ML13197A095: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 9: Line 9:
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
| license number = NPF-041, NPF-051, NPF-074
| license number = NPF-041, NPF-051, NPF-074
| contact person = Rankin J K
| contact person = Rankin J
| case reference number = TAC MF1932, TAC MF1933, TAC MF1934
| case reference number = TAC MF1932, TAC MF1933, TAC MF1934
| document type = Slides and Viewgraphs
| document type = Slides and Viewgraphs
Line 20: Line 20:
{{#Wiki_filter:Implementation of STAR Program and Replacement of the 2/3 Cycle MTC Measurement Pre-Submittal Presentation to the NRC Date: 07/11/2013
{{#Wiki_filter:Implementation of STAR Program and Replacement of the 2/3 Cycle MTC Measurement Pre-Submittal Presentation to the NRC Date: 07/11/2013


Purpose Present and discuss with the NRC planned licensing changes
Purpose
-Implementation of the Startup Testing Activity Reduction (STAR) Program at PVNGS
* Present and discuss with the NRC planned licensing changes
-Replacement of the 2/3 Cycle Moderator Temperature Coefficient (MTC) Measurement 2
    - Implementation of the Startup Testing Activity Reduction (STAR) Program at PVNGS
Topics STAR Replacement of the 2/3 Cycle MTC Measurement Licensing Approach Conclusion and Discussion 3
    - Replacement of the 2/3 Cycle Moderator Temperature Coefficient (MTC) Measurement 2
STAR Objectives
 
-Alternate method to validate core design
Topics
-Minimize the time the plant is in an abnormal configuration 4
* STAR
STAR Overview -Approved by NRC in WCAP
* Replacement of the 2/3 Cycle MTC Measurement
-16011-P-A Participating plants only Successfully implemented at 8 CE units
* Licensing Approach
-Incorporated into Improved Standard TS NUREG-1432, Rev 4 TSTF 486   5 STAR Overview -Adds Credits Pre
* Conclusion and Discussion 3
-Operational Checks New Beginning of Cycle (BOC) Hot Zero Power (HZP) MTC surveillance methodology Applicability Requirements  
 
-Replaces BOC HZP Isothermal Temperature Coefficient (ITC) Measurement CEA Worth Measurement 6
STAR
STAR Current Methodology
* Objectives
-CEA worth measurement Require operation outside the normal TS LCOs Presents operational challenges
    - Alternate method to validate core design
-Unit 3 LER 2012
    - Minimize the time the plant is in an abnormal configuration 4
-001 -Unit 1 LER 2011
 
-005 -Measure ITC at HZP with use of reactivity computer   7 STAR Proposed Methodology
STAR
-Replacement of CEA Worth Measurements Use applicability requirements Replacement will reduce the occurrence of problems associated with testing and minimize time in abnormal operating configuration 8
* Overview
STAR Proposed Methodology (cont.)
    - Approved by NRC in WCAP-16011-P-A
-Alternate MTC verification Adjust predicted HZP MTC based on measured Critical Boron Increase availability of the control channels Align PVNGS with Improved Standard TS 9
* Participating plants only
STAR Applicability Requirements
* Successfully implemented at 8 CE units
-Found in Table 3
    - Incorporated into Improved Standard TS
-4 of WCAP-16011-P-A -Compliance evaluated on a reload cycle
* NUREG-1432, Rev 4
-specific basis
* TSTF 486 5
-STAR only applied to cycles when compliance verified -Maintain the effectiveness of the STAR Program in problem identification 10 STAR Applicability Requirements (cont.)
 
-Core design methods have a defined set of uncertainties based on a benchmark of predictions to actual plant measurements
STAR
-Core, fuel, CEA design are similar to that of a benchmarked core
* Overview
-Cycle specific predictions independently verified by Comparison of 2 independent neutronics codes   11 STAR Applicability Requirements (cont.)
    - Adds
-Implementation of CEA Lifetime Program Limit CEA life within operation experience base
* Credits Pre-Operational Checks
-Pre-operational checks verify core and CEA loading are consistent with design
* New Beginning of Cycle (BOC) Hot Zero Power (HZP) MTC surveillance methodology
-CEA Coupling checks performed during reactor restack Many favorable PVNGS unique design feature 12 STAR Benefits -Minimize the time the plant is in an abnormal operating configuration
* Applicability Requirements
-Increase the availability of the control channels
    - Replaces
-Operationally focused improvement 13 STAR WCAP 16011
* BOC HZP Isothermal Temperature Coefficient (ITC) Measurement 6
-P-A approach
* CEA Worth Measurement
-Compare STAR Program to Generic Program Generic Program based on ANSI/ANS 19.6.1
 
-1997 Identify set of core problems
STAR
-Design Predictions
* Current Methodology
-As-Built Core
    - CEA worth measurement
-Test Performance 14 STAR WCAP 16011
* Require operation outside the normal TS LCOs
-P-A approach (cont.)
* Presents operational challenges
-Concluded STAR Program is as effective in detecting the Problems as the Generic Program
          - Unit 3 LER 2012-001
-STAR is an NRC approved and implemented alternative to current testing methodology.
          - Unit 1 LER 2011-005
15 STAR PVNGS Application
    - Measure ITC at HZP with use of reactivity computer 7
-Compared Design differences between PVNGS and original participating plants Differences in current PVNGS startup program and Generic Program Operating Experience since original STAR
 
-NRC and INPO
STAR
-PVNGS -Implementing plants 16 STAR Results of Evaluations
* Proposed Methodology
-Contained in plant specific justification
    - Replacement of CEA Worth Measurements
-CASMO/SIMULATE as applied at PVNGS is acceptable for STAR
* Use applicability requirements
-The PVNGS STAR Program is as effective as the approved STAR Program and is an acceptable alternative to the current PVNGS startup testing program.
* Replacement will reduce the occurrence of problems associated with testing and minimize time in abnormal operating configuration 8
17 Replacement of 2/3 Cycle MTC Measurement Objective -To replace the 2/3 cycle MTC measurement with alternate verification Overview -Approved for all CE plants in CE NPSD
 
-911-A and Amendment 1
STAR
-A (TSTF 406)
* Proposed Methodology (cont.)
-No measurement at 2/3 cycle if 40 EFPD measurement is within acceptance criteria
    - Alternate MTC verification
-Already implemented at many PWRs 18 Replacement of 2/3 Cycle MTC Measurement Current Topical only applicable for ROCS & ANC PVNGS will demonstrate applicability of SIMULATE Conclusions
* Adjust predicted HZP MTC based on measured Critical Boron
-SIMULATE is acceptable for use
* Increase availability of the control channels
-Replacement of the 2/3 cycle MTC measurement is acceptable at PVNGS including STAR Cycles 19 Licensing Approach Submit one LAR
* Align PVNGS with Improved Standard TS 9
-Application of STAR to PVNGS
 
-Replacement of 2/3 cycle MTC Measurement 20 Licensing Approach Technical Specification 3.1.4 MTC
STAR
-SR 3.1.4.1 (HZP verification)
* Applicability Requirements
Add note allowing use of alternate BOC HZP MTC surveillance method (TSTF 486)
    - Found in Table 3-4 of WCAP-16011-P-A
-SR 3.1.4.2 (At power verifications)
    - Compliance evaluated on a reload cycle-specific basis
Add note allowing replacement of 2/3 cycle at power MTC Measurement (CE
    - STAR only applied to cycles when compliance verified
-NPSD-911 & TSTF 406) 21 Licensing Approach Proposed Schedule
    - Maintain the effectiveness of the STAR Program in problem identification 10
-Submit November 2013
 
-Requesting NRC Approval in November 2014
STAR
-First use in Spring of 2015 22 Conclusion and Discussion Acceptable to implement the STAR Program at PVNGS Acceptable to replace the 2/3 cycle at power MTC measurement Submit both under a single LAR November 2013 Requesting NRC approval November 2014 23}}
* Applicability Requirements (cont.)
    - Core design methods have a defined set of uncertainties based on a benchmark of predictions to actual plant measurements
    - Core, fuel, CEA design are similar to that of a benchmarked core
    - Cycle specific predictions independently verified by
* Comparison of 2 independent neutronics codes 11
 
STAR
* Applicability Requirements (cont.)
    - Implementation of CEA Lifetime Program
* Limit CEA life within operation experience base
    - Pre-operational checks verify core and CEA loading are consistent with design
    - CEA Coupling checks performed during reactor restack
* Many favorable PVNGS unique design feature 12
 
STAR
* Benefits
    - Minimize the time the plant is in an abnormal operating configuration
    - Increase the availability of the control channels
    - Operationally focused improvement 13
 
STAR
* WCAP 16011-P-A approach
    - Compare STAR Program to Generic Program
* Generic Program based on ANSI/ANS 19.6.1-1997
* Identify set of core problems
            - Design Predictions
            - As-Built Core
            - Test Performance 14
 
STAR
* WCAP 16011-P-A approach (cont.)
    - Concluded STAR Program is as effective in detecting the Problems as the Generic Program
    - STAR is an NRC approved and implemented alternative to current testing methodology.
15
 
STAR
* PVNGS Application
      - Compared
* Design differences between PVNGS and original participating plants
* Differences in current PVNGS startup program and Generic Program
* Operating Experience since original STAR
            - NRC and INPO
            - PVNGS
            - Implementing plants 16
 
STAR
* Results of Evaluations
    - Contained in plant specific justification
    - CASMO/SIMULATE as applied at PVNGS is acceptable for STAR
    - The PVNGS STAR Program is as effective as the approved STAR Program and is an acceptable alternative to the current PVNGS startup testing program.
17
 
Replacement of 2/3 Cycle MTC Measurement
* Objective
    - To replace the 2/3 cycle MTC measurement with alternate verification
* Overview
    - Approved for all CE plants in CE NPSD-911-A and Amendment 1-A (TSTF 406)
    - No measurement at 2/3 cycle if 40 EFPD measurement is within acceptance criteria 18  - Already implemented at many PWRs
 
Replacement of 2/3 Cycle MTC Measurement
* Current Topical only applicable for ROCS
    & ANC
* PVNGS will demonstrate applicability of SIMULATE
* Conclusions
      - SIMULATE is acceptable for use
      - Replacement of the 2/3 cycle MTC measurement is acceptable at PVNGS including 19      STAR Cycles
 
Licensing Approach
* Submit one LAR
      - Application of STAR to PVNGS
      - Replacement of 2/3 cycle MTC Measurement 20
 
Licensing Approach
* Technical Specification 3.1.4 MTC
    - SR 3.1.4.1 (HZP verification)
* Add note allowing use of alternate BOC HZP MTC surveillance method (TSTF 486)
    - SR 3.1.4.2 (At power verifications)
* Add note allowing replacement of 2/3 cycle at power MTC Measurement (CE-NPSD-911 & TSTF 406) 21
 
Licensing Approach
* Proposed Schedule
      - Submit November 2013
      - Requesting NRC Approval in November 2014
      - First use in Spring of 2015 22
 
Conclusion and Discussion
* Acceptable to implement the STAR Program at PVNGS
* Acceptable to replace the 2/3 cycle at power MTC measurement
* Submit both under a single LAR November 2013
* Requesting NRC approval November 2014 23}}

Latest revision as of 16:58, 4 November 2019

7/11/13 Meeting Slides - Implementation of STAR Program and Replacement of the 2/3 Cycle Mtc Measurement
ML13197A095
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/11/2013
From:
Arizona Public Service Co
To:
Division of Operating Reactor Licensing
Rankin J
References
TAC MF1932, TAC MF1933, TAC MF1934
Download: ML13197A095 (23)


Text

Implementation of STAR Program and Replacement of the 2/3 Cycle MTC Measurement Pre-Submittal Presentation to the NRC Date: 07/11/2013

Purpose

  • Present and discuss with the NRC planned licensing changes

- Implementation of the Startup Testing Activity Reduction (STAR) Program at PVNGS

- Replacement of the 2/3 Cycle Moderator Temperature Coefficient (MTC) Measurement 2

Topics

  • Replacement of the 2/3 Cycle MTC Measurement
  • Licensing Approach
  • Conclusion and Discussion 3

STAR

  • Objectives

- Alternate method to validate core design

- Minimize the time the plant is in an abnormal configuration 4

STAR

  • Overview

- Approved by NRC in WCAP-16011-P-A

  • Participating plants only
  • Successfully implemented at 8 CE units

- Incorporated into Improved Standard TS

STAR

  • Overview

- Adds

  • Credits Pre-Operational Checks
  • New Beginning of Cycle (BOC) Hot Zero Power (HZP) MTC surveillance methodology
  • Applicability Requirements

- Replaces

  • BOC HZP Isothermal Temperature Coefficient (ITC) Measurement 6
  • CEA Worth Measurement

STAR

  • Current Methodology

- CEA worth measurement

  • Require operation outside the normal TS LCOs
  • Presents operational challenges

- Unit 3 LER 2012-001

- Unit 1 LER 2011-005

- Measure ITC at HZP with use of reactivity computer 7

STAR

  • Proposed Methodology

- Replacement of CEA Worth Measurements

  • Use applicability requirements
  • Replacement will reduce the occurrence of problems associated with testing and minimize time in abnormal operating configuration 8

STAR

  • Proposed Methodology (cont.)

- Alternate MTC verification

  • Adjust predicted HZP MTC based on measured Critical Boron
  • Increase availability of the control channels
  • Align PVNGS with Improved Standard TS 9

STAR

  • Applicability Requirements

- Found in Table 3-4 of WCAP-16011-P-A

- Compliance evaluated on a reload cycle-specific basis

- STAR only applied to cycles when compliance verified

- Maintain the effectiveness of the STAR Program in problem identification 10

STAR

  • Applicability Requirements (cont.)

- Core design methods have a defined set of uncertainties based on a benchmark of predictions to actual plant measurements

- Core, fuel, CEA design are similar to that of a benchmarked core

- Cycle specific predictions independently verified by

  • Comparison of 2 independent neutronics codes 11

STAR

  • Applicability Requirements (cont.)

- Implementation of CEA Lifetime Program

  • Limit CEA life within operation experience base

- Pre-operational checks verify core and CEA loading are consistent with design

- CEA Coupling checks performed during reactor restack

  • Many favorable PVNGS unique design feature 12

STAR

  • Benefits

- Minimize the time the plant is in an abnormal operating configuration

- Increase the availability of the control channels

- Operationally focused improvement 13

STAR

  • WCAP 16011-P-A approach

- Compare STAR Program to Generic Program

  • Identify set of core problems

- Design Predictions

- As-Built Core

- Test Performance 14

STAR

  • WCAP 16011-P-A approach (cont.)

- Concluded STAR Program is as effective in detecting the Problems as the Generic Program

- STAR is an NRC approved and implemented alternative to current testing methodology.

15

STAR

- Compared

  • Design differences between PVNGS and original participating plants
  • Differences in current PVNGS startup program and Generic Program
  • Operating Experience since original STAR

- NRC and INPO

- PVNGS

- Implementing plants 16

STAR

  • Results of Evaluations

- Contained in plant specific justification

- CASMO/SIMULATE as applied at PVNGS is acceptable for STAR

- The PVNGS STAR Program is as effective as the approved STAR Program and is an acceptable alternative to the current PVNGS startup testing program.

17

Replacement of 2/3 Cycle MTC Measurement

  • Objective

- To replace the 2/3 cycle MTC measurement with alternate verification

  • Overview

- Approved for all CE plants in CE NPSD-911-A and Amendment 1-A (TSTF 406)

- No measurement at 2/3 cycle if 40 EFPD measurement is within acceptance criteria 18 - Already implemented at many PWRs

Replacement of 2/3 Cycle MTC Measurement

  • Current Topical only applicable for ROCS

& ANC

  • PVNGS will demonstrate applicability of SIMULATE
  • Conclusions

- SIMULATE is acceptable for use

- Replacement of the 2/3 cycle MTC measurement is acceptable at PVNGS including 19 STAR Cycles

Licensing Approach

- Application of STAR to PVNGS

- Replacement of 2/3 cycle MTC Measurement 20

Licensing Approach

- SR 3.1.4.1 (HZP verification)

  • Add note allowing use of alternate BOC HZP MTC surveillance method (TSTF 486)

- SR 3.1.4.2 (At power verifications)

  • Add note allowing replacement of 2/3 cycle at power MTC Measurement (CE-NPSD-911 & TSTF 406) 21

Licensing Approach

  • Proposed Schedule

- Submit November 2013

- Requesting NRC Approval in November 2014

- First use in Spring of 2015 22

Conclusion and Discussion

  • Acceptable to implement the STAR Program at PVNGS
  • Acceptable to replace the 2/3 cycle at power MTC measurement
  • Submit both under a single LAR November 2013
  • Requesting NRC approval November 2014 23