ML041310091
From kanterella
Jump to navigation
Jump to search
ML041310091 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 05/05/2004 |
From: | Roach E Constellation Energy Group |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
ERPIP-106, Revision 5 | |
Download: ML041310091 (65) | |
Similar Documents at Calvert Cliffs | |
---|---|
Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML19162A1752019-06-0606 June 2019
[Table view]10 CFR 50.54(q)(5) Procedure Change Summary Analysis ML18065A2042018-03-0606 March 2018 Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. ML17181A2182017-06-22022 June 2017 ISFSI - EP-AA-1011, Addendum 3, Revision 3, Emergency Action Levels ML16209A0542016-07-14014 July 2016 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, R.E. Ginna, Nuclear Radiological Emergency Plan Annex Revisions ML16207A1132016-07-14014 July 2016 Radiological Emergency Plan Annex Revisions ML16190A3852016-07-0808 July 2016 EP-AA-1 12-100-F-50, Revision D, Shift Emergency Director Checklist (Cng), Emergency Implementing Procedure ML16067A1512016-02-26026 February 2016 EP-AA-1011, Addendum 3, Revision 1, Calvert Cliffs Nuclear Power Plan Emergency Action Levels, - Emergency Plan Addendum ML16067A1482016-02-26026 February 2016 Independent Spent Fuel Storage Installation (ISFSI) - Transmittal of Radiological Emergency Plan Addendum Revision ML16040A2622016-01-29029 January 2016 Emergency Plan Implementing Procedure, EP-AA-I 12-100O-F-58, Revision C, CR Operations Communicator Checklist (Cng). ML16040A2612016-01-29029 January 2016 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, and R.E. Ginna - Transmittal of Radiological Emergency Implementing Procedure Revisions ML12072A2022012-02-0606 February 2012 Submittal of After Action Report/Improvement Plan, Drill Evaluated on December 09, 2011, Radiological Emergency Preparedness Program ML11272A1992011-09-23023 September 2011 Independent Spent Fuel Storage Installation - Supplemental Information Request to Adopt Revised Emergency Action Levels ML11272A1882011-09-23023 September 2011 Erpip 3.0, Immediate Actions, Attachment 1 Emergency Action Level Criteria. Page 1 of 2 ML11272A1872011-09-23023 September 2011 Erpip 3.0, Immediate Actions, Attachment 1 Emergency Action Level Criteria, Page 2 of 2 ML1107002572011-02-0101 February 2011 Independent Spent Fuel Storage Installation, EAL Technical Bases (Strike Out Version). Part 1 of 13 ML1107002802011-02-0101 February 2011 Independent Spent Fuel Storage Installation - Drawing No. Erpip 3.0, Immediate Actions, Attachment 1 Emergency Action Level Criteria Rev 0XX00, Page 1 of 2 ML1107002812011-02-0101 February 2011 Independent Spent Fuel Storage Installation - Drawing No. Erpip 3.0, Immediate Actions, Attachment 1 Emergency Action Level Criteria Rev 0XX00, Page 2 of 2 ML1107002982011-02-0101 February 2011 Independent Spent Fuel Storage Installation, Attachment Flood, Flood Rule Development. Part 3 of 13 ML1107003012011-02-0101 February 2011 Independent Spent Fuel Storage Installation, Flood Evaluation Query. Part 4 of 13 ML1107003042011-02-0101 February 2011 Independent Spent Fuel Storage Installation, EAL Comparison Matrix. Part 2 of 13 ML1107003052011-02-0101 February 2011 Independent Spent Fuel Storage Installation, Flood Evaluation Query C324AM Not Provided But Similar to M520AM in CF-22. Part 5 of 13 ML1107003252011-02-0101 February 2011 Calvert Cliffs, Units 1 & 2, and Independent Spent Fuel Storage Installation, AOP-7J, Loss of 120 Volt Vital AC or 125 Volt Vital DC Power. Part 12 of 13 ML1107003562011-02-0101 February 2011 Independent Spent Fuel Storage Installation, ERPIP-600, Severe Accident Management. Part 6 of 13 ML1107003602011-02-0101 February 2011 Calvert Cliffs, Units 1 & 2, and Independent Spent Fuel Storage Installation, CEN-152. Part 7 of 13 ML1107003762011-02-0101 February 2011 Calvert Cliffs, Units 1 & 2, and Independent Spent Fuel Storage Installation, EOP-8, Functional Recovery Procedure, Rev 33. Part 10 of 13 ML1107003782011-02-0101 February 2011 Calvert Cliffs, Units 1 & 2, and Independent Spent Fuel Storage Installation, AOP-2A, Excessive Reactor Coolant Leakage, Rev. 20. Part 11 of 13 ML1107003812011-02-0101 February 2011 Independent Spent Fuel Storage Installation, OI-35, Radiation Monitoring System, Rev. 31. Part 13 of 13 ML1107003242011-02-0101 February 2011 Calvert Cliffs, Units 1 & 2, and Independent Spent Fuel Storage Installation, OP-7, Shutdown Operations, Rev. 44. Part 9 of 13 ML1107003902011-02-0101 February 2011 Calvert Cliffs, Units 1 & 2, and Independent Spent Fuel Storage Installation, Form 1, ECP Cover Sheet. Part 8 of 13 ML1032601172010-11-18018 November 2010 Independent Spent Fuel Storage Installation - Changes to the Emergency Response Plan Implementing Procedure ERPIP-730, Radiation Protection Hospital Assistance, Revision 00105 ML1032002792010-11-10010 November 2010 Independent Spent Fuel Storage Installation, Changes to the Emergency Response Plan and Implementing Procedures ML1016702852010-06-11011 June 2010 Independent Spent Fuel Storage Installation - Changes to the Emergency Response Plan and Implementing Procedures ML1015202232010-05-26026 May 2010 Independent Spent Fuel Storage Installation - Changes to the Emergency Response Plan and Implementing Procedures ML1005507112010-02-12012 February 2010 Independent Spent Fuel Storage Installation, Submittal of Changes to the Emergency Response Plan and Implementing Procedures ML0915301622009-05-29029 May 2009 Independent Spent Fuel Storage Installation - Revision 00003 to the Emergency Response Plan and Implementing Procedure ERPIP-510, Emergency Operations Facility Recorders ML0909603182009-04-0101 April 2009 Independent Spent Fuel Storage Installation - Changes to the Emergency Response Plan and Implementing Procedures ML0805804382008-02-22022 February 2008 ISFSI - Revision 2 to Change 5 of the Emergency Response Plan Implementing Procedure ERPIP-504, Environmental Assessment Director (EOF) ML0621903112005-08-0303 August 2005 Emergency Response Plan Implementation Procedures, ERPIP-611, Rev. 2, Severe Accident Management Restorative Actions. ML0436401672004-12-16016 December 2004 Changes to the Emergency Response Plan and Implementing Procedures ML0413100912004-05-0505 May 2004 Independent Spent Fuel Storage Installation Docket No. 72-8 Changes to the Emergency Response Plan and Implementing Procedures 2019-06-06 Category:Letter MONTHYEARIR 05000336/20240032024-11-0707 November 2024
[Table view]Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-24024 April 2024 Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 2024-09-06 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML041310091&oldid=2620850"