Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML15316A410 | | | number = ML15092A754 |
| | issue date = 11/10/2015 | | | issue date = 04/02/2015 |
| | title = Er 05000280/2015301, 05000281/2015301; Operating Test September 21-24, 2015 & Written Exam September 29, 2015; Surry Power Station, Units 1 and 2; Operator License Examinations | | | title = Surry Power Station - Notification of Licensed Operator Initial Examination (05000280/2015301 and 05000281/2015301) |
| | author name = Guthrie E F | | | author name = Guthrie E F |
| | author affiliation = NRC/RGN-II/DRS | | | author affiliation = NRC/RGN-II/DRS |
| | addressee name = Heacock D A | | | addressee name = Heacock D A |
| | addressee affiliation = Virginia Electric & Power Co (VEPCO) | | | addressee affiliation = Dominion Nuclear, Virginia Electric & Power Co (VEPCO) |
| | docket = 05000280, 05000281 | | | docket = 05000280, 05000281 |
| | license number = DPR-032, DPR-037 | | | license number = DPR-032, DPR-037 |
| | contact person = | | | contact person = |
| | document report number = IR 2015301 | | | case reference number = 50-280/15-301, 50-281/15-301 |
| | document type = Inspection Report | | | document type = Letter, License-Operator Examination Report |
| | page count = 8 | | | page count = 5 |
| }} | | }} |
|
| |
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: . November 10, 2015 Mr. David President and Chief Nuclear Officer Virginia Electric & Power Company Innsbrook Technical Center 5000 Dominion Blvd. Glen Allen, VA 23060 | | {{#Wiki_filter: |
| | [[Issue date::April 2, 2015]] |
|
| |
|
| SUBJECT: SURRY POWER STATION - NRC EXAMINATION REPORT 05000280/2015301 AND 05000281/2015301 | | Mr. David President and Chief Nuclear Officer Virginia Electric and Power Company Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 |
| | |
| | SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301) |
|
| |
|
| ==Dear Mr. Heacock:== | | ==Dear Mr. Heacock:== |
| During the period September 21-24, 2015, the Nuclear Regulatory Commission (NRC)
| | In a telephone conversation on March 30, 2015, between Mr. Richard Philpot, Supervisor, Nuclear Training, and Ms. Amanda Toth, Operations Engineer, arrangements were made for the administration of licensing examinations at Surry Power Station. The operating test is scheduled to be administered during the weeks of September 21 and September 28, 2015. The written examination is scheduled to be administered the week of October 5, 2015. The on-site preparatory week is scheduled for the week of August 24, 2015. |
| administered operating tests to employees of your company who had applied for licenses to operate Surry Power Station. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on September 29, 2015.
| |
|
| |
|
| All six Reactor Operator (RO) and all three Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. There were no post-examination comments. Nine applicants were issued licenses commensurate with the level of examination administered. A Simulator Fidelity Report is included in this report as Enclosure 2.
| | As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination. To meet the above schedule, it will be necessary for your staff to furnish the operating test outline and reference material by June 23, 2015. Ms. Toth provided the written examination outline to your staff in October 2014. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by July 23, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. |
|
| |
|
| The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10.
| | We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4662.
| | Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090) , medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. |
|
| |
|
| Sincerely,/RA: Gerald J. McCoy for/
| | This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. |
| Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
| |
|
| |
|
| ===Enclosures:===
| | The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. |
| 1. Report Details 2. Simulator Fidelity Report
| |
|
| |
|
| cc: Distribution via Listserv
| | In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html . Thank you for your cooperation in this matter. Mr. Philpot has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Ms. Toth at (404) 997-4520, (Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov). |
|
| |
|
| _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE AXT6 GJM1 FOR EFG NAME ATOTH EGUTHRIE DATE 11/10/2015 11/10/2015 11/ /2015 11/ /2015 11/ /2015 11/ /2015 11/ /2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION REGION II
| | Sincerely,/RA: Gerald J. McCoy/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37 |
|
| |
|
| Docket No.: 50-280, 50-281
| | cc: Distribution via Listserv |
| | |
| License No.: DPR-32, DPR-37
| |
| | |
| Report No.: 05000280/2015301, 05000281/2015301
| |
| | |
| Licensee: Virginia Electric and Power Company (VEPCO)
| |
| | |
| Facility: Surry Power Station, Units 1 and 2
| |
| | |
| Location: 5850 Hog Island Road Surry, VA 23883
| |
| | |
| Dates: Operating Test - September 21-24, 2015 Written Examination - September 29, 2015
| |
| | |
| Examiners: A. Toth, Chief, Senior Operations Engineer P. Capehart, Senior Operations Engineer M. Donithan, Operations Engineer
| |
| | |
| Approved by: Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety SUMMARY ER 05000280/2015301, 05000281/2015301; operating test September 21-24, 2015 & written exam September 29, 2015; Surry Power Station, Units 1 and 2; Operator License Examinations.
| |
| | |
| Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable. Members of the Surry Power Station staff developed both the operating tests and the written examination. The initial operating test, written RO examination, and written SRO examination submittals met the quality guidelines contained in NUREG-1021.
| |
| | |
| The NRC administered the operating tests during the period September 21-24, 2015. Members of the Surry Power Station training staff administered the written examination on September 29, 2015. All six Reactor Operator (RO) and all three Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. All applicants were issued licenses commensurate with the level of examination administered. There were no post-examination comments.
| |
| | |
| No findings were identified.
| |
| | |
| REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope The NRC evaluated the submitted operating test by combining the scenario events and JPMs in order to determine the percentage of submitted test items that required replacement or significant modification. The NRC also evaluated the submitted written examination questions (Reactor Operator and Senior Reactor Operator questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved knowledge and ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed, were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, "Operator Licensing Standards for Power Reactors." The NRC reviewed the licensee's examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49,
| |
| "Integrity of examinations and tests."
| |
| | |
| The NRC administered the operating tests during the period September 21-24, 2015. The NRC examiners evaluated six Reactor Operator (RO) and three Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. Members of the Surry Power Station training staff administered the written examination on September 29, 2015. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Surry Power Station, met the requirements specified in 10 CFR Part 55, "Operators' Licenses."
| |
| | |
| The NRC evaluated the performance or fidelity of the simulation facility during the preparation and conduct of the operating tests. b. Findings No findings were identified.
| |
| | |
| The NRC developed the written examination sample plan outline. Members of the Surry Power Station training staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 10 of NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials. Using NUREG-1021, the NRC determined that the licensee's initial examination submittal was within the range of acceptability expected for a proposed examination.
| |
| | |
| 4 All applicants passed both the operating test and written examination and were issued licenses.
| |
| | |
| Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
| |
| | |
| The licensee did not submit any post-examination comments. A copy of the final RO and SRO written examinations and answer keys, with all changes incorporated, may be accessed not earlier than September 29, 2017 in the ADAMS system (ADAMS Accession Numbers ML15293A072 and ML15293A075, respectively). 4OA6 Meetings, Including Exit Exit Meeting Summary On September 25, 2015 the NRC examination team discussed generic issues associated with the operating test with Michael Smith, Acting Director, Nuclear Safety and Licensing, and members of the Surry Power Station staff. The examiners asked the licensee if any of the examination material was proprietary, or if any of the examination material received should be withheld from public disclosure. No proprietary information was identified. No information was identified that required withholding from public disclosure.
| |
| | |
| KEY POINTS OF CONTACT Licensee personnel D. Bowden, Supervisor of Support Ops J. Fisher, Training Supervisor M. Hadock, Manager, Outage/Planning D. Haskins, Supervisor Civil Construction R. Herbert, Manager Site Engineering C. Lovett, Licensing Engineer M. Meyers, Senior Instructor Nuclear Ops P. Orrison, Senior Instructor Nuclear Ops R. Philpot, Training Supervisor R. Scanlon, Maintenance Manager M. Smith, Acting Director Nuclear Safety and Licensing D. Wilson, Assistant Operations Manager
| |
| | |
| NRC personnel C. Jones, Resident Inspector J. Bundy, Operations Engineer S. Shah, Operations Engineer
| |
| | |
| Enclosure 2 SIMULATOR FIDELITY REPORT Facility Licensee: Surry Power Station
| |
|
| |
|
| Facility Docket No.: 05000280, 05000281
| | _ML15092A754___________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE AXT6 GJM1 FOR NAME JATOTH EFGUTHRIE DATE 4/2/2015 4/2/2015 4/ /2015 4/ /2015 4/ /2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to David from Eugene F. Guthrie dated April 2, 2015. |
|
| |
|
| Operating Test Administered: September 21-24, 2015 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations. No simulator fidelity or configuration issues were identified.
| | SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301) |
| | Distribution: RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource |
| }} | | }} |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 IR 05000280/20213012021-11-10010 November 2021 NRC Operator License Examination Report 05000280/2021301 and 05000281/2021301 IR 05000280/20193012019-05-29029 May 2019 NRC Operator License Examination Report 05000280/2019301 and 05000281/2019301 IR 05000280/20173012018-01-12012 January 2018 NRC Operator License Examination Report 05000280/2017301 and 05000281/2017301 IR 05000280/20163012016-11-10010 November 2016 NRC Examination Report 05000280/2016301 and 05000281/2016301 ML15092A7542015-04-0202 April 2015 Notification of Licensed Operator Initial Examination (05000280/2015301 and 05000281/2015301) IR 05000280/20123012012-10-22022 October 2012 Reactor and Senior Reactor Operator Initial Examinations - 05000280/2012301 and 05000281/2012301 ML0812602622008-05-0202 May 2008 Er 05000280-08-301, 05000281-08-301, 03/17-27/2008 and 04/09/2008; Surry Power Station; Licensed Operator Examinations ML0220000992002-07-10010 July 2002 Stations, Units 1 & 2 -- Requested Information on Proposed Site-Specific Operator Licensing Examination Schedules & Estimated Number of Applicants, Regulatory Issue Summary 2002-09 IR 05000280/20023012002-04-19019 April 2002 NRC Examination Report 50-280/02-301 and 50-281/02-301 ML0211200112002-04-19019 April 2002 NRC Examination Report 50-280/02-301 and 50-281/02-301 2023-12-28
[Table view] |
Text
April 2, 2015
Mr. David President and Chief Nuclear Officer Virginia Electric and Power Company Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301)
Dear Mr. Heacock:
In a telephone conversation on March 30, 2015, between Mr. Richard Philpot, Supervisor, Nuclear Training, and Ms. Amanda Toth, Operations Engineer, arrangements were made for the administration of licensing examinations at Surry Power Station. The operating test is scheduled to be administered during the weeks of September 21 and September 28, 2015. The written examination is scheduled to be administered the week of October 5, 2015. The on-site preparatory week is scheduled for the week of August 24, 2015.
As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination. To meet the above schedule, it will be necessary for your staff to furnish the operating test outline and reference material by June 23, 2015. Ms. Toth provided the written examination outline to your staff in October 2014. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by July 23, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090) , medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html . Thank you for your cooperation in this matter. Mr. Philpot has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Ms. Toth at (404) 997-4520, (Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov).
Sincerely,/RA: Gerald J. McCoy/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
cc: Distribution via Listserv
_ML15092A754___________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE AXT6 GJM1 FOR NAME JATOTH EFGUTHRIE DATE 4/2/2015 4/2/2015 4/ /2015 4/ /2015 4/ /2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to David from Eugene F. Guthrie dated April 2, 2015.
SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301)
Distribution: RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource