{{#Wiki_filter:e
{{#Wiki_filter:e ATTACHMENT 1 TABULATION OF PAGES PROPOSED TECHNICAL SPECIFICATION CHANGE SURRY POWER STATION, UNITS NO. 1 AND NO. 2 DELETE                   ADD 3.21-1                   3.21-1 3.21-2                    3.21-2 3.21-3                    3.21-3 3.21-4                   3.21-4 3.21-5                    3.21-5 3.21-6                    3.21-6 3.21-7                    3.21-7 3.21-8                    3.21-8 3.21-9 3.21-10 3.21-11 4 .18-1                  4.18-1 4.18-2                   4.18-2
* ATTACHMENT 1 TABULATION OF PAGES PROPOSED TECHNICAL SPECIFICATION CHANGE SURRY POWER STATION, UNITS NO. 1 AND NO. 2 DELETE 3.21-1 3.21-2 3.21-3 3.21-4 3.21-5 3.21-6 3.21-7 3.21-8 4 .18-1 4.18-2 4. 1_8-3 4.18-4 4 .18-5 ADD 3.21-1 3.21-2 3.21-3 3.21-4 3.21-5 3.21-6 3.21-7 3.21-8 3.21-9 3.21-10 3.21-11 4.18-1 4.18-2 4 .18-3 4.18-4 4.18-5 4 .18-6 4.18-7
: 4. 1_8-3                  4 .18-3 4.18-4                    4.18-4 4 .18-5                  4.18-5 4 .18-6 4.18-7
* ATTACHMENT 2 PROPOSED TECHNICAL SPECIFICATION CHANGE I*
 
* TS 3.21-1 3.21 FIRE DETECTION AND SUPPRESSION SYSTEM Applicability Applies to the operating status of the Fire Detection and Suppression Systems. Objective To define those conditions of the Fire Detection and Suppression Systems necessary to insure safe reactor operations.
ATTACHMENT 2 PROPOSED TECHNICAL SPECIFICATION CHANGE
These conditions relate to: Fire Detection Systems, Plant Fire Suppression Water Syst~m, Plant Spray and/or Sprinkler Systems, Plant co 2 Systems, Plant Halon System, Plant Fire Hose Stations, Plant Fire Barrier Penetration Fire Seals and Yard Fire Hydrants.
 
3.21 Applicability FIRE DETECTION AND SUPPRESSION SYSTEM
* TS 3.21-1 Applies to the operating status of the Fire Detection and Suppression Systems.
Objective To define those conditions of the Fire Detection and Suppression Systems necessary to insure safe reactor operations.
These conditions relate to:                                     Fire Detection Systems, Plant Fire Suppression Water Syst~m, Plant Spray and/or Sprinkler Systems, Plant                                                                     co 2 Systems, Plant Halon System, Plant Fire Hose Stations, Plant Fire Barrier Penetration Fire Seals and Yard Fire Hydrants.
Specifications:
Specifications:
A. Fire Detection Systems 1. As a minimum, the fire detection instrumentation for each fire detection zone shown in Table 3.21-1 shall be operable at all times. 2. With the number of operable fire detection instruments less than required by Table 3.21-1: Within 1 hour establish a fire watch patrol to inspect the zone with the inoperable instrument(s) at least once per hour, and b. Restore the inoperable instrument(s) to operable status within 14 days or prepare and submit a special report to the Commission pursuant to Specification  
A. Fire Detection Systems
: 1.       As a minimum, the fire detection instrumentation for each fire detection zone shown in Table 3.21-1 shall be operable at all times.
: 2.       With the number of operable fire detection instruments less than required by Table 3.21-1:
Within 1 hour establish a fire watch patrol to inspect the zone I*
with the inoperable instrument(s) at least once per hour, and
: b.         Restore the inoperable instrument(s) to operable status within 14 days or prepare and submit a special report to the Commission pursuant to Specification 6.6.4 within the next 30 days outlining' the action taken, the cause of the malfunction, and the plans and schedule for restoring the instrument(s) to operable status *
        . -****--* ---.-----*-*-7*-***:,. ~* ,--.-- .. -*--*****---.. --... :-* *-*- .,., ,,. - ..... .. ... -.--*---*** .. - ..


====6.6.4 within====
e
the next 30 days outlining' the action taken, the cause of the malfunction, and the plans and schedule for restoring the instrument(s) to operable status * . -****--* ---.-----*-*-7*-***:,.  
* TS*3.21-2
~* ,--.--.. -*--*****---
: 3. The requirements of Specification 3.0.1 are not applicable.
.. --... :-* *-*-.,., ,,. -..... .. ... -.--*---***
B. Plant Fire Suppression Water* System
.. -..
: 1. The Fire Suppression Water System shall be operable at all times with:
B. e
: a. Two high pressure pumps each with a capability of 2,500 gpm with their discharge aligned to the fire suppression header.
* TS*3.21-2
: b. Separate water supplied each containing a minimum of 250,000 gallons reserved capacity from 300,000 gallon capacity tanks.
: c. An operable flow path capable of taking suction from both 300,000 gallon capacity tanks and transferring the water through distribution piping with operable sectionalizing control or isolation valves to the yard hydrant curb valves and the front valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser.
: d. Automatic initiation logic for each fire pump.
: 2. a. With less than the above required equipment, restore the in-operable equipment to operable status within 7 days or pre-pare and submit a Special Report to the Commission pursuant to Specification 6.6.4 within the next 30 days outlining the plans and procedures to be used to provide for the loss of redundancy in this system.
: b. With no Fire Suppression Water System operable, within 24 hours; (1)  Establish a backup Fire Suppression Water System.
(2)  Notify the Commission pursuant to Specification 6.6.4 out-lining the actions taken and the plans and schedule for restoring the system to operable status.
* TS. 3.21-3
: 3. The requirements of Specification 3.0.1 are not applicable.
: c. Plant Spray and/or Sprinkler Systems
: 1. The spray and sprinkler systems securing the following areas shall be operable.
: a.       Cable tunnel
: b.       Cable vault
: 2. a.     With a sprinkler system inoperable, within 1 hour establish a continuous fire watch with backup fire suppression equipment for the unprotected area(s).
: b.       Restore the system to operable status w~thin 14 days or prepare and submit a Special Report to the Commission pursuant to Speci-fication 6.6.4 within the next 30 days outlining the action taken, the cause of_inoperability, and the plans and schedule for restoring the system to.operable status.
: 3. The requirements of Specification 3.0.1 are not applicable.
: 3. The requirements of Specification 3.0.1 are not applicable.
Plant Fire Suppression Water* System 1. The Fire Suppression Water System shall be operable at all times with: 2. a. Two high pressure pumps each with a capability of 2,500 gpm with their discharge aligned to the fire suppression header. b. Separate water supplied each containing a minimum of 250,000 gallons reserved capacity from 300,000 gallon capacity tanks. c. An operable flow path capable of taking suction from both 300,000 gallon capacity tanks and transferring the water through distribution piping with operable sectionalizing control or isolation valves to the yard hydrant curb valves and the front valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser. d. Automatic initiation logic for each fire pump. a. With less than the above required equipment, restore the operable equipment to operable status within 7 days or pare and submit a Special Report to the Commission pursuant to Specification
D. Plant CO      Systems 2
: 1. The low pressure            co 2      systems shall be operable, with a minimum level of 75% and a minimum pressure of 275.psi in the associated storage tank, at all times when the equipment in the following areas are required to be operable:
: a.       Cable tray rooms
: b.       Cable tunnel
: c.      Cable vault
    * '**'"'  r . * ,.'>,_ __ ... , """'** * ,.~. **** ** -,:_.-. * *,


====6.6.4 within====
TS 3.21-4
the next 30 days outlining the plans and procedures to be used to provide for the loss of redundancy in this system. b. With no Fire Suppression Water System operable, within 24 hours; (1) Establish a backup Fire Suppression Water System. (2) Notify the Commission pursuant to Specification
: d. Charcoal filter banks A and B
: e. Emergency diesel generator rooms, 1, 2, and 3.
: 2. The high pressure CO  systems shall be operable, with a minimum 2
level of 90% by weight, at all times when equipment in the following areas are required to be operable:
: a. Fuel oil storage tank room for emergency service water pumps
: b. Emergency diesel generator fuel oil transfer pump rooms.
: 3. a. With one or more of the above required  co 2 systems inoperaqle, within 1 hour establish a continuous fire watch with backup fire suppression equipment for the unprotected area(s).
: b. Restore the system to operable status within 14 days or prepare and submit a Special Report to the Commission pursuant to Speci-fication 6.6.4 within the next 30 days outlining the action taken, the cause of inoperability, and the plans and schedule for restoring the system to operable status.
: 4. The requirements of Specification 3.0.1 are not applicable.
E. Plant Halon System
: 1. The Halon System shall be operable, with the storage tanks having at least 95% of full charge weight and 90% of full charge pressure, at all times when equipment in the following area is required to be operable:
: a. Station records storage vault.
: 2. a. With the Halon System inoperable, within 1 hour establish a contin-uous fire watch with backup fire suppression equipment for the unprotected area.


====6.6.4 lining====
e                                                                                                TS 3.21-5
the actions taken and the plans and schedule for restoring the system to operable status. 
: b. Restore the system to operable status within 14 days or pre-pare and submit a Special Report to the Commission pursuant to Specification 6.6.4 within the next 30 days outlining the action taken, the cause of inoperability, and the plans and schedule for restoring the system to operable status.
: c. D.
: 3. The requirements of Specification 3.0.1 are not applicable.
* TS. 3.21-3 3. The requirements of Specification 3.0.1 are not applicable.
F. Plant Fire Hose Stations
Plant Spray and/or Sprinkler Systems 1. The spray and sprinkler systems securing the following areas shall be operable.
: 1. The following fire hose stations shall be operable at all times when equipment in the area is required to be operable:
: 2. a. Cable tunnel b. Cable vault a. With a sprinkler system inoperable, within 1 hour establish a continuous fire watch with backup fire suppression equipment for the unprotected area(s). b. Restore the system to operable status w~thin 14 days or prepare and submit a Special Report to the Commission pursuant to fication 6.6.4 within the next 30 days outlining the action taken, the cause of_inoperability, and the plans and schedule for restoring the system to.operable status. 3. The requirements of Specification 3.0.1 are not applicable.
LOCATION                                                                                    SIZE
Plant CO 2 Systems 1. The low pressure co 2 systems shall be operable, with a minimum level of 75% and a minimum pressure of 275.psi in the associated storage tank, at all times when the equipment in the following areas are required to be operable:  
: a. Auxiliary building hose                                                                          1 1/2" Stations 37 through 51 and 41A
: a. Cable tray rooms b. Cable tunnel c. Cable vault * '**'"' r .* ,.'>, ___ ... , """'** * ,.~. **** ** -,:_.-. * *,
      . b. Fuel building hose                                                                              1 1/2" Stations 52 and 53.
E. TS 3.21-4 d. Charcoal filter banks A and B e. Emergency diesel generator rooms, 1, 2, and 3. 2. The high pressure CO 2 systems shall be operable, with a minimum level of 90% by weight, at all times when equipment in the following areas are required to be operable:
: c. Hose stations 12, 16, 20, 21A,                                                                   1 1/2" 22, 23, 33, 34, 54, 55, 56, and 57 in Turbine Building to be used as backup to Control Room, Emergency Switchgear Room and Diesel Generator Room
: 3. a. Fuel oil storage tank room for emergency service water pumps b. Emergency diesel generator fuel oil transfer pump rooms. a. With one or more of the above required co 2 systems inoperaqle, within 1 hour establish a continuous fire watch with backup fire suppression equipment for the unprotected area(s). b. Restore the system to operable status within 14 days or prepare and submit a Special Report to the Commission pursuant to fication 6.6.4 within the next 30 days outlining the action taken, the cause of inoperability, and the plans and schedule for restoring the system to operable status. 4. The requirements of Specification 3.0.1 are not applicable.
: 2. The following fire hose stations are designed to be dry and shall be operable at all times when the main shut off valves in the auxiliary building are opened.
Plant Halon System 1. The Halon System shall be operable, with the storage tanks having at least 95% of full charge weight and 90% of full charge pressure, at all times when equipment in the following area is required to be operable:
: a. Unit 1 containment dry standpipes                                                                1 1/2" (Hose Stations 75 through 87)
: 2. a. Station records storage vault. a. With the Halon System inoperable, within 1 hour establish a uous fire watch with backup fire suppression equipment for the unprotected area.
                    **-*** .* ., *. *.**-*** * . * . * * . * ~ ...........~._ *- ~ - - - - ~ ~ - J * * ** -**
e TS 3.21-5 b. Restore the system to operable status within 14 days or pare and submit a Special Report to the Commission pursuant to Specification


====6.6.4 within====
e            TS 3.21-6
the next 30 days outlining the action taken, the cause of inoperability, and the plans and schedule for restoring the system to operable status. 3. The requirements of Specification 3.0.1 are not applicable.
: b. Unit 2 containment dry stan~pipes            1 1/2" (Hose Stations 60 through 72)
F. Plant Fire Hose Stations 1. The following fire hose stations shall be operable at all times when equipment in the area is required to be operable:
: 3. a. With one or more of the fire hose stations listed above inoperable, route an additional equivalent capacity fire hose to the unprotected area(s) from an operable hose station within 11 hour if the inoper-able fire hose is the primary means of fire suppression; otherwise, route the additional hose within 24 hours.
: a. . b. c. LOCATION Auxiliary building hose Stations 37 through 51 and 41A Fuel building hose Stations 52 and 53. Hose stations 12, 16, 20, 21A, 22, 23, 33, 34, 54, 55, 56, and 57 in Turbine Building to be used as backup to Control Room, Emergency Switchgear Room and Diesel Generator Room SIZE 1 1/2" 1 1/2" 1 1/2" 2. The following fire hose stations are designed to be dry and shall be operable at all times when the main shut off valves in the auxiliary building are opened. a. Unit 1 containment dry standpipes (Hose Stations 75 through 87) **-*** .* ., *. *.**-*** *.*.**.* ...........
: b. Restore the fire hose station(s) to operable status within 14 days or prepare and submit a Special Report to the Commission pursuant to Specification 6.6.4 within the next 30 days outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the station to operable status.
~. _* -~----~~-J**
: 4. The requirements of Specification 3.0.1 are not applicable.
** -** 1 1/2"
G. Plant Fire Barrier Penetration Fire Seals
: 3. b. a. Unit 2 containment dry stan~pipes (Hose Stations 60 through 72) e TS 3.21-6 1 1/2" With one or more of the fire hose stations listed above inoperable, route an additional equivalent capacity fire hose to the unprotected area(s) from an operable hose station within 1 1 hour if the able fire hose is the primary means of fire suppression; otherwise, route the additional hose within 24 hours. b. Restore the fire hose station(s) to operable status within 14 days or prepare and submit a Special Report to the Commission pursuant to Specification  
: 1. All fire barrier penetrations protecting safety related areas shall be functional at all times.
: 2. a. With one or more of the above required fire barrier penetrations non-functional, within 1 hour establish a continuous fire watch on at least one side of the non-functional fire barrier.
: b. Restore the non-functional fire barrier penetration(s) to func-tional status within 7 days or prepare and submit a Special Report to the Commission pursuant to Specification 6.6.4 within the next 30 days outlining the action taken, the cause of the non-functional penetration, and the plans and schedule for restoring the fire barrier penetration(s) to functional status.
: 3. The requirements of Specification 3.0.1 are not applicable.
()


====6.6.4 within====
e                              e          Ts* 3.21-7 H. Yard Fire Hydrant and Hydrant Hose Houses I. The following yard fire hydrants and the associated hydrant hose houses shall be operable at all times when equipment in the area is required to be operable.
the next 30 days outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the station to operable status. 4. The requirements of Specification 3.0.1 are not applicable.
LOCATION              HOSE HOUSE#            HYDRANT NUMBER North of Condensate                1                    l-FP-154 Polishing Building                                      l-FP-155 l-FP-156 North of Containment #2          2                    l-FP-66 Between Boron Recovery                                  l-FP-67 Tanks and Fuel Oil                                      l-FP-68 Storage Alleyway South of                5                    l-FP-82 Containment III                                        l-FP-83 l-FP-84 South of Main Trans-              9                    l-FP-50 formers 112 Side                                        l-FP-51 l-FP-52 East of Containment #2 Next      11                    l-FP-62 To Underground Condensate                              l-FP-63 Tank                                                    l-FP-64 West of Containment 112 in        12                    l-FP-59 Alleyway Outside HP                                    l-FP-60 l-FP-61
G. Plant Fire Barrier Penetration Fire Seals 1. All fire barrier penetrations protecting safety related areas shall be functional at all times. 2. a. With one or more of the above required fire barrier penetrations non-functional, within 1 hour establish a continuous fire watch on at least one side of the non-functional fire barrier. b. Restore the non-functional fire barrier penetration(s) to tional status within 7 days or prepare and submit a Special Report to the Commission pursuant to Specification
: 2. a. With one or more of the yard fire hydrants or associated hydrant hose houses listed above inoperable, locate suffi-cient additional lengths of hose in an operable hydrant hose house to provide service to the unprotected area(s) within 1 hour if the inoperable fire hydrant or associated hydrant hose house is the primary means of fire suppression; other-wise provide the additional hose within 24 hours.


====6.6.4 within====
TS 3.21-8
the next 30 days outlining the action taken, the cause of the non-functional penetration, and the plans and schedule for restoring the fire barrier penetration(s) to functional status. 3. The requirements of Specification 3.0.1 are not applicable.  
: b. Restore the hydrant or hose house to operable status within 14 days or prepare and submit a Special Report to the Commission pursuant to specification 6.6.4 within the next 30 days outlining the action taken, the cause of the in-operability, and the plans and schedule for restoring the hydrant or hose house to operable status.
() '
: 3. The requirements of Specification 3.0.1 are not applicable.
e e Ts* 3.21-7 H. Yard Fire Hydrant and Hydrant Hose Houses I. The following yard fire hydrants and the associated hydrant hose houses shall be operable at all times when equipment in the area is required to be operable.
LOCATION HOSE HOUSE# HYDRANT NUMBER North of Condensate 1 l-FP-154 Polishing Building l-FP-155 l-FP-156 North of Containment
#2 2 l-FP-66 Between Boron Recovery l-FP-67 Tanks and Fuel Oil l-FP-68 Storage Alleyway South of 5 l-FP-82 Containment III l-FP-83 l-FP-84 South of Main Trans-9 l-FP-50 formers 112 Side l-FP-51 l-FP-52 East of Containment
#2 Next 11 l-FP-62 To Underground Condensate l-FP-63 Tank l-FP-64 West of Containment 112 in 12 l-FP-59 Alleyway Outside HP l-FP-60 l-FP-61 2. a. With one or more of the yard fire hydrants or associated hydrant hose houses listed above inoperable, locate cient additional lengths of hose in an operable hydrant hose house to provide service to the unprotected area(s) within 1 hour if the inoperable fire hydrant or associated hydrant hose house is the primary means of fire suppression; wise provide the additional hose within 24 hours.
TS 3.21-8 b. Restore the hydrant or hose house to operable status within 14 days or prepare and submit a Special Report to the Commission pursuant to specification


====6.6.4 within====
e           TS 3.21-9 Bases Fire Detection Instrumentation Operability of the fire detection instrumentation ensures that adequate warning capability is available for the prompt detection of fires. This capability is required in order to detect and locate fires in their early stages,     Prompt detection of fires will reduce the potential for damage to safety related equipment and is an integral element in the overall facility fire protection program.
the next 30 days outlining the action taken, the cause of the operability, and the plans and schedule for restoring the hydrant or hose house to operable status. 3. The requirements of Specification 3.0.1 are not applicable.
In the event that a portion of the fire detection instrumentation is inoperable, the establishment of frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is returned to service.
e TS 3.21-9 Bases Fire Detection Instrumentation Operability of the fire detection instrumentation ensures that adequate warning capability is available for the prompt detection of fires. This capability is required in order to detect and locate fires in their early stages, Prompt detection of fires will reduce the potential for damage to safety related equipment and is an integral element in the overall facility fire protection program. In the event that a portion of the fire detection instrumentation is inoperable, the establishment of frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is returned to service. Fire Suppression Systems The operablity of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water system, spray and/or sprinklers, co 2 , Halon, and fire hose stations.
Fire Suppression Systems The operablity of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water system, spray and/or sprinklers, co 2 , Halon, and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.
The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program. In the event that the fire suppression water systems are inoperable, immediate corrective measures must be taken since this system provides the major fire suppression capability of the plant. The requirement e TS 3.21-10 for a twenty-four hour report to the Commission provides for prompt evaluation of the acceptability of the corrective measures to provide adequate fire suppression capability for the continued protection of the nuclear plant. Fire Barrier Penetration Seals The functional integrity of the fire barrier penetration seals ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility.
In the event that the fire suppression water systems are inoperable, immediate corrective measures must be taken since this system provides the major fire suppression capability of the plant. The requirement
This design feature minimizes the sibility of a single fire rapidly involving several areas of the facility prior to detection and extinguishment.
 
The fire barrier penetration seals are a passive element in the facility fire protection program and are ject to periodic inspections  
e           TS 3.21-10 for a twenty-four hour report to the Commission provides for prompt evaluation of the acceptability of the corrective measures to provide adequate fire suppression capability for the continued protection of the nuclear plant.
.. During periods of time when the seals are not functional, a continuous fire watch is required to be maintained in the vicinity of the affected seal until the seal is restored to functional status * . .. ***:* 
Fire Barrier Penetration Seals The functional integrity of the fire barrier penetration seals ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility. This design feature minimizes the pos-sibility of a single fire rapidly involving several areas of the facility prior to detection and extinguishment. The fire barrier penetration seals are a passive element in the facility fire protection program and are sub-ject to periodic inspections ..
,* i,,~ * *-e TS *3.21-11 TABLE 3.21-1 FIRE DETECTION INSTRUMENTS INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE Heat Smoke 1. Containment (Reactor Coolant Pumps Only)*** 1 per RCP *2. Cable Tray Room 3 4 *3. Cable Tunnel 2 3 4. Cable Vault Area *Lower Area 1 2 Upper Area 1 1 *5. Charcoal Filter Banks 1 per bank *6. Emergency Diesel Generator Room 1 per room *7. Fuel Oil Tank Room (river) l** 1 *8. Fuel Oil Transfer Pump Houses 1 per house** *Allows for one inoperable instrument  
During periods of time when the seals are not functional, a continuous fire watch is required to be maintained in the vicinity of the affected seal until the seal is restored to functional status
**Rate of rise actuation devices for high pressure CO 2 system ***One heat detector installed per pump. RCP pump bearing and motor temperature will be monitored once per hour if the RCP heat detector is inoperable  
* e               TS *3.21-11 TABLE 3.21-1 FIRE DETECTION INSTRUMENTS INSTRUMENT LOCATION                             MINIMUM INSTRUMENTS OPERABLE Heat       Smoke
* .. . . -* -... ~.. ... .. -.
: 1. Containment (Reactor Coolant Pumps Only)***                       1 per RCP
* TS 4.18-1 4.18 FIRE DETECTION AND PROTECTION SYSTEM SURVEILLANCE Applicability Applies to periodic testing and surveillance of the Fire Protection System. Objective To verify that the fire protection system will respond promptly and properly when required. ) Specification Tests and Frequency A. Fire Detection and Instrumentation  
            *2. Cable Tray Room                                                           3           4
: 1. Each of the fire detection instruments listed in Table 3.21-1 shall be demonstrated operable at least once per 6 months by a channel functional test. 2. The circuitry associated with the detector alarms shall be demonstrated operable at least once per 6 months for all NEPA Code 72D Class A supervised circuits.  
            *3. Cable Tunnel                                                             2           3
: 4. Cable Vault Area
                    *Lower Area                                                           1           2 Upper Area                                                           1           1
            *5. Charcoal Filter Banks                                             1 per bank
            *6. Emergency Diesel Generator Room                                   1 per room
            *7. Fuel Oil Tank Room (river)                                         l**               1
            *8. Fuel Oil Transfer Pump Houses                                     1 per house**
              *Allows for one inoperable instrument
              **Rate of rise actuation devices for high pressure CO                     system 2
            ***One heat detector installed per pump. RCP pump bearing and motor temperature will be monitored once per hour if the RCP heat detector is inoperable *
,* i,,~ * *-
                                                              .. . . -* - ... ~.. ... .. - .
* TS 4.18-1 4.18     FIRE DETECTION AND PROTECTION SYSTEM SURVEILLANCE Applicability Applies to periodic testing and surveillance of the Fire Protection System.
Objective To verify that the fire protection system will respond promptly and properly when required.
                                                      )
Specification Tests and Frequency A. Fire Detection and Instrumentation
: 1. Each of the fire detection instruments listed in Table 3.21-1 shall be demonstrated operable at least once per 6 months by a channel functional test.
: 2. The circuitry associated with the detector alarms shall be demonstrated operable at least once per 6 months for all NEPA Code 72D Class A supervised circuits.
: 3. The non-supervised c~rcuits between the local panels in Specification 4.18.A.2 and the control room shall be demonstrated operable at least once per 31 days.
: 3. The non-supervised c~rcuits between the local panels in Specification 4.18.A.2 and the control room shall be demonstrated operable at least once per 31 days.
B. -------------------
* TS 4.18-2 B. Plant Fire Suppression Water System
* TS 4.18-2 Plant Fire Suppression Water System 1. The Fire Suppression Water system shall be demonstrated operable:  
: 1. The Fire Suppression Water system shall be demonstrated operable:
: a. At least once per 7 days by verifying the water supply volume. b. At least once per 31 days on a staggered test basis by starting each pump and operating it for at least 15 minutes on tion flow. c. At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path is in its correct position.  
: a. At least once per 7 days by verifying the water supply volume.
: d. At least once per 6 months by performance of a system flush. e. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel. f. At least once per 18 months: (1) By performing a system functional test which includes lated automatic actuation of the system throughout its operating sequence and verifying that each automatic valve in the flow path actuates to its correct position, and (2) By verifying that each pump develops a flow equal to or greater than 2500 gpm at a Total Dynamic Head of 231 feet, and (3) By verifying that each high pressure pump starts tially) to maintain the fire suppression water system pressure equal to or greater than 90 psig. g. At least once per 3 years by performing a flow test of the system in accordance with Chapter 5, Section 11 of Fire Protection book, 14th Edition published by National Fire Protection tion. . -. .. ----. . . ----------
: b. At least once per 31 days on a staggered test basis by starting each pump and operating it for at least 15 minutes on recircula-tion flow.
e
: c. At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path is in its correct position.
* TS 4.18-3 2. The fire pump diesel engine shall be demonstrated operable:
: d. At least once per 6 months by performance of a system flush.
: a. At least once per 31 days by verifying:  
: e. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.
(1) The fuel storage tank contains at least 220 gallons of fuel, and (2) The diesel starts from ambient conditions and operates for at least 30 minutes on recirculation flow. b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within the acceptable limits. specified in Table 1 of ASTM-D975-74 when checked for viscosity, water, and sediment.  
: f. At least once per 18 months:
: c. At least once per 18 months, during shutdown, by subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for the class of service. 3. The fire pump diesel starting 24-volt battery bank and charger shall be demonstrated operable:  
(1)   By performing a system functional test which includes simu-lated automatic actuation of the system throughout its operating sequence and verifying that each automatic valve in the flow path actuates to its correct position, and (2)   By verifying that each pump develops a flow equal to or greater than 2500 gpm at a Total Dynamic Head of 231 feet, and (3)   By verifying that each high pressure pump starts (sequen-tially) to maintain the fire suppression water system pressure equal to or greater than 90 psig.
: a. At least once per 7 days by verifying that: (1) The electrolyte level of each battery is above the plates, and (2) The overall battery voltage is greater than or equal to 24 volts. b. At least once per 92 days by verifying that the specific gravity is appropriate for continued service of the battery. c. At least once per 18 months by verifying that: (1) The batteries, cell plates, and battery racks show no visual indication of physical damage or abnormal deterioration, and *-.. *-* . *" *---._ * ., *..* *.** --~~-r...-
: g. At least once per 3 years by performing a flow test of the system in accordance with Chapter 5, Section 11 of Fire Protection Hand-book, 14th Edition published by National Fire Protection Associa-tion.
"' oo ... *
 
* _.,.. -  
2.
: c. D.
e The fire pump diesel engine shall be demonstrated operable:
* TS 4.18-4 (2) The battery-to-battery and terminal connections are clean, tight, and free of corrosion and coated with anti-corrosion material.
* TS 4.18-3
Plant Spray and/or Sprinkler Systems 1. The spray and sprinkler systems shall be demonstrated operable:  
: a.         At least once per 31 days by verifying:
: a. At least once per 31 days by verifying that each*valve (manual, power operated or automatic) in the flow path is in its correct position.  
(1)                 The fuel storage tank contains at least 220 gallons of fuel, and (2)                 The diesel starts from ambient conditions and operates for at least 30 minutes on recirculation flow.
: b. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel. c. At least once per 18 months: (1) By a visual inspection of the dry pipe spray and sprinkler headers to verify their integrity, and (2) By a visual inspection of each nozzle's spray pattern to verify the spray pattern is not obstructed.  
: b.         At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within the acceptable limits.
: d. At least once per 3 years by performing an air flow test through each open head spray/sprinkler and verifying each open head spray/sprinkler nozzle is unobstructed.
specified in Table 1 of ASTM-D975-74 when checked for viscosity, water, and sediment.
Plant CO 2 Systems 1. The low pressure CO 2 system shall be demonstrated operable:  
: c.         At least once per 18 months, during shutdown, by subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for the class of service.
: a. At least once per 7 days by verifying each CO 2 storage tank level and pressure.  
: 3.           The fire pump diesel starting 24-volt battery bank and charger shall be demonstrated operable:
: b. At least once per 18 months: (1) By verifying the system valves and associated ventilation dampers and fire doors actuate manually and automatically to a simulated actuation signal, and (2) By verifying flow from each nozzle during a "Puff Test".
: a.         At least once per 7 days by verifying that:
* V . -, . ,._ * ,*."' .--*-........ ***.-**:-.... -...... ',i-**,
(1)                 The electrolyte level of each battery is above the plates, and (2)                 The overall battery voltage is greater than or equal to 24 volts.
E. TS 4.18-5 2. The high pressure co 2 sytem shall be demonstrated operable:  
: b.         At least once per 92 days by verifying that the specific gravity is appropriate for continued service of the battery.
: a. At least once per 6 months by verifying CO 2 cylinder weight. b. At least once per 18 months by: (1) Verifying the system, including associated ventilation dampers and fire doors, actuates manually.and cally upon receipt of a simulated actuation signal, and (2) Performance of a flow test through headers and nozzles to assure no blockage.
: c.         At least once per 18 months by verifying that:
Plant Halon Systems 1. The Halon system shall be demonstrated operable:  
(1)                 The batteries, cell plates, and battery racks show no visual indication of physical damage or abnormal deterioration, and
: a. At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path is in its correct posit.ion.  
*-.. *-* . *" *- -- ._ *., *..* *.** --~~-r...- "' oo ... *
: b. At least once per 6 months by verifying each Halon storage tank weight and pressure.  
* _.,.. -
: c. At least once per 18 month by: (1) Verifying the system actuates automatically to a simulated actuation signal, and (2) Performance of a flow test through headers and nozzles to assure no blockage, and (3) Verifying the operability of the manual initiating system. F. Plant Fire Hose Station l. Each fire hose station shall be verified operable:  
 
: a. At least once per 31 days by visual inspection of the fire hose: station to assure all equipment is available.
(2)   The battery-to-battery and terminal connections are clean,
ti TS 4 .18-6 b. At least once per 18 months by removing the hose for inspection and re-racking, and inspecting all gaskets and replacing any degraded gaskets in the couplings.  
* TS 4.18-4 tight, and free of corrosion and coated with anti-corrosion material.
: c. At least once per 3 years by: (1) Partially open each hose station valve to verify valve operability and no flow blockage, and (2) Conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at that hose station. 2. Each containment hose station shall be verified operable:  
: c. Plant Spray and/or Sprinkler Systems
: a. By a visual inspection during each outage of duration greater than 7 days. b. At least once per refueling cycle by removing the hose for inspection and reracking, and inspecting all gaskets and replacing any degraded gaskets in the couplings.  
: 1. The spray and sprinkler systems shall be demonstrated operable:
: c. At least once every other refueling by partially opening each hose station valve to verify valve operability and no flow age, and conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at that hose station. G. Plant Fire Barriers Penetration Fire Seals 1. Fire barrier penetrations shall be v~rified to be functional:  
: a.     At least once per 31 days by verifying that each*valve (manual, power operated or automatic) in the flow path is in its correct position.
: a. At least once per 18 months by a visual inspection.  
: b.     At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.
: b. Prior to returning a fire barrier penetration to functional status following repairs or maintenance by performance of a visual inspection of the affected fire barrier penetration(s)  
: c.     At least once per 18 months:
* * -*--,**-*-----.  
(1)   By a visual inspection of the dry pipe spray and sprinkler headers to verify their integrity, and (2)   By a visual inspection of each nozzle's spray pattern to verify the spray pattern is not obstructed.
** --*** .,,. ..... 'k:____:_"
: d.     At least once per 3 years by performing an air flow test through each open head spray/sprinkler and verifying each open head spray/sprinkler nozzle is unobstructed.
Ja.J e
D. Plant CO 2
* TS 4.18-7 2. Penetration fire barriers that perform a pressure sealing function shall be verified to be functional by performance of a local leakage test prior to declaring a penetration fire barrier functional ing repafrs or maintenance.
Systems
H. Yard Fire Hydrant and Hydrant Hose Houses. 1. Each yard fire hydrant and associated hydrant hose house shall be verified operable:  
: 1. The low pressure CO         system shall be demonstrated operable:
: a. At least once per 31 days by visual inspection of the hydrant hose house to assure all equipment is available.  
2
: b. At least once per 18 months by visually inspecting each yard fire hydrant and verifying  
: a.     At least once per 7 days by verifying each CO                                           storage tank level 2
~hat the hydrant is not damaged. c. At least once per 3 years by: (1) Conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at any yard fire hydrant. (2) Inspecting all the gaskets and replacing any degraded gaskets in the couplings.  
and pressure.
: b.     At least once per 18 months:
(1)   By verifying the system valves and associated ventilation dampers and fire doors actuate manually and automatically to a simulated actuation signal, and (2)   By verifying flow from each nozzle during a "Puff Test".
* V     .   -,   . ,._ * ,*."' .- - * - ........ * * * . - * * : - .... - ...... ',i-**,
 
TS 4.18-5
: 2. The high pressure   co 2 sytem shall be demonstrated operable:
: a. At least once per 6 months by verifying CO   cylinder 2
weight.
: b. At least once per 18 months by:
(1)   Verifying the system, including associated ventilation dampers and fire doors, actuates manually.and automati-cally upon receipt of a simulated actuation signal, and (2)   Performance of a flow test through headers and nozzles to assure no blockage.
E. Plant Halon Systems
: 1. The Halon system shall be demonstrated operable:
: a. At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path is in its correct posit.ion.
: b. At least once per 6 months by verifying each Halon storage tank weight and pressure.
: c. At least once per 18 month by:
(1)   Verifying the system actuates automatically to a simulated actuation signal, and (2)   Performance of a flow test through headers and nozzles to assure no blockage, and (3) Verifying the operability of the manual initiating system.
F. Plant Fire Hose Station
: l. Each fire hose station shall be verified operable:
: a. At least once per 31 days by visual inspection of the fire hose:
station to assure all equipment is available.
 
ti                                             TS 4 .18-6
: b. At least once per 18 months by removing the hose for inspection and re-racking, and inspecting all gaskets and replacing any degraded gaskets in the couplings.
: c. At least once per 3 years by:
(1)   Partially open each hose station valve to verify valve operability and no flow blockage, and (2)   Conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at that hose station.
: 2. Each containment hose station shall be verified operable:
: a. By a visual inspection during each outage of duration greater than 7 days.
: b. At least once per refueling cycle by removing the hose for inspection and reracking, and inspecting all gaskets and replacing any degraded gaskets in the couplings.
: c. At least once every other refueling by partially opening each hose station valve to verify valve operability and no flow block-age, and conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at that hose station.
G. Plant Fire Barriers Penetration Fire Seals
: 1. Fire barrier penetrations shall be v~rified to be functional:
: a. At least once per 18 months by a visual inspection.
: b. Prior to returning a fire barrier penetration to functional status following repairs or maintenance by performance of a visual inspection of the affected fire barrier penetration(s) *
            * -*--,**-*-----. ** - -*** .,,.. . . . . 'k:____:_"
 
e 2.
Ja.J
* TS 4.18-7 Penetration fire barriers that perform a pressure sealing function shall be verified to be functional by performance of a local leakage test prior to declaring a penetration fire barrier functional follow-ing repafrs or maintenance.
H. Yard Fire Hydrant and Hydrant Hose Houses.
: 1. Each yard fire hydrant and associated hydrant hose house shall be verified operable:
: a. At least once per 31 days by visual inspection of the hydrant hose house to assure all equipment is available.
: b. At least once per 18 months by visually inspecting each yard fire hydrant and verifying ~hat the hydrant is not damaged.
: c. At least once per 3 years by:
(1) Conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at any yard fire hydrant.
(2) Inspecting all the gaskets and replacing any degraded gaskets in the couplings.
(3) Performing a flow check of each hydrant to verify its operability.}}
(3) Performing a flow check of each hydrant to verify its operability.}}

Latest revision as of 00:57, 3 February 2020

Proposed Tech Spec Changes to Sections 3.21 & 4.18 Re Fire Protection Sys
ML18139B845
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/13/1982
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139B844 List:
References
NUDOCS 8204160618
Download: ML18139B845 (20)


Text

e ATTACHMENT 1 TABULATION OF PAGES PROPOSED TECHNICAL SPECIFICATION CHANGE SURRY POWER STATION, UNITS NO. 1 AND NO. 2 DELETE ADD 3.21-1 3.21-1 3.21-2 3.21-2 3.21-3 3.21-3 3.21-4 3.21-4 3.21-5 3.21-5 3.21-6 3.21-6 3.21-7 3.21-7 3.21-8 3.21-8 3.21-9 3.21-10 3.21-11 4 .18-1 4.18-1 4.18-2 4.18-2

4. 1_8-3 4 .18-3 4.18-4 4.18-4 4 .18-5 4.18-5 4 .18-6 4.18-7

ATTACHMENT 2 PROPOSED TECHNICAL SPECIFICATION CHANGE

3.21 Applicability FIRE DETECTION AND SUPPRESSION SYSTEM

  • TS 3.21-1 Applies to the operating status of the Fire Detection and Suppression Systems.

Objective To define those conditions of the Fire Detection and Suppression Systems necessary to insure safe reactor operations.

These conditions relate to: Fire Detection Systems, Plant Fire Suppression Water Syst~m, Plant Spray and/or Sprinkler Systems, Plant co 2 Systems, Plant Halon System, Plant Fire Hose Stations, Plant Fire Barrier Penetration Fire Seals and Yard Fire Hydrants.

Specifications:

A. Fire Detection Systems

1. As a minimum, the fire detection instrumentation for each fire detection zone shown in Table 3.21-1 shall be operable at all times.
2. With the number of operable fire detection instruments less than required by Table 3.21-1:

Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a fire watch patrol to inspect the zone I*

with the inoperable instrument(s) at least once per hour, and

b. Restore the inoperable instrument(s) to operable status within 14 days or prepare and submit a special report to the Commission pursuant to Specification 6.6.4 within the next 30 days outlining' the action taken, the cause of the malfunction, and the plans and schedule for restoring the instrument(s) to operable status *

. -****--* ---.-----*-*-7*-***:,. ~* ,--.-- .. -*--*****---.. --... :-* *-*- .,., ,,. - ..... .. ... -.--*---*** .. - ..

e

  • TS*3.21-2
3. The requirements of Specification 3.0.1 are not applicable.

B. Plant Fire Suppression Water* System

1. The Fire Suppression Water System shall be operable at all times with:
a. Two high pressure pumps each with a capability of 2,500 gpm with their discharge aligned to the fire suppression header.
b. Separate water supplied each containing a minimum of 250,000 gallons reserved capacity from 300,000 gallon capacity tanks.
c. An operable flow path capable of taking suction from both 300,000 gallon capacity tanks and transferring the water through distribution piping with operable sectionalizing control or isolation valves to the yard hydrant curb valves and the front valve ahead of the water flow alarm device on each sprinkler, hose standpipe or spray system riser.
d. Automatic initiation logic for each fire pump.
2. a. With less than the above required equipment, restore the in-operable equipment to operable status within 7 days or pre-pare and submit a Special Report to the Commission pursuant to Specification 6.6.4 within the next 30 days outlining the plans and procedures to be used to provide for the loss of redundancy in this system.
b. With no Fire Suppression Water System operable, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; (1) Establish a backup Fire Suppression Water System.

(2) Notify the Commission pursuant to Specification 6.6.4 out-lining the actions taken and the plans and schedule for restoring the system to operable status.

  • TS. 3.21-3
3. The requirements of Specification 3.0.1 are not applicable.
c. Plant Spray and/or Sprinkler Systems
1. The spray and sprinkler systems securing the following areas shall be operable.
a. Cable tunnel
b. Cable vault
2. a. With a sprinkler system inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a continuous fire watch with backup fire suppression equipment for the unprotected area(s).
b. Restore the system to operable status w~thin 14 days or prepare and submit a Special Report to the Commission pursuant to Speci-fication 6.6.4 within the next 30 days outlining the action taken, the cause of_inoperability, and the plans and schedule for restoring the system to.operable status.
3. The requirements of Specification 3.0.1 are not applicable.

D. Plant CO Systems 2

1. The low pressure co 2 systems shall be operable, with a minimum level of 75% and a minimum pressure of 275.psi in the associated storage tank, at all times when the equipment in the following areas are required to be operable:
a. Cable tray rooms
b. Cable tunnel
c. Cable vault
  • '**'"' r . * ,.'>,_ __ ... , """'** * ,.~. **** ** -,:_.-. * *,

TS 3.21-4

d. Charcoal filter banks A and B
e. Emergency diesel generator rooms, 1, 2, and 3.
2. The high pressure CO systems shall be operable, with a minimum 2

level of 90% by weight, at all times when equipment in the following areas are required to be operable:

a. Fuel oil storage tank room for emergency service water pumps
b. Emergency diesel generator fuel oil transfer pump rooms.
3. a. With one or more of the above required co 2 systems inoperaqle, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a continuous fire watch with backup fire suppression equipment for the unprotected area(s).
b. Restore the system to operable status within 14 days or prepare and submit a Special Report to the Commission pursuant to Speci-fication 6.6.4 within the next 30 days outlining the action taken, the cause of inoperability, and the plans and schedule for restoring the system to operable status.
4. The requirements of Specification 3.0.1 are not applicable.

E. Plant Halon System

1. The Halon System shall be operable, with the storage tanks having at least 95% of full charge weight and 90% of full charge pressure, at all times when equipment in the following area is required to be operable:
a. Station records storage vault.
2. a. With the Halon System inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a contin-uous fire watch with backup fire suppression equipment for the unprotected area.

e TS 3.21-5

b. Restore the system to operable status within 14 days or pre-pare and submit a Special Report to the Commission pursuant to Specification 6.6.4 within the next 30 days outlining the action taken, the cause of inoperability, and the plans and schedule for restoring the system to operable status.
3. The requirements of Specification 3.0.1 are not applicable.

F. Plant Fire Hose Stations

1. The following fire hose stations shall be operable at all times when equipment in the area is required to be operable:

LOCATION SIZE

a. Auxiliary building hose 1 1/2" Stations 37 through 51 and 41A

. b. Fuel building hose 1 1/2" Stations 52 and 53.

c. Hose stations 12, 16, 20, 21A, 1 1/2" 22, 23, 33, 34, 54, 55, 56, and 57 in Turbine Building to be used as backup to Control Room, Emergency Switchgear Room and Diesel Generator Room
2. The following fire hose stations are designed to be dry and shall be operable at all times when the main shut off valves in the auxiliary building are opened.
a. Unit 1 containment dry standpipes 1 1/2" (Hose Stations 75 through 87)
    • -*** .* ., *. *.**-*** * . * . * * . * ~ ...........~._ *- ~ - - - - ~ ~ - J * * ** -**

e TS 3.21-6

b. Unit 2 containment dry stan~pipes 1 1/2" (Hose Stations 60 through 72)
3. a. With one or more of the fire hose stations listed above inoperable, route an additional equivalent capacity fire hose to the unprotected area(s) from an operable hose station within 11 hour1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> if the inoper-able fire hose is the primary means of fire suppression; otherwise, route the additional hose within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b. Restore the fire hose station(s) to operable status within 14 days or prepare and submit a Special Report to the Commission pursuant to Specification 6.6.4 within the next 30 days outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the station to operable status.
4. The requirements of Specification 3.0.1 are not applicable.

G. Plant Fire Barrier Penetration Fire Seals

1. All fire barrier penetrations protecting safety related areas shall be functional at all times.
2. a. With one or more of the above required fire barrier penetrations non-functional, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a continuous fire watch on at least one side of the non-functional fire barrier.
b. Restore the non-functional fire barrier penetration(s) to func-tional status within 7 days or prepare and submit a Special Report to the Commission pursuant to Specification 6.6.4 within the next 30 days outlining the action taken, the cause of the non-functional penetration, and the plans and schedule for restoring the fire barrier penetration(s) to functional status.
3. The requirements of Specification 3.0.1 are not applicable.

()

e e Ts* 3.21-7 H. Yard Fire Hydrant and Hydrant Hose Houses I. The following yard fire hydrants and the associated hydrant hose houses shall be operable at all times when equipment in the area is required to be operable.

LOCATION HOSE HOUSE# HYDRANT NUMBER North of Condensate 1 l-FP-154 Polishing Building l-FP-155 l-FP-156 North of Containment #2 2 l-FP-66 Between Boron Recovery l-FP-67 Tanks and Fuel Oil l-FP-68 Storage Alleyway South of 5 l-FP-82 Containment III l-FP-83 l-FP-84 South of Main Trans- 9 l-FP-50 formers 112 Side l-FP-51 l-FP-52 East of Containment #2 Next 11 l-FP-62 To Underground Condensate l-FP-63 Tank l-FP-64 West of Containment 112 in 12 l-FP-59 Alleyway Outside HP l-FP-60 l-FP-61

2. a. With one or more of the yard fire hydrants or associated hydrant hose houses listed above inoperable, locate suffi-cient additional lengths of hose in an operable hydrant hose house to provide service to the unprotected area(s) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> if the inoperable fire hydrant or associated hydrant hose house is the primary means of fire suppression; other-wise provide the additional hose within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

TS 3.21-8

b. Restore the hydrant or hose house to operable status within 14 days or prepare and submit a Special Report to the Commission pursuant to specification 6.6.4 within the next 30 days outlining the action taken, the cause of the in-operability, and the plans and schedule for restoring the hydrant or hose house to operable status.
3. The requirements of Specification 3.0.1 are not applicable.

e TS 3.21-9 Bases Fire Detection Instrumentation Operability of the fire detection instrumentation ensures that adequate warning capability is available for the prompt detection of fires. This capability is required in order to detect and locate fires in their early stages, Prompt detection of fires will reduce the potential for damage to safety related equipment and is an integral element in the overall facility fire protection program.

In the event that a portion of the fire detection instrumentation is inoperable, the establishment of frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is returned to service.

Fire Suppression Systems The operablity of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water system, spray and/or sprinklers, co 2 , Halon, and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.

In the event that the fire suppression water systems are inoperable, immediate corrective measures must be taken since this system provides the major fire suppression capability of the plant. The requirement

e TS 3.21-10 for a twenty-four hour report to the Commission provides for prompt evaluation of the acceptability of the corrective measures to provide adequate fire suppression capability for the continued protection of the nuclear plant.

Fire Barrier Penetration Seals The functional integrity of the fire barrier penetration seals ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility. This design feature minimizes the pos-sibility of a single fire rapidly involving several areas of the facility prior to detection and extinguishment. The fire barrier penetration seals are a passive element in the facility fire protection program and are sub-ject to periodic inspections ..

During periods of time when the seals are not functional, a continuous fire watch is required to be maintained in the vicinity of the affected seal until the seal is restored to functional status

  • e TS *3.21-11 TABLE 3.21-1 FIRE DETECTION INSTRUMENTS INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE Heat Smoke
1. Containment (Reactor Coolant Pumps Only)*** 1 per RCP
  • 2. Cable Tray Room 3 4
  • 3. Cable Tunnel 2 3
4. Cable Vault Area
  • Lower Area 1 2 Upper Area 1 1
  • 5. Charcoal Filter Banks 1 per bank
  • 7. Fuel Oil Tank Room (river) l** 1
  • 8. Fuel Oil Transfer Pump Houses 1 per house**
    • Rate of rise actuation devices for high pressure CO system 2
      • One heat detector installed per pump. RCP pump bearing and motor temperature will be monitored once per hour if the RCP heat detector is inoperable *

,* i,,~ * *-

.. . . -* - ... ~.. ... .. - .

  • TS 4.18-1 4.18 FIRE DETECTION AND PROTECTION SYSTEM SURVEILLANCE Applicability Applies to periodic testing and surveillance of the Fire Protection System.

Objective To verify that the fire protection system will respond promptly and properly when required.

)

Specification Tests and Frequency A. Fire Detection and Instrumentation

1. Each of the fire detection instruments listed in Table 3.21-1 shall be demonstrated operable at least once per 6 months by a channel functional test.
2. The circuitry associated with the detector alarms shall be demonstrated operable at least once per 6 months for all NEPA Code 72D Class A supervised circuits.
3. The non-supervised c~rcuits between the local panels in Specification 4.18.A.2 and the control room shall be demonstrated operable at least once per 31 days.
  • TS 4.18-2 B. Plant Fire Suppression Water System
1. The Fire Suppression Water system shall be demonstrated operable:
a. At least once per 7 days by verifying the water supply volume.
b. At least once per 31 days on a staggered test basis by starting each pump and operating it for at least 15 minutes on recircula-tion flow.
c. At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path is in its correct position.
d. At least once per 6 months by performance of a system flush.
e. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.
f. At least once per 18 months:

(1) By performing a system functional test which includes simu-lated automatic actuation of the system throughout its operating sequence and verifying that each automatic valve in the flow path actuates to its correct position, and (2) By verifying that each pump develops a flow equal to or greater than 2500 gpm at a Total Dynamic Head of 231 feet, and (3) By verifying that each high pressure pump starts (sequen-tially) to maintain the fire suppression water system pressure equal to or greater than 90 psig.

g. At least once per 3 years by performing a flow test of the system in accordance with Chapter 5, Section 11 of Fire Protection Hand-book, 14th Edition published by National Fire Protection Associa-tion.

2.

e The fire pump diesel engine shall be demonstrated operable:

  • TS 4.18-3
a. At least once per 31 days by verifying:

(1) The fuel storage tank contains at least 220 gallons of fuel, and (2) The diesel starts from ambient conditions and operates for at least 30 minutes on recirculation flow.

b. At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within the acceptable limits.

specified in Table 1 of ASTM-D975-74 when checked for viscosity, water, and sediment.

c. At least once per 18 months, during shutdown, by subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for the class of service.
3. The fire pump diesel starting 24-volt battery bank and charger shall be demonstrated operable:
a. At least once per 7 days by verifying that:

(1) The electrolyte level of each battery is above the plates, and (2) The overall battery voltage is greater than or equal to 24 volts.

b. At least once per 92 days by verifying that the specific gravity is appropriate for continued service of the battery.
c. At least once per 18 months by verifying that:

(1) The batteries, cell plates, and battery racks show no visual indication of physical damage or abnormal deterioration, and

  • -.. *-* . ~ *" *- -- ._ *., *..* *.** --~~-r...- "' oo ... *
  • _.,.. -

(2) The battery-to-battery and terminal connections are clean,

  • TS 4.18-4 tight, and free of corrosion and coated with anti-corrosion material.
c. Plant Spray and/or Sprinkler Systems
1. The spray and sprinkler systems shall be demonstrated operable:
a. At least once per 31 days by verifying that each*valve (manual, power operated or automatic) in the flow path is in its correct position.
b. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.
c. At least once per 18 months:

(1) By a visual inspection of the dry pipe spray and sprinkler headers to verify their integrity, and (2) By a visual inspection of each nozzle's spray pattern to verify the spray pattern is not obstructed.

d. At least once per 3 years by performing an air flow test through each open head spray/sprinkler and verifying each open head spray/sprinkler nozzle is unobstructed.

D. Plant CO 2

Systems

1. The low pressure CO system shall be demonstrated operable:

2

a. At least once per 7 days by verifying each CO storage tank level 2

and pressure.

b. At least once per 18 months:

(1) By verifying the system valves and associated ventilation dampers and fire doors actuate manually and automatically to a simulated actuation signal, and (2) By verifying flow from each nozzle during a "Puff Test".

  • V . -, . ,._ * ,*."' .- - * - ........ * * * . - * * : - .... - ...... ',i-**,

TS 4.18-5

2. The high pressure co 2 sytem shall be demonstrated operable:
a. At least once per 6 months by verifying CO cylinder 2

weight.

b. At least once per 18 months by:

(1) Verifying the system, including associated ventilation dampers and fire doors, actuates manually.and automati-cally upon receipt of a simulated actuation signal, and (2) Performance of a flow test through headers and nozzles to assure no blockage.

E. Plant Halon Systems

1. The Halon system shall be demonstrated operable:
a. At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path is in its correct posit.ion.
b. At least once per 6 months by verifying each Halon storage tank weight and pressure.
c. At least once per 18 month by:

(1) Verifying the system actuates automatically to a simulated actuation signal, and (2) Performance of a flow test through headers and nozzles to assure no blockage, and (3) Verifying the operability of the manual initiating system.

F. Plant Fire Hose Station

l. Each fire hose station shall be verified operable:
a. At least once per 31 days by visual inspection of the fire hose:

station to assure all equipment is available.

ti TS 4 .18-6

b. At least once per 18 months by removing the hose for inspection and re-racking, and inspecting all gaskets and replacing any degraded gaskets in the couplings.
c. At least once per 3 years by:

(1) Partially open each hose station valve to verify valve operability and no flow blockage, and (2) Conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at that hose station.

2. Each containment hose station shall be verified operable:
a. By a visual inspection during each outage of duration greater than 7 days.
b. At least once per refueling cycle by removing the hose for inspection and reracking, and inspecting all gaskets and replacing any degraded gaskets in the couplings.
c. At least once every other refueling by partially opening each hose station valve to verify valve operability and no flow block-age, and conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at that hose station.

G. Plant Fire Barriers Penetration Fire Seals

1. Fire barrier penetrations shall be v~rified to be functional:
a. At least once per 18 months by a visual inspection.
b. Prior to returning a fire barrier penetration to functional status following repairs or maintenance by performance of a visual inspection of the affected fire barrier penetration(s) *
  • -*--,**-*-----. ** - -*** .,,.. . . . . 'k:____:_"

e 2.

Ja.J

  • TS 4.18-7 Penetration fire barriers that perform a pressure sealing function shall be verified to be functional by performance of a local leakage test prior to declaring a penetration fire barrier functional follow-ing repafrs or maintenance.

H. Yard Fire Hydrant and Hydrant Hose Houses.

1. Each yard fire hydrant and associated hydrant hose house shall be verified operable:
a. At least once per 31 days by visual inspection of the hydrant hose house to assure all equipment is available.
b. At least once per 18 months by visually inspecting each yard fire hydrant and verifying ~hat the hydrant is not damaged.
c. At least once per 3 years by:

(1) Conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at any yard fire hydrant.

(2) Inspecting all the gaskets and replacing any degraded gaskets in the couplings.

(3) Performing a flow check of each hydrant to verify its operability.