{{#Wiki_filter:  January 17, 2017  MEMORANDUM TO:  Kriss M. Kennedy, Regional Administrator  THRU:    Troy W. Pruett, Director        /RA/  Division of Reactor Projects  FROM:    Geoffrey B. Miller, Chief  /RA/  Project Branch D 
==SUBJECT:==
MANAGEMENT DIRECTIVE 8.3 EVALUATION FOR PALO VERDE UNIT 3 EMERGENCY DIESEL GENERATOR FAILURE Pursuant to Regional Office Policy Guide 0801, "Management Directive 8.3 and Inspection Manual Chapter 0309 Reactive Team Inspection Decisions, Implementation, and Documentation for Power Reactors," the enclosed table provides the Management Directive 8.3 evaluation for determining that a Special Inspection Team inspection will be conducted at Palo Verde for the catastrophic failure of the Unit 3 emergency diesel generator. Concur with Recommendation:                /RA/  1/17/17  Kriss M. Kennedy Date  Regional Administrator 
==Enclosures:==
MD 8.3 Decision Documentation Form (Deterministic and Risk Criteria Analyzed)  CONTACT:  Geoffrey B. Miller          817-200-1173  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 K. Kennedy 2    MANAGEMENT DIRECTIVE 8.3 EVALUATION FOR PALO VERDE UNIT EMERGENCY  DIESEL GENERATOR FAILURE, JANUARY 17, 2017  DISTRIBUTION: Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov)  Senior Resident Inspector (Charles.Peabody@nrc.gov) Resident Inspector (David.You@nrc.gov) Resident Inspector (Dustin.Reinert@nrc.gov) PV Administrative Assistant (Yvonne.Dubay@nrc.gov) Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov) Senior Project Engineer, DRP/D (John.Dixon@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (Siva.Lingam@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) NRR_Reactive_Inspection@nrc.gov ADAMS ACCESSION NUMBER:  ML17018A123  SUNSI Review By:  JLD ADAMS  Yes  No  Publicly Available Non-Publicly Available  Non-Sensitive  Sensitive Keyword: MD 3.4/A.7 OFFICE RIV:SPE:DRP SRA:DRS/PSB2 C:DRP/D D:DRS D:DRP  NAME JDixon DLoveless GMiller AVegel TPruett  SIGNATURE /RA Geoff Miller for/ /RA/ /RA/ /RA/ /RA/  DATE 12/27/16 1/5/17 1/9/17 1/9/17 1/10/17  OFFICIAL RECORD COPY
}}
}}

Revision as of 17:02, 30 April 2018

Management Directive 8.3 Evaluation for Palo Verde Unit 3 Emergency Diesel Generator Failure
ML17018A123
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/17/2017
From: Miller G B
NRC/RGN-IV/DRP/RPB-D
To: Kennedy K M
Region 4 Administrator
Miller G B
References
MD 8.3
Download: ML17018A123 (5)


Text

January 17, 2017 MEMORANDUM TO: Kriss M. Kennedy, Regional Administrator THRU: Troy W. Pruett, Director /RA/ Division of Reactor Projects FROM: Geoffrey B. Miller, Chief /RA/ Project Branch D

SUBJECT:

MANAGEMENT DIRECTIVE 8.3 EVALUATION FOR PALO VERDE UNIT 3 EMERGENCY DIESEL GENERATOR FAILURE Pursuant to Regional Office Policy Guide 0801, "Management Directive 8.3 and Inspection Manual Chapter 0309 Reactive Team Inspection Decisions, Implementation, and Documentation for Power Reactors," the enclosed table provides the Management Directive 8.3 evaluation for determining that a Special Inspection Team inspection will be conducted at Palo Verde for the catastrophic failure of the Unit 3 emergency diesel generator. Concur with Recommendation: /RA/ 1/17/17 Kriss M. Kennedy Date Regional Administrator

Enclosures:

MD 8.3 Decision Documentation Form (Deterministic and Risk Criteria Analyzed) CONTACT: Geoffrey B. Miller 817-200-1173 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 K. Kennedy 2 MANAGEMENT DIRECTIVE 8.3 EVALUATION FOR PALO VERDE UNIT EMERGENCY DIESEL GENERATOR FAILURE, JANUARY 17, 2017 DISTRIBUTION: Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Charles.Peabody@nrc.gov) Resident Inspector (David.You@nrc.gov) Resident Inspector (Dustin.Reinert@nrc.gov) PV Administrative Assistant (Yvonne.Dubay@nrc.gov) Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov) Senior Project Engineer, DRP/D (John.Dixon@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (Siva.Lingam@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) NRR_Reactive_Inspection@nrc.gov ADAMS ACCESSION NUMBER: ML17018A123 SUNSI Review By: JLD ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4/A.7 OFFICE RIV:SPE:DRP SRA:DRS/PSB2 C:DRP/D D:DRS D:DRP NAME JDixon DLoveless GMiller AVegel TPruett SIGNATURE /RA Geoff Miller for/ /RA/ /RA/ /RA/ /RA/ DATE 12/27/16 1/5/17 1/9/17 1/9/17 1/10/17 OFFICIAL RECORD COPY