Lou Cortopassi, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550
Lou Cortopassi, Vice President  
 
and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550  
 
Fort Calhoun, NE 68023-0550


SUBJECT: FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015404
SUBJECT: FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015404


==Dear Mr. Cortopassi:==
==Dear Mr. Cortopassi:==
On September 24, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Fort Calhoun Station. The NRC inspectors discussed the results of this inspection with Mr. E. Dean, Plant Manager, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report. The NRC inspectors did not identify any findings or violations of more than minor significance.
On September 24, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Fort Calhoun Station. The NRC inspectors discussed the results of this inspection with Mr. E. Dean, Plant Manager, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
 
The NRC inspectors did not identify any findings or violations of more than minor significance.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withhol ding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for  
 
your response.


Sincerely,/RA/
Sincerely,/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-285 License No. DPR-40 Nonpublic  
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety  
 
Docket No. 50-285 License No. DPR-40  
 
Nonpublic  


===Enclosure:===
===Enclosure:===
Line 38: Line 54:
Supplemental Information  
Supplemental Information  


cc w/enclosure:
cc w/enclosure:  
Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008 cc w/o encl: Electronic Distribution
 
Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District  
 
Fort Calhoun Station  
 
Mail Stop FC-2-1  


ML15295A137 SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Keyword: NRC-002 MD 3.4 Non-Public A.3 SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Keyword: RGN-002 SUNSI Review Complete OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:DRP/B C:PSB1 NAME JLarsen MBrooks MHaire GMiller MHaire SIGNATURE MSH for MSH for MSH for /RA/ RCH for /RA/ DATE 10/22/15 10/22/15 10/22/15 10/22/15 10/22/15 Letter to Lou Cortopassi from Mark S. Haire, dated October 22, 2015
9610 Power Lane Blair, NE 68008


SUBJECT: FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015404 Electronic distribution by RIV w/enclosure: Security Specialist/NSIR (Eric.Wharton@nrc.gov)
cc w/o encl: Electronic Distribution
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) Security Specialist/NSIR (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov) Senior Resident Inspector (Max.Schneider@nrc.gov)
FCS Site Administrative Assistant (Janise.Schwee@nrc.gov) Electronic distribution by RIV w/o enclosure: Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Resident Inspector (Brian.Cummings@nrc.gov)
FCS Site Administrative Assistant (Janise.Schwee@nrc.gov) Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov) Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
RIV Public Affairs Officer (Lara.Uselding@nrc.gov) NRR Project Manager (Fred.Lyon@nrc.gov) Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) OEWEB Resource@nrc.gov OEWEB Resource (Sue.Bogle@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) ROPReports
}}
}}

Revision as of 19:54, 30 June 2018

Fort Calhoun Station - NRC Security Baseline Inspection Report 05000285/2015404
ML15295A137
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/22/2015
From: Haire M S
Plant Support Branch-1
To: Cortopassi L
Omaha Public Power District
References
IR 2015404
Download: ML15295A137 (4)


Text

" " October 22, 2015

Lou Cortopassi, Vice President

and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550

Fort Calhoun, NE 68023-0550

SUBJECT: FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2015404

Dear Mr. Cortopassi:

On September 24, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Fort Calhoun Station. The NRC inspectors discussed the results of this inspection with Mr. E. Dean, Plant Manager, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withhol ding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for

your response.

Sincerely,/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 50-285 License No. DPR-40

Nonpublic

Enclosure:

Inspection Report 05000285/2015404

w/Attachment:

Supplemental Information

cc w/enclosure:

Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District

Fort Calhoun Station

Mail Stop FC-2-1

9610 Power Lane Blair, NE 68008

cc w/o encl: Electronic Distribution