Line 3: |
Line 3: |
| | issue date = 02/06/2006 | | | issue date = 02/06/2006 |
| | title = Exercise of Enforcement Discretion - Turkey Point Nuclear Plant (NRC IR 05000250-05-013 and IR 05000251-05-013) | | | title = Exercise of Enforcement Discretion - Turkey Point Nuclear Plant (NRC IR 05000250-05-013 and IR 05000251-05-013) |
| | author name = Travers W D | | | author name = Travers W |
| | author affiliation = NRC/RGN-II/ORA | | | author affiliation = NRC/RGN-II/ORA |
| | addressee name = Stall J A | | | addressee name = Stall J |
| | addressee affiliation = Florida Power & Light Co | | | addressee affiliation = Florida Power & Light Co |
| | docket = 05000250, 05000251 | | | docket = 05000250, 05000251 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:ary 6, 2006 |
| [[Issue date::February 6, 2006]]
| |
|
| |
|
| EA-05-195 Florida Power and Light CompanyATTN:Mr. J. A. Stall, Senior Vice PresidentNuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420
| | ==SUBJECT:== |
| | EXERCISE OF ENFORCEMENT DISCRETION - TURKEY POINT NUCLEAR PLANT (NRC Inspection Report Nos. 05000250,251/2005013) |
|
| |
|
| SUBJECT: EXERCISE OF ENFORCEMENT DISCRETION - TURKEY POINT NUCLEARPLANT (NRC Inspection Report Nos. 05000250,251/2005013)
| | ==Dear Mr. Stall:== |
| | The purpose of this letter is to provide you with the results of our review of findings involving certain fire response procedures at the Turkey Point Nuclear Plant that would not be effective in ensuring a safe shutdown of Units 3 and 4 should a severe fire develop in certain fire zones. |
| | |
| | This issue was discussed at a regulatory conference held in the NRCs Region II Office on November 16, 2005. |
| | |
| | To summarize our review of this matter, the NRC has concluded that the significance of the findings was very low for Unit 3 and low to moderate for Unit 4. In addition, the NRC has concluded that the exercise of enforcement discretion is appropriate for these findings in accordance with the NRC Interim Enforcement Policy Regarding Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48). The NRC will also refrain from including the findings in the Agency Action Matrix in accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program. The bases for our conclusions regarding the significance of the findings is described below and in Enclosure 1. |
| | |
| | As background, NRC Inspection Report No. 05000250,251/2005010, was issued on October 7, 2005, and it documented a finding (one apparent violation of 10 CFR Part 50, Appendix R) based on the NRCs review of three separate unresolved items (URIs 05000250,251/2004007-001, -006, and -007). The collective significance of the finding was assessed under the significance determination process as a preliminary greater than Green issue (i.e., an issue of at least low to moderate safety significance which may require additional NRC inspection). The cover letter to NRC Inspection Report No. 05000250,251/2005010 informed Florida Power and Light Company (FPL) of the NRCs preliminary conclusion, provided FPL an opportunity to request a regulatory conference on this matter, and forwarded the details of the NRCs preliminary estimate of the change in core damage frequency (CDF) for the finding. |
|
| |
|
| ==Dear Mr. Stall:==
| | On November 15, 2005, FPL submitted a letter to the NRC documenting its intent to adopt the risk-informed, performance-based fire protection program under 10 CFR 50.48(c), which includes approaches in National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating |
| The purpose of this letter is to provide you with the results of our review of findings involvingcertain fire response procedures at the Turkey Point Nuclear Plant that would not be effective in ensuring a safe shutdown of Units 3 and 4 should a severe fire develop in certain fire zones. | | |
| | Florida Power and Light Company 2 Plants, 2001 Edition. In accordance with the NRCs Interim Enforcement Policy Regarding Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48), FPL requested enforcement discretion for existing identified noncompliances, noncompliances identified during its NFPA 805 transition process, and the noncompliance that was the subject of the November 16, 2005, regulatory conference. |
| | |
| | At FPLs request, an open regulatory conference was conducted on November 16, 2005, to discuss FPLs position on this issue. The enclosures to this letter include the list of attendees at the regulatory conference and material presented by FPL and NRC. |
| | |
| | During the conference, FPL presented the results of its estimate of the increase in CDF including influential assumptions and risk analysis methodology. FPLs presentation addressed the three aspects of the finding separately (i.e., URI 05000250,251/2004007-001, -006, and-007), and provided the following conclusions on the matter. In summary, FPL agreed with the NRCs view that URI 05000250,251/2004007-001 was a violation of 10 CFR Part 50, Appendix R, but concluded that the significance of this issue was very low. FPL disagreed with that portion of the finding consisting of URIs 05000250,251/2004007-006 and -007, concluding that procedural requirements were acceptable, a performance deficiency did not exist, and thus this finding did not represent a violation. Furthermore, FPL concluded that the significance of URIs 05000250,251/2004007-006 and -007, even if considered to be a finding, was very low. |
| | |
| | At the conference, the NRC requested that FPL provide additional information to support its risk analysis. This information was subsequently submitted by letter dated November 23, 2005. |
|
| |
|
| This issue was discussed at a regulatory conference held in the NRC's Region II Office onNovember 16, 2005.To summarize our review of this matter, the NRC has concluded that the significance of thefindings was very low for Unit 3 and low to moderate for Unit 4. In addition, the NRC hasconcluded that the exercise of enforcement discretion is appropriate for these findings inaccordance with the NRC Interim Enforcement Policy Regarding Enforcement Discretion forCertain Fire Protection Issues (10 CFR 50.48). The NRC will also refrain from including the findings in the Agency Action Matrix in accordance with NRC Inspection Manual Chapter 0305,Operating Reactor Assessment Program. The bases for our conclusions regarding the significance of the findings is described below and in Enclosure 1.As background, NRC Inspection Report No. 05000250,251/2005010, was issued onOctober 7, 2005, and it documented a finding (one apparent violation of 10 CFR Part 50,Appendix R) based on the NRC's review of three separate unresolved items(URIs 05000250,251/2004007-001, -006, and -007). The collective significance of the finding was assessed under the significance determination process as a preliminary "greater than Green" issue (i.e., an issue of at least low to moderate safety significance which may require additional NRC inspection). The cover letter to NRC Inspection ReportNo. 05000250,251/2005010 informed Florida Power and Light Company (FPL) of the NRC'spreliminary conclusion, provided FPL an opportunity to request a regulatory conference on this matter, and forwarded the details of the NRC's preliminary estimate of the change in coredamage frequency (CDF) for the finding.On November 15, 2005, FPL submitted a letter to the NRC documenting its intent to adopt therisk-informed, performance-based fire protection program under 10 CFR 50.48(c), which includes approaches in National Fire Protection Association (NFPA) Standard 805,
| | FPLs presentation and subsequent correspondence provided 15 inputs on the safety significance of the finding. The following three of the inputs were incorporated into the NRCs final significance determination: (1) reducing the main control room fire ignition frequency, (2) modifying the time at which the operating charging pump would be stopped during a main control room fire, and (3) reducing the time that reactor coolant pump (RCP) leakage could have created conditions for a small break loss of coolant accident (LOCA). A detailed discussion of the NRCs basis for acceptance or rejection of all inputs is provided in Enclosure 1. |
| "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Florida Power and Light Company2Plants," 2001 Edition. In accordance with the NRC's Interim Enforcement Policy RegardingEnforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48), FPL requested enforcement discretion for existing identified noncompliances, noncompliances identified during its NFPA 805 transition process, and the noncompliance that was the subject of the November 16, 2005, regulatory conference.At FPL's request, an open regulatory conference was conducted on November 16, 2005, todiscuss FPL's position on this issue. The enclosures to this letter include the list of attendees at the regulatory conference and material presented by FPL and NRC.During the conference, FPL presented the results of its estimate of the increase in CDFincluding influential assumptions and risk analysis methodology. FPL's presentation addressed the three aspects of the finding separately (i.e., URI 05000250,251/2004007-001, -006, and-007), and provided the following conclusions on the matter. In summary, FPL agreed with the NRC's view that URI 05000250,251/2004007-001 was a violation of 10 CFR Part 50,Appendix R, but concluded that the significance of this issue was very low. FPL disagreed with that portion of the finding consisting of URIs 05000250,251/2004007-006 and -007, concludingthat procedural requirements were acceptable, a performance deficiency did not exist, and thusthis finding did not represent a violation. Furthermore, FPL concluded that the significance ofURIs 05000250,251/2004007-006 and -007, even if considered to be a finding, was very low.
| |
|
| |
|
| At the conference, the NRC requested that FPL provide additional information to support its riskanalysis. This information was subsequently submitted by letter dated November 23, 2005.
| | After considering the information developed during the inspection, the information presented at the conference, and the supplemental information provided by FPL after the conference, the NRC has concluded that the final inspection findings are appropriately characterized as very low for Unit 3 and low to moderate for Unit 4. |
|
| |
|
| FPL's presentation and subsequent correspondence provided 15 inputs on the safety significance of the finding. The following three of the inputs were incorporated into the NRC'sfinal significance determination: (1) reducing the main control room fire ignition frequency, (2) modifying the time at which the operating charging pump would be stopped during a main control room fire, and (3) reducing the time that reactor coolant pump (RCP) leakage could have created conditions for a small break loss of coolant accident (LOCA). A detailed discussion of the NRC's basis for acceptance or rejection of all inputs is provided inEnclosure 1.After considering the information developed during the inspection, the information presented atthe conference, and the supplemental information provided by FPL after the conference, theNRC has concluded that the final inspection findings are appropriately characterized as verylow for Unit 3 and low to moderate for Unit 4.
| | The NRC also concluded that a violation of 10 CFR 50.48(b)(1) and 10 CFR Part 50, Appendix R, Sections III.G.2 and III.G.3, occurred. In particular, Appendix R, Section III.G.2 states, in part, that where cables or equipment (including associated non-safety circuits that could prevent operation or cause maloperation due to hot shorts, open circuits, or shorts to ground) of redundant trains of systems necessary to achieve and maintain hot shutdown conditions are located within the same fire area outside of primary containment, one of three means of ensuring that one of the redundant trains is free of fire damage shall be provided. |
|
| |
|
| The NRC also concluded that a violation of 10 CFR 50.48(b)(1) and 10 CFR Part 50,Appendix R, Sections III.G.2 and III.G.3, occurred. In particular, Appendix R, Section III.G.2states, in part, that where cables or equipment (including associated non-safety circuits that could prevent operation or cause maloperation due to hot shorts, open circuits, or shorts to ground) of redundant trains of systems necessary to achieve and maintain hot shutdownconditions are located within the same fire area outside of primary containment, one of three means of ensuring that one of the redundant trains is free of fire damage shall be provided.
| | Section III.G.3 states that alternative shutdown capability should be provided where the protection of systems (whose function is required for hot shutdown) does not satisfy the requirements of Section III.G.2. |
|
| |
|
| Section III.G.3 states that alternative shutdown capability should be provided where theprotection of systems (whose function is required for hot shutdown) does not satisfy therequirements of Section III.G.2.
| | Florida Power and Light Company 3 In this case, the following three instances were identified where FPL failed to satisfy the above Appendix R requirements: (1) FPL failed to protect control circuits and cables that could cause maloperation of motor-operated valve (MOV) MOV-4-626, RCP Thermal Barrier Component Cooling Water System Return Isolation Valve, in fire zone (FZ) 67. This condition existed since at least September 9, 2003, when it was first identified by FPL. (2) FPL failed to protect control circuits and cables that could cause maloperation of necessary RCP thermal barrier component cooling system valves MOV-3-716B and MOV-3-626 in FZ 63 and MOV-4-716B valve in FZ 67. This condition existed since at least February 9, 2001, when the applicable procedure page was last revised FPL. (3) FPL failed to protect control circuits and cables that could cause maloperation of necessary RCP thermal barrier component cooling system valves in FZ 106 and did not meet the alternative shutdown capability requirements. Specifically, under certain scenarios, FPLs procedure may not have mitigated a spurious closure of valves MOV-3-716A and MOV-4-716A in a timely manner, possibly resulting in an RCP seal LOCA and pressurizer level dropping below the indicating range. This condition existed since at least April 24, 2002, when the applicable procedure pages were last revised. |
|
| |
|
| Florida Power and Light Company3In this case, the following three instances were identified where FPL failed to satisfy the aboveAppendix R requirements: (1) FPL failed to protect control circuits and cables that could cause maloperation of motor-operated valve (MOV) MOV-4-626, "RCP Thermal Barrier Component Cooling Water System Return Isolation Valve," in fire zone (FZ) 67. This condition existed since at least September 9, 2003, when it was first identified by FPL. (2) FPL failed to protectcontrol circuits and cables that could cause maloperation of necessary RCP thermal barrier component cooling system valves MOV-3-716B and MOV-3-626 in FZ 63 and MOV-4-716Bvalve in FZ 67. This condition existed since at least February 9, 2001, when the applicable procedure page was last revised FPL. (3) FPL failed to protect control circuits and cables that could cause maloperation of necessary RCP thermal barrier component cooli ng system valvesin FZ 106 and did not meet the alternative shutdown capability requirements. Specifically,under certain scenarios, FPL's procedure may not have mitigated a spurious closure of valves MOV-3-716A and MOV-4-716A in a timely manner, possibly resulting in an RCP seal LOCA and pressurizer level dropping below the indicating range. This condition existed since at least April 24, 2002, when the applicable procedure pages were last revised.The NRC also reviewed FPL's request that the violation be considered for enforcementdiscretion. On June 16, 2004, the NRC published a final rule revising its regulations in10 CFR 50.48, which governs fire protection at operating nuclear power plants. This revision became effective on July 16, 2004, and it added a new paragraph (c) to 10 CFR 50.48 that allows reactor licensees to voluntary comply with the risk-informed, performance-based fire protection approaches in NFPA 805 (with limited exceptions stated in the rule language) as an alternative to complying with 10 CFR 50.48(b) or the requirements in their fire protection license conditions. As part of the transition to 10 CFR 50.48(c), licensees will establish the fundamentalfire protection program identified in NFPA 805 and will perform a plant-wide assessment toidentify fire areas and fire hazards and to evaluate compliance with their existing fire protection licensing basis. This fire protection assessment is beyond the normal licensee review of their fire protection program. With regard to applicable noncompliances, licensees are required to adopt compensatory measures until compliance is either restored to 10 CFR 50.48(b) or achieved per 10 CFR 50.48(c).In order to provide incentives for licensees initiating efforts to identify and correct subtleviolations that are not likely to be identified by routine efforts, the NRC issued EnforcementPolicy Statement revisions on June 16, 2004, and January 14, 2005, allowing enforcementdiscretion for certain fire protection noncompliances identified as part of the transition to 10 CFR 50.48(c) as well as existing identified compliances which could reasonably be corrected under 10 CFR 50.48(c). This interim enforcement discretion policy is consistent with the long-standing policy included in Section VII.B.3, "Violations Involving Old Design Issues," of the Enforcement Policy, which addresses discretion when licensee undertake a comprehensive review and assessment. This exercise of discretion provides appropriate incentives for licensees to initiate efforts to identify and correct subtle violations that are not likely to be identified by routine efforts. As such, the NRC Interim Enforcement Policy RegardingEnforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48) provides enforcement discretion for licensees who wish to take advantage of the new rule to resolve existing noncompliances (i.e., implement corrective actions until the licensee has transitioned to 10 CFR 50.48(c)) provided that certain criteria are met.In this case, the NRC concluded that (1) the noncompliance was not associated with a findingthat the reactor oversight process significance determination process would evaluate as Red, or Florida Power and Light Company4it would not be categorized at Severity Level I; (2) FPL submitted a letter of intent beforeDecember 31, 2005, stating its intent to transition to 10 CFR 50.48(c), which includes approaches in NFPA 805; and (3) the licensee entered the noncompliance into its corrective action program and implemented appropriate compensatory measures (including an operabilityevaluation to demonstrate that safety will be maintained during operation and shutdown). Regarding compensatory measures, FPL incorporated acceptable manual operator actions into applicable procedures to address the finding at the time of the original inspection. Based on the above, in accordance with the NRC's Interim Enforcement Policy Regarding EnforcementDiscretion for Certain Fire Protection Issues (10 CFR 50.48), and in consultation with the Director, Office of Enforcement; I have been authorized to exercise enforcement discretion such that the above violation will not be cited. In addition, based on the above correctiveactions and in accordance with NRC Inspection Manual Chapter 0305, Operating ReactorAssessment Program, the NRC will also refrain from including the finding in the Agency ActionMatrix. You are not required to respond to this letter. In accordance with 10 CFR 2.390 of the NRC's"Rules of Practice," a copy of this letter, its enclosures, and your response (should you choose to provide one) will be made available electronically for public inspection in the NRC PublicDocument Room or from the NRC's document system (ADAMS) which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, anyresponse should not include any personal privacy, proprietary, classified, or safeguards information so that it can be made available to the Public without redaction. Should you have any questions regarding this letter, please contact Mr. D. Charles Payne,Chief, Engineering Branch 2, Division of Reactor Safety, at (404)562-4669.
| | The NRC also reviewed FPLs request that the violation be considered for enforcement discretion. On June 16, 2004, the NRC published a final rule revising its regulations in 10 CFR 50.48, which governs fire protection at operating nuclear power plants. This revision became effective on July 16, 2004, and it added a new paragraph (c) to 10 CFR 50.48 that allows reactor licensees to voluntary comply with the risk-informed, performance-based fire protection approaches in NFPA 805 (with limited exceptions stated in the rule language) as an alternative to complying with 10 CFR 50.48(b) or the requirements in their fire protection license conditions. As part of the transition to 10 CFR 50.48(c), licensees will establish the fundamental fire protection program identified in NFPA 805 and will perform a plant-wide assessment to identify fire areas and fire hazards and to evaluate compliance with their existing fire protection licensing basis. This fire protection assessment is beyond the normal licensee review of their fire protection program. With regard to applicable noncompliances, licensees are required to adopt compensatory measures until compliance is either restored to 10 CFR 50.48(b) or achieved per 10 CFR 50.48(c). |
|
| |
|
| Sincerely,/RA/ BY LOREN PLISCO ACTING FOR
| | In order to provide incentives for licensees initiating efforts to identify and correct subtle violations that are not likely to be identified by routine efforts, the NRC issued Enforcement Policy Statement revisions on June 16, 2004, and January 14, 2005, allowing enforcement discretion for certain fire protection noncompliances identified as part of the transition to 10 CFR 50.48(c) as well as existing identified compliances which could reasonably be corrected under 10 CFR 50.48(c). This interim enforcement discretion policy is consistent with the long-standing policy included in Section VII.B.3, Violations Involving Old Design Issues, of the Enforcement Policy, which addresses discretion when licensee undertake a comprehensive review and assessment. This exercise of discretion provides appropriate incentives for licensees to initiate efforts to identify and correct subtle violations that are not likely to be identified by routine efforts. As such, the NRC Interim Enforcement Policy Regarding Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48) provides enforcement discretion for licensees who wish to take advantage of the new rule to resolve existing noncompliances (i.e., implement corrective actions until the licensee has transitioned to 10 CFR 50.48(c)) provided that certain criteria are met. |
| /William D. Travers Regional AdministratorDocket Nos. 50-250, 50-251License Nos. DPR-31, DPR-41
| |
|
| |
|
| ===Enclosures:===
| | In this case, the NRC concluded that (1) the noncompliance was not associated with a finding that the reactor oversight process significance determination process would evaluate as Red, or |
| 1. NRC Evaluation of Licensee's Risk Significance Inputs 2. List of Attendees 3. Material Presented by Licensee 4. Material Presented by NRC Florida Power and Light Company5cc w/encls:T. O. Jones Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail DistributionWalter ParkerLicensing Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail DistributionMichael O. PearcePlant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail DistributionDavid Moore, Vice PresidentNuclear Operations Support Florida Power & Light Company Electronic Mail DistributionRajiv S. KundalkarVice President - Nuclear Engineering Florida Power & Light Company Electronic Mail DistributionM. S. Ross, Managing AttorneyFlorida Power & Light Company Electronic Mail DistributionMarjan Mashhadi, Senior AttorneyFlorida Power & Light Company Electronic Mail DistributionAttorney GeneralDepartment of Legal Affairs The Capitol Tallahassee, FL 32304William A. PassettiBureau of Radiation Control Department of Health Electronic Mail DistributionCounty ManagerMetropolitan Dade County Electronic Mail DistributionCraig Fugate, DirectorDivision of Emergency Preparedness Department of Community Affairs Electronic Mail DistributionCurtis IvyCity Manager of Homestead Electronic Mail Distribution | |
|
| |
|
| ________________________OFFICERII:DRSRIIRII:DRSOENRRNRRSIGNATUREVIA EMAIL/RA//HC/ FORVIA EMAI:L/RA/LTROCINEVIA EMAI:L/RA/LTROCINEP. Koltay forNAMEWROGERSCEVANSVMCCREEC. NolanP. Bonnett
| | Florida Power and Light Company 4 it would not be categorized at Severity Level I; (2) FPL submitted a letter of intent before December 31, 2005, stating its intent to transition to 10 CFR 50.48(c), which includes approaches in NFPA 805; and (3) the licensee entered the noncompliance into its corrective action program and implemented appropriate compensatory measures (including an operability evaluation to demonstrate that safety will be maintained during operation and shutdown). |
| *R. Gibbs
| |
| *DATE1/5/06 1/9/061/9/0602/02/0601/12/0602/02/06E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO Enclosure 1NRC EVALUATION OF LICENSEE'S RISK SIGNIFICANCE INPUTSAt the November 16, 2005, regulatory conference, Florida Power and Light Company (FPL)provided numerous inputs to the NRC's preliminary significance determination. FPL's letter ofNovember 23, 2005, provided additional details and documented other inputs that were notdiscussed at the regulatory conference. In all, FPL provided 15 specific inputs to the NRC'spreliminary significance determination. The 15 inputs and the NRC's disposition/alteration ofthe preliminary significance determination process (SDP) are provided below:1.FPL, through an MPR Associates Thermal-Hydraulic analysis, indicated that after20 minutes and provided nominal seal leakage remained below 3 gallons per minute (gpm), the fluid in the reactor coolant pump (RCP) cavity would not increase to the critical temperature that produces the possibility of seal failures. Using this analysis, only 1% and6% of the time on the two units would leakages exceed 3 gpm. NRC Disposition - This information was insufficient to justify deviating from the vendor'srecommendations to use the "plug" model. Consequently, the critical leakage rate was assumed to be 2.4 gpm for 20 minutes to perform the restoration of cooling to the seals.2.FPL indicated that only the B charging pump would be tripped (33% of the time) duringinitial control room evacuation and that the other pumps would be de-energized 5 minuteslater in actions outside the control room. Therefore, 66% of the time the A or C charging pump would be in-service providing seal cooling for an additional 5 minutes. This reduced the exposure period that RCP seal leakage could have been high enough to allow elevated temperatures in the critical volume and establish possible seal failure conditions.NRC Disposition - After reviewing procedure ONOP-105 and the operating experience ofcharging pump operation, a modification of the analysis was warranted in this area.
| |
|
| |
|
| Specifically, for Unit 3, 57% of the time charging pump B will be assumed in service and 55% of the time on Unit 4. When charging pump B is in service, the critical leakage rate is assumed to be 2.4 gpm. When the other two charging pumps are in service 50% of the time, the assumed critical leakage will be 2.4 gpm and 3.2 gpm for the other 50% of thetime. The basis for the partitioning was due to the uncertainty associated with the possibility that fire effects would initially cause the loss of the operating charging pump. All walk downs and analyses did not focus on the location of charging pump power/controls/interlocks. Therefore, 0.5 was inserted to account for this. These changeswere included in the final significance determination.3.FPL indicated that, due to the unique design of the Turkey Point RCPs, the critical volumeof the seal cavity was 48 gallons. This information should be used when determining the critical leakage rate assuming 20 minutes was necessary to restore seal cooling. In addition, FPL provided the leakage data for all RCPs.NRC Disposition - The NRC accepted the critical volume as 48 gallons. Upon reviewingthe seal leakage information provided by FPL, for a given year, it was assumed 67% of the time for Unit 4 and 14% of the time for Unit 3 that leakage rates were sufficient for the Evaluation of Risk Significance Inputs-2-Enclosure 1conditions of an RCP seal loss of coolant accident (LOCA) to potentially exist. Theseexposure periods were factored into the final significance determination. 4.FPL, through a Kleinsorg Group, L.L.C., report, provided an analysis that control roomevacuation due to fire would occur after 15 minutes, rather than the 10 minutes used inthe preliminary significance determination. This evacuation time was based upon results indicating that the visibility and heat in the control room was not severe enough to causeevacuation until at least 15 minutes. NRC Disposition - This analysis did not address the status of the reactor controls, how thissituation related to procedural direction for control room evacuation, or the other physicalfactors contained in NUREG/CR-6850, Chapter 11, Section 11.5.2.11, Step 11.b. All ofthese aspects were taken into account in the original NRC analysis when selecting the10-minute evacuation time. Also, any fire modeling should include different ventilation conditions which were not evident from a review of the analysis. Therefore, no alteration of this portion of the preliminary significance determination was appropriate.5.FPL provided an analysis of post-LOCA operator actions based upon informationcontained in WCAP-16141.NRC Disposition - The staff has reviewed the licensee's proposed time-estimates for timeto core uncovery given various RCP seal LOCA sizes. Specifically, assuming a 182-gpm leak rate for each RCP, the licensee suggested times greater than 7 hours to core uncovery. Other times were presented assuming different combinations of charging and AFW availability including a 17-hour case. In general, time frames greater than 5 hoursare atypical for a Westinghouse three-loop plant when compared to the NRC's previousfire significance determination phase-3 analysis experience. Normally, the staff has used approximately 5 hours to core uncovery with an 182-gpm leak rate per RCP. The boundary conditions for the 5-hour window assumes the RCPs are tripped, the turbine-driven auxiliary feedwater pump is successful, and there is no RCS inventorymakeup (except cold leg accumulators). The 5-hour best-estimate (for PRA modeling) is based on assumptions used to close out Generic Safety Issue 23, "Reactor Coolant Pump Seal Failures," and confirmed under plant-specific analyses during subsequent significance determination cases. The 5-hour time frame is consistent with WCAP-16396,
| | Regarding compensatory measures, FPL incorporated acceptable manual operator actions into applicable procedures to address the finding at the time of the original inspection. Based on the above, in accordance with the NRCs Interim Enforcement Policy Regarding Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48), and in consultation with the Director, Office of Enforcement; I have been authorized to exercise enforcement discretion such that the above violation will not be cited. In addition, based on the above corrective actions and in accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program, the NRC will also refrain from including the finding in the Agency Action Matrix. |
| "Westinghouse Owners Group Reactor Coolant Pump Seal Performance for Appendix R Assessments (2005)." WCAP-16396, Table 7-1, cites an estimated time of 5.2 hours to core uncovery when only the turbine-driven auxiliary pump is used for cooldown. WCAP-16396 indicates that a 17-hour time frame may be achievable with an RCS cooldown and depressurization. The Turkey Point fire procedure that would have been used for alternate shutdown paneloperations appears to assume that a natural circulation cooldown would occur with an intact reactor coolant system. This is not the appropriate context for modeling fire PRAsequences involving a consequential RCP seal LOCA. Specifically, procedure ONOP-105 instructs the operators to halt the RCS cooldown at approximately 1200 pounds per square inch. The procedural hold point specifies an approximate 9-hour time frame to attempt to maintain RCS pressure in order to reduce the likelihood of void formation in the Evaluation of Risk Significance Inputs-3-Enclosure 1reactor vessel head area. The procedural hold directly conflicts with use of the 17-hourestimate case provided in WCAP-16396 (which is based on WCAP-16141). Therefore, the staff believes the 5-hour time to core uncovery estimate is a more appropriate and realistic time frame for fire PRA sequences of interest and associated human actions.
| |
|
| |
|
| The NRC considers the 5-hour estimate provided in WCAP-16396, which was issued in2005, as the best available information for significance determination risk assessment purposes and is appropriate for assessing the Turkey Point fire protection issue for RCP seal LOCA rates of 182 gpm per RCP.6.FPL, through a Scientech report, provided an analysis that the additionalactions/equipment needed for operators being able to mitigate a small break LOCA (SBLOCA) from outside the control room would have a failure probability of approximately7E-2. The NRC used 1.0 in the preliminary significance determination. The actions considered in the FPL analysis included recognition that a SBLOCA was happening, placing a high head safety injection (HHSI) pump into service, opening a crosstie valve, and opening the containment sump recirculation valve to provide suction to an residual heat removal (RHR) pump. All these actions were local.NRC Disposition - There were a number of aspects of this mitigation evaluation which theNRC viewed differently. The success criteria used in the FPL analysis was HHSI followed by low pressure recirculation (LPR). The standard success criteria for a SBLOCA is HHSI followed by high pressure recirculation (HPR). There was not sufficient justification for deviating from the standard success criteria. This was especially true given the small break size involved. None of the diagnostic considerations or actions associated with HPR were discussed or considered appropriate. Even for the LPR actions included in the analysis, there was no diagnostic aspect as to when to transition to LPR.
| | You are not required to respond to this letter. In accordance with 10 CFR 2.390 of the NRC's |
| | "Rules of Practice," a copy of this letter, its enclosures, and your response (should you choose to provide one) will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS) which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, any response should not include any personal privacy, proprietary, classified, or safeguards information so that it can be made available to the Public without redaction. |
|
| |
|
| This action is predicated on process indications and must be discerned from the appropriate section of the emergency operating procedures (EOP). The key process indication does not exist at the auxiliary shutdown panel and may be damaged by the fireor in subsequent suppression efforts. The HHSI pump portion of the analysis only involved starting an opposite unit HHSI and opening one valve. The actual procedure directed the manipulation of five valves and would require dependency considerations to establish the collective failure probability of accomplishing the critical task. There was nomethod that related to how operators would ensure adequate HHSI flow was discussed. (No HHSI flow indication is available at the auxiliary shutdown panel.) The FPL analysisrelied upon the technical support center when establishing the procedure portion of the performance shaping factor. However, the ramifications of the fire/suppression efforts in the control room were not discussed or considered for equipment/indications in the technical support center. Also, for the equipment being credited, there was not sufficientdiscussion as to whether the equipment could have been damaged (line item 4 of NUREG/CR-6850, Section 12.5.5.3). In addition, there would be an extra distraction intransferring from the prescribed procedure (ONOP-105) to the EOP, especially since the ONOP clearly stated that the EOP was not applicable. This is important since there wouldneed to be a transition in command and control to the technical support center very early in accident mitigation. The actual evaluation provided FPL's perspective on the increase in the failure probability without discussing the baseline mitigation strategy for shutdownfrom the remote shutdown panel. Consequently, the actions considered part of the Evaluation of Risk Significance Inputs-4-Enclosure 1"baseline" risk could not be determined. These were some of the factors coupled with noexperience/training of operating personnel to mitigate a SBLOCA from outside the control room and the sub-optimal environmental conditions to diagnose and carry out the mitigation strategy that precluded successful mitigation credit. Therefore, there was noalteration of the preliminary significance determination in this area.
| | Should you have any questions regarding this letter, please contact Mr. D. Charles Payne, Chief, Engineering Branch 2, Division of Reactor Safety, at (404)562-4669. |
|
| |
|
| 7.In Attachment 7 of its November 23, 2005, letter, FPL presented information to lower thenon-suppression probability of low voltage cabinet fires to 0.08. This was derived bygleaning of the fire events provided in NUREG/CR-6850 and extrapolating anon-suppression probability based upon those fires deemed to be "challenging" and thosethat spread to other cabinets.NRC Disposition - NUREG/CR-6850 included an analysis of each of the nominally1500 fire events in the fire event database to assess each event's individual relevance to fire PRA analysis. Those fire events that had no potential for growth or spread were already removed from the fire frequency calculations. The fundamental criterion for retaining an event was that the reported fire was such that some active intervention wasneeded to prevent a growing and potentially damaging fire. This approach was explicitly designed to preserve the independence of the credit given to fire suppression efforts. Any alterations to the event screening would also have strong implications for the treatment of fire intensity, fire growth, and fire suppression. This event screening analysis was conducted on a consensus basis. The consensus team included representatives of both Electric Power Research Institute (EPRI) and NRC, and the results were peer reviewed byindustry representatives (including FPL). The explicit objective was to resolve past inconsistencies introduced through the application of individualized fire event data reviews and analyses such as that put forward by the licensee for the non-suppression probabilityof low voltage cabinet fires. Furthermore, the independent analysis of a sampling of the fire events being put forward is fundamentally inconsistent with NUREG/CR-6850 andNRC Manual Chapter 0609, Appendix F, fire frequencies. Based on the information inthese documents, the severity factor is tied explicitly to the characteristics of the fire (e.g., the fire heat release rate). Other severity factors should not be applied. Therefore, there was no alteration of the preliminary significance determination in this area.8.In Attachment 7 of its November 23, 2005, letter, FPL presented information to lower theprobability of non-suppression for control room low voltage electrical cabinet fires. Part ofthat information stated:"The generic duration curve used in NUREG/CR-6850 is conservative for controlroom fires since plant specific attributes are not considered. Specifically, the derivation of these curves does not include plant specific items such as:a.Continuously occupied locationsb.Time to [a] control fire is much smaller than the time to suppress the fireUsing these factors[,] it is judged that the probability of non-suppression will be afactor of [two] lower than that determined in NUREG/CR-6850."
| | Sincerely, |
| | /RA/ BY LOREN PLISCO ACTING FOR/ |
| | William D. Travers Regional Administrator Docket Nos. 50-250, 50-251 License Nos. DPR-31, DPR-41 |
|
| |
|
| Evaluation of Risk Significance Inputs-5-Enclosure 1NRC Disposition - NRC Manual Chapter 0609, Appendix F, main control roomnon-suppression curves only included data from control room fire events and assume all control rooms are continuously manned at all plants. Hence, the data inherently reflectedthe fire fighting response for continuously manned areas. In addition, the NRC observedthe control room at Turkey Point and classified it as typical of a nuclear power plant control room. The licensee's input that fire control times were "much smaller" than fire suppression times was without support in the explicit context of fires, and in particular, main control room fires. The Requantification Study Team, which produced NUREG/CR-6850, considered the possibility of drawing such distinctions in its analysis ofevent data. However, the team found that the distinction could not be supported by theavailable fire event data either for fires in general or any specific subset of fire events. | | ===Enclosures:=== |
| | 1. NRC Evaluation of Licensees Risk Significance Inputs 2. List of Attendees 3. Material Presented by Licensee 4. Material Presented by NRC |
|
| |
|
| There was no technical basis other than the analyst's judgment provided for the input thatthe NRC Manual Chapter 0609, Appendix F, fire suppression curve was conservative by afactor of two or more. Therefore, this input was rejected, and the non-suppression curves used in the preliminary SDP analysis remained applicable.9.In Attachment 7 of its November 23, 2005, letter, FPL indicated that a value of 2.5E-3/yrinstead of 4.8E-3/yr should be used for main control board fire ignition frequency in the SDP analysis. This was based upon the information located in NUREG/CR-6850,Appendix C, Table C-3. NRC Disposition - The NRC agreed that the lower ignition frequency was appropriate forthe main control boards in the main control room. This reduction was incorporated into the final significance determination.10.In Attachment 7 of its November 23, 2005, letter, FPL stated that an additional 0.50 factorshould be used in the SDP to bound the uncertainty and conservative assumptions associated with the horizontal spread of the postulated control room fires.NRC Disposition - The fact that fire spread was limited in past fires was reflectedelsewhere in the analysis. In particular, this behavior was reflected in two companion assumptions. Of greatest importance in the context of the main control room analysis was the substantial credit to the disruption of main control room fires within a very short time period present in the fire suppression response curve. This was consistent with the experience base which showed that prompt suppression will limit fire spread. The secondassumption was tied to fire intensity. Manual Chapter 0609, Appendix F, assumed that 90% of all fires remain small even if left unsuppressed for an extended period. (The NUREG/CR-6850 approach further refined the fire intensity assumptions.) It would beinappropriate to apply an additional unsupported factor of two reduction independent of fire suppression credits applied elsewhere. This would simply be another type of fire severity factor that was not consistent with the SDP approach.11.In Attachment 7 of its November 23, 2005, letter, FPL stated that the probability that anMOV will close due to a hot short-induced spurious operation is 0.50. That is, thespurious operation can either open or close the valve with equal likelihood. The NRC'sSDP analysis assumed, for example, a spurious operation probability of 0.30 wit houtconsidering the failure mode. For this case, a more realistic probability would have been Evaluation of Risk Significance Inputs-6-Enclosure 10.15 (0.30 * 0.50) since the concern only deals with the closure of the valve. Spuriousopening of the valve does not lead to a loss of RCP seal cooling event.NRC Disposition - The input that the spurious actuation probability could be reduced by afactor of two based on the fact that there was only one undesired end state (closure of a normally open valve) was contradicted by the available experimental data. Hot shorts impacting multiple conductors were the predominant failure mode noted in the Nuclear Energy Institute (NEI) tests. In a number of tests, both the open and close circuit target conductors in the surrogate MOV circuit experienced hot shorts. Hence, this was not a simple question of one versus two potential end states, rather it involved complex dependencies that are currently poorly understood. Even under the most optimistic possible interpretation of the experimental data, minor reductions in the spurious actuationlikelihood (far less than a factor of two) would be expected given the case of only one undesired end state. It would be inappropriate for an analyst to speculate as to the magnitude of any such reductions without the benefit of directly applicable test data.To explain further, the NEI surrogate MOV control circuit configuration allowed for hotshorts to impact either of the two control "direction" target conductors (i.e., hot shorts to the target conductors for either the "open" or "close" coils on the motor controller circuit would be indicated as a spurious operation). In reality, with an actual valve in the "open" position, a hot short to the "open" coil target conductor would have no impact on the circuit. That is, with the valve open, the open coil target conductor was effectively relegated to the status of a spare conductor because it was isolated by limit switches which opened once the valve reached its travel limit. A hot short to the "open" target conductor would not reposition the valve, nor would it de-energize the circuit by causing a fuse or breaker to open. Most importantly, it would not prevent a subsequent hot short to the "close" coil target conductor from spuriously closing the valve. The close direction target conductor's exposure to hot shorts and spurious operation would not change.While future research may reveal that some minor reduction in probability for this type ofcase is warranted, the contention that a factor of two reduction applies is excessively optimistic and cannot be supported given the available data. Pending actual data thatreflects a more representative control circuit configuration, no reductions in the spurious actuation probabilities will be applied. It is also noteworthy that this issue was a point ofdiscussion during the EPRI expert panel deliberations (see EPRI Technical Report 1006961). The expert panel was aware of the configuration issues and explicitly chose not to modify the spurious actuation likelihood values on this basis. The expert panel spurious actuation values used in NRC Manual Chapter 0609, Appendix F, (and inNUREG/CR-6850) were used without modification in the final significance determination. Finally, this input was not consistent with FPL's input 12 below which indicated the wrongmethodology was used to determine the probability of valve closure due to hot short at 0.27.12.In Attachment 7 of its November 23, 2005, letter, FPL stated that an alternative approachas described in NUREG/CR-6850, Appendix J, is justified. The example cited was Unit 4MOV-626. It uses 12 conductor cables which includes spare conductors mounted in a vertical configuration with no tray or conduit. This configuration is different from that listed Evaluation of Risk Significance Inputs-7-Enclosure 1in Table 10-3. Therefore, the alternate approach is appropriate. A re-calculation of theclosure probability through a hot short was 0.27.NRC Disposition - NUREG/CR-6850 stated that the formula method was recommendedonly for cases that deviate substantially from the configurations tested by NEI. The only apparent difference for the FPL case compared to the NEI tests was the presence of additional spare conductors in their control cables (12 versus 7 conductors). This was not a substantive deviation from the tested configurations because the spare conductors play a small role in the spurious actuation behavior given that they can neither prevent norcause a spurious actuation. (The key factors are the number of grounded conductors, the number of source conductors, and the number of target conductors.) The licensee's
| | Florida Power and Light Company 5 |
| "lower bound" estimate was also flawed. The NEI test data clearly showed that hot shorts did not typically impact only one conductor, but rather, impacted multiple conductors.
| |
|
| |
|
| Hence, simple models do not apply. The contention that the "lower bound" hot shortprobability is 1/12 was without merit and contradicted by the actual experimental data. If a"lower bound" spurious actuation likelihood value was desired, the EPRI expert panel report which provided upper bound, lower bound, and best estimate values for each configuration should have been referenced. Overall, the FPL circuits appeared substantially identical to the circuits tested by NEI. Hence, the tabulated spuriousactuation likelihood values were the appropriate values to apply, and this portion of the preliminary significance determination was not altered.13.FPL stated that a common cause factor for hot shorts of adjacent cables should beconsidered. If this factor is considered, the probability of multiple cables having a hotshort due to the same fire should be lower - not more than the maximum of the hot short of any cables involved.NRC Disposition - The preliminary NRC SDP analysis did not involve the probability of twocables in any fire scenario having a hot short for the event of interest to happen. The analysis was based upon the possibility that any one of a group of cables could cause theevent of interest. The analysis explicitly removed multiple hot shorts from the calculation.
| | REGION II OFFICE, ATLANTA, GA. |
|
| |
|
| Therefore, to apply some sort of common cause factor was inappropriate and was not incorporated into the final significance determination. 14.FPL stated that the MPR thermal hydraulic analysis demonstrated that complete sealinjection seal cooling could be lost for up to 60 minutes, component cooling water seal cooling could be lost for 40 minutes, and component cooling water seal cooling could be reestablished without seal failure.NRC Disposition - The thermal hydraulic analysis provided was a computer simulation thatdid not include sufficient test validation to support the input. In addition, the historical evidence was very limited in this area. Given the uncertainty associated with the probability of the cold shock seal LOCA, this additional aspect was captured within thatquantification. Therefore, the analysis assumptions associated with this area remained unchanged.
| | I. OPENING REMARKS, INTRODUCTIONS AND MEETING INTENT Mr. H. Christensen, Deputy Director, Division of Reactor Safety (DRS) |
| | II. NRC REGULATORY CONFERENCE POLICY Mr. C. Payne, Chief, Engineering Branch 2, DRS III. STATEMENT OF THE ISSUE WITH RISK PERSPECTIVES Mr. C. Payne, Chief, Engineering Branch 2, DRS IV. SUMMARY OF APPARENT VIOLATIONS Mr. C. Payne, Chief, Engineering Branch 2, DRS V. LICENSEE RISK PERSPECTIVE PRESENTATION VI. LICENSEE RESPONSE TO APPARENT VIOLATIONS VII. BREAK / NRC CAUCUS Mr. H. Christensen, Deputy Director, Division of Reactor Safety (DRS) |
| | VIII. CLOSING REMARKS Mr. H. Christensen, Deputy Director, Division of Reactor Safety (DRS) |
| | Enclosure 4 |
|
| |
|
| Evaluation of Risk Significance Inputs-8-Enclosure 115.FPL stated that the Haddam Neck event of July 15, 1969, was not applicable whenconsidering RCP seal performance without forced cooling.NRC Disposition - There are methods available for bounding or considering the failurediscussed in the Haddam Neck event with varying degrees of importance assumed in a risk-informed context. To eliminate data would require complete information that demonstrated the event was not applicable. The information provided about the HaddamNeck event was not sufficient for its exclusion. In addition to the FPL input, the NRC identified an omission in the preliminary significancedetermination. Specifically, the event tree portion that led directly to the RCP seal LOCA priorto restoring seal cooling was not included in the preliminary significance determination. This accident sequence should have been included. However, after including this event tree portion in the final significance determination, it had no material affect on the outcome. The performance deficiency related to Unit 4 continued to be of low to moderate safety significance, and the performance deficiency for Unit 3 remained very low safety significance.
| | Material Presented by NRC -2-Draft Apparent Violation 10 CFR 50.48 (b)(1) requires, in part, that all nuclear power plants licensed to operate prior to January 1, 1979, must satisfy the applicable requirements of Appendix R, Section III.G. Section III.G.2 states, in part, that where cables or equipment, including associated non-safety circuits that could prevent operation or cause maloperation due to hot shorts, open circuits, or shorts to ground, of redundant trains of systems necessary to achieve and maintain hot shutdown conditions are located within the same fire area outside of primary containment, one of three means of ensuring that one of the redundant trains is free of fire damage shall be provided. Section III.G.3 states that alternative shutdown capability should be provided where the protection of systems whose function is required for hot shutdown, does not satisfy the requirements of III.G.2. Section III.L of Appendix R provides requirements to be met by alternative shutdown methods. Section III.L.2.b states, in part, that The reactor coolant makeup function shall be capable of maintaining the reactor coolant level...within the level indication in the pressurizer in PWRs. |
|
| |
|
| LIST OF ATTENDEESNUCLEAR REGULATORY COMMISSION:H. Christensen, Deputy Director, Division of Reactor Safety (DRS), RII C. Payne, Chief, Engineering Branch 2, DRS, RII W. Rogers, Senior Reactor Analyst, DRS, RII C. Evans, Regional Counsel and Enforcement Officer, RII B. Desai, Acting Chief, Reactor Projects Branch 3, DRP, RII S. Sparks, Senior Enforcement Specialist, RII L. Trocine, Senior Enforcement Specialist, Office of Enforcement R. Perch, APOB, Office of Nuclear Reactor Regulation (NRR) via teleconferenceM. Reinhart, APOB, NRR via teleconferenceS. Wong, APOB, NRR via teleconferenceM. Franovich, APOB, NRR via teleconferenceD. Harrison, APOB, NRR via teleconference C. Liang, SBWB, NRR via teleconferenceFLORIDA POWER AND LIGHT COMPANY (FPL):T. Jones, Site Vice President, Turkey Point R. Kundalkar, Vice President, Nuclear Engineering, FPL J. Garcia, Chief Nuclear Engineer, FPL S. Greenlee, Engineering Manager, Turkey Point W. Parker, Licensing Manager, Turkey Point C. Guey, Reliability and Risk Assessment Supervisor, FPLV. Rubano, Engineering Project Manager, FPL M. Ross, Assistant General Counsel, FPL J. Lambright, Fire Risk Consultant for FPL J. Julius, Scientech HRA Expert Consultant for FPL T. Greene, MPR Consultant for FPLOTHER ATTENDEES:C. Morgan, Miami Herald (via teleconference)Enclosure 2 MATERIAL PRESENTEDBY LICENSEEEnclosure 3 MATERIAL PRESENTED BY NRCAGENDAOPEN REGULATORY CONFERENCETURKEY POINT NUCLEAR PLANTNOVEMBER 16, 2005NRC REGION II OFFICE, ATLANTA, GA.I.OPENING REMARKS, INTRODUCTIONS AND MEETING INTENTMr. H. Christensen, Deputy Director, Division of Reactor
| | Contrary to the above, on February 13, 2004, the inspectors identified three examples where 10 CFR 50, Appendix R requirements were not met: |
| | a. The licensee failed to protect control circuits and cables that could cause maloperation of MOV-4-626, RCP Thermal Barrier Component Cooling Water System Return Isolation Valve in FZ 67. This condition existed since at least September 9, 2003, when it was first identified by the licensee. |
|
| |
|
| Safety (DRS)II.NRC REGULATORY CONFERENCE POLICYMr. C. Payne, Chief, Engineering Branch 2, DRSIII.STATEMENT OF THE ISSUE WITH RISK PERSPECTIVESMr. C. Payne, Chief, Engineering Branch 2, DRSIV.SUMMARY OF APPARENT VIOLATIONSMr. C. Payne, Chief, Engineering Branch 2, DRSV.LICENSEE RISK PERSPECTIVE PRESENTATIONVI.LICENSEE RESPONSE TO APPARENT VIOLATIONS VII.BREAK / NRC CAUCUSMr. H. Christensen, Deputy Director, Division of Reactor
| | b. The licensee failed to protect control circuits and cables that could cause maloperation of necessary RCP thermal barrier component cooling system valves MOV-3-716B and MOV-3-626 in FZ 63; and MOV-4-716B valve in FZ 67. This condition has existed since at least February 9, 2001, when the applicable procedure page was last revised. |
|
| |
|
| Safety (DRS)VIII.CLOSING REMARKSMr. H. Christensen, Deputy Director, Division of Reactor
| | c. The licensee failed to protect control circuits and cables that could cause maloperation of necessary RCP thermal barrier component cooling system valves in FZ 106; and did not meet the alternative shutdown capability requirements. Specifically, the licensees procedure may not mitigate a spurious closure of valves MOV-3-716A and MOV-4-716A in a timely manner, possibly resulting in an RCP seal LOCA, and pressurizer level dropping below the indicating range. This condition has existed since at least April 24, 2002, when the applicable procedure pages were last revised. |
|
| |
|
| Safety (DRS)Enclosure 4 Material Presented by NRC-2--2-Draft Apparent Violation10 CFR 50.48 (b)(1) requires, in part, that all nuclear power plants licensed tooperate prior to January 1, 1979, must satisfy the applicable requirements ofAppendix R, Section III.G. Section III.G.2 states, in part, that where cables orequipment, including associated non-safety circuits that could prevent operationor cause maloperation due to hot shorts, open circuits, or shorts to ground, ofredundant trains of systems necessary to achieve and maintain hot shutdownconditions are located within the same fire area outside of primary containment,one of three means of ensuring that one of the redundant trains is free of firedamage shall be provided. Section III.G.3 states that alternative shutdown capability should be provided where the protection of systems whose function isrequired for hot shutdown, does not satisfy the requirements of III.G.2. SectionIII.L of Appendix R provides requirements to be met by alternative shutdownmethods. Section III.L.2.b states, in part, that "The reactor coolant makeupfunction shall be capable of maintaining the reactor coolant level...within the levelindication in the pressurizer in PWRs." Contrary to the above, on February 13, 2004, the inspectors identified threeexamples where 10 CFR 50, Appendix R requirements were not met:a.The licensee failed to protect control circuits and cables that could causemaloperation of MOV-4-626, "RCP Thermal Barrier Component CoolingWater System Return Isolation Valve" in FZ 67. This condition existedsince at least September 9, 2003, when it was first identified by thelicensee. b.The licensee failed to protect control circuits and cables that could causemaloperation of necessary RCP thermal barrier component coolingsystem valves MOV-3-716B and MOV-3-626 in FZ 63; and MOV-4-716Bvalve in FZ 67. This condition has existed since at least February 9,2001, when the applicable procedure page was last revised. c.The licensee failed to protect control circuits and cables that could causemaloperation of necessary RCP thermal barrier component coolingsystem valves in FZ 106; and did not meet the alternative shutdown capability requirements. Specifically, the licensee's procedure may notmitigate a spurious closure of valves MOV-3-716A and MOV-4-716A in atimely manner, possibly resulting in an RCP seal LOCA, and pressurizerlevel dropping below the indicating range. This condition has existedsince at least April 24, 2002, when the applicable procedure pages werelast revised.Note: The apparent violation discussed at this Regulatory Conference is subjectto further review and subject to change prior to any resulting enforcement action.
| | Note: The apparent violation discussed at this Regulatory Conference is subject to further review and subject to change prior to any resulting enforcement action. |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000250/20240032024-11-13013 November 2024 Integrated Inspection Report - 05000250/2024003 & 05000251/2024003 & Notice of Violation L-2024-188, Supplement to License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-11-12012 November 2024 Supplement to License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-187, Supplement to the Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-11-12012 November 2024 Supplement to the Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles ML24305A1482024-11-0606 November 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 ML24276A2162024-11-0101 November 2024 Request for Withholding Information from Public Disclosure L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure 2024-09-25
[Table view] Category:Meeting Agenda
MONTHYEARPMNS20240533, Plants - 2023 Annual Assessment Meeting2024-04-12012 April 2024 Plants - 2023 Annual Assessment Meeting ML24073A3372024-03-13013 March 2024 NextEra - NRC Slides for the Public Meeting on March 19, 2024 Regarding Emergency Plan Licensing Amendment PMNS20240303, Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan2024-03-0606 March 2024 Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan PMNS20230973, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230969, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230932, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-14014 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230879, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-0101 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230809, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-07-11011 July 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230775, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-30030 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230732, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 42023-06-26026 June 2023 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 4 PMNS20230718, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-12012 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230673, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-26026 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230599, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-15015 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230594, Annual Assessment Meeting2023-05-0404 May 2023 Annual Assessment Meeting PMNS20230447, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-20020 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230449, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-18018 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230409, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-11011 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230253, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-0707 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230278, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-0303 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230308, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-27027 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230226, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-03-0707 March 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230223, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0606 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230192, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0101 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230168, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-02-22022 February 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230134, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-22022 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230159, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-15015 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230049, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-01-27027 January 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-26026 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230060, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-18018 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230003, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-0505 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221243, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 32022-12-0202 December 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and PMNS20221177, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 42022-11-22022 November 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 4 PMNS20221132, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-31031 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-17017 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221057, Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 42022-10-11011 October 2022 Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 4 PMNS20220997, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-0303 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20220998, Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request2022-09-22022 September 2022 Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request PMNS20220876, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point)2022-09-22022 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point) PMNS20220935, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-09-0909 September 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220930, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request2022-09-0808 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request ML22227A1302022-08-17017 August 2022 License Amendment Request Reactor Trip Breaker Completion Time Extension - Public Meeting August 17, 2022 (EPID L-2022-LRM-0061) (Slides) PMNS20220799, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and2022-08-16016 August 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and 4 PMNS20220832, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-16016 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220748, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-0303 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220701, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-07-14014 July 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220683, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-28028 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request ML22172A2172022-06-22022 June 2022 LAR: Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) PMNS20220609, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-14014 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220582, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-06-10010 June 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 PMNS20220592, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-0606 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request 2024-04-12
[Table view] |
Text
ary 6, 2006
SUBJECT:
EXERCISE OF ENFORCEMENT DISCRETION - TURKEY POINT NUCLEAR PLANT (NRC Inspection Report Nos. 05000250,251/2005013)
Dear Mr. Stall:
The purpose of this letter is to provide you with the results of our review of findings involving certain fire response procedures at the Turkey Point Nuclear Plant that would not be effective in ensuring a safe shutdown of Units 3 and 4 should a severe fire develop in certain fire zones.
This issue was discussed at a regulatory conference held in the NRCs Region II Office on November 16, 2005.
To summarize our review of this matter, the NRC has concluded that the significance of the findings was very low for Unit 3 and low to moderate for Unit 4. In addition, the NRC has concluded that the exercise of enforcement discretion is appropriate for these findings in accordance with the NRC Interim Enforcement Policy Regarding Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48). The NRC will also refrain from including the findings in the Agency Action Matrix in accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program. The bases for our conclusions regarding the significance of the findings is described below and in Enclosure 1.
As background, NRC Inspection Report No. 05000250,251/2005010, was issued on October 7, 2005, and it documented a finding (one apparent violation of 10 CFR Part 50, Appendix R) based on the NRCs review of three separate unresolved items (URIs 05000250,251/2004007-001, -006, and -007). The collective significance of the finding was assessed under the significance determination process as a preliminary greater than Green issue (i.e., an issue of at least low to moderate safety significance which may require additional NRC inspection). The cover letter to NRC Inspection Report No. 05000250,251/2005010 informed Florida Power and Light Company (FPL) of the NRCs preliminary conclusion, provided FPL an opportunity to request a regulatory conference on this matter, and forwarded the details of the NRCs preliminary estimate of the change in core damage frequency (CDF) for the finding.
On November 15, 2005, FPL submitted a letter to the NRC documenting its intent to adopt the risk-informed, performance-based fire protection program under 10 CFR 50.48(c), which includes approaches in National Fire Protection Association (NFPA) Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating
Florida Power and Light Company 2 Plants, 2001 Edition. In accordance with the NRCs Interim Enforcement Policy Regarding Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48), FPL requested enforcement discretion for existing identified noncompliances, noncompliances identified during its NFPA 805 transition process, and the noncompliance that was the subject of the November 16, 2005, regulatory conference.
At FPLs request, an open regulatory conference was conducted on November 16, 2005, to discuss FPLs position on this issue. The enclosures to this letter include the list of attendees at the regulatory conference and material presented by FPL and NRC.
During the conference, FPL presented the results of its estimate of the increase in CDF including influential assumptions and risk analysis methodology. FPLs presentation addressed the three aspects of the finding separately (i.e., URI 05000250,251/2004007-001, -006, and-007), and provided the following conclusions on the matter. In summary, FPL agreed with the NRCs view that URI 05000250,251/2004007-001 was a violation of 10 CFR Part 50, Appendix R, but concluded that the significance of this issue was very low. FPL disagreed with that portion of the finding consisting of URIs 05000250,251/2004007-006 and -007, concluding that procedural requirements were acceptable, a performance deficiency did not exist, and thus this finding did not represent a violation. Furthermore, FPL concluded that the significance of URIs 05000250,251/2004007-006 and -007, even if considered to be a finding, was very low.
At the conference, the NRC requested that FPL provide additional information to support its risk analysis. This information was subsequently submitted by letter dated November 23, 2005.
FPLs presentation and subsequent correspondence provided 15 inputs on the safety significance of the finding. The following three of the inputs were incorporated into the NRCs final significance determination: (1) reducing the main control room fire ignition frequency, (2) modifying the time at which the operating charging pump would be stopped during a main control room fire, and (3) reducing the time that reactor coolant pump (RCP) leakage could have created conditions for a small break loss of coolant accident (LOCA). A detailed discussion of the NRCs basis for acceptance or rejection of all inputs is provided in Enclosure 1.
After considering the information developed during the inspection, the information presented at the conference, and the supplemental information provided by FPL after the conference, the NRC has concluded that the final inspection findings are appropriately characterized as very low for Unit 3 and low to moderate for Unit 4.
The NRC also concluded that a violation of 10 CFR 50.48(b)(1) and 10 CFR Part 50, Appendix R, Sections III.G.2 and III.G.3, occurred. In particular, Appendix R,Section III.G.2 states, in part, that where cables or equipment (including associated non-safety circuits that could prevent operation or cause maloperation due to hot shorts, open circuits, or shorts to ground) of redundant trains of systems necessary to achieve and maintain hot shutdown conditions are located within the same fire area outside of primary containment, one of three means of ensuring that one of the redundant trains is free of fire damage shall be provided.
Section III.G.3 states that alternative shutdown capability should be provided where the protection of systems (whose function is required for hot shutdown) does not satisfy the requirements of Section III.G.2.
Florida Power and Light Company 3 In this case, the following three instances were identified where FPL failed to satisfy the above Appendix R requirements: (1) FPL failed to protect control circuits and cables that could cause maloperation of motor-operated valve (MOV) MOV-4-626, RCP Thermal Barrier Component Cooling Water System Return Isolation Valve, in fire zone (FZ) 67. This condition existed since at least September 9, 2003, when it was first identified by FPL. (2) FPL failed to protect control circuits and cables that could cause maloperation of necessary RCP thermal barrier component cooling system valves MOV-3-716B and MOV-3-626 in FZ 63 and MOV-4-716B valve in FZ 67. This condition existed since at least February 9, 2001, when the applicable procedure page was last revised FPL. (3) FPL failed to protect control circuits and cables that could cause maloperation of necessary RCP thermal barrier component cooling system valves in FZ 106 and did not meet the alternative shutdown capability requirements. Specifically, under certain scenarios, FPLs procedure may not have mitigated a spurious closure of valves MOV-3-716A and MOV-4-716A in a timely manner, possibly resulting in an RCP seal LOCA and pressurizer level dropping below the indicating range. This condition existed since at least April 24, 2002, when the applicable procedure pages were last revised.
The NRC also reviewed FPLs request that the violation be considered for enforcement discretion. On June 16, 2004, the NRC published a final rule revising its regulations in 10 CFR 50.48, which governs fire protection at operating nuclear power plants. This revision became effective on July 16, 2004, and it added a new paragraph (c) to 10 CFR 50.48 that allows reactor licensees to voluntary comply with the risk-informed, performance-based fire protection approaches in NFPA 805 (with limited exceptions stated in the rule language) as an alternative to complying with 10 CFR 50.48(b) or the requirements in their fire protection license conditions. As part of the transition to 10 CFR 50.48(c), licensees will establish the fundamental fire protection program identified in NFPA 805 and will perform a plant-wide assessment to identify fire areas and fire hazards and to evaluate compliance with their existing fire protection licensing basis. This fire protection assessment is beyond the normal licensee review of their fire protection program. With regard to applicable noncompliances, licensees are required to adopt compensatory measures until compliance is either restored to 10 CFR 50.48(b) or achieved per 10 CFR 50.48(c).
In order to provide incentives for licensees initiating efforts to identify and correct subtle violations that are not likely to be identified by routine efforts, the NRC issued Enforcement Policy Statement revisions on June 16, 2004, and January 14, 2005, allowing enforcement discretion for certain fire protection noncompliances identified as part of the transition to 10 CFR 50.48(c) as well as existing identified compliances which could reasonably be corrected under 10 CFR 50.48(c). This interim enforcement discretion policy is consistent with the long-standing policy included in Section VII.B.3, Violations Involving Old Design Issues, of the Enforcement Policy, which addresses discretion when licensee undertake a comprehensive review and assessment. This exercise of discretion provides appropriate incentives for licensees to initiate efforts to identify and correct subtle violations that are not likely to be identified by routine efforts. As such, the NRC Interim Enforcement Policy Regarding Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48) provides enforcement discretion for licensees who wish to take advantage of the new rule to resolve existing noncompliances (i.e., implement corrective actions until the licensee has transitioned to 10 CFR 50.48(c)) provided that certain criteria are met.
In this case, the NRC concluded that (1) the noncompliance was not associated with a finding that the reactor oversight process significance determination process would evaluate as Red, or
Florida Power and Light Company 4 it would not be categorized at Severity Level I; (2) FPL submitted a letter of intent before December 31, 2005, stating its intent to transition to 10 CFR 50.48(c), which includes approaches in NFPA 805; and (3) the licensee entered the noncompliance into its corrective action program and implemented appropriate compensatory measures (including an operability evaluation to demonstrate that safety will be maintained during operation and shutdown).
Regarding compensatory measures, FPL incorporated acceptable manual operator actions into applicable procedures to address the finding at the time of the original inspection. Based on the above, in accordance with the NRCs Interim Enforcement Policy Regarding Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48), and in consultation with the Director, Office of Enforcement; I have been authorized to exercise enforcement discretion such that the above violation will not be cited. In addition, based on the above corrective actions and in accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program, the NRC will also refrain from including the finding in the Agency Action Matrix.
You are not required to respond to this letter. In accordance with 10 CFR 2.390 of the NRC's
"Rules of Practice," a copy of this letter, its enclosures, and your response (should you choose to provide one) will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS) which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, any response should not include any personal privacy, proprietary, classified, or safeguards information so that it can be made available to the Public without redaction.
Should you have any questions regarding this letter, please contact Mr. D. Charles Payne, Chief, Engineering Branch 2, Division of Reactor Safety, at (404)562-4669.
Sincerely,
/RA/ BY LOREN PLISCO ACTING FOR/
William D. Travers Regional Administrator Docket Nos. 50-250, 50-251 License Nos. DPR-31, DPR-41
Enclosures:
1. NRC Evaluation of Licensees Risk Significance Inputs 2. List of Attendees 3. Material Presented by Licensee 4. Material Presented by NRC
Florida Power and Light Company 5
REGION II OFFICE, ATLANTA, GA.
I. OPENING REMARKS, INTRODUCTIONS AND MEETING INTENT Mr. H. Christensen, Deputy Director, Division of Reactor Safety (DRS)
II. NRC REGULATORY CONFERENCE POLICY Mr. C. Payne, Chief, Engineering Branch 2, DRS III. STATEMENT OF THE ISSUE WITH RISK PERSPECTIVES Mr. C. Payne, Chief, Engineering Branch 2, DRS IV. SUMMARY OF APPARENT VIOLATIONS Mr. C. Payne, Chief, Engineering Branch 2, DRS V. LICENSEE RISK PERSPECTIVE PRESENTATION VI. LICENSEE RESPONSE TO APPARENT VIOLATIONS VII. BREAK / NRC CAUCUS Mr. H. Christensen, Deputy Director, Division of Reactor Safety (DRS)
VIII. CLOSING REMARKS Mr. H. Christensen, Deputy Director, Division of Reactor Safety (DRS)
Enclosure 4
Material Presented by NRC -2-Draft Apparent Violation 10 CFR 50.48 (b)(1) requires, in part, that all nuclear power plants licensed to operate prior to January 1, 1979, must satisfy the applicable requirements of Appendix R,Section III.G.Section III.G.2 states, in part, that where cables or equipment, including associated non-safety circuits that could prevent operation or cause maloperation due to hot shorts, open circuits, or shorts to ground, of redundant trains of systems necessary to achieve and maintain hot shutdown conditions are located within the same fire area outside of primary containment, one of three means of ensuring that one of the redundant trains is free of fire damage shall be provided.Section III.G.3 states that alternative shutdown capability should be provided where the protection of systems whose function is required for hot shutdown, does not satisfy the requirements of III.G.2.Section III.L of Appendix R provides requirements to be met by alternative shutdown methods.Section III.L.2.b states, in part, that The reactor coolant makeup function shall be capable of maintaining the reactor coolant level...within the level indication in the pressurizer in PWRs.
Contrary to the above, on February 13, 2004, the inspectors identified three examples where 10 CFR 50, Appendix R requirements were not met:
a. The licensee failed to protect control circuits and cables that could cause maloperation of MOV-4-626, RCP Thermal Barrier Component Cooling Water System Return Isolation Valve in FZ 67. This condition existed since at least September 9, 2003, when it was first identified by the licensee.
b. The licensee failed to protect control circuits and cables that could cause maloperation of necessary RCP thermal barrier component cooling system valves MOV-3-716B and MOV-3-626 in FZ 63; and MOV-4-716B valve in FZ 67. This condition has existed since at least February 9, 2001, when the applicable procedure page was last revised.
c. The licensee failed to protect control circuits and cables that could cause maloperation of necessary RCP thermal barrier component cooling system valves in FZ 106; and did not meet the alternative shutdown capability requirements. Specifically, the licensees procedure may not mitigate a spurious closure of valves MOV-3-716A and MOV-4-716A in a timely manner, possibly resulting in an RCP seal LOCA, and pressurizer level dropping below the indicating range. This condition has existed since at least April 24, 2002, when the applicable procedure pages were last revised.
Note: The apparent violation discussed at this Regulatory Conference is subject to further review and subject to change prior to any resulting enforcement action.