ML063120335: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML063120335
| number = ML063120335
| issue date = 11/14/2006
| issue date = 11/14/2006
| title = Acceptance for Review of Electric Power Research Institute Motor-operated Valve Performance Prediction Methodology Software (TAC No. MD3236)
| title = Acceptance for Review of Electric Power Research Institute Motor-operated Valve Performance Prediction Methodology Software
| author name = Rosenberg S L
| author name = Rosenberg S
| author affiliation = NRC/NRR/ADRA/DPR/PSPB
| author affiliation = NRC/NRR/ADRA/DPR/PSPB
| addressee name = Riley J H
| addressee name = Riley J
| addressee affiliation = Nuclear Energy Institute (NEI)
| addressee affiliation = Nuclear Energy Institute (NEI)
| docket = PROJ0669, PROJ0689
| docket = PROJ0669, PROJ0689
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:November 14, 2006Mr. James H. Riley, DirectorEngineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
{{#Wiki_filter:November 14, 2006 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708


==SUBJECT:==
==SUBJECT:==
ACCEPTANCE FOR REVIEW OF "ELECTRIC POWER RESEARCHINSTITUTE MOTOR-OPERATED VALVE PERFORMANCE PREDICTION METHODOLOGY SOFTWARE" (TAC NO. MD3236)
ACCEPTANCE FOR REVIEW OF ELECTRIC POWER RESEARCH INSTITUTE MOTOR-OPERATED VALVE PERFORMANCE PREDICTION METHODOLOGY SOFTWARE (TAC NO. MD3236)


==Dear Mr. Riley:==
==Dear Mr. Riley:==


By letter dated June 8, 2004, as supplemented by letter dated January 6, 2006, the NuclearEnergy Institute submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Addenda 3, 4, 5, 6, and 7 to Electric Power Research Institute Topical Report (TR)-103237 "Motor-Operated Valve Performance Prediction Methodology Software.The NRC staff has performed an acceptance review of the TR-103237-R2 and Software Version. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by February 23, 2007, and issue its draft safety evaluation by June 15, 2007. The NRC staff estimates that the review will require approximately 325 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between you and the NRC staff on November 6, 2006.In accordance with the letter dated September 2, 2004 (Agencywide Documents Access andManagement System Accession No. ML042460445), the fee branch has waived the Section 170.11 of Title 10 of the Code of Federal Regulations fees associated with this TRreview.Sincerely,/RA/Stacey L. Rosenberg, ChiefSpecial Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor RegulationProject Nos. 669 and 689 cc: See next page November 14, 2006Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
By letter dated June 8, 2004, as supplemented by letter dated January 6, 2006, the Nuclear Energy Institute submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Addenda 3, 4, 5, 6, and 7 to Electric Power Research Institute Topical Report (TR)-103237 Motor-Operated Valve Performance Prediction Methodology Software. The NRC staff has performed an acceptance review of the TR-103237-R2 and Software Version. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by February 23, 2007, and issue its draft safety evaluation by June 15, 2007. The NRC staff estimates that the review will require approximately 325 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between you and the NRC staff on November 6, 2006.
In accordance with the letter dated September 2, 2004 (Agencywide Documents Access and Management System Accession No. ML042460445), the fee branch has waived the Section 170.11 of Title 10 of the Code of Federal Regulations fees associated with this TR review.
Sincerely,
                                              /RA/
Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689 cc: See next page
 
November 14, 2006 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708


==SUBJECT:==
==SUBJECT:==
ACCEPTANCE FOR REVIEW OF "ELECTRIC POWER RESEARCHINSTITUTE MOTOR-OPERATED VALVE PERFORMANCE PREDICTION METHODOLOGY SOFTWARE" (TAC NO. MD3236)
ACCEPTANCE FOR REVIEW OF ELECTRIC POWER RESEARCH INSTITUTE MOTOR-OPERATED VALVE PERFORMANCE PREDICTION METHODOLOGY SOFTWARE (TAC NO. MD3236)


==Dear Mr. Riley:==
==Dear Mr. Riley:==


By letter dated June 8, 2004, as supplemented by letter dated January 6, 2006, the NuclearEnergy Institute submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Addenda 3, 4, 5, 6, and 7 to Electric Power Research Institute Topical Report (TR)-103237 "Motor-Operated Valve Performance Prediction Methodology Software.The NRC staff has performed an acceptance review of the TR-103237-R2 and Software Version. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by February 23, 2007, and issue its draft safety evaluation by June 15, 2007. The NRC staff estimates that the review will require approximately 325 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between you and the NRC staff on November 6, 2006.In accordance with the letter dated September 2, 2004 (Agencywide Documents Access andManagement System Accession No. ML042460445), the fee branch has waived the Section 170.11 of Title 10 of the Code of Federal Regulations fees associated with this TRreview.Sincerely,/RA/Stacey L. Rosenberg, ChiefSpecial Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor RegulationProject Nos. 669 and 689 cc: See next pageDISTRIBUTION
By letter dated June 8, 2004, as supplemented by letter dated January 6, 2006, the Nuclear Energy Institute submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Addenda 3, 4, 5, 6, and 7 to Electric Power Research Institute Topical Report (TR)-103237 Motor-Operated Valve Performance Prediction Methodology Software. The NRC staff has performed an acceptance review of the TR-103237-R2 and Software Version. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by February 23, 2007, and issue its draft safety evaluation by June 15, 2007. The NRC staff estimates that the review will require approximately 325 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between you and the NRC staff on November 6, 2006.
:PUBLICPSPB Reading File   TScarborough RidsNrrDprRidsNrrDprPspbRidsNrrDciCptb RidsNrrLADBaxleyRidsAcrsAcnwMailCenter RidsNrrPMTMensahRidsOgcMailCenterRidsNrrDciCfebRidsNrrDciCpnbADAMS ACCESSION NO.: ML063120335 NRR-106OFFICEPSPB/PMPSPB/LAPSPB/BCNAMETMensahDBaxleySRosenberg DATE11/14/0611/13/0611/14/06OFFICIAL RECORD COPY Nuclear Energy InstituteProject No. 689Electric Power Research InstituteProject No. 669 cc:Mr. Anthony Pietrangelo, Senior DirectorRisk Regulation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC  20006-3708Mr. H. A. Sepp, ManagerRegulatory and Licensing Engineering Westinghouse Electric Company P. O. Box 355 Pittsburgh, PA  15230-0355Mr. Jack RoeNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC  20006-3708Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.
In accordance with the letter dated September 2, 2004 (Agencywide Documents Access and Management System Accession No. ML042460445), the fee branch has waived the Section 170.11 of Title 10 of the Code of Federal Regulations fees associated with this TR review.
12300 Twinbrook Parkway, Suite 330 Rockville, MD  20852Mr. Gary L. Vine, Executive Director EPRI 2000 L Street, NW, Suite 805 Washington, DC  20036-4907Mr. Pedro Salas  Regulatory Assurance Manager - Dresden Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL  60450-9765Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC  20005Mr. Gary WelshInstitute of Nuclear Power Operations Suite 100 700 Galleria Parkway, SE Atlanta, GA  30339-5957Mr. David J. ModeenVice President and Chief Nuclear Officer
Sincerely,
                                              /RA/
Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689 cc: See next page DISTRIBUTION:
PUBLIC                        PSPB Reading File               TScarborough RidsNrrDpr                    RidsNrrDprPspb                  RidsNrrDciCptb RidsNrrLADBaxley              RidsAcrsAcnwMailCenter RidsNrrPMTMensah              RidsOgcMailCenter RidsNrrDciCfeb                RidsNrrDciCpnb ADAMS ACCESSION NO.: ML063120335                               NRR-106 OFFICE      PSPB/PM        PSPB/LA      PSPB/BC NAME        TMensah        DBaxley      SRosenberg DATE        11/14/06      11/13/06 11/14/06 OFFICIAL RECORD COPY


EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550Mr. John Gaertner EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550Ms. Rosa Yang EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338Mr. Kenneth Huffman EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550}}
Nuclear Energy Institute                                        Project No. 689 Electric Power Research Institute                                Project No. 669 cc:
Mr. Anthony Pietrangelo, Senior Director Ms. Barbara Lewis Risk Regulation                          Assistant Editor Nuclear Energy Institute                Platts, Principal Editorial Office 1776 I Street, NW, Suite 400            1200 G St., N.W., Suite 1100 Washington, DC 20006-3708                Washington, DC 20005 Mr. H. A. Sepp, Manager                  Mr. Gary Welsh Regulatory and Licensing Engineering    Institute of Westinghouse Electric Company              Nuclear Power Operations P. O. Box 355                            Suite 100 Pittsburgh, PA 15230-0355                700 Galleria Parkway, SE Atlanta, GA 30339-5957 Mr. Jack Roe Nuclear Energy Institute                Mr. David J. Modeen 1776 I Street, NW, Suite 400            Vice President and Chief Nuclear Officer Washington, DC 20006-3708                EPRI 1300 W. T. Harris Boulevard Mr. Charles B. Brinkman                  Charlotte, NC 28262-8550 Washington Operations ABB-Combustion Engineering, Inc.        Mr. John Gaertner 12300 Twinbrook Parkway, Suite 330      EPRI Rockville, MD 20852                      1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 Mr. Gary L. Vine, Executive Director EPRI                                    Ms. Rosa Yang 2000 L Street, NW, Suite 805            EPRI Washington, DC 20036-4907                3412 Hillview Avenue Palo Alto, CA 94304-1338 Mr. Pedro Salas Regulatory Assurance Manager - Dresden  Mr. Kenneth Huffman Exelon Generation Company, LLC          EPRI 6500 N. Dresden Road                    1300 W. T. Harris Boulevard Morris, IL 60450-9765                    Charlotte, NC 28262-8550}}

Latest revision as of 13:12, 23 November 2019

Acceptance for Review of Electric Power Research Institute Motor-operated Valve Performance Prediction Methodology Software
ML063120335
Person / Time
Site: Nuclear Energy Institute, PROJ0669
Issue date: 11/14/2006
From: Rosenberg S
NRC/NRR/ADRA/DPR/PSPB
To: Jeffrey Riley
Nuclear Energy Institute
Mensah T
References
TAC MD3236
Download: ML063120335 (3)


Text

November 14, 2006 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

ACCEPTANCE FOR REVIEW OF ELECTRIC POWER RESEARCH INSTITUTE MOTOR-OPERATED VALVE PERFORMANCE PREDICTION METHODOLOGY SOFTWARE (TAC NO. MD3236)

Dear Mr. Riley:

By letter dated June 8, 2004, as supplemented by letter dated January 6, 2006, the Nuclear Energy Institute submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Addenda 3, 4, 5, 6, and 7 to Electric Power Research Institute Topical Report (TR)-103237 Motor-Operated Valve Performance Prediction Methodology Software. The NRC staff has performed an acceptance review of the TR-103237-R2 and Software Version. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by February 23, 2007, and issue its draft safety evaluation by June 15, 2007. The NRC staff estimates that the review will require approximately 325 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between you and the NRC staff on November 6, 2006.

In accordance with the letter dated September 2, 2004 (Agencywide Documents Access and Management System Accession No. ML042460445), the fee branch has waived the Section 170.11 of Title 10 of the Code of Federal Regulations fees associated with this TR review.

Sincerely,

/RA/

Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689 cc: See next page

November 14, 2006 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

ACCEPTANCE FOR REVIEW OF ELECTRIC POWER RESEARCH INSTITUTE MOTOR-OPERATED VALVE PERFORMANCE PREDICTION METHODOLOGY SOFTWARE (TAC NO. MD3236)

Dear Mr. Riley:

By letter dated June 8, 2004, as supplemented by letter dated January 6, 2006, the Nuclear Energy Institute submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Addenda 3, 4, 5, 6, and 7 to Electric Power Research Institute Topical Report (TR)-103237 Motor-Operated Valve Performance Prediction Methodology Software. The NRC staff has performed an acceptance review of the TR-103237-R2 and Software Version. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by February 23, 2007, and issue its draft safety evaluation by June 15, 2007. The NRC staff estimates that the review will require approximately 325 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between you and the NRC staff on November 6, 2006.

In accordance with the letter dated September 2, 2004 (Agencywide Documents Access and Management System Accession No. ML042460445), the fee branch has waived the Section 170.11 of Title 10 of the Code of Federal Regulations fees associated with this TR review.

Sincerely,

/RA/

Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689 cc: See next page DISTRIBUTION:

PUBLIC PSPB Reading File TScarborough RidsNrrDpr RidsNrrDprPspb RidsNrrDciCptb RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsNrrPMTMensah RidsOgcMailCenter RidsNrrDciCfeb RidsNrrDciCpnb ADAMS ACCESSION NO.: ML063120335 NRR-106 OFFICE PSPB/PM PSPB/LA PSPB/BC NAME TMensah DBaxley SRosenberg DATE 11/14/06 11/13/06 11/14/06 OFFICIAL RECORD COPY

Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:

Mr. Anthony Pietrangelo, Senior Director Ms. Barbara Lewis Risk Regulation Assistant Editor Nuclear Energy Institute Platts, Principal Editorial Office 1776 I Street, NW, Suite 400 1200 G St., N.W., Suite 1100 Washington, DC 20006-3708 Washington, DC 20005 Mr. H. A. Sepp, Manager Mr. Gary Welsh Regulatory and Licensing Engineering Institute of Westinghouse Electric Company Nuclear Power Operations P. O. Box 355 Suite 100 Pittsburgh, PA 15230-0355 700 Galleria Parkway, SE Atlanta, GA 30339-5957 Mr. Jack Roe Nuclear Energy Institute Mr. David J. Modeen 1776 I Street, NW, Suite 400 Vice President and Chief Nuclear Officer Washington, DC 20006-3708 EPRI 1300 W. T. Harris Boulevard Mr. Charles B. Brinkman Charlotte, NC 28262-8550 Washington Operations ABB-Combustion Engineering, Inc. Mr. John Gaertner 12300 Twinbrook Parkway, Suite 330 EPRI Rockville, MD 20852 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 Mr. Gary L. Vine, Executive Director EPRI Ms. Rosa Yang 2000 L Street, NW, Suite 805 EPRI Washington, DC 20036-4907 3412 Hillview Avenue Palo Alto, CA 94304-1338 Mr. Pedro Salas Regulatory Assurance Manager - Dresden Mr. Kenneth Huffman Exelon Generation Company, LLC EPRI 6500 N. Dresden Road 1300 W. T. Harris Boulevard Morris, IL 60450-9765 Charlotte, NC 28262-8550