ML15092A754
| ML15092A754 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 04/02/2015 |
| From: | Eugene Guthrie Division of Reactor Safety II |
| To: | Heacock D Dominion Nuclear, Virginia Electric & Power Co (VEPCO) |
| References | |
| 50-280/15-301, 50-281/15-301 | |
| Download: ML15092A754 (5) | |
See also: IR 05000280/2015301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
April 2, 2015
Mr. David A. Heacock
President and Chief Nuclear Officer
Virginia Electric and Power Company
Dominion Nuclear
Innsbrook Technical Center
5000 Dominion Boulevard
Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR
INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301)
Dear Mr. Heacock:
In a telephone conversation on March 30, 2015, between Mr. Richard Philpot, Supervisor,
Nuclear Training, and Ms. Amanda Toth, Operations Engineer, arrangements were made for the
administration of licensing examinations at Surry Power Station. The operating test is
scheduled to be administered during the weeks of September 21 and September 28, 2015. The
written examination is scheduled to be administered the week of October 5, 2015. The on-site
preparatory week is scheduled for the week of August 24, 2015.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 10 of NUREG-1021, "Operator
Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline and reference material by June 23, 2015. Ms. Toth provided the written examination
outline to your staff in October 2014. The operating test, written examination, and the
supporting reference materials identified in Attachment 3 to ES-201 will be due by July 23,
2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outline, examination, and test before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
D. Heacock
2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090) , medical certifications (OMB approval number 3150-
0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before
the first examination date. If the applications are not received at least 30 days before the
examination date, a postponement may be necessary. Signed applications certifying that all
training has been completed should be submitted at least 14 days before the first examination
date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,
2016. The public reporting burden for this collection of information is estimated to average 2500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRCs Rules of Practice, a copy of this letter will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC
Website at http://www.nrc.gov/reading-rm.adams.html .
D. Heacock
3
Thank you for your cooperation in this matter. Mr. Philpot has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Ms. Toth at (404) 997-4520,
(Internet E-mail: Amanda.Toth@nrc.gov), or me at (404) 997-4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov).
Sincerely,
/RA: Gerald J. McCoy/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos.: 50-280, 50-281
cc: Distribution via Listserv
_ML15092A754___________________
SUNSI REVIEW COMPLETE
FORM 665 ATTACHED
OFFICE
RII:DRS
RII:DRS
SIGNATURE
AXT6
GJM1 FOR
NAME
JATOTH
EFGUTHRIE
DATE
4/2/2015
4/2/2015
4/ /2015
4/ /2015
4/ /2015
E-MAIL COPY?
YES
NO
YES
NO YES
NO
YES
NO
YES
NO YES
NO
YES
NO
Letter to David A. Heacock from Eugene F. Guthrie dated April 2, 2015.
SUBJECT:
SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR
INITIAL EXAMINATION (05000280/2015301 AND 05000281/2015301)
Distribution:
RIDSNRRDIRS
PUBLIC
RidsNrrPMSurry Resource