ML21105A360

From kanterella
Jump to navigation Jump to search
Duties of Reactor Superintendent
ML21105A360
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 04/07/2021
From: Foster J
Massachusetts Institute of Technology (MIT)
To:
Office of Nuclear Reactor Regulation
References
Download: ML21105A360 (1)


Text

MIT* NUCLEAR REACTOR LABORATORY AN MIT INTERDEPARTMENI'AL CENTER

. John P. Foster

  • *
  • Director of Reactor Operations Mail Stop: NWU-116A 138 Albany Street Cambridge, MA 02139 Phone: 617 253-4211 Fax: 617 324-0042
  • Email: jpfostermit.edu U. S. Nuclear Regulatory Commission Washington, DC i0555 Attn: Document Control Desk Subj~_: Duties of Reactor Superintendent

Dear Sir or Madam:

April 7, 2021 The following is provided as an item or'information. Mr. Marshall Wade has been named Reactor Superinten~ent fut the MIT Research Reactor effective April '1, 2021. He was in this position on _an interim basis and succeeds Ms. Sarah Don who has accepted a position outside_ of MIT_. Mr. Wade's education and.

experience exceed the requirements of MITR Technical Specification No. 7.1.4 (2):

Sincerely,

~*.

Director of Reactor Operations Cc:

USNRC - Senior Reactor Inspector Research and Test Reactors Section NRR/DRIP/RNRP.

USNRC - Senior Project Manager NRR/DRIP/RNRP