Line 3: Line 3:
| issue date = 10/24/2011
| issue date = 10/24/2011
| title = Notification of Inspection and Request for Information
| title = Notification of Inspection and Request for Information
| author name = Rivera-Ortiz J E
| author name = Rivera-Ortiz J
| author affiliation = NRC/RGN-II/DRS/EB3
| author affiliation = NRC/RGN-II/DRS/EB3
| addressee name = Nazar M
| addressee name = Nazar M
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 October 24, 2011  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 October 24, 2011 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
 
Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420  


==SUBJECT:==
==SUBJECT:==
ST. LUCIE, UNIT 1 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION  
ST. LUCIE, UNIT 1 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==


From December 05 - 16, 2011, the NRC will perform the baseline inservice inspection (ISI) at the St. Lucie Nuclear Plant, Unit 1 (NRC Inspection Procedure 71111.08). Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspector is adequately prepared. The second group (Section B of the enclosure) identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
From December 05 - 16, 2011, the NRC will perform the baseline inservice inspection (ISI) at the St. Lucie Nuclear Plant, Unit 1 (NRC Inspection Procedure 71111.08). Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspector is adequately prepared. The second group (Section B of the enclosure) identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Don Cecchett of your organization. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection or the material requested, please contact the lead inspector Michael Coursey at (404) 997-4671 (Michael.Coursey@nrc.gov).  
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Don Cecchett of your organization. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection or the material requested, please contact the lead inspector Michael Coursey at (404) 997-4671 (Michael.Coursey@nrc.gov).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document 
FP&L                                       2 Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,
FP&L     2 Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
                                          /RA/
Sincerely,       /RA/             Joel Rivera-Ortiz, Chief (Acting)       Engineering Branch 3       Division of Reactor Safety Docket No.: 50-335 License No.: DPR-67  
Joel Rivera-Ortiz, Chief (Acting)
Engineering Branch 3 Division of Reactor Safety Docket No.: 50-335 License No.: DPR-67


==Enclosure:==
==Enclosure:==
Inservice Inspection Document Request  
Inservice Inspection Document Request cc w/encl.: (See page 3)
 
cc w/encl.: (See page 3)  
 
___ML 112970822______  X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE DRS/EB-3 DRS/ EB-3 DRS/EB-3    SIGNATURE
/RA/ /RA/ /RA/    NAME J. RIVERA-ORTIZ L. LAKE M. COURSEY    DATE 10/24/2011 10/24/2011 10/19/2011    E-MAIL COPY?    YES NO YES NO YES NO      YES NO      YES NO      YES NO      YES NO FP&L      3 cc w/encl: Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution


Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution  
___ML112970822______ X SUNSI REVIEW COMPLETE            X FORM 665 ATTACHED OFFICE            DRS/EB-3        DRS/ EB-3      DRS/EB-3 SIGNATURE          /RA/            /RA/          /RA/
NAME              J. RIVERA-ORTIZ  L. LAKE        M. COURSEY DATE                  10/24/2011      10/24/2011    10/19/2011 E-MAIL COPY?          YES    NO    YES      NO    YES      NO    YES    NO    YES    NO      YES    NO    YES  NO FP&L                              3 cc w/encl:                          William A. Passetti Richard L. Anderson                  Chief Site Vice President                  Florida Bureau of Radiation Control St. Lucie Nuclear Plant              Department of Health Electronic Mail Distribution        Electronic Mail Distribution Robert J. Hughes                     Bryan Koon Plant General Manager               Director St. Lucie Nuclear Plant              Florida Division of Emergency Management Electronic Mail Distribution        Electronic Mail Distribution Gene St. Pierre                      Donna Calabrese Vice President, Fleet Support        Emergency Preparedness Manager Florida Power & Light Company        St. Lucie Plant Electronic Mail Distribution        Electronic Mail Distribution Daniel D. DeBoer                    J. Kammel Operations Site Director            Radiological Emergency Planning St. Lucie Nuclear Plant             Administrator Electronic Mail Distribution        Department of Public Safety Electronic Mail Distribution Eric Katzman Licensing Manager                    Senior Resident Inspector St. Lucie Nuclear Plant              St. Lucie Nuclear Plant Electronic Mail Distribution        U.S. Nuclear Regulatory Commission P.O. Box 6090 Larry Nicholson                      Jensen Beach, FL 34957-2010 Director Licensing                            Seth B. Duston Florida Power & Light Company        Training Manager Electronic Mail Distribution        St. Lucie Nuclear Plant Electronic Mail Distribution Alison Brown Nuclear Licensing                    Faye Outlaw Florida Power & Light Company        County Administrator Electronic Mail Distribution        St. Lucie County Electronic Mail Distribution Mitch S. Ross Vice President and General Counsel  Jack Southard Nuclear                              Director Florida Power & Light Company        Public Safety Department Electronic Mail Distribution        St. Lucie County Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution


Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution Daniel D. DeBoer Operations Site Director St. Lucie Nuclear Plant Electronic Mail Distribution Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Mitch S. Ross Vice President and General Counsel Nuclear Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution
INSERVICE INSPECTION DOCUMENT REQUEST Inspection Dates:              December 5 - 16, 2011 Inspection Procedures:        IP 71111.08, Inservice Inspection (ISI) Activities Inspectors:                    Michael Coursey, Reactor Inspector (Lead Inspector, ISI)
Louis Lake, Senior Reactor Inspector (SGISI Inspector)
A. Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office in hard copy or electronic format (CD preferred), in care of Michael Coursey by November 28, 2011, to facilitate the selection of specific items that will be reviewed during the onsite inspection week.
The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.
A.1    ISI / Welding Programs and Schedule Information a)      A detailed schedule (including preliminary dates) of:
i)      Nondestructive examinations (NDEs) planned for Class 1, 2, and 3 systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI Programs during the upcoming outage.
Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per ASME Section XI, IWX-2400. (Do not provide separately if other documentation requested contains this information).
ii)    Reactor pressure vessel head (RPVH) examinations planned for the upcoming outage.
iii)    Examinations planned for Alloy 82/182/600 components that are not included in the scope of Section XI. (If applicable.)
iv)    Examinations planned as part of your Boric Acid Corrosion Control Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).
Enclosure


Bryan Koon Director Florida Division of Emergency Management Electronic Mail Distribution
2 v)      Welding activities that are scheduled to be completed during the upcoming outage in ASME Class 1, 2, or 3 structures, systems, or components (SSCs).
b)    A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.
c)    A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual VT-1, VT-2, and VT-3) which have identified surface or volumetric indications that were analytically evaluated and accepted for continued service on Code Class 1, 2, or 3 systems since the beginning of the last refueling outage.
This should include the previous Section XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests.
Also, include in the list the NDE reports with identified surface or volumetric indications that were analytically evaluated and accepted for continued service in the RPVH penetration nozzles. The list of NDE reports should include a brief description of the SSC where the recordable indication was identified.
d)    A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1, 2, and 3 systems which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.
e)    If reactor vessel weld examinations required by the ASME Code or 10 CFR 50.55a are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.
f)    Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.
g)    A list of any temporary non-code repairs in service (e.g., pinhole leaks).
h)    Please provide copies of the most recent self-assessments for the ISI, Welding, and Alloy 600 Programs.
A.2 Reactor Pressure Vessel Head (RPVH) a)    Provide the detailed scope of the planned NDE of the reactor vessel head which identifies the types of NDE methods to be used on each specific part of the vessel head to meet the augmented inspection requirements of 50.55a(g)(6)(ii)(D). Also, include examination scope expansion criteria and planned expansion sample sizes if relevant indications are identified. (If applicable.)
b)    A list of the standards and/or requirements that will be used to evaluate indications identified during NDE of the reactor vessel head (e.g., the specific Enclosure


Donna Calabrese Emergency Preparedness Manager St. Lucie Plant Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL  34957-2010
3 industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).
A.3 Boric Acid Corrosion Control Program (BACCP) a)    Copy of the procedures that govern the scope, equipment, and implementation of the inspections required to identify boric acid leakage and the procedures for boric acid leakage/corrosion evaluation.
b)    Please provide a list of leaks (including code class of the components) that have been identified since the last refueling outage and associated corrective action documentation. If during the last cycle the unit was shutdown, please provide documentation of containment walkdown inspections performed as part of the BACCP.
c)    Please provide a copy of the most recent self-assessment performed for the BACCP.
A.4 Steam Generator (SG) Inspections a)    A schedule of:
i)      SG tube inspection, data analyses, and repair activities for the upcoming outage.
ii)    SG secondary side inspection activities for the upcoming outage.
b)    A copy of your SG ISI Inspection Program and Plan.
c)    A copy of the last Operational Assessment, and the Degradation Assessment for the upcoming outage.
d)    Description of any deviations from Technical Specification Task Force (TSTF) -
449 applicable to your site.
e)    A copy of SG site specific training given to vendors performing eddy current (ET) testing for the upcoming outage.
f)    A copy of SG Eddy Current Data Analyst Guidelines.
g)    A copy of your Site Validated Eddy Current Technique Sheets (acquisition and analysis), along with the supporting EPRI ETSSs.
h)    A copy of your EPRI Appendix H or I Eddy Current Technique Qualification Records.
i)    Identify and quantify any SG tube leakage experienced during the previous operating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition. (If applicable.)
Enclosure


Seth B. Duston Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution
4 j)    Provide past history of the condition and issues pertaining to the secondary side of the steam generators (including items such as loose parts, fouling, top of tube sheet condition, and crud removal amounts).
k)    Copies of your most recent self-assessments of the SG monitoring, loose parts monitoring, and secondary side water chemistry control programs.
l)    Please indicate where the primary, secondary, and resolution analyses are scheduled to take place.
m)    Indicate any temporary or permanent Alternate Repair Criteria (ARC) that are applicable to the upcoming outage.
A.5 Additional Information Related to All ISI Activities a)    A list with a brief description of ISI, BACCP, and SG ISI-related issues (e.g.,
condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Unit 1). For example, a list based upon data base searches using key words related to piping or SG tube degradation such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/SG tube examinations.
b)    Please provide names and phone numbers for the following program leads:
ISI contacts (Examination, planning)
Containment Exams RPVH Exams Snubbers and Supports Repair and Replacement Program Licensing Contact Site Welding Engineer Boric Acid Corrosion Control Program Steam Generator Inspections B. Information to be provided on-site to the inspectors at the entrance meeting (December 5, 2011):
B.1 ISI / Welding Programs and Schedule Information a)    Updated schedules for ISI/NDE activities, including SG ISI, planned welding activities, and schedule showing contingency repair plans, if available.
b)    For ASME Class 1, 2, or 3 welds selected by the inspector from the lists provided from Section A of this enclosure, please provide copies of the following documentation for each subject weld:
Enclosure


Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution
5 i)      Weld data sheet (traveler).
ii)      Weld configuration and system location.
iii)    Applicable Code Edition and Addenda for weldment.
iv)      Applicable Code Edition and Addenda for welding procedures.
v)      Applicable weld procedures (WPS) used to fabricate the welds vi)      Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v.
vii)    Copies of mechanical test reports identified in the PQRs above.
viii)    Copies of the nonconformance reports for the selected welds. (If applicable.)
ix)      Radiographs of the selected welds and access to equipment to allow viewing radiographs. (If RT was performed.)
x)      Copies of the preservice examination records for the selected welds.
xi)      Copies of welder performance qualifications records applicable to WPS, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (at least six months prior to date subject work).
xii)    Copies of applicable NDE personnel qualifications. (VT, PT, UT, RT) c)    For the ISI-related corrective action issues selected by the inspector from Section A of this enclosure, provide a copy of the corrective actions and supporting documentation.
d)    For the NDE reports with recordable indications on Code Class 1, 2, or 3 systems selected by the inspector from Section A above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.
e)    A copy of (or ready access to) the most current revision of the ISI Program Manual and Plan for the current Interval.
f)    For the NDEs selected by the inspector from Section A of this enclosure, provide copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME Code, Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g., ultrasonic unit; cables; and transducers, including serial numbers) and NDE personnel qualification records.
B.2 Reactor Pressure Vessel Head (RPVH) a)    Provide the NDE personnel qualification records for the examiners who will perform examinations of the RPVH.
b)    Provide drawings showing the following: (If a visual examination is planned for the upcoming refueling outage.)
Enclosure


Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution
6 i)       RPVH and CRDM nozzle configurations.
 
ii)     RPVH insulation configuration.
Enclosure INSERVICE INSPECTION DOCUMENT REQUEST
 
Inspection Dates:  December 5 - 16, 2011 Inspection Procedures: IP 71111.08, "Inservice Inspection (ISI) Activities" Inspectors:  Michael Coursey, Reactor Inspector (Lead Inspector, ISI)    Louis Lake, Senior Reactor Inspector (SGISI Inspector)
 
A. Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office in hard copy or electronic format (CD preferred), in care of Michael Coursey by November 28, 2011, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.
A.1 ISI / Welding Programs and Schedule Information a) A detailed schedule (including preliminary dates) of:
i)  Nondestructive examinations (NDEs) planned for Class 1, 2, and 3 systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI Programs during the upcoming outage.      Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per ASME Section XI, IWX-2400.  (Do not provide separately if other documentation requested contains this information).
ii)  Reactor pressure vessel head (RPVH) examinations planned for the upcoming outage.
iii)  Examinations planned for Alloy 82/182/600 components that are not included in the scope of Section XI.  (If applicable.)
iv) Examinations planned as part of your Boric Acid Corrosion Control Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).
2  Enclosure v) Welding activities that are scheduled to be completed during the upcoming outage in ASME Class 1, 2, or 3 structures, systems, or components (SSCs).
b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.
c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual VT-1, VT-2, and VT-3) which have identified surface or volumetric indications that were analytically evaluated and accepted for continued service on Code Class 1, 2, or 3 systems since the beginning of the last refueling outage. This should include the previous Section XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests. Also, include in the list the NDE reports with identified surface or volumetric indications that were analytically evaluated and accepted for continued service in the RPVH penetration nozzles. The list of NDE reports should include a brief description of the SSC where the recordable indication was identified.
d) A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1, 2, and 3 systems which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.
e) If reactor vessel weld examinations required by the ASME Code or 10 CFR 50.55a are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.
f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.
g)  A list of any temporary non-code repairs in service (e.g., pinhole leaks).
h) Please provide copies of the most recent self-assessments for the ISI, Welding, and Alloy 600 Programs.
A.2 Reactor Pressure Vessel Head (RPVH) a)  Provide the detailed scope of the planned NDE of the reactor vessel head which identifies the types of NDE methods to be used on each specific part of the vessel head to meet the augmented inspection requirements of 50.55a(g)(6)(ii)(D). Also, include examination scope expansion criteria and planned expansion sample sizes if relevant indications are identified.  (If applicable.)
b)  A list of the standards and/or requirements that will be used to evaluate indications identified during NDE of the reactor vessel head (e.g., the specific 3  Enclosure  industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).
A.3 Boric Acid Corrosion Control Program (BACCP) a)  Copy of the procedures that govern the scope, equipment, and implementation of the inspections required to identify boric acid leakage and the procedures for boric acid leakage/corrosion evaluation.
b) Please provide a list of leaks (including code class of the components) that have been identified since the last refueling outage and associated corrective action documentation. If during the last cycle the unit was shutdown, please provide documentation of containment walkdown inspections performed as part of the BACCP. c) Please provide a copy of the most recent self-assessment performed for the BACCP. A.4 Steam Generator (SG) Inspections a) A schedule of:
i)  SG tube inspection, data analyses, and repair activities for the upcoming outage. ii)  SG secondary side inspection activities for the upcoming outage.
b) A copy of your SG ISI Inspection Program and Plan. 
 
c)  A copy of the last Operational Assessment, and the Degradation Assessment for the upcoming outage.
d) Description of any deviations from Technical Specification Task Force (TSTF) - 449 applicable to your site.
e) A copy of SG site specific training given to vendors performing eddy current (ET) testing for the upcoming outage.
f) A copy of SG Eddy Current Data Analyst Guidelines.
g) A copy of your Site Validated Eddy Current Technique Sheets (acquisition and analysis), along with the supporting EPRI ETSS's.
h)  A copy of your EPRI Appendix H or I Eddy Current Technique Qualification Records. i) Identify and quantify any SG tube leakage experienced during the previous operating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition.  (If applicable.)
4  Enclosure j)  Provide past history of the condition and issues pertaining to the secondary side of the steam generators (including items such as loose parts, fouling, top of tube sheet condition, and crud removal amounts).
k) Copies of your most recent self-assessments of the SG monitoring, loose parts monitoring, and secondary side water chemistry control programs.
l) Please indicate where the primary, secondary, and resolution analyses are scheduled to take place.
m)  Indicate any temporary or permanent Alternate Repair Criteria (ARC) that are applicable to the upcoming outage.
A.5 Additional Information Related to All ISI Activities a)  A list with a brief description of ISI, BACCP, and SG ISI-related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Unit 1). For example, a list based upon data base searches using key words related to piping or SG tube degradation such as:  ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/SG tube examinations.
b)  Please provide names and phone numbers for the following program leads:
ISI contacts (Examination, planning)  Containment Exams  RPVH Exams  Snubbers and Supports Repair and Replacement Program  Licensing Contact  Site Welding Engineer  Boric Acid Corrosion Control Program  Steam Generator Inspections
 
B. Information to be provided on-site to the inspectors at the entrance meeting (December 5, 2011):
 
B.1 ISI / Welding Programs and Schedule Information a) Updated schedules for ISI/NDE activities, including SG ISI, planned welding activities, and schedule showing contingency repair plans, if available.
b) For ASME Class 1, 2, or 3 welds selected by the inspector from the lists provided from Section A of this enclosure, please provide copies of the following documentation for each subject weld:
5  Enclosure i) Weld data sheet (traveler). ii) Weld configuration and system location. iii) Applicable Code Edition and Addenda for weldment. iv) Applicable Code Edition and Addenda for welding procedures. v) Applicable weld procedures (WPS) used to fabricate the welds vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v. vii) Copies of mechanical test reports identified in the PQRs above. viii) Copies of the nonconformance reports for the selected welds.  (If applicable.) ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs.  (If RT was performed.) x) Copies of the preservice examination records for the selected welds. xi) Copies of welder performance qualifications records applicable to WPS, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (at least six months prior to date subject work). xii) Copies of applicable NDE personnel qualifications. (VT, PT, UT, RT) c) For the ISI-related corrective action issues selected by the inspector from Section A of this enclosure, provide a copy of the corrective actions and supporting documentation.
d) For the NDE reports with recordable indications on Code Class 1, 2, or 3 systems selected by the inspector from Section A above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.
e) A copy of (or ready access to) the most current revision of the ISI Program Manual and Plan for the current Interval.
f) For the NDEs selected by the inspector from Section A of this enclosure, provide copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME Code, Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g., ultrasonic unit; cables; and transducers, including serial numbers) and NDE personnel qualification records.
B.2 Reactor Pressure Vessel Head (RPVH) a) Provide the NDE personnel qualification records for the examiners who will perform examinations of the RPVH.      b) Provide drawings showing the following:  (If a visual examination is planned for the upcoming refueling outage.)
6   Enclosure  i) RPVH and CRDM nozzle configurations. ii) RPVH insulation configuration.
The drawings listed above should include fabrication drawings for the nozzle attachment welds as applicable.
The drawings listed above should include fabrication drawings for the nozzle attachment welds as applicable.
c) Copy of NDE reports from the last RPVH examination.
c)     Copy of NDE reports from the last RPVH examination.
d) Copy of evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95% minimum coverage required by Code Case N-729-1. (If a visual examination is planned for the upcoming refueling outage.)
d)     Copy of evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95% minimum coverage required by Code Case N-729-1. (If a visual examination is planned for the upcoming refueling outage.)
e) Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the RPVH. If no explicit procedures exist which govern this activity, provide a description of the process to be followed including personnel responsibilities and expectations.
e)     Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the RPVH. If no explicit procedures exist which govern this activity, provide a description of the process to be followed including personnel responsibilities and expectations.
f) Provide a copy of the updated calculation of effective degradation years (EDYs) for the RPVH susceptibility ranking.
f)     Provide a copy of the updated calculation of effective degradation years (EDYs) for the RPVH susceptibility ranking.
g) Provide copy of the vendor qualification report(s) that demonstrates the detection capability of the NDE equipment used for the RPVH examinations. Also, identify any changes in equipment configurations used for the RPVH examinations which differ from that used in the vendor qualification report(s).
g)     Provide copy of the vendor qualification report(s) that demonstrates the detection capability of the NDE equipment used for the RPVH examinations. Also, identify any changes in equipment configurations used for the RPVH examinations which differ from that used in the vendor qualification report(s).
B.3 Boric Acid Corrosion Control Program (BACCP) a) Please provide boric acid walk down inspection results, an updated list of boric acid leaks identified to date for this outage, associated corrective action documentation, and overall status of planned boric acid inspections.
B.3 Boric Acid Corrosion Control Program (BACCP) a)     Please provide boric acid walk down inspection results, an updated list of boric acid leaks identified to date for this outage, associated corrective action documentation, and overall status of planned boric acid inspections.
b) Please provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage. Please include a status of corrective actions to repair and/or clean these boric acid leaks. Please specify which known leaks, if any, have remained in service or will remain in service as active leaks.
b)     Please provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage. Please include a status of corrective actions to repair and/or clean these boric acid leaks. Please specify which known leaks, if any, have remained in service or will remain in service as active leaks.
 
c)     In accordance with NRC inspection procedure 71111.08, the inspector would like to conduct an independent boric acid walk down of the Reactor Building early in the inspection week. Please have knowledgeable BACCP staff available to accompany the inspector during the walk down.
c) In accordance with NRC inspection procedure 71111.08, the inspector would like to conduct an independent boric acid walk down of the Reactor Building early in the inspection week. Please have knowledgeable BACCP staff available to accompany the inspector during the walk down.
B.4 Steam Generator (SG) Inspections a)     A copy of the guidance to be followed if a loose part or foreign material is identified in the SG.
B.4 Steam Generator (SG) Inspections a) A copy of the guidance to be followed if a loose part or foreign material is identified in the SG.
Enclosure
Enclosure b) List of corrective action documents generated by the vendor and/or site with respect to SG inspection activities.
B.5 Codes and Standards a) Ready access to:  (i.e. copies provided to the inspector to use for the duration of the inspection at the on-site inspection location, or room number and location where available.)
i)  Applicable editions of the ASME Code (Sections V, IX, and XI) for the inservice inspection program and the repair/replacement program.
ii)  EPRI and industry standards referenced in the procedures used to perform the SG tube eddy current examination.


Inspector Contact Information
7 b)    List of corrective action documents generated by the vendor and/or site with respect to SG inspection activities.
: Michael Coursey     Mailing Address
B.5    Codes and Standards a)    Ready access to: (i.e. copies provided to the inspector to use for the duration of the inspection at the on-site inspection location, or room number and location where available.)
: Reactor Inspector     US NRC Region 2 404-997-4671     Attn: Michael Coursey Michael.Coursey@nrc.gov   245 Peachtree Center Ave., NE Ste.1200 Atlanta, GA 30303 Louis Lake Senior Reactor Inspector 404-997-4683 Louis.Lake@nrc.gov}}
i)      Applicable editions of the ASME Code (Sections V, IX, and XI) for the inservice inspection program and the repair/replacement program.
ii)      EPRI and industry standards referenced in the procedures used to perform the SG tube eddy current examination.
Inspector Contact Information:
Michael Coursey                                     Mailing Address:
Reactor Inspector                                   US NRC Region 2 404-997-4671                                         Attn: Michael Coursey Michael.Coursey@nrc.gov                             245 Peachtree Center Ave., NE Ste.1200 Atlanta, GA 30303 Louis Lake Senior Reactor Inspector 404-997-4683 Louis.Lake@nrc.gov Enclosure}}

Latest revision as of 21:52, 6 February 2020

Notification of Inspection and Request for Information
ML112970822
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/24/2011
From: Rivera-Ortiz J
NRC/RGN-II/DRS/EB3
To: Nazar M
Florida Power & Light Co
References
Download: ML112970822 (11)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 October 24, 2011 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

ST. LUCIE, UNIT 1 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Nazar:

From December 05 - 16, 2011, the NRC will perform the baseline inservice inspection (ISI) at the St. Lucie Nuclear Plant, Unit 1 (NRC Inspection Procedure 71111.08). Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspector is adequately prepared. The second group (Section B of the enclosure) identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Don Cecchett of your organization. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection or the material requested, please contact the lead inspector Michael Coursey at (404) 997-4671 (Michael.Coursey@nrc.gov).

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document

FP&L 2 Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Joel Rivera-Ortiz, Chief (Acting)

Engineering Branch 3 Division of Reactor Safety Docket No.: 50-335 License No.: DPR-67

Enclosure:

Inservice Inspection Document Request cc w/encl.: (See page 3)

___ML112970822______ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE DRS/EB-3 DRS/ EB-3 DRS/EB-3 SIGNATURE /RA/ /RA/ /RA/

NAME J. RIVERA-ORTIZ L. LAKE M. COURSEY DATE 10/24/2011 10/24/2011 10/19/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FP&L 3 cc w/encl: William A. Passetti Richard L. Anderson Chief Site Vice President Florida Bureau of Radiation Control St. Lucie Nuclear Plant Department of Health Electronic Mail Distribution Electronic Mail Distribution Robert J. Hughes Bryan Koon Plant General Manager Director St. Lucie Nuclear Plant Florida Division of Emergency Management Electronic Mail Distribution Electronic Mail Distribution Gene St. Pierre Donna Calabrese Vice President, Fleet Support Emergency Preparedness Manager Florida Power & Light Company St. Lucie Plant Electronic Mail Distribution Electronic Mail Distribution Daniel D. DeBoer J. Kammel Operations Site Director Radiological Emergency Planning St. Lucie Nuclear Plant Administrator Electronic Mail Distribution Department of Public Safety Electronic Mail Distribution Eric Katzman Licensing Manager Senior Resident Inspector St. Lucie Nuclear Plant St. Lucie Nuclear Plant Electronic Mail Distribution U.S. Nuclear Regulatory Commission P.O. Box 6090 Larry Nicholson Jensen Beach, FL 34957-2010 Director Licensing Seth B. Duston Florida Power & Light Company Training Manager Electronic Mail Distribution St. Lucie Nuclear Plant Electronic Mail Distribution Alison Brown Nuclear Licensing Faye Outlaw Florida Power & Light Company County Administrator Electronic Mail Distribution St. Lucie County Electronic Mail Distribution Mitch S. Ross Vice President and General Counsel Jack Southard Nuclear Director Florida Power & Light Company Public Safety Department Electronic Mail Distribution St. Lucie County Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution

INSERVICE INSPECTION DOCUMENT REQUEST Inspection Dates: December 5 - 16, 2011 Inspection Procedures: IP 71111.08, Inservice Inspection (ISI) Activities Inspectors: Michael Coursey, Reactor Inspector (Lead Inspector, ISI)

Louis Lake, Senior Reactor Inspector (SGISI Inspector)

A. Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office in hard copy or electronic format (CD preferred), in care of Michael Coursey by November 28, 2011, to facilitate the selection of specific items that will be reviewed during the onsite inspection week.

The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.

A.1 ISI / Welding Programs and Schedule Information a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations (NDEs) planned for Class 1, 2, and 3 systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI Programs during the upcoming outage.

Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per ASME Section XI, IWX-2400. (Do not provide separately if other documentation requested contains this information).

ii) Reactor pressure vessel head (RPVH) examinations planned for the upcoming outage.

iii) Examinations planned for Alloy 82/182/600 components that are not included in the scope of Section XI. (If applicable.)

iv) Examinations planned as part of your Boric Acid Corrosion Control Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).

Enclosure

2 v) Welding activities that are scheduled to be completed during the upcoming outage in ASME Class 1, 2, or 3 structures, systems, or components (SSCs).

b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.

c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual VT-1, VT-2, and VT-3) which have identified surface or volumetric indications that were analytically evaluated and accepted for continued service on Code Class 1, 2, or 3 systems since the beginning of the last refueling outage.

This should include the previousSection XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests.

Also, include in the list the NDE reports with identified surface or volumetric indications that were analytically evaluated and accepted for continued service in the RPVH penetration nozzles. The list of NDE reports should include a brief description of the SSC where the recordable indication was identified.

d) A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1, 2, and 3 systems which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.

e) If reactor vessel weld examinations required by the ASME Code or 10 CFR 50.55a are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined, and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.

g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h) Please provide copies of the most recent self-assessments for the ISI, Welding, and Alloy 600 Programs.

A.2 Reactor Pressure Vessel Head (RPVH) a) Provide the detailed scope of the planned NDE of the reactor vessel head which identifies the types of NDE methods to be used on each specific part of the vessel head to meet the augmented inspection requirements of 50.55a(g)(6)(ii)(D). Also, include examination scope expansion criteria and planned expansion sample sizes if relevant indications are identified. (If applicable.)

b) A list of the standards and/or requirements that will be used to evaluate indications identified during NDE of the reactor vessel head (e.g., the specific Enclosure

3 industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).

A.3 Boric Acid Corrosion Control Program (BACCP) a) Copy of the procedures that govern the scope, equipment, and implementation of the inspections required to identify boric acid leakage and the procedures for boric acid leakage/corrosion evaluation.

b) Please provide a list of leaks (including code class of the components) that have been identified since the last refueling outage and associated corrective action documentation. If during the last cycle the unit was shutdown, please provide documentation of containment walkdown inspections performed as part of the BACCP.

c) Please provide a copy of the most recent self-assessment performed for the BACCP.

A.4 Steam Generator (SG) Inspections a) A schedule of:

i) SG tube inspection, data analyses, and repair activities for the upcoming outage.

ii) SG secondary side inspection activities for the upcoming outage.

b) A copy of your SG ISI Inspection Program and Plan.

c) A copy of the last Operational Assessment, and the Degradation Assessment for the upcoming outage.

d) Description of any deviations from Technical Specification Task Force (TSTF) -

449 applicable to your site.

e) A copy of SG site specific training given to vendors performing eddy current (ET) testing for the upcoming outage.

f) A copy of SG Eddy Current Data Analyst Guidelines.

g) A copy of your Site Validated Eddy Current Technique Sheets (acquisition and analysis), along with the supporting EPRI ETSSs.

h) A copy of your EPRI Appendix H or I Eddy Current Technique Qualification Records.

i) Identify and quantify any SG tube leakage experienced during the previous operating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition. (If applicable.)

Enclosure

4 j) Provide past history of the condition and issues pertaining to the secondary side of the steam generators (including items such as loose parts, fouling, top of tube sheet condition, and crud removal amounts).

k) Copies of your most recent self-assessments of the SG monitoring, loose parts monitoring, and secondary side water chemistry control programs.

l) Please indicate where the primary, secondary, and resolution analyses are scheduled to take place.

m) Indicate any temporary or permanent Alternate Repair Criteria (ARC) that are applicable to the upcoming outage.

A.5 Additional Information Related to All ISI Activities a) A list with a brief description of ISI, BACCP, and SG ISI-related issues (e.g.,

condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Unit 1). For example, a list based upon data base searches using key words related to piping or SG tube degradation such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/SG tube examinations.

b) Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams RPVH Exams Snubbers and Supports Repair and Replacement Program Licensing Contact Site Welding Engineer Boric Acid Corrosion Control Program Steam Generator Inspections B. Information to be provided on-site to the inspectors at the entrance meeting (December 5, 2011):

B.1 ISI / Welding Programs and Schedule Information a) Updated schedules for ISI/NDE activities, including SG ISI, planned welding activities, and schedule showing contingency repair plans, if available.

b) For ASME Class 1, 2, or 3 welds selected by the inspector from the lists provided from Section A of this enclosure, please provide copies of the following documentation for each subject weld:

Enclosure

5 i) Weld data sheet (traveler).

ii) Weld configuration and system location.

iii) Applicable Code Edition and Addenda for weldment.

iv) Applicable Code Edition and Addenda for welding procedures.

v) Applicable weld procedures (WPS) used to fabricate the welds vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v.

vii) Copies of mechanical test reports identified in the PQRs above.

viii) Copies of the nonconformance reports for the selected welds. (If applicable.)

ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs. (If RT was performed.)

x) Copies of the preservice examination records for the selected welds.

xi) Copies of welder performance qualifications records applicable to WPS, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (at least six months prior to date subject work).

xii) Copies of applicable NDE personnel qualifications. (VT, PT, UT, RT) c) For the ISI-related corrective action issues selected by the inspector from Section A of this enclosure, provide a copy of the corrective actions and supporting documentation.

d) For the NDE reports with recordable indications on Code Class 1, 2, or 3 systems selected by the inspector from Section A above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.

e) A copy of (or ready access to) the most current revision of the ISI Program Manual and Plan for the current Interval.

f) For the NDEs selected by the inspector from Section A of this enclosure, provide copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME Code,Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g., ultrasonic unit; cables; and transducers, including serial numbers) and NDE personnel qualification records.

B.2 Reactor Pressure Vessel Head (RPVH) a) Provide the NDE personnel qualification records for the examiners who will perform examinations of the RPVH.

b) Provide drawings showing the following: (If a visual examination is planned for the upcoming refueling outage.)

Enclosure

6 i) RPVH and CRDM nozzle configurations.

ii) RPVH insulation configuration.

The drawings listed above should include fabrication drawings for the nozzle attachment welds as applicable.

c) Copy of NDE reports from the last RPVH examination.

d) Copy of evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95% minimum coverage required by Code Case N-729-1. (If a visual examination is planned for the upcoming refueling outage.)

e) Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the RPVH. If no explicit procedures exist which govern this activity, provide a description of the process to be followed including personnel responsibilities and expectations.

f) Provide a copy of the updated calculation of effective degradation years (EDYs) for the RPVH susceptibility ranking.

g) Provide copy of the vendor qualification report(s) that demonstrates the detection capability of the NDE equipment used for the RPVH examinations. Also, identify any changes in equipment configurations used for the RPVH examinations which differ from that used in the vendor qualification report(s).

B.3 Boric Acid Corrosion Control Program (BACCP) a) Please provide boric acid walk down inspection results, an updated list of boric acid leaks identified to date for this outage, associated corrective action documentation, and overall status of planned boric acid inspections.

b) Please provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage. Please include a status of corrective actions to repair and/or clean these boric acid leaks. Please specify which known leaks, if any, have remained in service or will remain in service as active leaks.

c) In accordance with NRC inspection procedure 71111.08, the inspector would like to conduct an independent boric acid walk down of the Reactor Building early in the inspection week. Please have knowledgeable BACCP staff available to accompany the inspector during the walk down.

B.4 Steam Generator (SG) Inspections a) A copy of the guidance to be followed if a loose part or foreign material is identified in the SG.

Enclosure

7 b) List of corrective action documents generated by the vendor and/or site with respect to SG inspection activities.

B.5 Codes and Standards a) Ready access to: (i.e. copies provided to the inspector to use for the duration of the inspection at the on-site inspection location, or room number and location where available.)

i) Applicable editions of the ASME Code (Sections V, IX, and XI) for the inservice inspection program and the repair/replacement program.

ii) EPRI and industry standards referenced in the procedures used to perform the SG tube eddy current examination.

Inspector Contact Information:

Michael Coursey Mailing Address:

Reactor Inspector US NRC Region 2 404-997-4671 Attn: Michael Coursey Michael.Coursey@nrc.gov 245 Peachtree Center Ave., NE Ste.1200 Atlanta, GA 30303 Louis Lake Senior Reactor Inspector 404-997-4683 Louis.Lake@nrc.gov Enclosure