IR 05000313/2025003: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 70: | Line 70: | ||
Division of Operating Reactor Safety | Division of Operating Reactor Safety | ||
SUMMARY | =SUMMARY= | ||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees | The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Arkansas Nuclear One, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | ||
performance by conducting an integrated inspection at Arkansas Nuclear One, in accordance | |||
with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for | ===List of Findings and Violations=== | ||
overseeing the safe operation of commercial nuclear power reactors. Refer to | Failure to Establish an Adequate Procedure for Diesel Fire Pump Maintenance Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000313,05000368/2025003-01 Open/Closed | ||
https://www.nrc.gov/reactors/operating/oversight.html for more information. | [H.12] - Avoid Complacency 71152A A self-revealed Green finding and associated non-cited violation of Unit 1 License Condition 2.C.(8) and Unit 2 License Condition 2.C.(3)(b) was identified when the licensee failed to establish an adequate procedure for maintenance of the diesel fire pump. | ||
List of Findings and Violations | |||
Failure to Establish an Adequate Procedure for Diesel Fire Pump Maintenance | Specifically, on January 7, 2025, April 4, 2025, and May 14, 2025, the starter motor for the diesel fire pump was installed without a spacer and subsequently failed to start the diesel fire pump. This occurred because Procedure OP-1307.004, Diesel Fire Pump Engine (K-5) | ||
Cornerstone | Biannual Surveillance, Revision 16, provided no instructions regarding the starter motor spacer. | ||
Significance | |||
Cross-Cutting | ===Additional Tracking Items=== | ||
Aspect | Type Issue Number Title Report Section Status NOV 05000313/2024090-01 SLIII NOV for ANO Unit 1, | ||
Report | Internet Usage while ATC EA-24-107 71111.11B Closed LER 05000313, 05000368/ | ||
Section | 2025-S001-00 Follow-up Report for a 10 CFR 73 Security Report on January 31, 2025 71153 Closed | ||
Mitigating | |||
Systems | =PLANT STATUS= | ||
Green | |||
NCV 05000313,05000368/2025003-01 | Unit 1 began a coastdown for refueling outage 1R32 on September 15, 2025. On September 24, 2025, Unit 1 tripped due to a B main phase transformer fault. Unit 1 was restarted on September 28, 2025, and ended the inspection period at approximately 60 percent power. | ||
Open/Closed | |||
[H.12] - Avoid | Unit 2 began the inspection period at full power and remained there for the duration of the inspection period. | ||
Complacency | |||
71152A | ==INSPECTION SCOPES== | ||
A self-revealed Green finding and associated non-cited violation of Unit 1 License | Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. | ||
Condition 2.C.(8) and Unit 2 License Condition 2.C.(3)(b) was identified when the licensee | |||
failed to establish an adequate procedure for maintenance of the diesel fire pump. | ==REACTOR SAFETY== | ||
Specifically, on January 7, 2025, April 4, 2025, and May 14, 2025, the starter motor for the | ==71111.04 - Equipment Alignment== | ||
diesel fire pump was installed without a spacer and subsequently failed to start the diesel fire | ===Partial Walkdown Sample (IP Section 03.01) (3 Samples)=== | ||
pump. This occurred because Procedure OP-1307.004, Diesel Fire Pump Engine (K-5) | The inspectors evaluated system configurations during partial walkdowns of the following systems/trains: | ||
Biannual Surveillance, Revision 16, provided no instructions regarding the starter motor | : (1) Unit 2, low-pressure safety injection system train B following maintenance on the low-pressure safety injection pump seal cooler, on July 31, 2025 | ||
spacer. | : (2) Units 1 and 2, control room boundary and control room emergency ventilation system during boundary breach with administrative controls, on August 5, 2025 | ||
Additional Tracking Items | : (3) Unit 1, high-pressure injection system trains A and C following weekly pump swap, on August 25, 2025 | ||
Type | |||
Issue Number | ===Complete Walkdown Sample (IP Section 03.02) (1 Sample)=== | ||
Title | : (1) The inspectors evaluated system configurations during a complete walkdown of the Unit 1 service water system, on July 28, 2025. | ||
Report Section | |||
Status | ==71111.05 - Fire Protection== | ||
NOV | ===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)=== | ||
05000313/2024090-01 | The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas: | ||
SLIII NOV for ANO Unit 1, | : (1) Unit 2, diesel generator room access corridor, fire area JJ, due to safety-related equipment in the area, on August 4, 2025 | ||
Internet Usage while ATC | : (2) Unit 2, control element drive mechanism equipment room, fire area B-4, due to safety-related equipment in the area, on August 8, 2025 | ||
EA-24-107 | : (3) Unit 1, diesel generator access corridor 98, fire area I-1, due to safety-related equipment in the area, on August 12, 2025 | ||
71111.11B | |||
Closed | ===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)=== | ||
LER | : (1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill in the Unit 2 hot tool room, on September 5, 2025. | ||
05000313, 05000368/ | |||
2025-S001-00 | |||
Follow-up Report for a | |||
10 CFR 73 Security Report | |||
on | |||
==71111.06 - Flood Protection Measures== | |||
===Flooding Sample (IP Section 03.01) (1 Sample)=== | |||
: (1) The inspectors evaluated internal flooding mitigation protections in the Unit 1 turbine building due to a postulated pipe break in auxiliary cooling water that could fail both trains of safety-related service water, on August 1, 2025. | |||
71111. | |||
(1) | |||
The inspectors evaluated | |||
Unit 1 service water | |||
==71111.07A - Heat Exchanger/Sink Performance== | |||
===Annual Review (IP Section 03.01) (1 Sample)=== | |||
71111.07A - Heat Exchanger/Sink Performance | |||
Annual Review (IP Section 03.01) (1 Sample) | |||
The inspectors evaluated readiness and performance of: | The inspectors evaluated readiness and performance of: | ||
(1) | : (1) Unit 1, emergency diesel generator train B jacket water heat exchanger, on July 11, 2025 | ||
Unit 1, emergency diesel generator train B jacket water heat exchanger, on | |||
July 11, 2025 | ==71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance== | ||
71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance | ===Requalification Examination Results (IP Section 03.03) (2 Samples)=== | ||
Requalification Examination Results (IP Section 03.03) (2 Samples) | : (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating test and biennial written examinations on July 29, 2025. | ||
(1) | : (2) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered on August 13, 2025. | ||
The inspectors reviewed and evaluated the licensed operator examination failure | |||
rates for the requalification annual operating test and biennial written examinations on | ==71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance== | ||
July 29, 2025. | ===Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)=== | ||
(2) | : (1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on July 3, 2025. | ||
The inspectors reviewed and evaluated the licensed operator examination failure | |||
rates for the requalification annual operating exam administered on August 13, 2025. | Annual Requalification Operating Tests The inspectors evaluated the adequacy of the licensees annual requalification operating test. | ||
Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the licensee is effectively evaluating their licensed operators for mastery of training objectives. | |||
Requalification Examination Security The inspectors evaluated the ability of the licensee to safeguard examination material, such that the examination is not compromised. | |||
Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination. | |||
Remedial Training and Re-examinations | |||
The inspectors evaluated the effectiveness of remedial training conducted by the | |||
licensee and reviewed the adequacy of re-examinations for licensed operators who | |||
did not pass a required requalification examination | |||
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance | Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses. | ||
Control Room Simulator The inspectors evaluated the adequacy of the licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46. | |||
Problem Identification and Resolution The inspectors evaluated the licensee's program for identifying and resolving problems related to licensed operator training and performance, to include reviewing the licensee's corrective actions for SL III NOV 05000313/2024090-01 (ADAMS Accession No. ML24346A037), Internet Usage while ATC, EA-24-107. | |||
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance== | |||
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples) | Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples) | ||
(1) | : (1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 1 turbine-driven emergency feedwater pump comprehensive surveillance testing, on July 30, 2025. | ||
The inspectors observed and evaluated licensed operator performance in the control | : (2) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 high-pressure safety injection valve stroking and control room ventilation surveillance testing, on September 4, 2025. | ||
room during Unit 1 turbine-driven emergency feedwater pump comprehensive | |||
surveillance testing, on July 30, 2025. | ===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (2 Samples)=== | ||
(2) | : (1) The inspectors observed and evaluated Unit 1 annual requalification exam simulator activities, on July 23, 2025. | ||
The inspectors observed and evaluated licensed operator performance in the control | : (2) The inspectors observed and evaluated Unit 2 annual requalification exam simulator activities, on July 23, 2025. | ||
room during Unit 2 high-pressure safety injection valve stroking and control room | |||
ventilation surveillance testing, on September 4, 2025. | ==71111.12 - Maintenance Effectiveness== | ||
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (2 Samples) | ===Maintenance Effectiveness (IP Section 03.01) (3 Samples)=== | ||
(1) | The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function: | ||
The inspectors observed and evaluated Unit 1 annual requalification exam simulator | : (1) Unit 2, component cooling water system, on July 11, 2025 | ||
activities, on July 23, 2025. | : (2) Unit 1, reactor protection system following a failure of a DC power supply, on August 7, 2025 | ||
(2) | : (3) Unit 1, high-pressure injection system following replacement high-pressure injection pump A bearing failure, on August 29, 2025 | ||
The inspectors observed and evaluated Unit 2 annual requalification exam simulator | |||
activities, on July 23, 2025. | |||
71111.12 - Maintenance Effectiveness | |||
Maintenance Effectiveness (IP Section 03.01) (3 Samples) | |||
The inspectors evaluated the effectiveness of maintenance to ensure the following | |||
structures, systems, and components (SSCs) remain capable of performing their intended | |||
function: | |||
(1) | |||
Unit 2, component cooling water system, on July 11, 2025 | |||
(2) | |||
Unit 1, reactor protection system following a failure of a DC power supply, on | |||
August 7, 2025 | |||
(3) | |||
Unit 1, high-pressure injection system following replacement high-pressure injection | |||
pump A bearing failure, on August 29 | |||
71111. | ==71111.15 - Operability Determinations and Functionality Assessments== | ||
===Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)=== | |||
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments: | |||
: (1) Unit 2, emergency safeguards features train B operability determination due to service water leak from vault room cooling coil 2VUC-1D, on July 28, 2025 | |||
(1) | : (2) Unit 1, vital battery charger D-03B operability determination due to trip of output breaker, on August 13, 2025 | ||
: (3) Unit 1, emergency diesel generator train B operability determination due to governor solenoid failure on emergency diesel generator train A, on September 4, 2025 | |||
: (4) Unit 2, low-pressure safety injection pump A operability determination due to seismic concerns from a loose metal support, on September 10, 2025 | |||
(2) | |||
Unit | |||
(3) | |||
Unit | |||
(4) | |||
Unit 2, | |||
In addition, the inspectors evaluated the 10 CFR 50.54(q) emergency plan change | ==71111.24 - Testing and Maintenance of Equipment Important to Risk== | ||
process and practices between September 1, 2023 - July 28, 2025. The evaluations | The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality: | ||
reviewed screenings and evaluations documenting implementation of the process. | |||
The reviews of the change process documentation or the emergency plan changes | ===Post-Maintenance Testing (PMT) (IP Section 03.01) (4 Samples)=== | ||
do not constitute NRC approval. | : (1) Units 1 and 2, alternate ac diesel generator test after engine, breaker, and controls maintenance, on August 4, 2025 | ||
71114.05 - Maintenance of Emergency Preparedness | : (2) Unit 2, high-pressure safety injection pump C breaker protective relay tests following calibration, on August 11, 2025 | ||
Inspection Review (IP Section 02.01 - 02.11) (1 Sample) | : (3) Unit 2, high-pressure safety injection pump C breaker test after removal and replacement, on September 11, 2025 | ||
(1) | : (4) Unit 2, high-pressure safety injection pump A test after injection valve preventive maintenance, on September 12, 2025 | ||
The inspectors evaluated the maintenance of the emergency preparedness program | |||
between September 1, 2023 - July 28, 2025. The evaluation reviewed evidence of | ===Surveillance Testing (IP Section 03.01) (1 Sample)=== | ||
completing various emergency plan commitments, the conduct of drills and exercises, | : (1) Unit 2, plant protection system channel D matrix surveillance test, on August 19, 2025 | ||
licensee audits and assessments, and the maintenance of equipment important to | |||
emergency preparedness. | ===Inservice Testing (IST) (IP Section 03.01) (1 Sample)=== | ||
71114.06 - Drill Evaluation | : (1) Unit 2, charging pump A inservice test, on August 18, 2025 | ||
Additional Drill and/or Training Evolution (1 Sample) | |||
==71114.02 - Alert and Notification System Testing== | |||
===Inspection Review (IP Section 02.01-02.04) (1 Sample)=== | |||
: (1) The inspectors evaluated the maintenance and testing of the alert and notification system between September 1, 2023 - July 28, 2025. | |||
==71114.03 - Emergency Response Organization Staffing and Augmentation System== | |||
===Inspection Review (IP Section 02.01-02.02) (1 Sample)=== | |||
: (1) The inspectors evaluated the readiness of the Emergency Preparedness Organization between September 1, 2023 - July 28, 2025. Inspectors also evaluated the licensee's ability to staff the emergency response facilities in accordance with emergency plan commitments. | |||
==71114.04 - Emergency Action Level and Emergency Plan Changes== | |||
===Inspection Review (IP Section 02.01-02.03) (1 Sample)=== | |||
: (1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes. | |||
* OP-1903.010, Emergency Action Level Classification, Revision 62, 63, 64 | |||
* OP-1904.002, Offsite Dose Projections, Revision 52 | |||
* OP1903.010-U1WC, Emergency Action Level Classification U1 Wall Chart, Revision 3 | |||
* OP1903.010-U2WC, Emergency Action Level Classification U2 Wall Chart, Revision 2 In addition, the inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between September 1, 2023 - July 28, 2025. The evaluations reviewed screenings and evaluations documenting implementation of the process. | |||
The reviews of the change process documentation or the emergency plan changes do not constitute NRC approval. | |||
==71114.05 - Maintenance of Emergency Preparedness== | |||
===Inspection Review (IP Section 02.01 - 02.11) (1 Sample)=== | |||
: (1) The inspectors evaluated the maintenance of the emergency preparedness program between September 1, 2023 - July 28, 2025. The evaluation reviewed evidence of completing various emergency plan commitments, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness. | |||
==71114.06 - Drill Evaluation== | |||
===Additional Drill and/or Training Evolution (1 Sample)=== | |||
The inspectors evaluated: | The inspectors evaluated: | ||
(1) | : (1) Unit 2, emergency preparedness drill for loss of all feedwater, failed fuel, and containment isolation valve leak, on July 31, 2025 | ||
Unit 2, emergency preparedness drill for loss of all feedwater, failed fuel, and | |||
containment isolation valve leak, on July 31 | |||
EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample) | ==OTHER ACTIVITIES - BASELINE== | ||
(1) | 71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below: | ||
July 1, 2024, through June 30, 2025 | |||
EP04: Emergency Response Facility and Equipment Readiness (ERFER) (IP Section 02.14) (1 Sample) | ===MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)=== | ||
(1) | : (1) Unit 1 (July 1, 2024, through June 30, 2025) | ||
January 1, 2025, through June 30, 2025 | : (2) Unit 2 (July 1, 2024, through June 30, 2025) | ||
71152A - Annual Follow-up Problem Identification and Resolution | |||
Annual Follow-up of Selected Issues (Section 03.03) (1 Sample) | ===MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)=== | ||
The inspectors reviewed the licensees implementation of its corrective action program | : (1) Unit 1 (July 1, 2024, through June 30, 2025) | ||
related to the following issues: | : (2) Unit 2 (July 1, 2024, through June 30, 2025) | ||
(1) | |||
Units 1 and 2, effectiveness of corrective actions relating to the diesel-driven fire | ===MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)=== | ||
pump repeated failure to start, on August 5, 2025 | : (1) Unit 1 (July 1, 2024, through June 30, 2025) | ||
71152S - Semiannual Trend Problem Identification and Resolution | : (2) Unit 2 (July 1, 2024, through June 30, 2025) | ||
Semiannual Trend Review (Section 03.02) (1 Sample) | |||
(1) | ===EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)=== | ||
The inspectors reviewed the licensees corrective action program to identify potential | : (1) July 1, 2024, through June 30, 2025 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample) | ||
adverse trends that might be indicative of a more significant safety issue. The | : (1) July 1, 2024, through June 30, 2025 EP04: Emergency Response Facility and Equipment Readiness (ERFER) (IP Section 02.14) (1 Sample) | ||
inspectors performed an in-depth review of the licensees ability to identify procedure | : (1) January 1, 2025, through June 30, 2025 71152A - Annual Follow-up Problem Identification and Resolution | ||
quality issues, evaluate each occurrence, and implement corrective actions. The | |||
inspectors determined evidence of an emerging trend in this area, informed the | ===Annual Follow-up of Selected Issues (Section 03.03) (1 Sample)=== | ||
licensee of this trend, and documented an observation in the Inspection Results | The inspectors reviewed the licensees implementation of its corrective action program related to the following issues: | ||
section of this report. No issues of more than minor significance were identified. | : (1) Units 1 and 2, effectiveness of corrective actions relating to the diesel-driven fire pump repeated failure to start, on August 5, 2025 | ||
71153 - Follow-Up of Events and Notices of Enforcement Discretion | |||
Event Report (IP Section 03.02) (1 Sample) | ===71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02) (1 Sample)=== | ||
The inspectors evaluated the following licensee event reports (LERs) which can be | {{IP sample|IP=IP 71152|count=1}} | ||
accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx: | : (1) The inspectors reviewed the licensees corrective action program to identify potential adverse trends that might be indicative of a more significant safety issue. The inspectors performed an in-depth review of the licensees ability to identify procedure quality issues, evaluate each occurrence, and implement corrective actions. The inspectors determined evidence of an emerging trend in this area, informed the licensee of this trend, and documented an observation in the Inspection Results section of this report. No issues of more than minor significance were identified. | ||
(1) | |||
LER 05000313,05000368/2025-S001-00, Follow-up Report for a 10 CFR 73 Security | ===71153 - Follow-Up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02) (1 Sample)=== | ||
Report on January 31, 2025, (ML25091A100). The inspection conclusions | {{IP sample|IP=IP 71153|count=1}} | ||
associated with this LER are documented as a minor violation in the Inspection | The inspectors evaluated the following licensee event reports (LERs) which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx: | ||
Results section of this report. This LER is Closed. | : (1) LER 05000313,05000368/2025-S001-00, Follow-up Report for a 10 CFR 73 Security Report on January 31, 2025, (ML25091A100). The inspection conclusions associated with this LER are documented as a minor violation in the Inspection Results section of this report. This LER is Closed. | ||
Personnel Performance (IP Section 03.03) (1 Sample) | |||
(1) | ===Personnel Performance (IP Section 03.03) (1 Sample)=== | ||
The inspectors evaluated the Unit 1 reactor trip event, including operator and | : (1) The inspectors evaluated the Unit 1 reactor trip event, including operator and equipment performance, on September 24, 2025. | ||
equipment performance, on September 24, 2025. | |||
==INSPECTION RESULTS== | |||
Failure to Establish an Adequate Procedure for Diesel Fire Pump Maintenance Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000313,05000368/2025003-01 Open/Closed | |||
[H.12] - Avoid Complacency 71152A A self-revealed Green finding and associated non-cited violation of Unit 1 License Condition 2.C.(8) and Unit 2 License Condition 2.C.(3)(b) was identified when the licensee failed to establish an adequate procedure for maintenance of the diesel fire pump. | |||
Specifically, on January 7, 2025, April 4, 2025, and May 14, 2025, the starter motor for the diesel fire pump was installed without a spacer and subsequently failed to start the diesel fire pump. This occurred because Procedure OP-1307.004, Diesel Fire Pump Engine (K-5) | |||
Biannual Surveillance, Revision 16, provided no instructions regarding the starter motor spacer. | |||
=====Description:===== | |||
On January 7, 2025, the diesel fire pump starter motor was replaced. The starter spacer was inadvertently removed along with the starter. The replacement starter was installed in accordance with Procedure OP-1307.004, Diesel Fire Pump Engine (K-5) | |||
Biannual Surveillance, Revision 16. However, the starter spacer was not installed with the starter because the procedure did not direct installation of the spacer; this information is available from the diesel engine technical manual, TDC742 0080 1, Operation and Maintenance Manual for Cummins C Series Engines, Revision 2. The diesel fire pump passed subsequent tests until April 4, 2025, when it failed to start. The starter was replaced using the same procedure, again without the spacer, and the diesel fire pump passed testing. | |||
During the next surveillance test on May 8, 2025, the diesel fire pump failed to start. | During the next surveillance test on May 8, 2025, the diesel fire pump failed to start. | ||
manual TDC742 0080 1, Operation and Maintenance Manual for Cummins C Series | Following replacement of the starter, again without the spacer, the diesel fire pump failed to start on May 14, 2025. After a review of the removed starters, the licensee identified the starter spacer on the starter removed on January 7, 2025, and installed the starter spacer on the diesel fire pump with a new starter. The diesel fire pump passed subsequent testing. The inspectors noted that the electric fire pump, which can fully supply water to the fire suppression system for Unit 1 and Unit 2, was available during these times of unavailability of the diesel fire pump. | ||
Engines, Revision 2, in the procedure. | |||
Screening: The inspectors determined the performance deficiency was more than minor | Corrective Actions: The licensee installed the starter spacer on the starter and revised the procedure to install/remove the starter to include installation of the spacer. | ||
because it was associated with the Protection Against External Factors attribute of the | |||
Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure | Corrective Action References: Condition Reports CR-ANO-1-2025-00016, CR-ANO-C-2025-00584, CR-ANO-1-2025-00670, CR-ANO-1-2025-00696 | ||
the availability, reliability, and capability of systems that respond to initiating events to prevent | |||
undesirable consequences. Specifically, the inspectors determined the reliability of the diesel | =====Performance Assessment:===== | ||
fire pump, which responds to potential fire events to prevent fire damage of equipment | Performance Deficiency: The licensees failure to establish an adequate procedure for the maintenance of the diesel fire pump in accordance with the Unit 1 and Unit 2 fire protection license conditions was a performance deficiency. Specifically, Procedure OP-1307.004, Diesel Fire Pump Engine (K-5) Biannual Surveillance, Revision 16, did not include instructions for installing the starter motor spacer. This led to the starter motor being installed without the spacer on January 7, April 4, and May 14, 2025, and resulted in repeated failures of the diesel fire pump to start, which should have been prevented. The cause of the issue of concern was reasonably within the licensee's ability to foresee and correct because the licensee did not include information available from the diesel engine technical manual TDC742 0080 1, Operation and Maintenance Manual for Cummins C Series Engines, Revision 2, in the procedure. | ||
important for safe shutdown, was adversely affected due to the multiple failures. | |||
Significance: The inspectors assessed the significance of the finding using IMC 0609 | Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Protection Against External Factors attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the inspectors determined the reliability of the diesel fire pump, which responds to potential fire events to prevent fire damage of equipment important for safe shutdown, was adversely affected due to the multiple failures. | ||
Appendix F, Fire Protection and Post - Fire Safe Shutdown SDP. Using IMC 0609 | |||
Appendix F, Attachment 1, Fire Protection Significance Determination Process Worksheets, | Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix F, Fire Protection and Post - Fire Safe Shutdown SDP. Using IMC 0609 Appendix F, Attachment 1, Fire Protection Significance Determination Process Worksheets, revised January 1, 2025, the inspectors assigned the finding category of Fire Water Supply. | ||
revised January 1, 2025, the inspectors assigned the finding category of Fire Water Supply. | |||
The inspectors determined that the finding was of very low safety significance (Green) | The inspectors determined that the finding was of very low safety significance (Green)because adequate fire water capacity would still be available from the permanent electric fire pump for protection of equipment important to safe shutdown in the most limiting location onsite. | ||
because adequate fire water capacity would still be available from the permanent electric fire | |||
pump for protection of equipment important to safe shutdown in the most limiting location | Cross-Cutting Aspect: H.12 - Avoid Complacency: Individuals recognize and plan for the possibility of mistakes, latent issues, and inherent risk, even while expecting successful outcomes. Individuals implement appropriate error reduction tools. Specifically, the licensee failed to recognize the difference between removed and installed components and failed to use vendor documentation, which is referenced in the procedure, after repeated failures. This resulted in delayed effective corrective actions and repeated failures of the diesel fire pump to start. | ||
onsite. | |||
Cross-Cutting Aspect: H.12 - Avoid Complacency: Individuals recognize and plan for the | =====Enforcement:===== | ||
possibility of mistakes, latent issues, and inherent risk, even while expecting successful | Violation: Arkansas Nuclear One, Unit 1 License Condition 2.C.(8) states, in part, the licensee shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment request dated January 29, 2014. The license amendment request dated January 29, 2014, Attachment A, Section 3.2.3, Procedures (1), states, in part, procedures are established for inspection, testing, and maintenance of fire protection systems. | ||
outcomes. Individuals implement appropriate error reduction tools. Specifically, the licensee | |||
failed to recognize the difference between removed and installed components and failed to | Arkansas Nuclear One, Unit 2 License Condition 2.C.(3)(b) states, in part, the licensee shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment request dated December 17, 2012. The license amendment request dated December 17, 2012, Attachment A, Section 3.2.3, Procedures (1), states, in part, procedures are established for inspection, testing, and maintenance of fire protection systems. | ||
use vendor documentation, which is referenced in the procedure, after repeated failures. This | |||
resulted in delayed effective corrective actions and repeated failures of the diesel fire pump to | Procedure OP-1307.004, Diesel Fire Pump Engine (K-5) Biannual Surveillance, revision 16, is one such procedure that the licensee uses to establish for inspection, testing, and maintenance of fire protection systems. | ||
start. | |||
Enforcement: | Contrary to the above, prior to July 15, 2025, the licensee failed to maintain in effect all provisions of the approved fire protection program, as specified in the license amendment request dated January 29, 2014, for Unit 1, and December 17, 2012, for Unit 2 by not having adequate procedures for maintenance of fire protection systems. Specifically, on January 7, April 4, and May 14, 2025, the starter motor for the diesel fire pump was installed without a required spacer because the inspection, testing, and maintenance procedure OP-1307.004, Diesel Fire Pump Engine (K-5) Biannual Surveillance, revision 16, failed to direct installation of the starter motor spacer. Subsequently, the diesel fire pump failed to start multiple times due to the missing spacer. | ||
Violation: Arkansas Nuclear One, Unit 1 License Condition 2.C.(8) states, in part, the licensee | |||
shall implement and maintain in effect all provisions of the approved fire protection program | Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy. | ||
that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license | |||
amendment request dated January 29, 2014. The license amendment request dated | Observation: Negative Trend in Prioritizing and Addressing Procedure Improvements 71152S The inspectors performed a review of the licensees Procedure Improvement Form (PIF)database with a focus on procedure improvements that did not rise to the level of tracking in the corrective action program. Procedural improvements prevent human errors that could adversely impact safety. | ||
January 29, 2014, Attachment A, Section 3.2.3, Procedures (1), states, in part, procedures | |||
are established for inspection, testing, and maintenance of fire protection systems. | The inspectors noted that the licensees guidance for procedure revisions, OP-1000.006, Procedure Control, Revision 76, Step 6.3.6 states, in part, that procedure improvements will generally be completed within a year. However, the inspectors counted the following open PIFs: 1 from 2016, 51 from 2018, 47 from 2019, 91 from 2020, 136 from 2021, 209 from 2022, and 336 from 2023. The inspector counted a total of 871 PIFs open for more than a year. | ||
Arkansas Nuclear One, Unit 2 License Condition 2.C.(3)(b) states, in part, the licensee shall | |||
implement and maintain in effect all provisions of the approved fire protection program that | The inspectors notified the licensee about the lack of prioritization and timely procedure revisions. The licensee documented the observations in Condition Report CR-ANO-C-2025-00861. Once the inspectors notified the licensee about the number of open PIFs, the licensee subsequently determined that many of the procedure improvement forms had been incorporated into procedures, but the forms had not been closed. However, the inspectors identified other examples of PIFs that should have been prioritized and incorporated into procedures earlier. The licensee initiated actions to prioritize and close PIFs in a timely manner. | ||
comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment | |||
request dated December 17, 2012. The license amendment request dated | |||
December 17, 2012, Attachment A, Section 3.2.3, Procedures (1), states, in part, | |||
procedures are established for inspection, testing, and maintenance of fire protection | |||
systems. | |||
Procedure OP-1307.004, Diesel Fire Pump Engine (K-5) Biannual Surveillance, revision 16, | |||
is one such procedure that the licensee uses to establish for inspection, testing, and | |||
maintenance of fire protection systems. | |||
Contrary to the above, prior to July 15, 2025, the licensee failed to maintain in effect all | |||
provisions of the approved fire protection program, as specified in the license amendment | |||
request dated January 29, 2014, for Unit 1, and December 17, 2012, for Unit 2 by not having | |||
See the minor violation documented in this report associated with this observation. | See the minor violation documented in this report associated with this observation. | ||
Enforcement: Unit 1 Technical Specification 5.4.1.a requires, in part, written procedures shall | Minor Violation 71152S Minor Violation: For a description of the issue, see the Observation in this Inspection Report titled Negative Trend in Prioritizing and Addressing Procedure Improvements. | ||
be established, implemented, and maintained covering the applicable procedures | |||
recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Unit 2 | Screening: The inspectors determined that this violation was minor because there was not a human error within the last 3 years that was caused in part by lack of PIF processing. In addition, the inspectors did not find any open PIFs that would most likely lead to a human error that would adversely impact the cornerstones found in IMC 0612 Appendix B, Issue Screening Directions, dated May 28, 2025. The licensee has taken actions to restore compliance, as detailed in the Observation. | ||
Technical Specification 6.4.1.a requires, in part, written procedures shall be established, | |||
implemented, and maintained covering the applicable procedures recommended in | =====Enforcement:===== | ||
Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Regulatory Guide 1.33, | Unit 1 Technical Specification 5.4.1.a requires, in part, written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Unit 2 Technical Specification 6.4.1.a requires, in part, written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Regulatory Guide 1.33, Revision 2, Appendix A, February 1978, Section 1.a, recommends Procedure Review and Approval. Procedure OP-1000.006, Procedure Control, Revision 76, Step 6.3.6, states, in part, if a PIF is written, to determine the PIF priority. The step gives guidance to close the forms in a timely manner, depending on their priority; PIFs should typically be closed in less than 1 year. Procedure OP-1000.006, Step 6.6, states that when a procedure is revised, then initiate action to close out the PIF. Contrary to the above, the licensee failed to implement the procedure review and approval procedure required by technical specifications in Regulatory Guide 1.33. Specifically, the licensee failed to determine PIF priority for most PIFs and failed to close most PIFs within 1 year. The licensee also failed to initiate action to close out the PIFs when the procedures were revised. | ||
Revision 2, Appendix A, February 1978, Section 1.a, recommends Procedure Review and | |||
Approval. Procedure OP-1000.006, Procedure Control, Revision 76, Step 6.3.6, states, in | The licensee has taken actions to restore compliance. This failure to comply with technical specifications constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy. | ||
part, if a PIF is written, to determine the PIF priority. The step gives guidance to close the | |||
forms in a timely manner, depending on their priority; PIFs should typically be closed in less | Minor Violation 71153 Minor Violation: The inspector reviewed LER 05000313, 05000368/2025-S001-00 (ML25091A100) dated April 1, 2025, regarding an actual entry of unauthorized personnel into the protected area (PA). In this LER, the licensee reported that three employees had retained their unescorted access to the site despite having expired plant access training. This training covers individual fitness-for-duty (FFD) and behavior observation program (BOP)responsibilities and must be completed on a nominal 12-month frequency for individuals maintaining unescorted access to the PA. | ||
than 1 year. Procedure OP-1000.006, Step 6.6, states that when a procedure is revised, then | |||
initiate action to close out the PIF. Contrary to the above, the licensee failed to implement the | Of the three individuals, two made entries into the licensees PA unescorted without meeting all the requirements for maintaining unescorted access. The licensee reported this as an actual entry of unauthorized personnel into the PA. The inspector determined that the individuals had received initial FFD and BOP training and were still subject to other required elements of the licensees access authorization program that provide assurance of trustworthiness and reliability. | ||
procedure review and approval procedure required by technical specifications in Regulatory | |||
Guide 1.33. Specifically, the licensee failed to determine PIF priority for most PIFs and failed | |||
to close most PIFs within 1 year. The licensee also failed to initiate action to close out the | |||
PIFs when the procedures were revised. | |||
The licensee has taken actions to restore compliance. This failure to comply with technical | |||
specifications constitutes a minor violation that is not subject to enforcement action in | |||
accordance with the NRCs Enforcement Policy. | |||
Minor Violation | |||
71153 | |||
Minor Violation: The inspector reviewed LER 05000313, 05000368/2025-S001-00 | |||
(ML25091A100) dated April 1, 2025, regarding an actual entry of unauthorized personnel into | |||
the protected area (PA). In this LER, the licensee reported that three employees had retained | |||
their unescorted access to the site despite having expired plant access training. This training | |||
covers individual fitness-for-duty (FFD) and behavior observation program (BOP) | |||
responsibilities and must be completed on a nominal 12-month frequency for individuals | |||
maintaining unescorted access to the PA. | |||
Of the three individuals, two made entries into the licensees PA unescorted without meeting | |||
all the requirements for maintaining unescorted access. The licensee reported this as an | |||
actual entry of unauthorized personnel into the PA. The inspector determined that the | |||
individuals had received initial FFD and BOP training and were still subject to other required | |||
elements of the licensees access authorization program that provide assurance of | |||
trustworthiness and reliability. | |||
Title 10 CFR 73.56(f)(2)(ii) states, in part, Behavioral observation training must be: | Title 10 CFR 73.56(f)(2)(ii) states, in part, Behavioral observation training must be: | ||
(C) Maintained in a current status during any period of time an individual possesses | (C) Maintained in a current status during any period of time an individual possesses unescorted access or unescorted access authorization in accordance with paragraph (f)(2)(iv)of this section. | ||
unescorted access or unescorted access authorization in accordance with paragraph (f)(2)(iv) | |||
of this section. | |||
individuals failed to complete behavior observation refresher training within a nominal 12- | Title 10 CFR 73.56(f)(2)(iv) states, in part, Individuals shall complete refresher training on a nominal 12-month frequency, or more frequently where the need is indicated. | ||
month frequency. Two of the individuals made entry into the sites protected area. | |||
Screening: The inspectors determined the performance deficiency was minor. The inspector | Contrary to the above, from November 29, 2024, to February 6, 2025, the licensee failed to ensure that behavioral observation training was maintained in a current status during any period of time an individual possesses unescorted access or unescorted access authorization. Specifically, three individuals with unescorted access to Arkansas Nuclear One were allowed to retain their access to the site despite having expired training. These individuals failed to complete behavior observation refresher training within a nominal 12-month frequency. Two of the individuals made entry into the sites protected area. | ||
determined the performance deficiency was minor because it could not be viewed as a | |||
precursor to a significant event, would not have the potential to lead to a more significant | Screening: The inspectors determined the performance deficiency was minor. The inspector determined the performance deficiency was minor because it could not be viewed as a precursor to a significant event, would not have the potential to lead to a more significant safety concern if left uncorrected, and did not adversely affect the security cornerstone objective. | ||
safety concern if left uncorrected, and did not adversely affect the security cornerstone | |||
objective. | =====Enforcement:===== | ||
Enforcement: This failure to comply with 10 CFR 73.56(f)(2)(ii) constitutes a minor violation | This failure to comply with 10 CFR 73.56(f)(2)(ii) constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy. | ||
that is not subject to enforcement action in accordance with the NRCs Enforcement Policy. | |||
EXIT MEETINGS AND DEBRIEFS | ==EXIT MEETINGS AND DEBRIEFS== | ||
The inspectors verified no proprietary information was retained or documented in this report. | The inspectors verified no proprietary information was retained or documented in this report. | ||
* | * On July 10, 2025, the inspectors presented the biennial requalification inspection results to Joey Fields, Operations Training Superintendent, and other members of the licensee staff. | ||
On July 10, 2025, the inspectors presented the biennial requalification inspection results | * On July 29, 2025, the inspectors presented the requalification examination inspection results to Chris Norwood, Regulatory Exam Author, and other members of the licensee staff. | ||
to Joey Fields, Operations Training Superintendent, and other members of the licensee | * On August 7, 2025, the inspectors presented the emergency preparedness program inspection results to Doug Pehrson, Site Vice President, and other members of the licensee staff. | ||
staff. | * On December 4, 2025, the inspectors presented the integrated inspection results to Joshua Toben, Manager of Regulatory Assurance and Emergency Planning, and other members of the licensee staff. | ||
* | |||
On July 29, 2025, the inspectors presented the requalification examination inspection | =DOCUMENTS REVIEWED= | ||
results to Chris Norwood, Regulatory Exam Author, and other members of the licensee | |||
staff. | |||
* | |||
On August 7, 2025, the inspectors presented the emergency preparedness program | |||
inspection results to Doug Pehrson, Site Vice President, and other members of the | |||
licensee staff. | |||
* | |||
On December 4, 2025, the inspectors presented the integrated inspection results to | |||
Joshua Toben, Manager of Regulatory Assurance and Emergency Planning, and other | |||
members of the licensee staff. | |||
Inspection | Inspection | ||
Procedure | Procedure | ||
| Line 641: | Line 348: | ||
M-2232, Sheet 1 | M-2232, Sheet 1 | ||
Piping and Instrument Diagram Safety Injection System | Piping and Instrument Diagram Safety Injection System | ||
23 | |||
71111.04 | 71111.04 | ||
Drawings | Drawings | ||
| Line 647: | Line 354: | ||
Piping and Instrument Diagram Units 1 and 2 Control and | Piping and Instrument Diagram Units 1 and 2 Control and | ||
Computer Rooms HVAC | Computer Rooms HVAC | ||
71111.04 | 71111.04 | ||
Drawings | Drawings | ||
| Line 668: | Line 374: | ||
OP-2104.040 | OP-2104.040 | ||
LPSI System Operations | LPSI System Operations | ||
71111.04 | 71111.04 | ||
Procedures | Procedures | ||
OP-2104,007 | OP-2104,007 | ||
Control Room Emergency Air Conditioning and Ventilation | Control Room Emergency Air Conditioning and Ventilation | ||
71111.04 | 71111.04 | ||
Work Orders | Work Orders | ||
| Line 682: | Line 386: | ||
FP-2104 | FP-2104 | ||
Fire Zone Ground Floor Plan EL 354-0 | Fire Zone Ground Floor Plan EL 354-0 | ||
71111.05 | 71111.05 | ||
Engineering | Engineering | ||
| Line 689: | Line 392: | ||
FQ | FQ | ||
ANO-1 Fire PRA Integration and Quantification | ANO-1 Fire PRA Integration and Quantification | ||
71111.05 | 71111.05 | ||
Engineering | Engineering | ||
| Line 696: | Line 398: | ||
Arkansas Nuclear One Unit 2 Fire Probabilistic Risk | Arkansas Nuclear One Unit 2 Fire Probabilistic Risk | ||
Assessment Summary Report | Assessment Summary Report | ||
71111.05 | 71111.05 | ||
Procedures | Procedures | ||
EN-DC-161 | EN-DC-161 | ||
Control of Combustibles | Control of Combustibles | ||
71111.05 | 71111.05 | ||
Procedures | Procedures | ||
EN-OP-125 | EN-OP-125 | ||
Fire Brigade Drills | Fire Brigade Drills | ||
71111.05 | 71111.05 | ||
Procedures | Procedures | ||
PFP-U1 | PFP-U1 | ||
Unit 1 Prefire Plans | Unit 1 Prefire Plans | ||
71111.05 | 71111.05 | ||
Procedures | Procedures | ||
PFP-U2 | PFP-U2 | ||
Unit 2 Prefire Plans | Unit 2 Prefire Plans | ||
71111.06 | 71111.06 | ||
Engineering | Engineering | ||
| Line 723: | Line 420: | ||
Service Water System Crossover Valves Logic and Fire | Service Water System Crossover Valves Logic and Fire | ||
Protection | Protection | ||
71111.06 | 71111.06 | ||
Miscellaneous | Miscellaneous | ||
| Line 729: | Line 425: | ||
AS | AS | ||
ANO-1 PRA - Internal Flooding Accident Sequence Analysis | ANO-1 PRA - Internal Flooding Accident Sequence Analysis | ||
71111.06 | 71111.06 | ||
Procedures | Procedures | ||
OP-1203.030 | OP-1203.030 | ||
Loss of Service Water | Loss of Service Water | ||
71111.06 | 71111.06 | ||
Procedures | Procedures | ||
OP-1203.054 | OP-1203.054 | ||
Internal Flooding | Internal Flooding | ||
71111.07A | 71111.07A | ||
Procedures | Procedures | ||
EN-DC-316 | EN-DC-316 | ||
Heat Exchanger Performance and Condition Monitoring | Heat Exchanger Performance and Condition Monitoring | ||
71111.07A | 71111.07A | ||
Procedures | Procedures | ||
| Line 750: | Line 442: | ||
001 | 001 | ||
Arkansas Nuclear One (ANO) Heat Exchanger Program | Arkansas Nuclear One (ANO) Heat Exchanger Program | ||
71111.07A | 71111.07A | ||
Work Orders | Work Orders | ||
WO | WO | ||
2779637, 52998309 | |||
71111.11A | 71111.11A | ||
Miscellaneous | Miscellaneous | ||
| Line 761: | Line 452: | ||
Examination Results | Examination Results | ||
08/13/2025 | 08/13/2025 | ||
Inspection | Inspection | ||
Procedure | Procedure | ||
| Line 780: | Line 470: | ||
CR-ANO- | CR-ANO- | ||
1-2024-02133, 2-2024-01027, C-2024-00129, C-2024- | 1-2024-02133, 2-2024-01027, C-2024-00129, C-2024- | ||
2132, C-2025-00109 | |||
71111.11B | 71111.11B | ||
Miscellaneous | Miscellaneous | ||
| Line 790: | Line 480: | ||
Miscellaneous | Miscellaneous | ||
ANO1-PEST-24- | ANO1-PEST-24- | ||
Simulator Post Event Test - RCP Loss Runback Without | Simulator Post Event Test - RCP Loss Runback Without | ||
RCP Trip | RCP Trip | ||
| Line 796: | Line 485: | ||
71111.11B | 71111.11B | ||
Miscellaneous | Miscellaneous | ||
25 Operating Test - Week 4 | |||
06/30/2025 | 06/30/2025 | ||
71111.11B | 71111.11B | ||
Miscellaneous | Miscellaneous | ||
25 Operating Test - Week 5 | |||
07/07/2025 | 07/07/2025 | ||
71111.11B | 71111.11B | ||
Miscellaneous | Miscellaneous | ||
25 Scenario Malfunction Cross Check | |||
71111.11B | 71111.11B | ||
Miscellaneous | Miscellaneous | ||
25 JPM Overlap Tracker | |||
07/07/2025 | 07/07/2025 | ||
71111.11B | 71111.11B | ||
Miscellaneous | Miscellaneous | ||
ANO-1 Open Simulator Differences | ANO-1 Open Simulator Differences | ||
2/7/2025 | |||
71111.11B | 71111.11B | ||
Miscellaneous | Miscellaneous | ||
| Line 852: | Line 540: | ||
EXAMSEC | EXAMSEC | ||
Simulator Exam Security Guidelines | Simulator Exam Security Guidelines | ||
71111.11B | 71111.11B | ||
Procedures | Procedures | ||
EN-OP-115-02 | EN-OP-115-02 | ||
Control Room Conduct and Access Control | Control Room Conduct and Access Control | ||
71111.11B | 71111.11B | ||
Procedures | Procedures | ||
| Line 863: | Line 549: | ||
Activation and Deactivation of Licenses, and Maintaining | Activation and Deactivation of Licenses, and Maintaining | ||
Active License Status | Active License Status | ||
71111.11B | 71111.11B | ||
Procedures | Procedures | ||
EN-TQ-201 | EN-TQ-201 | ||
Systematic Approach to Training Process | Systematic Approach to Training Process | ||
71111.11B | 71111.11B | ||
Procedures | Procedures | ||
EN-TQ-202 | EN-TQ-202 | ||
Simulator Configuration Control | Simulator Configuration Control | ||
71111.11B | 71111.11B | ||
Procedures | Procedures | ||
EN-TQ-210 | EN-TQ-210 | ||
Conduct of Simulator Training | Conduct of Simulator Training | ||
71111.11B | 71111.11B | ||
Procedures | Procedures | ||
| Line 884: | Line 566: | ||
Licensed Operator Requalification Annual and Biennial | Licensed Operator Requalification Annual and Biennial | ||
Exam Development | Exam Development | ||
71111.11Q | 71111.11Q | ||
Miscellaneous | Miscellaneous | ||
| Line 901: | Line 582: | ||
SES-1-047 | SES-1-047 | ||
Unit 1 Dynamic Exam Scenario | Unit 1 Dynamic Exam Scenario | ||
71111.11Q | 71111.11Q | ||
Miscellaneous | Miscellaneous | ||
SES-2-026 | SES-2-026 | ||
Unit 2 Dynamic Exam Scenario | Unit 2 Dynamic Exam Scenario | ||
71111.11Q | 71111.11Q | ||
Miscellaneous | Miscellaneous | ||
SES-2-030 | SES-2-030 | ||
Unit 2 Dynamic Exam Scenario | Unit 2 Dynamic Exam Scenario | ||
71111.11Q | 71111.11Q | ||
Procedures | Procedures | ||
OP-1106.006 | OP-1106.006 | ||
Emergency Feedwater Pump Operation | Emergency Feedwater Pump Operation | ||
2 | |||
71111.11Q | 71111.11Q | ||
Procedures | Procedures | ||
OP-2104.007 | OP-2104.007 | ||
Control Room Emergency Air Conditioning and Ventilation | Control Room Emergency Air Conditioning and Ventilation | ||
71111.11Q | 71111.11Q | ||
Procedures | Procedures | ||
OP-2104.039 | OP-2104.039 | ||
HPSI System Operation | HPSI System Operation | ||
71111.11Q | 71111.11Q | ||
Work Orders | Work Orders | ||
| Line 941: | Line 617: | ||
OP-1105.001 | OP-1105.001 | ||
NI & RPS Operating Procedure | NI & RPS Operating Procedure | ||
71111.12 | 71111.12 | ||
Procedures | Procedures | ||
OP-2104.028 | OP-2104.028 | ||
Component Cooling Water System Operations | Component Cooling Water System Operations | ||
71111.12 | 71111.12 | ||
Procedures | Procedures | ||
OP-2203.012-L | OP-2203.012-L | ||
Annunciator 2K12 Corrective Action | Annunciator 2K12 Corrective Action | ||
71111.12 | 71111.12 | ||
Procedures | Procedures | ||
OP-2203.016 | OP-2203.016 | ||
Excess RCS Leakage | Excess RCS Leakage | ||
71111.12 | 71111.12 | ||
Procedures | Procedures | ||
OP-2203.025 | OP-2203.025 | ||
RCP Emergencies | RCP Emergencies | ||
71111.12 | 71111.12 | ||
Work Orders | Work Orders | ||
WO | WO | ||
298267 | |||
71111.15 | 71111.15 | ||
Corrective Action | Corrective Action | ||
| Line 978: | Line 649: | ||
2VUC-1D Cooling Coil Mechanical Clamp ASME Section XI | 2VUC-1D Cooling Coil Mechanical Clamp ASME Section XI | ||
Code Repair TMOD | Code Repair TMOD | ||
71111.15 | 71111.15 | ||
Miscellaneous | Miscellaneous | ||
| Line 984: | Line 654: | ||
Installation and Operation Manual for Shutdown Solenoid for | Installation and Operation Manual for Shutdown Solenoid for | ||
UG Governor | UG Governor | ||
71111.15 | 71111.15 | ||
Procedures | Procedures | ||
| Line 990: | Line 659: | ||
Review of Potentially Hazardous Seismic Category II/I | Review of Potentially Hazardous Seismic Category II/I | ||
Situations | Situations | ||
71111.15 | 71111.15 | ||
Work Orders | Work Orders | ||
| Line 1,004: | Line 672: | ||
OP-1416.041 | OP-1416.041 | ||
Magne-Blast Circuit Breaker Overhaul | Magne-Blast Circuit Breaker Overhaul | ||
71111.24 | 71111.24 | ||
Procedures | Procedures | ||
OP-1416.052 | OP-1416.052 | ||
Unit 1 & 2 IAC66K Relay Test Instructions | Unit 1 & 2 IAC66K Relay Test Instructions | ||
71111.24 | 71111.24 | ||
Procedures | Procedures | ||
OP-2104.002 | OP-2104.002 | ||
Chemical and Volume Control | Chemical and Volume Control | ||
71111.24 | 71111.24 | ||
Procedures | Procedures | ||
OP-2104.039 | OP-2104.039 | ||
HPSI System Operation | HPSI System Operation | ||
71111.24 | 71111.24 | ||
Procedures | Procedures | ||
OP-2304.040 | OP-2304.040 | ||
Unit 2 Plant Protection System Channel D Test | Unit 2 Plant Protection System Channel D Test | ||
71111.24 | 71111.24 | ||
Procedures | Procedures | ||
| Line 1,042: | Line 705: | ||
WO | WO | ||
53024752, 54050458, 54077626, 54120201, 54159480, | 53024752, 54050458, 54077626, 54120201, 54159480, | ||
264720, 54279261 | |||
71114.02 | 71114.02 | ||
Miscellaneous | Miscellaneous | ||
| Line 1,066: | Line 729: | ||
71114.02 | 71114.02 | ||
Miscellaneous | Miscellaneous | ||
25 EIB Locations | |||
71114.02 | 71114.02 | ||
Miscellaneous | Miscellaneous | ||
| Line 1,077: | Line 740: | ||
Miscellaneous | Miscellaneous | ||
Form 1903.004-K | Form 1903.004-K | ||
23 Alert and Notification System Oversight Activity | |||
10/30/2023 | 10/30/2023 | ||
71114.02 | 71114.02 | ||
Miscellaneous | Miscellaneous | ||
Form 1903.004-K | Form 1903.004-K | ||
24 Alert and Notification System Oversight Activity | |||
11/14/2024 | 11/14/2024 | ||
71114.02 | 71114.02 | ||
Procedures | Procedures | ||
OP-1903.004 | OP-1903.004 | ||
Alert and Notification System (ANS) Monitoring | Alert and Notification System (ANS) Monitoring | ||
Requirements | Requirements | ||
71114.03 | 71114.03 | ||
Miscellaneous | Miscellaneous | ||
| Line 1,098: | Line 759: | ||
Miscellaneous | Miscellaneous | ||
Emergency Response Organization Roster | Emergency Response Organization Roster | ||
2/31/2023 | |||
71114.03 | 71114.03 | ||
Miscellaneous | Miscellaneous | ||
| Line 1,112: | Line 773: | ||
Miscellaneous | Miscellaneous | ||
Emergency Response Organization Roster | Emergency Response Organization Roster | ||
2/28/2024 | |||
71114.03 | 71114.03 | ||
Miscellaneous | Miscellaneous | ||
| Line 1,133: | Line 794: | ||
- 1st Quarter 2025 | - 1st Quarter 2025 | ||
- 2nd Quarter 2025 | - 2nd Quarter 2025 | ||
Inspection | Inspection | ||
Procedure | Procedure | ||
| Line 1,145: | Line 805: | ||
EN-EP-306 | EN-EP-306 | ||
Drills and Exercises | Drills and Exercises | ||
71114.03 | 71114.03 | ||
Procedures | Procedures | ||
EN-EP-310 | EN-EP-310 | ||
Emergency Response Organization Notification System | Emergency Response Organization Notification System | ||
71114.03 | 71114.03 | ||
Procedures | Procedures | ||
EN-EP-603 | EN-EP-603 | ||
Emergency Notifications | Emergency Notifications | ||
71114.03 | 71114.03 | ||
Procedures | Procedures | ||
EN-EP-801 | EN-EP-801 | ||
Emergency Response Organization | Emergency Response Organization | ||
71114.04 | 71114.04 | ||
Miscellaneous | Miscellaneous | ||
CFR 50.54(Q) Evaluation - OP-1903.010 | |||
71114.04 | 71114.04 | ||
Miscellaneous | Miscellaneous | ||
CFR 50.54(Q) Evaluation - OP-1903.010 | |||
71114.04 | 71114.04 | ||
Miscellaneous | Miscellaneous | ||
CFR 50.54(Q) Evaluation - OP-1903.010 | |||
71114.04 | 71114.04 | ||
Miscellaneous | Miscellaneous | ||
CFR 50.54(Q) Evaluation - OP-1903.010-U1WC | |||
71114.04 | 71114.04 | ||
Miscellaneous | Miscellaneous | ||
CFR 50.54(Q) Evaluation - OP-1903.010-U1WC | |||
71114.04 | 71114.04 | ||
Miscellaneous | Miscellaneous | ||
CFR 50.54(Q) Evaluation - OP-1903.010-U2WC | |||
71114.04 | 71114.04 | ||
Miscellaneous | Miscellaneous | ||
CFR 50.54(Q) Evaluation - OP-1903.010-U2WC | |||
71114.04 | 71114.04 | ||
Miscellaneous | Miscellaneous | ||
CFR 50.54(Q) Screening - OP-1903.011-Z | |||
71114.04 | 71114.04 | ||
Miscellaneous | Miscellaneous | ||
CFR 50.54(Q) Screening - OP-1903.060 | |||
71114.04 | 71114.04 | ||
Miscellaneous | Miscellaneous | ||
CFR 50.54(Q) Screening - OP-1903.068 | |||
71114.04 | 71114.04 | ||
Miscellaneous | Miscellaneous | ||
CFR 50.54(Q) Screening - OP-1903.079 | |||
71114.04 | 71114.04 | ||
Miscellaneous | Miscellaneous | ||
CFR 50.54(Q) Evaluation - 1904.002 | |||
71114.04 | 71114.04 | ||
Miscellaneous | Miscellaneous | ||
CFR 50.54(Q) Screening - 1903.011-Y | |||
71114.04 | 71114.04 | ||
Procedures | Procedures | ||
EN-EP-305 | EN-EP-305 | ||
Emergency Planning 10 CFR 50.54(q) Review Program | Emergency Planning 10 CFR 50.54(q) Review Program | ||
71114.05 | 71114.05 | ||
Corrective Action | Corrective Action | ||
| Line 1,224: | Line 866: | ||
C-2024-00607, C-2024-01425, C-2024-01742, C-2024- | C-2024-00607, C-2024-01425, C-2024-01742, C-2024- | ||
01824, C-2024-01917, C-2024-02124, C-2024-02129, C- | 01824, C-2024-01917, C-2024-02124, C-2024-02129, C- | ||
25-00214, C-2025-00667, C-2025-00916, C-2025-00946, | |||
C-2025-00966, C-2025-00967, C-2025-00968 | C-2025-00966, C-2025-00967, C-2025-00968 | ||
71114.05 | 71114.05 | ||
| Line 1,232: | Line 874: | ||
71114.05 | 71114.05 | ||
Miscellaneous | Miscellaneous | ||
23 Onsite Medical Drill | |||
11/08/2023 | 11/08/2023 | ||
71114.05 | 71114.05 | ||
| Line 1,251: | Line 893: | ||
71114.05 | 71114.05 | ||
Miscellaneous | Miscellaneous | ||
24 Onsite Medical Drill | |||
08/26/2024 | 08/26/2024 | ||
71114.05 | 71114.05 | ||
| Line 1,268: | Line 910: | ||
Miscellaneous | Miscellaneous | ||
NIOS/Quality Assurance Audit of Emergency Preparedness | NIOS/Quality Assurance Audit of Emergency Preparedness | ||
2/18/2025 | |||
Inspection | Inspection | ||
Procedure | Procedure | ||
| Line 1,284: | Line 925: | ||
Off-Site Agencies Interface Interview Questionnaire - Pope | Off-Site Agencies Interface Interview Questionnaire - Pope | ||
County OEM | County OEM | ||
2/18/2025 | |||
71114.05 | 71114.05 | ||
Miscellaneous | Miscellaneous | ||
| Line 1,290: | Line 931: | ||
Off-Site Agencies Interface Interview Questionnaire - Pope | Off-Site Agencies Interface Interview Questionnaire - Pope | ||
County Judge | County Judge | ||
2/18/2025 | |||
71114.05 | 71114.05 | ||
Miscellaneous | Miscellaneous | ||
| Line 1,296: | Line 937: | ||
Off-Site Agencies Interface Interview Questionnaire - | Off-Site Agencies Interface Interview Questionnaire - | ||
Arkansas State Department of Health | Arkansas State Department of Health | ||
2/18/2025 | |||
71114.05 | 71114.05 | ||
Miscellaneous | Miscellaneous | ||
| Line 1,302: | Line 943: | ||
Off-Site Agencies Interface Interview Questionnaire - Logan | Off-Site Agencies Interface Interview Questionnaire - Logan | ||
County Emergency Management | County Emergency Management | ||
2/18/2025 | |||
71114.05 | 71114.05 | ||
Miscellaneous | Miscellaneous | ||
| Line 1,308: | Line 949: | ||
Off-Site Agencies Interface Interview Questionnaire - | Off-Site Agencies Interface Interview Questionnaire - | ||
Johnson Co Dept of Emergency Management | Johnson Co Dept of Emergency Management | ||
2/18/2025 | |||
71114.05 | 71114.05 | ||
Miscellaneous | Miscellaneous | ||
KLD - 1402 | KLD - 1402 | ||
24 Population Update Analysis | |||
03/26/2024 | 03/26/2024 | ||
71114.05 | 71114.05 | ||
Miscellaneous | Miscellaneous | ||
KLD TR - 1312 | KLD TR - 1312 | ||
23 Population Update Analysis | |||
04/03/2023 | 04/03/2023 | ||
71114.05 | 71114.05 | ||
| Line 1,323: | Line 964: | ||
KLD TR - 2025 - | KLD TR - 2025 - | ||
1470 | 1470 | ||
25 Population Update Analysis | |||
04/02/2025 | 04/02/2025 | ||
71114.05 | 71114.05 | ||
| Line 1,335: | Line 976: | ||
EN-LI-102 | EN-LI-102 | ||
Corrective Action Program | Corrective Action Program | ||
71114.05 | 71114.05 | ||
Work Orders | Work Orders | ||
| Line 1,355: | Line 995: | ||
OP-1903.010 | OP-1903.010 | ||
Emergency Action Level Classification | Emergency Action Level Classification | ||
71151 | 71151 | ||
Calculations | Calculations | ||
| Line 1,362: | Line 1,001: | ||
ANO Mitigating System Performance Indicator Reliability | ANO Mitigating System Performance Indicator Reliability | ||
and Unavailability Inputs and Guidelines | and Unavailability Inputs and Guidelines | ||
71151 | 71151 | ||
Corrective Action | Corrective Action | ||
| Line 1,372: | Line 1,010: | ||
2nd Qtr 2025 Signed KPI Sheets | 2nd Qtr 2025 Signed KPI Sheets | ||
07/02/2025 | 07/02/2025 | ||
Inspection | Inspection | ||
Procedure | Procedure | ||
| Line 1,412: | Line 1,049: | ||
EN-LI-114 | EN-LI-114 | ||
Regulatory Performance Indicator Process | Regulatory Performance Indicator Process | ||
71152A | 71152A | ||
Corrective Action | Corrective Action | ||
| Line 1,423: | Line 1,059: | ||
TDC742 0050 | TDC742 0050 | ||
Instruction Manual for NH/NT Diesel Engine | Instruction Manual for NH/NT Diesel Engine | ||
71152A | 71152A | ||
Miscellaneous | Miscellaneous | ||
TDC742 0080 | TDC742 0080 | ||
Parts Catalog for Cummins Fire Pump Engine (K-5) | Parts Catalog for Cummins Fire Pump Engine (K-5) | ||
71152A | 71152A | ||
Procedures | Procedures | ||
OP-1104.032 | OP-1104.032 | ||
Fire Protection Systems | Fire Protection Systems | ||
71152A | 71152A | ||
Procedures | Procedures | ||
| Line 1,448: | Line 1,081: | ||
OP-1000.006 | OP-1000.006 | ||
Procedure Control | Procedure Control | ||
71153 | 71153 | ||
Corrective Action | Corrective Action | ||
| Line 1,464: | Line 1,096: | ||
OP-1202.001 | OP-1202.001 | ||
Reactor Trip | Reactor Trip | ||
2 | |||
}} | }} | ||
Latest revision as of 23:16, 22 February 2026
| ML25345A068 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 12/16/2025 |
| From: | John Dixon NRC/RGN-IV/DORS/PBD |
| To: | Pehrson D Entergy Operations |
| References | |
| EA-24-107 IR 2025003 | |
| Download: ML25345A068 (0) | |
Text
December 16, 2025
SUBJECT:
ARKANSAS NUCLEAR ONE - INTEGRATED INSPECTION REPORT 05000313/2025003 AND 05000368/2025003
Dear Doug Pehrson:
On September 30, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One. On December 4, 2025, the NRC inspectors discussed the results of this inspection with Joshua Toben, Manager of Regulatory Assurance and Emergency Planning, and other members of your staff. The results of this inspection are documented in the enclosed report.
Due to the temporary cessation of government operations, which commenced on October 1, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at reduced staffing levels throughout the duration of the shutdown. However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300. On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations. However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of the calendar year 2025 inspection reports that should have been issued by November 13, 2025, to December 31, 2025. The NRC resumed the routine cycle of issuing inspection reports on November 13, 2025.
One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy. If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at Arkansas Nuclear One.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at Arkansas Nuclear One.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000313 and 05000368
License Numbers:
Report Numbers:
05000313/2025003 and 05000368/2025003
Enterprise Identifier:
I-2025-003-0002
Licensee:
Entergy Operations, Inc.
Facility:
Arkansas Nuclear One
Location:
Russellville, AR
Inspection Dates:
July 1, 2025, to September 30, 2025
Inspectors:
T. Farina, Senior Operations Engineer
J. Kirkland, Senior Operations Engineer
M. Mondou, Resident Inspector
L. Moore, Emergency Preparedness Inspector
B. Tindell, Senior Resident Inspector
E. Tinger, Resident Inspector
Approved By:
John L. Dixon, Jr., Chief
Reactor Projects Branch D
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Arkansas Nuclear One, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
Failure to Establish an Adequate Procedure for Diesel Fire Pump Maintenance Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000313,05000368/2025003-01 Open/Closed
[H.12] - Avoid Complacency 71152A A self-revealed Green finding and associated non-cited violation of Unit 1 License Condition 2.C.(8) and Unit 2 License Condition 2.C.(3)(b) was identified when the licensee failed to establish an adequate procedure for maintenance of the diesel fire pump.
Specifically, on January 7, 2025, April 4, 2025, and May 14, 2025, the starter motor for the diesel fire pump was installed without a spacer and subsequently failed to start the diesel fire pump. This occurred because Procedure OP-1307.004, Diesel Fire Pump Engine (K-5)
Biannual Surveillance, Revision 16, provided no instructions regarding the starter motor spacer.
Additional Tracking Items
Type Issue Number Title Report Section Status NOV 05000313/2024090-01 SLIII NOV for ANO Unit 1,
Internet Usage while ATC EA-24-107 71111.11B Closed LER 05000313, 05000368/
2025-S001-00 Follow-up Report for a 10 CFR 73 Security Report on January 31, 2025 71153 Closed
PLANT STATUS
Unit 1 began a coastdown for refueling outage 1R32 on September 15, 2025. On September 24, 2025, Unit 1 tripped due to a B main phase transformer fault. Unit 1 was restarted on September 28, 2025, and ended the inspection period at approximately 60 percent power.
Unit 2 began the inspection period at full power and remained there for the duration of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 2, low-pressure safety injection system train B following maintenance on the low-pressure safety injection pump seal cooler, on July 31, 2025
- (2) Units 1 and 2, control room boundary and control room emergency ventilation system during boundary breach with administrative controls, on August 5, 2025
- (3) Unit 1, high-pressure injection system trains A and C following weekly pump swap, on August 25, 2025
Complete Walkdown Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated system configurations during a complete walkdown of the Unit 1 service water system, on July 28, 2025.
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 2, diesel generator room access corridor, fire area JJ, due to safety-related equipment in the area, on August 4, 2025
- (2) Unit 2, control element drive mechanism equipment room, fire area B-4, due to safety-related equipment in the area, on August 8, 2025
- (3) Unit 1, diesel generator access corridor 98, fire area I-1, due to safety-related equipment in the area, on August 12, 2025
Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill in the Unit 2 hot tool room, on September 5, 2025.
71111.06 - Flood Protection Measures
Flooding Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated internal flooding mitigation protections in the Unit 1 turbine building due to a postulated pipe break in auxiliary cooling water that could fail both trains of safety-related service water, on August 1, 2025.
71111.07A - Heat Exchanger/Sink Performance
Annual Review (IP Section 03.01) (1 Sample)
The inspectors evaluated readiness and performance of:
- (1) Unit 1, emergency diesel generator train B jacket water heat exchanger, on July 11, 2025
71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance
Requalification Examination Results (IP Section 03.03) (2 Samples)
- (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating test and biennial written examinations on July 29, 2025.
- (2) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered on August 13, 2025.
71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)
- (1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on July 3, 2025.
Annual Requalification Operating Tests The inspectors evaluated the adequacy of the licensees annual requalification operating test.
Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the licensee is effectively evaluating their licensed operators for mastery of training objectives.
Requalification Examination Security The inspectors evaluated the ability of the licensee to safeguard examination material, such that the examination is not compromised.
Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.
Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.
Control Room Simulator The inspectors evaluated the adequacy of the licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.
Problem Identification and Resolution The inspectors evaluated the licensee's program for identifying and resolving problems related to licensed operator training and performance, to include reviewing the licensee's corrective actions for SL III NOV 05000313/2024090-01 (ADAMS Accession No. ML24346A037), Internet Usage while ATC, EA-24-107.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 1 turbine-driven emergency feedwater pump comprehensive surveillance testing, on July 30, 2025.
- (2) The inspectors observed and evaluated licensed operator performance in the control room during Unit 2 high-pressure safety injection valve stroking and control room ventilation surveillance testing, on September 4, 2025.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (2 Samples)
- (1) The inspectors observed and evaluated Unit 1 annual requalification exam simulator activities, on July 23, 2025.
- (2) The inspectors observed and evaluated Unit 2 annual requalification exam simulator activities, on July 23, 2025.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (3 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Unit 2, component cooling water system, on July 11, 2025
- (2) Unit 1, reactor protection system following a failure of a DC power supply, on August 7, 2025
- (3) Unit 1, high-pressure injection system following replacement high-pressure injection pump A bearing failure, on August 29, 2025
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Unit 2, emergency safeguards features train B operability determination due to service water leak from vault room cooling coil 2VUC-1D, on July 28, 2025
- (2) Unit 1, vital battery charger D-03B operability determination due to trip of output breaker, on August 13, 2025
- (3) Unit 1, emergency diesel generator train B operability determination due to governor solenoid failure on emergency diesel generator train A, on September 4, 2025
- (4) Unit 2, low-pressure safety injection pump A operability determination due to seismic concerns from a loose metal support, on September 10, 2025
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (PMT) (IP Section 03.01) (4 Samples)
- (1) Units 1 and 2, alternate ac diesel generator test after engine, breaker, and controls maintenance, on August 4, 2025
- (2) Unit 2, high-pressure safety injection pump C breaker protective relay tests following calibration, on August 11, 2025
- (3) Unit 2, high-pressure safety injection pump C breaker test after removal and replacement, on September 11, 2025
- (4) Unit 2, high-pressure safety injection pump A test after injection valve preventive maintenance, on September 12, 2025
Surveillance Testing (IP Section 03.01) (1 Sample)
- (1) Unit 2, plant protection system channel D matrix surveillance test, on August 19, 2025
Inservice Testing (IST) (IP Section 03.01) (1 Sample)
- (1) Unit 2, charging pump A inservice test, on August 18, 2025
71114.02 - Alert and Notification System Testing
Inspection Review (IP Section 02.01-02.04) (1 Sample)
- (1) The inspectors evaluated the maintenance and testing of the alert and notification system between September 1, 2023 - July 28, 2025.
71114.03 - Emergency Response Organization Staffing and Augmentation System
Inspection Review (IP Section 02.01-02.02) (1 Sample)
- (1) The inspectors evaluated the readiness of the Emergency Preparedness Organization between September 1, 2023 - July 28, 2025. Inspectors also evaluated the licensee's ability to staff the emergency response facilities in accordance with emergency plan commitments.
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes.
- OP-1903.010, Emergency Action Level Classification, Revision 62, 63, 64
- OP-1904.002, Offsite Dose Projections, Revision 52
- OP1903.010-U1WC, Emergency Action Level Classification U1 Wall Chart, Revision 3
- OP1903.010-U2WC, Emergency Action Level Classification U2 Wall Chart, Revision 2 In addition, the inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between September 1, 2023 - July 28, 2025. The evaluations reviewed screenings and evaluations documenting implementation of the process.
The reviews of the change process documentation or the emergency plan changes do not constitute NRC approval.
71114.05 - Maintenance of Emergency Preparedness
Inspection Review (IP Section 02.01 - 02.11) (1 Sample)
- (1) The inspectors evaluated the maintenance of the emergency preparedness program between September 1, 2023 - July 28, 2025. The evaluation reviewed evidence of completing various emergency plan commitments, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness.
71114.06 - Drill Evaluation
Additional Drill and/or Training Evolution (1 Sample)
The inspectors evaluated:
- (1) Unit 2, emergency preparedness drill for loss of all feedwater, failed fuel, and containment isolation valve leak, on July 31, 2025
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)
- (1) Unit 1 (July 1, 2024, through June 30, 2025)
- (2) Unit 2 (July 1, 2024, through June 30, 2025)
MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)
- (1) Unit 1 (July 1, 2024, through June 30, 2025)
- (2) Unit 2 (July 1, 2024, through June 30, 2025)
MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)
- (1) Unit 1 (July 1, 2024, through June 30, 2025)
- (2) Unit 2 (July 1, 2024, through June 30, 2025)
EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)
- (1) July 1, 2024, through June 30, 2025 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
- (1) July 1, 2024, through June 30, 2025 EP04: Emergency Response Facility and Equipment Readiness (ERFER) (IP Section 02.14) (1 Sample)
- (1) January 1, 2025, through June 30, 2025 71152A - Annual Follow-up Problem Identification and Resolution
Annual Follow-up of Selected Issues (Section 03.03) (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Units 1 and 2, effectiveness of corrective actions relating to the diesel-driven fire pump repeated failure to start, on August 5, 2025
71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02) (1 Sample)
- (1) The inspectors reviewed the licensees corrective action program to identify potential adverse trends that might be indicative of a more significant safety issue. The inspectors performed an in-depth review of the licensees ability to identify procedure quality issues, evaluate each occurrence, and implement corrective actions. The inspectors determined evidence of an emerging trend in this area, informed the licensee of this trend, and documented an observation in the Inspection Results section of this report. No issues of more than minor significance were identified.
71153 - Follow-Up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02) (1 Sample)
The inspectors evaluated the following licensee event reports (LERs) which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:
- (1) LER 05000313,05000368/2025-S001-00, Follow-up Report for a 10 CFR 73 Security Report on January 31, 2025, (ML25091A100). The inspection conclusions associated with this LER are documented as a minor violation in the Inspection Results section of this report. This LER is Closed.
Personnel Performance (IP Section 03.03) (1 Sample)
- (1) The inspectors evaluated the Unit 1 reactor trip event, including operator and equipment performance, on September 24, 2025.
INSPECTION RESULTS
Failure to Establish an Adequate Procedure for Diesel Fire Pump Maintenance Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000313,05000368/2025003-01 Open/Closed
[H.12] - Avoid Complacency 71152A A self-revealed Green finding and associated non-cited violation of Unit 1 License Condition 2.C.(8) and Unit 2 License Condition 2.C.(3)(b) was identified when the licensee failed to establish an adequate procedure for maintenance of the diesel fire pump.
Specifically, on January 7, 2025, April 4, 2025, and May 14, 2025, the starter motor for the diesel fire pump was installed without a spacer and subsequently failed to start the diesel fire pump. This occurred because Procedure OP-1307.004, Diesel Fire Pump Engine (K-5)
Biannual Surveillance, Revision 16, provided no instructions regarding the starter motor spacer.
Description:
On January 7, 2025, the diesel fire pump starter motor was replaced. The starter spacer was inadvertently removed along with the starter. The replacement starter was installed in accordance with Procedure OP-1307.004, Diesel Fire Pump Engine (K-5)
Biannual Surveillance, Revision 16. However, the starter spacer was not installed with the starter because the procedure did not direct installation of the spacer; this information is available from the diesel engine technical manual, TDC742 0080 1, Operation and Maintenance Manual for Cummins C Series Engines, Revision 2. The diesel fire pump passed subsequent tests until April 4, 2025, when it failed to start. The starter was replaced using the same procedure, again without the spacer, and the diesel fire pump passed testing.
During the next surveillance test on May 8, 2025, the diesel fire pump failed to start.
Following replacement of the starter, again without the spacer, the diesel fire pump failed to start on May 14, 2025. After a review of the removed starters, the licensee identified the starter spacer on the starter removed on January 7, 2025, and installed the starter spacer on the diesel fire pump with a new starter. The diesel fire pump passed subsequent testing. The inspectors noted that the electric fire pump, which can fully supply water to the fire suppression system for Unit 1 and Unit 2, was available during these times of unavailability of the diesel fire pump.
Corrective Actions: The licensee installed the starter spacer on the starter and revised the procedure to install/remove the starter to include installation of the spacer.
Corrective Action References: Condition Reports CR-ANO-1-2025-00016, CR-ANO-C-2025-00584, CR-ANO-1-2025-00670, CR-ANO-1-2025-00696
Performance Assessment:
Performance Deficiency: The licensees failure to establish an adequate procedure for the maintenance of the diesel fire pump in accordance with the Unit 1 and Unit 2 fire protection license conditions was a performance deficiency. Specifically, Procedure OP-1307.004, Diesel Fire Pump Engine (K-5) Biannual Surveillance, Revision 16, did not include instructions for installing the starter motor spacer. This led to the starter motor being installed without the spacer on January 7, April 4, and May 14, 2025, and resulted in repeated failures of the diesel fire pump to start, which should have been prevented. The cause of the issue of concern was reasonably within the licensee's ability to foresee and correct because the licensee did not include information available from the diesel engine technical manual TDC742 0080 1, Operation and Maintenance Manual for Cummins C Series Engines, Revision 2, in the procedure.
Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Protection Against External Factors attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the inspectors determined the reliability of the diesel fire pump, which responds to potential fire events to prevent fire damage of equipment important for safe shutdown, was adversely affected due to the multiple failures.
Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix F, Fire Protection and Post - Fire Safe Shutdown SDP. Using IMC 0609 Appendix F, Attachment 1, Fire Protection Significance Determination Process Worksheets, revised January 1, 2025, the inspectors assigned the finding category of Fire Water Supply.
The inspectors determined that the finding was of very low safety significance (Green)because adequate fire water capacity would still be available from the permanent electric fire pump for protection of equipment important to safe shutdown in the most limiting location onsite.
Cross-Cutting Aspect: H.12 - Avoid Complacency: Individuals recognize and plan for the possibility of mistakes, latent issues, and inherent risk, even while expecting successful outcomes. Individuals implement appropriate error reduction tools. Specifically, the licensee failed to recognize the difference between removed and installed components and failed to use vendor documentation, which is referenced in the procedure, after repeated failures. This resulted in delayed effective corrective actions and repeated failures of the diesel fire pump to start.
Enforcement:
Violation: Arkansas Nuclear One, Unit 1 License Condition 2.C.(8) states, in part, the licensee shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment request dated January 29, 2014. The license amendment request dated January 29, 2014, Attachment A, Section 3.2.3, Procedures (1), states, in part, procedures are established for inspection, testing, and maintenance of fire protection systems.
Arkansas Nuclear One, Unit 2 License Condition 2.C.(3)(b) states, in part, the licensee shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the license amendment request dated December 17, 2012. The license amendment request dated December 17, 2012, Attachment A, Section 3.2.3, Procedures (1), states, in part, procedures are established for inspection, testing, and maintenance of fire protection systems.
Procedure OP-1307.004, Diesel Fire Pump Engine (K-5) Biannual Surveillance, revision 16, is one such procedure that the licensee uses to establish for inspection, testing, and maintenance of fire protection systems.
Contrary to the above, prior to July 15, 2025, the licensee failed to maintain in effect all provisions of the approved fire protection program, as specified in the license amendment request dated January 29, 2014, for Unit 1, and December 17, 2012, for Unit 2 by not having adequate procedures for maintenance of fire protection systems. Specifically, on January 7, April 4, and May 14, 2025, the starter motor for the diesel fire pump was installed without a required spacer because the inspection, testing, and maintenance procedure OP-1307.004, Diesel Fire Pump Engine (K-5) Biannual Surveillance, revision 16, failed to direct installation of the starter motor spacer. Subsequently, the diesel fire pump failed to start multiple times due to the missing spacer.
Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.
Observation: Negative Trend in Prioritizing and Addressing Procedure Improvements 71152S The inspectors performed a review of the licensees Procedure Improvement Form (PIF)database with a focus on procedure improvements that did not rise to the level of tracking in the corrective action program. Procedural improvements prevent human errors that could adversely impact safety.
The inspectors noted that the licensees guidance for procedure revisions, OP-1000.006, Procedure Control, Revision 76, Step 6.3.6 states, in part, that procedure improvements will generally be completed within a year. However, the inspectors counted the following open PIFs: 1 from 2016, 51 from 2018, 47 from 2019, 91 from 2020, 136 from 2021, 209 from 2022, and 336 from 2023. The inspector counted a total of 871 PIFs open for more than a year.
The inspectors notified the licensee about the lack of prioritization and timely procedure revisions. The licensee documented the observations in Condition Report CR-ANO-C-2025-00861. Once the inspectors notified the licensee about the number of open PIFs, the licensee subsequently determined that many of the procedure improvement forms had been incorporated into procedures, but the forms had not been closed. However, the inspectors identified other examples of PIFs that should have been prioritized and incorporated into procedures earlier. The licensee initiated actions to prioritize and close PIFs in a timely manner.
See the minor violation documented in this report associated with this observation.
Minor Violation 71152S Minor Violation: For a description of the issue, see the Observation in this Inspection Report titled Negative Trend in Prioritizing and Addressing Procedure Improvements.
Screening: The inspectors determined that this violation was minor because there was not a human error within the last 3 years that was caused in part by lack of PIF processing. In addition, the inspectors did not find any open PIFs that would most likely lead to a human error that would adversely impact the cornerstones found in IMC 0612 Appendix B, Issue Screening Directions, dated May 28, 2025. The licensee has taken actions to restore compliance, as detailed in the Observation.
Enforcement:
Unit 1 Technical Specification 5.4.1.a requires, in part, written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Unit 2 Technical Specification 6.4.1.a requires, in part, written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Regulatory Guide 1.33, Revision 2, Appendix A, February 1978, Section 1.a, recommends Procedure Review and Approval. Procedure OP-1000.006, Procedure Control, Revision 76, Step 6.3.6, states, in part, if a PIF is written, to determine the PIF priority. The step gives guidance to close the forms in a timely manner, depending on their priority; PIFs should typically be closed in less than 1 year. Procedure OP-1000.006, Step 6.6, states that when a procedure is revised, then initiate action to close out the PIF. Contrary to the above, the licensee failed to implement the procedure review and approval procedure required by technical specifications in Regulatory Guide 1.33. Specifically, the licensee failed to determine PIF priority for most PIFs and failed to close most PIFs within 1 year. The licensee also failed to initiate action to close out the PIFs when the procedures were revised.
The licensee has taken actions to restore compliance. This failure to comply with technical specifications constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.
Minor Violation 71153 Minor Violation: The inspector reviewed LER 05000313, 05000368/2025-S001-00 (ML25091A100) dated April 1, 2025, regarding an actual entry of unauthorized personnel into the protected area (PA). In this LER, the licensee reported that three employees had retained their unescorted access to the site despite having expired plant access training. This training covers individual fitness-for-duty (FFD) and behavior observation program (BOP)responsibilities and must be completed on a nominal 12-month frequency for individuals maintaining unescorted access to the PA.
Of the three individuals, two made entries into the licensees PA unescorted without meeting all the requirements for maintaining unescorted access. The licensee reported this as an actual entry of unauthorized personnel into the PA. The inspector determined that the individuals had received initial FFD and BOP training and were still subject to other required elements of the licensees access authorization program that provide assurance of trustworthiness and reliability.
Title 10 CFR 73.56(f)(2)(ii) states, in part, Behavioral observation training must be:
(C) Maintained in a current status during any period of time an individual possesses unescorted access or unescorted access authorization in accordance with paragraph (f)(2)(iv)of this section.
Title 10 CFR 73.56(f)(2)(iv) states, in part, Individuals shall complete refresher training on a nominal 12-month frequency, or more frequently where the need is indicated.
Contrary to the above, from November 29, 2024, to February 6, 2025, the licensee failed to ensure that behavioral observation training was maintained in a current status during any period of time an individual possesses unescorted access or unescorted access authorization. Specifically, three individuals with unescorted access to Arkansas Nuclear One were allowed to retain their access to the site despite having expired training. These individuals failed to complete behavior observation refresher training within a nominal 12-month frequency. Two of the individuals made entry into the sites protected area.
Screening: The inspectors determined the performance deficiency was minor. The inspector determined the performance deficiency was minor because it could not be viewed as a precursor to a significant event, would not have the potential to lead to a more significant safety concern if left uncorrected, and did not adversely affect the security cornerstone objective.
Enforcement:
This failure to comply with 10 CFR 73.56(f)(2)(ii) constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On July 10, 2025, the inspectors presented the biennial requalification inspection results to Joey Fields, Operations Training Superintendent, and other members of the licensee staff.
- On July 29, 2025, the inspectors presented the requalification examination inspection results to Chris Norwood, Regulatory Exam Author, and other members of the licensee staff.
- On August 7, 2025, the inspectors presented the emergency preparedness program inspection results to Doug Pehrson, Site Vice President, and other members of the licensee staff.
- On December 4, 2025, the inspectors presented the integrated inspection results to Joshua Toben, Manager of Regulatory Assurance and Emergency Planning, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Drawings
M-210, Sheet 1
Piping and Instrument Diagram Service Water
155
Drawings
M-2232, Sheet 1
Piping and Instrument Diagram Safety Injection System
23
Drawings
M-2263
Piping and Instrument Diagram Units 1 and 2 Control and
Computer Rooms HVAC
Drawings
M-231, Sheet 1
Piping and Instrument Diagram Makeup and Purification
System
116
Procedures
OP-1104.002
Makeup and Purification System Operation
105
Procedures
OP-1104.029
Service Water and Auxiliary Cooling System
130
Procedures
OP-2104.040
LPSI System Operations
Procedures
OP-2104,007
Control Room Emergency Air Conditioning and Ventilation
Work Orders
WO 555146, 54105036
Drawings
Fire Zone Ground Floor Plan EL 354-0
Engineering
Evaluations
PSA-ANO1-03-
FQ
ANO-1 Fire PRA Integration and Quantification
Engineering
Evaluations
PSA-ANO2-03
Arkansas Nuclear One Unit 2 Fire Probabilistic Risk
Assessment Summary Report
Procedures
Control of Combustibles
Procedures
Fire Brigade Drills
Procedures
Unit 1 Prefire Plans
Procedures
Unit 2 Prefire Plans
Engineering
Changes
LCP-94-5022
Service Water System Crossover Valves Logic and Fire
Protection
Miscellaneous
PSA-ANO1-01-IF-
ANO-1 PRA - Internal Flooding Accident Sequence Analysis
Procedures
OP-1203.030
Loss of Service Water
Procedures
OP-1203.054
Procedures
Heat Exchanger Performance and Condition Monitoring
Procedures
SEP-HX-ANO-
001
Arkansas Nuclear One (ANO) Heat Exchanger Program
Work Orders
WO 2779637, 52998309
Miscellaneous
Table 3.03-1
Examination Results
08/13/2025
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
Table 3.03-1
Examination Results
07/29/2025
Corrective Action
Documents
CR-ANO-
1-2024-02133, 2-2024-01027, C-2024-00129, C-2024-
2132, C-2025-00109
Miscellaneous
ANO1-OT-04
Simulator Transient Test B3.2.1(4) - Simultaneous Trip of all
06/13/2024
Miscellaneous
ANO1-PEST-24-
Simulator Post Event Test - RCP Loss Runback Without
RCP Trip
01/21/2024
Miscellaneous
25 Operating Test - Week 4
06/30/2025
Miscellaneous
25 Operating Test - Week 5
07/07/2025
Miscellaneous
25 Scenario Malfunction Cross Check
Miscellaneous
25 JPM Overlap Tracker
07/07/2025
Miscellaneous
ANO-1 Open Simulator Differences
2/7/2025
Miscellaneous
ANO1 Turbine Control System Simulator Acceptance
Testing
Miscellaneous
Credit for Standing Watch Report
03/31/2025
Miscellaneous
Week 4 RO-SRO Written Examination
06/30/2025
Miscellaneous
Written Exam Development Tracker
N/A
Miscellaneous
TQF-202-SRB
SRB Simulator Review Board (SRB) Meeting Minutes
06/24/2024
Procedures
ANO1-SST
Simulator Steady State Test B3.1
06/20/2024
Procedures
ANSI/ANS-3.4-
1983Property "ANSI code" (as page type) with input value "ANSI/ANS-3.4-</br></br>1983" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.
Medical Certification and Monitoring of Personnel Requiring
Operator Licenses for Nuclear Power Plants
04/29/1983
Procedures
DG-TRNA-015-
EXAMSEC
Simulator Exam Security Guidelines
Procedures
EN-OP-115-02
Control Room Conduct and Access Control
Procedures
EN-OP-115-06
Activation and Deactivation of Licenses, and Maintaining
Active License Status
Procedures
Systematic Approach to Training Process
Procedures
Simulator Configuration Control
Procedures
Conduct of Simulator Training
Procedures
Licensed Operator Requalification Annual and Biennial
Exam Development
Miscellaneous
SES-1-013
Unit 1 Dynamic Exam Scenario
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
SES-1-047
Unit 1 Dynamic Exam Scenario
Miscellaneous
SES-2-026
Unit 2 Dynamic Exam Scenario
Miscellaneous
SES-2-030
Unit 2 Dynamic Exam Scenario
Procedures
OP-1106.006
Emergency Feedwater Pump Operation
2
Procedures
OP-2104.007
Control Room Emergency Air Conditioning and Ventilation
Procedures
OP-2104.039
HPSI System Operation
Work Orders
WO 54107904, 54275875, 54283034
Corrective Action
Documents
CR-ANO-
1-2025-00665, 1-2025-00943, 1-2025-01024, 1-2025-01055,
2-2024-00504, 2-2024-02241
Procedures
OP-1105.001
NI & RPS Operating Procedure
Procedures
OP-2104.028
Component Cooling Water System Operations
Procedures
OP-2203.012-L
Annunciator 2K12 Corrective Action
Procedures
OP-2203.016
Excess RCS Leakage
Procedures
OP-2203.025
RCP Emergencies
Work Orders
Corrective Action
Documents
CR-ANO-
1-2025-01040, 1-2025-01157, 1-2025-01229, 2-2002-01748,
2-2025-00747, 2-2025-01227
Engineering
Changes
2VUC-1D Cooling Coil Mechanical Clamp ASME Section XI
Code Repair TMOD
Miscellaneous
TDE147.0640
Installation and Operation Manual for Shutdown Solenoid for
UG Governor
Procedures
EN-CS-S-056-A
Review of Potentially Hazardous Seismic Category II/I
Situations
Work Orders
WO 54106845, 54273622
Corrective Action
Documents
CR-ANO-
2-2025-00279, 2-2025-01278
Procedures
OP-1416.041
Magne-Blast Circuit Breaker Overhaul
Procedures
OP-1416.052
Unit 1 & 2 IAC66K Relay Test Instructions
Procedures
OP-2104.002
Chemical and Volume Control
Procedures
OP-2104.039
HPSI System Operation
Procedures
OP-2304.040
Unit 2 Plant Protection System Channel D Test
Procedures
OP-2411.066
Charging Pump Dampener Bladder 2M-115A, B, C and
2M-116A, B, C Charging, Checking and Depressurization
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Work Orders
WO 53024752, 54050458, 54077626, 54120201, 54159480,
264720, 54279261
Miscellaneous
Siren Maintenance Checklist 2023_1
Miscellaneous
Siren Maintenance Checklist 2023_2
Miscellaneous
Siren Maintenance Checklist - 2023_3
Miscellaneous
Siren Maintenance Checklist - 2024_1
Miscellaneous
Siren Maintenance Checklist - 2024_2
Miscellaneous
Siren Maintenance Checklist - 2024_3
Miscellaneous
Monthly Siren Test Records - January 2024 - July 2025
Miscellaneous
25 EIB Locations
Miscellaneous
Emergency Instructions Booklet Arkansas Nuclear One -
English Version
Miscellaneous
Arkansas Nuclear One - Alert and Notification Design Report
Miscellaneous
Form 1903.004-K
23 Alert and Notification System Oversight Activity
10/30/2023
Miscellaneous
Form 1903.004-K
24 Alert and Notification System Oversight Activity
11/14/2024
Procedures
OP-1903.004
Alert and Notification System (ANS) Monitoring
Requirements
Miscellaneous
Emergency Response Organization Roster
09/28/2023
Miscellaneous
Emergency Response Organization Roster
2/31/2023
Miscellaneous
Emergency Response Organization Roster
03/28/2024
Miscellaneous
Emergency Response Organization Roster
06/27/2024
Emergency Response Organization Roster
09/30/2024
Miscellaneous
Emergency Response Organization Roster
2/28/2024
Miscellaneous
Emergency Response Organization Roster
03/31/2025
Miscellaneous
Emergency Response Organization Roster
06/30/2025
Miscellaneous
Form 1903.062C
Emergency Response Staffing Drill -
- 3rd Quarter 2023
- 4th Quarter 2023
- 1st Quarter 2024
- 2nd Quarter 2024
- 3rd Quarter 2024
- 4th Quarter 2024
- 1st Quarter 2025
- 2nd Quarter 2025
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
Drills and Exercises
Procedures
Emergency Response Organization Notification System
Procedures
Emergency Notifications
Procedures
Emergency Response Organization
Miscellaneous
CFR 50.54(Q) Evaluation - OP-1903.010
Miscellaneous
CFR 50.54(Q) Evaluation - OP-1903.010
Miscellaneous
CFR 50.54(Q) Evaluation - OP-1903.010
Miscellaneous
CFR 50.54(Q) Evaluation - OP-1903.010-U1WC
Miscellaneous
CFR 50.54(Q) Evaluation - OP-1903.010-U1WC
Miscellaneous
CFR 50.54(Q) Evaluation - OP-1903.010-U2WC
Miscellaneous
CFR 50.54(Q) Evaluation - OP-1903.010-U2WC
Miscellaneous
CFR 50.54(Q) Screening - OP-1903.011-Z
Miscellaneous
CFR 50.54(Q) Screening - OP-1903.060
Miscellaneous
CFR 50.54(Q) Screening - OP-1903.068
Miscellaneous
CFR 50.54(Q) Screening - OP-1903.079
Miscellaneous
CFR 50.54(Q) Evaluation - 1904.002
Miscellaneous
CFR 50.54(Q) Screening - 1903.011-Y
Procedures
Emergency Planning 10 CFR 50.54(q) Review Program
Corrective Action
Documents
CR-ANO-
C-2024-00607, C-2024-01425, C-2024-01742, C-2024-
01824, C-2024-01917, C-2024-02124, C-2024-02129, C-
25-00214, C-2025-00667, C-2025-00916, C-2025-00946,
C-2025-00966, C-2025-00967, C-2025-00968
Miscellaneous
ANO 2023 Environmental (Radiological Monitoring)
09/05/2023
Miscellaneous
23 Onsite Medical Drill
11/08/2023
Miscellaneous
ANO 2024 Yellow Team 1st Quarter PI Drill
01/18/2024
Miscellaneous
Emergency Response Staffing Drill 3rd Quarter 2024
Miscellaneous
SM/STA DEP Tabletop Drill 2 Rob King
08/21/2024
Miscellaneous
Shantz Hooper IC Drill
08/14/2024
Miscellaneous
24 Onsite Medical Drill
08/26/2024
Miscellaneous
ANO 2025 Red Team 1st Quarter PI Drill
01/30/2025
Miscellaneous
ANO 2025 Green Team 1st Quarter PI Drill
03/13/2025
Miscellaneous
ANO 2025 Blue Team 2nd Quarter PI Drill
06/26/2025
Miscellaneous
NIOS/Quality Assurance Audit of Emergency Preparedness
2/18/2025
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Off-Site Agencies Interface Interview Questionnaire - Yell
County OEM
Miscellaneous
NIOS/Quality Assurance Audit of Emergency Preparedness
Off-Site Agencies Interface Interview Questionnaire - Pope
County OEM
2/18/2025
Miscellaneous
NIOS/Quality Assurance Audit of Emergency Preparedness
Off-Site Agencies Interface Interview Questionnaire - Pope
County Judge
2/18/2025
Miscellaneous
NIOS/Quality Assurance Audit of Emergency Preparedness
Off-Site Agencies Interface Interview Questionnaire -
Arkansas State Department of Health
2/18/2025
Miscellaneous
NIOS/Quality Assurance Audit of Emergency Preparedness
Off-Site Agencies Interface Interview Questionnaire - Logan
County Emergency Management
2/18/2025
Miscellaneous
NIOS/Quality Assurance Audit of Emergency Preparedness
Off-Site Agencies Interface Interview Questionnaire -
Johnson Co Dept of Emergency Management
2/18/2025
Miscellaneous
KLD - 1402
24 Population Update Analysis
03/26/2024
Miscellaneous
KLD TR - 1312
23 Population Update Analysis
04/03/2023
Miscellaneous
KLD TR - 2025 -
1470
25 Population Update Analysis
04/02/2025
Miscellaneous
NQ-2025-011
QA Audit Report QA-7-2025-HQN-1, 2025 QA Audit of
05/12/2025
Procedures
Corrective Action Program
Work Orders
WO 54281348-02 ACS-8001 Seismic Monitor
Work Orders
WO 54057484 Comm Link Failure
05/28/2025
Work Orders
WO 54252948 RE-8017 Rad Monitor
07/31/2025
Miscellaneous
Red Team Drill
07/30/2025
Procedures
OP-1903.010
Emergency Action Level Classification
71151
Calculations
CALC-ANOC-SE-
06-00004
ANO Mitigating System Performance Indicator Reliability
and Unavailability Inputs and Guidelines
71151
Corrective Action
Documents
CR-ANO-
1-2013-03213
71151
Miscellaneous
2nd Qtr 2025 Signed KPI Sheets
07/02/2025
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71151
Miscellaneous
1st Qtr 2025 Signed KPI Sheets
04/01/2025
71151
Miscellaneous
3rd Qtr 2023 Signed KPI Sheets
10/02/2023
71151
Miscellaneous
4th Qtr 2023 Signed KPI Sheets
01/02/2024
71151
Miscellaneous
1st Qtr 2024 Signed KPI Sheets
04/02/2024
71151
Miscellaneous
2nd Qtr 2024 Signed KPI Sheets
07/01/2024
71151
Miscellaneous
3rd Qtr 2024 Signed KPI Sheets
10/02/2024
71151
Miscellaneous
4th Qtr 2024 Signed KPI Sheets
01/06/2025
71151
Procedures
Regulatory Performance Indicator Process
Corrective Action
Documents
CR-ANO-
1-2025-00016, 1-2025-00670, C-2025-00584, C-2025-
00811,
Miscellaneous
TDC742 0050
Instruction Manual for NH/NT Diesel Engine
Miscellaneous
TDC742 0080
Parts Catalog for Cummins Fire Pump Engine (K-5)
Procedures
OP-1104.032
Fire Protection Systems
Procedures
OP-1307.004
Diesel Fire Pump Engine (K-5) Biannual Surveillance
16, 17
Corrective Action
Documents
CR-ANO-
C-2025-00861, C-2025-01275
Procedures
OP-1000.006
Procedure Control
Corrective Action
Documents
CR-ANO-
1-2025-01382
Miscellaneous
LER 2025-S01-00
Arkansas Nuclear One, Units 1 and 2, Follow-up Report for
a 10 CFR 73 Security Report
01/31/2025
Procedures
OP-1202.001
2