Confirmation Letter No. 50-020/OL-21-02, Massachusetts Institute of Technology ML21165A1542021-05-28028 May 2021 Mit - Emergency Plan and Procedures, 10 CFR 50.54(q)(5) ML21140A3622021-05-17017 May 2021 Massachusetts Institute of Technology (Mit) - Supplement to Response to the Request for Additional Information for Battery Upgrade License Amendment Request (EPID: L-2021 -NFA-0000) ML21132A2512021-05-0606 May 2021 Massachusetts Institute of Technology, License No. R-37, Docket No. 50-20, Reportable Occurrence 50-20/2021-: Operation with Less than the Required Staffing on Site; NRC OPS Center Log EN 55212 ML21112A1672021-04-12012 April 2021 Massachusetts Institute of Technology - Physical Security Plan Revision Regarding Biometric Readers ML21105A3602021-04-0707 April 2021 Duties of Reactor Superintendent ML21099A1132021-03-31031 March 2021 Massachusetts Institute of Technology - Annual Report, Docket No. 50-20, License R-37, Technical Specification 7.7.1 ML21091A2082021-03-24024 March 2021 Mit Nuclear Reactor Lab - Response to Request for Additional Information for Battery Upgrade License Amendment Request ML21076A0232021-03-18018 March 2021 Requests for Additional Information - Related to License Amendment Request to Replace Emergency Power System Batteries ML21070A1852021-03-0202 March 2021 Mit Nuclear Reactor Laboratory, License Amendment Request Regarding Emergency Battery Surveillances in Technical Specification 4.6, Docket No. 50-20, License R-37 ML21063A2552021-02-25025 February 2021 Proposal for Conversion to Low Enriched Uranium (Leu), :Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21053A4372021-02-23023 February 2021 Examination Confirmation Letter No. 50-020/OL-21-01, Massachusetts Institute of Technology ML21036A0852021-02-19019 February 2021 Massachusetts Institute of Technology - Acceptance of License Amendment Request to Revise Surveillance Frequency During Extended Reactor Shutdown ML21035A2582021-01-29029 January 2021 Massachusetts Institute of Technology (Mit), Supplement to Technical Specifications Surveillance Frequency Definition Update for Improved Compliance Under 10 CPR 50.36(c)(3) ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20307A4202020-11-0505 November 2020 Granting of Extension Request to Supplement License Amendment to Revise Surveillance Requirement Frequency ML20304A1172020-10-19019 October 2020 Time Extension Request for LAR on Technical Specifications Surveillance Frequency Update for Improved Compliance Under 10 CFR 50.36(c)(3) for the Mit Research Reactor ML20248H5682020-09-22022 September 2020 Mit Research Reactor Routine Inspection Report with Enforcement Discretion (EA-20-109) - August 2020 ML20161A3342020-07-24024 July 2020 Massachusetts Institute of Technology - Issuance of Amendment NO.44 to Renewed Facility Operation License No. R-37 to Amend Technical Specifications Related to Level 1 Position Title Change ML20182A7092020-07-0909 July 2020 Acceptance Review Amendment Request to Revise Surveillance Frequency - Opportunity to Supplement ML20192A0762020-06-30030 June 2020 Mit - Supplemental Information for License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML20070H2672020-06-0404 June 2020 Examination Report No. 50-020/OL-20-01, Massachusetts Institute of Technology ML20119A8272020-05-29029 May 2020 Massachusetts Institute of Technology - Issuance of Amendment No. 43 Extending Time to Implement License Amendment No. 42 to Facility Operating License No. R-37 2024-09-12
[Table view] Category:License-Operator
MONTHYEARML24220A1502024-10-0909 October 2024 Examination Report Letter No. 50-020/OL-24-02 Massachusetts Institute of Technology ML24199A1082024-07-23023 July 2024 Examination Confirmation Letter No. 50-020/OL-24-02, Massachusetts Institute of Technology ML24052A2102024-06-0606 June 2024 Examination Result Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology ML23354A1442024-01-0505 January 2024 Examination Confirmation Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology ML23242A3382023-11-0606 November 2023 Examination Report Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23242A3392023-11-0606 November 2023 Examination Result Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23103A2632023-05-10010 May 2023 Examination Confirmation Letter No. 50-020/OL-23-01 Massachusetts Institute of Technology ML22343A1372023-01-0303 January 2023 Examination Confirmation Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML22189A0492022-07-25025 July 2022 Examination Confirmation Letter No.50-020/OL-22-02, Massachusetts Institute of Technology ML21328A2342021-11-29029 November 2021 Examination Confirmation Letter No. 50-020/OL-22-01, Massachusetts Institute of Technology ML21186A0032021-07-16016 July 2021 Examination Confirmation Letter No. 50-020/OL-21-02, Massachusetts Institute of Technology ML21053A4372021-02-23023 February 2021 Examination Confirmation Letter No. 50-020/OL-21-01, Massachusetts Institute of Technology ML19345F3782019-12-11011 December 2019 Examination Confirmation Letter No. 50-020/OL-20-01, Massachusetts Institute of Technology ML19295F4202019-10-30030 October 2019 Examination Report No. 50-020/OL-19-03, Massachusetts Institute of Technology ML19191A1512019-07-10010 July 2019 Examination Confirmation Letter No. 50-020/OL-19-03, Massachusetts Institute of Technology ML19084A0752019-04-0202 April 2019 Examination Report No. 50-020-OL-19-02, Massachusetts Institute of Technology ML19024A0682019-01-28028 January 2019 Examination Confirmation Letter No. 50-020/OL-19-02, Massachusetts Institute of Technology ML18317A2982018-11-0707 November 2018 Examination Report No. 50-020/OL-19-01, Massachusetts Institute of Technology ML18247A1942018-08-30030 August 2018 Examination Confirmation Letter 50-020/OL-19-01, Massachusetts Institute of Technology ML18011A0062018-01-0303 January 2018 Examination Confirmation Letter No. 50-020/OL 18-01 Massahusetts Institute of Technology ML17283A2152017-10-11011 October 2017 Examination Report No. 50-20/OL-17-03, Massachusetts Institute of Technology ML17170A1542017-06-21021 June 2017 Examination Confirmation Letter 50-020 OL 17-03, Massahusetts Institute of Technology ML17058A0972017-02-28028 February 2017 Examination Report No. 50-020/OL-17-02, Massachusetts Institute of Technology ML16334A1392016-11-29029 November 2016 Examination Confirmation Letter No. 50-020/OL-17-02, Massachusetts Institute of Technology ML16177A1302016-06-28028 June 2016 Examination Notification Letter, No. 50-020/OL-17-01, Massachusetts Institute of Technology ML14247A2202014-09-0202 September 2014 Rescheduled Examination, No. 50-020/OL-14-02, Massachusetts Institute of Technology ML13261A0832013-10-0101 October 2013 Examination Results Report, No. 50-20/OL-13-02, Massachusetts Institute of Technology ML13261A1072013-10-0101 October 2013 Examination Results Letter No. 50-020/OL-13-02, Massachusetts Institute Technology ML13045A4522013-02-19019 February 2013 Examination Results Letter No. 50-020/OL-13-01, Massachusetts Institute of Technology ML13003A3152013-01-10010 January 2013 Massachusetts Institute of Technology - Corporate Notification Letter No. 50-020/OL-13-01 ML1203400872012-03-0808 March 2012 Examination Results Letter, No. 50-020/OL-12-02, Massachusetts Institute of Technology ML1130500382011-11-0101 November 2011 Examination Corporate Notification Letter, No. 50-020/OL-12-02, Massachusetts Institute of Technology ML1129405982011-10-25025 October 2011 Examination Results Letter No. 50-20/OL-12-01, Massachusetts Institute of Technology ML1120606302011-08-0808 August 2011 Corporate Notification Letter No. 50-20/OL-12-01, Massachusetts Institute of Technology ML1105601812011-03-11011 March 2011 Initial Examination Report No. 50-20/OL-11-01, Massachusetts Institute of Technology ML1030802232010-11-0404 November 2010 Initial Examination Corporation Notification Letter No. 50-20/OL-11-01, Massachusetts Institute of Technology ML1025902802010-09-17017 September 2010 Initial Examination Results Letter, No. 50-20/OL-10-01, Massachusetts Institute of Technology ML0915903922009-06-0909 June 2009 Initial Examination Corporate Notification Letter, No. 50-020/OL-09-01, Massachusetts Institute of Technology ML0715000072007-05-31031 May 2007 Initial Examination Corporate Notification Letter, No. 50-020-OL-07-02, Mit ML0527303902005-10-0707 October 2005 Initial Examination Results Letter No. 50-20/OL-05-01, Massachusetts Institute Technology ML0518102892005-07-0707 July 2005 Initial Examination Corporate Notification Letter No. 50-20/OL-05-01, Massachusetts Institute of Technology, September 6, 2005 ML0427804202004-10-0808 October 2004 Initial Examination Results Letter No. 50-20/OL-04-02, Massachusetts Institute of Technology ML0420804472004-07-30030 July 2004 Retake Examination Results Letter, No. 50-020/OL-04-01, Massachusetts Institute of Technology ML0417400872004-06-24024 June 2004 Retake Examination Corporate Notification Letter No. 50-020/OL-04-01, Massachusetts Institute of Technology ML0417005012004-06-21021 June 2004 Initial Examination Corporate Notification Letter No. 50-020/OL-04-02, Massachusetts Institute of Technology ML0407002102004-03-22022 March 2004 Initial Examination 50-20/OL-04-01 Results, Massachusetts Institute of Technology ML0332302722003-11-20020 November 2003 Corporate Notification Letter No. 50-20/OL-04-01, Massachusetts Institute of Technology ML0303606752003-02-14014 February 2003 Retake Examination Results Letter No. 50-020/OL-03-01, Massachusetts Institute of Technology ML0233807912002-12-0909 December 2002 Retake Examination Corporate Notification Letter No. 50-20/OL-03-01, Massachusetts Institute of Technology 2024-07-23
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24220A1502024-10-0909 October 2024 Examination Report Letter No. 50-020/OL-24-02 Massachusetts Institute of Technology ML24199A1082024-07-23023 July 2024 Examination Confirmation Letter No. 50-020/OL-24-02, Massachusetts Institute of Technology ML24052A2102024-06-0606 June 2024 Examination Result Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology ML23354A1442024-01-0505 January 2024 Examination Confirmation Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology ML23242A3382023-11-0606 November 2023 Examination Report Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23242A3392023-11-0606 November 2023 Examination Result Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23103A2632023-05-10010 May 2023 Examination Confirmation Letter No. 50-020/OL-23-01 Massachusetts Institute of Technology ML22343A1372023-01-0303 January 2023 Examination Confirmation Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML22189A0492022-07-25025 July 2022 Examination Confirmation Letter No.50-020/OL-22-02, Massachusetts Institute of Technology ML21328A2342021-11-29029 November 2021 Examination Confirmation Letter No. 50-020/OL-22-01, Massachusetts Institute of Technology ML21186A0032021-07-16016 July 2021 Examination Confirmation Letter No. 50-020/OL-21-02, Massachusetts Institute of Technology ML21053A4372021-02-23023 February 2021 Examination Confirmation Letter No. 50-020/OL-21-01, Massachusetts Institute of Technology ML19345F3782019-12-11011 December 2019 Examination Confirmation Letter No. 50-020/OL-20-01, Massachusetts Institute of Technology ML19295F4202019-10-30030 October 2019 Examination Report No. 50-020/OL-19-03, Massachusetts Institute of Technology ML19191A1512019-07-10010 July 2019 Examination Confirmation Letter No. 50-020/OL-19-03, Massachusetts Institute of Technology ML19084A0752019-04-0202 April 2019 Examination Report No. 50-020-OL-19-02, Massachusetts Institute of Technology ML18317A2982018-11-0707 November 2018 Examination Report No. 50-020/OL-19-01, Massachusetts Institute of Technology ML18247A1942018-08-30030 August 2018 Examination Confirmation Letter 50-020/OL-19-01, Massachusetts Institute of Technology ML18011A0062018-01-0303 January 2018 Examination Confirmation Letter No. 50-020/OL 18-01 Massahusetts Institute of Technology ML17283A2152017-10-11011 October 2017 Examination Report No. 50-20/OL-17-03, Massachusetts Institute of Technology ML17170A1542017-06-21021 June 2017 Examination Confirmation Letter 50-020 OL 17-03, Massahusetts Institute of Technology ML17058A0972017-02-28028 February 2017 Examination Report No. 50-020/OL-17-02, Massachusetts Institute of Technology ML16334A1392016-11-29029 November 2016 Examination Confirmation Letter No. 50-020/OL-17-02, Massachusetts Institute of Technology ML16177A1302016-06-28028 June 2016 Examination Notification Letter, No. 50-020/OL-17-01, Massachusetts Institute of Technology ML14247A2202014-09-0202 September 2014 Rescheduled Examination, No. 50-020/OL-14-02, Massachusetts Institute of Technology ML13261A1072013-10-0101 October 2013 Examination Results Letter No. 50-020/OL-13-02, Massachusetts Institute Technology ML13003A3152013-01-10010 January 2013 Massachusetts Institute of Technology - Corporate Notification Letter No. 50-020/OL-13-01 ML1129405982011-10-25025 October 2011 Examination Results Letter No. 50-20/OL-12-01, Massachusetts Institute of Technology ML1120606302011-08-0808 August 2011 Corporate Notification Letter No. 50-20/OL-12-01, Massachusetts Institute of Technology ML1105601812011-03-11011 March 2011 Initial Examination Report No. 50-20/OL-11-01, Massachusetts Institute of Technology ML1025902802010-09-17017 September 2010 Initial Examination Results Letter, No. 50-20/OL-10-01, Massachusetts Institute of Technology ML0915903922009-06-0909 June 2009 Initial Examination Corporate Notification Letter, No. 50-020/OL-09-01, Massachusetts Institute of Technology ML0715000072007-05-31031 May 2007 Initial Examination Corporate Notification Letter, No. 50-020-OL-07-02, Mit ML0527303902005-10-0707 October 2005 Initial Examination Results Letter No. 50-20/OL-05-01, Massachusetts Institute Technology ML0518102892005-07-0707 July 2005 Initial Examination Corporate Notification Letter No. 50-20/OL-05-01, Massachusetts Institute of Technology, September 6, 2005 ML0427804202004-10-0808 October 2004 Initial Examination Results Letter No. 50-20/OL-04-02, Massachusetts Institute of Technology ML0420804472004-07-30030 July 2004 Retake Examination Results Letter, No. 50-020/OL-04-01, Massachusetts Institute of Technology ML0417400872004-06-24024 June 2004 Retake Examination Corporate Notification Letter No. 50-020/OL-04-01, Massachusetts Institute of Technology ML0417005012004-06-21021 June 2004 Initial Examination Corporate Notification Letter No. 50-020/OL-04-02, Massachusetts Institute of Technology ML0407002102004-03-22022 March 2004 Initial Examination 50-20/OL-04-01 Results, Massachusetts Institute of Technology ML0332302722003-11-20020 November 2003 Corporate Notification Letter No. 50-20/OL-04-01, Massachusetts Institute of Technology ML0303606752003-02-14014 February 2003 Retake Examination Results Letter No. 50-020/OL-03-01, Massachusetts Institute of Technology ML0233807912002-12-0909 December 2002 Retake Examination Corporate Notification Letter No. 50-20/OL-03-01, Massachusetts Institute of Technology 2024-07-23
[Table view] |
Text
Mr. John P. Foster Director of Reactor Operations Nuclear Reactor Laboratory Massachusetts Institute of Technology 138 Albany Street, MS NW12-116A Cambridge, MA 02139
SUBJECT:
EXAMINATION CONFIRMATION LETTER NO. 50-020/OL 24-01, MASSACHUSETTS INSTITUTE OF TECHNOLOGY
Dear Mr. John Foster:
Arrangements were made with Edward Lau for the administration of operator licensing examinations at the Massachusetts Institute of Technology Research Reactor. The written examinations and operating tests are scheduled for the week of April 1, 2024.
To meet this schedule, please furnish the material listed in Enclosure 1, Reference Material for Reactor/Senior Operator Licensing Examinations, at least 60 days before the examination date in either hard copy to the address below, electronically via BOX, or email to Amy.Beasten@nrc.gov.
ATTN: Amy E. Beasten, PhD M/S: OWFN 6 A51M U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738, Administration of Written Examinations, describes your responsibilities for conducting written examinations. Enclosure 3, Procedures for the Administration of Written Examinations, describes applicant responsibilities during the administration of the written examination. Please ensure that all applicants are aware of these rules.
Your review of the written examination will be conducted in accordance with the procedures specified in Enclosure 4, Facility Review of Written Examinations.
Signed operator license applications in accordance with Title 10 of the Code of Federal Regulations Section 55 Subpart D, Applications, certifying that all applicants have successfully completed the facility licensees requirements to be licensed as an operator or senior operator and that all applicants meet the medical requirements, must be submitted at least 14 working days before the start date of the examination. This will allow the chief examiner time to review and process the applications. If this review cannot be completed in time to decide an applicants eligibility, that applicant will not be permitted to sit for the examination. Therefore, it is recommended that license applications be timely provided to ensure an appropriate level of review.January 5, 2024 J. Foster 2 The U.S. Nuclear Regulatory Commission (NRC) has posted copies of the application forms, Personal Qualification StatementLicensee (NRC Form 398), and, Certification of Medical History by Facility Licensee (NRC Form 396), on the agencys website. The forms are in Adobe Acrobat format. https://www.nrc.gov/reading-rm/doc-collections/forms/nrc398.pdf https://www.nrc.gov/reading-rm/doc-collections/forms/nrc396.pdf Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval numbers 3150-0018, 3150-0024 and 3150-0090.
The burden to the public for these mandatory information collections is estimated to average 7.45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> per combined response for completing the information collections. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and Freedom of Information Act/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to: INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-8341, or email at Amy.Beasten@nrc.gov.
Sincerely, Amy E. Beasten, PhD, Chief Examiner Non-Power Production and Utilization Facility Oversight Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No.50-020
Enclosures:
- 1. Reference Material for Reactor/
Senior Operator Licensing Examinations
- 2. Administration of Written Examinations
- 3. Procedures for the Administration of Written Examination
- 4. Facility Review of Written Examinations cc: w/enclosures to GovDelivery Subscribers Signed by Beasten, Amy on 01/05/24
J. Foster 3
SUBJECT:
EXAMINATION CONFIRMATION LETTER NO. 50-020/OL 24-01, MASSACHUSSETTS INSTITUE OF TECHNOLOGY DATED: JANUARY 5, 2024
DISTRIBUTION:
PUBLIC JBowen, NRR JBorromeo, NRR TTate, NRR HCruz, NRR PBoyle, NRR XYin, NRR KRoche, NRR ABeasten, NRR NJones, NRR DTifft, RGN-I JNick, RGN-I
ADAMS ACCESSION No.: ML23354A144 NRR-079 OFFICE NRR/DANU/UNPO/CE NRR/DANU/UNPO/OLA NRR/DANU/UNPO/BC NRR/DANU/UNPO/CE
NAME ABeasten NJones TTate ABeasten DATE 1/4/2024 1/4/2024 1/4/2024 1/5/2024 OFFICIAL RECORD COPY REFERENCE MATERIAL FOR REACTOR/
SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS
- 1) Training materials including all substantive written material used to prepare applicants for initial reactor operator and senior reactor operator licensing. The material should include learning objectives, if available, and details presented during lectures, rather than outlines.
Training materials should be identified, bound, and indexed. Training materials should include the following:
(a) System descriptions including descriptions of all operationally relevant flowpaths, components, controls, and instrumentation. System training material should draw parallels to the actual procedures used for operating an applicable system.
(b) Learning objectives, student handouts, and lesson plans (including training manuals, facility orientation manual, system descriptions, reactor theory, thermodynamics).
(c) Complete and operationally useful descriptions of all safety-system interactions and secondary interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.
(d) Training material used to clarify and strengthen understanding of emergency operating procedures.
- 2) Complete Procedure Index (including temporary procedures).
- 3) All administrative procedures as applicable to reactor operation or safety.
- 4) All integrated facility procedures, normal or general operating procedures, and procedures for experiments.
- 5) All emergency procedures, emergency instructions, and abnormal or special procedures.
- 6) Standing orders or procedures changed by reactor supervision and important orders or changes that are safety related and may supersede the regular procedures.
- 7) A list of all reactor facility surveillances, with copies of all COMPLETED surveillances which require the collection of data (e.g., heat balance, rod drop times).
- 8) Fuel-handling and core-loading procedures and initial core-loading procedure (if appropriate).
- 9) Any annunciator/alarm procedures, as applicable.
- 10) Radiation protection manual and radiation control manual or procedures.
- 11) Emergency plan and any emergency plan implementing procedures.
- 12) Safety analysis report, technical specifications, and interpretations, if available.
- 13) System operating procedures, including experiments.
Enclosure 1 2
- 14) Piping and instrumentation diagrams, electrical single-line diagrams, and flow diagrams.
- 15) Technical data book, and/or facility curve information, as used by operators and facility precautions, limitations, and setpoints.
- 16) Questions and answers specific to the facility training program, which may be used in the written or operating examinations (voluntary by facility licensee).
- 17) Facility modification authorizations, which were authorized since the last revision to the safety analysis report.
- 18) Additional material as requested by the examiners to develop examinations that meet the requirements of the research and test reactor examiner standards and regulations.
The above reference material should be approved, final issues and be so marked. If a facility has not finalized some of the material, the chief examiner should verify with the facility that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination.
ADMINISTRATION OF WRITTEN EXAMINATIONS
- 1) A single room must be provided for administration of the written examination. This room and supporting restroom facilities should be located so as to prevent contact with other facility personnel during the written examination.
- 2) Minimum spacing is necessary to ensure examination integrity. The chief examiner will determine whether the room has adequate area to support minimum spacing between examination applicants to ensure examination integrity.
- 3) The chief examiner will review any arrangements made by the facility to give the applicants lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above.
- 4) The facility licensee may provide pads of 8.5 by 11-inch lined paper in unopened packages for the applicants use in completing the examination. The examiner will distribute these pads as needed.
- 5) Applicants may bring pens, pencils, calculators, or slide rules into the examination room.
Black ink or dark pencils should be used for writing answers to questions.
- 6) The chief examiner must approve any wall charts, models, training materials, equipment, or reference material present in the examination room.
- 7) The chief examiner will give the facility staff a copy of the written examination with answer key at the beginning of the examination. The facility staff will then have five working days to submit formal written comments with supporting documentation regarding written examination questions and answers to the chief examiner.
Enclosure 2 PROCEDURES FOR THE ADMINISTRATION OF WRITTEN EXAMINATIONS
- 1) Verify candidate identity.
- 2) Pass out examinations and handouts. Instruct applicants not to review examination until instructed to do so.
READ THE FOLLOWING INSTRUCTIONS VERBATIM:
- 1) Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
- 2) When you have completed your examination, you must sign the statement at the bottom of the cover sheet. This indicates that the work is your own and you have not received or given assistance in completing the examination.
READ THE FOLLOWING INSTRUCTIONS:
With the start of the examination, you must comply with the following rules. These rules are in effect within the examination area, until the last candidate has handed in his or her examination:
- 1) Restroom trips are limited to only one applicant at a time. You must avoid all contact with anyone outside the examination room to preclude even the appearance of cheating.
- 2) Use black ink or dark pencil only to facilitate legible reproductions.
- 3) Print your name in the blank provided in the upper right corner of the examination cover sheet and each answer sheet.
- 4) Mark your answers on the answer sheet(s) provided.
- 5) The point value for each question is shown in brackets after the question.
- 6) If the intent of a question is unclear, ask questions of the examiner or proctor only.
- 7) There is a time limit of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per section of the written examination. For example, a one-section retake examination has a 1-hour time limit, while a normal three-section initial examination has a 3-hour time limit.
- 8) You must achieve a grade of 70 percent or greater in each category to pass the examination.
- 9) When turning in your examination, assemble the completed examination with examination questions, examination aids, answer sheets, and all scrap paper. Give the proctor your answer sheet(s) along with the signed cover sheet. Take all other material collected with you out of the examination area.
Enclosure 3 2
- 10) After turning in your examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked.
- 11) During the examination you will be evaluated for your actions as if you were the actual watchstander. Please operate the reactor as if you were licensed, with the exception that you should announce your actions, and then pause momentarily to give the operator of record time to correct you or stop you, if necessary, before you actually perform the action. In addition, the examiner will be observing that you meet all conditions of your license (e.g., wearing corrective lenses to perform licensed duties).
FACILITY REVIEW OF WRITTEN EXAMINATIONS
- 1. At the option of the appropriate U.S. Nuclear Regulatory Commission (NRC) management, the facility may review the written examination up to 2 weeks before its administration. This review may take place at the facility or an NRC office. The chief examiner will coordinate the details of the review with the facility. An NRC examiner will be present at all times during the review. The facility staff may not retain copies of the examination or any written notes.
When using this option, the facility reviewers must sign the following statement before being allowed access to the examination.
- a. Pre-examination Security Agreement:
I acknowledge that I have acquired specialized
[Print Name]
knowledge concerning the examination scheduled for at
[Print Date]
__________________________ as of the date of my signature below.
[Print Facility Name]
I agree that I will not knowingly divulge any information concerning this examination to any unauthorized persons. I understand that I am not to participate in any instruction involving those applicants scheduled to be administered the above examination from this date until after the examination has been administered. I further understand that violation of the conditions of this agreement may result in the examinations being canceled and/or enforcement action against myself or the facility licensee by whom I am employed or represent.
Signature/Date
In addition, the facility staff reviewers will sign the following statement after the written examination has been administered.
- b. Post-examination Security Agreement:
I did not, to the best of my knowledge, divulge any
[Print Name]
information concerning the examinations administered during the week of at ________________or provide any
[Print Date] [Print Facility Name]
instruction to those those applicants who were administered the examination from the date I entered into this security agreement until the completion of examination administration.
Signature/Date
Enclosure 4 2
- 2. The facility staff will be provided a copy of the examination and the answer key at the beginning of the examination. A copy will be kept of any pen and ink changes made to questions during the examination administration.
If members of the facility staff did not review the examination before its administration, they will have five working days from the day of the written examination to submit formal comments. If the facility staff reviewed the examination before its administration, they must submit any additional comments before the examiner leaves the facility. The reactor supervisor will address the comments to the chief examiner. The NRC will consider comments submitted after the required period on a case-by-case basis. This may cause delays in grading the examinations.
- 3. The facility licensee should submit comments in the following format:
- list the question section and number and state the comment along with a recommendation for correction (e.g., delete, two correct answers)
- support the comment with a reference and provide a copy of the reference if it was not included in the original reference material submitted
NOTES:
- 1) No change to the examination will be made without a reference to support the facility comment. Provide any supporting documentation not previously supplied.
- 2) Comments made without a concise facility recommendation will not be addressed.
- 3) Comments not submitted within the requested time will be included in the grading process on a case-by-case basis as determined by the NRC. Comments not submitted within the requested time will delay the examination grading process.
- 4) NRC policy is to delete a multiple-choice question that has no correct answer or more than two correct answers and to give credit for either response for questions that have two correct answers.