ML060240039: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:January 24, 2006 MEMORANDUM TO: Evangelos C. Marinos, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:               Stephen Monarque, Project Manager           /RA/
{{#Wiki_filter:January 24, 2006 MEMORANDUM TO: Evangelos C. Marinos, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Stephen Monarque, Project Manager  
/RA/
Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
FORTHCOMING MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY (VEPCO) ON INCREASING THE ALLOWED-OUTAGE TIMES FOR SYSTEMS AT NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 (NORTH ANNA)
FORTHCOMING MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY (VEPCO) ON INCREASING THE ALLOWED-OUTAGE TIMES FOR SYSTEMS AT NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 (NORTH ANNA)
DATE & TIME:         Wednesday, February 8, 2006 10:00 a.m. - 1:00 p.m.
DATE & TIME:
LOCATION:           U.S. Nuclear Regulatory Commission (NRC)
Wednesday, February 8, 2006 10:00 a.m. - 1:00 p.m.
One White Flint North 11555 Rockville Pike, Room O-07B4 Rockville, Maryland PURPOSE:             Discuss VEPCOs proposal to increase the allowed-outage times for various systems from 72 hours to 7 days at North Anna.
LOCATION:
CATEGORY 1:         This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
U.S. Nuclear Regulatory Commission (NRC)
PARTICIPANTS:       Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
One White Flint North 11555 Rockville Pike, Room O-07B4 Rockville, Maryland PURPOSE:
NRC/NRR               VEPCO E. Marinos           Kerry Basehore J. Nakoski           Chris Funderburk T. Tjader             Dave Bucheit S. Monarque           Dave Sommers M. Stutzke           Page Kemp Docket Nos. 50-338 and 50-339
Discuss VEPCOs proposal to increase the allowed-outage times for various systems from 72 hours to 7 days at North Anna.
CATEGORY 1:
This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC/NRR VEPCO E. Marinos Kerry Basehore J. Nakoski Chris Funderburk T. Tjader Dave Bucheit S. Monarque Dave Sommers M. Stutzke Page Kemp Docket Nos. 50-338 and 50-339


==Enclosure:==
==Enclosure:==
Agenda cc w/encl: See next page MEETING CONTACTS:         Stephen Monarque, NRR         Robert Martin, NRR 301-415-1544                 301-415-1493 Srm2nrc.gov                   Rem@nrc.gov
Agenda cc w/encl: See next page MEETING CONTACTS:
Stephen Monarque, NRR Robert Martin, NRR 301-415-1544 301-415-1493 Srm2nrc.gov Rem@nrc.gov
* Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"
* Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"
(67 FR 36920), May 28, 2002
(67 FR 36920), May 28, 2002  


ML060240039                             NRC-001 OFFICE   NRR/LPL2-1/PM       NRR/LPL2-1/LA       NRR/LPL2-1/BC NAME     SMonarque:srm       MOBrien           EMarinos DATE     1/24/06             1/24/06             1/24/06
ML060240039 NRC-001 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME SMonarque:srm MOBrien EMarinos DATE 1/24/06 1/24/06 1/24/06


DISTRIBUTION FOR MEETING NOTICE
DISTRIBUTION FOR MEETING NOTICE  


==SUBJECT:==
==SUBJECT:==
FORTHCOMING MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY ON INCREASING THE ALLOWED-OUTAGE TIMES FOR SYSTEMS AT NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 Date:         January 24, 2006 Distribution:
FORTHCOMING MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY ON INCREASING THE ALLOWED-OUTAGE TIMES FOR SYSTEMS AT NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 Date:
January 24, 2006 Distribution:
PUBLIC LPL2-1 r/f RidsNrrAdro(BBoger)
PUBLIC LPL2-1 r/f RidsNrrAdro(BBoger)
RidsNrrAdro(CDorsey)
RidsNrrAdro(CDorsey)
Line 46: Line 55:
PMNS RJasinski RidsOgcMailCenter RidsOpaMailCenter(KClark)
PMNS RJasinski RidsOgcMailCenter RidsOpaMailCenter(KClark)


MEETING AGENDA FEBRUARY 8, 2006 10:00 AM - 1:00 PM PROPOSED AMENDMENT TO INCREASE THE ALLOWED-OUTAGE TIMES FOR SYSTEMS
Enclosure MEETING AGENDA FEBRUARY 8, 2006 10:00 AM - 1:00 PM PROPOSED AMENDMENT TO INCREASE THE ALLOWED-OUTAGE TIMES FOR SYSTEMS
: 1. Introduction
: 1.
: 2. A discussion of VEPCOs proposed amendments, dated December 17, 2004, to increase the allowed-outage times for the auxiliary feedwater, quench spray, low-head safety injection, and chemical addition systems from 72 hours to 7 days at North Anna Power Station, Unit Nos. 1 and 2.
Introduction
: 3. Closing Remarks/ Public Comments Enclosure
: 2.
A discussion of VEPCOs proposed amendments, dated December 17, 2004, to increase the allowed-outage times for the auxiliary feedwater, quench spray, low-head safety injection, and chemical addition systems from 72 hours to 7 days at North Anna Power Station, Unit Nos. 1 and 2.
3.
Closing Remarks/ Public Comments


North Anna Power Station, Units 1 & 2 cc:
North Anna Power Station, Units 1 & 2 cc:
Mr. Jack M. Davis Mr. C. Lee Lintecum                   Site Vice President County Administrator                   North Anna Power Station Louisa County                         Virginia Electric and Power Company Post Office Box 160                   Post Office Box 402 Louisa, Virginia 23093                 Mineral, Virginia 23117 Ms. Lillian M. Cuoco, Esquire         Mr. David A. Christian Senior Counsel                         Sr. Vice President and Chief Nuclear Officer Dominion Resources Services, Inc.     Virginia Electric and Power Company Millstone Power Station               Innsbrook Technical Center Building 475, 5th Floor               5000 Dominion Blvd.
Mr. C. Lee Lintecum County Administrator Louisa County Post Office Box 160 Louisa, Virginia 23093 Ms. Lillian M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.
Rope Ferry Road                       Glen Allen, Virginia 23060-6711 Waterford, Connecticut 06385 Mr. Robert B. Stroube, MD, MPH Dr. W. T. Lough                       State Health Commissioner Virginia State Corporation Commission Office of the Commissioner Division of Energy Regulation         Virginia Department of Health Post Office Box 1197                   Post Office Box 2448 Richmond, Virginia 23218              Richmond, Virginia 23218 Old Dominion Electric Cooperative 4201 Dominion Blvd.
Millstone Power Station Building 475, 5th Floor Rope Ferry Road Waterford, Connecticut 06385 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218 Old Dominion Electric Cooperative 4201 Dominion Blvd.
Glen Allen, Virginia 23060 Mr. Chris L. Funderburk, Director Nuclear Licensing & Operations Support Dominion Resources Services, Inc.
Glen Allen, Virginia 23060 Mr. Chris L. Funderburk, Director Nuclear Licensing & Operations Support Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Blvd.
Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060-6711 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117}}
Glen Allen, Virginia 23060-6711 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117 Mr. Jack M. Davis Site Vice President North Anna Power Station Virginia Electric and Power Company Post Office Box 402 Mineral, Virginia 23117 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060-6711 Mr. Robert B. Stroube, MD, MPH State Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia 23218}}

Latest revision as of 12:16, 15 January 2025

Notice of Meeting with Virginia Electric and Power Company Increasing the Allowed Outage Times for Various Systems at North Anna, Units 1 and 2
ML060240039
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/24/2006
From: Stephen Monarque
Plant Licensing Branch III-2
To: Marinos E
Plant Licensing Branch III-2
Monarque, S R, NRR/DLPM, 415-1544
References
Download: ML060240039 (5)


Text

January 24, 2006 MEMORANDUM TO: Evangelos C. Marinos, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

Stephen Monarque, Project Manager

/RA/

Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY (VEPCO) ON INCREASING THE ALLOWED-OUTAGE TIMES FOR SYSTEMS AT NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 (NORTH ANNA)

DATE & TIME:

Wednesday, February 8, 2006 10:00 a.m. - 1:00 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission (NRC)

One White Flint North 11555 Rockville Pike, Room O-07B4 Rockville, Maryland PURPOSE:

Discuss VEPCOs proposal to increase the allowed-outage times for various systems from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days at North Anna.

CATEGORY 1:

This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC/NRR VEPCO E. Marinos Kerry Basehore J. Nakoski Chris Funderburk T. Tjader Dave Bucheit S. Monarque Dave Sommers M. Stutzke Page Kemp Docket Nos. 50-338 and 50-339

Enclosure:

Agenda cc w/encl: See next page MEETING CONTACTS:

Stephen Monarque, NRR Robert Martin, NRR 301-415-1544 301-415-1493 Srm2nrc.gov Rem@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

ML060240039 NRC-001 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME SMonarque:srm MOBrien EMarinos DATE 1/24/06 1/24/06 1/24/06

DISTRIBUTION FOR MEETING NOTICE

SUBJECT:

FORTHCOMING MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY ON INCREASING THE ALLOWED-OUTAGE TIMES FOR SYSTEMS AT NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 Date:

January 24, 2006 Distribution:

PUBLIC LPL2-1 r/f RidsNrrAdro(BBoger)

RidsNrrAdro(CDorsey)

RidsNrrDorl(CHaney/EHackett)

RidsNrrDorlLplc(EMarinos)

RidsNrrPMSMonarque RidsNrrLplcMOBrien Bwetzel, EDO RGN II MStutzke TTjader JNakoski RLobel RidsAcrsAcnwMailCenter RidsRgn2MailCenter(KLandis)

Receptionist(OWFN and TWFN)

PMNS RJasinski RidsOgcMailCenter RidsOpaMailCenter(KClark)

Enclosure MEETING AGENDA FEBRUARY 8, 2006 10:00 AM - 1:00 PM PROPOSED AMENDMENT TO INCREASE THE ALLOWED-OUTAGE TIMES FOR SYSTEMS

1.

Introduction

2.

A discussion of VEPCOs proposed amendments, dated December 17, 2004, to increase the allowed-outage times for the auxiliary feedwater, quench spray, low-head safety injection, and chemical addition systems from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days at North Anna Power Station, Unit Nos. 1 and 2.

3.

Closing Remarks/ Public Comments

North Anna Power Station, Units 1 & 2 cc:

Mr. C. Lee Lintecum County Administrator Louisa County Post Office Box 160 Louisa, Virginia 23093 Ms. Lillian M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.

Millstone Power Station Building 475, 5th Floor Rope Ferry Road Waterford, Connecticut 06385 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218 Old Dominion Electric Cooperative 4201 Dominion Blvd.

Glen Allen, Virginia 23060 Mr. Chris L. Funderburk, Director Nuclear Licensing & Operations Support Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, Virginia 23060-6711 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117 Mr. Jack M. Davis Site Vice President North Anna Power Station Virginia Electric and Power Company Post Office Box 402 Mineral, Virginia 23117 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, Virginia 23060-6711 Mr. Robert B. Stroube, MD, MPH State Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia 23218