Independent Spent Fuel Storage Installation - Revision 00003 to the Emergency Response Plan and Implementing Procedure ERPIP-510, Emergency Operations Facility Recorders
ML091530162
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/29/2009
From: Speer S
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ERPIP-510, Rev 00003
Download: ML091530162 (10)


Text

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 Nuclear Generation Group Constellation Energy" May 29, 2009 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Installation Docket No. 72-8 Changes to the Emergency Response Plan and Implementing Procedures As required by 10 CFR 50.54(q), 10 CFR Part 50 Appendix E.V, and 10 CFR 72.44(f), changes to the Emergency Response Plan Implementing Procedures are enclosed. These changes do not decrease the effectiveness of the Emergency Response Plan.

Should you have questions regarding this matter, please contact Mr. Jay S. Gaines at (410) 495-5219 or Mr. Steven C. Speer at (410) 495-5216.

Very truly yours, Steven C. Speer Director - Emergency Preparedness SCS/RDW/bjd

Enclosure:

ERPIP-5 10, Revision 00003 cc: S. J. Collins, NRC Resident Inspector, NRC E. W. Brach, NRC (Without Enclosure)

D. V. Pickett, NRC S. Gray, DNR 'A Y4

CALVERT CLIFFS NUCLEAR POWER PLANT TECHNICAL PROCEDURE EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES ERPIP-510 EMERGENCY OPERATIONS FACILITY (EOF)

RECORDERS REVISION 00003 Safety Related *1 Non-Safety Related REFERRAL USE Periodically refer to procedure during use.

R. Denton APPROVAL AUTHORITY 8/27/1991 EFFECTIVE DATE

ERPIP-510 EMERGENCY OPERATIONS FACILITY (EOF) Revision 00003 RECORDERS Pacie 2 of 9 RECORD OF REVISIONS AND CHANGES Rev. Chg. Summary of Revision and Changes 0 05-082 Editorial correction to perform the following:

Reformat procedure to meet the format and content requirements of the Technical Procedures Writer's Manual.

Change bars not used to identify the reformatting.

Change procedure title from Emergency Operations Facility (EOF) Support Staff to Emergency Operations Facility (EOF) Recorders.

Add Subsection 2.2, Initial Conditions, to clarify that order of actions in this procedure are not mandatory.

Revise Section 6.2, Operation, to add NOTE preceding this section that action order is not mandatory.

  • Revise Section 6.2 to remove all telecopier instructions.

Revise Section 6.3, Deactivation, to clarify documents gathered by Recorders.

Designate procedure as REFERRAL USE according to PR-1-103, Use of Procedures.

Designate procedure as Safety-Related according to PR-1-101, Preparation and Control of Calvert Cliffs Nuclear Power Plant.

  • Minor editorial correction included to ensure consistency.

0002 Editorial correction to change the wording in step 6.2.A to "CAPTURE pertinent information using the ERO Sharepoint Site".

By using the ERP Sharepoint Site, step 6.2.B (from previous version of procedure) was no longer required.

Changed Site Emergency to Site Area Emergency throughout procedure, where appropriate.

ERPIP-510 EMERGENCY OPERATIONS FACILITY (EOF) Revision 00003 RECORDERS Page 3 of 9 Rev. Chg. Summary of Revision and Changes 00 003 Editorial corrections to the following:

Under Developmental

References:

Updated subsection 3.1.F from PR-1-101, Preparation and Control of Calvert Cliffs Technical Procedures, to CNG-PR-1.01-1005, Control of Constellation Nuclear Generation Technical Procedure Format and Content.

PR-1-101 is no longer used. CNG-PR-1.01-1005 is the new Fleet Procedure.

Updated subsection 3.1 .G under Developmental References from PR-1-103, Use of Procedures, to CNG-PR-1.01-1009, Procedure Use and Adherence Requirements. PR-1-103 is no longer used.

CNG-PR-1.01-1009 is the new Fleet Procedure.

Updated Section 3.2, Performance References and Section 9.0, Records. Changed PR-3-100, Records Management, to CNG-PR-3.01-1000, Records Management. PR-3-100 is no longer used. CNG-PR-3.01-1000 is the new Fleet Procedure.

Removed Subsection 6.1.C Under Activation. (#2008-0387)

Status Boards are no longer being used in the EOF. Flat Screens are now used.

Removed Subsection 6.3.A.3.a under Deactivation. (#2008-0387)

Status Boards are no longer being used in the EOF. Flat Screens are now used.

Updated the NOTE on Page 7. Changed 6.2.D to 6.2.C. There is no longer step 6.2.D.

Under Section 9.0, Records, removed status board logs from the bulleted items. (#2008-0387) Status Boards are no longer being used in the EOF. Flat Screens are now being used.

This Change is applying a conversion exemption approved by the PGM and Director, Fleet Policies and Procedures. (See E-Mail in package).

ERPIP-510 EMERGENCY OPERATIONS FACILITY (EOF) Revision 00003 RECORDERS Paae 4 of 9 TABLE OF CONTENTS SECTION TITLE PAGE 1.0 PURPOSE ..................................................................................................... 6 2.0 APPLICABILITY/SCOPE/RESPO NSIBILITIES ................................................ 6 2.1 Applicability ........................................................................................... 6 2.2 Scope .................................................................................................... 6 2.3 Responsibilities .................................................................................... 6

3.0 REFERENCES

AND DEFINITIONS ................................................................. 6 3.1 Developm ental References ................................................................... 6 3.2 Perform ance References ..................................................................... 7 3.3 Definitions .............................................................................................. 7 4.0 PREREQ UISITES .............................................................................................. 7 4.1 Training and Qualification ...................................................................... 7 4.2 Initial Conditions ................................................................................... 7 5.0 PRECAUTIO NS ................................................................................................ 7 6.0 PERFO RMANCE ............................................................................................. 7 6.1 Activation .............................................................................................. 7 6.2 Operation .............................................................................................. 8 6.3 Deactivation .......................................................................................... 8 7.0 POST PERFO RMANCE ACTIVITIES ............................................................... 8 8.0 BASES .................................................................................................................. 8 9.0 RECORDS ............................................... ...................................................... 9

ERPIP-510 EMERGENCY OPERATIONS FACILITY (EOF) Revision 00003 Page 5 of 9 LIST OF EFFECTIVE PAGES Cumulative changes to this revision 3 (including EC's) 1 05-082 2 05-082,0002 3 05-082 4 05-082,0002 5 05-082 6 05-082,0002 7 05-082,0002 8 05-082 7 0002 8 0002 6 00003 7 00003 8 00003 9 00003

ERPIP-510 EMERGENCY OPERATIONS FACILITY (EOF) Revision 00003 RECORDERS 1.0 PURPOSE This procedure provides emergency response instructions to the Emergency Operations Facility (EOF) Recorders when an emergency action level is called at Calvert Cliffs Nuclear Power Plant.

2.0 APPLICABILITY/SCOPEIRESPONSIBILITIES 2.1 Applicability 0o 9

Lfn This procedure applies to the Emergency Operations Facility (EOF) Recorders.

2.2 Scope Performance of the actions in the order they are presented in Subsection 6.2, Operations, is not mandatory provided Subsection 6.1, Activation, has been accomplished.

00 2.3 Responsibilities 0 Li, The Emergency Operations Facility (EOF) Recorders shall report directly to the Emergency Operations Facility Director.

3.0 REFERENCES

AND DEFINITIONS 3.1 Developmental References A. NUREG 0654, Criteria for Preparation and Evaluation of Radiological Emergency response Plans and Preparedness in Support of Nuclear Power Plants B. 10 CFR 20, Standard for Protection Against Radiation C. 10 CFR 50.47, Emergency Plans D. 10 CFR 50 Appendix E to Part 50, Emergency Planning and Preparedness for Production and Utilization Facilities E. Calvert Cliffs Nuclear Power Plant Emergency Response Plan F. CNG-PR-1.01-1005, Control of Constellation Nuclear Generation Technical 0 0

Procedure Format and Content 0 G. CNG-PR-1.01-1009, Procedure Use and Adherence Requirements 0

H. Technical Procedures Writer's Manual 10

ERPIP-510 EMERGENCY OPERATIONS FACILITY (EOF) Revision 00003 RECORDERS Page

  • *7* of ,*,:_1 9

"77 3.2 Performance References CNG-PR-3.01-1000, Records Management a 0

3.3 Definitions None 4.0 PREREQUISITES 4.1 Training and Qualification Personnel performing this procedure shall be qualified on the tasks or activities contained in this procedure.

4.2 Initial Conditions One of the following Emergency Action Levels is called at Calvert Cliffs Nuclear Power Plant:

  • Alert f'4
  • Site Area Emergency 0
  • General Emergency 5.0 PRECAUTIONS Declared pregnant women and minors are not authorized to perform emergency functions.

6.0 PERFORMANCE 6.1 Activation 0

A. REPORT Emergency.to the EOF on notification of an Alert, Site Area Emergency, or General 0 B. REPORT presence in the EOF to the Emergency Operations Facility Director. en 0

0 0

ERPIP-51 0 EMERGENCY OPERATIONS FACILITY (EOF) Revision 00003 RECORDERS 6.2 Operation NOTE r'J 0o 0

The actions in Subsection 6.2, Operation, Steps 6.2.A through 6.2.C may be performed in any Ln order and only appropriate actions implemented considering the situation.

A. CAPTURE pertinentint information using the ERO Sharepoint Site.

B. RECORD and TRANSCRIBE minutes of conference discussions. o C. MAKE and DISTRIBUTE copies of minutes to EOF personnel, as requested.

6.3 Deactivation A. WHEN notified of event termination, THEN:

1. GATHER minutes and transcriptions generated during EOF operation. 00 Co 0
2. GIVE minutes and transcriptions to the Emergency Operations Facility 0 Director.

7.0 POST PERFORMANCE ACTIVITIES None 8.0 BASES None

ERPIP-510 EMERGENCY OPERATIONS FACILITY (EOF) Revision 00003 Pacle 9 of 9 9.0 RECORDS Records generated by this procedure may be permanent, non-permanent, or lifetime radiological records depending on the circumstances under which they are generated.

Records shall be captured and controlled as follows:

A. During an actual event as described in the purpose statement of this procedure, records shall be considered permanent records and submitted to the Emergency Preparedness Unit for final disposition according to CNG-PR-3.01-1000, Records Management.

Minutes/transcriptions from meetings, phone conversations and decisions. oC B. During an actual event as described in the purpose statement of this procedure, dosimetry records, that is, any dose-related record including access history records, are considered radiological lifetime records and are to be handled and maintained according to standard practices and unit procedures.

  • None C. During a drill or exercise, records generated shall be considered non-permanent records and submitted to the Emergency Preparedness Unit for evaluation.
  • Minutes/transcriptions from meetings, phone conversations and decisions. 0 C

C::