ML23072A024

From kanterella
Jump to navigation Jump to search
Mit, Nuclear Reactor Lab., Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor
ML23072A024
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 03/07/2023
From: Foster J, Hu L
Massachusetts Institute of Technology (MIT)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML23072A024 (1)


Text

MIT NUCLEAR REACTOR LABORATORY AN MIT INTERDEPARTMENTAL CENTER John P. Foster Director of Reactor Operations Attn: Document Control Desk Mail Stop: NW12-116A 138 Albany Street Cambridge, MA 02139 Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 Phone: 617 253-4211 Fax: 617 324-0042 Email: jpfoster@mit.edu March 7, 2023

Subject:

Proposal for Conversion to Low Enriched Uranium (LEU), MIT Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of that paragraph.

Dear Sir or Madam:

In accordance with 10 CFR 50.64 "Limitation of the Use of Highly Enriched Uranium in Domestic Non-Power Reactors," the MIT Nuclear Reactor Laboratory submits herewith the information required by subsection (c)(2)(ii) of that paragraph.

The high-density low enriched uranium fuel (U-lOMo) will not be available during Fiscal Year 2024. Furthermore, specific to 10 CFR 50.64( c )(2)(ii), Federal Government funding for conversion to LEU will not be available. However, we continue to receive funding for conversion planning and engage in fuel qualification and fabrication activities. A new MITR LEU fuel element design was developed and the LEU core has been analyzed and demonstrated to meet nuclear safety and performance criteria. A Preliminary Safety Analysis Report (PSAR) for the LEU conversion was submitted and docketed in October 2018 for NRC review. The PSAR contains the LEU fuel design as well _as steady-state and transient analyses relevant to the proposed LEU core.

We* will continue the conversion planning and work with NRC staff on the PSAR review to prepare for the conversion when the new LEU fuel completes qualification tests.

Lin-wen Hu, Ph.D.

Director, Research and Services Cc:

USNRC - Senior Project Manager Research and Test Reactors Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation USNRC -

Senior Reactor Inspector Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Sincerely,

~P~oster Director of Reactor Operations