ML14211A527: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390Nebraska Public Power DistrictAlways there when you need usNLS2014075 50.90July 28, 2014U.S. Nuclear Regulatory CommissionAttention: Document Control DeskWashington, D.C. 20555-0001
{{#Wiki_filter:SECURITY-RELATED INFORMATION  
-WITHHOLD UNDER 10 CFR 2.390Nebraska Public Power DistrictAlways there when you need usNLS2014075 50.90July 28, 2014U.S. Nuclear Regulatory Commission Attention:
Document Control DeskWashington, D.C. 20555-0001


==Subject:==
==Subject:==
Supplement to License Amendment Request -Revision of Cyber Security PlanImplementation ScheduleCooper Nuclear Station, Docket No. 50-298, DPR-46
Supplement to License Amendment Request -Revision of Cyber Security PlanImplementation ScheduleCooper Nuclear Station, Docket No. 50-298, DPR-46


==Reference:==
==Reference:==
Letter from Oscar A. Limpias, Nebraska Public Power District, to U.S. NuclearRegulatory Commission, dated March 14, 2014, "License Amendment Request -Revision of Cyber Security Plan Implementation Schedule" (NLS2014022)
Letter from Oscar A. Limpias, Nebraska Public Power District, to U.S. NuclearRegulatory Commission, dated March 14, 2014, "License Amendment Request -Revision of Cyber Security Plan Implementation Schedule" (NLS2014022)


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In the Reference letter, Nebraska Public Power District (NPPD) requested an amendment toFacility Operating License DPR-46 for Cooper Nuclear Station (CNS) to revise the PhysicalProtection license condition as it relates to the cyber security plan. The License AmendmentRequest (LAR) proposed a change to the CNS Cyber Security Plan (CSP) Milestone 8implementation date as set forth in the previously approved CNS CSP Implementation Schedule.The purpose of this letter is to provide a supplement to the LAR submitted by the Referenceletter.Attachment 1 of the Reference letter provided an analysis of the proposed change. In theTechnical Evaluation provided in Attachment 1 of the Reference letter, NPPD identified thespecific requirements of the CNS CSP that CNS needs additional time to implement, as well asthe justification for needing additional time to implement those requirements. NPPD has sincedetermined that additional time is required to implement another aspect of the CNS CSP. Thischange is discussed in the Attachment to this letter.This LAR supplement does not impact any other aspects of the LAR submitted per the Referenceletter. It does not change the conclusions or the basis of the no significant hazards considerationpreviously provided with the Reference letter. NPPD requests that this supplemental informationbe considered in conjunction with approval of the Reference LAR.NOTE: The Attachment to this letter contains Security-Related Information. Upon separationfrom the Attachment, the cover letter is decontrolled.COOPER NUCLEAR STATION 5 2(c AP.O. Box 98 / Brownville, NE 68321-0098Telephone: (402) 825-3811 / Fax: (402) 825-5211www.nppd.com SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390NLS2014075Page 2 of 2The Attachment contains security-related information; therefore, NPPD requests that thisattachment be withheld from public disclosure in accordance with 10 CFR 2.390.This letter contains no regulatory commitments.By copy of this letter and its attachments, the appropriate State of Nebraska official is notified inaccordance with 10 CFR 50.91(b)(1). Copies are also being provided to the NRC Region IVoffice and the CNS Resident Inspector in accordance with 10 CFR 50.4(b)(1).Should you have any questions concerning this letter, or require additional information, pleasecontact David Van Der Kamp, Licensing Manager, at (402) 825-2904.I declare under penalty of perjury that the foregoing is true and correct.Executed on: 7______--Since 4ely,Os ar A. LimpiasVice President -Nuclear andChief Nuclear Officer/lb
In the Reference letter, Nebraska Public Power District (NPPD) requested an amendment toFacility Operating License DPR-46 for Cooper Nuclear Station (CNS) to revise the PhysicalProtection license condition as it relates to the cyber security plan. The License Amendment Request (LAR) proposed a change to the CNS Cyber Security Plan (CSP) Milestone 8implementation date as set forth in the previously approved CNS CSP Implementation Schedule.
The purpose of this letter is to provide a supplement to the LAR submitted by the Reference letter.Attachment 1 of the Reference letter provided an analysis of the proposed change. In theTechnical Evaluation provided in Attachment 1 of the Reference letter, NPPD identified thespecific requirements of the CNS CSP that CNS needs additional time to implement, as well asthe justification for needing additional time to implement those requirements.
NPPD has sincedetermined that additional time is required to implement another aspect of the CNS CSP. Thischange is discussed in the Attachment to this letter.This LAR supplement does not impact any other aspects of the LAR submitted per the Reference letter. It does not change the conclusions or the basis of the no significant hazards consideration previously provided with the Reference letter. NPPD requests that this supplemental information be considered in conjunction with approval of the Reference LAR.NOTE: The Attachment to this letter contains Security-Related Information.
Upon separation from the Attachment, the cover letter is decontrolled.
COOPER NUCLEAR STATION 5 2(c AP.O. Box 98 / Brownville, NE 68321-0098 Telephone:  
(402) 825-3811  
/ Fax: (402) 825-5211www.nppd.com SECURITY-RELATED INFORMATION  
-WITHHOLD UNDER 10 CFR 2.390NLS2014075 Page 2 of 2The Attachment contains security-related information; therefore, NPPD requests that thisattachment be withheld from public disclosure in accordance with 10 CFR 2.390.This letter contains no regulatory commitments.
By copy of this letter and its attachments, the appropriate State of Nebraska official is notified inaccordance with 10 CFR 50.91(b)(1).
Copies are also being provided to the NRC Region IVoffice and the CNS Resident Inspector in accordance with 10 CFR 50.4(b)(1).
Should you have any questions concerning this letter, or require additional information, pleasecontact David Van Der Kamp, Licensing  
: Manager, at (402) 825-2904.
I declare under penalty of perjury that the foregoing is true and correct.Executed on: 7______--
Since 4ely,Os ar A. LimpiasVice President  
-Nuclear andChief Nuclear Officer/lb


==Attachment:==
==Attachment:==
Supplemental Information for License Amendment RequestRevision of Cyber Security Plan Implementation Schedulecc: Regional Administrator w/attachmentUSNRC -Region IVCooper Project Manager w/attachmentUSNRC -NRR Project Directorate IV-1Senior Resident Inspector w/attachmentUSNRC -CNSNebraska Health and Human Services w/attachmentDepartment of Regulation and LicensureNPG Distribution w/o attachmentCNS Records w/attachmentNOTE: The Attachment to this letter contains Security-Related Information. Upon separationfrom the Attachment, the cover letter is decontrolled.}}
 
Supplemental Information for License Amendment RequestRevision of Cyber Security Plan Implementation Schedulecc: Regional Administrator w/attachment USNRC -Region IVCooper Project Manager w/attachment USNRC -NRR Project Directorate IV-1Senior Resident Inspector w/attachment USNRC -CNSNebraska Health and Human Services w/attachment Department of Regulation and Licensure NPG Distribution w/o attachment CNS Records w/attachment NOTE: The Attachment to this letter contains Security-Related Information.
Upon separation from the Attachment, the cover letter is decontrolled.}}

Revision as of 12:46, 1 July 2018

Cooper Nuclear Station - Supplement to License Amendment Request - Revision of Cyber Security Plan Implementation Schedule
ML14211A527
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/28/2014
From: Limpias O A
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2014075
Download: ML14211A527 (2)


Text

SECURITY-RELATED INFORMATION

-WITHHOLD UNDER 10 CFR 2.390Nebraska Public Power DistrictAlways there when you need usNLS2014075 50.90July 28, 2014U.S. Nuclear Regulatory Commission Attention:

Document Control DeskWashington, D.C. 20555-0001

Subject:

Supplement to License Amendment Request -Revision of Cyber Security PlanImplementation ScheduleCooper Nuclear Station, Docket No. 50-298, DPR-46

Reference:

Letter from Oscar A. Limpias, Nebraska Public Power District, to U.S. NuclearRegulatory Commission, dated March 14, 2014, "License Amendment Request -Revision of Cyber Security Plan Implementation Schedule" (NLS2014022)

Dear Sir or Madam:

In the Reference letter, Nebraska Public Power District (NPPD) requested an amendment toFacility Operating License DPR-46 for Cooper Nuclear Station (CNS) to revise the PhysicalProtection license condition as it relates to the cyber security plan. The License Amendment Request (LAR) proposed a change to the CNS Cyber Security Plan (CSP) Milestone 8implementation date as set forth in the previously approved CNS CSP Implementation Schedule.

The purpose of this letter is to provide a supplement to the LAR submitted by the Reference letter.Attachment 1 of the Reference letter provided an analysis of the proposed change. In theTechnical Evaluation provided in Attachment 1 of the Reference letter, NPPD identified thespecific requirements of the CNS CSP that CNS needs additional time to implement, as well asthe justification for needing additional time to implement those requirements.

NPPD has sincedetermined that additional time is required to implement another aspect of the CNS CSP. Thischange is discussed in the Attachment to this letter.This LAR supplement does not impact any other aspects of the LAR submitted per the Reference letter. It does not change the conclusions or the basis of the no significant hazards consideration previously provided with the Reference letter. NPPD requests that this supplemental information be considered in conjunction with approval of the Reference LAR.NOTE: The Attachment to this letter contains Security-Related Information.

Upon separation from the Attachment, the cover letter is decontrolled.

COOPER NUCLEAR STATION 5 2(c AP.O. Box 98 / Brownville, NE 68321-0098 Telephone:

(402) 825-3811

/ Fax: (402) 825-5211www.nppd.com SECURITY-RELATED INFORMATION

-WITHHOLD UNDER 10 CFR 2.390NLS2014075 Page 2 of 2The Attachment contains security-related information; therefore, NPPD requests that thisattachment be withheld from public disclosure in accordance with 10 CFR 2.390.This letter contains no regulatory commitments.

By copy of this letter and its attachments, the appropriate State of Nebraska official is notified inaccordance with 10 CFR 50.91(b)(1).

Copies are also being provided to the NRC Region IVoffice and the CNS Resident Inspector in accordance with 10 CFR 50.4(b)(1).

Should you have any questions concerning this letter, or require additional information, pleasecontact David Van Der Kamp, Licensing

Manager, at (402) 825-2904.

I declare under penalty of perjury that the foregoing is true and correct.Executed on: 7______--

Since 4ely,Os ar A. LimpiasVice President

-Nuclear andChief Nuclear Officer/lb

Attachment:

Supplemental Information for License Amendment RequestRevision of Cyber Security Plan Implementation Schedulecc: Regional Administrator w/attachment USNRC -Region IVCooper Project Manager w/attachment USNRC -NRR Project Directorate IV-1Senior Resident Inspector w/attachment USNRC -CNSNebraska Health and Human Services w/attachment Department of Regulation and Licensure NPG Distribution w/o attachment CNS Records w/attachment NOTE: The Attachment to this letter contains Security-Related Information.

Upon separation from the Attachment, the cover letter is decontrolled.