Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: ML20280A970, ML20343A224, ML21147A547, ML21160A221, ML21218A045, ML22018A300, ML23097A123, ML23097A127, ML24103A224, ML24212A030, ML24262A066, ML24297A138, ML25017A130, ML25023A086, ML25028A267, ML25161A172
|
MONTHYEARML21263A2362020-08-0505 August 2020 Safety Evaluation by the Office of Nuclear Reactor Regulation Regarding the Terrapower, LLC Quality Assurance Topical Report Project stage: Approval ML20280A9702020-10-21021 October 2020 Terrapower - Acceptance Topical Report Quality Assurance Program Description Project stage: Other ML20294A3372020-11-10010 November 2020 Letter and Final Safety Evaluation for Kairos Power, LLC Topical Report-KP Fhr Risk-Informed Performance-Based Licensing Basis Development Methodology (Revision 1) (EPID No. L-2019-TOP-0009/CAC No. 000431) Project stage: Approval ML20343A2242020-12-0808 December 2020 Verification Letter of the Approval Version of Kairos Power LLC Topical Report KP-TR-O09-NP, - KP-FHR Risk-Informed Performance-Based Licensing Basis Development Methodology - (Revision 1) (CAC No. 000431) Project stage: Other ML21005A0152020-12-23023 December 2020 Revision to Terrapower, LLC - Quality Assurance Topical Report Project stage: Request ML21021A3642021-01-21021 January 2021 Enclosure 2: Presentation Materials About Construction Permit Application for the KP-FHR (Non-Proprietary) Project stage: Request ML21071A0822021-03-0808 March 2021 Kairos Power, LLC - Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 1) Project stage: Request ML21071A0832021-03-31031 March 2021 Kairos Power, LLC - KP-TR-007-NP, Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report, Revision 1 (Non-Proprietary) Project stage: Request ML21105A5182021-04-15015 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 2) Project stage: Request ML21117A0472021-04-26026 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report(Revision 3) Project stage: Request ML21117A0482021-04-26026 April 2021 Quality Assurance Program for the Kairos Power Flouride Salt Cooled High Temperature Reactor Topical Report, Revision 3 Project stage: Request ML21105A5192021-04-30030 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report Revision 2 Project stage: Request ML21148A2362021-05-28028 May 2021 Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21147A5472021-06-0909 June 2021 Kairos Power Hermes Test Reactor Psotulated Events Audit Plan Project stage: Other ML21160A2212021-06-22022 June 2021 Letter SE Kairos Fuel Performance Methodology Topical Project stage: Other ML21183A2002021-07-0202 July 2021 Revised Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21218A0452021-08-17017 August 2021 Kairos Hermes PSAR Pre-Submittal Audit Plan - Rev. 3 Project stage: Other ML21194A4392021-08-20020 August 2021 Draft Kairos Flibe Thermophisical Properties Audit Plan 6 30 21 Project stage: Draft Other ML21308A5982021-11-16016 November 2021 Letter - Kairos Power, LLC - Safety Evaluation for Kairos Power, LLC Topical Report KP-TR-007-NP, Quality Assurance Program Project stage: Approval ML21308A5972021-11-16016 November 2021 Enclosure - Safety Evaluation for Kairos Power LLC Topical Report KP-TR-007-NP, Quality Assurance Program for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Revision 3 Project stage: Approval ML22018A3002022-01-21021 January 2022 Letter - NRC Feedback on Terrapower Advanced SER QAPD Project stage: Other ML22018A1612022-01-31031 January 2022 Kairos Power LLC, Kp& 8208;TR& 8208;004& 8208;NP, Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Rev. 4 Project stage: Request ML22024A4852022-02-0808 February 2022 OEDO-21-00545 -Safety Evaluation of the Kairos Power LLC Topical Report KP-TR-012-P, Revision 1, KP-FHR Mechanistic Source Term Methodology Project stage: Request ML22088A2312022-03-28028 March 2022 KP-TR-012-NP, Revision 3, KP-FHR Mechanistic Source Term Methodology Topical Report Project stage: Request ML22112A1332022-04-22022 April 2022 Kairos Power, LLC, Safety Evaluation for KP-TR-012 KP-FHR Mechanistic Source Term Methodology Topical Report, Revision 3 (EPID L-2020-TOP-0051/CAC 000431) Project stage: Approval ML22136A0892022-05-26026 May 2022 Safety Evaluation for Kairos Regulatory Analysis Topical Report Kp TR-004, Revision 4 Project stage: Approval ML22186A2132022-07-0505 July 2022 Kairos Power LLC, Fuel Qualification Methodology for Fluoride Salt-Cooled High Temperature Reactor (KP-FHR), Revision 2 Project stage: Request ML22216A1792022-07-29029 July 2022 Submission of X Energy, LLC (X-energy) TRISO-X Pebble Fuel Qualification Methodology Project stage: Request ML22265A2182022-09-21021 September 2022 Withdrawal of X Energy, LLC (X-energy) Xe-100 Topical Report: TRISO-X Pebble Fuel Qualification Methodology, Revisions 1 and 2 Project stage: Request ML22266A2862022-09-23023 September 2022 Submittal of Revised Terrapower, LLC Quality Assurance Topical Report, Revision 14 Project stage: Request ML22318A2362022-11-10010 November 2022 Submission of X Energy, LLC (X-energy) Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Request ML23024A2632023-02-0808 February 2023 Staff Response to Advisory Committee on Reactor Safeguards Letter on Safety Evaluation of the Kairos TR Project stage: Request ML23048A3262023-03-0202 March 2023 Final Safety Evaluation for Kairos Fuel Qualification TR Project stage: Approval ML22327A2012023-03-0909 March 2023 X Energy LLC - Safety Evaluation of XE-100 Topical Report TRISO-X Pebble Fuel Qualification Methodology Revision No. 3 (EPID No. L-2021-TOP-0011) - Redacted Project stage: Approval ML22327A1982023-03-0909 March 2023 Cover Letter – X Energy, LLC - Safety Evaluation of Xe-100 Topical Report, TRISO-X Pebble Fuel Qualification Methodology, Revision No. 3 Project stage: Approval ML23062A7282023-03-13013 March 2023 Redacted Final Safety Evaluation of Metallic Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-013) Project stage: Approval ML23062A7332023-03-14014 March 2023 Redacted Final Safety Evaluation of Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor (KP-TR-014) Project stage: Approval ML24325A3772023-03-20020 March 2023 Revised Draft SE Natrium EPZ TR Project stage: Draft Approval ML23116A1832023-05-0909 May 2023 Enclosure - Safety Evaluation of Quality Assurance Topical Report TP-QA-PD-0001, Terrapower QA Program Description, Revisions 13 and 14 Project stage: Approval ML23116A1782023-05-0909 May 2023 Letter - Safety Evaluation of Quality Assurance Topical Report TP-QA-PD-0001, Terrapower QA Program Description, Revisions 13 and 14 Project stage: Approval ML23097A1272023-05-31031 May 2023 Enclosure - X Energy, LLC – NRC Feedback Regarding Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach (EPID L-2022-LRO-0150/CAC 000431) Project stage: Other ML23097A1232023-05-31031 May 2023 Letter - X Energy, LLC - U.S. NRC Observations Regarding Xe-100 White Paper - Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Other ML23174A1752023-07-0606 July 2023 Transmittal Letter of Safety Evaluation for General Atomics Electromagnetic Systems Topical Report 30599T00005, Revision 2 Project stage: Approval PMNS20231071, Public Meeting Regarding the NRC Staffs Review of Kairos Instrument Setpoint Methodology Topical Report2023-09-25025 September 2023 Public Meeting Regarding the NRC Staffs Review of Kairos Instrument Setpoint Methodology Topical Report Project stage: Request ML23257A2592023-09-28028 September 2023 Terrapower, LLC - Final Safety Evaluation for Topical Report NATD-LIC-Report-0001, Regulatory Management of Natrium Nuclear Island and Energy Island Design Interfaces, Revision 0 (CAC: 000431 / EPID: L-2022-TOP-0045) Project stage: Approval 2022-01-31
[Table View] |
Text
Mr. Chanson Yang Radiant Industries, Inc.
1921 Maple St.
El Segundo, CA 90245
SUBJECT:
RADIANT INDUSTRIES, INC. - U.S. NUCLEAR REGULATORY COMMISSIONS FEEDBACK REGARDING TITLE 10 OF THE CODE OF FEDERAL REGULATIONS PART 100, REACTOR SITE CRITERIA, GAP ANALYSIS WHITE PAPER (EPID NO. L-2024-LRO-0059/CAC 000431)
Dear Mr. Yang:
By submission dated September 30, 2024 (Agencywide Documents Access and Management System Accession No. ML24275A261), Radiant Industries, Inc. (Radiant), submitted for the U.S. Nuclear Regulatory Commission (NRC) staffs review, white paper DOC-0BDB, 10 CFR 100 Gap Analysis. This white paper describes a gap analysis of Title 10 of the Code of Federal Regulation (10 CFR) Part 100, Reactor Site Criteria, against the specific requirements necessary to license a manufacturing facility capable of constructing and testing Radiants Kaleidos reactor design and deploy the Kaleidos reactor units. The NRC staff was asked to perform a review of this paper and provide feedback regarding the gap analysis. Given the availability of design information at this time, the NRC staff completed its review of the submittal and is generally aligned with its overall approach. However, the NRC staff noted that Radiant may want to reconsider its approach to a few sections noted in the enclosure. The enclosure to this letter provides the NRC staffs detailed observations for Radiant to consider.
If you have questions regarding this matter, please contact Kevin Roche at (301) 415-1554 or via email at Kevin.Roche@nrc.gov Sincerely, John P. Segala, Chief Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Project No.: 99902106
Enclosure:
As stated January 26, 2025 Signed by Segala, John on 01/26/25
ML25017A130 NRR-106 OFFICE NRR/DANU/UAL2:PM NRR/DANU/UAL2:LA NRR/DEX/EXHB:BC NRR/DANU/UAL2:BC NAME KRoche CSmith BHayes JSegala DATE 01/21/2025 01/22/2025 01/22/2025 01/26/2025
Enclosure RADIANT INDUSTRIES, INC. - U.S. NUCLEAR REGULATORY COMMISSIONS FEEDBACK REGARDING RADIANT WHITE PAPER: 10 CFR 100 GAP ANALYSIS WHITE PAPER, (L-2024-LRO-0059/CAC 000431)
SPONSOR INFORMATION Sponsor:
Mr. Chanson Yang Sponsor Address:
Radiant Industries, Inc.
1921 Maple St.
El Segundo, CA 90245 Docket /Project No(s).:
99902106/L-2024-LRO-0059/CAC 000431 DOCUMENT INFORMATION Submittal Date: September 30, 2024 Submittal Agencywide Documents Access and Management System (ADAMS) Accession No.: ML24275A261 Purpose of the White Paper: Radiant Industries, Inc., (Radiant) stated that the purpose of this white paper is to document its gap analysis of Title 10 of the Code of Federal Regulations (10 CFR), Part 100, Reactor Site Criteria, against the specific requirements necessary to license both a manufacturing facility capable of online reactor testing and deployed microreactor units for the Kaleidos reactor design.
Action Requested: Radiant requested the U.S. Nuclear Regulatory Commission (NRC) staffs feedback and observations regarding the information discussed in 10 CFR 100 Gap Analysis.
FEEDBACK AND OBSERVATIONS The feedback and observations regarding this white paper are preliminary given the amount of available information and is subject to change. The feedback and observations are not regulatory findings regarding any specific licensing matter and are not official agency positions.
NRC Staff Observations The NRC staff focused its feedback on the information provided in the compliance rationale column with respect to reactor siting. The feedback is divided into general NRC staff observations and feedback and observations regarding specific regulations.
General NRC Staff Observations:
The applicability of existing site and hazard characterization information to support license or permit applications to the NRC has been a topic of discussion between the NRC staff and various stakeholders. The NRC staff are currently considering developing guidance on how to use existing information, either directly or indirectly, in support of site characterization for licensing actions. Some considerations regarding the applicability of information under discussion are the age of the information, methods of data retrieval and analysis, quality assurance of the available data, and other considerations.
The NRC staff notes that the use of engineering solutions related to site characteristics should be fully discussed and supported by appropriate site investigations and hazard specific information.
The NRC staff encourages the applicant to leverage pre-application engagement to discuss site and hazard specific considerations for a selected design and site. This would include the available information and how it can be used in the development of an application.
The NRC staff is considering the how to apply margin within the characterization of the site, as was discussed in the Preliminary White Paper on Nth-of-a-Kind Microreactor Licensing and Deployment Considerations (ML24268A317). The NRC staff notes that crediting margin inherent to the reactor design may be limited as there is only so much margin available before safety could be compromised. The applicant should consider this in the design and deployment of microreactors and in any justification for why margin can be credited for safety.
Observations on Specific Regulations:
Section 4.3 Subpart B - Evaluation Factors for Stationary Power Reactor Site Applications on or After January 10, 1997 Regulations 10 CFR Sections 100.20(c)(3), 100.21(b), 100.23(c), 100.23(d)(4) - General observation - Apart from the safe shutdown earthquake, it appears this gap analysis paper is focused on exemptions to regulatory requirements for certain aspects of siting. For the sections for which a potential exemption is being considered, the applicant should consider how to demonstrate that the applicable principal design criteria (PDC) or general design criteria, if used in lieu of PDCs, related to protection against natural phenomenon can be met and there is reasonable assurance of adequate protection.
Regulation 10 CFR Part 100.23, Geologic and seismic siting criteria - The regulation requires site investigations for determining the soil and rock subsurface properties in order to characterize the seismic hazard, foundation stability, slope stability, and the potential for soil liquefaction at the site. In addition, the analysis to determine the safe shutdown earthquake ground motion response spectra requires that uncertainty be adequately captured through an appropriate analysis such as a probabilistic seismic hazard analysis.
Principal Contributor(s): Jenise Thompson, Cliff Munson, NRR