ML062930280: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML062930280
| number = ML062930280
| issue date = 09/11/2006
| issue date = 09/11/2006
| title = Limerick Oct. 2006 Exam - Draft - Section B Operating Exam (Folder 2)
| title = Oct. 2006 Exam - Draft - Section B Operating Exam (Folder 2)
| author name = Fish T H
| author name = Fish T
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name =  
| addressee name =  
Line 16: Line 16:
=Text=
=Text=
{{#Wiki_filter:Limerick Generating Station Job Performance Measure START REACTOR RECIRC PUMP (ALTERNATE PATH)
{{#Wiki_filter:Limerick Generating Station Job Performance Measure START REACTOR RECIRC PUMP (ALTERNATE PATH)
JPM Number: LLOJPM0526 EXELON NUCLEAR I LLOJPM0526 REV003 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through I1 below. 1. Task description and number, JPM description and number are identified.
JPM Number: LLOJPM0526
: 2. Knowledge and Abilities (WA) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. Date 9. Pilot test the JPM: a. verify cues both verbal and visual are free of conflict, and b. ensure performance time is accurate.
JPM. 10. If the JPM cannot be performed as written with proper responses, then revise the I I. When JPM is revalidated, SME or Instructor sign and date JPM cover page. L LOJPM0526 RevOO3. doc Page 2 of 8 EXELON NUCLEAR I LLOJPM0526 REV003 REVISION RECORD (Summary)
Revision 2, Changed setup instructions. SIMULATOR SETUP INSTRUCTIONS:
I. Reset to Single Loop IC (36% power) 2. Ensure that the "I B" RRP shutdown IAW S43.2.A and then Startup of the "1 B" RRP is complete up to and including step 4.3.5 3. Insert the following malfunctions on Trigger
#I. Set up Trigger #I to activate the malfunctions when the "B" RRP discharge valve is full open (Trigger Text !ZRRL31 BG) TASK STANDARD:
"IB" RRP started then secured due to Reactor Recirc Pump High Vibration IN ITlAL CON DlTlON S: I. Unit 1 is at 36% power in Single Loop operation, with the "IA" Reactor Recirc Pump in service and the "I By' Reactor Recirc Pump shutdown.
: 2. S43.1 .A, Start Up of Recirculation System, has been completed up to and including step


====4.3.5 INITIATING====
EXELON NUCLEAR                                                      I LLOJPM0526 REV003 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:  All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through I 1 below.
: 1. Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (WA) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.          Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
II.When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LLOJPM0526 RevOO3.doc                                                              Page 2 of 8
 
EXELON NUCLEAR                                                I LLOJPM0526 REV003 REVISION RECORD (Summary)
Revision 2, Changed setup instructions.
SIMULATOR SETUP INSTRUCTIONS:
I.Reset to Single Loop IC (36% power)
: 2. Ensure that the I B RRP shutdown IAW S43.2.A and then Startup of the 1B RRP is complete up to and including step 4.3.5
: 3. Insert the following malfunctions on Trigger # I . Set up Trigger # I to activate the malfunctions when the B RRP discharge valve is full open (Trigger Text !ZRRL31BG)
TASK STANDARD:
IB RRP started then secured due to Reactor Recirc Pump High Vibration INITlAL CONDlTlONS:
I.Unit 1 is at 36% power in Single Loop operation, with the IA Reactor Recirc Pump in service and the I ByReactor Recirc Pump shutdown.
: 2. S43.1 .A, Start Up of Recirculation System, has been completed up to and including step 4.3.5 INITIATING CUES:
You are directed by shift supervision start the 1B Reactor Recirc pump in accordance with step 4.3.6 of S43.1 .A.
LLOJPM0526 RevOO3.doc                                                                Page 3 of 8


CUES: You are directed by shift supervision start the "1 B" Reactor Recirc pump in accordance with step 4.3.6 of S43.1 .A. LLOJPM0526 RevOO3.doc Page 3 of 8 EXEL ON NUCLEAR ~ LLOJPM0526 REV003 Information For Evaluator's Use: UNSAT requires written comments on respective step.
EXELON NUCLEAR                                         ~
LLOJPM0526 REV003 Information For Evaluators Use:
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section.
Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue. L L OJPMO526 RevOO3. doc Page 4 of 8 EXELON NUCLEAR LLOJPM0526 REV003 Operator's Name: Job Title:
The timeclock starts when the candidate acknowledges the initiating cue.
0 NLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM Title: START REACTOR RECIRC PUMP (ALTERNATE PATH) JPM Number: LLOJPM0526 Revision Number: 002 WA Number and Importance:
LL OJPMO526 RevOO3.doc                                                                     Page 4 of 8
202001 A3.02 3.1/3.0 Suggested Testing Environment:
 
Simulator Actual Testing Environment:
EXELON NUCLEAR LLOJPM0526 REV003 Operators Name:
Simulator Testing Method:
Job
Perform Faulted: Yes Alternate Path:
 
Yes Time Critical:
==Title:==
No Estimated Time to Complete:
0 NLO         0 RO         0 SRO         0 STA         0SRO Cert JPM
20 minutes Actual Time Used: minutes  
 
==Title:==
START REACTOR RECIRC PUMP (ALTERNATE PATH)
JPM Number: LLOJPM0526                 Revision Number: 002 WA Number and Importance:           202001 A3.02     3.1/3.0 Suggested Testing Environment:           Simulator Actual Testing Environment:         Simulator Testing Method: Perform                       Faulted: Yes Alternate Path: Yes Time Critical: No Estimated Time to Complete: 20 minutes         Actual Time Used:               minutes


==References:==
==References:==
S43.1 .A, START UP OF RECIRCULATION SYSTEM EVALUATION  
S43.1 .A, START UP OF RECIRCULATION SYSTEM EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily? CI Yes       Cl No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:               0Satisfactory            0Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Note: Any grade of UNSAT requires a comment.
CI Yes Cl No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments:
Evaluators Name:                                             (Print)
Note: Any grade of UNSAT requires a comment. Evaluator's Name: (Print) Evaluator's Signature: Date:
Evaluators Signature:                                                 Date:
LLOJPM0526 RevOO3. doc Page 5 of 8
LLOJPM0526 RevOO3.doc                                                                 Page 5 of 8
,&CLEAR GENERATION GROUP EXELON NUCLEAR1 LLOJPM0526 Rev003 JOB PERFORMANCE MEASURE (JPM) NOTE: Critical Element@) indicated by
 
,&CLEAR GENERATION GROUP                                                   EXELON NUCLEAR1 LLOJPM0526 Rev003 JOB PERFORMANCE MEASURE (JPM)
NOTE: Critical Element@)indicated by
* in Performance Checklist.
* in Performance Checklist.
PERFORMANCE CHECKLIST:
PERFORMANCE CHECKLIST:
JPM Start Time: ELEMENT *I. PLACE "Recirc Pp M-G Set Drive Motor Control" (MOTOR), to "START" at *OC602 AND VERIFY the following:
JPM Start Time:
la. XY4-M1-*R621A(B), "Recirc Pp Speed" (S), increases to approximately 100% I b. M-G Field breaker closes approximately 13 seconds after M-G start 1 c. B 32-*R627A(B), "Generator Current" (AM), rise 1 d. B32-*R623A(B), "Generator Voltage" (V), rise le. PDI43-*R612A(B), "Recirc Pp Differential Pressure" (DELTA PX), rise If. XY5-MI -*R621A(B), "Recirc Pp Speed Demand" (DEMAND), reduces to approximately 20% lg. XY4-M1-*R621A(B), "Recirc Pp Speed" (S), reduces to approximately 20% STANDARD "Recirc Pp M-G Set Drive Motor Control" (MOTOR), taken to "START" XY4-Ml-*R621A(B), "Recirc Pp Speed" (S), increases at approximately 100%
ELEMENT                           STANDARD
M-G Field breaker closed approximately 13 seconds after M-G start B32-*R627A( B), "Generator Current" (AM) rises B32-*R623A( B), "Generator Voltage" (V), rises PDI43-*R612A(B), "Recirc Pp Differential Pressure" (DELTA PX), rose XYS-MI-*R621A(B), "Recirc Pp Speed Demand" , at approximately 20% XY4-M1-*R621A(B), "Recirc Pp Speed" (S), reduces to approximately 20% LLOJPM0526 Rev003.doc Page 6 of 8 JUCLEAR GENERATION GROUP EXELON NUCLEAR[ "1 B Recirc Pump at minimum speed LLOJPM0526 Rev003 JOB PERFORMANCE MEASURE (JPM)
  *I. PLACE "Recirc Pp M-G Set      "Recirc Pp M-G Set Drive Motor Drive Motor Control"           Control" (MOTOR), taken to (MOTOR), to "START" at         "START"
< II ELEMENT *2. JOG OPEN HV-43-*F031 A( B), DISCHARGE, at OC602 for 1 to 2 seconds allowing 5 to IO seconds for power AND level to stabilize repeating as necessary until the following conditions are met: 2a. Recirc Pp speed is stable 2b. FI-42-*R61 IA(B), "Total Jet Pump Loop Flow" (FL), is approximately 15 Ibs/hr XI OE6 NOTE TO Evaluator:
        *OC602   AND VERIFY the following:
STANDARD SAT UNSAT Comment I 1 I Number Recirc Pp speed is stable I I I FI-42-*R61 IA(B), "Total Jet Pump Loop Flow" (FL), is approximately 15 Ibs/hr X10E6 Ensure Malf VIC105B9 0-18 inserted over I minute after Discharge Valve is fully open Ensure Malf VIC106B1 0-18 inserted over I minute after Discharge Valve is fully open Ensure Annunciator 112 0-2 RECIRC M-G PUMP MOTOR Hi VIBRATION inserted 30 seconds after Discharge Valve is fully open NOTE TO Evaluator: The following actions are from ARC 112 D-2 1 B RECIRC M-G PUMP MOTOR HI VIBRATION
la. XY4-M1-*R621A(B), "Recirc       XY4-Ml-*R621A(B), "Recirc Pp Pp Speed" (S),increases to   Speed" (S), increases at approximately 100%           approximately 100%
*3. IF no speed changes on ''I B" . Recirc Pump were made OR Vibration Monitoring System indicates a problem during a speed change, THEN reduce speed of "1 B" Recirc Pump to clear annunciator
Ib. M-G Field breaker closes         M-G Field breaker closed approximately 13 seconds      approximately 13 seconds after after M-G start              M-G start 1c. B 32-*R627A(B), "Generator       B32-*R627A(B), "Generator Current" (AM), rise           Current" (AM) rises 1d. B32-*R623A(B), "Generator        B32-*R623A(B), "Generator Voltage" (V), rise            Voltage" (V), rises le. PDI43-*R612A(B), "Recirc         PDI43-*R612A(B), "Recirc Pp Pp Differential Pressure"    Differential Pressure" (DELTA PX),
: 4. IF annunciator cannot be cleared after reducing flow to the low speed setpoint, THEN secure "1 B" Recirc Pump, per S43.2.A I I NOTE TO Evaluator:
(DELTA PX), rise              rose I f . XY5-MI -*R621A(B), "Recirc     XYS-MI-*R621A(B), "Recirc Pp Pp Speed Demand"               Speed Demand" , at approximately (DEMAND), reduces to           20%
The following actions are from S43.2.A L LO JPMO526 Rev003. doc Page 7 of 8 
approximately 20%
,\IUCLEAR GENERATION GROUP EXELON  NUCLEAR^
lg. XY4-M1-*R621A(B), "Recirc       XY4-M1-*R621A(B), "Recirc Pp Pp Speed" (S), reduces to     Speed" (S), reduces to approximately20%              approximately 20%
ELEMENT LLOJPM0526 Rev003 STANDARD JOB PERFORMANCE MEASURE (JPM) *7. TRIP M-G Drive Motor breaker (MOTOR) AND .... M-G Drive Motor breaker (MOTOR) Tripped 5. ENSURE XC-M1-*R621A(B), "Recirc Pp & MG set-M/A" (S), set at O%, at *OC602 ~ ~~ 6. Rx is at power THEN MONITOR position ON power/Flow Map in accordance with GP-5 Appendix 2, Planned Rx Maneuvering Without Shutdown AND/OR OT-I12 U/*, Recirculation Pump Trip, as applicable Otherwise, MARK this step N/A XC-M1-*R621A(B), "Recirc Pp & MG Set-M/A" (S), set at 0%, N/A 7a. VERIFY B32-*R628A(B), "Motor current" (AM)1 lowers to zero B32-*R628A(B), "Motor current" (AM), at zero __ ~ ~___ ~~ *8. CLOSE HV-43-*F031A(B), (DISCHARGE) HV "Recirc Pp Disch Vlv" *F023A(B), "Recirc Pp Suction Vlv" (SUCTION)
LLOJPM0526 Rev003.doc                                                         Page 6 of 8
CUE:"You can stop here you have met the termination criteria for this JPM" HV-43-I F031A(B), "Recirc Pp Discharge" (DISCHARGE) - OR HV-43-1 FO23A(B), "Recirc Pp Suction" (SUCTION) CLOSED JPM Stop Time SAT = UNSAT I Comment L LOJPM0526 Rev003. doc Page 8 of 8 EXELONNUCLEAR INITIAL CON DlTlON S : 1. Unit 1 is at 36% power in Single Loop operation, with the "IA" Reactor Recirc Pump in service and the "1 B" Reactor Recirc Pump shutdown.
: 2. S43.1 .A, Start Up of Recirculation System, has been completed up to and including step


====4.3.5 INITIATING====
JUCLEAR GENERATION          GROUP                                            EXELON NUCLEAR[
LLOJPM0526 Rev003 JOB PERFORMANCE MEASURE (JPM)
I                ELEMENT                          STANDARD I 1 SAT      UNSAT I Comment Number
    *2. JOG OPEN HV-43-*F031A( B),
DISCHARGE, at OC602 for 1 to 2 seconds allowing 5 to I O seconds for power AND level to stabilize repeating as necessary until the following conditions are met:
2a. Recirc Pp speed is stable      Recirc Pp speed is stable        I        I          I 2b. FI-42-*R61IA(B), Total Jet    FI-42-*R61IA(B), Total Jet Pump Pump Loop Flow (FL), is      Loop Flow (FL), is approximately approximately 15 Ibs/hr        15 Ibs/hr X10E6 X I OE6 NOTE TO Evaluator:
Ensure Malf VIC105B9 0-18 inserted over Iminute after Discharge Valve is fully open Ensure Malf VIC106B1 0-18 inserted over Iminute after Discharge Valve is fully open Ensure Annunciator 112 0-2 RECIRC M-G PUMP MOTOR Hi VIBRATION inserted 30 seconds after Discharge Valve is fully open NOTE TO Evaluator:
The following actions are from ARC 112 D-2 1B RECIRC M-G PUMP MOTOR HI VIBRATION
    *3.
IF no speed changes on I  B  1B Recirc Pump at minimum Recirc Pump were made OR        speed                                      <
Vibration Monitoring System indicates a problem during a speed change, THEN reduce speed of 1B Recirc Pump to clear annunciator
: 4. IF annunciator cannot be cleared after reducing flow to the low speed setpoint, THEN secure 1B Recirc Pump, per S43.2.A                                                          I                  I NOTE TO Evaluator: The following actions are from S43.2.A LLOJPMO526 Rev003.doc                                                                Page 7 of 8


CUES: You are directed by shift supervision start the "1 B" Reactor Recirc pump in accordance with step 4.3.6 of S43.1 .A.
,\IUCLEAR GENERATION        GROUP                                        EXELON    NUCLEAR^
Limerick Generating Station Job Performance Measure RESTORE RECW, DWCW, AND INSTRUMENT GAS (E-IAYIGO) (TIME CRITICAL)JPM Number: LLOJPM0050 GLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0050 Rev 011 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
LLOJPM0526 Rev003 JOB PERFORMANCE MEASURE (JPM)
Prior to JPM usage, revalidate JPM using steps 8 through 11 below. I. Task description and number, JPM description and number are identified.  
ELEMENT                          STANDARD            SAT  UNSAT  I Comment
: 2. Knowledge and Abilities (WA) references are included.  
                                                                        =
: 3. Performance location specified. (in-plant, control room, or simulator)  
: 5. ENSURE XC-M1-*R621A(B),          XC-M1-*R621A(B), "Recirc Pp &
: 4. Initial setup conditions are identified.  
      "Recirc Pp & MG set-M/A" (S),    MG Set-M/A" (S),set at 0%,
: 5. Initiating and terminating cues are properly identified.  
set at O%, at *OC602
: 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are identified with an asterisk  
                    ~~
(*). 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
~
Procedure Rev. Date a. verify cues both verbal and visual are free of conflict, and b. ensure performance time is accurate.
: 6. Rx is at power THEN                          N/A MONITOR position ON power/Flow Map in accordance with GP-5 Appendix 2, Planned Rx Maneuvering Without Shutdown AND/OR OT-I12 U/*, Recirculation Pump Trip, as applicable Otherwise, MARK this step N/A M-G Drive Motor breaker (MOTOR)
then revise the JPM. cover page. 9. Pilot test the JPM: IO. If the JPM cannot be performed as written with proper responses, 11. When JPM is revalidated, SME or Instructor sign and date JPM LLOJPM0050 Rev001 ?.doc Page 2 of 7 dLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPMOO50 Rev 077 REVISION RECORD (Summary):  
    *7. TRIP M-G Drive Motor            Tripped breaker (MOTOR) AND        ....
: 1. Revised format. SIMULATOR SETUP INSTRUCTIONS:
7a. VERIFY B32-*R628A(B),          B32-*R628A(B), "Motor current" "Motor current" (AM)1lowers    (AM), at zero to zero
I. Reset the Simulator to IC-I7 2. Insert Malfunction MED280A (Loss of 1AY160) TASK STANDARD:
__      ~  ~  _    _ _    ~~
Restore RECW and DWCW flow to the drywell, and Instrument Gas aligned to the Drywell. INITIAL CONDITIONS:
    *8. CLOSE HV-43-*F031A(B),          HV-43-I F031A(B), "Recirc Pp "Recirc Pp Disch Vlv"          Discharge" (DISCHARGE)
This task is time critical 1. 1AY160 is de-energized  
(DISCHARGE)        HV        *F023A(B), "Recirc Pp          -
: 2. "1 B" DW Chiller was running. INITIATING CUE:
OR Suction Vlv" (SUCTION)          HV-43-1FO23A(B), "Recirc Pp Suction" (SUCTION) CLOSED CUE:"You can stop here you have met the termination criteria for this JPM" JPM Stop Time LLOJPM0526 Rev003.doc                                                          Page 8 of 8
You are directed by Shift Supervision to perform the initial actions of E-1AY160 to restore RECW, DWCW, and Instrument Gas. Information For Evaluator's Use: UNSAT requires written comments on respective step.
 
* Denotes CRITICAL steps. Number any comments in the "Comment Number" column.
EXELONNUCLEAR INITIAL CON DlTlONS :
Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
: 1. Unit 1 is at 36% power in Single Loop operation, with the IA Reactor Recirc Pump in service and the 1B Reactor Recirc Pump shutdown.
Some operations that are performed from outside of the control room may require multiple steps.
: 2. S43.1 .A, Start Up of Recirculation System, has been completed up to and including step 4.3.5 INITIATING CUES:
These items may'be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
You are directed by shift supervision start the 1B Reactor Recirc pump in accordance with step 4.3.6 of S43.1 .A.
T initiating cue. .........  
 
"..I ....................  
Limerick Generating Station Job Performance Measure RESTORE RECW, DWCW, AND INSTRUMENT GAS (E-IAYIGO) (TIME CRITICAL)JPM Number: LLOJPM0050
" ....... * ...........................
 
"..I .................  
GLEAR GENERATION         GROUP                                             EXELON NUCLEAR       I LLOJPM0050 Rev 011 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
..^^. LLOJPM0050 Rev001 ?.doc Page 3 of 7 2LEAR GENERATiON GROUP EXELON NUCLEAR I LLOJPM0050 Rev 011 Operator's Name: Job Title:
I.Task description and number, JPM description and number are identified.
0 NLO I7 RO 0 SRO 0 STA SRO Cert JPM Title: RESTORE RECW, DWCW, AND INSTRUMENT GAS (E-IAYIGO)
: 2. Knowledge and Abilities (WA) references are included.
JPM Number: LLOJPM0050 Revision Number: 01 1 K/A Number and Importance:
: 3. Performance location specified. (in-plant, control room, or simulator)
223001 A4.12 333.6 Suggested Testing Environment:
: 4. Initial setup conditions are identified.
Simulator Actual Testing Environment:
: 5. Initiating and terminating cues are properly identified.
Simulator  
: 6. Task standards identified and verified by SME review.
' Testing Method:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
Perform Faulted: No Alternate Path:
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
No Time Critical:
Procedure Rev.             Date
Yes Estimated Time to Complete: 15 minutes Actual Time Used: minutes  
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LLOJPM0050 Rev001 ?.doc                                                             Page 2 of 7
 
dLEAR GENERATION GROUP                                                                               EXELON NUCLEAR                 I LLOJPMOO50 Rev 077 REVISION RECORD (Summary):
: 1. Revised format.
SIMULATOR SETUP INSTRUCTIONS:
I.Reset the Simulator to IC-I7
: 2. Insert Malfunction MED280A (Loss of 1AY160)
TASK STANDARD:
Restore RECW and DWCW flow to the drywell, and Instrument Gas aligned to the Drywell.
INITIAL CONDITIONS: This task is time critical
: 1. 1AY160 is de-energized
: 2. 1B DW Chiller was running.
INITIATING CUE:
You are directed by Shift Supervision to perform the initial actions of E-1AY160 to restore RECW, DWCW, and Instrument Gas.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items maybe listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
T
..^^.                                                                 initiating
                                                                    ...........I.......... cue.
                                                                                            .......* .............. ..I.................
LLOJPM0050 Rev001 ?.doc                                                                                                   Page 3 of 7
 
2LEAR GENERATiON GROUP                                                   EXELON NUCLEAR       I LLOJPM0050 Rev 011 Operators Name:
Job
 
==Title:==
0NLO          I7 RO         0SRO          0 STA             SRO Cert JPM
 
==Title:==
RESTORE RECW, DWCW, AND INSTRUMENT GAS (E-IAYIGO)
JPM Number: LLOJPM0050             Revision Number: 01 1 K/A Number and Importance: 223001 A4.12 333.6 Suggested Testing Environment:           Simulator Actual Testing Environment:       Simulator Testing Method:       Perform               Faulted:       No Alternate Path:       No Time Critical:     Yes Estimated Time to Complete: 15 minutes Actual Time Used:                           minutes


==References:==
==References:==
E-IAYI 60 EVALUATION  
E-IAYI 60 EVALUATION  


==SUMMARY==
==SUMMARY==
: Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?         El Yes         0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory         c3 Unsatisfactory Comments:
El Yes 0 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory c3 Unsatisfactory Comments:
Note: Any grade of UNSAT requires a comment.
Note: Any grade of UNSAT requires a comment. Evaluator's Name: (Print) Eva1 uator's Signature: Date:
Evaluators Name:                                           (Print)
LLOJPM0050 Rev001 ?.doc Page 4 of 7 iLEAR GENERATION GROUP EXELON NUCLEAR LLOJPM0050 Rev 079 JOB PERFORMANCE MEASURE (JPM)
Eva1uators Signature:                                               Date:
NOTE: Critical Element@)
LLOJPM0050 Rev001 ?.doc                                                               Page 4 of 7
indicated by
 
* in Performance Checklist. PERFORMANCE CHECKLIST:
iLEAR GENERATIONGROUP                                              EXELON NUCLEAR LLOJPM0050 Rev 079 JOB PERFORMANCE MEASURE (JPM)
JPM Start Time: ELEMENT I. Obtain current revision of E- l AY l 60. Cue: Once the trainee demonstrates the ability to locate the current revision of the procedure, provide him/her a copy. 2. ENTER ON-I 13, LOSS Of RECW. Cue: ON-I 13 is being performed  
NOTE: Critical Element@)indicated by
: 3. - IF Recirc Pumps trip, THEN ENTER OT-I 12, Recirculation Pump Trip. 4. PERFORM the following to restore RECW to Recirc Pump seal motor oil coolers, on 1 OC655: *4a. PLACE HS-13-112, "Seals/ Oils Clrs lnbd Is01 Bypass" to "BYPASS" *4b. PLACE HS-13-106, "Recirc Pumps Seals/Oil Coolers" (IN), to "OPEN" *4c. PLACE HS-13-107, "Recirc Pumps Seals/Oil Cooler" (OUT), to "OPEN" 5. REFER TO Tech Spec 3.6.3 - AND TAKE action for an inoperable isolation valve. STANDARD Current revision of E-I AY 1 60 obtained.
* in Performance Checklist.
N/A N/A N/A Within 10 minutes of start time, HS-13-112 in BYPASS Within 10 minutes of start time, HS-13-106 OPEN Within 10 minutes of start time, HS-I 3-1 07 OPEN CRS notified T.S. 3.6.3 applicable.
PERFORMANCE CHECKLIST:
SAT UNSAT Comment Number LLOJPM0050 RevOO? 1.doc 'Page 5 of 7 GLEAR GENERATION GROUP EXELON NUCLEAR LLOJPM0050 Rev 011 JOB PERFORMANCE MEASURE (JPM) ELEMENT I 6. PERFORM the following to I restore Drywell Cpoling: *6a. PLACE HS-87-116, DNV CHILL WTR OUTBD ISOL BYPASS, keylock switch to "BYPASS at I OC681. er Isolation valves Valve Number  
JPM Start Time:
-- Description HV-87-120A "Chld Wtr In" HV-87-121A "Chld Wtr Out" *7b. *2) Handswitch  
ELEMENT                               STANDARD              SAT  UNSAT    Comment Number I. Obtain current revision of E-     Current revision of E-IAY 160 lAY l60.                          obtained.
#: HSS I21 B (Loop B) Valve Number  
Cue:   Once the trainee demonstrates the ability to locate the current revision of the procedure, provide him/her a copy.
-- Description HV-87-120B "Chld Wtr In" HV-87-121 B "Chld Wtr Out" 8. - IF Drywell Chiller trips, THEN REFER TO S87.1 .A, Startup of Drywell Chilled Water System, - AND START Drywell Chilled Water System. 9. PERFORM the following to restore Instrument Gas on 1 OC601 , ISOLATION:
: 2. ENTER ON-I 13, LOSSOf                            N/A RECW.
1 :;CIS PLACE HS-59-129Ar  
Cue:   ON-I 13 is being performed
~ "Instrument Gas Supply" (DRYWELL A), in "CLOSE". "Containment Isolation Bypass" (A), in "BYPASS".
: 3.     -
PLACE HSS-57-191AY STANDARD NIA HS-87-116 in BYPASS CRS notified T.S. 3.6.3 applicable.
IF Recirc Pumps trip, THEN                       N/A ENTER OT-I 12, Recirculation Pump Trip.
NIA HV-87-120A and 121A OPEN HV-87-120B and 121 B OPEN NIA NIA HS-59-129A in CLOSE HSS-57-191A in BYPASS SAT UNSAT Comment Number LLOJPM0050 Rev001 ?.doc Page 6 of 7 dLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0050 Rev Of1 JOB PERFORMANCE MEASURE (JPM) ELEMENT I *9~. PLACE HS-59-129A, "Instrument Gas Supply (DRYWELL A),in "AUTO".  
: 4. PERFORM the following to                         N/A restore RECW to Recirc Pump seal       motor oil coolers, on 1OC655:
*9d. PLACE HS-59-101, "Instrument Gas Suction" (INBOARD), in "OPEN". 9e. ENSURE compliance with Tech.Spec action statement 3.6.3.a IO. PERFORM the following to restore Instrument Gas Blocks - AND Vents: "Containment Isolation Bypass" (C), in "BYPASS. *I Oa. PLACE HSS-57-191 C, *I Ob. PLACE HS-59-140, "Instrument Gas Block Valve Control I Switch" to "OPEN". 1 Oc. ENSURE compliance with Tech. Spec.
*4a. PLACE HS-13-112, Seals/           Within 10 minutes of start time, Oils Clrs lnbd Is01 Bypass to     HS-13-112 in BYPASS BYPASS
Action Statement 3.6.3.a Cue:"You have met the termination criteria for this JPM." JPM Stop Time: STANDARD 1 HV-59-129A is OPEN HV-59-101 is OPEN CRS notified T.S. 3.6.3 applicable N/A HSS-57-191 C in BYPASS HV-59-140 is OPEN CRS notified T.S. 3.6.3 applicable.
*4b. PLACE HS-13-106, Recirc           Within 10 minutes of start time, Pumps Seals/Oil Coolers (IN),     HS-13-106 OPEN to OPEN
LLOJPMU050 RevOUl 1.doc Page 7 of 7 cl'LEAR GENERATION GROUP EXELON NUCLEAR I INITIAL CONDITIONS: This task is time critical 1. 1 AY 160 is de-energized  
*4c. PLACE HS-13-107, Recirc           Within 10 minutes of start time, Pumps Seals/Oil Cooler           HS-I3-107 OPEN (OUT), to OPEN
: 2. "IB" DW INITIATING CUE: Chiller was running.
: 5. REFER TO Tech Spec 3.6.3           CRS notified T.S. 3.6.3 AND TAKE action for an            applicable.
inoperable isolation valve.
LLOJPM0050 RevOO?1.doc                                                             Page 5 of 7
 
GLEAR GENERATION         GROUP                             EXELON NUCLEAR LLOJPM0050 Rev 011 JOB PERFORMANCE MEASURE (JPM)
I                ELEMENT                           STANDARD        SAT  UNSAT    Comment Number I 6.     PERFORM the following to restore Drywell Cpoling:
NIA
  *6a. PLACE HS-87-116, DNV CHILL HS-87-116 in BYPASS WTR OUTBD ISOL BYPASS, keylock switch to BYPASS at IOC681.
CRS notified T.S. 3.6.3 applicable.
NIA er Isolation valves HV-87-120A and 121A OPEN Valve Number     -- Description HV-87-120A Chld Wtr In HV-87-121A Chld Wtr Out
  *7b.   *2) Handswitch #: HSS         HV-87-120B and 121B OPEN I21B (Loop B)
Valve Number     -- Description HV-87-120B Chld Wtr In HV-87-121B Chld Wtr Out
: 8.     -
IF Drywell Chiller trips, THEN                 NIA REFER TO S87.1 .A, Startup of Drywell Chilled Water System, AND START Drywell Chilled Water System.
1:;CIS
: 9.     PERFORM the following to restore Instrument Gas on 1OC601, ISOLATION:
PLACE HS-59-129Ar Instrument Gas Supply (DRYWELL A), in CLOSE.
PLACE HSS-57-191AY
                                        ~
NIA HS-59-129A in CLOSE HSS-57-191A in BYPASS Containment Isolation Bypass (A), in BYPASS.
LLOJPM0050 Rev001?.doc                                                     Page 6 of 7
 
dLEAR GENERATION GROUP                                     EXELON NUCLEAR           I LLOJPM0050 Rev O f 1 JOB PERFORMANCE MEASURE (JPM)
I                ELEMENT
* 9 ~ . PLACE HS-59-129A, STANDARD 1 HV-59-129A is OPEN Instrument Gas Supply (DRYWELL A),in AUTO.
  *9d. PLACE HS-59-101, Instrument     HV-59-101 is OPEN Gas Suction (INBOARD), in OPEN.
9e. ENSURE compliance with           CRS notified T.S. 3.6.3 Tech.Spec action statement       applicable 3.6.3.a IO. PERFORM the following to                       N/A restore Instrument Gas Blocks AND Vents:
  *I Oa. PLACE HSS-57-191C,              HSS-57-191C in BYPASS Containment Isolation Bypass (C), in BYPASS.
* I Ob. PLACE HS-59-140, Instrument HV-59-140 is OPEN I 1Oc.
Gas Block Valve Control Switch to OPEN.
ENSURE compliance with           CRS notified T.S. 3.6.3 Tech. Spec. Action Statement     applicable.
3.6.3.a Cue:You have met the termination criteria for this JPM.
JPM Stop Time:
LLOJPMU050 RevOUl 1.doc                                                   Page 7 of 7
 
clLEAR GENERATION GROUP                                               EXELON NUCLEAR         I INITIAL CONDITIONS: This task is time critical
: 1. 1AY 160 is de-energized
: 2. IB DW Chiller was running.
INITIATING CUE:
You are directed by Shift Supervision to perform the initial actions of E-lAYI60 to restore RECW, DWCW, and Instrument Gas.
You are directed by Shift Supervision to perform the initial actions of E-lAYI60 to restore RECW, DWCW, and Instrument Gas.
Limerick Generating Station Job Performance Measure CONTROL ROOM VENTILATION HIGH RADIATION ISOLATION RESET JPM Number: LLOJPM0074
 
, NUCLEAR GENERATION GROUP EXELON NUCLEAR I L LOJPh40074 Rev012 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through I I below. 1. Task description and number, JPM description and number are 2. Knowledge and Abilities (WA) referdnces are included.  
Limerick Generating Station Job Performance Measure CONTROL ROOM VENTILATION HIGH RADIATION ISOLATION RESET JPM Number: LLOJPM0074
: 3. Performance location specified. (in-plant, control room, or simulator)  
 
: 4. Initial setup conditions are identified.  
, NUCLEAR GENERATION         GROUP                                             EXELON NUCLEAR       I LLOJPh40074 Rev012 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through IIbelow.
: 5. Initiating and terminating cues are properly identified.  
: 1. Task description and number, JPM description and number are identified.
: 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are identified  
: 2. Knowledge and Abilities (WA) referdnces are included.
: 8. Verify the procedure referenced by this JPM matches the most identified. with an asterisk
: 3. Performance location specified. (in-plant, control room, or simulator)
(*). current revision of that procedure:
: 4. Initial setup conditions are identified.
Procedure Rev. Date a. verify cues both verbal and visual are free of conflict, and b. ensure performance time is accurate.
: 5. Initiating and terminating cues are properly identified.
then revise the JPM. cover page. 9. Pilot test the JPM: IO. If the JPM cannot be performed as written with proper responses, I I. When JPM is revalidated, SME or Instructor sign and date JPM LLOJPM0074 Rev012 .doc Page 2 of 7
: 6. Task standards identified and verified by SME review.
, NUCLEAR GENERATION GROUP EXELON NUCLEAR1 REVISION RECORD (Summary):  
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 1. JPM revised to new format. SIMULATOR SETUP INSTRUCTIONS:
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
I. Place the HS-78-017AYB,C, and D keylock switches to RESET. 2. Rotate the arming collars for HSS-78-0l7A,ByC, and D to RAD. 3. Place the HS-78-017A,B,C, and D keylock switches to AUTO. 4. Depress the pushbutton on HSS-78-0l7AyB,C, and D. 5. Place the arming collars for HSS-78-0l7AyB,C,D back to NOR. 7. Remove the four PA2235 keys from HS-78-017A,B,CYD.  
Procedure Rev.           Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.
II.When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LLOJPM0074 Rev012 .doc                                                               Page 2 of 7
 
, NUCLEAR GENERATION GROUP                                                 EXELON NUCLEAR1 LLOJPM0074 Rev012 REVISION RECORD (Summary):
: 1. JPM revised to new format.
SIMULATOR SETUP INSTRUCTIONS:
I.Place the HS-78-017AYB,C,and D keylock switches to RESET.
: 2. Rotate the arming collars for HSS-78-0l7A,ByC,and D to RAD.
: 3. Place the HS-78-017A,B,C, and D keylock switches to AUTO.
: 4. Depress the pushbutton on HSS-78-0l7AyB,C,and D.
: 5. Place the arming collars for HSS-78-0l7AyB,C,D back to NOR.
: 6. Ensure the HI RAD ISLN light lit and the CHLOR ISLN NOT lit for all four isolation channels.
: 7. Remove the four PA2235 keys from HS-78-017A,B,CYD.
: 8. Reset any annunciators that will reset.
: 8. Reset any annunciators that will reset.
TASK STANDARD:
TASK STANDARD:
LLOJPM0074 Rev012 6. Ensure the HI RAD ISLN light lit and the CHLOR ISLN NOT lit for all four isolation channels.
Control Room HVAC High Radiation isolation res.,with CREF, S aligned for normal a w m a    C operation.
C Control Room HVAC High Radiation isolation res*., with CREF, operation.
TASK CONDITIONS:
S aligned for normal awma TASK CONDITIONS:
I.A Control Room HVAC High Radiation Level isolation occurred
I. A Control Room HVAC High Radiation Level isolation occurred  
: 2. The High Radiation isolation condition is cleared.
: 2. The High Radiation isolation condition is cleared. 3. The system was operating per S78.1 .A before the isolation occurred.  
: 3. The system was operating per S78.1 .A before the isolation occurred.
: 4. The High Radiation condition has been acknowledged on the RM-I I in the MCR. INITIATING CUES: You are directed by Shift Supervision to reset the Control Room HVAC High Radiation isolation per S78.7.A LLOJPM0074 Rev012 .doc Page 3 of 7
: 4. The High Radiation condition has been acknowledged on the RM-I Iin the MCR.
, NUCLEAR GENERATION GROUP EXEL ON NUCLEAR I c I LLOJPh40074 Rev012 Information For Evaluator's Use: UNSAT requires written comments on respective step.
INITIATING CUES:
* Denotes CRITICAL steps. Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section.
You are directed by Shift Supervision to reset the Control Room HVAC High Radiation isolation per S78.7.A LLOJPM0074 Rev012 .doc                                                           Page 3 of 7
The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
 
c NUCLEAR GENERATION GROUP                                                           EXELON NUCLEAR I         I LLOJPh40074 Rev012 Information For Evaluators Use:
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue. LLOJPM0074 RevOl2 .doc Page 4 of 7
The timeclock starts when the candidate acknowledges the initiating cue.
, NUCLEAR GENERATION GROUP EXELON NUCLEAR1 LLOJPMOO74 Rev012 Operator's Name: Job Title:
LLOJPM0074 RevOl2 .doc                                                                     Page 4 of 7
CI NLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM Title: CONTROL ROOM VENTILATION HIGH RADIATION ISOLATION RESET JPM Number: LLOJPM0074 Revision Number: 012 K/A Number and Importance:
 
Suggested Testing Environment:
, NUCLEAR GENERATION GROUP                                                     EXELON NUCLEAR1 LLOJPMOO74 Rev012 Operators Name:
Simulator 290003 A4.01 3.2/3.2 Actua I Testing Environment  
Job
: Testing Method: Simulate Faulted: No Alternate Path: No Time Critical:
 
No Simulator Estimated Time to Complete: 20 minutes Actual Time Used: minutes  
==Title:==
CI NLO       0 RO           0SRO          0STA            0SRO Cert JPM
 
==Title:==
CONTROL ROOM VENTILATION HIGH RADIATION ISOLATION RESET JPM Number: LLOJPM0074                       Revision Number: 012 K/A Number and Importance:       290003 A4.01 3.2/3.2 Suggested Testing Environment:            Simulator Actua I Testing Environment:     Simulator Testing Method:     Simulate               Faulted: No Alternate Path: No Time Critical:     No Estimated Time to Complete: 20 minutes         Actual Time Used:                 minutes


==References:==
==References:==
S78.7.A, CONTROL ROOM HVAC SYSTEM RESTORATION FROM AN ISOLATION EVALUATION  
S78.7.A, CONTROL ROOM HVAC SYSTEM RESTORATION FROM AN ISOLATION EVALUATION  


==SUMMARY==
==SUMMARY==
: Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?         0Yes          17 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:               0 Satisfactory           0Unsatisfactory Comments:
0 Yes 17 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments: Note: Any grade of UNSAT requires a comment.
Note: Any grade of UNSAT requires a comment.
Eva I ua tor's Name: (Print) Eva1 uator's Signa tu re : Date: LLOJPM0074 Rev012 .doc Page 5 of 7 LLOJPM0074 Rev072 JOB PERFORMANCE MEASURE (JPM) NOTE: Critical Element(s) indicated by
EvaIuators Name:                                           (Print)
* in Performance Checklist. PERFORMANCE CHECKLIST:
Eva1uators Signature:                                               Date:
JPM Start Time ELEMENT 1. IF required, THEN manually ACKNOWLEDGE chlorine detectors locally at detector by depressing the RESET BUTTOM (625-08-350).  
LLOJPM0074 Rev012 .doc                                                               Page 5 of 7
: 2. required, THEN RESET toxic chemical alarms per S78.1.F, Alignment of Toxic Chemical Detection System for Normal Operation.  
 
: 3. IF required, THEN ACKNOWLEDGE radiation condition by depressing ACK- GRID on RM-11 console, MCR. 4. PLACE the following Control Room Isolation Valve Reset Keylock Switches to "RESET": *4a. HS-78-017C, RESET C *4b. HS-78-017A, RESET A *4C. HS-78-017B, RESET B *4d. HS-78-017D, RESET D 5. ENSURE the following Control Room Isolation Valve Trip Switches to "NOR": 5a. HSS-78-017C, TRIP C 5b. HSS-78-017A, TRIP A 5~. HSS-78-017B, TRIP B 5d. HSS-78-017D, TRIP D STANDARD N/A N/A N/A HS-78-017C is in RESET HS-78-017C is in RESET HS-78-017A is in RESET HS-78-0178 is in RESET HS-78-017D is in RESET I I I HSS-78-017C is in NOR I I I HSS-78-017A is in NOR I I I HSS-78-017B is in NOR I I I HSS-78-017D is in NOR LLOJPM0074 Rev012 .doc Page 6 of 7 WCLEAR GENERATION GROUP EXELON NUCLEAR] L L OJPMOO74 Rev012 JOB PERFORMANCE MEASURE (JPM) I ELEMENT 6. PLACE the desired following Control Room Isolation Valve Reset Keylock Switches to "AUTO": I *6a. HS-78-017C, RESET C *6b. HS-78-017A, RESET A *6~. HS-78-017B, RESET B I *6d. HS-78-017D, RESET D 7. VERIFY status of OA(B)Vl27, EMERGENCY AIR FAN A (B) as follows: 7a. a single subsystem isolation remains, THEN VERIFY OAVl27 - OR OBVI 27 is running as appropriate.
LLOJPM0074 Rev072 JOB PERFORMANCE MEASURE (JPM)
7b. IF all subsystems reset, THEN YERlFY OAV127 OBV127 are not running the termination criteria for this JPM. CUE: You can stop here. You have met STANDARD I N/A HS-78-017C is in AUTO HS-78-017A is in AUTO HS-78-017B is in AUTO HS-78-017D is in AUTO N/A N/A OAVI 27 and OBVI 27 are not running. SAT JPM Stop Time UNSAT Comment Number LLOJPM0074 Rev072 .doc Page 7 of 7 IVUCLEAR GENERATION GROUP EXELON NUCLEAR1 TASK CONDITIONS:
NOTE: Critical Element(s) indicated by
I. A Control Room HVAC High Radiation Level isolation occurred 2. The High Radiation isolation condition is cleared. 3. The system was operating per S78.1 .A before the isolation occurred.  
* in Performance Checklist.
: 4. The High Radiation condition has been acknowledged on the RM-11 in the MCR. INITIATING CUES: You are directed by Shift Supervision to reset the Control Room HVAC High Radiation isolation per S78.7.A Limerick Generating Station Job Performance Measure MANUALLY INITIATE CORE SPRAY SYSTEM PUMP FAILS TO START) (ALTERNATE PATH - "D" CORE SPRAY JPM Number: LLOJPMOl28
PERFORMANCE CHECKLIST:
,(IUCLEAR GENERATION GROUP EXELON NUCLEAR 1 LLOJPMOl28 REvOOO .DOC JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 1 I below. 1. 2. 3. Task description and number, JPM description and number are identified. Knowledge and Abilities (WA) references are included.
JPM Start Time ELEMENT                             STANDARD
Performance location specified. (in-plant, control room, or simulator)  
: 1. IF required, THEN manually ACKNOWLEDGE chlorine detectors locally at detector by depressing the RESET BUTTOM (625-08-350).
: 4. 5. 6. 7. 8. 9. Initial setup conditions are identified. Initiating and terminating cues are properly identified. Task standards identified and verified by SME review. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). Verify the procedure referenced by this JPM matches the most current revision of that procedure:
: 2.     required, THEN RESET toxic                   N/A chemical alarms per S78.1.F, Alignment of Toxic Chemical Detection System for Normal Operation.
Procedure Rev. Date Pilot test the JPM: a. verify cues both verbal and visual are free of conflict, and b. ensure performance time is accurate.
: 3. IF required, THEN                               N/A ACKNOWLEDGE radiation condition by depressing ACK-GRID on RM-11 console, MCR.
IO. If the JPM cannot be performed as written with proper responses, then revise the JPM. 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page. LLOJPMOl28 Rev000 .doc Page 2 of 7 I &CLEAR GENERATION GROUP EXELON NUCLEAR1 LLOJPM0128 REvOOO .DOC . REVISION RECORD (Summary):
: 4. PLACE the following Control                     N/A Room IsolationValve Reset Keylock Switches to RESET:
Revision 0 SIMULATOR SETUP INSTRUCTIONS:  
*4a. HS-78-017C, RESET C                 HS-78-017C is in RESET
: 1. Put in the following malfunctions and MRR440A, Recirc Loop A Rupture, at 2%. 2. When indicated level is approximately  
*4b. HS-78-017A, RESET A                 HS-78-017A is in RESET
-140, remove the Recirc Loop A Rupture. TASK STANDARD:
*4C. HS-78-017B, RESET B                 HS-78-0178 is in RESET
I. Core spray manually initiated per S52.7.A 2. Start the "1 D" Core Spray Pump following failure to auto start. INITIAL CONDITIONS:  
*4d. HS-78-017D, RESET D                 HS-78-017D is in RESET  I  I      I
: 1. Reactor has scrammed, all rods inserted, all scram actions have been taken. 2. Reactor vessel water level is -140" on Fuel Zone and lowering.  
: 5. ENSURE the following Control Room IsolationValve Trip Switches to     NOR:
: 3. Reactor pressure is 950 psig. 4. Drywell pressure is 2.7 psig and rising. 5. Emergency Diesel Generators have failed to Auto Start.  
5a. HSS-78-017C, TRIP C                 HSS-78-017C is in NOR    I  I      I 5b. HSS-78-017A, TRIP A                  HSS-78-017A is in NOR    I I     I 5 ~ . HSS-78-017B, TRIP B                  HSS-78-017B is in NOR   I I     I 5d. HSS-78-017D, TRIP D                  HSS-78-017D is in NOR LLOJPM0074 Rev012 .doc                                                   Page 6 of 7
: 6. Emergency buses are being powered from Off-site power. 7. Core spray has failed to automatically initiate.
 
LLOJPMU728 RevOUO .doc Page 3 of 7 rJUCLEAR GENERATION GROUP EXELON NUCLEAR] LLOJPM0128 REvOOO .DOC INITIATING CUES: I. Shift Supervision directs you to manually initiate Core Spray System per S52.7.A. 2. An additional RO is available to acknowledge alarms. Information For Evaluator's Use: UNSAT requires written comments on respective step.
WCLEAR       GENERATION       GROUP                                   EXELON NUCLEAR]
* Denotes CRITICAL steps. Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
LL OJPMOO74 Rev012 JOB PERFORMANCE MEASURE (JPM)
I                 ELEMENT                         STANDARD          SAT  UNSAT Comment Number I
: 6.     PLACE the desired following                 N/A Control Room IsolationValve Reset Keylock Switches to "AUTO":
I *6a. HS-78-017C, RESET C               HS-78-017C is in AUTO
  *6b. HS-78-017A, RESET A               HS-78-017A is in AUTO
* 6 ~ . HS-78-017B, RESET B               HS-78-017B is in AUTO I *6d. HS-78-017D, RESET D               HS-78-017D is in AUTO
: 7.     VERIFY status of OA(B)Vl27,                 N/A EMERGENCY AIR FAN A (B) as follows:
7a.         a single subsystem isolation             N/A remains, THEN VERIFY OAVl27 OR OBVI27 is running as appropriate.
7b. IF all subsystems reset, THEN     OAVI27 and OBVI27 are not YERlFY OAV127           OBV127   running.
are not running CUE: You can stop here. You have met the termination criteria for this JPM.
JPM Stop Time LLOJPM0074 Rev072 .doc                                                       Page 7 of 7
 
IVUCLEAR GENERATION     GROUP                                         EXELON NUCLEAR1 TASK CONDITIONS:
I.A Control Room HVAC High Radiation Level isolation occurred
: 2. The High Radiation isolation condition is cleared.
: 3. The system was operating per S78.1.A before the isolation occurred.
: 4. The High Radiation condition has been acknowledged on the RM-11 in the MCR.
INITIATING CUES:
You are directed by Shift Supervision to reset the Control Room HVAC High Radiation isolation per S78.7.A
 
Limerick Generating Station Job Performance Measure MANUALLY INITIATE CORE SPRAY SYSTEM (ALTERNATE PATH - D CORE SPRAY PUMP FAILS TO START)
JPM Number: LLOJPMOl28
 
,(IUCLEAR GENERATION GROUP                                                   EXELON NUCLEAR             1 LLOJPMOl28 REvOOO .DOC JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:   All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 1Ibelow.
: 1. Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (WA) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.         Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LLOJPMOl28 Rev000 .doc                                                                   Page 2 of 7
 
I &CLEAR GENERATION GROUP                                                 EXELON NUCLEAR1 LLOJPM0128 REvOOO .DOC .
REVISION RECORD (Summary):
Revision 0 SIMULATOR SETUP INSTRUCTIONS:
: 1. Put in the following malfunctions and MRR440A, Recirc Loop A Rupture, at 2%.
: 2. When indicated level is approximately -140, remove the Recirc Loop A Rupture.
TASK STANDARD:
I.Core spray manually initiated per S52.7.A
: 2. Start the 1 D Core Spray Pump following failure to auto start.
INITIAL CONDITIONS:
: 1. Reactor has scrammed, all rods inserted, all scram actions have been taken.
: 2. Reactor vessel water level is -140 on Fuel Zone and lowering.
: 3. Reactor pressure is 950 psig.
: 4. Drywell pressure is 2.7 psig and rising.
: 5. Emergency Diesel Generators have failed to Auto Start.
: 6. Emergency buses are being powered from Off-site power.
: 7. Core spray has failed to automatically initiate.
LLOJPMU728 RevOUO .doc                                                             Page 3 of 7
 
rJUCLEAR GENERATION         GROUP                                                 EXELON NUCLEAR]
LLOJPM0128 REvOOO           .DOC INITIATING CUES:
I.Shift Supervision directs you to manually initiate Core Spray System per S52.7.A.
: 2. An additional RO is available to acknowledge alarms.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue. LLOJPM0728 Rev000 .doc Page 4 of 7
The timeclock starts when the candidate acknowledges the initiating cue.
~UCLEAR GENERAT~ON GROUP EXELON NUCLEAR 1 LLOJPM0728 Rev000 Operator's Name: Job Title: 0 NLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM Title: MANUALLY INITIATE CORE SPRAY SYSTEM (ALTERNATE PATH - "D" CORE SPRAY PUMP FAILS TO START)SCRAM RESET (Alternate Path)
LLOJPM0728 Rev000 .doc                                                                         Page 4 of 7
JPM Number: LLOJPMOOOI Revision Number: 000 K/A Number and Importance:
 
Suggested Testing Environment:
~UCLEAR     GENERAT~ON     GROUP                                             EXELON NUCLEAR       1 LLOJPM0728 Rev000 Operators Name:
Simulator 295031 EA1 4.414.4 Actual Testing Environment:
Job
Simulator Testing Method: Perform Faulted: Yes Alternate Path:
 
Yes Time Critical:
==Title:==
No Estimated Time to Complete:
0 NLO         0 RO         0 SRO         0 STA           0SRO Cert JPM
15 minutes Actual Time Used: minutes  
 
==Title:==
MANUALLY INITIATE CORE SPRAY SYSTEM (ALTERNATE PATH - D CORE SPRAY PUMP FAILS TO START)SCRAM RESET (Alternate Path)
JPM Number: LLOJPMOOOI                       Revision Number: 000 K/A Number and Importance:         295031 EA1 4.414.4 Suggested Testing Environment:            Simulator Actual Testing Environment:         Simulator Testing Method: Perform                       Faulted: Yes Alternate Path: Yes Time Critical: No Estimated Time to Complete: 15 minutes         Actual Time Used:               minutes


==References:==
==References:==
S52.7.A MANUAL INITIATION AFTER FAILURE OF AUTOMATIC INJECTION DURING A LOCA EVALUATION


S52.7.A' MANUAL INITIATION AFTER FAILURE OF AUTOMATIC INJECTION DURING A LOCA EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?      0 Yes          0No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:              0Satisfactory            0Unsatisfactory Comments:
Note: Any grade of UNSAT requires a comment.
Evaluators Name:                                            (Print)
Evaluators Signature:                                                Date:
LLOJPMO.128 Rev000 .doc00                                                            Page 5 of 7


==SUMMARY==
UCLEAR GENERATION GROUP                                               EXELON NUCLEAR     I LLOJPMO?28 Rev000 JOB PERFORMANCE MEASURE (JPM)
: Were all the Critical Elements performed satisfactorily?
NOTE: Critical Element@)indicated by
0 Yes 0 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments: Note: Any grade of UNSAT requires a comment. Evaluator's Name: (Print) Evaluator's Signature: Date:
* in Performance Checklist.
LLOJPMO.128 Rev000 .doc00 Page 5 of 7 UCLEAR GENERATION GROUP EXELON NUCLEAR I L LOJPMO? 28 Rev000 JOB PERFORMANCE MEASURE (JPM) NOTE: Critical Element@)
PERFORMANCE CHECKLIST:
indicated by
JPM Start Time ELEMENT                               STANDARD                     Comment Number rotated clockwise to the I                                         ARMED position.
* in Performance Checklist. PERFORMANCE CHECKLIST:
    *IC. (INITIATION 3) E21-S22C           Core Spray manual initiation pushbutton collar S22C is rotated clockwise to the ARMED position.
JPM Start Time ELEMENT STANDARD rotated clockwise to the I ARMED position.  
    *Id. (INITIATION 4) E21-S22D           Core Spray manual initiation pushbutton collar S22D is rotated clockwise to the ARMED position.
*IC. (INITIATION  
: 2. VERIFY DIV 1 CORE SPRAY           DIV Iand DIV 3 CORE SPRAY MANUAL INITIATION SWITCH          MANUAL INITIATION SWITCH ARMED, AND DIV 3 CORE             ARMED annunciators are SPRAY M ~ U A INITIATION L              verified lit on
: 3) E21-S22C Core Spray manual initiation  
* I 3 COOL A.
*Id. (INITIATION  
SWITCH ARMED, annunciator alarms on *I3 COOL A
: 4) E21-S22D 2. VERIFY DIV 1 CORE SPRAY MANUAL INITIATION SWITCH ARMED, AND DIV 3 CORE SWITCH ARMED, annunciator alarms on *I3 COOL A VERIFY DIV 2 CORE SPRAY MANUAL INITIATION SWITCH ARMED, AND DIV 4 CORE SPRAY MANUAL INITIATION SWITCH ARMED, annunciator alarms on
: 3. VERIFY DIV 2 CORE SPRAY           DIV 2 and DIV 4 CORE SPRAY MANUAL INITIATION SWITCH          MANUAL INITIATION SWITCH ARMED, AND DIV 4 CORE             ARMED annunciators are SPRAY MANUAL INITIATION           verified lit on
*I5 COOL B SPRAY M~UAL INITIATION
* I 5 COOL B.
: 3. I pushbutton collar S22C is rotated clockwise to the ARMED position. Core Spray manual initiation pushbutton collar S22D is rotated clockwise to the ARMED position.
SWITCH ARMED, annunciator                            I alarms on
DIV I and DIV 3 CORE SPRAY MANUAL INITIATION SWITCH ARMED annunciators are verified lit on *I3 COOL A. DIV 2 and DIV 4 CORE SPRAY MANUAL INITIATION SWITCH ARMED annunciators are verified lit on *I5 COOL B. I Comment Number LLOJPM0128 RevOOO .doc00 Page 6 of 7 LLOJPM0128 RevOOO JOB PERFORMANCE MEASURE (JPM) 4. DEPRESS AND RELEASE all four of the following MANUAL INITIATION pushbuttons to *4b. (INITIATION I) E21-S22B 1 *4~. (INITIATION 1) E21-S22C  
* I 5 COOL B     I LLOJPM0128 RevOOO .doc00                                                   Page 6 of 7
*4d. (INITIATION I) E21-S22D 5. ENSURE the following Core Spray Pump minimum flow bypass valves are open: -HV-52-*F031A, MIN FLOW -HV-52-*F031 B, MIN FLOW 6. WHEN Reactor Pressure is between 435 to 475 psig, THEN VERIFY HV-52-*F005, OUTBOARD, &lJ HV-52-*F037, INBOARD DISCHARGE, open. only one Core Spray Pump in a loop is runnins THEN GO TO S52.7.B, Core Spray Injection with a Single Operable Pump "8. Start the "ID" Core Spray Pump 7. CUE: You have met the termination criteria for this JPM JPM Stop Time NIA MAN UAL I N IT1 AT10 N pushbutton S22A is momentarily depressed and released MANUAL INITIATION pushbutton S22B is momentarily depressed and released MANUAL INITIATION pushbutton S22C is momentarily depressed and released MANUAL IN ITlATlON pushbutton S22D is momentarily depressed and released HV-52-*F031A, MIN FLOW and HV-52-*F031B, MIN FLOW are verified open. NIA Recognize "1 D Core Spray Pump failure to start. The "1 D" Core Spray Pump is running. Page 7 of 7 LLOJPM0128 RevOOO .doc00 NUCLEAR GENERATION GROUP EXELON NUCLEAR I IN ITlAL ,CONDITIONS:  
 
: 1. 2. 3. 4. 5. 6. 7. Reactor has scrammed, all rods inserted, all scram actions have been taken. Reactor vessel water level is -140" on Fuel Zone and lowering. Reactor pressure is 950 psig. Drywell pressure is 2.7 psig and rising. Emergency Diesel Generators have failed to Auto Start. Emergency buses are being powered from Off-site power. Core spray has failed to automatically initiate. INITIATING CUES:  
LLOJPM0128 RevOOO JOB PERFORMANCE MEASURE (JPM)
: 1. Shift Supervision directs you to manually initiate Core Spray System per S52.7.A. 2. An additional RO is available to acknowledge alarms.
: 4. DEPRESS AND RELEASE all four                     NIA of the following MANUAL INITIATION pushbuttons to MANUAL INIT1AT10N pushbutton S22A is momentarily depressed and released 1 *4b. (INITIATION I)     E21-S22B
Limerick Generating Station Job Performance Measure DIESEL GENERATOR FAST START FROM THE CONTROL ROOM - (ALTERNATE PATH - ESW PUMP FAILS TO START) JPM Number: LLOJPMOl30 I
* 4 ~ .(INITIATION 1) E21-S22C MANUAL INITIATION pushbutton S22B is momentarily depressed and released MANUAL INITIATION pushbutton S22C is momentarily depressed and released
rUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0130Rev000 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below. 1. Task description and number, JPM description and number are identified.  
  *4d. (INITIATION I)     E21-S22D       MANUAL INITlATlON pushbutton S22D is momentarily depressed and released
: 2. Knowledge and Abilities (WA) references are included.  
: 5. ENSURE the following Core             HV-52-*F031A, MIN FLOW and Spray Pump minimum flow           HV-52-*F031B, MIN FLOW are bypass valves are open:           verified open.
: 3. Performance location specified. (in-plant, control room, or simulator)  
        -HV-52-*F031A, MIN FLOW
: 4. Initial setup conditions are identified.  
        -HV-52-*F031B, MIN FLOW
: 5. Initiating and terminating cues are properly identified.  
: 6. WHEN Reactor Pressure is                             NIA between 435 to 475 psig, THEN VERIFY HV-52-*F005, OUTBOARD, &           HV-52-*F037, lJ INBOARD DISCHARGE, open.
: 6. Task standards identified and verified by SME review.  
: 7.        only one Core Spray Pump in   Recognize 1D Core Spray a loop is runnins THEN GO TO       Pump failure to start.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
S52.7.B, Core Spray Injection with a Single Operable Pump
Procedure Rev. Date 9. Pilot test the JPM: a. verify cues both verbal and visual are free of conflict, and b. ensure performance time is accurate.  
: 8. Start the ID Core Spray Pump The 1D Core Spray Pump is running.
: 10. If the JPM cannot be performed as written with proper responses, then revise the JPM. I I. When JPM is revalidated, SME or Instructor sign and date JPM cover page. L L OJPMO I30 RevOOO. doc Page 2 of 7 JUCLEAR GENERATION GROUP EXELON NUCLEAR I L L 0 JPMO f 3ORevOOO REVISION RECORD (Summary)
CUE: You have met the termination criteria for this JPM JPM Stop Time LLOJPM0128 RevOOO .doc00                                                  Page 7 of 7
Revision 0 SIMULATOR SETUP INSTRUCTIONS:  
 
: 1. This JPM can be run from any Simulator IC 2. Insert the following malfunction TASK STANDARD:
NUCLEARGENERATION GROUP                                             EXELON NUCLEAR   I INITlAL ,CONDITIONS:
EITHER D1 I is running and the "C" ESW has been manually started shutdown once it is noted that the "A ESW pump has failed to start.
: 1. Reactor has scrammed, all rods inserted, all scram actions have been taken.
D1 I has been INITIAL CONDITIONS:  
: 2. Reactor vessel water level is -140 on Fuel Zone and lowering.
: 1. S92.1 .O, "Local and Remote Manual Startup Of A Diesel Generator, is complete up to and 2. An EO is standing by at DI I D/G to support diesel generator operation. including step  
: 3. Reactor pressure is 950 psig.
: 4. Drywell pressure is 2.7 psig and rising.
: 5. Emergency Diesel Generators have failed to Auto Start.
: 6. Emergency buses are being powered from Off-site power.
: 7. Core spray has failed to automatically initiate.
INITIATING CUES:
: 1. Shift Supervision directs you to manually initiate Core Spray System per S52.7.A.
: 2. An additional RO is available to acknowledge alarms.
 
Limerick Generating Station Job Performance Measure DIESEL GENERATOR FAST START FROM THE CONTROL ROOM - (ALTERNATE PATH
    - ESW PUMP FAILS TO START)
JPM Number: LLOJPMOl30 I
 
rUCLEAR GENERATION GROUP                                                   EXELON NUCLEAR I LLOJPM0130Rev000 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
: 1. Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (WA) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.           Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
II.When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LLOJPMOI30 RevOOO.doc                                                                   Page 2 of 7
 
JUCLEAR GENERATION       GROUP                                       EXELON NUCLEAR         I LL0JPMO f 3ORevOOO REVISION RECORD (Summary)
Revision 0 SIMULATOR SETUP INSTRUCTIONS:
: 1. This JPM can be run from any Simulator IC
: 2. Insert the following malfunction TASK STANDARD:
EITHER D1Iis running and the C ESW has been manually started           D1Ihas been shutdown once it is noted that the A ESW pump has failed to start.
INITIAL CONDITIONS:
: 1. S92.1 .O, Local and Remote Manual Startup Of A Diesel Generator, is complete up to and including step 4.1.
: 2. An EO is standing by at D I ID/G to support diesel generator operation.
INITIATING CUES:
You are directed by the CRS to perform a Remote Manual Startup of the D I I Diesel Generator per step 4.3 of S92.1 .O.
LLOJPMO I30 Rev000.doc                                                            Page 3 of 7


===4.1. INITIATING===
JUCLEAR   GENERATION     GROUP                                                 EXELON NUCLEAR           I LLOJPMOI 30Rev000 Information For Evaluators Use:
CUES:
UNSAT requires written comments on respective step.
You are directed by the CRS to perform a Remote Manual Startup of the DII Diesel Generator per step 4.3 of S92.1 .O. L LOJPMO I30 Rev000. doc Page 3 of 7 JUCLEAR GENERATION GROUP EXELON NUCLEAR I L L OJPMO I 30Rev000 Information For Evaluator's Use: UNSAT requires written comments on respective step. Denotes CRITICAL steps. Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Denotes CRITICAL steps.
Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue. LLOJPM0130 Rev000.doc Page 4 of 7 JUCLEAR GENERATION GROUP EXELON NUCLEAR I L L OJPMO 7 3ORevOOO Operator's Name: Job Title: 0 NLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM Title: DIESEL GENERATOR FAST START FROM THE CONTROL ROOM - (ALTERNATE PATH - ESW PUMP FAILS TO START) JPM Number: LLOJPMOOOI Revision Number: 012 WA Number and Importance:
The timeclock starts when the candidate acknowledges the initiating cue.
295003 AA1.02 4.2/4.3 Suggested Testing Environment:
LLOJPM0130 Rev000.doc                                                                           Page 4 of 7
Simulator Actual Testing Environment:
 
Simulator Faulted: Yes Testing Method: Perform Alternate Path:
JUCLEAR GENERATION       GROUP                                             EXELON NUCLEAR         I LL OJPMO7 3ORevOOO Operator's Name:
Yes Time Critical:
Job
No Estimated Time to Complete:
 
20 mlliutes Actual Time Usec. minutes  
==Title:==
0 NLO         0 RO         0 SRO         0STA          0SRO Cert JPM
 
==Title:==
DIESEL GENERATOR FAST START FROM THE CONTROL ROOM - (ALTERNATE PATH - ESW PUMP FAILS TO START)
JPM Number: LLOJPMOOOI                   Revision Number: 012 WA Number and Importance:           295003     AA1.02   4.2/4.3 Suggested Testing Environment:             Simulator Actual Testing Environment:         Simulator Testing Method: Perform                       Faulted: Yes Alternate Path: Yes Time Critical: No Estimated Time to Complete: 20 mlliutes         Actual Time Usec.               minutes


==References:==
==References:==
S92.1 .O, "Local and Remote Manual Startup Of A Diesel Generator EVALUATION  
S92.1.O, "Local and Remote Manual Startup Of A Diesel Generator EVALUATION  


==SUMMARY==
==SUMMARY==
: Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?   Yes       17 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:                   Satisfactory         0 Unsatisfactory Comments:
Yes 17 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory 0 Unsatisfactory Comments: Note: Any grade of UNSAT requires a comment. Evaluator's Name: (Print) Eva I u a tor's Sign at u re: Date: LLOJPMOf30 Rev000.doc Page 5 of 7   
Note: Any grade of UNSAT requires a comment.
.dCLEAR GENERATtON GROUP EXEL ON NUCLEAR I ELEMENT LLOJPM0130Rev012 STANDARD JOB PERFORMANCE MEASURE (JPM) 1. Provide the candidate with a marked up copy of S92.1 .O. NOTE: Critical Element(s) indicated by
Evaluator's Name:                                           (Print)
* in Performance Checklist. . N/A PERFORMANCE CHECKLIST:
EvaIuator's Signature:                                               Date:
: 2. VERIFY LOCAL-REMOTE switch in "REMOTE" JPM Start Time LOCAL-REMOTE switch is verified to be in the REMOTE position.  
LLOJPMOf30 Rev000.doc                                                                     Page 5 of 7
: 3. NOTIFY MCR AND SSV that the next step makes the D/G INOPERABLE AND unavailable. Shift Supervisor notified that DII will be INOPERABLE and unavailable.  
 
: 7. WHEN 3 minute time delay for prelube pump operation is completed, THEN OBSERVE diesel generator starts. Diesel Generator start is observed.  
  .dCLEAR GENERATtON GROUP                                                 EXELON NUCLEAR     I LLOJPM0130Rev012 JOB PERFORMANCE MEASURE (JPM)
: 4. RECORD in OPS logs that the applicable D/G is INOP AND unavailable WHEN EXCITER SHUTDOWN RESET switch to "STOP". Recorded in Ops logs that DII is INOPERABLE and unavailable.  
NOTE: Critical Element(s) indicated by
: 5. DIRECT the EO to perform steps 4.3.4 through 4.3.7 CUE: The EO reports that steps  
* in Performance Checklist.
PERFORMANCE CHECKLIST:
JPM Start Time ELEMENT                            STANDARD
: 1. Provide the candidate with a marked      .          N/A up copy of S92.1.O.
: 2. VERIFY LOCAL-REMOTE switch in         LOCAL-REMOTE switch is REMOTE                            verified to be in the REMOTE position.
: 3. NOTIFY MCR AND SSV that the           Shift Supervisor notified that next step makes the D/G             DII will be INOPERABLE and INOPERABLE AND unavailable.         unavailable.
: 4. RECORD in OPS logs that the           Recorded in Ops logs that DII applicable D/G is INOP AND           is INOPERABLE and unavailable WHEN EXCITER             unavailable.
SHUTDOWN RESET switch to STOP.
: 5. DIRECT the EO to perform steps                      N/A 4.3.4 through 4.3.7 CUE: The EO reports that steps 4.3.4 through 4.3.7 are complete.
  *6. PLACE selected lOl-A(B, C,          101-AG501/CS, Diesel D)G501/CS, Diesel Generator          Generator Control, in Control, to START.                START.
: 7. WHEN 3 minute time delay for          Diesel Generator start is prelube pump operation is           observed.
completed, THEN OBSERVE diesel generator starts.
: 8. DIRECT the EO to perform steps                       N/A 4.3.10 through 4.3.14 CUE: The EO reports that steps 4.3.10 through 4.3.14 are complete.
LLOJPM0130 Rev000.doc                                                            Page 6 of 7


====4.3.4 through====
JOB PERFORMANCE MEASURE (JPM)
4.3.7 are complete.
ELEMENT                         STANDARD            SAT UNSAT Comment Number
N/A *6. PLACE selected lOl-A(B, C, D)G501/CS, Diesel Generator Control,"
: 9. RECORD in the OPS log that           Recorded in Ops logs that DII applicable D/G is now considered   is available.
to "START". 101 -AG501/CS, Diesel Generator Control,"
available.
in "START". 8. DIRECT the EO to perform steps 4.3.10 through 4.3.14 CUE: The EO reports that steps 4.3.10 through 4.3.14 are complete.
10.VERIFY frequency meter reads from Frequency verified from 5 9 t o 59 to 61 Hz.                       61 Hz
N/A LLOJPM0130 Rev000.doc Page 6 of 7 JOB PERFORMANCE MEASURE (JPM) ELEMENT 9. RECORD in the OPS log that applicable D/G is now considered available.
* I 1.EESW pump is         already      Either start the "C" ESW Pump running, THEN VERIFY ESW           or shutdown D11.
10.VERIFY frequency meter reads from 59 to 61 Hz. *I 1 .E ESW pump is running, THEN VERIFY ESW pump starts 50 to 60 seconds after diesel start.
pump starts 50 to 60 seconds after diesel start.
already CUE: You have met the termination criteria for the JPM. STANDARD Recorded in Ops logs that DII is available.
CUE:You have met the termination criteria for the JPM.
Frequency verified from 5 9 to 61 Hz Either start the "C" ESW Pump or shutdown D11. SAT UNSAT Comment Number JPM Stop Time LLOJPM0130 Rev000.doc Page 7 of 7 ACLEAR GENERATION GROUP EXELON NUCLEAR1 IN IT1 AL CONDITIONS:  
JPM Stop Time LLOJPM0130 Rev000.doc                                                           Page 7 of 7
: 1. S92.1 .O, "Local and Remote Manual Startup Of A Diesel Generator, is complete up to and including step 4.1. 2. An EO is standing by at D11 D/G to support diesel generator operation.
 
INITIATING CUES: You are directed by the CRS to perform a Remote Manual Startup of the DI I Diesel Generator per step 4.3 of S92.1 .O.
ACLEAR GENERATION GROUP                                               EXELON NUCLEAR1 INIT1AL CONDITIONS:
Limerick Generating Station Job Performance Measure . SCRAM RESET - ALTERNATE PATH JPM Number: LLOJPMOOOI  
: 1. S92.1 .O, Local and Remote Manual Startup Of A Diesel Generator, is complete up to and including step 4.1.
.. 
: 2. An EO is standing by at D11 D/G to support diesel generator operation.
, NUCLEAR GENERATION GROUP EXEL ON NUCLEAR I L L OJPMOOO I RevO 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
INITIATING CUES:
Prior to JPM usage, revalidate JPM usina steDs 8 throuah 11 below. ~~ ~~ I. Task description and number, JPM description and number are identified.  
You are directed by the CRS to perform a Remote Manual Startup of the D I IDiesel Generator per step 4.3 of S92.1 .O.
: 2. Knowledge and Abilities (WA) references are included.  
 
: 3. Performance location specified. (in-plant, control room, or simulator)  
Limerick Generating Station Job Performance Measure
: 4. Initial setup conditions are identified.  
. SCRAM RESET - ALTERNATE PATH JPM Number: LLOJPMOOOI
: 5. Initiating and terminating cues are properly identified.  
 
: 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
, NUCLEAR GENERATION GROUP                                                       EXELON NUCLEAR I LL OJPMOOOI RevO 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM usina steDs 8 throuah 11 below.
Procedure Rev. Date a. verify cues both verbal and visual are free of conflict, and b. ensure performance time is accurate.
                                ~~ ~~
then revise the JPM. cover page. 9. Pilot test the JPM: IO. If the JPM cannot be performed as written with proper responses, 11. When JPM is revalidated, SME or Instructor sign and date JPM L LOJPMOOO I RevO 12. doc Page 2 of 7 i NUCLEAR GENERATION GROUP EXELON NUCLEAR1 LLQJPMOOOI Rev072 REVISION RECORD (Summary):  
I.Task description and number, JPM description and number are identified.
: 1. JPM Revised, New format used. Step to obtain procedure removed. Initial Condition changed to include procedure number to enhance task clarity. SIMULATOR SETUP INSTRUCTIONS:
: 2. Knowledge and Abilities (WA) references are included.
I. Transfer house loads. 2. 3. Trip Main Turbine. 4. 5. Place Reactor Mode Switch in "SHUTDOWN".
: 3. Performance location specified. (in-plant, control room, or simulator)
Line up for startup level control Insert malfunction MRP028B, RPS Group 1 Reactor Scram. TASK STANDARD:
: 4. Initial setup conditions are identified.
Insert a full reactor scram signal upon recognition that scram will not reset after 2nd attempt. TASK CONDITIONS:  
: 5. Initiating and terminating cues are properly identified.
: 1. Unit I Reactor was scrammed for a planned shutdown.  
: 6. Task standards identified and verified by SME review.
: 2. There are NO indications of fuel damage. INITIATING CUE:
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
You are directed by the CRS to perform a Unit 1 RPS scram reset per GP-1 I Information For Evaluator's Use:
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.           Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
L LOJPMOOOI RevO 12.doc                                                             Page 2 of 7
 
i NUCLEAR GENERATION           GROUP                                                 EXELON NUCLEAR1 LLQJPMOOOI Rev072 REVISION RECORD (Summary):
: 1. JPM Revised, New format used. Step to obtain procedure removed. Initial Condition changed to include procedure number to enhance task clarity.
SIMULATOR SETUP INSTRUCTIONS:
I. Transfer house loads.
: 2. Place Reactor Mode Switch in "SHUTDOWN".
: 3. Trip Main Turbine.
: 4. Line up for startup level control
: 5. Insert malfunction MRP028B, RPS Group 1 Reactor Scram.
TASK STANDARD:
Insert a full reactor scram signal upon recognition that scram will not reset after 2ndattempt.
TASK CONDITIONS:
: 1. Unit IReactor was scrammed for a planned shutdown.
: 2. There are NO indications of fuel damage.
INITIATING CUE:
You are directed by the CRS to perform a Unit 1 RPS scram reset per GP-1I Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps. Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
* Denotes CRITICAL steps.
Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue. L L LOJPMOOO 7 Rev0 12. doc Page 3 of 7
The timeclock starts when the candidate acknowledges the initiating cue.
, NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0001 Rev012 Operator's Name: Job Title: 0 NLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM Title: SCRAM RESET (Alternate Path)
L LLOJPMOOO 7 Rev0 12.doc                                                                     Page 3 of 7
JPM Number: LLOJPM0001 Revision Number: 012 KIA Number and Importance: Suggested Testing Environment:
 
Simulator 212000 A4.14 3.8/3.8 Actual Testing Environment:
, NUCLEAR GENERATION GROUP                                                     EXELON NUCLEAR I LLOJPM0001Rev012 Operators Name:
Simulator Testing Method: Perform Faulted: No Alternate Path: Yes Time Critical:
Job
No Estimated Time to Complete:
 
15 minutes Actual Time Used: minutes  
==Title:==
0 NLO         0 RO           0 SRO         0STA            0SRO Cert JPM
 
==Title:==
SCRAM RESET (Alternate Path)
JPM Number: LLOJPM0001                       Revision Number: 012 KIA Number and Importance:       212000 A4.14 3.8/3.8 Suggested Testing Environment:            Simulator Actual Testing Environment:       Simulator Testing Method: Perform                     Faulted: No Alternate Path: Yes Time Critical: No Estimated Time to Complete: 15 minutes         Actual Time Used:               minutes


==References:==
==References:==
GP-11, REACTOR PROTECTION SYSTEM - SCRAM RESET EVALUATION  
GP-11, REACTOR PROTECTION SYSTEM - SCRAM RESET EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?         0Yes          0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:               0Satisfactory            0 Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Note: Any grade of UNSAT requires a comment.
0 Yes 0 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments: Note: Any grade of UNSAT requires a comment. Evaluator's Name: (Print) Eva1 ua tor's Sign a tu re: L L OJPMOOOI Rev0 12. doc Date: Page 4 of 7
Evaluators Name:                                           (Print)
, NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0007Rev012 JOB PERFORMANCE MEASURE (JPM) NOTE: Critical Element(s) indicated by
Eva1uators Signatu re:                                               Date:
* in Performance Checklist. PERFORMANCE CHECKLIST:
LL OJPMOOOI Rev0 12.doc                                                               Page 4 of 7
JPM Start Time ELEMENT 1. REQUEST Radiation Protection to perform the following:
 
la. SURVEY SDV prior to release of fluid inventory.
, NUCLEAR     GENERATION GROUP                                           EXELON NUCLEAR       I LLOJPM0007Rev012 JOB PERFORMANCE MEASURE (JPM)
1 b. EVALUATE the need for RT 047-600-*, Flush of CRD Scram Discharge Volume (SDV)." (CUE: Report that RP has surveyed the SDV and there is no need for the RT to be done.) '2. PLACE Scram Discharge Volume High Level Bypass Keylock Switch on *OC603 to "BYPASS".  
NOTE: Critical Element(s) indicated by
: 3. VERIFY Annunciator Panel *07, REACTOR, Window C-2, "SCRAM DISC VOLUME HI LEVEL SCRAM BYPASSED,"
* in Performance Checklist.
is in alarm. 4. ENSURE Annunciator panel *08, REACTOR, Window E-5, "RPIS INOPERATIVE" is clear. - IF Annunciator Panel *08, REACTOR, Window E-4, "RDCS INOPERATIVE,"
PERFORMANCE CHECKLIST:
is in alarm, THEN RESET the Rod Drive Control System (RDCS) in accordance with S73.0.F, "Resetting the Rod Drive Control Sys tem". 5. STANDARD SAT UNSAT Commenl I 1 1 Number RP contacted to survey the SDV and evaluate need to NIA SDV High Level Bypass Switch in "BYPASS position.
JPM Start Time ELEMENT                               STANDARD I 1 SAT  UNSAT 1 Commenl Number
Verify by observation that "SDV HI LEVEL SCRAM BYPASSED", 107 REACTOR (C-2), is lit. Annunciator panel
: 1. REQUEST Radiation Protection       RP contacted to survey the to perform the following:           SDV and evaluate need to la. SURVEY SDV prior to release of fluid inventory.
*08, REACTOR, Window E-5, "RPIS INOPERATIVE" is clear LLOJPMOOOI Rev012 doc Page 5 of 7 NUCLEAR GENERATION GROUP EXELON NUCLEAR I ELEMENT L LOJPM0001 Rev012 JOB PERFORMANCE MEASURE (JPM) STANDARD SAT UNSAT Commeni I I 1 Number *9b. PLACE Scram Reset switch to "GP U3". 6. - IF CRD Full Core Display Process Computer indicates - all control rods are fully inserted, Appendix I using Attachment
1b. EVALUATE the need for RT                       NIA 047-600-*, Flush of CRD Scram Discharge Volume (SDV).
: 1. 7. RESET Alternate Rod Insertion (ARI) at panel *OC603 as follows: THEN PERFORM GP-1 I I/ 1 Skmm Reset Switch taken to GP 2/3 positions. ~~ ~~~~~~ 8. DEPRESS ARI RESET pushbuttons (IA. IB. 2A. 2B). I I. the eight scram group white lights are @ lit after initial reset, THEN VERIFY proper Reactor Mode Switch position ... AND REPEAT step 3.8 one time ... 12. 9. RESET RPS at *OC603 as follows: Verify Mode switch in "SHUTDOWN".
(CUE: Report that RP has surveyed the SDV and there is no need for the RT to be done.)
N/A N/A '13. PLACE Scram Reset switch to "GP 1 /4". N/A I1 I Scram Reset Switch taken to GP 1/4 position.
: 2. PLACE Scram Discharge               SDV High Level Bypass Volume High Level Bypass           Switch in BYPASS position.
ARI Reset pushbuttons IA, I B, 2A, 2B depressed.
Keylock Switch on *OC603 to BYPASS.
N/A II I "9a. PLACE Scram Reset switch to "GP 1/4".
: 3. VERIFY Annunciator Panel *07,       Verify by observation that REACTOR, Window C-2,               SDV HI LEVEL SCRAM SCRAM DISC VOLUME HI               BYPASSED, 107 REACTOR LEVEL SCRAM BYPASSED, is          (C-2), is lit.
Scram Reset Switch taken to I GP 1/4 position.
in alarm.
IO. VERIFY the eight (8) scram group white lights are Lit for Scram System A,W Scram System B on *OC603. Recognize 1 light for RPS 'A' and I light for RPS 'B did not light. LLOJPMOOOI RevOl2.doc Page 6 of 7 NUCLEAR GENERATION GROUP EXELON NUCLEAR I UNSAT LLOJPMOOOI Rev012 Comment Number JOB PERFORMANCE MEASURE (JPM)
: 4. ENSURE Annunciator panel *08, Annunciator panel *08, REACTOR, Window E-5, RPIS REACTOR, Window E-5, INOPERATIVE is clear.              RPIS INOPERATIVE is clear
ELEMENT 15. E the eight scram group white lights are Lit after second reset attempt, THEN PERFORM the following:
: 5.   -
INSERT a full scram signal via Manual Scram Pushbuttons.  
IF Annunciator Panel *08, REACTOR, Window E-4, RDCS INOPERATIVE, is in alarm, THEN RESET the Rod Drive Control System (RDCS) in accordance with S73.0.F, Resetting the Rod Drive Control System.
*I 6. CUE: You have reached the termination point for the JPM. JPM Stop Time STANDARD NIA CHAl orCHA2,UCHBl or CH B2 manual scram collars armed and pushbuttons depressed.
LLOJPMOOOI Rev012 doc                                                          Page 5 of 7
SAT L L OJPMOOOI Rev0 7 2. doc Page 7 of 7 
 
, JUCLEAR GENERATION GROUP EXEL ON NUCLEAR TASK CONDITIONS:
NUCLEAR GENERATION GROUP                                                      EXELON NUCLEAR        I LLOJPM0001Rev012 JOB PERFORMANCE MEASURE (JPM)
I. Unit I 2. There Reactor was scrammed for a planned shutdown.
ELEMENT                                STANDARD I I SAT UNSAT 1 Commeni Number
are NO indications of fuel damage. L LOJPMOOOI Rev01 2 INITIATING CUE: You are directed by the CRS to perform a.Unit 1 RPS scram reset per GP-11 .................  
: 6.  -
..........." ..........
IF CRD Full Core Display                            N/A Process Computer indicates all control rods are fully inserted, THEN PERFORM GP-1I Appendix I using Attachment 1.
.........-....  
: 7. RESET Alternate Rod Insertion                        N/A (ARI) at panel *OC603as follows:
.........
~~                      ~~~~~~
......................................................  
: 8. DEPRESS ARI RESET                      ARI Reset pushbuttons I A ,
.,.......... . ...... ".-".........".*-".."".-
pushbuttons (IA. IB. 2A. 2B).         IB, 2A, 2B depressed.
.........................
: 9. RESET RPS at *OC603 as                               N/A follows:
........................................
"9a. PLACE Scram Reset switch to "GP 1/4".                            I Scram Reset Switch taken to GP 1/4 position.               I I          I
Limerick Generating Station Job Performance Measure PLACING ALTERNATE TECW PUMP IN SERVICE JPM Number: LLOJPMOl29 
*9b.
,\IUCLEAR GENERATION GROUP EXELON NUCLEAR[ LLOJPMO729 REVOOO.LJOC JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
IO.
Prior to JPM usage, revalidate JPM using steps 8 through 1 I below. 1. Task description and number, JPM description and number are identified.
PLACE Scram Reset switch to "GP U3".
: 2. Knowledge and Abilities (WA) references are included.
VERIFY the eight (8) scram Skmm Reset Switch taken to GP 2/3 positions.
: 3. Performance location specified. (in-plant, control room, or simulator)
Recognize 1 light for RPS 'A' I /          1 group white lights are Lit for        and Ilight for RPS ' B did not Scram System A , W Scram              light.
: 4. Initial setup conditions are identified.  
System B on *OC603.
: 5. Initiating and terminating cues are properly identified.
II. the eight scram group white        Verify Mode switch in lights are @ lit after initial reset, "SHUTDOWN".
: 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
THEN VERIFY proper Reactor Mode Switch position...
Procedure Rev. Date 9. Pilot test the JPM: a. verify cues both verbal and visual are free of conflict, and b. ensure performance time is accurate.
: 12. AND REPEAT step 3.8 one                              N/A time...
: 10. If the JPM cannot be performed as written with proper responses, then revise the JPM. 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page. Page 2 of 6 LLOJPM0129 Rev000. doc rJUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0429 REvOOO. DOC REVISION RECORD (Summary):
'13. PLACE Scram Reset switch to "GP 1/4".
Revision 0 SIMULATOR SETUP INSTRUCTIONS: This JPM can be run in any Simulator IC TASK STANDARD:
Scram Reset Switch taken to GP 1/4 position.               I 1          I LLOJPMOOOI RevOl2.doc                                                                Page 6 of 7
The "1 B" TECW Pump is in "RUN", the "1A TECW Pump is in "AUTO" INITIAL CONDITIONS:
 
: 1. Service Water System in operation supplying cooling water to both TECW Heat Exchangers.
NUCLEAR    GENERATION        GROUP                                    EXELON NUCLEAR        I LLOJPMOOOI Rev012 JOB PERFORMANCE MEASURE (JPM)
: 2. The Turbine Building EO reports that the YA TECW Pump Outboard Bearing is running hot. 3. The EO is standing by to support swapping TECW Pumps INITIATING CUES: Shift Supervision directs you to start the "I B" TECW pump and place the "1A TECW pump in AUTO per Sl4.6.Al "Placing Alternate TECW Pump In Service".
ELEMENT                            STANDARD            SAT  UNSAT    Comment Number
Information For Evaluator's Use: UNSAT requires written comments on respective step.
: 15. E the eight scram group white                 NIA lights are     Lit after second reset attempt, THEN PERFORM the following:
* Denotes CRITICAL steps. Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
*I6. INSERT a full scram signal via  CHAl o r C H A 2 , U C H B l Manual Scram Pushbuttons.       or CH B2 manual scram collars armed and pushbuttons depressed.
CUE: You have reached the termination point for the JPM.
JPM Stop Time LL OJPMOOOI Rev0 7 2.doc                                                     Page 7 of 7
 
,JUCLEAR GENERATION GROUP                                                                                                                               EXELON NUCLEAR LLOJPMOOOIRev012 TASK CONDITIONS:
I. Unit IReactor was scrammed for a planned shutdown.
: 2. There are NO indications of fuel damage.
INITIATING CUE:
You ..are
      .................         directed
                        ...." ..........             by
                                      .....-.. ......... the CRS to perform a.Unit 1 RPS
                                                        ...................................................... .,............scram            reset per ..GP-11
 
Limerick Generating Station Job Performance Measure PLACING ALTERNATE TECW PUMP IN SERVICE JPM Number: LLOJPMOl29
 
,\IUCLEAR GENERATION GROUP                                                    EXELON NUCLEAR[
LLOJPMO729 REVOOO.LJOC JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 1Ibelow.
: 1. Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (WA) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.           Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LLOJPM0129 Rev000.doc                                                                      Page 2 of 6
 
rJUCLEAR GENERATION          GROUP                                                  EXELON NUCLEAR            I LLOJPM0429 REvOOO.DOC REVISION RECORD (Summary):
Revision 0 SIMULATOR SETUP INSTRUCTIONS:
This JPM can be run in any Simulator IC TASK STANDARD:
The 1B TECW Pump is in RUN, the  1 A TECW Pump is in AUTO INITIAL CONDITIONS:
: 1. Service Water System in operation supplying cooling water to both TECW Heat Exchangers.
: 2. The Turbine Building EO reports that the Y A TECW Pump Outboard Bearing is running hot.
: 3. The EO is standing by to support swapping TECW Pumps INITIATING CUES:
Shift Supervision directs you to start the I  B TECW pump and place the  1 A TECW pump in AUTO per Sl4.6.Al Placing Alternate TECW Pump In Service.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue. L LOJPMO I29 Rev000. doc Page 3 of 6
The timeclock starts when the candidate acknowledges the initiating cue.
,\lUCLEAR GENERATiON GROUP EXELON NUCLEAR[ LLOJPMOIPS REvOOO. DOC Operator's Name: Job Title: 0 NLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM Title: PLACING ALTERNATE TECW PUMP IN SERVICE JPM Number:
LLOJPMOI29 Rev000.doc                                                                           Page 3 of 6
LLOJPM0129 Revision Number:
 
000 KIA Number and Importance:
,\lUCLEAR GENERATiON GROUP                                                     EXELON NUCLEAR[
2.1.23 3.9/4.0 Suggested Testing Environment:
LLOJPMOIPS REvOOO. DOC Operators Name:
Simulator Actual Testing Environment:
J o b
Simulator Testing Method: Perform Faulted: No Alternate Path: No Time Critical:
 
No Estimated Time to Complete: 15 minutes Actual Time Used: minutes  
==Title:==
0 NLO         0 RO         0SRO          0STA            0 SRO Cert JPM
 
==Title:==
PLACING ALTERNATE TECW PUMP IN SERVICE JPM Number: LLOJPM0129                       Revision Number: 000 KIA Number and Importance:         2.1.23     3.9/4.0 Suggested Testing Environment:             Simulator Actual Testing Environment:         Simulator Testing Method: Perform                       Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 15 minutes         Actual Time Used:               minutes


==References:==
==References:==
S14.6.A, PLACING ALTERNATE TECW PUMP IN SERVICE EVALUATION  
S14.6.A, PLACING ALTERNATE TECW PUMP IN SERVICE EVALUATION  


==SUMMARY==
==SUMMARY==
: Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?       0Yes            0No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:               0Satisfactory            0 Unsatisfactory Comments:
0 Yes 0 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments: Note: Any grade of UNSAT requires a comment.
Note: Any grade of UNSAT requires a comment.
Evaluator's Name: (Print) Evaluator's Signature:
Evaluators Name:                                           (Print)
Date: LLOJPMOl29 Rev000. doc Page 4 of 6
Evaluators Signature:                                               Date:
,&CLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPMUI20 Rev000 JOB PERFORMANCE MEASURE (JPM)
LLOJPMOl29 Rev000.doc                                                                     Page 4 of 6
NOTE: Critical Element@) indicated by
 
,&CLEAR       GENERATION       GROUP                               EXELON NUCLEAR     I LLOJPMUI20 Rev000 JOB PERFORMANCE MEASURE (JPM)
NOTE: Critical Element@)indicated by
* in Performance Checklist.
* in Performance Checklist.
PERFORMANCE CHECKLIST:
PERFORMANCE CHECKLIST:
JPM Start Time ELEMENT STANDARD open. I I I I CUE: The EO reports that the 14- 4. VERIFY 14-*048B, "TECW Pump Minimum Flow Recirc Valve," throttled.  
JPM Start Time ELEMENT                       STANDARD open.
*005B is open. CUE: The EO reports that the 14- 5. VENT TECW Pump using *048B is throttled.
I                       I   I     I CUE: The EO reports that the 14-
14-*003B, "TECW Pump Vent," until a steady stream is observed.
          *005B is open.
CUE: The EO reports that "1 B TECW Pump has been vented.  
: 4. VERIFY 14-*048B, "TECW Pump Minimum Flow Recirc Valve,"
*6. START standby *BPf03, "TECW Pump" (PUMP) P L LOJPMOf29 Rev0UO.doc Page 5 of 6 dUCLEAR GENERATION GROUP EXELON NUCLEAR1 LLOJPMOI29 Rev000 JOB PERFORMANCE MEASURE (JPM)
throttled.
ELEMENT 6a.. ..AND PERFORM the following: -VERIFY PI-I4-*03B, "TECW Pump Disch," is 60 to 80 psig. -VERIFY no excessive vibration - OR noise at pump/motor.
CUE: The EO reports that the 14-
CUE: The EO reports that discharge pressure is 76 psig and no excessive vibration or noise are noted. *7. STOP desired *AP103, "TECW Pump" (Pump).  
          *048B is throttled.
: 8. VERIFY TECW Pump is spin.ning backwards.
: 5. VENT TECW Pump using 14-*003B, "TECW Pump Vent,"
CUE: The EO reports that the "IA" TECW Pump is rotating backwards.  
until a steady stream is observed.
*9. pump is to remain in standby THEN PLACE HS-l4-*0lA, "TECW Pump Control Switch" (PUMP), in "AUTO" ... 9a.m ENSURE suction/discharge valves are not closed. CUE: The EO reports that "1A" TECW suction and discharge valves are not closed. CUE: You have met the termination criteria for this JPM") STANDARD "1 B" TECW pump discharge pressure verified, "1 B TECW pump is verified to - not have excessive vibration or noise. HS-14-1O1A is taken to STOP The "IA" TECW Pump is verified not rotating backwards.
CUE: The EO reports that "1B TECW Pump has been vented.
HS-14-101A is taken to AUTO "IA" TECW Pump Suction and Discharge valves are verified - not closed. JPM Stop Time UNSAT Comment Number L L 0 JP MO I29 Re v000. doc Page 6 of 6 INITIAL CONDITIONS:  
  *6. START standby *BPf03, "TECW Pump" (PUMP)       P LLOJPMOf29 Rev0UO.doc                                                     Page 5 of 6
: 1. Service Water System in operation supplying cooling water to both TECW Heat 2. The Turbine Building EO reports that the "IA" TECW Pump Outboard Bearing is running  
 
: 3. The EO is standing by to support swapping TECW Pumps Exchangers.
dUCLEAR GENERATION GROUP                                                     EXELON NUCLEAR1 LLOJPMOI29 Rev000 JOB PERFORMANCE MEASURE (JPM)
hot. IN IT1 AT I N G C U E S : Shift Supervision directs you to start the "16" TECW pump and place the "IA" TECW pump in AUTO per S14.6.A, "Placing Alternate TECW Pump In Service".
ELEMENT                             STANDARD                  UNSAT Comment Number 6a.. ..ANDPERFORM the following:         "1B" TECW pump discharge pressure verified,
Limerick Generating Station Job Performance Measure REMOVING THE "IC" REACTOR FEED PUMP FROM SERVICE TO A STANDBY CONDITION JPM Number:
      -VERIFY PI-I4-*03B, "TECW Pump Disch," is 60 to 80 psig.       "1B TECW pump is verified to not have excessive vibration or
LLOJPMOI 14
      -VERIFY no excessive vibration       noise.
, NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPMOIII Rev 001 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
OR noise at pump/motor.
Prior to JPM usage, revalidate JPM using steps 8 through 11 below. 1. Task description and number, JPM description and number are identified.  
CUE: The EO reports that discharge pressure is 76 psig and no excessive vibration or noise are noted.
: 2. Knowledge and Abilities (WA) references are included.  
  *7. STOP desired *AP103, "TECW           HS-14-1O1A is taken to STOP Pump" (Pump).
: 3. Performance location specified. (in-plant, control room, or simulator)  
: 8. VERIFY TECW Pump is                    The "IA" TECW Pump is spin.ning backwards.                  verified not rotating backwards.
: 4. Initial setup conditions are identified.  
CUE: The EO reports that the "IA" TECW Pump is           rotating backwards.
: 5. Initiating and terminating cues are properly identified.  
  *9. pump is to remain in standby         HS-14-101A is taken to AUTO THEN PLACE HS-l4-*0lA, "TECW Pump Control Switch" (PUMP), in "AUTO" ...
: 6. Task standards identified and verified by SME review.  
9 a . m ENSURE suction/discharge         "IA" TECW Pump Suction and valves are not closed.               Discharge valves are verified not closed.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk ("). 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
CUE: The EO reports that "1A" TECW suction and discharge valves are not closed.
Procedure Rev. Date a. verify cues both verbal and visual are free of conflict, and b. ensure performance time is accurate. then revise the JPM. cover page. 9. Pilot test the JPM: IO. If the JPM cannot be performed as written with proper responses, 11. When JPM is revalidated, SME or Instructor sign and date JPM LLOJPMOI 14 RevOO1.doc Page 2 of 7
CUE: You have met the termination criteria for this JPM")
, NUCLEAR GENERATION GROUP EXELON NUCLEAR 1 LLOJPM0114 Rev 007 REVISION RECORD (Summary)
JPM Stop Time LL0JPMO I29 Rev000.doc                                                               Page 6 of 6
I. JPM revised to new format SIMULATOR SETUP INSTRUCTIONS:  
 
: 1. Reset simulator to 60% power IC 2. Toggle Remote Function RFW003 to  
INITIAL CONDITIONS:
'Close" to remove Hydrogen (H2) injection path for "1 C" RFP TASK STANDARD:
: 1. Service Water System in operation supplying cooling water to both TECW Heat Exchangers.
The "IC Reactor Feed Pump is in STANDBY TASK CONDITIONS:  
: 2. The Turbine Building EO reports that the IA TECW Pump Outboard Bearing is running hot.
: 1. Hydrogen Water Chemistry (HWC) Hydrogen (H2) injection path for "IC RFP is removed from service 2. An additional operator is briefed AND assigned responsibility to immediately reduce Rx power in the event OT-100, Reactor Low Level, is entered INITIATING CUE: You are directed by Shift Supervision to remove the "1 C" RFP from service to standby condition using the FWLC Semi-Automatic Sequences per S06.2.C U/1, Section 4.3 LLOJPMOI 14 RevOOWoc Page 3 of 7
: 3. The EO is standing by to support swapping TECW Pumps INIT1AT ING CUES:
, NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJP#OII#
Shift Supervision directs you to start the 16TECW pump and place the IA TECW pump in AUTO per S14.6.A, Placing Alternate TECW Pump In Service.
Rev 001 Information For Evaluator's Use: UNSAT requires written comments on respective step.
 
* Denotes CRITICAL steps. Number any comments in the "Comment Number" column.
Limerick Generating Station Job Performance Measure REMOVING THE "IC" REACTOR FEED PUMP FROM SERVICE TO A STANDBY CONDITION JPM Number: LLOJPMOI 14
Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
 
, NUCLEARGENERATION          GROUP                                             EXELON NUCLEAR       I LLOJPMOIII Rev 001 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
: 1. Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (WA) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (").
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.           Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LLOJPMOI 14 RevOO1.doc                                                               Page 2 of 7
 
, NUCLEAR GENERATION       GROUP                                           EXELON NUCLEAR           1 LLOJPM0114 Rev 007 REVISION RECORD (Summary)
I.JPM revised to new format SIMULATOR SETUP INSTRUCTIONS:
: 1. Reset simulator to 60% power IC
: 2. Toggle Remote Function RFW003 to Close to remove Hydrogen (H2) injection path for 1C RFP TASK STANDARD:
The I C Reactor Feed Pump is in STANDBY TASK CONDITIONS:
: 1. Hydrogen Water Chemistry (HWC) Hydrogen (H2) injection path for I C RFP is removed from service
: 2. An additional operator is briefed AND assigned responsibility to immediately reduce Rx power in the event OT-100, Reactor Low Level, is entered INITIATING CUE:
You are directed by Shift Supervision to remove the 1C RFP from service to standby condition using the FWLC Semi-Automatic Sequences per S06.2.C U/1, Section 4.3 LLOJPMOI 14 RevOOWoc                                                             Page 3 of 7
 
, NUCLEARGENERATION            GROUP                                                 EXELON NUCLEAR           I LLOJP#OII# Rev 001 Information For Evaluators Use:
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue. LLOJPMO7 74 RevOO7.doc Page 4 of 7
The timeclock starts when the candidate acknowledges the initiating cue.
. /\IUCLEAR GENERWION GROUP EXELON NUCLEAR I Operator's Name:
LLOJPMO7 74 RevOO7.doc                                                                       Page 4 of 7
Job Title: 0 NLO 0 RO 0 SRO CI STA 0 SRO Cert JPM Title:
 
Shutdown "IC Reactor Feed Pump From Standby Condition JPM Number: LLOJPMOI 14 Revision Number:
. /\IUCLEAR GENERWION       GROUP                                             EXELON NUCLEAR       I Operators Name:
001 WA Number and Importance:
Job
259002 A4.02 3.7/3.6 Suggested Testing Environment:
 
Simulator Actual Testing Environment:
==Title:==
Simulator Testing Method: Perform Faulted: No Alternate Path: No Time Critical:
0 NLO         0RO            0 SRO         CI STA         0SRO Cert JPM
No Estimated Time to Complete:
 
20 minutes Actual Time Used: minutes  
==Title:==
Shutdown I C Reactor Feed Pump From Standby Condition JPM Number: LLOJPMOI 14                     Revision Number: 001 WA Number and Importance:         259002 A4.02 3.7/3.6 Suggested Testing Environment:           Simulator Actual Testing Environment:       Simulator Testing Method: Perform                     Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 20 minutes Actual Time Used:                       minutes


==References:==
==References:==
S06.2.CU/1, REMOVING RFPS FROM SERVICE TO A STANDBY CONDITION EVALUATION


S06.2.C U/1, REMOVING RFP'S FROM SERVICE TO A STANDBY CONDITION EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?      0Yes            0No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:              0 Satisfactory            0Unsatisfactory Comments :
Note: Any grade of UNSAT requires a comment.
Evaluators Name:                                            (Print)
Eva1uators Signature:                                                Date:
LLOJPMOI 14 RevOO1.doc                                                                Page 5 of 7


==SUMMARY==
, I\IUCLEAR GENERATION GROUP                                                   EXELON NUCLEAR     I LLOJPMOP14 Rev 001 JOB PERFORMANCE MEASURE (JPM)
: Were all the Critical Elements performed satisfactorily?
NOTE: Critical Element(s) indicated by
0 Yes 0 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments : Note: Any grade of UNSAT requires a comment. Evaluator's Name: (Print) Eva1 uator's Signature:
Date: LLOJPMOI 14 RevOO1.doc Page 5 of 7 
, I\IUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPMOP14 Rev 001 JOB PERFORMANCE MEASURE (JPM) NOTE: Critical Element(s) indicated by
* in Performance Checklist.
* in Performance Checklist.
PERFORMANCE CHECKLIST:
PERFORMANCE CHECKLIST:
JPM Start Time ELEMENT 1. REFER TO S06.8.H, Startup, Shutdown And Operation Of The Hydrogen Water Chemistry System, to ensure the HWC H2 injection path is secured for RFP being removed from service CUE: Provided in initial conditions  
JPM Start Time ELEMENT                                                       UNSAT Comment Number
: 2. ACCESS screen FWLC-07, Automatic Sequences, at FWLCS Operator Station ENSURE "READY" box to left of "Stop Of C RFP" sequence is solid green SELECT blue bordered box next to "Stop Of C RFP" sequence - until it is outlined in white AND 3. then release SELECT "Start" (D4) Dialog Key  
: 1. REFER TO S06.8.H, Startup,                           NIA Shutdown And Operation Of The Hydrogen Water Chemistry System, to ensure the HWC H2 injection path is secured for RFP being removed from service CUE: Provided in initial conditions
*5. (at bottom of screenj. VERIFY the following on screen FWLC-07, Automatic Sequences, at FWLCS Operator Station: Box next to "Stop Of C RFP" 6a. sequence turns solid blue Step Number AND Title appear next to blue box of "Stop Of C RFP sequence 7. VERIFY the following automatic actions: Speed of offgoing RFPT slowly lowers to a nominal 2300 RPM 7a. ' 7b. Remaining IN SERVICE RFP(s) automatically maintain RPV NIA Screen FWLC-07, Automatic Sequences is accessed "READY" box to left of "Stop Of "C" RFP" sequence is solid green Blue bordered box next to "Stop Of C RFP" sequence is selected until it is outlined in white "Start" (D4) Dialog Key is selected NIA Box next to "Stop Of C RFP sequence is solid blue Step Number AND Title are next to blue box of "Stop Of C RFP" N/A Speed of C RFPT is a nominal 2300 RPM RPV level remains constant UNSAT Comment Number I Page 6 of 7 LLOJPMO? 14 RevOO7.doc
: 2. ACCESS screen FWLC-07,              Screen FWLC-07, Automatic Automatic Sequences, at             Sequences is accessed FWLCS Operator Station
, NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPMOIII Rev 001 JOB PERFORMANCE MEASURE (JPM)
: 3. ENSURE "READY" box to left of      "READY" box to left of "Stop Of "Stop Of C RFP" sequence is        "C" RFP" sequence is solid solid green                        green SELECT blue bordered box next      Blue bordered box next to "Stop to "Stop Of C RFP" sequence         Of C RFP" sequence is selected until it is outlined in white AND   until it is outlined in white then release
ELEMENT IB 7c. HV-006-108C "1 C RFP Disch Vlv" (DISCH C), closes for offaoina RFP 8. VERIFY HV-006-1 05C, "1 C RFP Disch Chk Vlv" (FEED, CHECK C), for offgoing RFP is closed at panel I OC651. CUE: You can stop here you have met the termination criteria for this JPM STANDARD HV-006-108C "1 C RFP Disch Vlv" (DISCH C) is closed HV-006-105C, "IC RFP Disch Chk Vlv" (FEED, CHECK C) is closed N/A ~~ ~~~ JPM Stop Time LLOJPMO7 74 RevOO7.doc Page 7 of 7
  *5. SELECT "Start" (D4) Dialog Key     "Start" (D4) Dialog Key is (at bottom of screenj.             selected VERIFY the following on screen                       NIA FWLC-07, Automatic Sequences, at FWLCS Operator Station:
, NUCLEAR GENERATiON GROUP EXELON NUCLEAR I TASK CONDITIONS:
6a. Box next to "Stop Of C RFP"         Box next to "Stop Of C R F P sequence turns solid blue          sequence is solid blue Step Number       AND Title appear Step Number AND Title are next next to blue box of "Stop Of C      to blue box of "Stop Of C RFP" R F P sequence
I. Hydrogen Water Chemistry (HWC) Hydrogen (Hz) injection path for ''I C RFP is removed from service 2. An additional operator is briefed AND assigned responsibility to immediately reduce Rx power in the event OT-100, Reactor Low Level, is entered INITIATING CUE: You are directed by Shift Supervision to remove the "1 C" RFP from service to standby condition using the FWLC Semi-Automatic Sequences per S06.2.C U/1 section 4.3 Limerick Generating Station Job Performance Measure START OB ESW PUMP FROM D12 SWITCHGEAR FOR SE-6 JPM Number: LLOJPM0207 I NUCLEAR GENERATION GROUP EXELON NUCLEARI LLOJPM0207 Rev009 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below. 1. Task description and number, JPM description and number are 2. Knowledge and Abilities (WA) references are included.  
: 7. VERIFY the following automatic                       N/A actions:
: 3. Performance location specified. (in-plant, control room, or simulator)  
7a. Speed of offgoing RFPT slowly       Speed of C RFPT is a nominal lowers to a nominal 2300 RPM       2300 RPM
: 4. Initial setup conditions are identified.  
'7b. Remaining IN SERVICE RFP(s) RPV level remains constant automatically maintain RPV I
: 5. Initiating and terminating cues are properly identified.  
LLOJPMO?14 RevOO7.doc                                                             Page 6 of 7
: 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are identified with an asterisk  
 
(*). 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
, NUCLEAR   GENERATION       GROUP                                   EXELON NUCLEAR     I LLOJPMOIII Rev 001 JOB PERFORMANCE MEASURE (JPM)
Procedure Rev. Date a. verify cues both verbal and visual are free of conflict, and b. ensure performance time is accurate. then revise the JPM. cover page. identified.  
ELEMENT                           STANDARD IB 7c. HV-006-108C "1C RFP Disch        HV-006-108C "1 C RFP Disch Vlv" (DISCH C), closes for       Vlv" (DISCH C) is closed offaoina RFP
: 9. Pilot test the JPM: IO. If the JPM cannot be performed as written with proper responses, 11. When JPM is revalidated, SME or Instructor sign and date JPM L L OJPM0207 RevOO9. doc Page 2 of 5 I NUCLEAR GENERATION GROUP EXELON NUCLEAR1 LLOJPM0207 Rev009 Operator's Name: Job Title: NLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM Title:
: 8. VERIFY HV-006-105C, "1C RFP      HV-006-105C, "IC RFP Disch Disch Chk Vlv" (FEED, CHECK      Chk Vlv" (FEED, CHECK C) is C), for offgoing RFP is closed at closed panel IOC651.
START OB ESW PUMP FROM D12 SWITCHGEAR FOR SE-6 JPM Number: LLOJPM0207 Revision Number: 009 KIA Number and Importance:
CUE: You can stop here you have met                 N/A the termination criteria for this JPM
262001 A4.03 3.213.4 Suggested Testing Environment:
            ~~         ~~~
Plant Actual Testing Environment:
JPM Stop Time LLOJPMO7 74 RevOO7.doc                                                   Page 7 of 7
Plant Testing Method: Simulate Faulted: No Alternate Path: No Time Critical:
 
No Estimated Time to Complete:
, NUCLEAR GENERATiON GROUP                                         EXELON NUCLEAR             I TASK CONDITIONS:
15 minutes Actual Time Used: minutes  
I.Hydrogen Water Chemistry (HWC) Hydrogen (Hz) injection path for I   C RFP is removed from service
: 2. An additional operator is briefed AND assigned responsibility to immediately reduce Rx power in the event OT-100, Reactor Low Level, is entered INITIATING CUE:
You are directed by Shift Supervision to remove the 1C RFP from service to standby condition using the FWLC Semi-Automatic Sequences per S06.2.C U/1 section 4.3
 
Limerick Generating Station Job Performance Measure START OB ESW PUMP FROM D12 SWITCHGEAR FOR SE-6 JPM Number: LLOJPM0207
 
I NUCLEAR GENERATION         GROUP                                             EXELON NUCLEARI LLOJPM0207 Rev009 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
: 1. Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (WA) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.           Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LL OJPM0207 RevOO9.doc                                                               Page 2 of 5
 
I NUCLEAR   GENERATION     GROUP                                             EXELON NUCLEAR1 LLOJPM0207 Rev009 Operators Name:
Job
 
==Title:==
NLO         0 RO         0SRO          0STA            0SRO Cert JPM
 
==Title:==
START OB ESW PUMP FROM D12 SWITCHGEAR FOR SE-6 JPM Number: LLOJPM0207                   Revision Number: 009 KIA Number and Importance:             262001 A4.03         3.213.4 Suggested Testing Environment:           Plant Actual Testing Environment:       Plant Testing Method:       Simulate             Faulted:       No Alternate Path:       No Time Critical:     No Estimated Time to Complete: 15 minutes Actual Time Used:                         minutes


==References:==
==References:==
SE-6, ALTERNATE REMOTE SHUTDOWN EVALUATION
==SUMMARY==
. Were all the Critical Elements performed satisfactorily?        0Yes            0 No The operators performancewas evaluated against the standards contained in this JPM, and has been determined to be:              0Satisfactory            0 Unsatisfactory Comments:
Note: Any grade of UNSAT requires a comment.
Evaluators Name:                                          (Print)
Evaluators Signature:                                                Date:
LLOJPM0207 RevOO9.doc                                                                Page 3 of 5


SE-6, ALTERNATE REMOTE SHUTDOWN EVALUATION SUM MARY: . Were all the Critical Elements performed satisfactorily?
I NUCLEARGENERATION GROUP                                                           EXELON NUCLEAR]
0 Yes 0 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments:
LL OJPM0207 Rev009 REVISION RECORD (
Note: Any grade of UNSAT requires a comment. Evaluator's Name: (Print) Evaluator's Signatu re: Date:
LLOJPM0207 RevOO9. doc Page 3 of 5 
- I NUCLEAR GENERATION GROUP EXELON NUCLEAR] L L OJPM0207 Rev009 REVISION RECORD (


==SUMMARY==
==SUMMARY==
):  
):
: 1. Updated format SIMULATOR SETUP INSTRUCTIONS:
: 1. Updated format SIMULATOR SETUP INSTRUCTIONS:
None TASK STANDARD(S):
None TASK STANDARD(S):
OB ESW Pump Breaker closed using local control at D12 Switchgear.
OB ESW Pump Breaker closed using local control at D12 Switchgear.
TASK CONDITIONS:  
TASK CONDITIONS:
: 1. The Main Control Room has been evacuated.  
: 1. The Main Control Room has been evacuated.
: 2. The Remote Shutdown Panel has been manned 3. "OB" ESW pump failed to start automatically.
: 2. The Remote Shutdown Panel has been manned
INITIATING CUES: I. You have been summoned to the RSP by Shift Supervision, briefed, and provided with a copy of SE-6 and a GE-75 key 2. Shift supervision directs you to start the OB ESW pump from the D12 switchgear per Section 4.10 of SE-6. Information For Evaluator's Use: UNSAT requires written comments on respective step.
: 3. OB ESW pump failed to start automatically.
* Denotes CRITICAL steps. Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
INITIATING CUES:
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local ' operator to perform groups of procedure steps instead of calling for each individual item to be performed.
I.You have been summoned to the RSP by Shift Supervision, briefed, and provided with a copy of SE-6 and a GE-75 key
The timeclock starts when the candidate acknowledges the initiating cue. LLOJPM0207 Rev009.doc Page 4 of 5 NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0207 Rev009 JOB PERFORMANCE MEASURE (JPM)
: 2. Shift supervision directs you to start the OB ESW pump from the D12 switchgear per Section 4.10 of SE-6.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
LLOJPM0207 Rev009.doc                                                                       Page 4 of 5
 
NUCLEAR         GENERATION     GROUP                                   EXELON NUCLEAR     I LLOJPM0207 Rev009 JOB PERFORMANCE MEASURE (JPM)
Critical Element(s) indicated by
Critical Element(s) indicated by
* in Performance Checklist.
* in Performance Checklist.
PERFORMANCE CHECKLIST:
PERFORMANCE CHECKLIST:
JPM Start Time ELEMENT I. IF B ESW pump is pJ running, THEN START pump as foiiows from D12 Emergency Switchgear:  
JPM Start Time ELEMENT                           STANDARD              SAT          Comment Number I.     IF B ESW pump is p    J running,                 N/A THEN     START pump as foiiows from D12 Emergency Switchgear:
*2. PLACE 152-1 1608/CST, "OB Emerg Service Water Pump CUE: 152-1 1608/CST is in PULL-TO- LOCK (OBP548),"
  *2.     PLACE 152-11608/CST, OB           152-11608/CST is in PULL-Emerg Service Water Pump            TO-LOCK at D12 (OBP548), to PULL-TO-LOCK. switchgear.
to "PULL-TO-LOCK".  
CUE: 152-11608/CST is in PULL-TO-LOCK
*3. PLACE HSS-I 1-094, "Transfer Switch" to "EMERGENCY" CUE: (When the GE-75 key has been used) HSS-11-094 Transfer Switch is in EMERGENCY."
  *3.     PLACE HSS-I 1-094, Transfer       GE-75 key is placed in Switch to EMERGENCY             Transfer switch HSS-11-094, the key is turned, and then the Transfer Switch is placed CUE: (When the GE-75 key has been           in EMERGENCY.
*4 PLACE 152-1 1608/CST to I "CLOSE. CUE: 152-1 1608/CST is taken to close. Red lamp is lit, green lamp is out. Instructor should use pen to indicate starting current initially, then decaying to running value on breaker ammeter. CUE: You have met the ternhation I criteria for this JPM) JPM Stop Time STANDARD N/A 152-1 1608/CST is in PULL- TO-LOCK at D12 switchgear.
used) HSS-11-094 Transfer Switch is in EMERGENCY.
GE-75 key is placed in Transfer switch HSS-11-094, the key is turned, and then the Transfer Switch is placed in EMERGENCY.
I *4       PLACE 152-11608/CSTto CLOSE.
Breaker 152-1 1608 is closed. SAT Comment Number L LOJPM0207 RevOO9. doc Page 5 of 5 L NUCLEAR GENERATION GROUP EXEL ON NUCLEAR I TASK CONDITIONS:
CUE: 152-11608/CST is taken to close.
I, The Main Control Room has been evacuated.  
Breaker 152-11608 is closed.
: 2. The Remote Shutdown Panel has been manned  
Red lamp is lit, green lamp is out. Instructor should use pen to indicate starting current initially, then decaying to running value on breaker ammeter.
: 3. "OB" ESW pump failed to start automatically.
I CUE: You have met the ternhation criteria for this JPM)
INITIATING CUES: 1. You have been summoned to the RSP by Shift Supervision, briefed, and provided with a copy of SE-6 and a GE-75 key  
JPM Stop Time LLOJPM0207 RevOO9.doc                                                               Page 5 of 5
: 2. Shift supervision directs you to start the OB ESW pump from the D12 switchgear per Section 4.10 of SE-6.   -- . Limerick Gene rating Station Job Performance Measure PLACING ALTERNATE CRD FLOW CONTROL VALVE IN SERVICE JPM Number: LLOJPM0200 I NUCLEAR GENERATION GROUP EXELON NUCLEAR I L LOJPM0200Rev003 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
 
Prior to JPM usage, revalidate JPM using steps 8 through I1 below. 1. 2. 3. 4. 5. 6. 7. 8. 9. Task description and number, JPM description and number are identified. Knowledge and Abilities (WA) references are included.
L NUCLEARGENERATION GROUP                                               EXELON NUCLEAR       I TASK CONDITIONS:
Performance location specified. (in-plant, control room, or simulator) Initial setup conditions are identified.
I,The Main Control Room has been evacuated.
Initiating and terminating cues are properly identified. Task standards identified and verified by SME review. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). Verify the procedure referenced by this JPM matches the most current revision of that procedure:
: 2. The Remote Shutdown Panel has been manned
Procedure Rev. Date Pilot test the JPM: a. verify cues both verbal and visual are free of conflict, and  
: 3. OB ESW pump failed to start automatically.
INITIATING CUES:
: 1. You have been summoned to the RSP by Shift Supervision, briefed, and provided with a copy of SE-6 and a GE-75 key
: 2. Shift supervision directs you to start the OB ESW pump from the D12 switchgear per Section 4.10 of SE-6.
 
1 --- .
Limerick Generating Station Job Performance Measure PLACING ALTERNATE CRD FLOW CONTROL VALVE IN SERVICE JPM Number: LLOJPM0200
 
I NUCLEARGENERATION        GROUP                                             EXELON NUCLEAR             I LLOJPM0200Rev003 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through I 1 below.
: 1. Task description and number, JPM description and number are identified.
: 2. Knowledge and Abilities (WA) references are included.
: 3. Performance location specified. (in-plant, control room, or simulator)
: 4. Initial setup conditions are identified.
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.         Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
IO. If the JPM cannot be performed as written with proper responses, then revise the JPM. 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page. L LOJPM0200 Rev003. doc Page 2 of 9 I1 ** I NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0200Rev003 REVISION RECORD (Summary):
I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
LLOJPM0200 Rev003.doc                                                               Page 2 of 9
 
I I 1 I NUCLEARGENERATION            GROUP                                                 EXELON NUCLEAR LLOJPM0200Rev003 REVISION RECORD (Summary):
Revision 3, revised to new format SIMULATOR SETUP INSTRUCTIONS:
Revision 3, revised to new format SIMULATOR SETUP INSTRUCTIONS:
NIA TASK STANDARD:  
NIA TASK STANDARD:
"*B" Flow Control Valve (FCV) in service in the automatic mode and the CRD "*A FCV removed from service. INITIAL CONDITIONS:
            *B Flow Control Valve (FCV) in service in the automatic mode and the CRD
I. *A CRD flow control valve is in service. 2. A startup of Unit
* A FCV removed from service.
* is in progress per GP-2. 3. Unit
INITIAL CONDITIONS:
* RPV pressure was recently increased to 920 psig. 4. All prerequisites to perform task are satisfied.
I.*A CRD flow control valve is in service.
INITIATING CUES: Shift supervision directs you to place the "*B" CRD flow control valve in service and remove the "*A CRD flow control valve from service per S46.6.B. Information For Evaluator's Use:
: 2. A startup of Unit
* is in progress per GP-2.
: 3. Unit
* RPV pressure was recently increased to 920 psig.
: 4. All prerequisites to perform task are satisfied.
INITIATING CUES:
Shift supervision directs you to place the *B CRD flow control valve in service and remove the
* A CRD flow control valve from service per S46.6.B.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps. Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section.
* Denotes CRITICAL steps.
The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue. LL OJPM0200 Rev003. doc Page 3 of 9 I NUCLEAR GENERATION GROUP EXELON NUCLEAR I LL OJPM0200Rev003 Operator's Name: Job Title: 0 NLO 0 RO 0 SRO 0 STA 0 SRO Cert JPM Title: PLACING ALTERNATE CRD FLOW CONTROL VALVE IN SERVICE JPM Number:
The timeclock starts when the candidate acknowledges the initiating cue.
LLOJPM0200 Revision Number: 003 KIA Number and Importance: 201001 A4.14 3.7/3.4 Suggested Testing Environment:
LL OJPM0200 Rev003.doc                                                                     Page 3 of 9
Plant Actual Testing Environment:
 
Plant Testing Method: Simulate Faulted: No Alternate Path: No Time Critical:
I NUCLEARGENERATION GROUP                                                       EXELON NUCLEAR       I LLOJPM0200Rev003 Operators Name:
No Estimated Time to Complete: 20 minutes Actual Time Used: minutes  
Job
 
==Title:==
0 NLO         0 RO         0SRO          0STA            0 SRO Cert JPM
 
==Title:==
PLACING ALTERNATE CRD FLOW CONTROL VALVE IN SERVICE JPM Number: LLOJPM0200                 Revision Number: 003 KIA Number and Importance:         201001     A4.14     3.7/3.4 Suggested Testing Environment:           Plant Actual Testing Environment:         Plant Testing Method: Simulate                     Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 20 minutes         Actual Time Used:               minutes


==References:==
==References:==
S46.6.B, PLACING ALTERNATE CRD HYDRAULIC SYSTEM FLOW CONTROL VALVE IN SERVICE EVALUATION  
S46.6.B, PLACING ALTERNATE CRD HYDRAULIC SYSTEM FLOW CONTROL VALVE IN SERVICE EVALUATION  


==SUMMARY==
==SUMMARY==
: Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?   Yes         No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:               0Satisfactory            0Unsatisfactory Comments:
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments:
Note: Any grade of UNSAT requires a comment.
Note: Any grade of UNSAT requires a comment.
Evaluator's Name: (Print) Evaluator's Signature:
Evaluators Name:                                           (Print)
Date: LLOJPM0200 Rev003.doc Page 4 of 9
Evaluators Signature:                                                 Date:
,I 't I NUCLEAR GENERATION GROUP EXELON NUCLEAR I L L 0 JPMO2OORevOO3 JOB PERFORMANCE MEASURE (JPM) NOTE: Critical Element@) indicated by
LLOJPM0200 Rev003.doc                                                                 Page 4 of 9
 
, I   t I NUCLEAR     GENERATION     GROUP                                         EXELON NUCLEAR       I LL0JPMO2OORevOO3 JOB PERFORMANCE MEASURE (JPM)
NOTE: Critical Element@)indicated by
* in Performance Checklist.
* in Performance Checklist.
PERFORMANCE CHECKLIST:
PERFORMANCE CHECKLIST:
JPM Start Time ELEMENT I. Obtain a copy of S46.6.B 2. ESTABLISH communications between Reactor Operator AND *OC213, CRD Hydraulic Master ' Control Area Panel CUE: (Via simulated radio communication) Unit
JPM Start Time ELEMENT                           STANDARD              SAT  UNSAT Comment Number I.Obtain a copy of S46.6.B             Copy ofthe most recent revision of S46.6.B is obtained
* Reactor Operator standing by for the performance of S46.6.B. 3. VERIFY FC-O46--*R600 "Rod Drive Flow Controller" (FL) is in "AUTO" at *OC603. CUE: Reactor Operator reports, "The CRD Flow Controller is in AUTO. 4. VERIFY in-service DOOSA(B) CRD Flow Controller" is in "AUTO" at *OC213 CUE: CRD Flow Controller D009A is in AUTO. 5. ENSURE the on-coming DOO9B(A) "CRD Flow Controller" in "MANUAL" AND... CUE: CRD Flow Controller D009A is in AUTO. 5a. . . .O% open as indicated by the red arrow at *OC213 CUE: The red arrow for D009B indicates 0% open. STANDARD Copy ofthe most recent revision of S46.6.B is obtained Communication established with Unit Reactor Operator CRD Flow Controller verified in AUTO at *OC603 from the Reactor Operator Local MANUAUAUTO switch for controller D009A at *OC213 verified in AUTO Local MANUAUAUTO switch for controller D009B at *OC213 verified in MANUAL The red arrow for D009B is verified at 0% at *OC213. SAT UNSAT Comment Number LLOJPM0200 Rev003,doc Page 5 of 9 
: 2. ESTABLISH communications             Communication established between Reactor Operator AND         with Unit Reactor Operator
.I 't I NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0200Rev003 JOB PERFORMANCE MEASURE (JPM) ELEMENT P P 6. PLACE on-coming FV-C *F002B(A), "CRD Flow Control Valve" in-service:
          *OC213, CRD Hydraulic Master Control Area Panel CUE: (Via simulated radio communication) Unit
* 6a. OPEN 46-*F046B Inlet Isolation Valve CUE: Valve handwheel is rotated counter-clockwise until it stops.
* Reactor Operator standing by for the performance of S46.6.B.
* 6b. OPEN 46-*F047B Outlet Isolation Valve CUE: Valve handwheel is rotated counter-clockwise until it stops. 7. Using FC-O46-*R600, "Rod Drive Flow Controller" at *OC603, Hydraulic Flow Controller,"
: 3. VERIFY FC-O46--*R600 Rod Drive CRD Flow Controller verified in Flow Controller (FL) is in AUTO   AUTO at *OC603 from the at *OC603.                           Reactor Operator CUE: Reactor Operator reports, The CRD Flow Controller is in AUTO.
indicates 50-55 gpm at *OC213 ENSURE FI-46-*R019, CRD CUE: FI-46-*R019 indicates 52 gpm. 10. 50 to 55 gpm cannot be achieved THEN slowly THROlTLE closed the off-going 46-*F047A(B), "Outlet Isolation Valve," until FI-46-*R019 indicates 50 to 55 gpm. "CRD Flow Controller", "MANUAL" (red) indicating arrow to the same position as "AUTO" (black) indicating arrow.
: 4. VERIFY in-service DOOSA(B) CRD       Local MANUAUAUTO switch Flow Controller is in AUTOat      for controller D009A at *OC213
* 11. MATCH off-going DOO9A(B), CUE: (Before Adiustment) The red arrow for D009A is indicating 70%; the black arrow for D009A is indicating 90%. CUE: (After Adjustment)
          *OC213                              verified in AUTO CUE: CRD Flow Controller D009A is in AUTO.
The red and black arrow for D009A are indicatina 90%. STANDARD P NIA Handwheel for valve 46-*F046B is rotated counter-clockwise until the valve is full open Handwheel for valve 46-*F047B is rotated counter-clockwise until the valve is full open System flow is verified to be 50-55 gpm on FI-46-*ROl9 N/A The control knob for D009A is adjusted so that the red arrow is set to the same position as the black arrow SAT UNSAT Comment Number L LOJPM0200 RevOO3. doc Page 6 of 9 
: 5. ENSURE the on-coming DOO9B(A)       Local MANUAUAUTO switch CRD Flow Controller in             for controller D009B at *OC213 MANUAL AND...                     verified in MANUAL CUE: CRD Flow Controller D009A is in AUTO.
". 1- 1 NUCLEAR GENERATION GROUP EXELON NUCLEAR\ LLOJPM0200Rev003 JOB PERFORMANCE MEASURE (JPM) ELEMENT 4
5a. ...O% open as indicated by the red The red arrow for D009B is arrow at *OC213                    verified at 0% at *OC213.
* 12. PLACE off-going DOO9A(B), "CRD Flow Controller", in "MANUAL" at *OC213 CUE: D009A in MANUAL 13. MONITOR system flow at FI *R019 AND MAINTAIN 50 to 63 gpm while performing transition.
CUE: The red arrow for D009B indicates 0% open.
* 14. Slowly OPEN on-coming D009B "CRD Flow Controller" by rotating control knob in clockwise (INCREASE}
LLOJPM0200 Rev003,doc                                                            Page 5 of 9
direction until a slight increase in flow is observed on FI- 46-*RO19 CUE: (As D009B Control Knob is rotated clockwise)
 
Indicated flow on FI-46-*R019 has risen to 55 gpm.
I
* 15. Alternately AND slowly OPEN on- coming DOO9B(A) "CRD Flow Controller" by rotating control knob in clockwise (INCREASE) direction AND slowly CLOSE off-going DOOSA(B) "CRD Flow Controller" by rotating control knob in counterclockwise direction CUE: The red indicating arrow for D009B is increasing to 90% open and the red indicating arrow for D009A is decreasing to 0% open. FI-46-*R019 indicates 55 atsm. STANDARD Local MANUAUAUTO switch for controller D009A at *OC213 verified in MANUAL N/A D009B control knob has been rotated clockwise until flow increases on FI46-*R019 The on-coming D009B control knob is slowly rotated clockwise while the off-going D009A control knob is slowly rotated counter-clockwise. System flow is maintained between 50 to 63 gpm on FI46-*ROI 9 during the transition.
. I    t I NUCLEARGENERATION GROUP                                                    EXELON NUCLEAR LLOJPM0200Rev003 JOB PERFORMANCE MEASURE (JPM)
UNSAT Comment Number LLOJP M0200 Rev003.doc Page 7 of 9 I NUCLEAR GENERATION GROUP EXELON NUCLEAR I L L OJPMO2OORevOO3 JOB PERFORMANCE MEASURE (JPM) ELEMENT -
ELEMENT                              STANDARD            SAT  UNSAT    Comment Number P                      P                  P
* 16. WHEN off-going DOO9A(B) "CRD Flow Controller" "MANUAL" (red) indicating arrow is at 0% open, - THEN STOP rotating both control knobs. CUE: The red indicating arrow for D009A is at 0% and the red indicating arrow for D009B is at 90%. FI-46-*R019 indicates 55 gpm.
: 6. PLACE on-coming FV-C                              NIA
* 17. MATCH on-coming D009B "CRD Flow Controller" "AUTO" (black) indicating arrow with "MANUAL" (red) indicating arrow CUE: The red indicating arrow indicates 90% open and the black indicating arrow indicates 90% oDen. 18. indicating arrows cannot be matched at *OC213, THEN PERFORM the following:
          *F002B(A), CRD Flow Control Valve in-service:
: 1. PLACE FC-O46-*R600 in "MANUAL" 2. ADJUST FC-O46-*R600 Output to match "AUTO (black) indicating arrow with "MANUAL" (red) indicating arrow at "OC213. STANDARD DOO9A(B) "CRD Flow Controller" "MANUAL" (red) indicating arrow is at 0% open. EITHER the D009B control knob has been adjusted so that the (red) indicating arrow at
* 6a. OPEN 46-*F046B Inlet Isolation      Handwheel for valve 46-*F046B Valve                                is rotated counter-clockwise until the valve is full open CUE: Valve handwheel is rotated counter-clockwise until it stops.
*OC213 matches the AUTO (black) indicating arrow the RO has been requested to adjust FC
* 6b. OPEN 46-*F047B Outlet Isolation      Handwheelfor valve 46-*F047B Valve                               is rotated counter-clockwise until the valve is full open CUE: Valve handwheel is rotated counter-clockwise until it stops.
*R600 "CRD Flow Controller" AUTO setpoint at *OC603 until the AUTO (black) indicating arrow matches the MANUAL (red) indicating arrow on D009B at *OC213. NIA Comment Number LLOJPM0200 Rev003.doc Page 8 of 9 1 NUCLEAR GENERATION GROUP EXELON NUCLEAR] LLOJPM0200Rev003 JOB PERFORMANCE MEASURE (JPM) ELEMENT I STANDARD -
: 7. Using FC-O46-*R600, Rod Drive       System flow is verified to be Flow Controller at *OC603,         50-55 gpm on FI-46-*ROl9 ENSURE FI-46-*R019, CRD Hydraulic Flow Controller, indicates 50-55 gpm at *OC213 CUE: FI-46-*R019 indicates 52 gpm.
* 19. PLACE on-coming DOO9B(A), "CRD Flow Controller''
: 10. 50 to 55 gpm cannot be                               N/A achieved THEN slowly THROlTLE closed the off-going 46-*F047A(B), Outlet Isolation Valve, until FI-46-*R019 indicates 50 to 55 gpm.
in "AUTO" at *OC213. Local MANUAUAUTO switch for controller D009B at *OC213 verified in AUTO CUE: D009B is in AUTO. 20. step 4.16.12 was performed
* 11. MATCH off-going DOO9A(B),            The control knob for D009A is CRD Flow Controller, MANUAL     adjusted so that the red arrow (red) indicating arrow to the same   is set to the same position as position as AUTO (black)           the black arrow indicating arrow.
... N/A (Step 4.6.12 was not performed)
CUE: (Before Adiustment) The red arrow for D009A is indicating 70%; the black arrow for D009A is indicating 90%.
Valve for off-going FV-C *F002A(B), Flow Control Valve."
CUE: (After Adjustment) The red and black arrow for D009A are indicatina 90%.
* 21. CLOSE 46-*F046A Inlet Isolation Handwheel for valve 46-*F046A is rotated clockwise until the valve is full closed. CUE: Valve handwheel is rotated clockwise until it stops
LLOJPM0200 RevOO3.doc                                                            Page 6 of 9
* 22. CLOSE 46-*F047A Outlet Handwheel for valve 46-*F047A Isolation Valve for off-going FV-C- 46-*F002A(B), Flow Control Va Ive.
 
* CUE: Valve handwheel is rotated clockwise until it stops 21. INFORM Reactor Operator on- coming FV-C-46-*F002B(A), Flow Control Valve," is in-service.
. 1 -
CUE: The RO responds, "I understand the
1 NUCLEARGENERATION            GROUP                                          EXELON NUCLEAR\
*B CRD Flow Control Valve has been placed in service."
LLOJPM0200Rev003 JOB PERFORMANCE MEASURE (JPM)
: 22. VERIFY the following at *OC603: System flow and drive water AP 0 50 to 63 gpm on FI-46-*R606.
ELEMENT                              STANDARD                  UNSAT    Comment Number 4
0 255 to 265 psi on PDI *R602, DELTA PX. is rotated clockwise until the valve is full closed. The RO has been informed that the *B CRD FCV is in service and the *A CRD FCV has been removed from service. have been verified to be within at acceptable limits at *OC603. CUE: The RO reports he has 55 gpm and 260 psi at *OC603. CUE: You have met the termination UNSAT Comment Number JPM Stop Time L LOJPM0200 Rev003.
* 12. PLACE off-going DOO9A(B), CRD Local MANUAUAUTO switch Flow Controller, in MANUAL at    for controller D009A at *OC213
doc Page 9 of 9 
            *OC213                              verified in MANUAL CUE: D009A in MANUAL
?,, 1,s I NUCLEAR GENERATION GROUP EXELON NUCLEAR 1 IN ITlAL CON DlTlON S : I. *A CRD flow control valve is in service. 2. A startup of Unit
: 13. MONITOR system flow at FI                       N/A
* is in progress per GP-2. 3. Unit
            *R019 AND MAINTAIN 50 to 63 gpm while performing transition.
* RPV pressure was recently increased to 920 psig. 4. All prerequisites to perform task are satisfied.
* 14. Slowly OPEN on-coming D009B          D009B control knob has been CRD Flow Controller by rotating rotated clockwise until flow control knob in clockwise            increases on FI46-*R019 (INCREASE} direction until a slight increase in flow is observed on FI-46-*RO19 CUE: (As D009B Control Knob is rotated clockwise) Indicated flow on FI-46-*R019 has risen to 55 gpm.
INITIATING CUES: Shift supervision directs you to place the "*B" CRD flow control valve in service and remove the "*A" CRD flow control valve from service per S46.6.B.
* 15. Alternately AND slowly OPEN on-     The on-coming D009B control coming DOO9B(A) CRD Flow           knob is slowly rotated clockwise Controller by rotating control knob while the off-going D009A in clockwise (INCREASE) direction   control knob is slowly rotated AND slowly CLOSE off-going          counter-clockwise. System flow DOOSA(B) CRD Flow Controller      is maintained between 50 to 63 by rotating control knob in          gpm on FI46-*ROI9 during the counterclockwise direction          transition.
CUE: The red indicating arrow for D009B is increasing to 90%
open and the red indicating arrow for D009A is decreasing to 0% open. FI-46-*R019 indicates 55 atsm.
LLOJPM0200 Rev003.doc                                                            Page 7 of 9
 
I NUCLEARGENERATION            GROUP                                        EXELON NUCLEAR I LL OJPMO2OORevOO3 JOB PERFORMANCE MEASURE (JPM)
ELEMENT                            STANDARD                          Comment
* 16. WHEN off-going DOO9A(B) "CRD       DOO9A(B) "CRD Flow Number Flow Controller" "MANUAL" (red)    Controller" "MANUAL" (red) indicating arrow is at 0% open,    indicating arrow is at 0% open.
THEN STOP rotating both control knobs.
CUE: The red indicating arrow for D009A is at 0% and the red indicating arrow for D009B is at 90%. FI-46-*R019 indicates 55 gpm.
* 17. MATCH on-coming D009B "CRD          EITHER the D009B control knob Flow Controller" "AUTO" (black)    has been adjusted so that the indicating arrow with "MANUAL"      (red) indicating arrow at *OC213 (red) indicating arrow              matches the AUTO (black) indicating arrow    the RO has been requested to adjust FC                                            *R600 "CRD Flow Controller" AUTO setpoint at *OC603 until CUE: The red indicating arrow           the AUTO (black) indicating indicates 90% open and the       arrow matches the MANUAL black indicating arrow indicates (red) indicating arrow on D009B 90% oDen.                       at *OC213.
: 18. indicating arrows cannot be                        NIA matched at *OC213,THEN PERFORM the following:
: 1. PLACE FC-O46-*R600 in "MANUAL"
: 2. ADJUST FC-O46-*R600 Output to match "AUTO (black) indicating arrow with "MANUAL" (red) indicating arrow at "OC213.
LLOJPM0200 Rev003.doc                                                            Page 8 of 9
 
1 NUCLEAR GENERATION GROUP                                                    EXELON NUCLEAR]
LLOJPM0200Rev003 JOB PERFORMANCE MEASURE (JPM)
ELEMENT                  I          STANDARD                  UNSAT    Comment
* 19. PLACE on-coming DOO9B(A),              Local MANUAUAUTO switch Number CRD Flow Controller in AUTO      for controller D009B at *OC213 at *OC213.                             verified in AUTO CUE: D009B is in AUTO.
: 20. step 4.16.12 was performed...                          N/A (Step 4.6.12 was not performed)
* 21. CLOSE 46-*F046A Inlet Isolation        Handwheel for valve 46-*F046A Valve for off-going FV-C          is rotated clockwise until the
        *F002A(B), Flow Control Valve.       valve is full closed.
CUE: Valve handwheel is rotated clockwise until it stops
* 22. CLOSE 46-*F047A Outlet                Handwheel for valve 46-*F047A Isolation Valve for off-going FV-C-  is rotated clockwise until the 46-*F002A(B), Flow Control            valve is full closed.
VaIve.*
CUE: Valve handwheel is rotated clockwise until it stops
: 21. INFORM Reactor Operator on-            The RO has been informed that coming FV-C-46-*F002B(A), Flow         the *B CRD FCV is in service Control Valve, is in-service.         and the *A CRD FCV has been removed from service.
CUE: The RO responds, I understand the *B CRD Flow Control Valve has been placed in service.
: 22. VERIFY the following at *OC603:        System flow and drive water AP have been verified to be within 0    50 to 63 gpm on FI-46-*R606.      at acceptable limits at *OC603.
0    255 to 265 psi on PDI              *R602, DELTA PX.
CUE: The RO reports he has 55 gpm and 260 psi at *OC603.
CUE: You have met the termination JPM Stop Time LLOJPM0200 Rev003.doc                                                              Page 9 of 9
 
? , ,   1 , s I NUCLEAR GENERATION GROUP                                                      EXELON NUCLEAR1 INITlAL CONDlTlONS :
I.*A CRD flow control valve is in service.
: 2. A startup of Unit
* is in progress per GP-2.
: 3. Unit
* RPV pressure was recently increased to 920 psig.
: 4. All prerequisites to perform task are satisfied.
INITIATING CUES:
Shift supervision directs you to place the "*B" CRD flow control valve in service and remove the "*A" CRD flow control valve from service per S46.6.B.
 
Limerick Generating Station Job Performance Measure MSIWPCIG LOW LOW LOW LEVEL BYPASS (MSIV'S OPEN)
Limerick Generating Station Job Performance Measure MSIWPCIG LOW LOW LOW LEVEL BYPASS (MSIV'S OPEN)
JPM Number: LLOJPM0212   
JPM Number: LLOJPM0212
. I. 7 17 '* 1 NUCLEAR GENERATION GROUP EXELON NUCLEAR 1 LLOJPM02 12 RevOO7.doc JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
 
Prior to JPM usage, revalidate JPM using steps 8 through 11 below. 1. Task description and number, JPM description and number are identified.  
  . I. 7 1
: 2. Knowledge and Abilities (KIA) references are included.  
1                                                                                                          7 1 NUCLEARGENERATION        GROUP                                             EXELON NUCLEAR LLOJPM0212 RevOO7.doc JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
: 3. Performance location specified. (in-plant, control room, or simulator)  
: 1. Task description and number, JPM description and number are identified.
: 4. Initial setup conditions are identified.  
: 2. Knowledge and Abilities (KIA) references are included.
: 5. Initiating and terminating cues are properly identified.  
: 3. Performance location specified. (in-plant, control room, or simulator)
: 6. Task standards identified and verified by SME review. 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
: 4. Initial setup conditions are identified.
Procedure Rev. Date 9. Pilot test the JPM: a. verify cues both verbal and visual are free of conflict, and  
: 5. Initiating and terminating cues are properly identified.
: 6. Task standards identified and verified by SME review.
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.         Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
JPM. IO. If the JPM cannot be performed as written with proper responses, then revise the 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page. LLOJPM0212 RevOO7.doc7 Page 2 of 6
I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.
, >>e 1 NUCLEAR GENERA TION GROUP EXELON NUCLEAR I LLOJPM0212 RevOO7.doc REVISION RECORD (Summary):
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
Revision 8, revised format SI MU LATOR SETUP INSTRUCTIONS:
LLOJPM0212 RevOO7.doc7                                                                   Page 2 of 6
 
, > > e 1 NUCLEARGENERATION GROUP                                                             EXELON NUCLEAR           I LLOJPM0212 RevOO7.doc REVISION RECORD (Summary):
Revision 8, revised format SIMULATOR SETUP INSTRUCTIONS:
N/A TASK STANDARD:
N/A TASK STANDARD:
Isolation bypassed in accordance with T-221, section 4.2. INITIAL CONDITIONS:  
Isolation bypassed in accordance with T-221, section 4.2.
: 1. An ATWS is in progress and the appropriate Trip procedures have been entered 2. The MSIV's are open and Instrument Gas system is not isolated.  
INITIAL CONDITIONS:
: 3. No indication of a Main Steam line break or gross fuel failure. 4. -BY160 is not known to be inoperative INITIATING CUES: You are directed by shift supervision to perform T-221 (MSIV's open) on Unit - Information For Evaluator's Use: UNSAT requires written comments on respective step.
: 1. An ATWS is in progress and the appropriate Trip procedures have been entered
: 2. The MSIV's are open and Instrument Gas system is not isolated.
: 3. No indication of a Main Steam line break or gross fuel failure.
: 4. -BY160 is not known to be inoperative INITIATING CUES:
You are directed by shift supervision to perform T-221 (MSIV's open) on Unit -
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
L LOJPM02 7 2 Rev007. doc7 Page 3 of 6 I NUCLEAR GENERATION GROUP EXELON NUCLEAR1 L LOJPM02 12 Re vOO7. doc 0 perator's Name  
LLOJPM02 7 2 Rev007.doc7                                                                         Page 3 of 6
: Job Title: 0 NLO Cl RO 0 SRO 0 STA 0 SRO Cert JPM Title: MSIV/PCIG LOW LOW LOW LEVEL BYPASS (MSIV'S OPEN) JPM Number: LLOJPMOOOI Revision Number: 012 KIA Number and Importance: 295037 EA1 .I 1 3.U3.6 Suggested Testing Environment:
 
Plant Actual Testing Environment:
I NUCLEAR GENERATION GROUP                                                     EXELON NUCLEAR1 LLOJPM02 12 Re vOO7.doc 0perators Name:
Plant Testing Method:
Job
Simulate Faulted: No Alternate Path: No Time Critical:
 
No Estimated Time to Complete:
==Title:==
20 minutes Actual Time Used: minutes  
0 NLO         Cl RO         0SRO          0 STA           0 SRO Cert JPM
 
==Title:==
MSIV/PCIG LOW LOW LOW LEVEL BYPASS (MSIVS OPEN)
JPM Number: LLOJPMOOOI                 Revision Number: 012 KIA Number and Importance:       295037     EA1.I   1   3.U3.6 Suggested Testing Environment:           Plant Actual Testing Environment:       Plant Testing Method: Simulate                     Faulted: No Alternate Path: No Time Critical: No Estimated Time t o Complete: 20 minutes         Actual Time Used:               minutes


==References:==
==References:==
T-221, MSIV/PCIG LOW LOW LOW LEVEL BYPASS (MSIVS OPEN)
EVALUATION


T-221, MSIV/PCIG LOW LOW LOW LEVEL BYPASS (MSIV'S OPEN) EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes        0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:              0 Satisfactory            0Unsatisfactory Comments:
Note: Any grade of UNSAT requires a comment.
Evaluators Name:                                            (Print)
Eva1uators Signature:                                                Date:
LLOJPM02 12 Rev007.doc7                                                                  Page 4 of 6


==SUMMARY==
, ,   , t P I NUCLEARGmfwnoN GROUP                                                           EXELON NUCLEAR I LLOJPM0272 RevOO7.doc JOB PERFORMANCE MEASURE (JPM)
: Were all the Critical Elements performed satisfactorily?
Yes 0 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0 Unsatisfactory Comments:
Note: Any grade of UNSAT requires a comment. Evaluator's Name: (Print)
Eva1 uator's Signature:
Date: L LOJPM02 12 Rev007.doc7 Page 4 of 6 
,, ,tP I NUCLEAR GmfwnoN GROUP EXELON NUCLEAR I LLOJPM0272 RevOO7. doc JOB PERFORMANCE MEASURE (JPM)
NOTE: Critical Element(s) indicated by
NOTE: Critical Element(s) indicated by
* in Performance Checklist. PERFORMANCE CHECKLIST:
* in Performance Checklist.
JPM Start Time ELEMENT
PERFORMANCE CHECKLIST:
* I. Obtain current revision of T-221
JPM Start Time
                                                                                    -I-ELEMENT                         STANDARD              SAT  UNSAT    Comment Number
* I.Obtain current revision of T-221         Current revision of T-221 obtained.
* 2. Obtain tools/equipment from Unit
* 2. Obtain tools/equipment from Unit
* T200 cabinet: -( 1 ) 4 screwdriver  
* Operator obtains equipment T200 cabinet:                         from T-221 box in T-200
-( 1 ) screwholding screwdriver  
                -( 1) 4 screwdriver                 cabinet.
-(I) roll of electrical tape -(I) flashlight  
                -( 1) screwholding screwdriver
-(I 0) electrical jumpers CUE: You have obtained the eaubment.  
                -(I) roll of electrical tape
: 3. PERFORM the following at *OC61 I (Aux Equip Room):
                -(I) flashlight
* 3a. INSTALL jumper from TI at relay B21 H-K13B/FL to MI at relay 821 H-KI B/EX. (BAY B Attachment 1 ). CUE: Jumper is installed.
                -(I 0) electrical jumpers CUE: You have obtained the eaubment.
* 3b. INSTALL jumper from TI at relay 821 H-K13D/BL to MI at relay Attachment 2). B21 H-K16D/BH (BAY D - CUE: Jumper is installed.  
: 3. PERFORM the following at *OC61I                      NIA (Aux Equip Room):
: 4. E PClG isolated, THEN PERFORM the following at 10C601 (Main Control Room):. . . 3 5. E PClG did not isolate due to high Drywell pressure, THEN PERFORM the following:
* 3a. INSTALL jumper from T I at relay       Jumper installed between T I on B21H-K13B/FL to M I at relay         relay B21H-K13B/FL to M I at 821H-KI B/EX. (BAY B Attachment     relay B21H-Kl B/EX in *OC611, 1).                                 BAY B.
1 B L LOJPM0272 RevOO7. doc7 STANDARD Current revision of T-221 obtained.
CUE: Jumper is installed.
Operator obtains equipment from T-221 box in T-200 cabinet. NIA Jumper installed between TI on relay B21 H-K13B/FL to MI at relay B21 H-Kl B/EX in *OC611, BAY "B". Jumper installed between TI on relay B21 H-K13D/BL to MI at relay B21 H-K16D/BH in *OC611 BAY "D". N/A NIA SAT UNSAT -I-- ___ Comment Number Page 5 of 6 I NUCLEAR GENERATION GROUP EXELON NUCLEAR I JOB PERFORMANCE MEASURE (JPM) ELEMENT STANDARD "06622 (Aux Equip Room). K105NCK.in  
* 3b. INSTALL jumper from T I at relay       Jumper installed between T I on 821H-K13D/BL to M I at relay         relay B21H-K13D/BL to M I at B21H-K16D/BH (BAY D -               relay B21H-K16D/BH in *OC611 Attachment 2).                      BAY D.
*OC622. at *OC623 (Aux Equip Room). K105D/CK in *OC623. CUE: Jumper is installed.
CUE: Jumper is installed.
* 5d. INSTALL jumper EEES-1 to EEES- Jumper installed between 3 (Attachment  
: 4. E PClG isolated, THEN PERFORM                         N/A the following at 10C601 (Main Control Room):. ..
: 4) at *OC623 (Aux Equip Room). EEES-I and EEES-3 in "OC623. I CUE: Jumper is installed.
3
CUE: You have met the termination criteria for this JPM JPM Stop Time LL OJPM02 12 RevOO7.doc L L OJPM02 I 2 Rev00 7. doc7 Page 6 of 6 4 , -. ,* > I NUCLEAR GENERATION GROUP EXELON NUCLEAR I INITIAL CONDITIONS:  
: 5. E PClG did not isolate due to high                   NIA Drywell pressure, THEN PERFORM the following:
: 1. An ATWS is in progress and the appropriate Trip procedures have been entered  
1 B
: 2. The MSIV's are open and Instrument Gas system is not isolated.  
LLOJPM0272 RevOO7.doc7                                                                 Page 5 of 6
: 3. No indication of a Main Steam line break or gross fuel failure. 4. -BY160 is not known to be inoperative i INITIATING CUES: You are directed by shift supervision to perform T-221 (MSIV's open) on Unit -}}
 
I NUCLEAR GENERATION             GROUP                                   EXELON NUCLEAR I LL OJPM0212 RevOO7.doc JOB PERFORMANCE MEASURE (JPM)
ELEMENT                       STANDARD "06622 (Aux Equip Room).         K105NCK.in *OC622.
at *OC623 (Aux Equip Room).       K105D/CK in *OC623.
CUE: Jumper is installed.
* 5d. INSTALLjumper EEES-1 to EEES-     Jumper installed between I      3 (Attachment 4) at *OC623 (Aux Equip Room).
EEES-I and EEES-3 in "OC623.
CUE: Jumper is installed.
CUE: You have met the termination criteria for this JPM JPM Stop Time LL OJPM02I 2 Rev00 7.doc7                                                       Page 6 of 6
 
4 , -. ,* >
I NUCLEARGENERATION            GROUP                                         EXELON NUCLEAR I INITIAL CONDITIONS:
: 1. An ATWS is in progress and the appropriate Trip procedures have been entered
: 2. The MSIV's are open and Instrument Gas system is not isolated.
: 3. No indication of a Main Steam line break or gross fuel failure.
i
: 4. -BY160 is not known to be inoperative INITIATING CUES:
You are directed by shift supervision to perform T-221 (MSIV's open) on Unit -}}

Latest revision as of 00:27, 14 March 2020

Oct. 2006 Exam - Draft - Section B Operating Exam (Folder 2)
ML062930280
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/11/2006
From: Todd Fish
Operations Branch I
To:
Exelon Generation Co
Sykes, Marvin D.
References
Download: ML062930280 (87)


Text

Limerick Generating Station Job Performance Measure START REACTOR RECIRC PUMP (ALTERNATE PATH)

JPM Number: LLOJPM0526

EXELON NUCLEAR I LLOJPM0526 REV003 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through I 1 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

II.When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPM0526 RevOO3.doc Page 2 of 8

EXELON NUCLEAR I LLOJPM0526 REV003 REVISION RECORD (Summary)

Revision 2, Changed setup instructions.

SIMULATOR SETUP INSTRUCTIONS:

I.Reset to Single Loop IC (36% power)

2. Ensure that the I B RRP shutdown IAW S43.2.A and then Startup of the 1B RRP is complete up to and including step 4.3.5
3. Insert the following malfunctions on Trigger # I . Set up Trigger # I to activate the malfunctions when the B RRP discharge valve is full open (Trigger Text !ZRRL31BG)

TASK STANDARD:

IB RRP started then secured due to Reactor Recirc Pump High Vibration INITlAL CONDlTlONS:

I.Unit 1 is at 36% power in Single Loop operation, with the IA Reactor Recirc Pump in service and the I ByReactor Recirc Pump shutdown.

2. S43.1 .A, Start Up of Recirculation System, has been completed up to and including step 4.3.5 INITIATING CUES:

You are directed by shift supervision start the 1B Reactor Recirc pump in accordance with step 4.3.6 of S43.1 .A.

LLOJPM0526 RevOO3.doc Page 3 of 8

EXELON NUCLEAR ~

LLOJPM0526 REV003 Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

LL OJPMO526 RevOO3.doc Page 4 of 8

EXELON NUCLEAR LLOJPM0526 REV003 Operators Name:

Job

Title:

0 NLO 0 RO 0 SRO 0 STA 0SRO Cert JPM

Title:

START REACTOR RECIRC PUMP (ALTERNATE PATH)

JPM Number: LLOJPM0526 Revision Number: 002 WA Number and Importance: 202001 A3.02 3.1/3.0 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Testing Method: Perform Faulted: Yes Alternate Path: Yes Time Critical: No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

S43.1 .A, START UP OF RECIRCULATION SYSTEM EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? CI Yes Cl No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0Satisfactory 0Unsatisfactory Comments:

Note: Any grade of UNSAT requires a comment.

Evaluators Name: (Print)

Evaluators Signature: Date:

LLOJPM0526 RevOO3.doc Page 5 of 8

,&CLEAR GENERATION GROUP EXELON NUCLEAR1 LLOJPM0526 Rev003 JOB PERFORMANCE MEASURE (JPM)

NOTE: Critical Element@)indicated by

  • in Performance Checklist.

PERFORMANCE CHECKLIST:

JPM Start Time:

ELEMENT STANDARD

  • I. PLACE "Recirc Pp M-G Set "Recirc Pp M-G Set Drive Motor Drive Motor Control" Control" (MOTOR), taken to (MOTOR), to "START" at "START"
  • OC602 AND VERIFY the following:

la. XY4-M1-*R621A(B), "Recirc XY4-Ml-*R621A(B), "Recirc Pp Pp Speed" (S),increases to Speed" (S), increases at approximately 100% approximately 100%

Ib. M-G Field breaker closes M-G Field breaker closed approximately 13 seconds approximately 13 seconds after after M-G start M-G start 1c. B 32-*R627A(B), "Generator B32-*R627A(B), "Generator Current" (AM), rise Current" (AM) rises 1d. B32-*R623A(B), "Generator B32-*R623A(B), "Generator Voltage" (V), rise Voltage" (V), rises le. PDI43-*R612A(B), "Recirc PDI43-*R612A(B), "Recirc Pp Pp Differential Pressure" Differential Pressure" (DELTA PX),

(DELTA PX), rise rose I f . XY5-MI -*R621A(B), "Recirc XYS-MI-*R621A(B), "Recirc Pp Pp Speed Demand" Speed Demand" , at approximately (DEMAND), reduces to 20%

approximately 20%

lg. XY4-M1-*R621A(B), "Recirc XY4-M1-*R621A(B), "Recirc Pp Pp Speed" (S), reduces to Speed" (S), reduces to approximately20% approximately 20%

LLOJPM0526 Rev003.doc Page 6 of 8

JUCLEAR GENERATION GROUP EXELON NUCLEAR[

LLOJPM0526 Rev003 JOB PERFORMANCE MEASURE (JPM)

I ELEMENT STANDARD I 1 SAT UNSAT I Comment Number

  • 2. JOG OPEN HV-43-*F031A( B),

DISCHARGE, at OC602 for 1 to 2 seconds allowing 5 to I O seconds for power AND level to stabilize repeating as necessary until the following conditions are met:

2a. Recirc Pp speed is stable Recirc Pp speed is stable I I I 2b. FI-42-*R61IA(B), Total Jet FI-42-*R61IA(B), Total Jet Pump Pump Loop Flow (FL), is Loop Flow (FL), is approximately approximately 15 Ibs/hr 15 Ibs/hr X10E6 X I OE6 NOTE TO Evaluator:

Ensure Malf VIC105B9 0-18 inserted over Iminute after Discharge Valve is fully open Ensure Malf VIC106B1 0-18 inserted over Iminute after Discharge Valve is fully open Ensure Annunciator 112 0-2 RECIRC M-G PUMP MOTOR Hi VIBRATION inserted 30 seconds after Discharge Valve is fully open NOTE TO Evaluator:

The following actions are from ARC 112 D-2 1B RECIRC M-G PUMP MOTOR HI VIBRATION

  • 3.

IF no speed changes on I B 1B Recirc Pump at minimum Recirc Pump were made OR speed <

Vibration Monitoring System indicates a problem during a speed change, THEN reduce speed of 1B Recirc Pump to clear annunciator

4. IF annunciator cannot be cleared after reducing flow to the low speed setpoint, THEN secure 1B Recirc Pump, per S43.2.A I I NOTE TO Evaluator: The following actions are from S43.2.A LLOJPMO526 Rev003.doc Page 7 of 8

,\IUCLEAR GENERATION GROUP EXELON NUCLEAR^

LLOJPM0526 Rev003 JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD SAT UNSAT I Comment

=

5. ENSURE XC-M1-*R621A(B), XC-M1-*R621A(B), "Recirc Pp &

"Recirc Pp & MG set-M/A" (S), MG Set-M/A" (S),set at 0%,

set at O%, at *OC602

~~

~

6. Rx is at power THEN N/A MONITOR position ON power/Flow Map in accordance with GP-5 Appendix 2, Planned Rx Maneuvering Without Shutdown AND/OR OT-I12 U/*, Recirculation Pump Trip, as applicable Otherwise, MARK this step N/A M-G Drive Motor breaker (MOTOR)
  • 7. TRIP M-G Drive Motor Tripped breaker (MOTOR) AND ....

7a. VERIFY B32-*R628A(B), B32-*R628A(B), "Motor current" "Motor current" (AM)1lowers (AM), at zero to zero

__ ~ ~ _ _ _ ~~

  • 8. CLOSE HV-43-*F031A(B), HV-43-I F031A(B), "Recirc Pp "Recirc Pp Disch Vlv" Discharge" (DISCHARGE)

(DISCHARGE) HV *F023A(B), "Recirc Pp -

OR Suction Vlv" (SUCTION) HV-43-1FO23A(B), "Recirc Pp Suction" (SUCTION) CLOSED CUE:"You can stop here you have met the termination criteria for this JPM" JPM Stop Time LLOJPM0526 Rev003.doc Page 8 of 8

EXELONNUCLEAR INITIAL CON DlTlONS :

1. Unit 1 is at 36% power in Single Loop operation, with the IA Reactor Recirc Pump in service and the 1B Reactor Recirc Pump shutdown.
2. S43.1 .A, Start Up of Recirculation System, has been completed up to and including step 4.3.5 INITIATING CUES:

You are directed by shift supervision start the 1B Reactor Recirc pump in accordance with step 4.3.6 of S43.1 .A.

Limerick Generating Station Job Performance Measure RESTORE RECW, DWCW, AND INSTRUMENT GAS (E-IAYIGO) (TIME CRITICAL)JPM Number: LLOJPM0050

GLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0050 Rev 011 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

I.Task description and number, JPM description and number are identified.

2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPM0050 Rev001 ?.doc Page 2 of 7

dLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPMOO50 Rev 077 REVISION RECORD (Summary):

1. Revised format.

SIMULATOR SETUP INSTRUCTIONS:

I.Reset the Simulator to IC-I7

2. Insert Malfunction MED280A (Loss of 1AY160)

TASK STANDARD:

Restore RECW and DWCW flow to the drywell, and Instrument Gas aligned to the Drywell.

INITIAL CONDITIONS: This task is time critical

1. 1AY160 is de-energized
2. 1B DW Chiller was running.

INITIATING CUE:

You are directed by Shift Supervision to perform the initial actions of E-1AY160 to restore RECW, DWCW, and Instrument Gas.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items maybe listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

T

..^^. initiating

...........I.......... cue.

.......* .............. ..I.................

LLOJPM0050 Rev001 ?.doc Page 3 of 7

2LEAR GENERATiON GROUP EXELON NUCLEAR I LLOJPM0050 Rev 011 Operators Name:

Job

Title:

0NLO I7 RO 0SRO 0 STA SRO Cert JPM

Title:

RESTORE RECW, DWCW, AND INSTRUMENT GAS (E-IAYIGO)

JPM Number: LLOJPM0050 Revision Number: 01 1 K/A Number and Importance: 223001 A4.12 333.6 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Testing Method: Perform Faulted: No Alternate Path: No Time Critical: Yes Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

E-IAYI 60 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? El Yes 0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory c3 Unsatisfactory Comments:

Note: Any grade of UNSAT requires a comment.

Evaluators Name: (Print)

Eva1uators Signature: Date:

LLOJPM0050 Rev001 ?.doc Page 4 of 7

iLEAR GENERATIONGROUP EXELON NUCLEAR LLOJPM0050 Rev 079 JOB PERFORMANCE MEASURE (JPM)

NOTE: Critical Element@)indicated by

  • in Performance Checklist.

PERFORMANCE CHECKLIST:

JPM Start Time:

ELEMENT STANDARD SAT UNSAT Comment Number I. Obtain current revision of E- Current revision of E-IAY 160 lAY l60. obtained.

Cue: Once the trainee demonstrates the ability to locate the current revision of the procedure, provide him/her a copy.

2. ENTER ON-I 13, LOSSOf N/A RECW.

Cue: ON-I 13 is being performed

3. -

IF Recirc Pumps trip, THEN N/A ENTER OT-I 12, Recirculation Pump Trip.

4. PERFORM the following to N/A restore RECW to Recirc Pump seal motor oil coolers, on 1OC655:
  • 4a. PLACE HS-13-112, Seals/ Within 10 minutes of start time, Oils Clrs lnbd Is01 Bypass to HS-13-112 in BYPASS BYPASS
  • 4b. PLACE HS-13-106, Recirc Within 10 minutes of start time, Pumps Seals/Oil Coolers (IN), HS-13-106 OPEN to OPEN
  • 4c. PLACE HS-13-107, Recirc Within 10 minutes of start time, Pumps Seals/Oil Cooler HS-I3-107 OPEN (OUT), to OPEN
5. REFER TO Tech Spec 3.6.3 CRS notified T.S. 3.6.3 AND TAKE action for an applicable.

inoperable isolation valve.

LLOJPM0050 RevOO?1.doc Page 5 of 7

GLEAR GENERATION GROUP EXELON NUCLEAR LLOJPM0050 Rev 011 JOB PERFORMANCE MEASURE (JPM)

I ELEMENT STANDARD SAT UNSAT Comment Number I 6. PERFORM the following to restore Drywell Cpoling:

NIA

  • 6a. PLACE HS-87-116, DNV CHILL HS-87-116 in BYPASS WTR OUTBD ISOL BYPASS, keylock switch to BYPASS at IOC681.

CRS notified T.S. 3.6.3 applicable.

NIA er Isolation valves HV-87-120A and 121A OPEN Valve Number -- Description HV-87-120A Chld Wtr In HV-87-121A Chld Wtr Out

  • 7b. *2) Handswitch #: HSS HV-87-120B and 121B OPEN I21B (Loop B)

Valve Number -- Description HV-87-120B Chld Wtr In HV-87-121B Chld Wtr Out

8. -

IF Drywell Chiller trips, THEN NIA REFER TO S87.1 .A, Startup of Drywell Chilled Water System, AND START Drywell Chilled Water System.

1:;CIS

9. PERFORM the following to restore Instrument Gas on 1OC601, ISOLATION:

PLACE HS-59-129Ar Instrument Gas Supply (DRYWELL A), in CLOSE.

PLACE HSS-57-191AY

~

NIA HS-59-129A in CLOSE HSS-57-191A in BYPASS Containment Isolation Bypass (A), in BYPASS.

LLOJPM0050 Rev001?.doc Page 6 of 7

dLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0050 Rev O f 1 JOB PERFORMANCE MEASURE (JPM)

I ELEMENT

  • 9 ~ . PLACE HS-59-129A, STANDARD 1 HV-59-129A is OPEN Instrument Gas Supply (DRYWELL A),in AUTO.
  • 9d. PLACE HS-59-101, Instrument HV-59-101 is OPEN Gas Suction (INBOARD), in OPEN.

9e. ENSURE compliance with CRS notified T.S. 3.6.3 Tech.Spec action statement applicable 3.6.3.a IO. PERFORM the following to N/A restore Instrument Gas Blocks AND Vents:

  • I Oa. PLACE HSS-57-191C, HSS-57-191C in BYPASS Containment Isolation Bypass (C), in BYPASS.
  • I Ob. PLACE HS-59-140, Instrument HV-59-140 is OPEN I 1Oc.

Gas Block Valve Control Switch to OPEN.

ENSURE compliance with CRS notified T.S. 3.6.3 Tech. Spec. Action Statement applicable.

3.6.3.a Cue:You have met the termination criteria for this JPM.

JPM Stop Time:

LLOJPMU050 RevOUl 1.doc Page 7 of 7

clLEAR GENERATION GROUP EXELON NUCLEAR I INITIAL CONDITIONS: This task is time critical

1. 1AY 160 is de-energized
2. IB DW Chiller was running.

INITIATING CUE:

You are directed by Shift Supervision to perform the initial actions of E-lAYI60 to restore RECW, DWCW, and Instrument Gas.

Limerick Generating Station Job Performance Measure CONTROL ROOM VENTILATION HIGH RADIATION ISOLATION RESET JPM Number: LLOJPM0074

, NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPh40074 Rev012 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through IIbelow.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) referdnces are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

II.When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPM0074 Rev012 .doc Page 2 of 7

, NUCLEAR GENERATION GROUP EXELON NUCLEAR1 LLOJPM0074 Rev012 REVISION RECORD (Summary):

1. JPM revised to new format.

SIMULATOR SETUP INSTRUCTIONS:

I.Place the HS-78-017AYB,C,and D keylock switches to RESET.

2. Rotate the arming collars for HSS-78-0l7A,ByC,and D to RAD.
3. Place the HS-78-017A,B,C, and D keylock switches to AUTO.
4. Depress the pushbutton on HSS-78-0l7AyB,C,and D.
5. Place the arming collars for HSS-78-0l7AyB,C,D back to NOR.
6. Ensure the HI RAD ISLN light lit and the CHLOR ISLN NOT lit for all four isolation channels.
7. Remove the four PA2235 keys from HS-78-017A,B,CYD.
8. Reset any annunciators that will reset.

TASK STANDARD:

Control Room HVAC High Radiation isolation res.,with CREF, S aligned for normal a w m a C operation.

TASK CONDITIONS:

I.A Control Room HVAC High Radiation Level isolation occurred

2. The High Radiation isolation condition is cleared.
3. The system was operating per S78.1 .A before the isolation occurred.
4. The High Radiation condition has been acknowledged on the RM-I Iin the MCR.

INITIATING CUES:

You are directed by Shift Supervision to reset the Control Room HVAC High Radiation isolation per S78.7.A LLOJPM0074 Rev012 .doc Page 3 of 7

c NUCLEAR GENERATION GROUP EXELON NUCLEAR I I LLOJPh40074 Rev012 Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

LLOJPM0074 RevOl2 .doc Page 4 of 7

, NUCLEAR GENERATION GROUP EXELON NUCLEAR1 LLOJPMOO74 Rev012 Operators Name:

Job

Title:

CI NLO 0 RO 0SRO 0STA 0SRO Cert JPM

Title:

CONTROL ROOM VENTILATION HIGH RADIATION ISOLATION RESET JPM Number: LLOJPM0074 Revision Number: 012 K/A Number and Importance: 290003 A4.01 3.2/3.2 Suggested Testing Environment: Simulator Actua I Testing Environment: Simulator Testing Method: Simulate Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

S78.7.A, CONTROL ROOM HVAC SYSTEM RESTORATION FROM AN ISOLATION EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0Yes 17 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0Unsatisfactory Comments:

Note: Any grade of UNSAT requires a comment.

EvaIuators Name: (Print)

Eva1uators Signature: Date:

LLOJPM0074 Rev012 .doc Page 5 of 7

LLOJPM0074 Rev072 JOB PERFORMANCE MEASURE (JPM)

NOTE: Critical Element(s) indicated by

  • in Performance Checklist.

PERFORMANCE CHECKLIST:

JPM Start Time ELEMENT STANDARD

1. IF required, THEN manually ACKNOWLEDGE chlorine detectors locally at detector by depressing the RESET BUTTOM (625-08-350).
2. required, THEN RESET toxic N/A chemical alarms per S78.1.F, Alignment of Toxic Chemical Detection System for Normal Operation.
3. IF required, THEN N/A ACKNOWLEDGE radiation condition by depressing ACK-GRID on RM-11 console, MCR.
4. PLACE the following Control N/A Room IsolationValve Reset Keylock Switches to RESET:
  • 4a. HS-78-017C, RESET C HS-78-017C is in RESET
  • 4b. HS-78-017A, RESET A HS-78-017A is in RESET
  • 4C. HS-78-017B, RESET B HS-78-0178 is in RESET
  • 4d. HS-78-017D, RESET D HS-78-017D is in RESET I I I
5. ENSURE the following Control Room IsolationValve Trip Switches to NOR:

5a. HSS-78-017C, TRIP C HSS-78-017C is in NOR I I I 5b. HSS-78-017A, TRIP A HSS-78-017A is in NOR I I I 5 ~ . HSS-78-017B, TRIP B HSS-78-017B is in NOR I I I 5d. HSS-78-017D, TRIP D HSS-78-017D is in NOR LLOJPM0074 Rev012 .doc Page 6 of 7

WCLEAR GENERATION GROUP EXELON NUCLEAR]

LL OJPMOO74 Rev012 JOB PERFORMANCE MEASURE (JPM)

I ELEMENT STANDARD SAT UNSAT Comment Number I

6. PLACE the desired following N/A Control Room IsolationValve Reset Keylock Switches to "AUTO":

I *6a. HS-78-017C, RESET C HS-78-017C is in AUTO

  • 6b. HS-78-017A, RESET A HS-78-017A is in AUTO
  • 6 ~ . HS-78-017B, RESET B HS-78-017B is in AUTO I *6d. HS-78-017D, RESET D HS-78-017D is in AUTO
7. VERIFY status of OA(B)Vl27, N/A EMERGENCY AIR FAN A (B) as follows:

7a. a single subsystem isolation N/A remains, THEN VERIFY OAVl27 OR OBVI27 is running as appropriate.

7b. IF all subsystems reset, THEN OAVI27 and OBVI27 are not YERlFY OAV127 OBV127 running.

are not running CUE: You can stop here. You have met the termination criteria for this JPM.

JPM Stop Time LLOJPM0074 Rev072 .doc Page 7 of 7

IVUCLEAR GENERATION GROUP EXELON NUCLEAR1 TASK CONDITIONS:

I.A Control Room HVAC High Radiation Level isolation occurred

2. The High Radiation isolation condition is cleared.
3. The system was operating per S78.1.A before the isolation occurred.
4. The High Radiation condition has been acknowledged on the RM-11 in the MCR.

INITIATING CUES:

You are directed by Shift Supervision to reset the Control Room HVAC High Radiation isolation per S78.7.A

Limerick Generating Station Job Performance Measure MANUALLY INITIATE CORE SPRAY SYSTEM (ALTERNATE PATH - D CORE SPRAY PUMP FAILS TO START)

JPM Number: LLOJPMOl28

,(IUCLEAR GENERATION GROUP EXELON NUCLEAR 1 LLOJPMOl28 REvOOO .DOC JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 1Ibelow.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPMOl28 Rev000 .doc Page 2 of 7

I &CLEAR GENERATION GROUP EXELON NUCLEAR1 LLOJPM0128 REvOOO .DOC .

REVISION RECORD (Summary):

Revision 0 SIMULATOR SETUP INSTRUCTIONS:

1. Put in the following malfunctions and MRR440A, Recirc Loop A Rupture, at 2%.
2. When indicated level is approximately -140, remove the Recirc Loop A Rupture.

TASK STANDARD:

I.Core spray manually initiated per S52.7.A

2. Start the 1 D Core Spray Pump following failure to auto start.

INITIAL CONDITIONS:

1. Reactor has scrammed, all rods inserted, all scram actions have been taken.
2. Reactor vessel water level is -140 on Fuel Zone and lowering.
3. Reactor pressure is 950 psig.
4. Drywell pressure is 2.7 psig and rising.
5. Emergency Diesel Generators have failed to Auto Start.
6. Emergency buses are being powered from Off-site power.
7. Core spray has failed to automatically initiate.

LLOJPMU728 RevOUO .doc Page 3 of 7

rJUCLEAR GENERATION GROUP EXELON NUCLEAR]

LLOJPM0128 REvOOO .DOC INITIATING CUES:

I.Shift Supervision directs you to manually initiate Core Spray System per S52.7.A.

2. An additional RO is available to acknowledge alarms.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

LLOJPM0728 Rev000 .doc Page 4 of 7

~UCLEAR GENERAT~ON GROUP EXELON NUCLEAR 1 LLOJPM0728 Rev000 Operators Name:

Job

Title:

0 NLO 0 RO 0 SRO 0 STA 0SRO Cert JPM

Title:

MANUALLY INITIATE CORE SPRAY SYSTEM (ALTERNATE PATH - D CORE SPRAY PUMP FAILS TO START)SCRAM RESET (Alternate Path)

JPM Number: LLOJPMOOOI Revision Number: 000 K/A Number and Importance: 295031 EA1 4.414.4 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Testing Method: Perform Faulted: Yes Alternate Path: Yes Time Critical: No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

S52.7.A MANUAL INITIATION AFTER FAILURE OF AUTOMATIC INJECTION DURING A LOCA EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0 Yes 0No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0Satisfactory 0Unsatisfactory Comments:

Note: Any grade of UNSAT requires a comment.

Evaluators Name: (Print)

Evaluators Signature: Date:

LLOJPMO.128 Rev000 .doc00 Page 5 of 7

UCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPMO?28 Rev000 JOB PERFORMANCE MEASURE (JPM)

NOTE: Critical Element@)indicated by

  • in Performance Checklist.

PERFORMANCE CHECKLIST:

JPM Start Time ELEMENT STANDARD Comment Number rotated clockwise to the I ARMED position.

  • IC. (INITIATION 3) E21-S22C Core Spray manual initiation pushbutton collar S22C is rotated clockwise to the ARMED position.
  • Id. (INITIATION 4) E21-S22D Core Spray manual initiation pushbutton collar S22D is rotated clockwise to the ARMED position.
2. VERIFY DIV 1 CORE SPRAY DIV Iand DIV 3 CORE SPRAY MANUAL INITIATION SWITCH MANUAL INITIATION SWITCH ARMED, AND DIV 3 CORE ARMED annunciators are SPRAY M ~ U A INITIATION L verified lit on
  • I 3 COOL A.

SWITCH ARMED, annunciator alarms on *I3 COOL A

3. VERIFY DIV 2 CORE SPRAY DIV 2 and DIV 4 CORE SPRAY MANUAL INITIATION SWITCH MANUAL INITIATION SWITCH ARMED, AND DIV 4 CORE ARMED annunciators are SPRAY MANUAL INITIATION verified lit on
  • I 5 COOL B.

SWITCH ARMED, annunciator I alarms on

  • I 5 COOL B I LLOJPM0128 RevOOO .doc00 Page 6 of 7

LLOJPM0128 RevOOO JOB PERFORMANCE MEASURE (JPM)

4. DEPRESS AND RELEASE all four NIA of the following MANUAL INITIATION pushbuttons to MANUAL INIT1AT10N pushbutton S22A is momentarily depressed and released 1 *4b. (INITIATION I) E21-S22B
  • 4 ~ .(INITIATION 1) E21-S22C MANUAL INITIATION pushbutton S22B is momentarily depressed and released MANUAL INITIATION pushbutton S22C is momentarily depressed and released
  • 4d. (INITIATION I) E21-S22D MANUAL INITlATlON pushbutton S22D is momentarily depressed and released
5. ENSURE the following Core HV-52-*F031A, MIN FLOW and Spray Pump minimum flow HV-52-*F031B, MIN FLOW are bypass valves are open: verified open.

-HV-52-*F031A, MIN FLOW

-HV-52-*F031B, MIN FLOW

6. WHEN Reactor Pressure is NIA between 435 to 475 psig, THEN VERIFY HV-52-*F005, OUTBOARD, & HV-52-*F037, lJ INBOARD DISCHARGE, open.
7. only one Core Spray Pump in Recognize 1D Core Spray a loop is runnins THEN GO TO Pump failure to start.

S52.7.B, Core Spray Injection with a Single Operable Pump

8. Start the ID Core Spray Pump The 1D Core Spray Pump is running.

CUE: You have met the termination criteria for this JPM JPM Stop Time LLOJPM0128 RevOOO .doc00 Page 7 of 7

NUCLEARGENERATION GROUP EXELON NUCLEAR I INITlAL ,CONDITIONS:

1. Reactor has scrammed, all rods inserted, all scram actions have been taken.
2. Reactor vessel water level is -140 on Fuel Zone and lowering.
3. Reactor pressure is 950 psig.
4. Drywell pressure is 2.7 psig and rising.
5. Emergency Diesel Generators have failed to Auto Start.
6. Emergency buses are being powered from Off-site power.
7. Core spray has failed to automatically initiate.

INITIATING CUES:

1. Shift Supervision directs you to manually initiate Core Spray System per S52.7.A.
2. An additional RO is available to acknowledge alarms.

Limerick Generating Station Job Performance Measure DIESEL GENERATOR FAST START FROM THE CONTROL ROOM - (ALTERNATE PATH

- ESW PUMP FAILS TO START)

JPM Number: LLOJPMOl30 I

rUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0130Rev000 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

II.When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPMOI30 RevOOO.doc Page 2 of 7

JUCLEAR GENERATION GROUP EXELON NUCLEAR I LL0JPMO f 3ORevOOO REVISION RECORD (Summary)

Revision 0 SIMULATOR SETUP INSTRUCTIONS:

1. This JPM can be run from any Simulator IC
2. Insert the following malfunction TASK STANDARD:

EITHER D1Iis running and the C ESW has been manually started D1Ihas been shutdown once it is noted that the A ESW pump has failed to start.

INITIAL CONDITIONS:

1. S92.1 .O, Local and Remote Manual Startup Of A Diesel Generator, is complete up to and including step 4.1.
2. An EO is standing by at D I ID/G to support diesel generator operation.

INITIATING CUES:

You are directed by the CRS to perform a Remote Manual Startup of the D I I Diesel Generator per step 4.3 of S92.1 .O.

LLOJPMO I30 Rev000.doc Page 3 of 7

JUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPMOI 30Rev000 Information For Evaluators Use:

UNSAT requires written comments on respective step.

Denotes CRITICAL steps.

Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

LLOJPM0130 Rev000.doc Page 4 of 7

JUCLEAR GENERATION GROUP EXELON NUCLEAR I LL OJPMO7 3ORevOOO Operator's Name:

Job

Title:

0 NLO 0 RO 0 SRO 0STA 0SRO Cert JPM

Title:

DIESEL GENERATOR FAST START FROM THE CONTROL ROOM - (ALTERNATE PATH - ESW PUMP FAILS TO START)

JPM Number: LLOJPMOOOI Revision Number: 012 WA Number and Importance: 295003 AA1.02 4.2/4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Testing Method: Perform Faulted: Yes Alternate Path: Yes Time Critical: No Estimated Time to Complete: 20 mlliutes Actual Time Usec. minutes

References:

S92.1.O, "Local and Remote Manual Startup Of A Diesel Generator EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes 17 No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory 0 Unsatisfactory Comments:

Note: Any grade of UNSAT requires a comment.

Evaluator's Name: (Print)

EvaIuator's Signature: Date:

LLOJPMOf30 Rev000.doc Page 5 of 7

.dCLEAR GENERATtON GROUP EXELON NUCLEAR I LLOJPM0130Rev012 JOB PERFORMANCE MEASURE (JPM)

NOTE: Critical Element(s) indicated by

  • in Performance Checklist.

PERFORMANCE CHECKLIST:

JPM Start Time ELEMENT STANDARD

1. Provide the candidate with a marked . N/A up copy of S92.1.O.
2. VERIFY LOCAL-REMOTE switch in LOCAL-REMOTE switch is REMOTE verified to be in the REMOTE position.
3. NOTIFY MCR AND SSV that the Shift Supervisor notified that next step makes the D/G DII will be INOPERABLE and INOPERABLE AND unavailable. unavailable.
4. RECORD in OPS logs that the Recorded in Ops logs that DII applicable D/G is INOP AND is INOPERABLE and unavailable WHEN EXCITER unavailable.

SHUTDOWN RESET switch to STOP.

5. DIRECT the EO to perform steps N/A 4.3.4 through 4.3.7 CUE: The EO reports that steps 4.3.4 through 4.3.7 are complete.
  • 6. PLACE selected lOl-A(B, C, 101-AG501/CS, Diesel D)G501/CS, Diesel Generator Generator Control, in Control, to START. START.
7. WHEN 3 minute time delay for Diesel Generator start is prelube pump operation is observed.

completed, THEN OBSERVE diesel generator starts.

8. DIRECT the EO to perform steps N/A 4.3.10 through 4.3.14 CUE: The EO reports that steps 4.3.10 through 4.3.14 are complete.

LLOJPM0130 Rev000.doc Page 6 of 7

JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD SAT UNSAT Comment Number

9. RECORD in the OPS log that Recorded in Ops logs that DII applicable D/G is now considered is available.

available.

10.VERIFY frequency meter reads from Frequency verified from 5 9 t o 59 to 61 Hz. 61 Hz

  • I 1.EESW pump is already Either start the "C" ESW Pump running, THEN VERIFY ESW or shutdown D11.

pump starts 50 to 60 seconds after diesel start.

CUE:You have met the termination criteria for the JPM.

JPM Stop Time LLOJPM0130 Rev000.doc Page 7 of 7

ACLEAR GENERATION GROUP EXELON NUCLEAR1 INIT1AL CONDITIONS:

1. S92.1 .O, Local and Remote Manual Startup Of A Diesel Generator, is complete up to and including step 4.1.
2. An EO is standing by at D11 D/G to support diesel generator operation.

INITIATING CUES:

You are directed by the CRS to perform a Remote Manual Startup of the D I IDiesel Generator per step 4.3 of S92.1 .O.

Limerick Generating Station Job Performance Measure

. SCRAM RESET - ALTERNATE PATH JPM Number: LLOJPMOOOI

, NUCLEAR GENERATION GROUP EXELON NUCLEAR I LL OJPMOOOI RevO 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM usina steDs 8 throuah 11 below.

~~ ~~

I.Task description and number, JPM description and number are identified.

2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

L LOJPMOOOI RevO 12.doc Page 2 of 7

i NUCLEAR GENERATION GROUP EXELON NUCLEAR1 LLQJPMOOOI Rev072 REVISION RECORD (Summary):

1. JPM Revised, New format used. Step to obtain procedure removed. Initial Condition changed to include procedure number to enhance task clarity.

SIMULATOR SETUP INSTRUCTIONS:

I. Transfer house loads.

2. Place Reactor Mode Switch in "SHUTDOWN".
3. Trip Main Turbine.
4. Line up for startup level control
5. Insert malfunction MRP028B, RPS Group 1 Reactor Scram.

TASK STANDARD:

Insert a full reactor scram signal upon recognition that scram will not reset after 2ndattempt.

TASK CONDITIONS:

1. Unit IReactor was scrammed for a planned shutdown.
2. There are NO indications of fuel damage.

INITIATING CUE:

You are directed by the CRS to perform a Unit 1 RPS scram reset per GP-1I Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

L LLOJPMOOO 7 Rev0 12.doc Page 3 of 7

, NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0001Rev012 Operators Name:

Job

Title:

0 NLO 0 RO 0 SRO 0STA 0SRO Cert JPM

Title:

SCRAM RESET (Alternate Path)

JPM Number: LLOJPM0001 Revision Number: 012 KIA Number and Importance: 212000 A4.14 3.8/3.8 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Testing Method: Perform Faulted: No Alternate Path: Yes Time Critical: No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

GP-11, REACTOR PROTECTION SYSTEM - SCRAM RESET EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0Yes 0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0Satisfactory 0 Unsatisfactory Comments:

Note: Any grade of UNSAT requires a comment.

Evaluators Name: (Print)

Eva1uators Signatu re: Date:

LL OJPMOOOI Rev0 12.doc Page 4 of 7

, NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0007Rev012 JOB PERFORMANCE MEASURE (JPM)

NOTE: Critical Element(s) indicated by

  • in Performance Checklist.

PERFORMANCE CHECKLIST:

JPM Start Time ELEMENT STANDARD I 1 SAT UNSAT 1 Commenl Number

1. REQUEST Radiation Protection RP contacted to survey the to perform the following: SDV and evaluate need to la. SURVEY SDV prior to release of fluid inventory.

1b. EVALUATE the need for RT NIA 047-600-*, Flush of CRD Scram Discharge Volume (SDV).

(CUE: Report that RP has surveyed the SDV and there is no need for the RT to be done.)

2. PLACE Scram Discharge SDV High Level Bypass Volume High Level Bypass Switch in BYPASS position.

Keylock Switch on *OC603 to BYPASS.

3. VERIFY Annunciator Panel *07, Verify by observation that REACTOR, Window C-2, SDV HI LEVEL SCRAM SCRAM DISC VOLUME HI BYPASSED, 107 REACTOR LEVEL SCRAM BYPASSED, is (C-2), is lit.

in alarm.

4. ENSURE Annunciator panel *08, Annunciator panel *08, REACTOR, Window E-5, RPIS REACTOR, Window E-5, INOPERATIVE is clear. RPIS INOPERATIVE is clear
5. -

IF Annunciator Panel *08, REACTOR, Window E-4, RDCS INOPERATIVE, is in alarm, THEN RESET the Rod Drive Control System (RDCS) in accordance with S73.0.F, Resetting the Rod Drive Control System.

LLOJPMOOOI Rev012 doc Page 5 of 7

NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0001Rev012 JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD I I SAT UNSAT 1 Commeni Number

6. -

IF CRD Full Core Display N/A Process Computer indicates all control rods are fully inserted, THEN PERFORM GP-1I Appendix I using Attachment 1.

7. RESET Alternate Rod Insertion N/A (ARI) at panel *OC603as follows:

~~ ~~~~~~

8. DEPRESS ARI RESET ARI Reset pushbuttons I A ,

pushbuttons (IA. IB. 2A. 2B). IB, 2A, 2B depressed.

9. RESET RPS at *OC603 as N/A follows:

"9a. PLACE Scram Reset switch to "GP 1/4". I Scram Reset Switch taken to GP 1/4 position. I I I

  • 9b.

IO.

PLACE Scram Reset switch to "GP U3".

VERIFY the eight (8) scram Skmm Reset Switch taken to GP 2/3 positions.

Recognize 1 light for RPS 'A' I / 1 group white lights are Lit for and Ilight for RPS ' B did not Scram System A , W Scram light.

System B on *OC603.

II. the eight scram group white Verify Mode switch in lights are @ lit after initial reset, "SHUTDOWN".

THEN VERIFY proper Reactor Mode Switch position...

12. AND REPEAT step 3.8 one N/A time...

'13. PLACE Scram Reset switch to "GP 1/4".

Scram Reset Switch taken to GP 1/4 position. I 1 I LLOJPMOOOI RevOl2.doc Page 6 of 7

NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPMOOOI Rev012 JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD SAT UNSAT Comment Number

15. E the eight scram group white NIA lights are Lit after second reset attempt, THEN PERFORM the following:
  • I6. INSERT a full scram signal via CHAl o r C H A 2 , U C H B l Manual Scram Pushbuttons. or CH B2 manual scram collars armed and pushbuttons depressed.

CUE: You have reached the termination point for the JPM.

JPM Stop Time LL OJPMOOOI Rev0 7 2.doc Page 7 of 7

,JUCLEAR GENERATION GROUP EXELON NUCLEAR LLOJPMOOOIRev012 TASK CONDITIONS:

I. Unit IReactor was scrammed for a planned shutdown.

2. There are NO indications of fuel damage.

INITIATING CUE:

You ..are

................. directed

...." .......... by

.....-.. ......... the CRS to perform a.Unit 1 RPS

...................................................... .,............scram reset per ..GP-11

Limerick Generating Station Job Performance Measure PLACING ALTERNATE TECW PUMP IN SERVICE JPM Number: LLOJPMOl29

,\IUCLEAR GENERATION GROUP EXELON NUCLEAR[

LLOJPMO729 REVOOO.LJOC JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 1Ibelow.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPM0129 Rev000.doc Page 2 of 6

rJUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0429 REvOOO.DOC REVISION RECORD (Summary):

Revision 0 SIMULATOR SETUP INSTRUCTIONS:

This JPM can be run in any Simulator IC TASK STANDARD:

The 1B TECW Pump is in RUN, the 1 A TECW Pump is in AUTO INITIAL CONDITIONS:

1. Service Water System in operation supplying cooling water to both TECW Heat Exchangers.
2. The Turbine Building EO reports that the Y A TECW Pump Outboard Bearing is running hot.
3. The EO is standing by to support swapping TECW Pumps INITIATING CUES:

Shift Supervision directs you to start the I B TECW pump and place the 1 A TECW pump in AUTO per Sl4.6.Al Placing Alternate TECW Pump In Service.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

LLOJPMOI29 Rev000.doc Page 3 of 6

,\lUCLEAR GENERATiON GROUP EXELON NUCLEAR[

LLOJPMOIPS REvOOO. DOC Operators Name:

J o b

Title:

0 NLO 0 RO 0SRO 0STA 0 SRO Cert JPM

Title:

PLACING ALTERNATE TECW PUMP IN SERVICE JPM Number: LLOJPM0129 Revision Number: 000 KIA Number and Importance: 2.1.23 3.9/4.0 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Testing Method: Perform Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

S14.6.A, PLACING ALTERNATE TECW PUMP IN SERVICE EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0Yes 0No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0Satisfactory 0 Unsatisfactory Comments:

Note: Any grade of UNSAT requires a comment.

Evaluators Name: (Print)

Evaluators Signature: Date:

LLOJPMOl29 Rev000.doc Page 4 of 6

,&CLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPMUI20 Rev000 JOB PERFORMANCE MEASURE (JPM)

NOTE: Critical Element@)indicated by

  • in Performance Checklist.

PERFORMANCE CHECKLIST:

JPM Start Time ELEMENT STANDARD open.

I I I I CUE: The EO reports that the 14-

  • 005B is open.
4. VERIFY 14-*048B, "TECW Pump Minimum Flow Recirc Valve,"

throttled.

CUE: The EO reports that the 14-

  • 048B is throttled.
5. VENT TECW Pump using 14-*003B, "TECW Pump Vent,"

until a steady stream is observed.

CUE: The EO reports that "1B TECW Pump has been vented.

  • 6. START standby *BPf03, "TECW Pump" (PUMP) P LLOJPMOf29 Rev0UO.doc Page 5 of 6

dUCLEAR GENERATION GROUP EXELON NUCLEAR1 LLOJPMOI29 Rev000 JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD UNSAT Comment Number 6a.. ..ANDPERFORM the following: "1B" TECW pump discharge pressure verified,

-VERIFY PI-I4-*03B, "TECW Pump Disch," is 60 to 80 psig. "1B TECW pump is verified to not have excessive vibration or

-VERIFY no excessive vibration noise.

OR noise at pump/motor.

CUE: The EO reports that discharge pressure is 76 psig and no excessive vibration or noise are noted.

  • 7. STOP desired *AP103, "TECW HS-14-1O1A is taken to STOP Pump" (Pump).
8. VERIFY TECW Pump is The "IA" TECW Pump is spin.ning backwards. verified not rotating backwards.

CUE: The EO reports that the "IA" TECW Pump is rotating backwards.

  • 9. pump is to remain in standby HS-14-101A is taken to AUTO THEN PLACE HS-l4-*0lA, "TECW Pump Control Switch" (PUMP), in "AUTO" ...

9 a . m ENSURE suction/discharge "IA" TECW Pump Suction and valves are not closed. Discharge valves are verified not closed.

CUE: The EO reports that "1A" TECW suction and discharge valves are not closed.

CUE: You have met the termination criteria for this JPM")

JPM Stop Time LL0JPMO I29 Rev000.doc Page 6 of 6

INITIAL CONDITIONS:

1. Service Water System in operation supplying cooling water to both TECW Heat Exchangers.
2. The Turbine Building EO reports that the IA TECW Pump Outboard Bearing is running hot.
3. The EO is standing by to support swapping TECW Pumps INIT1AT ING CUES:

Shift Supervision directs you to start the 16TECW pump and place the IA TECW pump in AUTO per S14.6.A, Placing Alternate TECW Pump In Service.

Limerick Generating Station Job Performance Measure REMOVING THE "IC" REACTOR FEED PUMP FROM SERVICE TO A STANDBY CONDITION JPM Number: LLOJPMOI 14

, NUCLEARGENERATION GROUP EXELON NUCLEAR I LLOJPMOIII Rev 001 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (").
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPMOI 14 RevOO1.doc Page 2 of 7

, NUCLEAR GENERATION GROUP EXELON NUCLEAR 1 LLOJPM0114 Rev 007 REVISION RECORD (Summary)

I.JPM revised to new format SIMULATOR SETUP INSTRUCTIONS:

1. Reset simulator to 60% power IC
2. Toggle Remote Function RFW003 to Close to remove Hydrogen (H2) injection path for 1C RFP TASK STANDARD:

The I C Reactor Feed Pump is in STANDBY TASK CONDITIONS:

1. Hydrogen Water Chemistry (HWC) Hydrogen (H2) injection path for I C RFP is removed from service
2. An additional operator is briefed AND assigned responsibility to immediately reduce Rx power in the event OT-100, Reactor Low Level, is entered INITIATING CUE:

You are directed by Shift Supervision to remove the 1C RFP from service to standby condition using the FWLC Semi-Automatic Sequences per S06.2.C U/1, Section 4.3 LLOJPMOI 14 RevOOWoc Page 3 of 7

, NUCLEARGENERATION GROUP EXELON NUCLEAR I LLOJP#OII# Rev 001 Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

LLOJPMO7 74 RevOO7.doc Page 4 of 7

. /\IUCLEAR GENERWION GROUP EXELON NUCLEAR I Operators Name:

Job

Title:

0 NLO 0RO 0 SRO CI STA 0SRO Cert JPM

Title:

Shutdown I C Reactor Feed Pump From Standby Condition JPM Number: LLOJPMOI 14 Revision Number: 001 WA Number and Importance: 259002 A4.02 3.7/3.6 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Testing Method: Perform Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

S06.2.CU/1, REMOVING RFPS FROM SERVICE TO A STANDBY CONDITION EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? 0Yes 0No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0Unsatisfactory Comments :

Note: Any grade of UNSAT requires a comment.

Evaluators Name: (Print)

Eva1uators Signature: Date:

LLOJPMOI 14 RevOO1.doc Page 5 of 7

, I\IUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPMOP14 Rev 001 JOB PERFORMANCE MEASURE (JPM)

NOTE: Critical Element(s) indicated by

  • in Performance Checklist.

PERFORMANCE CHECKLIST:

JPM Start Time ELEMENT UNSAT Comment Number

1. REFER TO S06.8.H, Startup, NIA Shutdown And Operation Of The Hydrogen Water Chemistry System, to ensure the HWC H2 injection path is secured for RFP being removed from service CUE: Provided in initial conditions
2. ACCESS screen FWLC-07, Screen FWLC-07, Automatic Automatic Sequences, at Sequences is accessed FWLCS Operator Station
3. ENSURE "READY" box to left of "READY" box to left of "Stop Of "Stop Of C RFP" sequence is "C" RFP" sequence is solid solid green green SELECT blue bordered box next Blue bordered box next to "Stop to "Stop Of C RFP" sequence Of C RFP" sequence is selected until it is outlined in white AND until it is outlined in white then release
  • 5. SELECT "Start" (D4) Dialog Key "Start" (D4) Dialog Key is (at bottom of screenj. selected VERIFY the following on screen NIA FWLC-07, Automatic Sequences, at FWLCS Operator Station:

6a. Box next to "Stop Of C RFP" Box next to "Stop Of C R F P sequence turns solid blue sequence is solid blue Step Number AND Title appear Step Number AND Title are next next to blue box of "Stop Of C to blue box of "Stop Of C RFP" R F P sequence

7. VERIFY the following automatic N/A actions:

7a. Speed of offgoing RFPT slowly Speed of C RFPT is a nominal lowers to a nominal 2300 RPM 2300 RPM

'7b. Remaining IN SERVICE RFP(s) RPV level remains constant automatically maintain RPV I

LLOJPMO?14 RevOO7.doc Page 6 of 7

, NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPMOIII Rev 001 JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD IB 7c. HV-006-108C "1C RFP Disch HV-006-108C "1 C RFP Disch Vlv" (DISCH C), closes for Vlv" (DISCH C) is closed offaoina RFP

8. VERIFY HV-006-105C, "1C RFP HV-006-105C, "IC RFP Disch Disch Chk Vlv" (FEED, CHECK Chk Vlv" (FEED, CHECK C) is C), for offgoing RFP is closed at closed panel IOC651.

CUE: You can stop here you have met N/A the termination criteria for this JPM

~~ ~~~

JPM Stop Time LLOJPMO7 74 RevOO7.doc Page 7 of 7

, NUCLEAR GENERATiON GROUP EXELON NUCLEAR I TASK CONDITIONS:

I.Hydrogen Water Chemistry (HWC) Hydrogen (Hz) injection path for I C RFP is removed from service

2. An additional operator is briefed AND assigned responsibility to immediately reduce Rx power in the event OT-100, Reactor Low Level, is entered INITIATING CUE:

You are directed by Shift Supervision to remove the 1C RFP from service to standby condition using the FWLC Semi-Automatic Sequences per S06.2.C U/1 section 4.3

Limerick Generating Station Job Performance Measure START OB ESW PUMP FROM D12 SWITCHGEAR FOR SE-6 JPM Number: LLOJPM0207

I NUCLEAR GENERATION GROUP EXELON NUCLEARI LLOJPM0207 Rev009 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LL OJPM0207 RevOO9.doc Page 2 of 5

I NUCLEAR GENERATION GROUP EXELON NUCLEAR1 LLOJPM0207 Rev009 Operators Name:

Job

Title:

NLO 0 RO 0SRO 0STA 0SRO Cert JPM

Title:

START OB ESW PUMP FROM D12 SWITCHGEAR FOR SE-6 JPM Number: LLOJPM0207 Revision Number: 009 KIA Number and Importance: 262001 A4.03 3.213.4 Suggested Testing Environment: Plant Actual Testing Environment: Plant Testing Method: Simulate Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

SE-6, ALTERNATE REMOTE SHUTDOWN EVALUATION

SUMMARY

. Were all the Critical Elements performed satisfactorily? 0Yes 0 No The operators performancewas evaluated against the standards contained in this JPM, and has been determined to be: 0Satisfactory 0 Unsatisfactory Comments:

Note: Any grade of UNSAT requires a comment.

Evaluators Name: (Print)

Evaluators Signature: Date:

LLOJPM0207 RevOO9.doc Page 3 of 5

I NUCLEARGENERATION GROUP EXELON NUCLEAR]

LL OJPM0207 Rev009 REVISION RECORD (

SUMMARY

):

1. Updated format SIMULATOR SETUP INSTRUCTIONS:

None TASK STANDARD(S):

OB ESW Pump Breaker closed using local control at D12 Switchgear.

TASK CONDITIONS:

1. The Main Control Room has been evacuated.
2. The Remote Shutdown Panel has been manned
3. OB ESW pump failed to start automatically.

INITIATING CUES:

I.You have been summoned to the RSP by Shift Supervision, briefed, and provided with a copy of SE-6 and a GE-75 key

2. Shift supervision directs you to start the OB ESW pump from the D12 switchgear per Section 4.10 of SE-6.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

LLOJPM0207 Rev009.doc Page 4 of 5

NUCLEAR GENERATION GROUP EXELON NUCLEAR I LLOJPM0207 Rev009 JOB PERFORMANCE MEASURE (JPM)

Critical Element(s) indicated by

  • in Performance Checklist.

PERFORMANCE CHECKLIST:

JPM Start Time ELEMENT STANDARD SAT Comment Number I. IF B ESW pump is p J running, N/A THEN START pump as foiiows from D12 Emergency Switchgear:

  • 2. PLACE 152-11608/CST, OB 152-11608/CST is in PULL-Emerg Service Water Pump TO-LOCK at D12 (OBP548), to PULL-TO-LOCK. switchgear.

CUE: 152-11608/CST is in PULL-TO-LOCK

  • 3. PLACE HSS-I 1-094, Transfer GE-75 key is placed in Switch to EMERGENCY Transfer switch HSS-11-094, the key is turned, and then the Transfer Switch is placed CUE: (When the GE-75 key has been in EMERGENCY.

used) HSS-11-094 Transfer Switch is in EMERGENCY.

I *4 PLACE 152-11608/CSTto CLOSE.

CUE: 152-11608/CST is taken to close.

Breaker 152-11608 is closed.

Red lamp is lit, green lamp is out. Instructor should use pen to indicate starting current initially, then decaying to running value on breaker ammeter.

I CUE: You have met the ternhation criteria for this JPM)

JPM Stop Time LLOJPM0207 RevOO9.doc Page 5 of 5

L NUCLEARGENERATION GROUP EXELON NUCLEAR I TASK CONDITIONS:

I,The Main Control Room has been evacuated.

2. The Remote Shutdown Panel has been manned
3. OB ESW pump failed to start automatically.

INITIATING CUES:

1. You have been summoned to the RSP by Shift Supervision, briefed, and provided with a copy of SE-6 and a GE-75 key
2. Shift supervision directs you to start the OB ESW pump from the D12 switchgear per Section 4.10 of SE-6.

1 --- .

Limerick Generating Station Job Performance Measure PLACING ALTERNATE CRD FLOW CONTROL VALVE IN SERVICE JPM Number: LLOJPM0200

I NUCLEARGENERATION GROUP EXELON NUCLEAR I LLOJPM0200Rev003 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through I 1 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (WA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPM0200 Rev003.doc Page 2 of 9

I I 1 I NUCLEARGENERATION GROUP EXELON NUCLEAR LLOJPM0200Rev003 REVISION RECORD (Summary):

Revision 3, revised to new format SIMULATOR SETUP INSTRUCTIONS:

NIA TASK STANDARD:

  • B Flow Control Valve (FCV) in service in the automatic mode and the CRD
  • A FCV removed from service.

INITIAL CONDITIONS:

I.*A CRD flow control valve is in service.

2. A startup of Unit
  • is in progress per GP-2.
3. Unit
  • RPV pressure was recently increased to 920 psig.
4. All prerequisites to perform task are satisfied.

INITIATING CUES:

Shift supervision directs you to place the *B CRD flow control valve in service and remove the

  • A CRD flow control valve from service per S46.6.B.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column. Then annotate that comment in the Comments section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

LL OJPM0200 Rev003.doc Page 3 of 9

I NUCLEARGENERATION GROUP EXELON NUCLEAR I LLOJPM0200Rev003 Operators Name:

Job

Title:

0 NLO 0 RO 0SRO 0STA 0 SRO Cert JPM

Title:

PLACING ALTERNATE CRD FLOW CONTROL VALVE IN SERVICE JPM Number: LLOJPM0200 Revision Number: 003 KIA Number and Importance: 201001 A4.14 3.7/3.4 Suggested Testing Environment: Plant Actual Testing Environment: Plant Testing Method: Simulate Faulted: No Alternate Path: No Time Critical: No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

S46.6.B, PLACING ALTERNATE CRD HYDRAULIC SYSTEM FLOW CONTROL VALVE IN SERVICE EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0Satisfactory 0Unsatisfactory Comments:

Note: Any grade of UNSAT requires a comment.

Evaluators Name: (Print)

Evaluators Signature: Date:

LLOJPM0200 Rev003.doc Page 4 of 9

, I t I NUCLEAR GENERATION GROUP EXELON NUCLEAR I LL0JPMO2OORevOO3 JOB PERFORMANCE MEASURE (JPM)

NOTE: Critical Element@)indicated by

  • in Performance Checklist.

PERFORMANCE CHECKLIST:

JPM Start Time ELEMENT STANDARD SAT UNSAT Comment Number I.Obtain a copy of S46.6.B Copy ofthe most recent revision of S46.6.B is obtained

2. ESTABLISH communications Communication established between Reactor Operator AND with Unit Reactor Operator
  • OC213, CRD Hydraulic Master Control Area Panel CUE: (Via simulated radio communication) Unit
  • Reactor Operator standing by for the performance of S46.6.B.
3. VERIFY FC-O46--*R600 Rod Drive CRD Flow Controller verified in Flow Controller (FL) is in AUTO AUTO at *OC603 from the at *OC603. Reactor Operator CUE: Reactor Operator reports, The CRD Flow Controller is in AUTO.
4. VERIFY in-service DOOSA(B) CRD Local MANUAUAUTO switch Flow Controller is in AUTOat for controller D009A at *OC213
  • OC213 verified in AUTO CUE: CRD Flow Controller D009A is in AUTO.
5. ENSURE the on-coming DOO9B(A) Local MANUAUAUTO switch CRD Flow Controller in for controller D009B at *OC213 MANUAL AND... verified in MANUAL CUE: CRD Flow Controller D009A is in AUTO.

5a. ...O% open as indicated by the red The red arrow for D009B is arrow at *OC213 verified at 0% at *OC213.

CUE: The red arrow for D009B indicates 0% open.

LLOJPM0200 Rev003,doc Page 5 of 9

I

. I t I NUCLEARGENERATION GROUP EXELON NUCLEAR LLOJPM0200Rev003 JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD SAT UNSAT Comment Number P P P

6. PLACE on-coming FV-C NIA
  • F002B(A), CRD Flow Control Valve in-service:
  • 6a. OPEN 46-*F046B Inlet Isolation Handwheel for valve 46-*F046B Valve is rotated counter-clockwise until the valve is full open CUE: Valve handwheel is rotated counter-clockwise until it stops.
  • 6b. OPEN 46-*F047B Outlet Isolation Handwheelfor valve 46-*F047B Valve is rotated counter-clockwise until the valve is full open CUE: Valve handwheel is rotated counter-clockwise until it stops.
7. Using FC-O46-*R600, Rod Drive System flow is verified to be Flow Controller at *OC603, 50-55 gpm on FI-46-*ROl9 ENSURE FI-46-*R019, CRD Hydraulic Flow Controller, indicates 50-55 gpm at *OC213 CUE: FI-46-*R019 indicates 52 gpm.
10. 50 to 55 gpm cannot be N/A achieved THEN slowly THROlTLE closed the off-going 46-*F047A(B), Outlet Isolation Valve, until FI-46-*R019 indicates 50 to 55 gpm.
  • 11. MATCH off-going DOO9A(B), The control knob for D009A is CRD Flow Controller, MANUAL adjusted so that the red arrow (red) indicating arrow to the same is set to the same position as position as AUTO (black) the black arrow indicating arrow.

CUE: (Before Adiustment) The red arrow for D009A is indicating 70%; the black arrow for D009A is indicating 90%.

CUE: (After Adjustment) The red and black arrow for D009A are indicatina 90%.

LLOJPM0200 RevOO3.doc Page 6 of 9

. 1 -

1 NUCLEARGENERATION GROUP EXELON NUCLEAR\

LLOJPM0200Rev003 JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD UNSAT Comment Number 4

  • 12. PLACE off-going DOO9A(B), CRD Local MANUAUAUTO switch Flow Controller, in MANUAL at for controller D009A at *OC213
  • OC213 verified in MANUAL CUE: D009A in MANUAL
13. MONITOR system flow at FI N/A
  • R019 AND MAINTAIN 50 to 63 gpm while performing transition.
  • 14. Slowly OPEN on-coming D009B D009B control knob has been CRD Flow Controller by rotating rotated clockwise until flow control knob in clockwise increases on FI46-*R019 (INCREASE} direction until a slight increase in flow is observed on FI-46-*RO19 CUE: (As D009B Control Knob is rotated clockwise) Indicated flow on FI-46-*R019 has risen to 55 gpm.
  • 15. Alternately AND slowly OPEN on- The on-coming D009B control coming DOO9B(A) CRD Flow knob is slowly rotated clockwise Controller by rotating control knob while the off-going D009A in clockwise (INCREASE) direction control knob is slowly rotated AND slowly CLOSE off-going counter-clockwise. System flow DOOSA(B) CRD Flow Controller is maintained between 50 to 63 by rotating control knob in gpm on FI46-*ROI9 during the counterclockwise direction transition.

CUE: The red indicating arrow for D009B is increasing to 90%

open and the red indicating arrow for D009A is decreasing to 0% open. FI-46-*R019 indicates 55 atsm.

LLOJPM0200 Rev003.doc Page 7 of 9

I NUCLEARGENERATION GROUP EXELON NUCLEAR I LL OJPMO2OORevOO3 JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD Comment

  • 16. WHEN off-going DOO9A(B) "CRD DOO9A(B) "CRD Flow Number Flow Controller" "MANUAL" (red) Controller" "MANUAL" (red) indicating arrow is at 0% open, indicating arrow is at 0% open.

THEN STOP rotating both control knobs.

CUE: The red indicating arrow for D009A is at 0% and the red indicating arrow for D009B is at 90%. FI-46-*R019 indicates 55 gpm.

  • 17. MATCH on-coming D009B "CRD EITHER the D009B control knob Flow Controller" "AUTO" (black) has been adjusted so that the indicating arrow with "MANUAL" (red) indicating arrow at *OC213 (red) indicating arrow matches the AUTO (black) indicating arrow the RO has been requested to adjust FC *R600 "CRD Flow Controller" AUTO setpoint at *OC603 until CUE: The red indicating arrow the AUTO (black) indicating indicates 90% open and the arrow matches the MANUAL black indicating arrow indicates (red) indicating arrow on D009B 90% oDen. at *OC213.
18. indicating arrows cannot be NIA matched at *OC213,THEN PERFORM the following:
1. PLACE FC-O46-*R600 in "MANUAL"
2. ADJUST FC-O46-*R600 Output to match "AUTO (black) indicating arrow with "MANUAL" (red) indicating arrow at "OC213.

LLOJPM0200 Rev003.doc Page 8 of 9

1 NUCLEAR GENERATION GROUP EXELON NUCLEAR]

LLOJPM0200Rev003 JOB PERFORMANCE MEASURE (JPM)

ELEMENT I STANDARD UNSAT Comment

  • 19. PLACE on-coming DOO9B(A), Local MANUAUAUTO switch Number CRD Flow Controller in AUTO for controller D009B at *OC213 at *OC213. verified in AUTO CUE: D009B is in AUTO.
20. step 4.16.12 was performed... N/A (Step 4.6.12 was not performed)
  • 21. CLOSE 46-*F046A Inlet Isolation Handwheel for valve 46-*F046A Valve for off-going FV-C is rotated clockwise until the
  • F002A(B), Flow Control Valve. valve is full closed.

CUE: Valve handwheel is rotated clockwise until it stops

  • 22. CLOSE 46-*F047A Outlet Handwheel for valve 46-*F047A Isolation Valve for off-going FV-C- is rotated clockwise until the 46-*F002A(B), Flow Control valve is full closed.

VaIve.*

CUE: Valve handwheel is rotated clockwise until it stops

21. INFORM Reactor Operator on- The RO has been informed that coming FV-C-46-*F002B(A), Flow the *B CRD FCV is in service Control Valve, is in-service. and the *A CRD FCV has been removed from service.

CUE: The RO responds, I understand the *B CRD Flow Control Valve has been placed in service.

22. VERIFY the following at *OC603: System flow and drive water AP have been verified to be within 0 50 to 63 gpm on FI-46-*R606. at acceptable limits at *OC603.

0 255 to 265 psi on PDI *R602, DELTA PX.

CUE: The RO reports he has 55 gpm and 260 psi at *OC603.

CUE: You have met the termination JPM Stop Time LLOJPM0200 Rev003.doc Page 9 of 9

? , , 1 , s I NUCLEAR GENERATION GROUP EXELON NUCLEAR1 INITlAL CONDlTlONS :

I.*A CRD flow control valve is in service.

2. A startup of Unit
  • is in progress per GP-2.
3. Unit
  • RPV pressure was recently increased to 920 psig.
4. All prerequisites to perform task are satisfied.

INITIATING CUES:

Shift supervision directs you to place the "*B" CRD flow control valve in service and remove the "*A" CRD flow control valve from service per S46.6.B.

Limerick Generating Station Job Performance Measure MSIWPCIG LOW LOW LOW LEVEL BYPASS (MSIV'S OPEN)

JPM Number: LLOJPM0212

  • . I. 7 1

1 7 1 NUCLEARGENERATION GROUP EXELON NUCLEAR LLOJPM0212 RevOO7.doc JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (KIA) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

I O . If the JPM cannot be performed as written with proper responses, then revise the JPM.

11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

LLOJPM0212 RevOO7.doc7 Page 2 of 6

, > > e 1 NUCLEARGENERATION GROUP EXELON NUCLEAR I LLOJPM0212 RevOO7.doc REVISION RECORD (Summary):

Revision 8, revised format SIMULATOR SETUP INSTRUCTIONS:

N/A TASK STANDARD:

Isolation bypassed in accordance with T-221, section 4.2.

INITIAL CONDITIONS:

1. An ATWS is in progress and the appropriate Trip procedures have been entered
2. The MSIV's are open and Instrument Gas system is not isolated.
3. No indication of a Main Steam line break or gross fuel failure.
4. -BY160 is not known to be inoperative INITIATING CUES:

You are directed by shift supervision to perform T-221 (MSIV's open) on Unit -

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the "Comment Number" column. Then annotate that comment in the "Comments" section. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

LLOJPM02 7 2 Rev007.doc7 Page 3 of 6

I NUCLEAR GENERATION GROUP EXELON NUCLEAR1 LLOJPM02 12 Re vOO7.doc 0perators Name:

Job

Title:

0 NLO Cl RO 0SRO 0 STA 0 SRO Cert JPM

Title:

MSIV/PCIG LOW LOW LOW LEVEL BYPASS (MSIVS OPEN)

JPM Number: LLOJPMOOOI Revision Number: 012 KIA Number and Importance: 295037 EA1.I 1 3.U3.6 Suggested Testing Environment: Plant Actual Testing Environment: Plant Testing Method: Simulate Faulted: No Alternate Path: No Time Critical: No Estimated Time t o Complete: 20 minutes Actual Time Used: minutes

References:

T-221, MSIV/PCIG LOW LOW LOW LEVEL BYPASS (MSIVS OPEN)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes 0 No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: 0 Satisfactory 0Unsatisfactory Comments:

Note: Any grade of UNSAT requires a comment.

Evaluators Name: (Print)

Eva1uators Signature: Date:

LLOJPM02 12 Rev007.doc7 Page 4 of 6

, , , t P I NUCLEARGmfwnoN GROUP EXELON NUCLEAR I LLOJPM0272 RevOO7.doc JOB PERFORMANCE MEASURE (JPM)

NOTE: Critical Element(s) indicated by

  • in Performance Checklist.

PERFORMANCE CHECKLIST:

JPM Start Time

-I-ELEMENT STANDARD SAT UNSAT Comment Number

  • I.Obtain current revision of T-221 Current revision of T-221 obtained.
  • 2. Obtain tools/equipment from Unit
  • Operator obtains equipment T200 cabinet: from T-221 box in T-200

-( 1) 4 screwdriver cabinet.

-( 1) screwholding screwdriver

-(I) roll of electrical tape

-(I) flashlight

-(I 0) electrical jumpers CUE: You have obtained the eaubment.

3. PERFORM the following at *OC61I NIA (Aux Equip Room):
  • 3a. INSTALL jumper from T I at relay Jumper installed between T I on B21H-K13B/FL to M I at relay relay B21H-K13B/FL to M I at 821H-KI B/EX. (BAY B Attachment relay B21H-Kl B/EX in *OC611, 1). BAY B.

CUE: Jumper is installed.

  • 3b. INSTALL jumper from T I at relay Jumper installed between T I on 821H-K13D/BL to M I at relay relay B21H-K13D/BL to M I at B21H-K16D/BH (BAY D - relay B21H-K16D/BH in *OC611 Attachment 2). BAY D.

CUE: Jumper is installed.

4. E PClG isolated, THEN PERFORM N/A the following at 10C601 (Main Control Room):. ..

3

5. E PClG did not isolate due to high NIA Drywell pressure, THEN PERFORM the following:

1 B

LLOJPM0272 RevOO7.doc7 Page 5 of 6

I NUCLEAR GENERATION GROUP EXELON NUCLEAR I LL OJPM0212 RevOO7.doc JOB PERFORMANCE MEASURE (JPM)

ELEMENT STANDARD "06622 (Aux Equip Room). K105NCK.in *OC622.

at *OC623 (Aux Equip Room). K105D/CK in *OC623.

CUE: Jumper is installed.

  • 5d. INSTALLjumper EEES-1 to EEES- Jumper installed between I 3 (Attachment 4) at *OC623 (Aux Equip Room).

EEES-I and EEES-3 in "OC623.

CUE: Jumper is installed.

CUE: You have met the termination criteria for this JPM JPM Stop Time LL OJPM02I 2 Rev00 7.doc7 Page 6 of 6

4 , -. ,* >

I NUCLEARGENERATION GROUP EXELON NUCLEAR I INITIAL CONDITIONS:

1. An ATWS is in progress and the appropriate Trip procedures have been entered
2. The MSIV's are open and Instrument Gas system is not isolated.
3. No indication of a Main Steam line break or gross fuel failure.

i

4. -BY160 is not known to be inoperative INITIATING CUES:

You are directed by shift supervision to perform T-221 (MSIV's open) on Unit -