| issue date = 12/13/2006
| issue date = 12/13/2006
| title = Results of Isotopic Analysis Performed for Industrial Wastewater from Perry Nuclear Power Plant
| title = Results of Isotopic Analysis Performed for Industrial Wastewater from Perry Nuclear Power Plant
| author name = Pearce L W
| author name = Pearce L
| author affiliation = FirstEnergy Nuclear Operating Co
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name = Shelby R
| addressee name = Shelby R
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Station 10 Center Road Perry, Ohio 44081 L. William Pearce Vice President 440-280-5382 Fax: 440-280-8029 December 13, 2006 PY-CEPILCDU-0077L Att'nfit'in:ý Rob'ert Shelby,' Mentor Waste Facility Lake County Department of Utilities P.O. Box 490 Painesville, Ohilo"440-77-'0490 Ladies and Gentlemen:
{{#Wiki_filter:FENOC                                                                                             Perry Nuclear Power Station 10 Center Road FirstEnergyNuclear Operating Company                                                                      Perry,Ohio 44081 L. William Pearce                                                                                             440-280-5382 Vice President                                                                                          Fax: 440-280-8029 December 13, 2006 PY-CEPILCDU-0077L Att'nfit'in:ý Rob'ert Shelby,' Mentor Waste Facility Lake County Department of Utilities P.O. Box 490 Painesville, Ohilo"440-77-'0490 Ladies and Gentlemen:
Enclosed are the results of an isotopic analysis performed for industrial wastewater from the Perry Nuclear Power Plant. No radioactive material attributable to the Perry Nuclear Power Plant was detected.If you have questions or require additional information, please contact Mr. Jamie Balstad at (440) 280-5515.Sincerely, Enclosure cc: NRC Region III NRC Resident Inspector Office NRC Project Manager NRC Document Control Desk (L--" bo I Perry utr Aut-orllýtoryi ytorn 4 ysemCALS)~Mode NL]Mer:ýSay~p~e D F 7 D~c-jSewge Lift Sato~De~s: Pern~i-Ann1uVl
Enclosed are the results of an isotopic analysis performed for industrial wastewater from the Perry Nuclear Power Plant. No radioactive material attributable to the Perry Nuclear Power Plant was detected.
~Desc: ýAt All Times, KDate Collected:
If you have questions or require additional information, please contact Mr. Jamie Balstad at (440) 280-5515.
11 2iM O 'I 2/6~}}
Sincerely, Enclosure cc:       NRC Region III NRC Resident Inspector Office NRC Project Manager NRC Document Control Desk (L--" bo I
 
Perry   utr Aut-orllýtoryi   ytornysemCALS) 4 D~c-jSewge Lift Sato
                                      ~De~s: Pern~i-Ann1uVl
  ~Mode NL]Mer:ý                      ~Desc: ýAt All Times, Say~p~e D        F 7                      KDate Collected: 11 2iM O'I2/6~}}

Latest revision as of 11:03, 23 November 2019

Results of Isotopic Analysis Performed for Industrial Wastewater from Perry Nuclear Power Plant
ML063560398
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/13/2006
From: Pearce L
FirstEnergy Nuclear Operating Co
To: Shelby R
Lake County, OH, Dept of Utilities, Office of Nuclear Reactor Regulation
References
PY-CEI/LCDU-0077L
Download: ML063560398 (2)


Text

FENOC Perry Nuclear Power Station 10 Center Road FirstEnergyNuclear Operating Company Perry,Ohio 44081 L. William Pearce 440-280-5382 Vice President Fax: 440-280-8029 December 13, 2006 PY-CEPILCDU-0077L Att'nfit'in:ý Rob'ert Shelby,' Mentor Waste Facility Lake County Department of Utilities P.O. Box 490 Painesville, Ohilo"440-77-'0490 Ladies and Gentlemen:

Enclosed are the results of an isotopic analysis performed for industrial wastewater from the Perry Nuclear Power Plant. No radioactive material attributable to the Perry Nuclear Power Plant was detected.

If you have questions or require additional information, please contact Mr. Jamie Balstad at (440) 280-5515.

Sincerely, Enclosure cc: NRC Region III NRC Resident Inspector Office NRC Project Manager NRC Document Control Desk (L--" bo I

Perry utr Aut-orllýtoryi ytornysemCALS) 4 D~c-jSewge Lift Sato

~De~s: Pern~i-Ann1uVl