ML110700280: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:}} |
Revision as of 02:38, 13 August 2018
ML110700280 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 02/01/2011 |
From: | Constellation Energy Nuclear Group, Calvert Cliffs, EDF Development |
To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
References | |
Download: ML110700280 (1) | |
Similar Documents at Calvert Cliffs | |
---|---|
Category:Drawing
MONTHYEARML21278A1522021-09-0707 September 2021
[Table view]2 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5E, Figures ML22115A0472021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A Figure 10A.1-1, Main Steam System: Redacted ML21278A1512021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5A, Figures ML22115A0482021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 11, Figures: Redacted ML21278A2352021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 10, Figures ML21278A1982021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 7, Figures ML21278A1102021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 4, Figures ML21257A3052021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 3, Figures ML22115A0422021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 1, Figures: Redacted ML21278A1302021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 5, Figures ML21278A1832021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 6, Figures ML21278A2112021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 8, Figures ML15077A1032015-04-16016 April 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15026A5952015-01-0707 January 2015 Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Figure 2.3-2, Revision 15 ML15026A5632015-01-0707 January 2015 Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Figure 1.3-2, Rev. 15, Nuhoms On-Site Transfer Cask ML15026A5612015-01-0707 January 2015 Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Figure 1.3-1, NUHOMS-24P Dry Shielded Canister Assembly Components ML13319A8182013-11-15015 November 2013 Drawing, 1130CCCHEM, Chemical Effects Head Loss Loop, Vertical LOOP Water Elevation ML13319A7732013-10-0808 October 2013 Drawing, 1130CCHEM Chemical Head Loss Loop, Pipe Schematic, T-6 ML12275A2332012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Drawing 69346, Rev. 10, USAR Figure 2.4-1, ISFSI Yard Area Topography. ML12275A2322012-08-0101 August 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Drawing 87113SH0012, Rev. 1, USAR Figure 2.3-3, Primary Meteorological Instrumentation System Information. ML1107002802011-02-0101 February 2011 Independent Spent Fuel Storage Installation - Drawing No. Erpip 3.0, Immediate Actions, Attachment 1 Emergency Action Level Criteria Rev 0XX00, Page 1 of 2 ML1107002812011-02-0101 February 2011 Independent Spent Fuel Storage Installation - Drawing No. Erpip 3.0, Immediate Actions, Attachment 1 Emergency Action Level Criteria Rev 0XX00, Page 2 of 2 ML1015902162010-06-0303 June 2010 Independent Spent Fuel Storage Installation, Informal Consultation Preparation for License Renewal Application ML0719804152007-06-19019 June 2007 Drawing 60731SH0002, Rev. 45, Safety Injection & Containment Spray Systems. ML0719901132007-06-0505 June 2007 Drawing 62730SH0001, Rev 79, Chemical & Volume Control System. ML0719705092007-06-0505 June 2007 Drawing 60730SH0001, Rev. 83, Chemical and Volume Control System. ML0719705142007-06-0505 June 2007 Drawing 60731SH0001, Rev. 79, Safety Injection & Containment Spray Systems. ML0719702082007-04-17017 April 2007 Drawing 60708SH0002, Rev. 104, Circulating Salt Water Cooling System. ML0719804692007-04-17017 April 2007 Drawing 60747, Rev. 29, Hydraulic Schematic Main Steam Isolation Valves 11 & 12. ML0719900752007-04-17017 April 2007 Drawing 62583SH0001, Rev. 56, Auxiliary Feedwater System (Steam). ML0719901272007-04-17017 April 2007 Drawing 62747, Rev 28, Diagram Hydraulic Schematic Main Steam Isolation Valves 21 & 22. ML0719900992007-04-12012 April 2007 Drawing 62708SH0002, Rev. 104, Circulating Water Cooling System. ML0719901112007-04-11011 April 2007 Drawing 62729SH0001, Rev 96, Reactor Coolant System. ML0719901242007-04-10010 April 2007 Drawing 62731SH0003, Rev 26, Safety Injection & Containment Spray Systems. ML0719702452007-03-14014 March 2007 Drawing 60727SH0003, Rev. 53, Diesel Generator Cooling Water, Starting Air, Fuel, Lube Oil Diesel Generator No. 2B. ML0719804732007-02-20020 February 2007 Drawing 60761, Rev. 51, Steam Generator Blowdown Recovery System. ML0719702362007-02-19019 February 2007 Drawing 60724SH0001, Rev. 57, Reactor Coolant & Waste Process Sample System Post Accident Sampling System. ML0719804682007-01-31031 January 2007 Drawing 60746SH0003, Rev. 36, Plant Water & Air Service System. ML0719702152007-01-30030 January 2007 Drawing 60712SH0003, Rev. 104, Compressed Air System Instrument Air & Plant Air. ML0719702142007-01-30030 January 2007 Drawing 60712SH0001, Rev. 65, Compressed Air System Instrument Air and Plant Air. ML0719804612006-10-30030 October 2006 Drawing 60738SH0001, Rev. 69, Area & Process Radiation Monitoring System. ML0719705062006-10-13013 October 2006 Drawing 60729SH0001, Rev. 77, Reactor Coolant System. ML0719701972006-08-25025 August 2006 Drawing 60583SH0001, Rev. 61, Auxiliary Feedwater System (Steam). ML0719900862006-08-25025 August 2006 Drawing 62702SH0004, Rev. 45, Condensate & Feedwater System. ML0719705102006-08-0202 August 2006 Drawing 60730SH0002, Rev. 70, Chemical and Volume Control System. ML0719804512006-06-28028 June 2006 Drawing 60734SH0003, Rev. 43, Reactor Coolant Waste Processing System. ML0719702252006-06-20020 June 2006 Drawing 60717SH0001, Rev. 96, Well Water, Pretreated Water, Demineralized Water and Condensate Storage System. ML0719901102006-06-20020 June 2006 Drawing 62712SH0003, Rev 110, Compressed Air System Plant & Instrument Air. ML0719901152006-05-25025 May 2006 Drawing 62730SH0002, Rev 61, Chemical & Volume Control System. ML0719701982006-05-0909 May 2006 Drawing 60583SH0002, Rev. 1, Auxiliary Feedwater System (Condensate). 2021-09-07 Category:Emergency Preparedness-Emergency Plan Implementing Procedures MONTHYEARML19162A1752019-06-0606 June 2019
[Table view]10 CFR 50.54(q)(5) Procedure Change Summary Analysis ML18065A2042018-03-0606 March 2018 Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. ML17181A2182017-06-22022 June 2017 ISFSI - EP-AA-1011, Addendum 3, Revision 3, Emergency Action Levels ML16209A0542016-07-14014 July 2016 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, R.E. Ginna, Nuclear Radiological Emergency Plan Annex Revisions ML16207A1132016-07-14014 July 2016 Radiological Emergency Plan Annex Revisions ML16190A3852016-07-0808 July 2016 EP-AA-1 12-100-F-50, Revision D, Shift Emergency Director Checklist (Cng), Emergency Implementing Procedure ML16067A1512016-02-26026 February 2016 EP-AA-1011, Addendum 3, Revision 1, Calvert Cliffs Nuclear Power Plan Emergency Action Levels, - Emergency Plan Addendum ML16067A1482016-02-26026 February 2016 Independent Spent Fuel Storage Installation (ISFSI) - Transmittal of Radiological Emergency Plan Addendum Revision ML16040A2622016-01-29029 January 2016 Emergency Plan Implementing Procedure, EP-AA-I 12-100O-F-58, Revision C, CR Operations Communicator Checklist (Cng). ML16040A2612016-01-29029 January 2016 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, and R.E. Ginna - Transmittal of Radiological Emergency Implementing Procedure Revisions ML12072A2022012-02-0606 February 2012 Submittal of After Action Report/Improvement Plan, Drill Evaluated on December 09, 2011, Radiological Emergency Preparedness Program ML11272A1992011-09-23023 September 2011 Independent Spent Fuel Storage Installation - Supplemental Information Request to Adopt Revised Emergency Action Levels ML11272A1882011-09-23023 September 2011 Erpip 3.0, Immediate Actions, Attachment 1 Emergency Action Level Criteria. Page 1 of 2 ML11272A1872011-09-23023 September 2011 Erpip 3.0, Immediate Actions, Attachment 1 Emergency Action Level Criteria, Page 2 of 2 ML1107002572011-02-0101 February 2011 Independent Spent Fuel Storage Installation, EAL Technical Bases (Strike Out Version). Part 1 of 13 ML1107002802011-02-0101 February 2011 Independent Spent Fuel Storage Installation - Drawing No. Erpip 3.0, Immediate Actions, Attachment 1 Emergency Action Level Criteria Rev 0XX00, Page 1 of 2 ML1107002812011-02-0101 February 2011 Independent Spent Fuel Storage Installation - Drawing No. Erpip 3.0, Immediate Actions, Attachment 1 Emergency Action Level Criteria Rev 0XX00, Page 2 of 2 ML1107002982011-02-0101 February 2011 Independent Spent Fuel Storage Installation, Attachment Flood, Flood Rule Development. Part 3 of 13 ML1107003012011-02-0101 February 2011 Independent Spent Fuel Storage Installation, Flood Evaluation Query. Part 4 of 13 ML1107003042011-02-0101 February 2011 Independent Spent Fuel Storage Installation, EAL Comparison Matrix. Part 2 of 13 ML1107003052011-02-0101 February 2011 Independent Spent Fuel Storage Installation, Flood Evaluation Query C324AM Not Provided But Similar to M520AM in CF-22. Part 5 of 13 ML1107003252011-02-0101 February 2011 Calvert Cliffs, Units 1 & 2, and Independent Spent Fuel Storage Installation, AOP-7J, Loss of 120 Volt Vital AC or 125 Volt Vital DC Power. Part 12 of 13 ML1107003562011-02-0101 February 2011 Independent Spent Fuel Storage Installation, ERPIP-600, Severe Accident Management. Part 6 of 13 ML1107003602011-02-0101 February 2011 Calvert Cliffs, Units 1 & 2, and Independent Spent Fuel Storage Installation, CEN-152. Part 7 of 13 ML1107003762011-02-0101 February 2011 Calvert Cliffs, Units 1 & 2, and Independent Spent Fuel Storage Installation, EOP-8, Functional Recovery Procedure, Rev 33. Part 10 of 13 ML1107003782011-02-0101 February 2011 Calvert Cliffs, Units 1 & 2, and Independent Spent Fuel Storage Installation, AOP-2A, Excessive Reactor Coolant Leakage, Rev. 20. Part 11 of 13 ML1107003812011-02-0101 February 2011 Independent Spent Fuel Storage Installation, OI-35, Radiation Monitoring System, Rev. 31. Part 13 of 13 ML1107003242011-02-0101 February 2011 Calvert Cliffs, Units 1 & 2, and Independent Spent Fuel Storage Installation, OP-7, Shutdown Operations, Rev. 44. Part 9 of 13 ML1107003902011-02-0101 February 2011 Calvert Cliffs, Units 1 & 2, and Independent Spent Fuel Storage Installation, Form 1, ECP Cover Sheet. Part 8 of 13 ML1032601172010-11-18018 November 2010 Independent Spent Fuel Storage Installation - Changes to the Emergency Response Plan Implementing Procedure ERPIP-730, Radiation Protection Hospital Assistance, Revision 00105 ML1032002792010-11-10010 November 2010 Independent Spent Fuel Storage Installation, Changes to the Emergency Response Plan and Implementing Procedures ML1016702852010-06-11011 June 2010 Independent Spent Fuel Storage Installation - Changes to the Emergency Response Plan and Implementing Procedures ML1015202232010-05-26026 May 2010 Independent Spent Fuel Storage Installation - Changes to the Emergency Response Plan and Implementing Procedures ML1005507112010-02-12012 February 2010 Independent Spent Fuel Storage Installation, Submittal of Changes to the Emergency Response Plan and Implementing Procedures ML0915301622009-05-29029 May 2009 Independent Spent Fuel Storage Installation - Revision 00003 to the Emergency Response Plan and Implementing Procedure ERPIP-510, Emergency Operations Facility Recorders ML0909603182009-04-0101 April 2009 Independent Spent Fuel Storage Installation - Changes to the Emergency Response Plan and Implementing Procedures ML0805804382008-02-22022 February 2008 ISFSI - Revision 2 to Change 5 of the Emergency Response Plan Implementing Procedure ERPIP-504, Environmental Assessment Director (EOF) ML0621903112005-08-0303 August 2005 Emergency Response Plan Implementation Procedures, ERPIP-611, Rev. 2, Severe Accident Management Restorative Actions. ML0436401672004-12-16016 December 2004 Changes to the Emergency Response Plan and Implementing Procedures ML0413100912004-05-0505 May 2004 Independent Spent Fuel Storage Installation Docket No. 72-8 Changes to the Emergency Response Plan and Implementing Procedures 2019-06-06 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML110700280&oldid=951214"