ML060230014: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/07/2005
| issue date = 11/07/2005
| title = NRC Comments to the Operating Test and Written Examination (ES-401-9) for the Point Beach Initial Examination - November 2005
| title = NRC Comments to the Operating Test and Written Examination (ES-401-9) for the Point Beach Initial Examination - November 2005
| author name = Walton R K
| author name = Walton R
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:NRC COMMENTS TO THE OPERATING TEST AND WRITTEN EXAMINATION (ES-401-9) FOR THE POINT BEACH INITIAL EXAMINATION - NOVEMBER 2005 Comments on Point Beach JPM's JPM P015.005A: Admin JPM (Both) Step 1 : Have candidate determine reactor power, don't spoon feed him. RE: delete reference to power in Cue. Steps 2, 3, &4: Delete, "if administering in simulator" since JPM will be administered in simulator.
{{#Wiki_filter:NRC COMMENTS TO THE OPERATING TEST AND WRITTEN EXAMINATION (ES-401-9)
RE: will delete references to simulator.
FOR THE POINT BEACH INITIAL EXAMINATION - NOVEMBER 2005
Step 10: Why is there a range of correct power reduction?
 
RE: Due to error/tolerances from reading gages.
Comments on Point Beach JPMs JPM P015.005A: Admin JPM (Both)
24 - 30 % calculated power acceptable range.
Step 1: Have candidate determine reactor power, dont spoon feed him. RE: delete reference to power in Cue.
Steps 2, 3, &4: Delete, if administering in simulator since JPM will be administered in simulator. RE: will delete references to simulator.
Step 10: Why is there a range of correct power reduction? RE: Due to error/tolerances from reading gages. 24 - 30 % calculated power acceptable range.
JPM POO1.001: Admin JPM (both)
JPM POO1.001: Admin JPM (both)
Steps 3, 4, & 5: Evaluator note contradicts with examiner cue!!! Equipment in these steps will be manipulated! RE: Will add "unless authorized to evaluator note.
Steps 3, 4, & 5: Evaluator note contradicts with examiner cue!!! Equipment in these steps will be manipulated! RE: Will add unless authorized to evaluator note.
Step 3: Blender Operations.
Step 3: Blender Operations. Need to establish an acceptable range of water and/or acid settings. RE: will include acceptable range.
Need to establish an acceptable range of water and/or acid settings.
JPM P015.004: Admin JPM (both)
RE: will include acceptable range. JPM P015.004: Admin JPM (both) NOTE: During onsite validation, examiners identified a faulty Operator Select switch on N31. Needs to be repaired prior to exam day. RE: Simulator staff will repair switch or exercise as necessary to guarantee correct operation.
NOTE: During onsite validation, examiners identified a faulty Operator Select switch on N31. Needs to be repaired prior to exam day. RE: Simulator staff will repair switch or exercise as necessary to guarantee correct operation.
JPM P088.008: Admin JPM (RO) N0TE:Why is it necessary to say wind direction is from the North, (towards Two Creeks)??
JPM P088.008: Admin JPM (RO)
RE: Will delete "towards Two Creeks." JPM POOO.011: Admin JPM (SRO) Gaseous Waste Discharge Permit attached to JPM has lineout of 1.35E-05 and replaced with "yesterday." Appears to be an incorrect lineout! RE: No, this is a known longstanding chemistry workaround since they have been having problems with their computer output. lssue has been provided to RP inspectors for review. Licensee documented this issue on CR. JPM P028.001a: Admin JPM (SRO) Licensee questioned the supporting regulations behind 15 minutes to classify and 15 minutes to notify. RE: 15 minutes to classify the event is rooted in regulations via NUREG 99-02, Performance indicators.
N0TE:Why is it necessary to say wind direction is from the North, (towards Two Creeks)?? RE: Will delete towards Two Creeks.
15 minutes to notify is rooted in regulations via NUREG 0654 and the licensee's EP plan which is specified in the operating license. Will change cover sheet to reflect time critical evolution. Will change cue sheets to add, 'This JPM is time critical."
JPM POOO.011: Admin JPM (SRO)
JPM POOl.020: Simulator JPM None JPM P004.013:
Gaseous Waste Discharge Permit attached to JPM has lineout of 1.35E-05 and replaced with yesterday. Appears to be an incorrect lineout! RE: No, this is a known longstanding chemistry workaround since they have been having problems with their computer output. lssue has been provided to RP inspectors for review. Licensee documented this issue on CR.
Simulator JPM Step 4: Why isn't this step critical?
JPM P028.001a: Admin JPM (SRO)
You need cooling water to excess UD Hx. RE: Not a critical step since valve is already open!
Licensee questioned the supporting regulations behind 15 minutes to classify and 15 minutes to notify. RE: 15 minutes to classify the event is rooted in regulations via NUREG 99-02, Performance indicators. 15 minutes to notify is rooted in regulations via NUREG 0654 and the licensees EP plan which is specified in the operating license.
Step 10: How is the RCDT level determined? Computer point, PAB A0 call? RE: PAB A0 will call CR with level reading. How much will PZR & VCT level drop due to this diversion?
Will change cover sheet to reflect time critical evolution. Will change cue sheets to add, This JPM is time critical.
RE: The level change is small - not an issue! Step 18: Charging flow allowed to continue?
JPM POOl.020: Simulator JPM None JPM P004.013: Simulator JPM Step 4: Why isnt this step critical? You need cooling water to excess UD Hx. RE: Not a critical step since valve is already open!
Why not isolate? RE: Charging flow is dialed down to minimum. JPM PO10.010: Simulator JPM Step 10: Why not have 1 PT-420 failed high prior to placing RC-430 LTOP key to ON? This would tell if the operator really knows what he is doing or just following a procedure.
Step 10: How is the RCDT level determined? Computer point, PAB A 0 call? RE: PAB A 0 will call CR with level reading. How much will PZR & VCT level drop due to this diversion? RE: The level change is small - not an issue!
Discrimination.
Step 18: Charging flow allowed to continue? Why not isolate? RE: Charging flow is
RE: Good idea, but if operator sees failed PT, operator may not perform JPM. Step 11: How long will it take from the time the PORV opens until the  
 
#I RCP seal DP Step 11: Need to add step from Conduct of Operations Manual that directs operator to take manual control when auto control fails. RE: Done Low Alarm annunciates (the failure criteria)?
dialed down to minimum.
RE: Timed at 55 seconds. JPM P000.028:
JPM PO10.010: Simulator JPM Step 10: Why not have 1PT-420 failed high prior to placing RC-430 LTOP key to ON?
Step 6: If candidates performs steps 17 and 18 of CSP-H.1, these steps would be incorrect. The candidate should proceed to step 19 (correct) and not perform steps 17  
This would tell if the operator really knows what he is doing or just following a procedure. Discrimination. RE: Good idea, but if operator sees failed PT, operator may not perform JPM.
& 18. However, in either case, the candidate will still perform step 19 of CSP-H.1. The difference is that RCS pressure would be unnecessarily reduced to 4765 psig had the candidate performed the incorrect steps.
Step 11: How long will it take from the time the PORV opens until the #I RCP seal DP Low Alarm annunciates (the failure criteria)? RE: Timed at 55 seconds.
Step 11: Need to add step from Conduct of Operations Manual that directs operator to take manual control when auto control fails. RE: Done JPM P000.028:
Step 6: If candidates performs steps 17 and 18 of CSP-H.1, these steps would be incorrect. The candidate should proceed to step 19 (correct) and not perform steps 17
      & 18. However, in either case, the candidate will still perform step 19 of CSP-H.1. The difference is that RCS pressure would be unnecessarily reduced to 4 7 6 5 psig had the candidate performed the incorrect steps.


== Conclusion:==
== Conclusion:==
This would warrant a comment for procedure adherence/panel monitoring but since there is no adverse consequence, this would not be a criteria for failure. Step 19: Add evaluator due to open breaker for SGFP discharge valves when valves fully open.
This would warrant a comment for procedure adherence/panel monitoring but since there is no adverse consequence, this would not be a criteria for failure.
RE: Done Step 20: No consideration as to whether SG is hot & dry prior to feed flow re-initiation.
Step 19: Add evaluator due to open breaker for SGFP discharge valves when valves fully open. RE: Done Step 20: No consideration as to whether SG is hot & dry prior to feed flow re-initiation.
Procedure doesn't even check it. Why? Has an evaluation been done that says it is not a problem to put cold water into a hotldry SG? RE: Yes, this has been evaluated per EOP Revision IC - OK to feed hot dry SG. Step 23: Not sure why this is a critical step?
Procedure doesnt even check it. Why? Has an evaluation been done that says it is not a problem to put cold water into a hotldry SG? RE: Yes, this has been evaluated per EOP Revision IC - OK to feed hot dry SG.
If flow path is established and a pump is running and S/G is depressurized level will be stable or increasing. Action is met with no effort.
Step 23: Not sure why this is a critical step? If flow path is established and a pump is running and S/G is depressurized level will be stable or increasing. Action is met with no effort. RE: This is why step 22 is not critical. But need to have applicant complete step 23 to ensure JPM is completed.
RE: This is why step 22 is not critical.
But need to have applicant complete step 23 to ensure JPM is completed.
JPM P026.002:
JPM P026.002:
Step 4: Why open the valve first then start the CS pump? Isn't there a concern with during SI actuation.
Step 4: Why open the valve first then start the CS pump? Isnt there a concern with water hammer conditions? RE: This is the sequence used for automatic pump start during SI actuation.
Step 6: Is there a minimum NaOH flow rate? Should valve be full open?
Step 6: Is there a minimum NaOH flow rate? Should valve be full open? RE: There is no minimum f/ow rate, valve is selected to full open. Flow rate is established by use af a preset throttle valve.
RE: There is no minimum f/ow rate, valve is selected to full open. Flow rate is established by use af a preset throttle valve. water hammer conditions?
JPM P062.013:
RE: This is the sequence used for automatic pump start JPM P062.013:
No comments.
No comments.
JPM PO1 5.01 1 : Step 4 & 6: Step 4: Why is it that the gain pot can be adjusted even though if it is locked in position?
JPM PO15.01 1:
Step 4 & 6:     Is gain pot really on drawer B? RE: Yes Step 4: Why is it that the gain pot can be adjusted even though if it is locked in position?
Sounds like a degraded condition in need of maintenance!
Sounds like a degraded condition in need of maintenance!
Attachment A: Why are N42, N43, & N44 marked MA? The Examinee should mark these N/A if he or she see fit. RE: JPM requires only that Nl channel N41 be aqusted! Is gain pot really on drawer "B?" RE: Yes JPM POOO.015: Cue Sheet:
Attachment A: Why are N42, N43, & N44 marked MA? The Examinee should mark these N/A if he or she see fit. RE: JPM requires only that Nl channel N41 be aqusted!
Why is it necessary to give candidate procedure to use? Shouldn't they demonstrate that they know how to get procedure?
 
RE: Candidate should demonstrate to examiner that he knows where to locate procedures.
JPM POOO.015:
Must be done during an early JPM. Once demonstrated, need not be repeated. Step 7: We should not direct Examinee to NOT enter a procedure.
Cue Sheet: Why is it necessary to give candidate procedure to use? Shouldnt they demonstrate that they know how to get procedure? RE: Candidate should demonstrate to examiner that he knows where to locate procedures. Must be done during an early JPM. Once demonstrated, need not be repeated.
During a real situation he needs to be able to decide which procedure to be in. RE: Cue will reflect that another operator will perform Attachment A. In-Plant JPMS: JPM P000.036b:
Step 7: We should not direct Examinee to NOT enter a procedure. During a real situation he needs to be able to decide which procedure to be in. RE: Cue will reflect that another operator will perform Attachment A.
Step 3: Delete asterisk from Critical attribute and state, "pump is found running."
In-Plant JPMS:
Delete, "If pump found off ..." RE: Incorporated.
JPM P000.036b:
Step 8: Which way will 2CV-361A be throttled to obtain 47psig?
Step 3: Delete asterisk from Critical attribute and state, pump is found running.
I assume open. RE: Correct! Added comment to step 8. JPM P000.039:
Delete, If pump found off ... RE: Incorporated.
Step 16: Ensure candidate operates the governor control switch to change frequency and not the voltage regulator switch! Ensure candidate looks at proper indications!
Step 8: Which way will 2CV-361A be throttled to obtain 47psig? I assume open. RE:
RE: Will change cue sheet such that after EDG starts, that frequency will be at 61 hz. This will necessitate candidate to adjust frequency.
Correct! Added comment to step 8.
JPM P008.003: Cue Sheet:
JPM P000.039:
Is it possible to observe a tube side through-wall leak? RE: No! Will change to a shell side leak.
Step 16: Ensure candidate operates the governor control switch to change frequency and not the voltage regulator switch! Ensure candidate looks at proper indications! RE:
Scenario Comments Scenario #I : Event #I: BOP should not receive credit as an instrument failure for this event since there is no diagnosis of the event. RE: Will change D-7 sheet to reflect that BOP will receive credit for Normal for tripping bistables.
Will change cue sheet such that after EDG starts, that frequency will be at 61 hz. This will necessitate candidate to adjust frequency.
Event #I, Page 3 of 5: Why have SRO turnover command and control? Why not let SRO remain in CR and have surrogate perform behind panel manipulations?
JPM P008.003:
OR, if surrogate takes command/control, ensure no changes to plant conditions for time SRO is gone! RE: Will ensure no changes to plant for time SRO is gone. Surrogate will act for SRO during his short absence. Event #3: Does MFP temperature increase gradually or quickly. For example, if it increases slowly, will operators note increase in MFP bearing temperature during initial walkdown of simulator prior to taking watch?
Cue Sheet: Is it possible to observe a tube side through-wall leak? RE: No! Will change to a shell side leak.
RE: Slow ramp, won't be seen during initial setup/walkdown of simulator.
 
Event #3: We do not want the main feed pump to trip before the power reduction. This is necessary to ensure we get a reactivity change. RE: True! MFP won't trip. Event #4/5:
Scenario Comments Scenario #I :
Page 5, Verify RCS temperature control. Temperature should be low due to feedwater line break. What actions are required for this step? RE: RCS temperature control is a continuous action step. Page 7: Scenario does not appear to go ;'oo far into the EOPs. Scenario is stopped prior to SI termination.
Event #I: BOP should not receive credit as an instrument failure for this event since there is no diagnosis of the event. RE: Will change D-7 sheet to reflect that BOP will receive credit for Normal for tripping bistables.
See if there is any value in continuing the scenario into EOP 1, Loss of Reactor or Secondary Coolant.
Event # I , Page 3 of 5: Why have SRO turnover command and control? Why not let SRO remain in CR and have surrogate perform behind panel manipulations? OR, if surrogate takes command/control, ensure no changes to plant conditions for time SRO is gone! RE: Will ensure no changes to plant for time SRO is gone. Surrogate will act for SRO during his short absence.
RE: Add EOP 7.7 steps up to step 72. We will evaluate into EOP 7.7. Scenario #2: Event #2: Which trip bistable(s) can be removed that would cause a Rx Trip? They should be specified in Applicants Action column on page 3 of 4! RE: SRO has already demonsfrated ability to remove control power fuses during previous scenario.
Event #3: Does MFP temperature increase gradually or quickly. For example, if it increases slowly, will operators note increase in MFP bearing temperature during initial walkdown of simulator prior to taking watch? RE: Slow ramp, wont be seen during initial setup/walkdown of simulator.
Can't remove bistables during this scenario since it will cause a reactor trip. SRO should not leave control room to pull fuses - will follow TS requirement to shutdown instead. Event #3: Do actions in AOP-24, "Response to Instrument Malfunctions," allow the BOP to place the FWRV back in AUTO? If not, then BOP will be 'attached' to the panel for the rest of the scenario (until the major). RE: The FWRV will not be placed back into AUTO. Operator will need to monitor SGWL until major event is put in - next step. Events #4, 5 , 6, 7: (Page 5 of 13): Is an auto trip of the RCP plausible? The crew should trip the affected RCP rather than the RCP auto trip. RE: During onsite validation, crew tripped RCP prior to auto trip. (Page 10 of 13): Evaluate continuing scenario until after cooldown/depressurization has been initiated per EOP 1.2. RE: Examiners will determine if enough crew has had enough material to be evaluated on.
Event #3: We do not want the main feed pump to trip before the power reduction. This is necessary to ensure we get a reactivity change. RE: True! MFP wont trip.
Scenario #3 Event #2: I assume that the SRO will remain in the controls area for removing of fuses. RE: SRO will turnover watch to surrogate, exit CR to supervise evolution, then return.
Event #4/5: Page 5, Verify RCS temperature control. Temperature should be low due to feedwater line break. What actions are required for this step? RE: RCS temperature control is a continuous action step.
No events will happen while SRO is outside CR. Event #3: Determine if the BOP operates any equipment during this event! The way this event is written, it sounds like the BOP could just watch and do nothing in response to this event. RE: BOP has to start standby fans in sequence.
Page 7: Scenario does not appear to go ;oo far into the EOPs. Scenario is stopped prior to SI termination. See if there is any value in continuing the scenario into EOP 1, Loss of Reactor or Secondary Coolant. RE: Add EOP 7 . 7 steps up to step 72. We will evaluate into EOP 7.7.
Event #4: I don't believe there are sufficient actionslmanipulations for the RO and BOP to do during this event. I suggest that the EDG start and NOT load onto the bus. This will allow the BOP operator to perform an action - close the breaker. We will need to delete 'ALL' from the D-1 sheet and replace it with a  
Scenario #2:
'BOP - C designator.
Event #2: Which trip bistable(s) can be removed that would cause a Rx Trip? They should be specified in Applicants Action column on page 3 of 4! RE: SRO has already demonsfrated ability to remove control power fuses during previous scenario. Cant remove bistables during this scenario since it will cause a reactor trip. SRO should not leave control room to pull fuses - will follow TS requirement to shutdown instead.
We will need to add an additional event for the RO to ensure we meet our bean count!
Event #3: Do actions in AOP-24, Response to Instrument Malfunctions, allow the BOP to place the FWRV back in AUTO? If not, then BOP will be attached to the panel for the rest of the scenario (until the major). RE: The FWRV will not be placed back into AUTO. Operator will need to monitor SGWL until major event is put in - next step.
RE: BOP must realign pumps/valves for blender operations on the back panel. RO must reposition switch and aaust charging flow. Its minimal - but evaluatable!!
Events #4, 5 , 6,7: (Page 5 of 13): Is an auto trip of the RCP plausible? The crew should trip the affected RCP rather than the RCP auto trip. RE: During onsite validation, crew tripped RCP prior to auto trip.
Event #5, D-1 sheet: Remove  
(Page 10 of 13): Evaluate continuing scenario until after cooldown/depressurization has been initiated per EOP 1.2. RE: Examiners will determine i f enough crew has had enough material to be evaluated on.
'GO3 fails to start' and add to Event 4. Need to add some failure to Event #5. Perhaps containment isolation valves fail to close (see page 2 of 9). RE: Simulator scenario ran fine as written. Don't make this change. Event 5, 6, Page 9 of 9: Why is emergency boration a critical step? Don't you have to wait till cooldown?
 
RE: It is required to initiate boration due to two stuck rods prior to exiting EOP 0.1.
Scenario #3 Event #2: I assume that the SRO will remain in the controls area for removing of fuses.
Scenario 4 This scenario does not have enough component/instrument failure events for the RO! This scenario does not have any TS calls for SRO - must ensure that all SRO beans for TS have been met prior to running this scenario on SRO candidates!
RE: SRO will turnover watch to surrogate, exit CR to supervise evolution, then return.
Event #2: The D-1 sheet has this event as a reactivity change for the RO position. Need to verify that the RO changes power during this event. Otherwise, need to put in reactivity change and change D-1 sheet. RE: We did not believe that the RO did anything in this position to warrant a credit for reactivity change.
No events will happen while SRO is outside CR.
If this spare scenario is used, we will need to add a bean for reactivity change. Similarly, the D-1 sheet has Event 2 as BOP action.
Event #3: Determine if the BOP operates any equipment during this event! The way this event is written, it sounds like the BOP could just watch and do nothing in response to this event. RE: BOP has to start standby fans in sequence.
Need to verify BOP has actions for this event to ensure we meet our bean count! RE: BOP had some actions on the panels associated with main feedwater.
Event #4: I dont believe there are sufficient actionslmanipulations for the RO and BOP to do during this event. I suggest that the EDG start and NOT load onto the bus. This will allow the BOP operator to perform an action - close the breaker. We will need to delete ALL from the D-1 sheet and replace it with a BOP - C designator. We will need to add an additional event for the RO to ensure we meet our bean count! RE: BOP must realign pumps/valves for blender operations on the back panel. RO must reposition switch and aaust charging flow. Its minimal - but evaluatable!!
Events 3, 4, & 5, Page 4 of 12: Will 'A' SG FWP trip during performance of Attachment A? It shouldn't so they have to deal with a faulted SG and an overfeed condition.
Event #5, D-1 sheet: Remove GO3 fails to start and add to Event 4. Need to add some failure to Event #5. Perhaps containment isolation valves fail to close (see page 2 of 9).
RE: Both SGFWPs will be tripped /A W Attachment A of EOP-0. Events 3, 4, & 5, Page 6 of 12: Can't control RCS temperature if both SG's are faulted!
RE: Simulator scenario ran fine as written. Dont make this change.
Event 5, 6 , Page 9 of 9: Why is emergency boration a critical step? Dont you have to wait till cooldown? RE: It is required to initiate boration due to two stuck rods prior to exiting EOP 0.1.
Scenario 4 This scenario does not have enough component/instrument failure events for the RO!
This scenario does not have any TS calls for SRO - must ensure that all SRO beans for TS have been met prior to running this scenario on SRO candidates!
Event #2: The D-1 sheet has this event as a reactivity change for the RO position. Need to verify that the RO changes power during this event. Otherwise, need to put in reactivity change and change D-1 sheet. RE: We did not believe that the RO did anything in this position to warrant a credit for reactivity change. If this spare scenario is used, we will need to add a bean for reactivity change.
Similarly, the D-1 sheet has Event 2 as BOP action. Need to verify BOP has actions for this event to ensure we meet our bean count! RE: BOP had some actions on the panels associated with main feedwater.
Events 3, 4, & 5, Page 4 of 12: Will ASG FWP trip during performance of Attachment A? It shouldnt so they have to deal with a faulted SG and an overfeed condition. RE:
Both SGFWPs will be tripped /AW Attachment A of EOP-0.
Events 3, 4, & 5, Page 6 of 12: Cant control RCS temperature if both SGs are faulted!
RE: True, there is a continuous action step to verify RCS temperature control. This is accomplished by restricting FW flow to SGs.
RE: True, there is a continuous action step to verify RCS temperature control. This is accomplished by restricting FW flow to SGs.
Events 3, 4, & 5, Page 7 of 12: Will MFP be tripped before step on top of pg 7? If not, will they be able to locally shut the FRV or Isolation valves? Is this possible with MFP running and generating such a high d/p? RE: Operators will be able to close the MFP discharge isolation valves with a high dp. Events 3, 4, & 5, Page 7 of 12: "Control Feed flow to minimize cooldown." Will there be a transition to FR-P.1 at this step?
 
If not, why not? RE: No, there will be no transition to FR-P. 1 due to the procedure sending you back to EOP-1, Loss of Secondary Coolant.
Events 3, 4, & 5, Page 7 of 12: Will MFP be tripped before step on top of pg 7? If not, will they be able to locally shut the FRV or Isolation valves? Is this possible with MFP running and generating such a high d/p? RE: Operators will be able to close the MFP discharge isolation valves with a high d p .
ES-401 Written Examination Form ES-401-9 Review Worksheet  
Events 3, 4, & 5, Page 7 of 12: Control Feed flow to minimize cooldown. Will there be a transition to FR-P.1 at this step? If not, why not? RE: No, there will be no transition to FR-P. 1 due to the procedure sending you back to EOP-1, Loss of Secondary Coolant.
: 1. 2. 3# LOK LOD (FIH) (1-5) 3. Psychometric Flaws  
 
: 4. Job Content Flaws 5. Other 6. 7. Stem Cues T/F Cred. Partial Job- Minutia #/ Eack- Q= SRO UIUS Explanation Focus Dist. Link units ward WA Only 3. Check the appropriate box if a psychometric flaw is identified: The stem lacks sufficient locus to elicit the correct answer (e.9.. unclear intent, more information is needed, or too much needless i The stem or distractors contain cues Ke.. clues.
ES-401                                                                         Written Examination                                                               Form ES-401-9 Review Worksheet
sDecific determiners.
: 1. 2.         3.Psychometric Flaws                 4. Job Content Flaws         5. Other     6.                                         7.
Dhrasina.
3#  LOK    LOD (FIH)  (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Eack- Q= SRO U I U S                                                          Explanation Focus                 Dist.           Link           units ward WA Only 7  F      3                                                                                        S 8  H      3                                                                                        E    TRM 2.11.3: Applicability: Mode 1. Suggest adding .."Rx is in Mode 1" RE: Added mode 1 to initial wndlions.
lenoth. etd. 10 rmr 7F3 S 8H3 E TRM 2.11.3: Applicability:
9  F      3                                                                                        S 10  F      3                                                                                        S
Mode 1. Suggest adding
: 3. Check the appropriate box if a psychometric flaw is identified:
.."Rx is in Mode 1" RE: Added mode 1 to initial wndlions.
The stem lacks sufficient locus to elicit the correct answer (e.9.. unclear intent, more information is needed, or too much needless i rmr The stem or distractors contain cues Ke.. clues. sDecific determiners. Dhrasina.   - lenoth.
9F3 S F 3 S -.~-. , The answer choices are a collection of urirelald tiueIfalse statements:
                                                                                                      . ~ - etd.
The answer choices are a collection of urirelald tiueIfalse statements:
More than one distractor is not credible.
More than one distractor is not credible.
One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem). Check the appropriate box if a job content error is identified:
One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
The question is not linked to the job requirements (i.e., the question has a valid WA but, as written, is not operational in content). The question requires the recall of knowledge that is tca specific for the closed reference test mode (i.e., it is not required to be known from memory). The question contains data with an unrealistic level of accuracy or inconsistent units (e.9.. panel meter in percent with question in gallons). The question requires reverse logic or application compared to the job requirements.  
: 4. Check the appropriate box if a job content error is identified:
: 4. 5. 6. 7. Check Questions that are samoled for conformance with the approved WA and those that are desimted SRO-only (WA and license level mismatches are unacceptable)
The question is not linked to the job requirements (i.e., the question has a valid WA but, as written, is not operational in content).
Based on the reviewer's judgment. is the question as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory? At a minimum, explain any "U" ratings (e.g., how the Appendix B psychometric attributes are not being met).
The question requires the recall of knowledge that is tca specific for the closed reference test mode (i.e., it is not required to be known from memory).
ES-401 2 Form ES-401-9 ES-401 3 Form ES-401-9 1. 2. 3. Psychometric Flaws I 4. Job Content Flaws I 5. Other I 6. 1 7.
The question contains data with an unrealistic level of accuracy or inconsistent units (e.9.. panel meter in percent with question in gallons).
4 Form ES-401-9 ES-401 I ES-401 5 Form ES-401-9 4. Job Content Flaws ob- Minutia #/ Back- ink units ward 64 H 65 F 66 H 67 H 68 H 69 F 70 H 71 F 72 H 73 H 74 F 75 H 5. Other 6. 7. c)= SRO U/E/S Evlanation WA Only U Must add ONLY to A distractor since A also correct!
The question requires reverse logic or application compared to the job requirements.
RE: In lieu of adding 'only,' added 'complete.'
: 5. Check Questionsthat are samoled for conformance with the approved WA and those that are d e s i m t e d SRO-only (WA and license level mismatches are unacceptable)
s U X 10CFR55.43, SRO only question reference.
: 6. Based on the reviewer's judgment. is the question as written (U)nacceptable(requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
Delete TS reference in stem of Q: RE: " ... require notification of SRO that leak rate limits have been exceeded." Also, need to provide different reference that provides acceptance criteria.
: 7. At a minimum, explain any "U" ratings (e.g., how the Appendix B psychometric attributes are not being met).
Surveillance test? CR logs? RE: Provided lesson plan as reference.
 
S s ES-401 6 Form ES-401-9 U/E/S 6. I 7. Explanation E Distractors A, B & C must be followed by 'ONLY." See 13. RE: Added 'only' to A B aC distractors. Change procedure references in distractors.
ES-401 2 Form ES-401-9 ES-401                                                       3               Form ES-401-9
RE: Keep procedures as is due lo size of leaklprocedural reference.
: 1. 2. 3. Psychometric Flaws I 4. Job Content Flaws I 5 . Other I 6. 1 7.
SI II ~~ ~~ Why IS U1 BOP performing An A of EOP-0 if a trip RE: Comment withdrawn.
 
U1 BOP mav assist U2 durino U2 trio. In lieu of adding ANDs and ONLYs to distractors. highlight COMPLETE in stem. RE: Highlighted 'complete' in stem. During Branch Chief review, this question, with TS 3.7.3 provided, was determined to be a direct look UP question.
ES-401 4 Form ES-401-9 I
Due to late identification. question was left as is.
 
ES-401 7 Form ES-401-9 Explanation The following were the 30 exam questions initially reviewed: Questions 5 - IO, 20 - 25,40 - 45,55 - 60,70 - 75, SRO questions 10 - 15. Included in the review of these sample questions, the chief examiner also reviewed references for why the correct distractor was correct and why the incorrect distractors were incorrect.
ES-401                           5                                                               Form ES-401-9
In addition, all questions received a WA review/conformance with ES-402 outline. This sample generated 10 comments.}}
: 4. Job Content Flaws 5.Other 6.                                      7.
ob- Minutia #/ Back- c)= SRO U/E/S                                 Evlanation ink          units ward WA Only 64  H                                U Must add ONLY to A distractor since A also correct! RE: In lieu of adding 'only,' added 'complete.'
65  F                                s 66  H                              X  U 10CFR55.43,SRO only question reference. Delete TS reference in stem of Q: RE: " ...require notification of SRO that leak rate limits have been exceeded."
Also, need to provide different reference that provides acceptance criteria. Surveillance test? CR logs? RE: Provided lesson plan as reference.
67  H                                S 68  H                                s 69  F 70  H 71  F 72  H 73  H 74  F 75  H
 
ES-401 6                                                               Form ES-401-9 6.
U/E/S I                                   7.
Explanation E   Distractors A, B & C must be followed by 'ONLY." See 13. RE: Added
                'only' to A B aC distractors.
Change procedure references in distractors. RE: Keep procedures as is due lo size of leaklproceduralreference.
S I                                                                              II
                                    ~~               ~~
Why IS U1 BOP performingAn A of EOP-0 if a trip RE: Comment withdrawn. U1 BOP mav assist U2 durino U2 trio.
In lieu of adding ANDs and ONLYs to distractors. highlight COMPLETE in stem. RE: Highlighted 'complete' in stem. During Branch Chief review, this question, with TS 3.7.3provided, was determined to be a direct look UP question. Due to late identification.question was left as is.
 
ES-401                                                             7                                               Form ES-401-9 Explanation The following were the 30 exam questions initially reviewed:
Questions 5 - IO, 20 - 25,40 - 45,55 - 60,70 - 75, SRO questions 10 - 15.
Included in the review of these sample questions, the chief examiner also reviewed references for why the correct distractor was correct and why the incorrect distractors were incorrect. In addition, all questions received a WA review/conformance with ES-402 outline. This sample generated 10 comments.}}

Latest revision as of 10:48, 14 March 2020

NRC Comments to the Operating Test and Written Examination (ES-401-9) for the Point Beach Initial Examination - November 2005
ML060230014
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/07/2005
From: Walton R
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML053610144 List:
References
50-266/05-301, 50-301/05-301, ES-401-9 50-266/05-301, 50-301/05-301
Download: ML060230014 (14)


Text

NRC COMMENTS TO THE OPERATING TEST AND WRITTEN EXAMINATION (ES-401-9)

FOR THE POINT BEACH INITIAL EXAMINATION - NOVEMBER 2005

Comments on Point Beach JPMs JPM P015.005A: Admin JPM (Both)

Step 1: Have candidate determine reactor power, dont spoon feed him. RE: delete reference to power in Cue.

Steps 2, 3, &4: Delete, if administering in simulator since JPM will be administered in simulator. RE: will delete references to simulator.

Step 10: Why is there a range of correct power reduction? RE: Due to error/tolerances from reading gages. 24 - 30 % calculated power acceptable range.

JPM POO1.001: Admin JPM (both)

Steps 3, 4, & 5: Evaluator note contradicts with examiner cue!!! Equipment in these steps will be manipulated! RE: Will add unless authorized to evaluator note.

Step 3: Blender Operations. Need to establish an acceptable range of water and/or acid settings. RE: will include acceptable range.

JPM P015.004: Admin JPM (both)

NOTE: During onsite validation, examiners identified a faulty Operator Select switch on N31. Needs to be repaired prior to exam day. RE: Simulator staff will repair switch or exercise as necessary to guarantee correct operation.

JPM P088.008: Admin JPM (RO)

N0TE:Why is it necessary to say wind direction is from the North, (towards Two Creeks)?? RE: Will delete towards Two Creeks.

JPM POOO.011: Admin JPM (SRO)

Gaseous Waste Discharge Permit attached to JPM has lineout of 1.35E-05 and replaced with yesterday. Appears to be an incorrect lineout! RE: No, this is a known longstanding chemistry workaround since they have been having problems with their computer output. lssue has been provided to RP inspectors for review. Licensee documented this issue on CR.

JPM P028.001a: Admin JPM (SRO)

Licensee questioned the supporting regulations behind 15 minutes to classify and 15 minutes to notify. RE: 15 minutes to classify the event is rooted in regulations via NUREG 99-02, Performance indicators. 15 minutes to notify is rooted in regulations via NUREG 0654 and the licensees EP plan which is specified in the operating license.

Will change cover sheet to reflect time critical evolution. Will change cue sheets to add, This JPM is time critical.

JPM POOl.020: Simulator JPM None JPM P004.013: Simulator JPM Step 4: Why isnt this step critical? You need cooling water to excess UD Hx. RE: Not a critical step since valve is already open!

Step 10: How is the RCDT level determined? Computer point, PAB A 0 call? RE: PAB A 0 will call CR with level reading. How much will PZR & VCT level drop due to this diversion? RE: The level change is small - not an issue!

Step 18: Charging flow allowed to continue? Why not isolate? RE: Charging flow is

dialed down to minimum.

JPM PO10.010: Simulator JPM Step 10: Why not have 1PT-420 failed high prior to placing RC-430 LTOP key to ON?

This would tell if the operator really knows what he is doing or just following a procedure. Discrimination. RE: Good idea, but if operator sees failed PT, operator may not perform JPM.

Step 11: How long will it take from the time the PORV opens until the #I RCP seal DP Low Alarm annunciates (the failure criteria)? RE: Timed at 55 seconds.

Step 11: Need to add step from Conduct of Operations Manual that directs operator to take manual control when auto control fails. RE: Done JPM P000.028:

Step 6: If candidates performs steps 17 and 18 of CSP-H.1, these steps would be incorrect. The candidate should proceed to step 19 (correct) and not perform steps 17

& 18. However, in either case, the candidate will still perform step 19 of CSP-H.1. The difference is that RCS pressure would be unnecessarily reduced to 4 7 6 5 psig had the candidate performed the incorrect steps.

Conclusion:

This would warrant a comment for procedure adherence/panel monitoring but since there is no adverse consequence, this would not be a criteria for failure.

Step 19: Add evaluator due to open breaker for SGFP discharge valves when valves fully open. RE: Done Step 20: No consideration as to whether SG is hot & dry prior to feed flow re-initiation.

Procedure doesnt even check it. Why? Has an evaluation been done that says it is not a problem to put cold water into a hotldry SG? RE: Yes, this has been evaluated per EOP Revision IC - OK to feed hot dry SG.

Step 23: Not sure why this is a critical step? If flow path is established and a pump is running and S/G is depressurized level will be stable or increasing. Action is met with no effort. RE: This is why step 22 is not critical. But need to have applicant complete step 23 to ensure JPM is completed.

JPM P026.002:

Step 4: Why open the valve first then start the CS pump? Isnt there a concern with water hammer conditions? RE: This is the sequence used for automatic pump start during SI actuation.

Step 6: Is there a minimum NaOH flow rate? Should valve be full open? RE: There is no minimum f/ow rate, valve is selected to full open. Flow rate is established by use af a preset throttle valve.

JPM P062.013:

No comments.

JPM PO15.01 1:

Step 4 & 6: Is gain pot really on drawer B? RE: Yes Step 4: Why is it that the gain pot can be adjusted even though if it is locked in position?

Sounds like a degraded condition in need of maintenance!

Attachment A: Why are N42, N43, & N44 marked MA? The Examinee should mark these N/A if he or she see fit. RE: JPM requires only that Nl channel N41 be aqusted!

JPM POOO.015:

Cue Sheet: Why is it necessary to give candidate procedure to use? Shouldnt they demonstrate that they know how to get procedure? RE: Candidate should demonstrate to examiner that he knows where to locate procedures. Must be done during an early JPM. Once demonstrated, need not be repeated.

Step 7: We should not direct Examinee to NOT enter a procedure. During a real situation he needs to be able to decide which procedure to be in. RE: Cue will reflect that another operator will perform Attachment A.

In-Plant JPMS:

JPM P000.036b:

Step 3: Delete asterisk from Critical attribute and state, pump is found running.

Delete, If pump found off ... RE: Incorporated.

Step 8: Which way will 2CV-361A be throttled to obtain 47psig? I assume open. RE:

Correct! Added comment to step 8.

JPM P000.039:

Step 16: Ensure candidate operates the governor control switch to change frequency and not the voltage regulator switch! Ensure candidate looks at proper indications! RE:

Will change cue sheet such that after EDG starts, that frequency will be at 61 hz. This will necessitate candidate to adjust frequency.

JPM P008.003:

Cue Sheet: Is it possible to observe a tube side through-wall leak? RE: No! Will change to a shell side leak.

Scenario Comments Scenario #I :

Event #I: BOP should not receive credit as an instrument failure for this event since there is no diagnosis of the event. RE: Will change D-7 sheet to reflect that BOP will receive credit for Normal for tripping bistables.

Event # I , Page 3 of 5: Why have SRO turnover command and control? Why not let SRO remain in CR and have surrogate perform behind panel manipulations? OR, if surrogate takes command/control, ensure no changes to plant conditions for time SRO is gone! RE: Will ensure no changes to plant for time SRO is gone. Surrogate will act for SRO during his short absence.

Event #3: Does MFP temperature increase gradually or quickly. For example, if it increases slowly, will operators note increase in MFP bearing temperature during initial walkdown of simulator prior to taking watch? RE: Slow ramp, wont be seen during initial setup/walkdown of simulator.

Event #3: We do not want the main feed pump to trip before the power reduction. This is necessary to ensure we get a reactivity change. RE: True! MFP wont trip.

Event #4/5: Page 5, Verify RCS temperature control. Temperature should be low due to feedwater line break. What actions are required for this step? RE: RCS temperature control is a continuous action step.

Page 7: Scenario does not appear to go ;oo far into the EOPs. Scenario is stopped prior to SI termination. See if there is any value in continuing the scenario into EOP 1, Loss of Reactor or Secondary Coolant. RE: Add EOP 7 . 7 steps up to step 72. We will evaluate into EOP 7.7.

Scenario #2:

Event #2: Which trip bistable(s) can be removed that would cause a Rx Trip? They should be specified in Applicants Action column on page 3 of 4! RE: SRO has already demonsfrated ability to remove control power fuses during previous scenario. Cant remove bistables during this scenario since it will cause a reactor trip. SRO should not leave control room to pull fuses - will follow TS requirement to shutdown instead.

Event #3: Do actions in AOP-24, Response to Instrument Malfunctions, allow the BOP to place the FWRV back in AUTO? If not, then BOP will be attached to the panel for the rest of the scenario (until the major). RE: The FWRV will not be placed back into AUTO. Operator will need to monitor SGWL until major event is put in - next step.

Events #4, 5 , 6,7: (Page 5 of 13): Is an auto trip of the RCP plausible? The crew should trip the affected RCP rather than the RCP auto trip. RE: During onsite validation, crew tripped RCP prior to auto trip.

(Page 10 of 13): Evaluate continuing scenario until after cooldown/depressurization has been initiated per EOP 1.2. RE: Examiners will determine i f enough crew has had enough material to be evaluated on.

Scenario #3 Event #2: I assume that the SRO will remain in the controls area for removing of fuses.

RE: SRO will turnover watch to surrogate, exit CR to supervise evolution, then return.

No events will happen while SRO is outside CR.

Event #3: Determine if the BOP operates any equipment during this event! The way this event is written, it sounds like the BOP could just watch and do nothing in response to this event. RE: BOP has to start standby fans in sequence.

Event #4: I dont believe there are sufficient actionslmanipulations for the RO and BOP to do during this event. I suggest that the EDG start and NOT load onto the bus. This will allow the BOP operator to perform an action - close the breaker. We will need to delete ALL from the D-1 sheet and replace it with a BOP - C designator. We will need to add an additional event for the RO to ensure we meet our bean count! RE: BOP must realign pumps/valves for blender operations on the back panel. RO must reposition switch and aaust charging flow. Its minimal - but evaluatable!!

Event #5, D-1 sheet: Remove GO3 fails to start and add to Event 4. Need to add some failure to Event #5. Perhaps containment isolation valves fail to close (see page 2 of 9).

RE: Simulator scenario ran fine as written. Dont make this change.

Event 5, 6 , Page 9 of 9: Why is emergency boration a critical step? Dont you have to wait till cooldown? RE: It is required to initiate boration due to two stuck rods prior to exiting EOP 0.1.

Scenario 4 This scenario does not have enough component/instrument failure events for the RO!

This scenario does not have any TS calls for SRO - must ensure that all SRO beans for TS have been met prior to running this scenario on SRO candidates!

Event #2: The D-1 sheet has this event as a reactivity change for the RO position. Need to verify that the RO changes power during this event. Otherwise, need to put in reactivity change and change D-1 sheet. RE: We did not believe that the RO did anything in this position to warrant a credit for reactivity change. If this spare scenario is used, we will need to add a bean for reactivity change.

Similarly, the D-1 sheet has Event 2 as BOP action. Need to verify BOP has actions for this event to ensure we meet our bean count! RE: BOP had some actions on the panels associated with main feedwater.

Events 3, 4, & 5, Page 4 of 12: Will ASG FWP trip during performance of Attachment A? It shouldnt so they have to deal with a faulted SG and an overfeed condition. RE:

Both SGFWPs will be tripped /AW Attachment A of EOP-0.

Events 3, 4, & 5, Page 6 of 12: Cant control RCS temperature if both SGs are faulted!

RE: True, there is a continuous action step to verify RCS temperature control. This is accomplished by restricting FW flow to SGs.

Events 3, 4, & 5, Page 7 of 12: Will MFP be tripped before step on top of pg 7? If not, will they be able to locally shut the FRV or Isolation valves? Is this possible with MFP running and generating such a high d/p? RE: Operators will be able to close the MFP discharge isolation valves with a high d p .

Events 3, 4, & 5, Page 7 of 12: Control Feed flow to minimize cooldown. Will there be a transition to FR-P.1 at this step? If not, why not? RE: No, there will be no transition to FR-P. 1 due to the procedure sending you back to EOP-1, Loss of Secondary Coolant.

ES-401 Written Examination Form ES-401-9 Review Worksheet

1. 2. 3.Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

3# LOK LOD (FIH) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Eack- Q= SRO U I U S Explanation Focus Dist. Link units ward WA Only 7 F 3 S 8 H 3 E TRM 2.11.3: Applicability: Mode 1. Suggest adding .."Rx is in Mode 1" RE: Added mode 1 to initial wndlions.

9 F 3 S 10 F 3 S

3. Check the appropriate box if a psychometric flaw is identified:

The stem lacks sufficient locus to elicit the correct answer (e.9.. unclear intent, more information is needed, or too much needless i rmr The stem or distractors contain cues Ke.. clues. sDecific determiners. Dhrasina. - lenoth.

. ~ - etd.

The answer choices are a collection of urirelald tiueIfalse statements:

More than one distractor is not credible.

One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).

4. Check the appropriate box if a job content error is identified:

The question is not linked to the job requirements (i.e., the question has a valid WA but, as written, is not operational in content).

The question requires the recall of knowledge that is tca specific for the closed reference test mode (i.e., it is not required to be known from memory).

The question contains data with an unrealistic level of accuracy or inconsistent units (e.9.. panel meter in percent with question in gallons).

The question requires reverse logic or application compared to the job requirements.

5. Check Questionsthat are samoled for conformance with the approved WA and those that are d e s i m t e d SRO-only (WA and license level mismatches are unacceptable)
6. Based on the reviewer's judgment. is the question as written (U)nacceptable(requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
7. At a minimum, explain any "U" ratings (e.g., how the Appendix B psychometric attributes are not being met).

ES-401 2 Form ES-401-9 ES-401 3 Form ES-401-9

1. 2. 3. Psychometric Flaws I 4. Job Content Flaws I 5 . Other I 6. 1 7.

ES-401 4 Form ES-401-9 I

ES-401 5 Form ES-401-9

4. Job Content Flaws 5.Other 6. 7.

ob- Minutia #/ Back- c)= SRO U/E/S Evlanation ink units ward WA Only 64 H U Must add ONLY to A distractor since A also correct! RE: In lieu of adding 'only,' added 'complete.'

65 F s 66 H X U 10CFR55.43,SRO only question reference. Delete TS reference in stem of Q: RE: " ...require notification of SRO that leak rate limits have been exceeded."

Also, need to provide different reference that provides acceptance criteria. Surveillance test? CR logs? RE: Provided lesson plan as reference.

67 H S 68 H s 69 F 70 H 71 F 72 H 73 H 74 F 75 H

ES-401 6 Form ES-401-9 6.

U/E/S I 7.

Explanation E Distractors A, B & C must be followed by 'ONLY." See 13. RE: Added

'only' to A B aC distractors.

Change procedure references in distractors. RE: Keep procedures as is due lo size of leaklproceduralreference.

S I II

~~ ~~

Why IS U1 BOP performingAn A of EOP-0 if a trip RE: Comment withdrawn. U1 BOP mav assist U2 durino U2 trio.

In lieu of adding ANDs and ONLYs to distractors. highlight COMPLETE in stem. RE: Highlighted 'complete' in stem. During Branch Chief review, this question, with TS 3.7.3provided, was determined to be a direct look UP question. Due to late identification.question was left as is.

ES-401 7 Form ES-401-9 Explanation The following were the 30 exam questions initially reviewed:

Questions 5 - IO, 20 - 25,40 - 45,55 - 60,70 - 75, SRO questions 10 - 15.

Included in the review of these sample questions, the chief examiner also reviewed references for why the correct distractor was correct and why the incorrect distractors were incorrect. In addition, all questions received a WA review/conformance with ES-402 outline. This sample generated 10 comments.