|
|
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Adriene SmithManager, | | {{#Wiki_filter:Adriene Smith Manager, Nuclear Training Department |
| Nuclear Training | | CENGOM a joint venture of 0 Constellation |
| Department | | " Energy, eDF R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, New York 14519-9364 |
| CENGOMa joint venture of0 Constellation
| |
| "Energy, eDFR.E. Ginna Nuclear Power Plant, LLC1503 Lake RoadOntario, | |
| New York 14519-9364 | |
| 585.771.5214 | | 585.771.5214 |
| Adriene.Smith@cengllc.com | | Adriene.Smith@cengllc.com |
| July 5, 2013U.S. Nuclear Regulatory | | July 5, 2013 U.S. Nuclear Regulatory |
| Commission | | Commission |
| Washington, | | Washington, DC 20555-0001 |
| DC 20555-0001 | |
| ATTENTION: | | ATTENTION: |
| SUBJECT:Document | | SUBJECT: Document Control Desk R.E. Ginna Nuclear Power Plant Docket No. 50-244 Response to RIS 2013-06, Preparation |
| Control DeskR.E. Ginna Nuclear Power PlantDocket No. 50-244Response | |
| to RIS 2013-06, | |
| Preparation | |
| and Scheduling | | and Scheduling |
| ofOperator
| | of Operator Licensing |
| Licensing | |
| Examinations | | Examinations |
| Attached | | Attached you will find NRC Form 536 providing |
| you will find NRC Form 536 providing | | R.E. Ginna Nuclear Power Plant's expected license examination |
| R.E. Ginna Nuclear Power Plant'sexpected | | schedule information. |
| license examination | | Should you have any questions, please contact Mr. Kyle Garnish, General Supervisor, Operations |
| schedule | | Training at 585-771-5321. |
| information. | | SiAncerely, Adriene Smith KC Enclosure: |
| Should you have any questions, | | Operator Licensing |
| please contact Mr. Kyle Garnish, | |
| General Supervisor, | |
| Operations | |
| Training | |
| at 585-771-5321. | |
| SiAncerely, | |
| Adriene SmithKCEnclosure: | |
| Operator | |
| Licensing | |
| Examination | | Examination |
| Data, Form 536 (1 page) | | Data, Form 536 (1 page) |
| NRC FORM 536 U. S. NUCLEAR REGULATORY | | NRC FORM 536 U. S. NUCLEAR REGULATORY |
| COMMISSION | | COMMISSION |
| APPROVED | | APPROVED BY OMB: NO. 3150-0131 |
| BY OMB: NO. 3150-0131 | | EXPIRES- 09130/2014 |
| EXPIRES- | | 0M.2011) Eslimated |
| 09130/2014 | | burden per response to cornpy wi th s voluntary |
| 0M.2011) | |
| Eslimated | |
| burden per response | |
| to cornpy wi th s voluntary | |
| inom,.atbon | | inom,.atbon |
| collecton | | collecton |
| request Ihour. This intormation | | request I hour. This intormation |
| cotlection | | cotlection |
| is used to plan budgets aid resourmes | | is used to plan budgets aid resourmes |
| for operatorexamsnations. | | for operator examsnations. |
| Send comments | | Send comments regarding |
| regarding | | burden estimate to the Infomation |
| burden estimate | | Services Branch OPERATOR LICENSING |
| to the Infomation | |
| Services | |
| BranchOPERATOR
| |
| LICENSING | |
| (7-5 F53). U.S. Nuclear Regulatory | | (7-5 F53). U.S. Nuclear Regulatory |
| Coissio, | | Coissio, Washington, DC 2055,50001, or by intemet e-EXAMINATION |
| Washington, | | DATA "m to rnfocol9tMResource@=.gov, and to the Desk Officer, Oden of lnrmao ad Regulatory |
| DC 2055,50001, | | Affairs, NEOB-10202, (3150-0131), Office of Management |
| or by intemet e-EXAMINATION | | and Budget, Washington, DC 20503. It a nmeans used to Ipose an nformation |
| DATA "m to rnfocol9tMResource@=.gov, | |
| and to the Desk Officer, | |
| Oden of lnrmao adRegulatory | |
| Affairs, | |
| NEOB-10202, | |
| (3150-0131), | |
| Office of Management | |
| and Budget, Washington, | |
| DC 20503. It a nmeans used to Ipose an nformation | |
| cotlection | | cotlection |
| does not display a curretlyvaftd OMB contol nurber, the NRC may not conduct or sponsor. | | does not display a curretly vaftd OMB contol nurber, the NRC may not conduct or sponsor. and a person Is not required to respond to, ihe information |
| and a person Is not required | |
| torespond to, ihe information
| |
| collection. | | collection. |
| FACILITY | | FACILITY NRC REGION R.E. Ginna Region I A. PROPOSED EXAMINATION |
| NRC REGIONR.E. Ginna Region IA. PROPOSED | |
| EXAMINATION | |
| PREPARATION | | PREPARATION |
| SCHEDULEPROPOSED
| | SCHEDULE PROPOSED NUMBER CY2015 CY 2016 CY 2017 CY 2018 ESTIMATED |
| NUMBER CY2015 CY 2016 CY 2017 CY 2018ESTIMATED | | NUMBER OF LICENSEE-PREPARED |
| NUMBER OFLICENSEE-PREPARED | | 0 1 0 1 EXAMINATIONS |
| 0 1 0 1EXAMINATIONS | |
| ESTIMATED | | ESTIMATED |
| NUMBER OFNRC-PREPARED | | NUMBER OF NRC-PREPARED |
| 0 0 0 0EXAMINATIONS | | 0 0 0 0 EXAMINATIONS |
| B. INITIAL OPERATOR | | B. INITIAL OPERATOR LICENSE EXAMINATIONS |
| LICENSE EXAMINATIONS | | PROPOSED NUMBER CY 2015 CY.20.16 CY*2017 CY 2018 NUMBER OF REACTOR 0 10 0 8 OPERATORS NUMBER OF SENIOR REACTOR 0 5 0 7 OPERATORS |
| PROPOSED | | -INSTANT NUMBER OF SENIOR REACTOR OPERATORS |
| NUMBER CY 2015 CY.20.16 | | -UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS |
| CY*2017 CY 2018NUMBER OF REACTOR 0 10 0 8OPERATORS | | -LIMITED PROPOSED DATES PRIMARY DATE 10/10/2016 |
| NUMBER OF SENIOR REACTOR 0 5 0 7OPERATORS | |
| -INSTANTNUMBER OF SENIOR REACTOROPERATORS | |
| -UPGRADENUMBER OF SENIOR REACTOR 0 0 0 0OPERATORS | |
| -LIMITEDPROPOSED | |
| DATESPRIMARY DATE 10/10/2016
| |
| 10/08/2018 | | 10/08/2018 |
| ALTERNATE | | ALTERNATE |
| DATE 10/03/2016 | | DATE 10/03/2016 |
| 10/01/2018 | | 10/01/2018 |
| C. PROPOSED | | C. PROPOSED GENERIC FUNDAMENTALS |
| GENERIC FUNDAMENTALS | | EXAMINATION (GFE) SCHEDULE NRC FORM 536 (09-2011) |
| EXAMINATION | |
| (GFE) SCHEDULENRC FORM 536 (09-2011) | |
| }} | | }} |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] |
See also: RIS 2013-06
Text
Adriene Smith Manager, Nuclear Training Department
CENGOM a joint venture of 0 Constellation
" Energy, eDF R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, New York 14519-9364
585.771.5214
Adriene.Smith@cengllc.com
July 5, 2013 U.S. Nuclear Regulatory
Commission
Washington, DC 20555-0001
ATTENTION:
SUBJECT: Document Control Desk R.E. Ginna Nuclear Power Plant Docket No. 50-244 Response to RIS 2013-06, Preparation
and Scheduling
of Operator Licensing
Examinations
Attached you will find NRC Form 536 providing
R.E. Ginna Nuclear Power Plant's expected license examination
schedule information.
Should you have any questions, please contact Mr. Kyle Garnish, General Supervisor, Operations
Training at 585-771-5321.
SiAncerely, Adriene Smith KC Enclosure:
Operator Licensing
Examination
Data, Form 536 (1 page)
NRC FORM 536 U. S. NUCLEAR REGULATORY
COMMISSION
APPROVED BY OMB: NO. 3150-0131
EXPIRES- 09130/2014
0M.2011) Eslimated
burden per response to cornpy wi th s voluntary
inom,.atbon
collecton
request I hour. This intormation
cotlection
is used to plan budgets aid resourmes
for operator examsnations.
Send comments regarding
burden estimate to the Infomation
Services Branch OPERATOR LICENSING
(7-5 F53). U.S. Nuclear Regulatory
Coissio, Washington, DC 2055,50001, or by intemet e-EXAMINATION
DATA "m to rnfocol9tMResource@=.gov, and to the Desk Officer, Oden of lnrmao ad Regulatory
Affairs, NEOB-10202, (3150-0131), Office of Management
and Budget, Washington, DC 20503. It a nmeans used to Ipose an nformation
cotlection
does not display a curretly vaftd OMB contol nurber, the NRC may not conduct or sponsor. and a person Is not required to respond to, ihe information
collection.
FACILITY NRC REGION R.E. Ginna Region I A. PROPOSED EXAMINATION
PREPARATION
SCHEDULE PROPOSED NUMBER CY2015 CY 2016 CY 2017 CY 2018 ESTIMATED
NUMBER OF LICENSEE-PREPARED
0 1 0 1 EXAMINATIONS
ESTIMATED
NUMBER OF NRC-PREPARED
0 0 0 0 EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY 2015 CY.20.16 CY*2017 CY 2018 NUMBER OF REACTOR 0 10 0 8 OPERATORS NUMBER OF SENIOR REACTOR 0 5 0 7 OPERATORS
-INSTANT NUMBER OF SENIOR REACTOR OPERATORS
-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS
-LIMITED PROPOSED DATES PRIMARY DATE 10/10/2016
10/08/2018
ALTERNATE
DATE 10/03/2016
10/01/2018
C. PROPOSED GENERIC FUNDAMENTALS
EXAMINATION (GFE) SCHEDULE NRC FORM 536 (09-2011)