{{#Wiki_filter:.ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y j U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PO5430 Equipment Class: (10) Air Handlers Equipment  
{{#Wiki_filter:. ATTACHMENT 3 WALKDOWN CHECKLISTS Status:   Y j U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PO5430 Equipment Class:     (10) Air Handlers Equipment


==
== Description:==
Description:==
DIESEL RM 2A SUPPLY DAMPER Project:  CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):      AUX, 45.00 ft, CAL-AB-422 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoracqe
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                Yes
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                      Yes
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                        Yes
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                        No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Need plant documentation to determine if anchorageis consistent with as-built sketch. CR-2012-009778
: 6. Based on the above anchorage evaluations, is the anchorage free of                                No potentially adverse seismic conditions?
Need plant documentation to determine if anchorage is consistent with as-built sketch.
344


DIESEL RM 2A SUPPLY DAMPER Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:   Y [i U Seismic Walkdown Checklist (SWC)
AUX, 45.00 ft, CAL-AB-422 Manufacturer/Model:
Equipment ID No.:     2PO5430 Equipment Class:    (10) Air Handlers Equipment
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchoracqe
== Description:==
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
DIESEL RM 2A SUPPLY DAMPER Interaction Effects
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 7. Are soft targets free from impact by nearby equipment or structures?                                  Yes
Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                      Yes masonry block walls not likely to collapse onto the equipment?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 9. Do attached lines have adequate flexibility to avoid damage?                                       Yes
Need plant documentation to determine if anchorage is consistent with as-built sketch. CR-2012-009778
: 10. Based on the above seismic interaction evaluations, is equipment free of                           Yes
: 6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?
        .potentially adverse seismic interaction effects?
Need plant documentation to determine if anchorage is consistent with as-built sketch.344 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [i U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PO5430 Equipment Class: (10) Air Handlers Equipment
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                                Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:                                        A. Karavoussianis              Date: 11/09/2012
                      ~E7                          C. Figliolini                          11/09/2012 Photos 345


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y W U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.: 2PO5430 Equipment Class:  (10) Air Handlers Fnuiinm*nt rPqrrintinn" rIFRFI PM 9A RIJPPI Y rAMPFR 2PO5430 8-13-12 229 i2    -
2PO5430  8-13-12 233 346


DIESEL RM 2A SUPPLY DAMPER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:   Y WI U Seismic Walkdown Checklist (SWC)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.: 2PO5430 Equipment Class: (10) Air Handlers
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of.potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
:naiinmint rfJrrintinn- rIIF5:IFI RU '2A 5qI IPPI V rlAUPIPR
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
!)PrirAoanA-1,A-19 9,AA                                 gpr)rAAn q-i,%-l 9 iqr%
Yes Comments Evaluated by: A. Karavoussianis Date: 11/09/2012
2PO5430 8-13-12 236                                     2PO5430 8-13-12 237 347
~E7 C. Figliolini 11/09/2012 Photos 345 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PO5430 Equipment Class: (10) Air Handlers rPqrrintinn" rIFRFI PM 9A RIJPPI Y rAMPFR 2PO5430 8-13-12 229 i2 -2PO5430 8-13-12 233 346 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y WI U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PO5430 Equipment Class: (10) Air Handlers:naiinmint rfJrrintinn-rIIF5*:IFI RU '2A 5qI IPPI V rlAUPIPR!)PrirAoan A-1,A-19 9,AA gpr)rAAn q-i,%-l 9 iqr%2PO5430 8-13-12 236 2PO5430 8-13-12 237 347 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y j-j U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5313A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y j-j  U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PT5313A Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment


CONTMT 21 PRESS TO SIAS Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
AUX, 45.00 ft, CAL-AB-409 Manufacturer/Model:
CONTMT 21 PRESS TO SIAS Project:   CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):     AUX, 45.00 ft, CAL-AB-409 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration Verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
Anchorage
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 1. Is anchorage configuration Verification required (i.e., is the item one of the 50%                   Yes of SWEL items requiring such verification)?
Yes Measured 3/4" F-F anchor bolt nuts in a 4-1/2" x 6-1/2" c/c anchor bolt pattern.Only 3" long weld on vertical side of channel, not fully welded as shown on typical detail.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                   Yes Measured 3/4" F-F anchorbolt nuts in a 4-1/2" x 6-1/2" c/c anchorbolt pattern.
No Oxidation on bolts and corrosion on base plate. The left base plate is flaking.CR-2012-009661
Only 3" long weld on verticalside of channel, not fully welded as shown on typical detail.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                         No Oxidation on bolts and corrosionon base plate. The left base plate is flaking.
Anchorage verified by Drawings 66944SHOO02 and 91005(J- 104). The web of the support channel is not fully welded to the wall anchor plates.The channel's web weld is approximately 3" long instead of being continuous.
CR-2012-009661
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                           Yes
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                           No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage verified by Drawings 66944SHOO02and 91005(J-104). The web of the support channel is not fully welded to the wall anchorplates.
The channel's web weld is approximately 3" long insteadof being continuous.
CR-2012-010259
CR-2012-010259
: 6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of                                   No potentially adverse seismic conditions?
348 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YFW1 U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5313A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
348


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  YFW1 U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PT5313A Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment


CONTMT 21 PRESS TO SIAS Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
== Description:==
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
CONTMT 21 PRESS TO SIAS Interaction Effects
Observed a roof drain system with Victaulic coupling directly above PTs.Drain pipe is normally empty and therefore judged not to be a credible hazard.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 7. Are soft targets free from impact by nearby equipment or structures?                               Yes
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                     Yes masonry block walls not likely to collapse onto the equipment?
Comments 4/ /. .Yes Evaluated by: A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 349 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5313A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Observed a roof drain system with Victaulic coupling directly above PTs.
Drainpipe is normally empty and thereforejudged not to be a credible hazard.
: 9. Do attached lines have adequate flexibility to avoid damage?                                     Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                         Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                             Yes adversely affect the safety functions of the equipment?
Comments 4/ /.                   .
Evaluated by:                                         A. Karavoussianis             Date: 11/09/2012 C. Figliolini                         11/09/2012 349


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y W U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:  2PT5313A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


CONTMT 21 PRESS TO SIAS Photos 350 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W-I U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5313A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
== Description:==
CONTMT 21 PRESS TO SIAS Photos 350


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y W-I U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:  2PT5313A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


CONTMT 21 PRESS TO SIAS 2PT5313A 8-7-12 032 2PT5313A 8-7-12 033 351 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5313A Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment Descriotion:
== Description:==
CONTMT 21 PRESS TO SIAS 352 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YFE U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5313B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
CONTMT 21 PRESS TO SIAS 2PT5313A 8-7-12 032                               2PT5313A 8-7-12 033 351


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y W U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:  2PT5313A Equipment Class:  (20) Instrumentation and Control Panels and Cabinets EauiDment Descriotion: CONTMT 21 PRESS TO SIAS 352


CONTMT 21 PRESS TO SIAS Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YFE U Seismic Walkdown Checklist (SWC)
AUX, 45.00 ft, CAL-AB-409 Manufacturer/Model:
Equipment ID No.:     2PT5313B Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1, Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
No 2, Is the anchorage free of bent, broken, missing or loose hardware?No Missing anchor bolt washer. CR-2012-009624
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
No Corrosion and oxidation on Anchor Bolt and plate.Base plate is flaking on both sides. CR-2012-009622
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No 353 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y j-jJ U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5313B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment  


==
== Description:==
Description:==
CONTMT 21 PRESS TO SIAS Project:    CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):      AUX, 45.00 ft, CAL-AB-409 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage 1, Is anchorage configuration verification required (i.e., is the item one of the 50%                    No of SWEL items requiring such verification)?
2,  Is the anchorage free of bent, broken, missing or loose hardware?                                    No Missing anchorbolt washer. CR-2012-009624
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                        No Corrosion and oxidation on Anchor Bolt and plate.
Base plate is flaking on both sides. CR-2012-009622
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                          Yes
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                                  No potentially adverse seismic conditions?
353


CONTMT 21 PRESS TO SIAS Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:   Y j-jJ U Seismic Walkdown Checklist (SWC)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.:     2PT5313B Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Observed a roof drain system with Victaulic coupling directly above PTs.Drain pipe is normally empty and therefore judged not to be a credible hazard.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments/" .44 ý ý- A. Karavoussianis Evaluated by: Date: 11/09/2012 11/09/2012 C. Figliolini Photos 354 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5313B Equipment Class: (20) Instrumentation and Control Panels and Cabinets FniiinmAnt Mact-rintinn" r.rNTMT 91 PR::RF Tr RIAR 355 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment  


==
== Description:==
Description:==
CONTMT 21 PRESS TO SIAS Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                              Yes
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                      Yes masonry block walls not likely to collapse onto the equipment?
Observed a roof drain system with Victaulic coupling directly above PTs.
Drain pipe is normally empty and therefore judged not to be a credible hazard.
: 9. Do attached lines have adequate flexibility to avoid damage?                                      Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                          Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                            Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:        /"    .44          ý    ý-    A. Karavoussianis            Date: 11/09/2012 C. Figliolini                        11/09/2012 Photos 354


2PT5313B (20) Instrumentation and Control Panels and Cabinets rONTMT 91 PRF:.. TOR5IA5R 356 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5313B Equipment Class: (20) Instrumentation and Control Panels and Cabinets lnaiinmnt flAe-rintinn-r.(NTMT 21 PPI=RF TO) RIAR 357 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [-E U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5313B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:   Y W U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PT5313B Equipment Class:   (20) Instrumentation and Control Panels and Cabinets FniiinmAnt Mact-rintinn" r.rNTMT 91 PR::RF     Tr RIAR 355


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y W U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:  2PT5313B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


CONTMT 21 PRESS TO SIAS 358 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W1 U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5315C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
== Description:==
rONTMT 91 PRF:..     TOR5IA5R 356


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y W U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.: 2PT5313B Equipment Class:  (20) Instrumentation and Control Panels and Cabinets lnaiinmnt flAe-rintinn- r.(NTMT 21 PPI=RF    TO) RIAR 357


CONTMT 21 PRESS TO CIS Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:   Y [-E U Seismic Walkdown Checklist (SWC)
AUX, 45.00 ft, CAL-AB-414 Manufacturer/Model:
Equipment ID No.: 2PT5313B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Bottom bolts on right side not engaged.Only 3" long weld on vertical side of channel, not fully welded as shown on typical detail. CR -2012-009754
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
No No Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
No 359 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [W U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5315C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment  


==
== Description:==
Description:==
CONTMT 21 PRESS TO SIAS 358


CONTMT 21 PRESS TO CIS Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:   Y   W1 U Seismic Walkdown Checklist (SWC)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.:     2PT5315C Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments ,9A Evaluated by: A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 360 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5315C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Enuinment Descnrntion:
CONTMT 21 PRESS TO CIS 361 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y E U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5315C Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment DescriDtion:
CONTMT 21 PRESS TO CIS 362 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YE U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5315D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment  


==
== Description:==
Description:==
CONTMT 21 PRESS TO CIS Project:  CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):      AUX, 45.00 ft, CAL-AB-414 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                    No of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                    No Bottom bolts on right side not engaged.
Only 3" long weld on vertical side of channel, not fully welded as shown on typical detail. CR -2012-009754
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                        Yes
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                          Yes
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                                    No potentially adverse seismic conditions?
359


CONTMT 21 PRESS TO CIS Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [W U Seismic Walkdown Checklist (SWC)
AUX, 45.00 ft, CAL-AB-414 Manufacturer/Model:
Equipment ID No.:     2PT5315C Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchored by 4 x 5/8" flat head screw or 9/16" F-F headed screws (i.e. 3/8" nominal diameter bolts) in a 4.5" x 6.5" bolt pattem with only 3" long weld on-vertical side of channel, not fully welded as shown on typical detail. CR-2012-009714 Anchorage verified by drawings 66578 sheet 2 and 91005 (J-104). The web of the support channel is not fully welded to the wall anchor plates as shown on 91005.363 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y il U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5315D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment  


==
== Description:==
Description:==
CONTMT 21 PRESS TO CIS Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                Yes
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                      Yes masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                                      Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                          Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                            Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:        ,9A                            A. Karavoussianis              Date: 11/09/2012 C. Figliolini                          11/09/2012 Photos 360


CONTMT 21 PRESS TO CIS 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:   Y W U Seismic Walkdown Checklist (SWC)
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Equipment ID No.: 2PT5315C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Enuinment Descnrntion: CONTMT 21 PRESS TO CIS 361
No Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
HVAC with adequate supports judged not a seismic concern.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments/ý /I- ý- ý ý' ýEvaluated by: A. Karavoussianis Date: 11/09/2012 364 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5315D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y E U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:  2PT5315C Equipment Class:  (20) Instrumentation and Control Panels and Cabinets EauiDment DescriDtion: CONTMT 21 PRESS TO CIS 362


CONTMT 21 PRESS TO CIS C. Figliolini 11/09/2012 Photos 365 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5315D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Pnsainmanf Ml2,.-rinfir~n (rKITRAT Tn P IQ 366 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y l U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PT5315D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauinment Descnntion:
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YE    U Seismic Walkdown Checklist (SWC)
CONTMT 21 PRESS TO CIS 367 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F-Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps Equipment  
Equipment ID No.:     2PT5315D Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment


==
== Description:==
Description:==
CONTMT 21 PRESS TO CIS Project:  CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):      AUX, 45.00 ft, CAL-AB-414 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                Yes
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                    Yes
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                        Yes
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                        No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchored by 4 x 5/8" flat head screw or 9/16" F-F headed screws (i.e. 3/8" nominal diameterbolts) in a 4.5" x 6.5" bolt pattem with only 3" long weld on-vertical side of channel, not fully welded as shown on typical detail. CR-2012-009714 Anchorage verified by drawings 66578 sheet 2 and 91005 (J-104). The web of the supportchannel is not fully welded to the wall anchorplates as shown on 91005.
363


23 AUX FW MTR DRIVEN PP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y  il    U Seismic Walkdown Checklist (SWC)
AUX, 5.00 ft, CAL-AB-205 Manufacturer/Model:
Equipment ID No.:     2PT5315D Equipment Class:     (20) Instrumentation and Control Panels and Cabinets Equipment
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes There are no cracks in concrete, but there are cracks and chips in grout. This condition is judged not to adversely affect the anchorage.
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with drawings 63817 (C-617) and 61671 (C-171).6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
368 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps Equipment  


==
== Description:==
Description:==
CONTMT 21 PRESS TO CIS
: 6. Based on the above anchorage evaluations, is the anchorage free of                                    No potentially adverse seismic conditions?
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                Yes
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                      Yes masonry block walls not likely to collapse onto the equipment?
HVAC with adequate supportsjudged not a seismic concern.
: 9. Do attached lines have adequate flexibility to avoid damage?                                      Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                          Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                              Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:        /ý /I-  ý- ý ý' ý              A. Karavoussianis            Date: 11/09/2012 364


23 AUX FW MTR DRIVEN PP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:   Y i-* U Seismic Walkdown Checklist (SWC)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.: 2PT5315D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments Evaluated by: A. Karavoussianis Date: 11/09/2012
~z7 C. Figliolini 11/09/2012 Photos 369 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps Enuinment Dfecnftinn; 23 AIIX FW MTR nRIVFN PP 370 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps ipment


== Description:==
== Description:==
CONTMT 21 PRESS TO CIS C. Figliolini                    11/09/2012 Photos 365
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y W U Seismic Walkdown Checklist (SWC)
Equipment ID No.:    2PT5315D Equipment Class:    (20) Instrumentation and Control Panels and Cabinets Pnsainmanf Ml2,.-rinfir~n (rKITRAT1*  DIPQ*    Tn P IQ 366
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y l U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PT5315D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauinment Descnntion: CONTMT 21 PRESS TO CIS 367
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F-Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:    2PUMPAFWMD23 Equipment Class:      (5) Horizontal Pumps Equipment


23 AUX FW MTR DRIVEN PP 371 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps Equipment
== Description:==
23 AUX FW MTR DRIVEN PP Project:  CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):      AUX, 5.00 ft, CAL-AB-205 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                  Yes
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                      Yes
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                        Yes There are no cracks in concrete, but there are cracks and chips in grout. This condition is judged not to adversely affect the anchorage.
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                       Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with drawings 63817 (C-617) and 61671 (C-171).
: 6. Based on the above anchorage evaluations, is the anchorage free of                                Yes potentially adverse seismic conditions?
368


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N  U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PUMPAFWMD23 Equipment Class:     (5) Horizontal Pumps Equipment


23 AUX FW MTR DRIVEN PP 2PUMPAFWMD23 8-6-12 308 372 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Fnmlinmpnt n.qrlrintinn" 2PUMPAFWMD23 (5) Horizontal Pumps 21 AtIX FW MTR D'RIVFN PP 373 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Equipment
== Description:==
23 AUX FW MTR DRIVEN PP Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                              Yes
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                    Yes masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                                    Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                        Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                            Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:                                         A. Karavoussianis            Date: 11/09/2012
                      ~z7                          C. Figliolini                        11/09/2012 Photos 369


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps Enuinment Dfecnftinn; 23 AIIX FW MTR nRIVFN PP 370


AUX FEED PUMP 21 Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
TURB, 12.00 ft, CAL-AFWPR-605 Manufacturer/Model:
Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps ipment
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with drawings 61625, 61597 sheet 3 and 62207.6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
374 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F--] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Equipment


==
== Description:==
Description:==
23 AUX FW MTR DRIVEN PP 371


AUX FEED PUMP 21 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:     N U Seismic Walkdown Checklist (SWC)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps Equipment
If not 211 overhead light may strike sensitive valve.10/3/12 -Overhead lights were deemed not a credible seismic concern due to their lightweight and to typical construction practices.
Also, they have been previously evaluated by CCNPP and found seismically acceptable.
: 9. Do attached lines have adequate flexibility to avoid damage?Attachments are flex conduit and flexible tubing. Tubing spans pump suction line and gage support judged not a seismic concern.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments/ý A. Karavoussianis Evaluated by: 49ý=7-Date: 11/09/2012 11/09/2012 C. Figliolini Photos 375 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Insiinm~n#
r'fglp rinfintn Al IY I1FP1l DI IRAD 'ýl 376 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps ipment


== Description:==
== Description:==
23 AUX FW MTR DRIVEN PP 2PUMPAFWMD23 8-6-12 308 372


AUX FEED PUMP 21 377 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Equipment
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI- N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2PUMPAFWMD23 Equipment Class:   (5) Horizontal Pumps Fnmlinmpnt n.qrlrintinn" 21 AtIX FW MTR D'RIVFN PP 373


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:    N  U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PUMPAFWTD21 Equipment Class:     (5) Horizontal Pumps Equipment


AUX FEED PUMP 21 378 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Pniuinmant lacrrintinn-AI IX I:FIF' P IMP 91 379 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Fni iinmant nlowrrintinn-ALIX FFFI: PlMP 71 380 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Fnilinmant rflarintinn.
== Description:==
AI IY l PIMP t1 381 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Equipment
AUX FEED PUMP 21 Project:   CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):      TURB, 12.00 ft, CAL-AFWPR-605 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                  Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                  Yes
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                      Yes
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                          Yes
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                         Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with drawings 61625, 61597 sheet 3 and 62207.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                Yes potentially adverse seismic conditions?
374


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F--] N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PUMPAFWTD21 Equipment Class:     (5) Horizontal Pumps Equipment


AUX FEED PUMP 21 382 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Pnoidnmnnt nd'a,'rinfinn" Al IY I:9=9=r) PI IIMP 91 383 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-l N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps l=nminmnt fl'ririntinn" AI IYl PFI Pl IMP 91 384 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPCC22 Equipment Class: (5) Horizontal Pumps Equipment
== Description:==
AUX FEED PUMP 21 Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                Yes
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                      Yes masonry block walls not likely to collapse onto the equipment?
If not 211 overhead light may strike sensitive valve.
10/3/12 - Overhead lights were deemed not a credible seismic concern due to their lightweight and to typical construction practices. Also, they have been previously evaluated by CCNPP and found seismically acceptable.
: 9. Do attached lines have adequate flexibility to avoid damage?                                      Yes Attachments are flex conduit and flexible tubing. Tubing spans pump suction line and gage supportjudged not a seismic concern.
: 10. Based on the above seismic interaction evaluations, is equipment free of                          Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                              Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:         /ý                              A. Karavoussianis            Date: 11/09/2012 49ý=7-                      C. Figliolini                        11/09/2012 Photos 375


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PUMPAFWTD21 Equipment Class:   (5) Horizontal Pumps Insiinm~n# r'fglp rinfintn Al IY I1FP1l DI IRAD 'ýl 376


22 COMPONENT COOLING PUMP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
AUX, 5.00 ft, CAL-AB-201 Manufacturer/Model:
Equipment ID No.:  2PUMPAFWTD21 Equipment Class:  (5) Horizontal Pumps ipment
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
== Description:==
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
AUX FEED PUMP 21 377
Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
 
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:  2PUMPAFWTD21 Equipment Class:  (5) Horizontal Pumps Equipment
 
== Description:==
AUX FEED PUMP 21 378
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:  2PUMPAFWTD21 Equipment Class:  (5) Horizontal Pumps Pniuinmant lacrrintinn- AI IXI:FIF' P IMP 91 379
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  M  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:  2PUMPAFWTD21 Equipment Class:  (5) Horizontal Pumps Fni iinmant nlowrrintinn- ALIX FFFI:  PlMP 71 380
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PUMPAFWTD21 Equipment Class:  (5) Horizontal Pumps Fnilinmant rflarintinn. AI IY Fppr* lPIMPt1 381
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:  2PUMPAFWTD21 Equipment Class:  (5) Horizontal Pumps Equipment
 
== Description:==
AUX FEED PUMP 21 382
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:    2PUMPAFWTD21 Equipment Class:    (5) Horizontal Pumps Pnoidnmnnt nd'a,'rinfinn" Al IY I:9=9=r) PI IIMP 91 383
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-l N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:  2PUMPAFWTD21 Equipment Class:  (5) Horizontal Pumps l=nminmnt fl'ririntinn" AI IYl PFI  Pl IMP 91 384
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y N  U Seismic Walkdown Checklist (SWC)
Equipment ID No.:    2PUMPCC22 Equipment Class:    (5) Horizontal Pumps Equipment
 
== Description:==
22 COMPONENT COOLING PUMP Project:   CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):     AUX, 5.00 ft, CAL-AB-201 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                 Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                 Yes
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                       Yes
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                         Yes
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                         Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with drawing FSK-C-0092.
Anchorage is consistent with drawing FSK-C-0092.
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of                                 Yes potentially adverse seismic conditions?
385 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPCC22 Equipment Class: (5) Horizontal Pumps Equipment  
385
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PUMPCC22 Equipment Class:     (5) Horizontal Pumps Equipment


==
== Description:==
Description:==
22 COMPONENT COOLING PUMP Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                              Yes Nearby block wall shielding adequately supported and braced,judged not a seismic concern.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                    Yes masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                                    Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                        Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                          Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:        ,94~                            A. Karavoussianis            Date: 11/09/2012 C. Figliolini                        11/09/2012 Photos 386


22 COMPONENT COOLING PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Yes Nearby block wall shielding adequately supported and braced, judged not a seismic concern.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.: 2PUMPCC22 Equipment Class: (5) Horizontal Pumps ipment
: 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Comments Yes ,94~Evaluated by: A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 386 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPCC22 Equipment Class: (5) Horizontal Pumps ipment


== Description:==
== Description:==
22 COMPONENT COOLING PUMP mm10                                  1%B 387


22 COMPONENT COOLING PUMP mm 10 1%B 387 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPCC22 Equipment Class: (5) Horizontal Pumps Frnminm~nt flaQnrintinn-99 fOMP(3ONFNT COr1 P1 IMP 388 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPCC22 Equipment Class: (5) Horizontal Pumps F~,i iinmgnt Ilg=oi=rinfinn" (t"MPfe3MFNT I~td(. Pl IMP 389 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPCC22 Equipment Class: (5) Horizontal Pumps I::naminmnnt rfl=Qr-nti~n" 99' (_tAMDAMFM2KT DI IUID 390 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPDFOXFR2A Equipment Class: (5) Horizontal Pumps Equipment
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2PUMPCC22 Equipment Class:   (5) Horizontal Pumps Frnminm~nt flaQnrintinn- 99 fOMP(3ONFNT COr1 IN(* P1 IMP 388


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PUMPCC22 Equipment Class:     (5) Horizontal Pumps F~,i iinmgnt Ilg=oi=rinfinn" '*  (t"MPfe3MFNT  *CAAI I~td(. Pl IMP 389


2A DG FO XFER PUMP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
AUX, 45.00 ft, CAL-AB-422 Manufacturer/Model:
Equipment ID No.:   2PUMPCC22 Equipment Class:   (5) Horizontal Pumps I::naminmnnt rfl=Qr-nti~n" 99' (_tAMDAMFM2KT ('*A"AI3 IMU'* DI IUID 390
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?No Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes 391 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPDFOXFR2A Equipment Class: (5) Horizontal Pumps Equipment


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [Y    N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PUMPDFOXFR2A Equipment Class:     (5) Horizontal Pumps Equipment


2A DG FO XFER PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
== Description:==
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
2A DG FO XFER PUMP Project:  CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):      AUX, 45.00 ft, CAL-AB-422 Manufacturer/Model:
Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Anchorage
Comments Evaluated by: A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 392 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPDFOXFR2A Equipment Class: (5) Horizontal Pumps Ini inmýnf rlaprrnfhin.
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                    No of SWEL items requiring such verification)?
qA rfl't In YI:r-D DI IKAD 393 I ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPHPSI21 Equipment Class: (5) Horizontal Pumps Equipment
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                   Yes
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                        Yes
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                           Yes
: 5. Is the anchorage configuration consistent with plant documentation? (Note:               Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                                  Yes potentially adverse seismic conditions?
391


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PUMPDFOXFR2A Equipment Class:     (5) Horizontal Pumps Equipment


Sl HPSI PUMP 21 Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
AUX, -15.00 ft, CAL-AB-101 Manufacturer/Model:
2A DG FO XFER PUMP Interaction Effects
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 7. Are soft targets free from impact by nearby equipment or structures?                            Yes
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                  Yes masonry block walls not likely to collapse onto the equipment?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 9. Do attached lines have adequate flexibility to avoid damage?                                   Yes
Yes Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 10. Based on the above seismic interaction evaluations, is equipment free of                       Yes potentially adverse seismic interaction effects?
Not Applicable
Other Adverse Conditions
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 11. Have you looked for and found no adverse seismic conditions that could                        Yes adversely affect the safety functions of the equipment?
Yes 394 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPHPSI21 Equipment Class: (5) Horizontal Pumps Equipment
Comments Evaluated by:                                       A. Karavoussianis            Date: 11/09/2012 C. Figliolini                        11/09/2012 Photos 392


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:  2PUMPDFOXFR2A Equipment Class:  (5) Horizontal Pumps Ini inmýnf rlaprrnfhin. qA rfl't In  YI:r-D DI IKAD 393 I


SI HPSI PUMP 21 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-- N U Seismic Walkdown Checklist (SWC)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.:     2PUMPHPSI21 Equipment Class:     (5) Horizontal Pumps Equipment
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Observed that the pump's sight glass cage is missing, not a seismic interaction concern.Comments Yes Evaluated by: A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 395 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPHPSI21 Equipment Class: (5) Horizontal Pumps Eauinment DPrtinfin:
n 1 HP.RI PiMP 21 396 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPHPSI21 Equipment Class: (5) Horizontal Pumps lFniiinmant nowr-rinfinn-5I HPQ I IP IMP 91 397 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Fm idnm~nt rflArrintinn-2PUMPHPS121 (5) Horizontal Pumps R1I HPRI P1 IMP'21 398 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: linmAnt r'Azrnrinfinn-2PUMPHPSI21 (5) Horizontal Pumps R~I "P5RI PI IMP 911 399 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPHPSI21 Equipment Class: (5) Horizontal Pumps In=iinmsxnt f)_Printinn" I HPRI Pl IMP 91 400 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment  


==
== Description:==
Description:==
Sl HPSI PUMP 21 Project:  CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):      AUX, -15.00 ft, CAL-AB-101 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                  No of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                  Yes
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                        Yes
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                          Yes
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                                  Yes potentially adverse seismic conditions?
394


2PUMPHPS121 (5) Horizontal Pumps SI HPSI PUMP 21 401 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPHPSI22 Equipment Class: (5) Horizontal Pumps Equipment  
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:     2PUMPHPSI21 Equipment Class:     (5) Horizontal Pumps Equipment


==
== Description:==
Description:==
SI HPSI PUMP 21 Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                              Yes
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                    Yes masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                                    Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                        Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                            Yes adversely affect the safety functions of the equipment?
Observed that the pump's sight glass cage is missing, not a seismic interactionconcern.
Comments Evaluated by:                                        A. Karavoussianis            Date: 11/09/2012 C. Figliolini                        11/09/2012 Photos 395


SI HPSI PUMP 22 Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
AUX, -15.00 ft, CAL-AB-102 Manufacturer/Model:
Equipment ID No.: 2PUMPHPSI21 Equipment Class: (5) Horizontal Pumps Eauinment DPrtinfin:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
n    1 HP.RI PiMP 21 396
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Walkdown anchorage as-built is consistent with drawings CA02066.6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
402 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPHPSI22 Equipment Class: (5) Horizontal Pumps Equipment


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:  2PUMPHPSI21 Equipment Class:   (5) Horizontal Pumps lFniiinmant nowr-rinfinn- 5I HPQ I IP IMP 91 397


SI HPSI PUMP 22 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.:   2PUMPHPS121 Equipment Class:   (5) Horizontal Pumps Fm idnm~nt rflArrintinn- R1IHPRI P1 IMP'21 398
: 9. Do attached lines have adequate flexibility to avoid damage?Noted small bore piping, judged flexible and not a seismic concern.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments/ý /- A. Karavoussianis Evaluated by: Date: 11/09/2012 11/09/2012 C. Figliolini Photos 403 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPHPS122 Equipment Class: (5) Horizontal Pumps Equipment


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PUMPHPSI21 Equipment Class:   (5) Horizontal Pumps linmAnt r'Azrnrinfinn- R~I"P5RI PI IMP 911 399


Sl HPSI PUMP 22 404 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y EE U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Equipment
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PUMPHPSI21 Equipment Class: (5) Horizontal Pumps In=iinmsxnt f)_Printinn"  I HPRI Pl IMP 91 400


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:  2PUMPHPS121 Equipment Class: (5) Horizontal Pumps Equipment


21 CONTAINMENT SPRAY PUMP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
AUX, -15.00 ft, CAL-AB-101 Manufacturer/Model:
SI HPSI PUMP 21 401
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
 
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:    N U Seismic Walkdown Checklist (SWC)
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Equipment ID No.:    2PUMPHPSI22 Equipment Class:    (5) Horizontal Pumps Equipment
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
 
== Description:==
SI HPSI PUMP 22 Project:  CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):      AUX, -15.00 ft, CAL-AB-102 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                  Yes
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                      Yes
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                          Yes
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                        Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Walkdown anchorageas-built is consistent with drawings CA02066.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                Yes potentially adverse seismic conditions?
402
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:    2PUMPHPSI22 Equipment Class:    (5) Horizontal Pumps Equipment
 
== Description:==
SI HPSI PUMP 22 Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                            Yes
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                    Yes masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                                  Yes Noted small bore piping,judged flexible and not a seismic concern.
: 10. Based on the above seismic interaction evaluations, is equipment free of                        Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                          Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:        /ý    /-                        A. Karavoussianis            Date: 11/09/2012 C. Figliolini                        11/09/2012 Photos 403
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  F  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:  2PUMPHPS122 Equipment Class:  (5) Horizontal Pumps Equipment
 
== Description:==
Sl HPSI PUMP 22 404
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y EE U Seismic Walkdown Checklist (SWC)
Equipment ID No.:    2PUMPSICS21 Equipment Class:    (5) Horizontal Pumps Equipment
 
== Description:==
21 CONTAINMENT SPRAY PUMP Project:   CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):     AUX, -15.00 ft, CAL-AB-101 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                 Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                 Yes
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                       Yes
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                         Yes
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                         Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with drawing FSK-C-0078.
Anchorage is consistent with drawing FSK-C-0078.
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of                                 Yes potentially adverse seismic conditions?
Yes Yes Yes Yes Yes Yes 405 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y FI- U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Equipment
405


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)
Description:==
Status:   Y FI- U Equipment ID No.:    2PUMPSICS21 Equipment Class:    (5) Horizontal Pumps Equipment


21 CONTAINMENT SPRAY PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
== Description:==
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
21 CONTAINMENT SPRAY PUMP Interaction Effects
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?There is a basket of rags supported off a manual valve above the pump motor, judged not to be a seismic concern.A 2-1/4" conduit and JB are supported on pinned frames, see sketch. CR-2012-009304 Other Adverse Conditions
: 7. Are soft targets free from impact by nearby equipment or structures?                               Yes
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                     Yes masonry block walls not likely to collapse onto the equipment?
Yes Yes Yes No Yes Comments Comments Evaluated by: A. Karavoussianis Date: 11/09/2012
: 9. Do attached lines have adequate flexibility to avoid damage?                                     Yes
~ZT C. Figliolini 11/09/2012 Photos 406 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y EEi U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Equipment
: 10. Based on the above seismic interaction evaluations, is equipment free of                           No potentially adverse seismic interaction effects?
There is a basket of rags supportedoff a manual valve above the pump motor,judged not to be a seismic concern.
A 2-1/4" conduit and JB are supportedon pinned frames, see sketch. CR-2012-009304 Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                             Yes adversely affect the safety functions of the equipment?
Comments Comments Evaluated by:                                         A. Karavoussianis             Date: 11/09/2012
                      ~ZT C. Figliolini                         11/09/2012 Photos 406


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y EEi U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:  2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Equipment


21 CONTAINMENT S 407 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YN] U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment  
== Description:==
21 CONTAINMENT S 407
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:   YN] U Seismic Walkdown Checklist (SWC)
Equipment ID No.:  2PUMPSICS21 Equipment Class:  (5) Horizontal Pumps Equipment
 
== Description:==
21 CONTAINMENT SPRAY PUMP 2PUMPSICS21 8-6-12 159                          2PUMPSICS21 8-6-12 160 408
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y [] U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Equipment
 
== Description:==
21 CONTAINMENT SPRAY PUMP 409
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:  2PUMPSICS21 Equipment Class:  (5) Horizontal Pumps Enuinment De~crintinn: 21 rONTAINMFNT RPRAY PI IMP 410
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y LN] U Seismic Walkdown Checklist (SWC)
Equipment ID No.:  2PUMPSICS21 Equipment Class:  (5) Horizontal Pumps Equipment
 
== Description:==
21 CONTAINMENT SPRAY PUMP 2PUMPSICS21 8-6-12 17 411


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  YEW U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:  2PUMPSICS21 Equipment Class:  (5) Horizontal Pumps Eauinmpnt Depcrintion: 21 CONTAINMENT SPRAY PIIMP 412


2PUMPSICS21 (5) Horizontal Pumps 21 CONTAINMENT SPRAY PUMP 2PUMPSICS21 8-6-12 159 2PUMPSICS21 8-6-12 160 408 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Equipment
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:   YEW U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps oment


==
== Description:==
Description:==
21 CONTAINMENT S 413


21 CONTAINMENT SPRAY PUMP 409 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Enuinment De~crintinn:
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:   7Y N U Seismic Walkdown Checklist (SWC)
21 rONTAINMFNT RPRAY PI IMP 410 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y LN] U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Equipment  
Equipment ID No.:     2PUMPSICS22 Equipment Class:     (5) Horizontal Pumps Equipment


==
== Description:==
Description:==
22 CONTAINMENT SPRAY PUMP Project:  CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):      AUX, -15.00 ft, CAL-AB-102 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                  Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                  Yes
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                      Yes
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                          Yes
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                        Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Walkdown anchorageas-built is consistent with drawing FSK-C-0078.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                Yes potentially adverse seismic conditions?
414


21 CONTAINMENT SPRAY PUMP 2PUMPSICS21 8-6-12 17 411 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YEW U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Eauinmpnt Depcrintion:
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N  U Seismic Walkdown Checklist (SWC)
21 CONTAINMENT SPRAY PIIMP 412 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YEW U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps oment
Equipment ID No.:   2PUMPSICS22 Equipment Class:     (5) Horizontal Pumps Equipment


== Description:==
== Description:==
22 CONTAINMENT SPRAY PUMP Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                              Yes
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                    Yes masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                                    Yes Drainpiping is judged adequatelysupportedand flexible.
: 10. Based on the above seismic interaction evaluations, is equipment free of                        Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                            Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:        /ý  '4                        A. Karavoussianis              Date: 11/09/2012
                      ~Ir C. Figliolini                          11/09/2012 Photos 415


21 CONTAINMENT S 413 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: 7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSICS22 Equipment Class: (5) Horizontal Pumps Equipment
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2PUMPSICS22 Equipment Class:   (5) Horizontal Pumps FnhlinmAnt r)fPqrintinn' 22 r.ONTAINMFINT RPRAY P1 IMP 2PUMPSICS22 8-7-12 289 416


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  T N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PUMPSILPSI22 Equipment Class:     (5) Horizontal Pumps Equipment


22 CONTAINMENT SPRAY PUMP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
AUX, -15.00 ft, CAL-AB-102 Manufacturer/Model:
SI LPSI PUMP 22 Project:   CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):     AUX, -15.00 ft, CAL-AB-102 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
Yes Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                 Yes of SWEL items requiring such verification)?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                               Yes
Walkdown anchorage as-built is consistent with drawing FSK-C-0078.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                     Yes
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                       Yes
Yes Yes 414 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSICS22 Equipment Class: (5) Horizontal Pumps Equipment
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                       Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with drawings FSK-C-70, FSK-M-331 and calculation CA02066.
: 6. Based on the above anchorage evaluations, is the anchorage free of                               Yes potentially adverse seismic conditions?
417


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Mi N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PUMPSILPS122 Equipment Class:     (5) Horizontal Pumps Equipment


22 CONTAINMENT SPRAY PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
== Description:==
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
. SI LPSI PUMP 22 Interaction Effects
: 9. Do attached lines have adequate flexibility to avoid damage?Drain piping is judged adequately supported and flexible.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 7. Are soft targets free from impact by nearby equipment or structures?                             Yes
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                   Yes masonry block walls not likely to collapse onto the equipment?
Yes Comments/ý '4 A. Karavoussianis Evaluated by: Date: 11/09/2012
: 9. Do attached lines have adequate flexibility to avoid damage?                                   Yes Noted small bore piping,judged flexible and not a seismic concern.
~Ir C. Figliolini 11/09/2012 Photos 415 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSICS22 Equipment Class: (5) Horizontal Pumps FnhlinmAnt r)fPqrintinn' 22 r.ONTAINMFINT RPRAY P1 IMP 2PUMPSICS22 8-7-12 289 416 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSILPSI22 Equipment Class: (5) Horizontal Pumps Equipment
: 10. Based on the above seismic interaction evaluations, is equipment free of                       Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                           Yes adversely affect the safety functions of the equipment?
Comments Comments Evaluated by:                                        A. Karavoussianis             Date: 11/09/2012
                      ~z7                          C. Figliolini                         11/09/2012 Photos 418


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [M N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:  2PUMPSILPSI22 Equipment Class:  (5) Horizontal Pumps oment Descrintion: SI LPSI PUMP 22 419


SI LPSI PUMP 22 Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:     N U Seismic Walkdown Checklist (SWC)
AUX, -15.00 ft, CAL-AB-102 Manufacturer/Model:
Equipment ID No.:     2PUMPSRW23 Equipment Class:     (5) Horizontal Pumps Equipment
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with drawings FSK-C-70, FSK-M-331 and calculation CA02066.6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
417 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Mi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSILPS122 Equipment Class: (5) Horizontal Pumps Equipment  


==
== Description:==
Description:==
23 SERVICE WATER PUMP Project:    CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):      AUX, 5.00 ft, CAL-AB-205 Manufacturer/Model:
.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
SI LPSI PUMP 22 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Anchorage
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                  Yes of SWEL items requiring such verification)?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Noted small bore piping, judged flexible and not a seismic concern.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                 Yes
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                      Yes
Yes Comments Comments Evaluated by: A. Karavoussianis
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                         Yes
~z7 Date: 11/09/2012 11/09/2012 C. Figliolini Photos 418 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSILPSI22 Equipment Class: (5) Horizontal Pumps oment Descrintion:
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                         Yes This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
SI LPSI PUMP 22 419 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps Equipment
Anchorage is consistent with drawing FSK-C-97.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                Yes potentially adverse seismic conditions?
420


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  EY] N  U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PUMPSRW23 Equipment Class:     (5) Horizontal Pumps Equipment


23 SERVICE WATER PUMP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
AUX, 5.00 ft, CAL-AB-205 Manufacturer/Model:
23 SERVICE WATER PUMP Interaction Effects
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
: 7. Are soft targets free from impact by nearby equipment or structures?                                Yes
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                      Yes masonry block walls not likely to collapse onto the equipment?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Observed a sight glass without a cage, but there no overhead hazard thereforejudged not be a concern.
Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 9. Do attached lines have adequate flexibility to avoid damage?                                       Yes
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 10. Based on the above seismic interaction evaluations, is equipment free of                           Yes potentially adverse seismic interaction effects?
Anchorage is consistent with drawing FSK-C-97.6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Other Adverse Conditions
420 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: EY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps Equipment
: 11. Have you looked for and found no adverse seismic conditions that could                              Yes adversely affect the safety functions of the equipment?
Comments Comments Evaluated by:         &ý    1A/',Zý            b    A. Karavoussianis            Date: 11/09/2012 C. Figliolini                        11/09/2012 Photos 421


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.: 2PUMPSRW23 Equipment Class:  (5) Horizontal Pumps Fnuinm~nt D*crintinn: 2,3FRVICE WATFR Pl IMP 422


23 SERVICE WATER PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps Equipment
Observed a sight glass without a cage, but there no overhead hazard therefore judged not be a concern.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Yes Comments Comments&ý 1A/',Z ý b Evaluated by: A. Karavoussianis Date: 11/09/2012 11/09/2012 C. Figliolini Photos 421 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps Fnuinm~nt 2, 3FRVICE WATFR Pl IMP 422 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps Equipment  


==
== Description:==
Description:==
23 SERVICE WATER PUMP 423


23 SERVICE WATER PUMP 423 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps Equipment  
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps Equipment


==
== Description:==
Description:==
23 SERVICE WATER PUMP 424


23 SERVICE WATER PUMP 424 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps ipment
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps ipment


== Description:==
== Description:==
23 SERVICE WATER 425


23 SERVICE WATER 425 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps ipment
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps ipment


== Description:==
== Description:==
23 SERVICE WATER PUMP OI U-426


23 SERVICE WATER PUMP OI U-426 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps ipment
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps ipment


== Description:==
== Description:==
23 SERVICE WATER PUMP 427


23 SERVICE WATER PUMP 427 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Fnhiinmpnt rlAw-rintinn-2PUMPSRW23 (5) Horizontal Pumps 23 .qFPVI(F WVATFP P1 IMP 428 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [W U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSW23 Equipment Class: (6) Vertical Pumps Equipment
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:   2PUMPSRW23 Equipment Class:   (5) Horizontal Pumps Fnhiinmpnt rlAw-rintinn- 23 .qFPVI(F WVATFP P1 IMP 428


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y [W U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PUMPSW23 Equipment Class:     (6) Vertical Pumps Equipment


23 SW PUMP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
Intake, -7.00 ft, CAL-ISPR-INT2 Manufacturer/Model:
23 SW PUMP Project:   CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):       Intake, -7.00 ft, CAL-ISPR-INT2 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
No 2. Is the anchorage free of bent, broken, missing or loose hardware?No Anchorage is inaccessible.
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                     No of SWEL items requiring such verification)?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                     No Anchorage is inaccessible.
No Anchorage is inaccessible.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                         No Anchorage is inaccessible.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?No Anchorage is inaccessible.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                             No Anchorage is inaccessible.
: 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation? (Note:               Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of                                   No potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Anchorage is inaccessible.
Anchorage is inaccessible.
No 429 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSW23 Equipment Class: (6) Vertical Pumps Equipment
429


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y W U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2PUMPSW23 Equipment Class:     (6) Vertical Pumps Equipment


23 SW PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
== Description:==
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
23 SW PUMP Interaction Effects
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 7. Are soft targets free from impact by nearby equipment or structures?                               Yes
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?.Yes Comments Evaluated by: A. Karavoussianis Date: 11/09/2012 7~IIT C. Figliolini 11/09/2012 Photos 430 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSW23 Equipment Class: (6) Vertical Pumps Equipment
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                     Yes masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                                     Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                         Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                             .Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:                                       A. Karavoussianis             Date: 11/09/2012 7~IIT C. Figliolini                         11/09/2012 Photos 430


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y W U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:  2PUMPSW23 Equipment Class: (6) Vertical Pumps Equipment


23 SW PUMP 431 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y r-q U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PUMPSW23 Equipment Class: (6) Vertical Pumps lntuinment DPqrcntinn:
== Description:==
2: SW PUMP 432 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2RY150/151/T21A Equipment Class: (4) Transformers Equipment
23 SW PUMP 431


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y r-q U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.: 2PUMPSW23 Equipment Class: (6) Vertical Pumps lntuinment DPqrcntinn: 2: SW PUMP 432


480V SERV XFMR U-440-21A Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [Y    N U Seismic Walkdown Checklist (SWC)
AUX, 27.00 ft, CAL-AB-311 Manufacturer/Model:
Equipment ID No.:     2RY150/151/T21A Equipment Class:     (4) Transformers Equipment
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
: 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with calculation CA02066 Pg. 27-7 that shows a minimum required weld length of 0. 7" which is smaller than the as-built measurements.
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
433 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Mi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2RY150/151/T21A Equipment Class: (4) Transformers Equipment  


==
== Description:==
Description:==
480V SERV XFMR U-440-21A Project:    CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):      AUX, 27.00 ft, CAL-AB-311 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                    Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                    Yes
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                        Yes
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                Not Applicable
: 5. Is the anchorage configuration consistent with plant documentation? (Note:                          Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with calculation CA02066 Pg. 27-7 that shows a minimum requiredweld length of 0. 7" which is smaller than the as-built measurements.
: 6. Based on the above anchorage evaluations, is the anchorage free of                                  Yes potentially adverse seismic conditions?
433


480V SERV XFMR U-440-21A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Mi N   U Seismic Walkdown Checklist (SWC)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.:   2RY150/151/T21A Equipment Class:   (4) Transformers Equipment
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Comments Yes Evaluated by: A. Karavoussianis Date: 11/09/2012
~z7 C. Figliolini 11/09/2012 Photos 434 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2RY150/151/T21A Equipment Class: (4) Transformers Fniiinmant fl'aw-rintinn-ARnVlh 5I:PV XFMR I I-An.l91A 435 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2RY150/151/T21A Equipment Class: (4) Transformers Equipment  


==
== Description:==
Description:==
480V SERV XFMR U-440-21A Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                              Yes
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                    Yes masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                                      Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                          Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                            Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:                                        A. Karavoussianis              Date: 11/09/2012
                      ~z7                          C. Figliolini                          11/09/2012 Photos 434
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:  2RY150/151/T21A Equipment Class:    (4) Transformers Fniiinmant fl'aw-rintinn- ARnVlh 5I:PV XFMR I I-An.l91A 435
 
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:  2RY150/151/T21A Equipment Class:  (4) Transformers Equipment


480V SERV XFMR U-440-21A'150#151#T21A 8-15-12 108 436 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2RY150/151/T21A Equipment Class: (4) Transformers FniJinmPnt nlAr-rintinn 4AROV 5FRV XFMR 437 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2RY150/151/T21A Equipment Class: (4) Transformers inment Descnntion:
== Description:==
480V SFRV XFMR J-440-21A 438 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2RY150/151/T21B Equipment Class: (4) Transformers Equipment
480V SERV XFMR U-440-21A
    '150#151#T21A 8-15-12 108 436


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:  2RY150/151/T21A Equipment Class: (4) Transformers FniJinmPnt nlAr-rintinn 4AROV 5FRV XFMR I1-449-*1A 437


480V SERVXFMR U-440-21B Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
AUX, 27.00 ft, CAL-AB-311 Manufacturer/Model:
Equipment ID No.: 2RY150/151/T21A Equipment Class: (4) Transformers inment Descnntion: 480V SFRV XFMR  J-440-21A 438
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
No Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes 439 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2RY150/151/T21B Equipment Class: (4) Transformers Equipment


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [-Y  N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2RY150/151/T21B Equipment Class:     (4) Transformers Equipment


480V SERV XFMR U-440-21B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
== Description:==
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
480V SERVXFMR U-440-21B Project:    CCNPP 2 SWEL Location (Bldg, Elev, Room/Area):      AUX, 27.00 ft, CAL-AB-311 Manufacturer/Model:
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
: 11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?
Anchorage
Yes Comments Comments& ,4-~4sA>Evaluated by: A. Karavoussianis Date: 11/09/2012 11/09/2012 C. Figliolini Photos 440 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2RY150/151/T21B Equipment Class: (4) Transformers Fniiinmant Ilarintinn" A4RAn CF:MP I -dAAn-91 R 441 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2RY150/151/T21B Equipment Class: (4) Transformers FnidnmPnt )APQrrintinn" 4RnV RIFVR' XIFR I i-44l-91R 442 ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2RY150/151/T21B Equipment Class: (4) Transformers Equipment
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%                    No of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                                   Yes
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?                       Yes
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                           Yes
: 5. Is the anchorage configuration consistent with plant documentation? (Note:               Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                                  Yes potentially adverse seismic conditions?
439


==
ATTACHMENT 3 WALKDOWN CHECKLISTS Status:  Y] N  U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:    2RY150/151/T21B Equipment Class:     (4) Transformers Equipment


== Description:==
480V SERV XFMR U-440-21B Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?                                Yes
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and                      Yes masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                                      Yes
: 10. Based on the above seismic interaction evaluations, is equipment free of                          Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could                            Yes adversely affect the safety functions of the equipment?
Comments Comments Evaluated by:        &,4-~4sA>                      A. Karavoussianis            Date: 11/09/2012 C. Figliolini                        11/09/2012 Photos 440
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2RY150/151/T21B Equipment Class:  (4) Transformers Fniiinmant Ilarintinn"  A4RAn5*RV CF:MP I -dAAn-91 R 441
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:  2RY150/151/T21B Equipment Class:  (4) Transformers FnidnmPnt )APQrrintinn" 4RnV RIFVR' XIFR I i-44l-91R 442
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M  N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:  2RY150/151/T21B Equipment Class:  (4) Transformers Equipment
== Description:==
480V SERV XFMR U-440-21B 2RY150#151#T21B 8-15-12 123 443}}
480V SERV XFMR U-440-21B 2RY150#151#T21B 8-15-12 123 443}}

Latest revision as of 19:44, 11 November 2019

Attachment (3 Cont.) Walkdown Checklists. Part 5 of 8
ML12339A368
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 11/27/2012
From:
Constellation Energy Nuclear Group
To:
Office of Nuclear Reactor Regulation
References
Download: ML12339A368 (100)


Text

. ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y j U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PO5430 Equipment Class: (10) Air Handlers Equipment

Description:

DIESEL RM 2A SUPPLY DAMPER Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-422 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoracqe

1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Need plant documentation to determine if anchorageis consistent with as-built sketch. CR-2012-009778

6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?

Need plant documentation to determine if anchorage is consistent with as-built sketch.

344

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [i U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PO5430 Equipment Class: (10) Air Handlers Equipment

Description:

DIESEL RM 2A SUPPLY DAMPER Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes

.potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: A. Karavoussianis Date: 11/09/2012

~E7 C. Figliolini 11/09/2012 Photos 345

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PO5430 Equipment Class: (10) Air Handlers Fnuiinm*nt rPqrrintinn" rIFRFI PM 9A RIJPPI Y rAMPFR 2PO5430 8-13-12 229 i2 -

2PO5430 8-13-12 233 346

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y WI U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PO5430 Equipment Class: (10) Air Handlers

naiinmint rfJrrintinn- rIIF5:IFI RU '2A 5qI IPPI V rlAUPIPR

!)PrirAoanA-1,A-19 9,AA gpr)rAAn q-i,%-l 9 iqr%

2PO5430 8-13-12 236 2PO5430 8-13-12 237 347

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y j-j U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5313A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTMT 21 PRESS TO SIAS Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-409 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration Verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes Measured 3/4" F-F anchorbolt nuts in a 4-1/2" x 6-1/2" c/c anchorbolt pattern.

Only 3" long weld on verticalside of channel, not fully welded as shown on typical detail.

3. Is the anchorage free of corrosion that is more than mild surface oxidation? No Oxidation on bolts and corrosionon base plate. The left base plate is flaking.

CR-2012-009661

4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage verified by Drawings 66944SHOO02and 91005(J-104). The web of the support channel is not fully welded to the wall anchorplates.

The channel's web weld is approximately 3" long insteadof being continuous.

CR-2012-010259

6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?

348

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YFW1 U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5313A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTMT 21 PRESS TO SIAS Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?

Observed a roof drain system with Victaulic coupling directly above PTs.

Drainpipe is normally empty and thereforejudged not to be a credible hazard.

9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments 4/ /. .

Evaluated by: A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 349

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5313A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTMT 21 PRESS TO SIAS Photos 350

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W-I U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5313A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTMT 21 PRESS TO SIAS 2PT5313A 8-7-12 032 2PT5313A 8-7-12 033 351

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5313A Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment Descriotion: CONTMT 21 PRESS TO SIAS 352

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YFE U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5313B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTMT 21 PRESS TO SIAS Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-409 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage 1, Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?

2, Is the anchorage free of bent, broken, missing or loose hardware? No Missing anchorbolt washer. CR-2012-009624

3. Is the anchorage free of corrosion that is more than mild surface oxidation? No Corrosion and oxidation on Anchor Bolt and plate.

Base plate is flaking on both sides. CR-2012-009622

4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?

353

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y j-jJ U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5313B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTMT 21 PRESS TO SIAS Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?

Observed a roof drain system with Victaulic coupling directly above PTs.

Drain pipe is normally empty and therefore judged not to be a credible hazard.

9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: /" .44 ý ý- A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 354

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5313B Equipment Class: (20) Instrumentation and Control Panels and Cabinets FniiinmAnt Mact-rintinn" r.rNTMT 91 PR::RF Tr RIAR 355

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5313B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

rONTMT 91 PRF:.. TOR5IA5R 356

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5313B Equipment Class: (20) Instrumentation and Control Panels and Cabinets lnaiinmnt flAe-rintinn- r.(NTMT 21 PPI=RF TO) RIAR 357

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [-E U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5313B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTMT 21 PRESS TO SIAS 358

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W1 U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5315C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTMT 21 PRESS TO CIS Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-414 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? No Bottom bolts on right side not engaged.

Only 3" long weld on vertical side of channel, not fully welded as shown on typical detail. CR -2012-009754

3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?

359

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [W U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5315C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTMT 21 PRESS TO CIS Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: ,9A A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 360

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5315C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Enuinment Descnrntion: CONTMT 21 PRESS TO CIS 361

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y E U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5315C Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment DescriDtion: CONTMT 21 PRESS TO CIS 362

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YE U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5315D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTMT 21 PRESS TO CIS Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-414 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchored by 4 x 5/8" flat head screw or 9/16" F-F headed screws (i.e. 3/8" nominal diameterbolts) in a 4.5" x 6.5" bolt pattem with only 3" long weld on-vertical side of channel, not fully welded as shown on typical detail. CR-2012-009714 Anchorage verified by drawings 66578 sheet 2 and 91005 (J-104). The web of the supportchannel is not fully welded to the wall anchorplates as shown on 91005.

363

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y il U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5315D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTMT 21 PRESS TO CIS

6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?

HVAC with adequate supportsjudged not a seismic concern.

9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: /ý /I- ý- ý ý' ý A. Karavoussianis Date: 11/09/2012 364

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y i-* U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5315D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

CONTMT 21 PRESS TO CIS C. Figliolini 11/09/2012 Photos 365

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5315D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Pnsainmanf Ml2,.-rinfir~n (rKITRAT1* DIPQ* Tn P IQ 366

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y l U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PT5315D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauinment Descnntion: CONTMT 21 PRESS TO CIS 367

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F-Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps Equipment

Description:

23 AUX FW MTR DRIVEN PP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 5.00 ft, CAL-AB-205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes There are no cracks in concrete, but there are cracks and chips in grout. This condition is judged not to adversely affect the anchorage.
5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistent with drawings 63817 (C-617) and 61671 (C-171).

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

368

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps Equipment

Description:

23 AUX FW MTR DRIVEN PP Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: A. Karavoussianis Date: 11/09/2012

~z7 C. Figliolini 11/09/2012 Photos 369

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps Enuinment Dfecnftinn; 23 AIIX FW MTR nRIVFN PP 370

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps ipment

Description:

23 AUX FW MTR DRIVEN PP 371

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps Equipment

Description:

23 AUX FW MTR DRIVEN PP 2PUMPAFWMD23 8-6-12 308 372

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI- N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWMD23 Equipment Class: (5) Horizontal Pumps Fnmlinmpnt n.qrlrintinn" 21 AtIX FW MTR D'RIVFN PP 373

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Equipment

Description:

AUX FEED PUMP 21 Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): TURB, 12.00 ft, CAL-AFWPR-605 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistent with drawings 61625, 61597 sheet 3 and 62207.

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

374

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F--] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Equipment

Description:

AUX FEED PUMP 21 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?

If not 211 overhead light may strike sensitive valve.

10/3/12 - Overhead lights were deemed not a credible seismic concern due to their lightweight and to typical construction practices. Also, they have been previously evaluated by CCNPP and found seismically acceptable.

9. Do attached lines have adequate flexibility to avoid damage? Yes Attachments are flex conduit and flexible tubing. Tubing spans pump suction line and gage supportjudged not a seismic concern.
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: /ý A. Karavoussianis Date: 11/09/2012 49ý=7- C. Figliolini 11/09/2012 Photos 375

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Insiinm~n# r'fglp rinfintn Al IY I1FP1l DI IRAD 'ýl 376

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps ipment

Description:

AUX FEED PUMP 21 377

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Equipment

Description:

AUX FEED PUMP 21 378

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Pniuinmant lacrrintinn- AI IXI:FIF' P IMP 91 379

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Fni iinmant nlowrrintinn- ALIX FFFI: PlMP 71 380

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Fnilinmant rflarintinn. AI IY Fppr* lPIMPt1 381

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Equipment

Description:

AUX FEED PUMP 21 382

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [ N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps Pnoidnmnnt nd'a,'rinfinn" Al IY I:9=9=r) PI IIMP 91 383

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-l N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPAFWTD21 Equipment Class: (5) Horizontal Pumps l=nminmnt fl'ririntinn" AI IYl PFI Pl IMP 91 384

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPCC22 Equipment Class: (5) Horizontal Pumps Equipment

Description:

22 COMPONENT COOLING PUMP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 5.00 ft, CAL-AB-201 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistent with drawing FSK-C-0092.

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

385

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPCC22 Equipment Class: (5) Horizontal Pumps Equipment

Description:

22 COMPONENT COOLING PUMP Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes Nearby block wall shielding adequately supported and braced,judged not a seismic concern.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: ,94~ A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 386

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPCC22 Equipment Class: (5) Horizontal Pumps ipment

Description:

22 COMPONENT COOLING PUMP mm10 1%B 387

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPCC22 Equipment Class: (5) Horizontal Pumps Frnminm~nt flaQnrintinn- 99 fOMP(3ONFNT COr1 IN(* P1 IMP 388

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPCC22 Equipment Class: (5) Horizontal Pumps F~,i iinmgnt Ilg=oi=rinfinn" '* (t"MPfe3MFNT *CAAI I~td(. Pl IMP 389

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPCC22 Equipment Class: (5) Horizontal Pumps I::naminmnnt rfl=Qr-nti~n" 99' (_tAMDAMFM2KT ('*A"AI3 IMU'* DI IUID 390

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPDFOXFR2A Equipment Class: (5) Horizontal Pumps Equipment

Description:

2A DG FO XFER PUMP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-422 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

391

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPDFOXFR2A Equipment Class: (5) Horizontal Pumps Equipment

Description:

2A DG FO XFER PUMP Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 392

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPDFOXFR2A Equipment Class: (5) Horizontal Pumps Ini inmýnf rlaprrnfhin. qA rfl't In YI:r-D DI IKAD 393 I

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-- N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPHPSI21 Equipment Class: (5) Horizontal Pumps Equipment

Description:

Sl HPSI PUMP 21 Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, -15.00 ft, CAL-AB-101 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

394

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPHPSI21 Equipment Class: (5) Horizontal Pumps Equipment

Description:

SI HPSI PUMP 21 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Observed that the pump's sight glass cage is missing, not a seismic interactionconcern.

Comments Evaluated by: A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 395

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPHPSI21 Equipment Class: (5) Horizontal Pumps Eauinment DPrtinfin:

n 1 HP.RI PiMP 21 396

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPHPSI21 Equipment Class: (5) Horizontal Pumps lFniiinmant nowr-rinfinn- 5I HPQ I IP IMP 91 397

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPHPS121 Equipment Class: (5) Horizontal Pumps Fm idnm~nt rflArrintinn- R1IHPRI P1 IMP'21 398

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPHPSI21 Equipment Class: (5) Horizontal Pumps linmAnt r'Azrnrinfinn- R~I"P5RI PI IMP 911 399

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPHPSI21 Equipment Class: (5) Horizontal Pumps In=iinmsxnt f)_Printinn" I HPRI Pl IMP 91 400

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPHPS121 Equipment Class: (5) Horizontal Pumps Equipment

Description:

SI HPSI PUMP 21 401

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPHPSI22 Equipment Class: (5) Horizontal Pumps Equipment

Description:

SI HPSI PUMP 22 Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, -15.00 ft, CAL-AB-102 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Walkdown anchorageas-built is consistent with drawings CA02066.

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

402

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPHPSI22 Equipment Class: (5) Horizontal Pumps Equipment

Description:

SI HPSI PUMP 22 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes Noted small bore piping,judged flexible and not a seismic concern.
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: /ý /- A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 403

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPHPS122 Equipment Class: (5) Horizontal Pumps Equipment

Description:

Sl HPSI PUMP 22 404

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y EE U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Equipment

Description:

21 CONTAINMENT SPRAY PUMP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, -15.00 ft, CAL-AB-101 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistent with drawing FSK-C-0078.

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

405

ATTACHMENT 3 WALKDOWN CHECKLISTS Seismic Walkdown Checklist (SWC)

Status: Y FI- U Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Equipment

Description:

21 CONTAINMENT SPRAY PUMP Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of No potentially adverse seismic interaction effects?

There is a basket of rags supportedoff a manual valve above the pump motor,judged not to be a seismic concern.

A 2-1/4" conduit and JB are supportedon pinned frames, see sketch. CR-2012-009304 Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Comments Evaluated by: A. Karavoussianis Date: 11/09/2012

~ZT C. Figliolini 11/09/2012 Photos 406

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y EEi U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Equipment

Description:

21 CONTAINMENT S 407

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YN] U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Equipment

Description:

21 CONTAINMENT SPRAY PUMP 2PUMPSICS21 8-6-12 159 2PUMPSICS21 8-6-12 160 408

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [] U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Equipment

Description:

21 CONTAINMENT SPRAY PUMP 409

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Enuinment De~crintinn: 21 rONTAINMFNT RPRAY PI IMP 410

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y LN] U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Equipment

Description:

21 CONTAINMENT SPRAY PUMP 2PUMPSICS21 8-6-12 17 411

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YEW U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps Eauinmpnt Depcrintion: 21 CONTAINMENT SPRAY PIIMP 412

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YEW U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSICS21 Equipment Class: (5) Horizontal Pumps oment

Description:

21 CONTAINMENT S 413

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: 7Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSICS22 Equipment Class: (5) Horizontal Pumps Equipment

Description:

22 CONTAINMENT SPRAY PUMP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, -15.00 ft, CAL-AB-102 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Walkdown anchorageas-built is consistent with drawing FSK-C-0078.

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

414

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSICS22 Equipment Class: (5) Horizontal Pumps Equipment

Description:

22 CONTAINMENT SPRAY PUMP Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes Drainpiping is judged adequatelysupportedand flexible.
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: /ý '4 A. Karavoussianis Date: 11/09/2012

~Ir C. Figliolini 11/09/2012 Photos 415

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSICS22 Equipment Class: (5) Horizontal Pumps FnhlinmAnt r)fPqrintinn' 22 r.ONTAINMFINT RPRAY P1 IMP 2PUMPSICS22 8-7-12 289 416

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSILPSI22 Equipment Class: (5) Horizontal Pumps Equipment

Description:

SI LPSI PUMP 22 Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, -15.00 ft, CAL-AB-102 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistent with drawings FSK-C-70, FSK-M-331 and calculation CA02066.

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

417

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Mi N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSILPS122 Equipment Class: (5) Horizontal Pumps Equipment

Description:

. SI LPSI PUMP 22 Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes Noted small bore piping,judged flexible and not a seismic concern.
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Comments Evaluated by: A. Karavoussianis Date: 11/09/2012

~z7 C. Figliolini 11/09/2012 Photos 418

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSILPSI22 Equipment Class: (5) Horizontal Pumps oment Descrintion: SI LPSI PUMP 22 419

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps Equipment

Description:

23 SERVICE WATER PUMP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 5.00 ft, CAL-AB-205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistent with drawing FSK-C-97.

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

420

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: EY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps Equipment

Description:

23 SERVICE WATER PUMP Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?

Observed a sight glass without a cage, but there no overhead hazard thereforejudged not be a concern.

9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Comments Evaluated by: &ý 1A/',Zý b A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 421

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps Fnuinm~nt D*crintinn: 2,3FRVICE WATFR Pl IMP 422

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps Equipment

Description:

23 SERVICE WATER PUMP 423

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps Equipment

Description:

23 SERVICE WATER PUMP 424

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps ipment

Description:

23 SERVICE WATER 425

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps ipment

Description:

23 SERVICE WATER PUMP OI U-426

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps ipment

Description:

23 SERVICE WATER PUMP 427

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSRW23 Equipment Class: (5) Horizontal Pumps Fnhiinmpnt rlAw-rintinn- 23 .qFPVI(F WVATFP P1 IMP 428

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [W U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSW23 Equipment Class: (6) Vertical Pumps Equipment

Description:

23 SW PUMP Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): Intake, -7.00 ft, CAL-ISPR-INT2 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? No Anchorage is inaccessible.
3. Is the anchorage free of corrosion that is more than mild surface oxidation? No Anchorage is inaccessible.
4. Is the anchorage free of visible cracks in the concrete near the anchors? No Anchorage is inaccessible.
5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?

Anchorage is inaccessible.

429

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSW23 Equipment Class: (6) Vertical Pumps Equipment

Description:

23 SW PUMP Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could .Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: A. Karavoussianis Date: 11/09/2012 7~IIT C. Figliolini 11/09/2012 Photos 430

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSW23 Equipment Class: (6) Vertical Pumps Equipment

Description:

23 SW PUMP 431

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y r-q U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2PUMPSW23 Equipment Class: (6) Vertical Pumps lntuinment DPqrcntinn: 2: SW PUMP 432

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2RY150/151/T21A Equipment Class: (4) Transformers Equipment

Description:

480V SERV XFMR U-440-21A Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 27.00 ft, CAL-AB-311 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistent with calculation CA02066 Pg. 27-7 that shows a minimum requiredweld length of 0. 7" which is smaller than the as-built measurements.

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

433

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Mi N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2RY150/151/T21A Equipment Class: (4) Transformers Equipment

Description:

480V SERV XFMR U-440-21A Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: A. Karavoussianis Date: 11/09/2012

~z7 C. Figliolini 11/09/2012 Photos 434

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2RY150/151/T21A Equipment Class: (4) Transformers Fniiinmant fl'aw-rintinn- ARnVlh 5I:PV XFMR I I-An.l91A 435

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2RY150/151/T21A Equipment Class: (4) Transformers Equipment

Description:

480V SERV XFMR U-440-21A

'150#151#T21A 8-15-12 108 436

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2RY150/151/T21A Equipment Class: (4) Transformers FniJinmPnt nlAr-rintinn 4AROV 5FRV XFMR I1-449-*1A 437

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2RY150/151/T21A Equipment Class: (4) Transformers inment Descnntion: 480V SFRV XFMR J-440-21A 438

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [-Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2RY150/151/T21B Equipment Class: (4) Transformers Equipment

Description:

480V SERVXFMR U-440-21B Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 27.00 ft, CAL-AB-311 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

439

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2RY150/151/T21B Equipment Class: (4) Transformers Equipment

Description:

480V SERV XFMR U-440-21B Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Comments Evaluated by: &,4-~4sA> A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 440

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2RY150/151/T21B Equipment Class: (4) Transformers Fniiinmant Ilarintinn" A4RAn5*RV CF:MP I -dAAn-91 R 441

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2RY150/151/T21B Equipment Class: (4) Transformers FnidnmPnt )APQrrintinn" 4RnV RIFVR' XIFR I i-44l-91R 442

ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2RY150/151/T21B Equipment Class: (4) Transformers Equipment

Description:

480V SERV XFMR U-440-21B 2RY150#151#T21B 8-15-12 123 443