ML12191A008: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12191A008
| number = ML12191A008
| issue date = 06/12/2012
| issue date = 06/12/2012
| title = James A. FitzPatrick Nuclear Power Plant, ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, (49 Additional Co-Petitioners)
| title = ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, (49 Additional Co-Petitioners)
| author name = Goldberg S, Elias L, Arginsky M
| author name = Goldberg S, Elias L, Arginsky M
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
| addressee name = Borchardt R W, Vaidya B K
| addressee name = Borchardt R, Vaidya B
| addressee affiliation = NRC/EDO, NRC/NRR
| addressee affiliation = NRC/EDO, NRC/NRR
| docket = 05000333
| docket = 05000333
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:\:LelctLS 1 (\JjCk CS , G C-) L() ( ': oI"7 0 Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  
{{#Wiki_filter:\\:LelctLS1 (\\JjCk CS  
, G C-) L()
( ':
oI"7 0 Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
C0/-,'EDO
-~DEDMVRT DEDR DED04 0 &-
euic 1gýJO~j We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there fe "me *We,'
b j*,io somwees aorg the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you, Name (print):
4"c.~ G~J(oci Signature Date Email:5
¢,,4i Address:
2 -'*
C04i'c/(
,}
I!
/'
Name (print):
(AC*,A'L A!.6l'J, Signatur Date
(' iý 1--
Email: _AGOJ,'Y
(;fr'ai.
e---
Address:
?(;
06"
{ )'J6 Name (print): * -
f.\\_J--
Signature______
Date 4511 Email:
ci-& u..
Address:
Name (print):
LL('*"-
Date Signature A
I Email:
_____L_
Addrss: ~ CTh7I t(k Address: ý401 Ul cjjý'j
: f. 5 ('0 /V V I
J In I


C0/-,'EDO-~DEDMVRT DEDR DED04 0 &-euic 1 gýJO~j We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there fe "me b somwees aorg the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, Name (print): 4"c.~ G~J(oci Signature Date , Email:5 ¢,,4i .Address: 2C 0 4 i'c/( .,} , I! /'-'-, Name (print): A!.6l'J, Signatur -Date (' iý 1-- Email: _AGOJ,'Y (;fr'ai. e---Address: ?(; 06" { )'J6 Name (print): -f.\_J--Signature______
Date 4511 Email: ci-& u..Address: Name (print): Date Signature A I Email: _____L_Addrss: ~ CTh7I t(k Address: ý401 Ul cjjý'j f. 5 ('0 /V V I J In I Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "nro ikel'*" ignition soumces a~or9 the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until The public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you, Sgtr Name (print):._
Signature Date 6/(7/"
Email:
A' L6' cJ)h*ILQ (6fr Address:
Name (print):
'. 4-r LI
,-Signature Date J'-'
Email:
Address:
Name (print):
C) /3ibc4.*
/7 C
__Signature Date I2 Email:
Y CI,4Q (h i_.,Co,'-
Address:
/o/(
1qs,4, <
.Yg 5
UO 0 0[7*
Name (print):.;1A-._4**,*l
.*'"1*
t?&#xa2;.,_,
Signature,..*L*-
Date (P~
2I],
Email:
-717y&#xa2;:
9o(-,) ow~z-co,/
d-Address:
d w. W'tCATLCC' q_
0*:**c i
111*l!! **


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident." The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "nro ignition soumces a~or9 the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until The public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, Sgtr Name (print): ._ __ __ __ _ __ __ __-_ _ Signature Date 6/(7/" Email: A' L6' (6fr Address: 'Name (print): " '. 4- r LI ,-Signature
_ _ ..,, __.___Date J'-' -Email: Address: Name (print): C) /7 C __Signature
.. --Date "& I2 Email: Y CI,4Q (h i_.,Co,'-Address: /o/( 1qs,4, < .Yg 5 -UO 0 Name t?&#xa2;.,_, _.
--Date (P~ 2I], Email: -717y&#xa2;: 9o(-,) ow~z- co,/ d-Address: d w. W'tCATLCC' q_ i ,
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, N
Name (print):.
Date Lf")t-2"}
\\'"F
____Sinature Ve Email:
A7
(-3 1 -c, V 6 Address:
Name (print):
A Si,
J Signature (
Date I I 1 l Email: 0 \\.b.,
I&#xa3;
-o-uc*iov it
*i Address: )-Ao-7
&#xa3;-i %(0,
V I
/rT-r-J' Name (print):1A Sig S nature_1--
Datefl t-Email:
W
--- "1'7-*_(
1)v[*
Name (print):
Date
/
Address: 1"2-o 0 1 fj4i/itr I


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident." The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public." The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, N Name (print):.Date Lf")t- 2"} \'" F____Sinature Ve Email: A7 (-3 1 -c, : V 6 Address: Name (print): A Si , J Signature ( ...-Date I I 1 l -Email: 0 \.b., I&#xa3;
.it  Address: )-Ao-7 &#xa3;-i %(0 , V I /rT- r-J'Name (print):1A Sig S nature_1--
Datefl t- Email: W ---Name (print): Date / ,--Address: 1"2-o 0 1 fj4i/itr I Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level.- poses severe risk to workers and the public.
P The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petitio),-.
I Thank you.
k Name (print):.
Signature Date b [Nv______
Email: A6 a*'i w" CO i
f Address:
~
~c
%\\Q~k'~iC&#xfd; Name (print):
4:c DVIYA
-Signature VUK&#xfd;f/*
Date
&#xfd;4 11-7 11*2.-
Email:
e-ZW 1-10 (C*
Address:
'U CA,
,A I LaAC Name (print):
c-Signature __
( 6 Date Email:
C A
Address:
\\ AWA L
k/\\
tV*
zgs Name (print):
P Date 7-_
Signature W..A IA,"
Address:
,, 1 5 Lm AWY4, A\\ tkf41 N'.I


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level.- poses severe risk to workers and the public.P The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager Ih the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petitio),-.
.I Thank you.k Name (print): .-Signature Date b [Nv______
Email: A6 w" CO i f Address: ~ ~c %\Q~k'~iC&#xfd;
*Name (print): 4:c DVIYA -Signature Date &#xfd;4 11-7 11*2.- Email: e-ZW 1-10 Address:
'U CA, ,A I LaAC Name (print): c- Signature
__ ( 6 Date Email: C A Address: \ AWA L k/\ --tV zgs Name (print): P , Date 7-___ __ __ _ Signature
,.. W ..A IA," Address: ,, 1 5 Lm AWY4, A\ tkf41 N'.I Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager Ih the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print):
"i o2LL Date 060 1 &
/>
)()i 1 1 6
Signature I
*c Email:
V) n Vv
-I Address:
Name (print):.Cl,/
me., AA!,
M e
Signature L%*,
# *A4L-Date
* i 1
/
Email:
h,4rkcli k cA b oa,-L, Address:
i
'I o 6 4eN A -_ &#xfd;
________________Signature
~
~
Name (print):
Date
& 1("n I I-Email:
Address:
,A*5-z."
i J;,
A )Y W 65-IQ Name (print): *
,C.
Signature.
Date i"4 Email:
"66 L
Address: S Ci i


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): "i o2LL Date 060 1& />)()i 1 1 6 Signature I  Email: V) n Vv-I -Address: Name (print): .Cl,/ me., AA!, M e Signature # Date i 1 / Email: h ,4rkcli k cA b oa ,-L, Address: i 'I o 6 4eN A -_ &#xfd;________________Signature
~ ~Name (print): Date & 1("n I I-Email: Address: i ' J;, ,. A )Y , W 65- IQ Name (print): ,C. Signature.
Date i"4 -Email: "66 L Address: S Ci i Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be ad public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you, Name (print):
S\\J(L" dcAiyu?
Signature Date Email:
k,
-to Address:
Name (prin):,
Signature Date 717 Email:
Address:
Name (print):
po Mi.
4-A J1
)
Signature Date 6-
/7-1t--
Email:
/
Address:
Name (print): "J-!'i t
Date c//I'//o-)
Address:


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public." The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be ad public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, Name (print): S\J(L" dcAiyu? Signature
_ __ __ __Date Email: _ k, , -to Address: Name (prin):, Signature Date 717 Email: Address: > -, Name (print): po Mi. 4-A J 1)Signature Date 6- /7-1t-- Email: -_/Address: Name (print): "J-!'i t _Date c//I'//o-)
Address:
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print):
Date Address:
vp *1
&#xa3;
*7 Signature.
E m a i 1 A(k U
~~e(
AT9, l'i ~v Name (print):
4
*/d, V1/1,
/..4-Signature //,i
/
i Date Y/',7/
/
i Email:
Address:
Name (print)$:--,
A X
Signature _
A Date 1"1 I I--
Email:
Address:
Name (print):
Keaz&#xfd;,Iiy, T "yVe*
Signature Date
(,*
2 Emnil:
Address:


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident." The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): Date Address: vp 1 &#xa3; 7 Signature.
E m a i 1 A(k U~~e( AT9, l'i ~v Name (print): 4 V1/1, /..4-Signature
//,i -/ i Date Y/',7/ / i Email: Address: Name (print)$:--, A , X Signature
_ _ _ _ A ,-----Date 1"1 I I-- Email: Address: ..Name (print): Keaz&#xfd;,Iiy, T Signature Date -2 Emnil: Address:
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A.. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
T h a n k y o u,
x 4 Name (print):,.
Signature Date
,- z,
//f.
Email:
7/1 A
L~.~.
A I.
YLI4~
Address:
6/a
//~(~-'
hbE17 L/
V-''-
LIC&Y
-Address: 3L U
6L Name (print):
r
-ig n*
/,)
Signature._.__
Date
;I-'
2-Email:
5g*4\\Az 2_
1&
ecC i02 Address:
IP)ii, dr
: LfAy, I (--) oe Name (print):
VAi 0*/,
E Date CO il/
Ema il:
Address:
9i-/
:5 j(-7 Signature


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A.. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the.James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.T h a n k y o u , x 4 Name (print):,.
Signature Date ,- z, //f.Email: 7/1 A L~.~. A I. YLI4~Address: 6/a --//~(~-' hbE17 L/ V-''- LIC&Y-Address:
3L U 6L Name (print): r -ig /,) Signature._.__
Date ;I-' 2- Email: 5g*4\Az 2_ 1& ecC i02 Address: IP)ii, dr LfAy, -,, I (--) oe Name (print): VAi E Date CO il/ Ema il: Address: 9i-/ :5 j(-7 Signature
"_---
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the.James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
o The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print): f%3_u'I & \\Rp -
rt--w2, Signature L L,4 4.
Date
-Q Email Address: ?-
*i d
: CkGkC4,- M 1_.)
-I\\
Name (print):.sc*t-A ULVA Q-i Date,*--
: Ema, o
Signature t.


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.o The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): f%3_u'I & \Rp -rt--w2, Signature L L,4 4.Date -Q -Email Address: ?- d ': CkGkC4,- M 1_.) -I\Name , A ULVA Q- i Date -. -Ema, -.-o Signature , t.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for.a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you, Name (print):
T_~ji
__i4~1 K/k
/14A I
Signature I
Date 6-- )
,- /.--
Email:
Address:
2,~
0 LQ/-(f-IT A]-~N
~' Y
)1 Name (print): _
ZX Signatu r.F*
Date I
Email:
4 Address:
.2 A-Name (print)-
Signature Date 6
Email:
vi' Address:
Name (print):
Date I I
,J-f E al L/-,
Signature A
Email:
uk I cS&f f m v Address:
t_
(V\\A,---
k J
i.-.,-
L~V ~in )~ IxL4 V
0


We wish to co-petition with the Alliance for.a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, Name (print): T_~ji __i4~1 K/k/14A I Signature I Date 6-- ) ,- / .--Email: Address: 2,~ 0 LQ/-(f- IT A]-~N ~' Y )1 'Name (print): _ ZX Signatu Date I ' Email: 4 , Address: " .2 A-Name (print)- Signature Date 6 Email: vi'Address: Name (print): Date I I-,J- f E al <, L/-, _ Signature A .Email: uk I cS&f f m v Address: t_ (V\A,--- k J i.-. ,-L~V ~in )~ IxL4 V 0 Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
'
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident." The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources a&#xfd;ov9 the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print)-2 " -' C Signature Date ii Z i Email: ' Cc&#xfd;v Address: (5-5--'Name (print): V1 C' Signature
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources a&#xfd;ov9 the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
__Z, ZZ ZI Date Email: k n--O. EmaPl: C) ne Address: t &#xa3;. (.'-7, Name (print): -- , -- Signature ---" " Date r( -. -Email: '-.'r -Address: --, 4 4/1 Name (print): DEmail: Address: L"1u/ V (K- p /- Signature  
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
-ca1t <:i-, , GO Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  
Thank you, Name (print)-2  
' C Signature Date ii Z
i Email:
Cc&#xfd;v Address:
(5-5--'
Name (print):
V1 C'
(A-*
Signature __Z, ZZ ZI Date Email:
k n--O.
EmaPl:
C) ne Address:
o-CA* t -*OO
&#xa3;. ''"t*
(.'-7, Name (print):  
\\*
Signature Date r( -.
Email:  
/-.(*
'-.'r Address:  
, 4 4
/1 Name (print):
DEmail:
Address:
z-*-LZl L"1u/
V *L4*'/
(K-p *L /- Signature ca1t <:i-,,
GO
 
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
o The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you,
?
&#xfd;1,111 Name (print):
ff&#xfd;-.
Date Address:
Q~'~1 fi /'~
Signature____________
email:
-'?0_"ij7-3/4t,"-
4'
('d
) e3C_-
Email:
(2\\j\\ ~
)1 ~D(
0 C
Name (print): _
n Date Address:
\\ () *
*, ?
II I
?
I i
I Name (print): \\'*
(P
[VCi Signature Date
/ ('7
./
Email:
C ME,, )
Address:
/.V C"4(
C\\.
Name (print):
(T1VSignatufi&#xfd;:4k Date f~ T(,/
Email:
CO~1e()Y
,,"~
Address: 201 lJ-(,4. :4 H17 iOO>
000 t,


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.o The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, ?&#xfd;1,111 Name (print): ff&#xfd;-.Date Address: '.'.Q~'~1 fi /'~ Signature____________
email: , -'?0_"ij7-3/4t
,"- 4' ('d ) e3C_-Email: (2\j\ ~ )1 ~D(0 C Name (print): _ _ n Date Address: \ () , ? .'II I ? I -- i I!Name (print): (P [VCi Signature Date / ('7 ./ Email: .C ME,, ) -..-, Address: /.V C"4( C\.Name (print): (T1VSignatufi&#xfd;:4k Date f~ T(,/ Email: CO~1e()Y ,,"~Address: 201 lJ- (,4. :4 H17 iOO> 000 t, Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources aiong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, T7DdLJq4/,,, V, W ) o W e t Name (print):
/
J Date 6
//7,_T2-i Email:*l Address:
t-
)Iov
-2,- 1r-5..
V L4.IA/V/
/
)/
Date
__ Email:__________________
Address: /0
/
/-VL
'y
/d f-?
Name (print):
(
"JX J
4I Signature Date i
(
1 Email:.C-Address:
Name (print):
4 (Y
Km k 'tl Date
'7 Email:
M -I' Address: ~G
~1 L
Signature 11_&#xfd;ka C
q-7J t


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident." The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources aiong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, T7DdLJq 4/,,, V, W ) o W e t Name (print):/J Date 6 //7,_T2-i Email:l Address: t- )Iov -2,- 1r- 5..V L4.IA/V//)/ -Date --, __ Email:__________________
_ ___Address: /0 / /-VL -& ,__. 'y /d f-?Name (print): '' ( "JX J 4I Signature Date i ( 1 Email: .C- " 'Address: Name (print): 4 (Y Km k 'tl Date '7 Email: M -I' " Address: ~G ~1 L Signature 11_&#xfd;ka C q-7J-t !
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print):
19"/* &#xa2;
&#xfd;"P_,DdAav&#xfd;s Signature ib&#xfd; 0 1^-
wd_11&#xfd; Name (print):
$9.TdSignature.14 Date k/
72-Email:
"-O Address:,
I t-w-1
-K I4
_D
-7dOti-Name (print):
/1) 6/
Signature
/
/
Date &#xfd;
//
7 Z //7----
Email:
kf.
, " /",
/
Address:
&#xa3;./
FZc MY/..i~_
.l-o*i*-.,)'*
f 7 /
6(6/(
Name (print):,
! a)\\ ec7'-,S*7 l6-Signature Date ifL
/i
: m.
email: /k/)
-O *
: 0. n1o--.
j,
Address:
s.,
l/
,.(r. by.l{
4//-


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant." The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): &#xa2;&#xfd;"P_,DdAav&#xfd;s Signature ib&#xfd; 0 1^- wd_11&#xfd;Name (print): $9 .TdSignature.14 Date k/ 72- Email: "-O , Address:, I t-w- 1 -K I4 _D -7dOti-Name (print): /1) 6/ Signature
/ /Date &#xfd; // 7 Z //7---- Email: kf. ...., " /", /Address: &#xa3;./ FZc MY/..i~_
f 7 / 6(6/(Name (print): , ! a)\
-l6- Signature
___ _ __ _ __ _Date ifL /i m. email: /k/) -O 0. n1o--. j , Address: s., l/ ,.(r .by .l{ 4//-
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there ame "D WeVf'," ignfiom soumrces aDnig tX,'e vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and unfil the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you,
-?4$r Sinaur Name (print):
Signature Name (print): __
,__v___.e
__C-Signature____/______
Date 6
2.-
Email:
Address:
I N.
Name (print):
f,'1...-.
c-'-cZ..*
Signatuire.z Date
.Email:
A
/.
-KY*.'s-.
*,2, &#xa2;J,<.-
*.--1 Name (print): 64.J*K &.
4i Date
&7/
Email:.
Address:W'Qt Signature
-,/", /1l*


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there ame "D WeVf'," ignfiom soumrces aDnig tX,'e vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and unfil the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, -?4$r Sinaur Name (print): ____________
Signature Name (print): __ ,__v___.e
__'____'_
__C- Signature____/______
Date 6 2.- Email: Address: I , N.Name (print): f,'1...-.
Signatuire .z Date ...Email: A /. &#xa2;J,< .-  Name (print): 64 .JK &. 4i Date &7/ Email:. .Address:W'Qt Signature
-,/",
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.*
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, H/
r\\
l,/
2 A,-AI Name (print):
-f 4
*UJ Signature YG Date Email.
K_4-A&#xfd;d Date-0/iL
/&#x17d;
/*-
Email:
*l
(,*-
C,.*.,'
C'l Address 2
A-'
L/
Name (print): *,.,
A--
S.
L't'"
Signature Date,,
1LJ Email:
Address:
QG>bqt%
_"(4 L-0*
Name (prin.t): Aj &N-,' A 5,A (/')*t" Signature Date if-IVt-I!-
Email:
Cz Vf,
-I--
C U/Z* *t-*:-
Address:
Name (print):
ckw-IV"--
Signature (0&C.
Date LIk1 0,012-Email:
v-cxg-4,,
w9;L o 00, Q
4pp0 (q Address:
I~l Cbz5'*
r
'.l*
(o,*O\\
A


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident." The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public." The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.*
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, H/ r\ l,/2 A,-AI Name (print): @ -f 4 Signature YG Date Email. K_4-A&#xfd;d Date- 0/iL , / Email: C'l Address 2 A-' L/Name (print): A-- S. L't'" Signature
" Date,, 1LJ Email: ---@ .Address: QG>bqt% _"(4 L- Name (prin .t): Aj &N-,' A -- 5,A Signature Date if- IVt- I!- Email: Cz Vf, -I-- C ; 'Address: Name (print): ckw-IV"--
Signature (0&C. .Date LIk1 0,012- Email: v-cxg-4,, w9;L o 00, -_ Q 4pp0 (q Address: I~l r A Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the. outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I reqipst NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will-be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print): I+e\\'AK\\ (*ri A Signature
-AA-"
Date Em;ail:C kk4UV\\6( (D
<ZJ~
I j
0 Address:
Name (print):
-- A S
0
,D/
Signature Email: 1447
/ 7 ?/u ZC&#xfd;b12r Add ress:
Date b
)2 Email:
Address:
/
Name (rint:
"tfN Sionature Date (L.-
Address:
]"7/I'*.-
Email:
!J,


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the. outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I reqipst NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will-be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): I+e\'AK\ (*ri A Signature -AA-" Date Em;ail:C kk4UV\6( (D<ZJ~I j 0 Address: Name (print): --A S 0 ,D/ Signature Email: 1447 / 7 ?/u ZC&#xfd;b12r Add ress: Date b )2 Email: Address: /Name (rint: "tfN Sionature Date (L.-Address:
Email: _ _ _ _ _ __ _!J, Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant.is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent, plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print):
I I.VO (k%(
Signature Date Email: tInIp 0P kn,"bJ NAA4S, I
Address:
(qg,,
Name (print):
",1(
Vw0
.A Date
,7 7
-H-,&#xfd; o d &#xfd; e-,&#xfd; Signature Email:
Address:
f2-_
: e. -e C-w! o*2(, 0
'.of*/2..*.*
/k Name (print):
v1(*,
d-
*-&#xa2; 14D f-Signature
* Date Cktl-/ 1*
'Z.
Email:
Address: R f
etC1-V rcir)~
1r -
OA{Lw~ )&#xfd;
.AAY \\
A Name (print):
Date Email:
Address:
f O)*
ift'l Signature 4
, A) r&~~4d~ ~\\IfOY72U


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant .is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent, plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): I I.VO (k%(Signature Date Email: tInIp 0P kn,"bJ NAA4S, 'I Address: (qg,, , Name (print): " ,1( Vw0 .A Date ,7 7-H-,&#xfd; o d &#xfd; e-,&#xfd;Signature
>Email: Address: f2-_ " e. -e C- w! 0 /k _Name (print): d- 14D f- Signature _Date Cktl-/ 'Z. Email: ________ ___ ________Address: R f etC1-V rcir)~ 1r -OA{Lw~ )&#xfd; .AAY \ A Name (print): Date Email: Address: f ift'l Signature 4 , A) , r&~~4d~ ~\IfOY72U Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -. poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "io MW*,f" ijition so~rces a&#xfd;oij tW)e vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you,
,o Name (print):
(' m Signature-.
Date L
[-/2e)f.-
Email:
Address:
---9.
:S Ze I
z AbAlo&#xfd;-kp&#xfd;_
L11710(o Name(print):
J i
Signature Date
(
-0 1L' V2-Email:
U J
Address:
A0
.Vb'V
. t&3-it.
L-C
(
O0 01 Name (print):
/iii L () G " --
Signature, /
Date &-/"7--b Email:
4/ 61, #r-(0
, iCd.-o Address:
J
)i,-
-LoiT5
(._
Signature Name (print):
Date dt Address:
-3 Email:
4 Ub-,


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -.poses severe risk to workers and the public.The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "io ijition so~rces a&#xfd;oij tW)e vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, ,o Name (print): (' m Signature-.
Date L -[-/2e)f.-
Email: Address: ---9.:S Ze I z AbAlo&#xfd;-kp&#xfd;_
L11710(o Name(print):
J i Signature
,.Date ( -0 1L' V2- Email: U J Address: A0 .Vb'V .t&3- it. L- C ( O0 01 Name (print): /iii L () G " -- Signature , / & .- _Date &-/"7--b Email: 4/ 61, #r-(0 , iCd.-o Address: J , )i,- .-LoiT5 (._ ._Signature Name (print): Date dt Address: -3 Email: 4 Ub-,
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency
-enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show thedangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no &#xfd;ikely" ignition soumes azong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you,
~-
Name (print):
Signatu atXZ.
Date3'"/ '??-LO/
* Email: J-oO*-f/C(..
,.-0, Address:
Name (print):
u tre Date r -
(-
E Address:
I
-,C


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency-enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.The hydrogen explosions at the Fukushima reactors show thedangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no &#xfd;ikely" ignition soumes azong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, ~-Name (print): Signatu atXZ.Date3'"/ '??-LO/ Email:
& ,.-0, .Address: Name (print): u tre Date r -(- E Address: I -,C -
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the Jam4s A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "'o
,etj," &#xfd;gnffit soouves a~oi~g te vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until The public is afforded bearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and mypdentity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this Ititin.
Thank you, Name (print): &#xfd;Oa_
\\
0100 Si nature Date Emails:
<'e,-
1z
<c,---/' -c&#xa2;-e Adres
-I Name (print):
Signature Date to
/
71Email:
Address:
Lr" 4/
k"',,
7s' Name (print): _____/__
__-_Signature Date 1*>. /2-Email:
Address:
2*Z/
j'-IL'/
6&#xa2; y>/&#xfd;-..
Name (print):
/
Signature""
Sigatu~re
&#xfd;
:'Date (7/2 Email:
fI*'*
L c
(L-i MAI LcWVI Address:
.L9_t trA-/Lo&#xfd;.
/k
_I
"- I-WACK--*
K5A
'ki-,
(9"7 6 o)


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the Jam4s A. FitzPatrick Nuclear Plant.The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "'o ,etj," &#xfd;gnffit soouves a~oi~g te vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until The public is afforded bearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and mypdentity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this Ititin.Thank you, Name (print): &#xfd;Oa_ \ 0100 _ " Si nature Date Emails: <'e,- 1z <c,---/' -c&#xa2;-e ' , Adres -I Name (print): Signature Date to / -71Email: Address: Lr" 4/ ", .k"', , 7s'Name (print): _____/__ __ _ _ _ _ _ __-_Signature
____Date ./2- Email: Address: j'-IL'/ 6&#xa2; y>/&#xfd;-.. ,"-Name (print): / ' Signature""* Sigatu~re
&#xfd;:'Date (7/2 Email: L c (L-i MAI LcWVI Address: .L9_t trA-/Lo&#xfd;.
/k _I "- I- K5A , 'ki-, (9"7 6 o)
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to. suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no inke\\y"
*gnron sorces atorNg tVe vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you, Name (print): A~ Y, 4'o Wptle-,iq ka L,&Sdignattuure_
Date JL/i.
p1 n-En Address: 7C/F7 2)*4Cx nail:
"j-2 RAI.
woaAg 411:1_&#xfd;A VI-X I2~AL~&g~~
Name (print):
Signature Date
* \\
Email:__________
Address:
0, C
AkO 3/4v 4A~
Name (print): A e*(,A g [y
-L*
Date Email:__
Address:
P&
9 OkX
-{
d/
Signature.
uIeci 0<- AW Name (print): L1 ZiA
'. S-'---
Signature__i, Date Ema 2cZ eaaWi Address:
ID(2 LCJ d 0\\J (2c)


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to. suspend the operation of the James A. FitzPatrick Nuclear Plant." The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no inke\y" sorces atorNg tVe vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrck Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, Name (print): A~ Y, 4'o Wptle-,iq ka L,&Sdignattuure_
Date JL/i. p1 n- En Address: 7C/F7  nail: "j-2 RAI. woaAg 411:1_&#xfd;A VI-X I2~AL~&g~~
Name (print): , Signature Date * \ Email:__________
Address: 0, C AkO 3/4v '4A~Name (print): A g [y Date _______ Email:__Address: P& 9 OkX -{d/Signature
..-- -uIeci 0<-AW Name (print): L 1  ZiA '. S-'--- Signature__i, Date -Ema 2cZ eaaWi Address: ID(2 LCJ d 0\J (2c)
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrck Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the'double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are ",io &#xfd;*e*j" ig'i i
ent
%wgc he 'vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you, Name *rint):
Date Email:_
'41&#xfd; L& 0.1 Signaturee.
/41 Address:
'**,]..
N a me (p rint):
e.,<-r, "A/-'*i.
s.cb;44*",&#xfd;&#xfd;1 Signaturei,/*
"('f DtEmail:
5CtFf4M CO)h I
NA&#xfd;I' Ir 5t!M Address:
eeQ;7 Ar'
/kV&
7 Name (print): 2 Signature../
Date.
7 Email:
Address:
VP I.
Signature
\\.
Name (print):
Date Email:
Address:


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.*
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the'double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are ",io ig'i i ent %wgc he 'vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, .Name  Date Email:_'41&#xfd; L& 0 .1 Signaturee.
/41 Address: -.N a me (p rint): e.,<-r,
"('f DtEmail: 5CtFf4M CO)h I NA&#xfd;I' Ir 5t!M Address: eeQ;7 Ar' /kV& 7 _____Name (print): 2 Signature
../ , -Date. 7 Email: Address: VP , .I.Signature
\.Name (print): Date Email: Address:
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the pubfic is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you,
__u t.z4L' Name (print):
\\,
")4()
Signature__
Date L./
-i Email:
4VI
-A 7 1
.I C 0VVN, Name (print): _________
-______________Signature Date P/
Z Email _____
Address:
P6 &x(5~ 6fa~ k A
? S Name (print):
Signature Date Email:
Address:
Name (print):
Signature Date Email:
Address:


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant." The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident." The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the pubfic is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, __u t.z4L'Name (print): \, #" ")4() Signature__
Date L./ -i .. Email: 4VI -A 7 1 , .I C 0VVN, Name (print): _________
-______________Signature
_ _ _ _ _ _ _Date P/ Z Email _____ ___.__,_______,.!__"____,.____,._'_
Address: P6 &x(5~ 6fa~ k A ? S Name (print): Signature Date Email: Address: Name (print): Signature Date Email: Address:
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
o The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print):
PO)Y2Y /$b id4(ture Date Email:_
I(A~NV~iZt 7/
,,TJ2 717Jh'AA Address: -
-*-.e.
,\\
.J..k,.-C#
f
\\
/
V/
Name (print): f\\rS '\\Signature Date */_*_
_Email:__
Address:
Y1-41 j a-$
)65-1 "
ry-kn-N C6, Name (print):
;~&-~
Signature Date 6,
.&#x17d;.)1.->
Email:
Address:
' T-'LI" l-u-IV \\--
Name (print):
A W'Y Date 6&#xfd;
/%-
)C Address: Cc cz&#xfd; &#xfd;cc &#xfd;,ws Signature (0
1c__k Email:
C A C:,o
-L,'-


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.o The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident." The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): PO)Y2Y /$b id4(ture Date Email:_ _ __ .__._____________________
I(A~NV~iZt 7/ ,,TJ2 717Jh'AA Address: -,\ .J..k,.-C#
f \ / V/ _Name (print): f\rS '\Signature
__ _ _ __ _ _ __ _ _ __ _ _Date _ _ _ _Email:__Address: Y1-41 j a-$ )65-1 " ry-kn-N C6, Name (print):& ;~&-~Signature Date 6, ..)1.->Email: Address: ' T-'LI" l-u- IV \-- -Name (print): A W'Y <Date 6&#xfd; /%- )C Address: Cc cz&#xfd; &#xfd;cc &#xfd;,ws Signature (0 1c__k Email: C A C:,o -L,'-
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources aiong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name(print):
-o*'y, C-\\L,*'
tN SignatureZ A',e-v(.A Date la
}6 I V*
Email: -+
0 8
A 4*L,.
Address:P6 AH g4 k07
*~*~icp~
Name (print):
L 1-kef6m~
V
&#xfd;vi Signature
('4W i7 Zz Date Email:
Anzkd CO)k Name (print): k P-22 Signature, Date 7
Email:
L02 0 e<4 Address:
6(-
/
'V
,16W42 "zO*<
/
Name (print): A XI H
Signature Date #
W Email:
lic(e-T-(- $
)-.f Address: P0 15e, 30 t hA ALmTv A/4A e-*F7


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant." The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident." The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public." The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources aiong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name(print): C-\L tN SignatureZ A',e-v(.A Date la }6 I Email: -+ 0 8 A Address:P6 AH g4 k07 ~~icp~Name (print): L 1- kef6m~ V &#xfd;vi Signature
('4W i7 Zz % <Date Email: Anzkd CO)k Name (print): k P-22 Signature, Date 7 Email: L02 0 e<4 Address: 6(- / 'V ,16W42 .-/Name (print): A XI H Signature
_ _ __ __ __Date # W Email: lic(e-T- (- $ )-.f " Address: P0 15e, 30 t hA ALmTv A/4A e-F7 Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
: Thankyou, Name (print):
L&,Vne_- 14.rh&#xfd; Date 6&/')
Signature i ma ffr 0/29 40 v Acvo
, 6O0'.
Email:
Address:
Name (print):
C 6P 0,jql-&#xfd; Date Co 0,0 Email:
Address:
*L GO,*J, JC;i.Ir 1%
Name (print):
/1t/eU 4*.-
'A Sign S1,v6e4ct-e's j
,L~
I/
ature Date
~/
I Email:
,.*L 9'6P->
.; t Address: -
*-r*-
4, e.
9-,6
, A-'/V 7
l'y6c, &#xfd; Z,--
Name (print):
N 4 Date
( Z4 Address:
/2.
J!
Signature
.I i
Email:
!.i 2 Le/-(
i "h
-C 7


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant." The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thankyou, Name (print): L&,Vne_- 14.rh&#xfd;Date 6&/')Signature i ma ffr 0/29 40 v Acvo , 6O0'.Email: Address: Name (print): C 6P 0,jql-&#xfd;Date Co 0,0 Email: Address: ! JC;i.Ir 1%Name (print): /1t/eU -.-'A Sign S1,v6e4ct-e's j ,L~, I/ature Date ~/I Email: ' 9'6P-> .; t Address: -4, e .9-,6 , A-'/V 7 l'y6c, &#xfd; Z,--Name (print): N 4 Date ( Z4 Address: /2 .J!______________
Signature .I i Email: !.i -2  Le/-(i "h -C 7 Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print): --*
1V(:D,&#xfd;) &#xfd; C.4:F Signature
~2 ~W~&
Date U / 4',
Address:
P D
-u"-)c Email:
'~K5 /,fr$ ~
~C~e2
~.
46,~2r)iq~ 754-i~ye J~~J-~ J,2o31 Name (print):
4Y__
"_Sg te___,_____._
Date
/ c-Email:
.kLA_-
5
'WA C/A Address:
"'W
-("5(d*(
3 P A Name (print):
f\\
Signature.
Date 5*
t1,,Email:_______________________________________
Address:6 k 3 I,-
Name (print):
lr
: vla, I
Date 6) () /
Email:
Address: 3>&#xa3;1k P.~v Signature L6!, l 4 -
0, KK 4"", &#xfd;) u - &#xfd;Id 1&#xfd;-
-- \\
6 l X L'&#xfd; Pa.
AL. r &#xfd;_\\ o c -,,-- D


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): --1V(:D,&#xfd;) &#xfd; C.4:F Signature~2 ~W~&Date U / 4', Address: P D -u"-)c Email: '~K5 /,fr$ ~ ~C~e2~. 46,~2r)iq~
754-i~ye J~~J-~ J,2o3 1 Name (print): 4Y__ "________-____
___ "_Sg te___,_____._
Date ./ c- Email: .kLA_-5  -'WA C/A Address: , ."'W ,-- ' 3 P A Name (print): f\ -' ..Signature.
Date t1,,Email:_______________________________________
Address:6 k 3 I,- _ _ _ _ _ _ _ _ _Name (print): lr vla, " I Date 6) () / Email: Address: 3>&#xa3;1k P.~v Signature L6!, l 4 -0, -KK 4"", &#xfd;) u -&#xfd;Id 1&#xfd;---\6 l X L'&#xfd; Pa. AL. r &#xfd;_\ o c -, ,-- D Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show thedangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print):C6t-ZY--
X, r'-&#xfd;-
Signature Date.
Emai A,'J2-J LAit, 1: So 01A-Address: /017-2 6
A 2-_)
C.
j,-
.,0(
Name (print):.. < re
.t Signature Date**Lt
;.('
Email:
Address:
t--
7-Name (print):
W Date Address:
Signature E dail:
*P0,-
I Signature' Name (print): Zi/-/1,(Y
,C'/'/1/A/' 6621 Date Address:-&
R 7
Email:
4'
~26


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant." The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.The hydrogen explosions at the Fukushima reactors show thedangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission.
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print):C6t-ZY-- X, r'-&#xfd;- Signature Date .Emai A,'J2-J LAit, .-. 1: So 01A-Address: /017-2 6 A 2-_) C. j,- -, .,0(Name (print): ..< re .t Signature;.(' Email: Address: t-- 7-Name (print): W , Date Address: Signature E dail: *P0,-I Signature' Name (print): Zi/-/1,(Y ,C'/'/1/A/'
6621 Date Address:-&
R 7 Email: 4' ~26 Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission.
Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies Upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and.identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print):
,,S
*_, )iL\\
Signature Date
)
I,
Email:.
0&#xfd; )10!&#xfd; "2 1,,;, -Z-o, &#xfd; C ? 9 Address:
- j cj CA 4//
0 Y_ lb I
Name (print):
Signature Date
~JuV~ r'~Or"~&~ (A~L I
Email:
rvo r-Address:
I-O)
&#xa3;A..-
l2-3
:;Th Name (print):
/
6 Signature./____.__
DateJj,,,
J(4
.0 Email: flA s sc-i f
/
O--,f
[
Address:
57 6 A)c 160 &,2e&#xfd;
;A&
- 04I~L VA-0 Name (print):
Kj1*
)
Date Email:j*
Address:
0 Signature 1/ AldL
.b(
B A_
A,()()
.&#xfd;A


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies Upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and.identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): ,,S ' )iL\Signature Date ) I , "-- Email: .0&#xfd; )10!&#xfd;"2 1,,;, -Z- o, &#xfd; C ? 9 Address:-j cj CA 4// 0 Y_ lb I Name (print): Signature Date~JuV~ r'~Or"~&~ (A~L I Email: rvo r-Address: I-O) &#xa3;A..- l2-3 :;Th __Name (print): / 6  Signature
./____.__DateJj,,, J(4 .0 .Email: flA s sc-i f -/ O--,f [ ,.-Address: 57 6 A)c 160 &,2e&#xfd; ;A& -04I~L VA-0 Name (print): Kj 1)Date .Address: 0 Signature 1/ AldL .b(B A_A,()() .&#xfd;A Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print): _
Date (I I-Email:
Address:
cO" Signature c~c~ r,4 op &#xfd;VOr- \\
'e Ac vtAYA
&#xfd;&#xfd; C tOj 1 (
(I cIC1Lib Name (print): '
&#xa3;&#xfd;z(o-0 9-&#xfd;-LCY Date 6-*- 1
'(9 Email:
Signature~~,
"of A~
\\
ooP
- yn v
Address: &#xfd;&#xfd;k S&Ldk a Co,"A t
~k~w\\
kOhf 7 Name (print): *
/
-a&
/ S,' /
'I, q
Signature L 'IJ
) _
Date 6/1"
)-
Address:
Email:
?*L.
/
.(./Z&#xa2;*
/,
6
.x/(
Name (print): 6/
Ali
&#xf7; &#xf7; L*-'--
(/"
Signature Z**1*ZII" Email:
o-)c,-
)t6
-oa Date I(
, j. 2-0{2-Address:
A9o 0 i i &#xfd;,x/ 44, Aly ' o i 9j -


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): _Date (I I- Email: Address: " cO" ---Signature c~c~ r,4 op &#xfd;VOr- \ -'e Ac -vtAYA -.&#xfd;&#xfd; C tOj 1 ((I cIC1Lib Name (print): ' &#xa3;&#xfd;z(o-0 9-&#xfd;-LCY Date 1 '(9 Email: Signature~~,"of -A~ \ ooP -yn v Address: &#xfd;&#xfd;k S&Ldk a -Co,"A t * " ~k~w\ kOhf 7 Name (print): / -a& / S,' / 'I, , q 'Signature L 'IJ ) _ --" , Date 6/1" )-Address: .Email: / /, 6 .x/(Name (print): 6/ Ali&#xf7; &#xf7;(/" Signature  Email: o-)c,- )t6 -oa Date I( , j. 2-0{2-Address: A9o 0 i i &#xfd;,x/ 44, Aly ' o i 9j -
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print): _
(*
Signature
(...O.
,i..o4 Date G(*-41.
Email:
(
sf"'sc.O_.c ('
&#xa2;iI Address:
P.
r' Z*
T VT Name (print):
0
#f<
cQ. iSgar" t
Date Email:______________________________
Address:*ll L
IAk
/
,fi I
A Name (print):
Sin Ur Date (0 11 Email:
r14
~
C.C{k Addressiab LOC Jt dCL kY tl Name (print):
&#xfd;,',
D)-r.
Signature Date
/
Email:
opk Je*,f OiFrJf Address:.:
k--,
o*4Le;i A)'


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): _ ' Signature
(...O. ,i..o4 Date .Email: ( sf"'sc.O_.c
(' &#xa2;iI , Address: P. r' Z T VT Name (print): 0 #f< cQ. iSgar" t Date Email:______________________________
L ; .IAk / ,fi I A Name (print): Sin Ur Date (0 11 Email: r14 ~ C.C{k Addressiab LOC J t-, dCL kY tl Name (print): &#xfd;,', D)-r .Signature
, Date / Email: opk ,f OiFrJf Address:.:
k--,..... A)'
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan,- since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "nolikely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print):
SR t" i5 K '-
Signature Date 2./
(4 Email:
Address:`
R-[/)
u,,
o:D'i zi (.:* Z*- A)-
0 Name (print):
c -c Le Signature 7
Date 2
-(
Email:__
Address:
(D C9-l T
'~/<
/.Y Name (print):
/ -I r C
.,S
: t.
Signature".
Date [
1 Email:
Address:
L..o C.
9 Name (print):
Y 2.NThJ i*, y
).Af/
Signature Date
/17, Email:
A W!
('JNN' (J Ct/,
U! CA P\\
Address:
22 V
'5t N IJ O \\


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant." The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident." The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan,- since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "nolikely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): SR t" i5 K '- Signature " ._ .-.Date 2./ (4 , Email: Address:`
R-[/) u,, o:D'i zi A)- 0 .Name (print): ._ c -c -- Le -Signature 7 -Date 2 -( ' -Email:__Address: (D C9- l T ' '~/< /.Y Name (print): / -I r C -.,S t. Signature".
Date [ , 1 Email: Address: ..-' L..o -C. 9 Name (print): Y 2.NThJ y ) .Af/ Signature Date /17, Email: A .. W! ('JNN' (J Ct/, U! CA P\Address: 22 V '5t N IJ O \
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print): LK>
(jk.U-Signature k //
o Date (
1 Z-Email:
Address:
6a K "UV+/-Aq(
,., f-ar Name (print): SKt 4 4 t2./ cc-o5*
Signature
,&V 4
Date-Email:
A Address:
IT U
Name (print): _S M,
Signaturec____
Date
-'///A)
Email:
&'c S"
_________/o Address:
Name (print): _E
-1
,r,.
Ke*-* 5 ifpr -
ignature "A'.
v-**
* r'***"-/R Address:


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident." The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public." The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): LK> (jk.U- ,,. Signature k // o -_Date ( 1 Z- Email: Address: 6a K "UV+/-Aq( ,., f-ar Name (print): SKt 4 4 t 2./ Signature
,&V ' 4 Date- Email: -A Address: IT .U Name (print): _S M, Signaturec____
_Date --'///A) Email: &'c S"_________/o Address: Name (print): _E -1 ,r ,. 5 ifpr -'" ignature "A'. Address:
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological-accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print):
C' IP'
"'i CIcL Signature Date 6-Email: C5T eA 1LL(,)
N'/VC.
/ie,
/
Address:
t3 1-fl,,
Je,'/gJ'!"-I.
,/\\/Itl1,,
Name (print):
60'J,
Signature Z,1cZCL Date 6
7-Email:
Address:
A)
/k2 VA
/\\
"/i.0
* 6a_)
Nam e (print): G aN)
- v v.s Signat' re Date
&#xfd;
:1 1 2( -
Email:
Address:
CA~1~
~
Name (print).
Q*J-',_ ec-.a14-5't
,*s Signature z
Date Email: emT /af 5" 7 o
c-o, Address:
P 4
/
o


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological-accident to the outside environment at ground level -poses severe risk to workers and the public." The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): C' IP' "'i CIcL Signature
_Date 6- -Email: C5T eA 1LL(,) N'/VC. /ie, /Address: t3 1- fl,, Je,'/gJ'!"-I.
,/\/Itl1,, Name (print): 60'J , Signature Z,1cZCL Date 6 7- Email: Address: A) /k2 VA -- /\ "/i.0 6a_)Nam e (print): G aN) -v v.s Signat' re -- " '-Date &#xfd; :1 1 2( -Email: ---Address: CA~1~ ~Name (print). ec-.a14-5't Signature z : Date Email: emT /af 5" 7 o c- o, Address: P .4 , / o .,-
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print):
Date
&, I 0"O J~qot A0z Signature i,
[7-Email: &U/Q 7-c[6I
'(-"C C)cVq Address:
Jc IL44 Lr ITc-7q$
I I IA Name Signature'rma--:
Date UEmail:
*f'r,~AP'*tl > V7'--
*-AJ1 9,- err'--
I
/
Address:
Name (p Date A Address:
Name (p I
rint):
M2/,1 A/4
!VA-IVt\\f.0 Signatu4 1,
Emal :.Email g
rint):x~
Signature Date & I 0t-1L Email:
&#xfd;- V.." &#xfd;. ", s
<ip Address:


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): Date &, I 0"O J~qot A0z Signature i, [7- Email: &U/Q 7-c[6I '(-"C C)cVq Address: Jc IL44 Lr ITc-7q$I I IA 'Name _ _ _"__ Signature'rma--:
Date UEmail:
> V7'-- 9,- err'--I /Address: Name (p Date A Address: Name (p I rint): M2/,1 A/4 !VA-IVt\f.0 Signatu4 1, Emal :.Email g rint):x~ Signature Date & I 0t-1L Email: &#xfd;- V.." &#xfd;. " , s <ip Address:
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
4 The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety.posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print):
L -,-- e-Signature ZLI:V Date-z
--.v.
t &>
toi
-z._
Email:__
Address:
t N/*<sA Name (print): Ja
-Signa turezi&#xfd;2
-*2-.*
Datess
(&#xfd;()
(/h-L__
Email:2 Vci Address:
(2 N 0- n
,w"*
Name (print):
KksF6/S-$
1- (
Signature/ Z*{)
4a, Dated&#xfd;(%//
Email:
51,2,
/`_,A, 6-*V` V I.'
t~
Address: 33
-7 ekr-Name (print. &#xfd;-/X M/D Date Add ress:
e~
Lo-ke-,
N-ik by ii;i9~~
fcJ/1 Signaturee.
Email:
4'


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.4 The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety.posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): L -,-- e-Signature ZLI:V Date-z --.v. t &> toi -z._ Email:__ _Address: ' t  Name (print): Ja -Signa turezi&#xfd;2 ..-Datess (&#xfd;() (/h-L__ Email:2 Vci Address: (2 N 0- n 'Name (print): KksF6/S-$
1- (Signature/ 4a, Dated&#xfd;(%//
Email: 51,2, /`_,A , V I.' t~Address: 33 -7 ekr-Name (print. &#xfd;-/X M/D Date Add ress: e~Lo-ke- , N-ik by ii;i9~~fcJ/1 _.. Signaturee.
_________Email: 4' ,
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did notinstall a Direct Torus Vent System as requested by the NRC in.1 989-and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
o The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Name (print):
Signatur r
Address:
dz Name (print):
&el Signature_)
&#xfd;__
Date 1-----
E m ail:
./'*
-,z
/-- j,
Name (print): _?C1 Lk r--U.
(A n V, Signature Y-a
\\)0L..--,c.'--
Date i
a-Email:
")
U.
V
*2-11\\0 Address:
('
r 2
LJ1.i (V"
II
, 7,--
,n.
/".
Name (print)://V L. (
L{
.U*,/
(_0 LiL Signature "
Date i
Email:
.f I
Address:
f() /
0,(
L


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant." The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did notinstall a Direct Torus Vent System as requested by the NRC in .1 989-and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.o The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public." The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Name (print): Signatur r Address: dz Name (print): &el Signature_)
&#xfd;__Date 1----- E m ail: -,z ../-- j , -, Name (print): _?C1 Lk r--U. (A n V, Signature Y-a , _ \)0L..--,c.'--
Date i a- Email: ") U. V  Address: (' -, r 2 .,- , LJ1.i (V" II , 7,--.,n. /". _.Name (print)://V L. ( L{ (_0 LiL Signature
" Date i Email: __,____________________.f .I ..-Address: f() / 0,( L Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to-suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no &#xfd;ike~y" ignition soaites a&#xfd;o&#xfd;N the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you, Name (print): P Date 117 1rc iC Signature Email: 41cu'lal-rrtj vh_40&
ccN Address: F*77 2-4di.i i-_)
i~~e"-cPP
!5M, f
~1C~&
Name (print):
Date U/
I I E!
Address:
____Signaure-ts Email:
(r v y1J(
VYi-(1 C'nLI 0
Q~AL~A
~
o7c(
Name (print):
'~J4Y/VJ A-c ci#67~
Signature 4,L7 Date 611 //Z Email:
o4E'kF-Address:
A0
,H7 DLa,-'O 7"
/",
/
Name (print):
bi/TA'-
C
/
Signature
- (C" Date 611 7ao-Email:
/
ou \\/ t, -o. C C),&#xfd;,
Address:
/ &#xfd;Z I
-F U _D o,/-e 0 V/1-L_
C-J F=&#xfd; !&#xfd;.-T F-I r.=. L b
,/VI- 0r7 0 7 c)
Addmss:
J77v~o,'Z
~
VJ~S-TPif~.Lb AI\\J c70~


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to-suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no &#xfd;ike~y" ignition soaites a&#xfd;o&#xfd;N the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, Name (print): P Date 117 1rc iC Signature Email: 41cu'lal-rrtj vh_40& ccN Address: 2-4di.i i-_)i~~e"-cPP
!5M, f ~1C~&Name (print): Date U/ I I E!Address: -____Signaure-ts Email: (r v y1J( VYi-(1 C'nLI 0 Q~AL~A ~ o7c(Name (print): '~J4Y/VJ A-c ci#67~Signature
.-4,L7 Date 611 //Z Email: o4E'kF-Address: A0 ,H7 DLa,-'O 7" /", /Name (print): bi/TA'- C -- / Signature -(C" Date 611 7ao-Email: /ou \/ t, -o .C C),&#xfd;, Address: / &#xfd;Z I-F U _D o,/-e 0 V/1- L_ C-J F=&#xfd; !&#xfd; .-T F- I r.=. L b ,/VI- 0r7 0 7 c)Addmss: J77v~o,'Z
~ VJ~S-TPif~.Lb AI\J c70~
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9,2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upona "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no ikel'y" ignition souyzes a&#xfd;,ng te vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you, Name (print):
Name (print):Sign at ure
~K DatesJs Address:
""r Email:________
0A7 K2626V&sect; Signatu Name (print): V' 4
.W.
C zX6L.-
Signatu Date (n 1 Email:
Address:
L{IL4 L"J*,*:,v~
kJKIC.
Address:I-LtIL
/-
~f S
N Name (print): A a k0
/-S) 4 Signature MAVZ'I, AjjkV17V Date 6 /17 1 Z-Email:I/V) 0 a
o co v--
Address: 32-- GerCtv w&c,, / C,_)
-\\AeS$
!/J 14iV.* NT 74-90 Name (print):
\\_ \\-k.V\\\\
Date Signature Email:
Address:
/1.1, f Lv*n 01* 1.' Zk I
E il


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9,2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upona "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public." The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no ikel'y" ignition souyzes a&#xfd;,ng te vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, Name (print): Name (print):Sign at ure ~K DatesJs Address: ""r Email:________
0A7 K2626V&sect;Signatu Name (print): V'4.W. C zX6L.-Signatu Date (n 1 Email: Address: L{IL4 kJKIC.Address:I-LtIL /- ~f S N Name (print): A a k 0, /-S) 4 Signature MAVZ'I, AjjkV17V --Date 6 /17 1 Z- Email:I/V) 0 a o co v--Address: 32-- GerCtv w&c,, / C,_) -\AeS$ !/J 1NT 74-90 Name (print): \_ \-k.V\\Date Signature Email: Address: "' /1.1, f 1.' Zk I Email:
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
o The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources alor9 the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded "nearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process.our request using the 2.206 process, and we understand that under this process, the contents of this message and.my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you, Name (print):_
7 re,/,p 27
-L L-C Date Z
7 /$"
2-Email:
f-K_.L Address:
2o-L"
) _ /AJ* *:A, Name (print):
DateL C
Address:
/
Signature
*L
(..,
: e.
F,
~
v
*114~.~~
,&#xfd;&#xfd;7 Y60.) " /&#xfd;-&#xfd; 1,-,7-A Signature IT>1I S".
e'ri~~
~~
I y~@(
&#xb6;:
w f
a-Name (print)':
A k.'6d(A' gu2,- A..
Signature 0&#xfd;_
Date4 Address:
Name (print):
Date 6LLI Email:
Address: /) 1 J
(I,


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant." The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.o The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources alor9 the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager in the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded "nearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process.our request using the 2.206 process, and we understand that under this process, the contents of this message and .my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, Name (print):_
7 re,/,p _ -: 27 -L L-C Date Z 7 /$" 2- Email: f-K_.L Address: 2o- L" " ) _  Name (print): -DateL C -, Address: / ." Signature -, (.., e. F, ~ v *114~.~~,&#xfd;&#xfd;7 Y60.) " /&#xfd;-&#xfd; 1,-,7- A Signature , IT>1I S".e'ri~~ ~~ I y~@( &#xb6;: w f a-Name (print)':
A k.'6d(A' gu2,- A..Signature 0&#xfd;_Date4 Address: Name (print): Date 6LLI Email: Address: /) 1 J (I, -
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager in the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition soumoes atorj Vne vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded 'hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you, Name (print):
Date u
/Signature Ema il:.
/'
Address:
.2/
f.-
Name (print):
S.5i*
i
,Signaturq/*
ez Date 7 7//._
Email: /jeQ4eV
,2/e
( C4tV1a, do rbQ Address:
Name (print): ji 2JI41i I/
zi.-
Signature Date 7-Email:
/.
Address:
O/
/7a/*lAV/i,.
J
,/
(/.-
/
->'7, Name (print):
\\".-le3 Cti-Date 6 t " I Email:
Address:
-7 "
2 leL) P-Qc '..4 Signature (I
oi e-m-/7'


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition soumoes atorj Vne vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded 'hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, Name (print): Date u /Signature
-Ema il:. /'Address: -"- , .2/ f.- -- 'Name (print): S -i -.
ez  Date 7 7//._ Email: /jeQ4eV ,2/e ( C4tV1a, do rbQ Address: Name (print): ji 2JI41i I/ zi.- Signature Date 7- -- Email: /.Address: O/
J ,/ (/.- / ->'7, Name (print): \".-le3 Cti- -Date 6 t " I -Email: Address: -7 " 2 leL) P-Qc '..4 Signature
-(I oi e-m-/7' Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency\\.
enforcement petition to suspend the operation of the James.A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that.did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies, upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident.- which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological
-accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license Until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print):
1121 A
Jf Signature Date Email:
N P zjw,_cz Address:
/5JkT X h4 Name (print):
LA Signature Date (V2 Email:
Address:
Name (print):
Signature Date__________
Email:/.
54/6
-/U'tY&'f /-"-" T Address:1.2-0 Name (print):
90 L-.(
v*d Signature Date 6 '-O("
Emal:__
Address:
I,,--


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency\.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
enforcement petition to suspend the operation of the James.A. FitzPatrick Nuclear Plant." The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that.did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies, upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident.-
which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological-accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license Until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): 1121 A Jf Signature Date Email: N P zjw ,_cz Address: /5JkT X h4 _ _Name (print): LA Signature Date , (V2 Email: Address: Name (print): Signature Date__________
Email:/. 54/6 -/U'tY&'f
/-"-" T Address:1.2-0
", Name (print): 90 L-.( -Signature Date 6 '-O(" Emal:__ _Address: I,,-- -" ., -
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
o The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for Z
a e Economy is my point of contact for this petition.
Thank you,
/
**/
/
/*/
/
Name (print):
Signature a't_
Date Email:
4*/
Address:
Name (print):-,
w*',*
"{..
46 e----
Signature Date v
l-f._.
Email:
<* iw
.(,
OA (q
,'.(
Address:
L t'/
Name (print): S 01,?4l n
Y Signature Date iUo I*
f2-Email:
(A L Address:
0_
-i
)-*. A )___
Name (print):
nitiIN 'At Signature DateJj1L L Email:
:WrUf.d'(
r~
A
-((
e Address:
A H I I


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.o The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for Z a e Economy is my point of contact for this petition.Thank you, / / /Name (print): Signature a't_ _Date Email: 4*/ - -Address: Name (print):-, "{.. 46 e---- Signature Date .- v l- f ._. Email: iw .(, OA (q ,'.( ,%, Address: L t'/Name (print): S 01,?4l n Y Signature Date iUo f2- Email: (A L Address: 0_ -i .A )___Name (print): nitiIN 'At Signature DateJj1L L Email: :WrUf.d'( r~ A -(( e Address: A H I I Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank vou KY?
Name (print):
Date
-4 Z-6 E
--1A,, N1i.
7UI1"-tiv -A Signature
/
nail:
C, 19-/'hf&
1.1-&#xfd;
(\\,
_ 4 "
Address:
(A t.
: < I.
L I L)
Name(print): A~i'ov Kor2 Wr-*.)4 Signature _________--
Date C7 1 V--
Email:
Address:
Name (print):
A148a Signature Date L/( 7i)t, Email:
1"hYI, "1m
'L (0m, Address: 60( PE'wI
'irioTV i& (
N (aqt~
=4____aI Name (print):
lt
[j*
Date Email:
Address: *-A
" AA Signature k 1 I.
VA r
4 ).Rk,
&#xfd; (24A 3
~O~\\AY>. Y\\i1 U,1A2


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public." The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank vou KY?Name (print): Date -4 Z-6 E--1A,, N 1 i. _7UI1"-tiv -A Signature
/nail: C, , 19-/'hf& , 1.1-&#xfd; (\, _ 4 " Address: (A t .: < I .L I & L)Name(print):
A~i'ov Kor2 Signature
_________--
,____--.-Date C7 1 V-- Email: Address: Name (print): A148a Signature
-Date L/( 7i)t, Email: 1"hYI, "1m 'L (0m, Address: 60( PE'wI 'irioTV i& ( N (aqt~ =4____aI Name (print): lt Date Email: Address: " AA Signature k 1 -I.VA r 4).Rk, &#xfd; (24A 3 ~O~\AY>. Y\i1 U,1A2 Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there ae "wDo 'MA,' *j-~tior sotrces a~on* the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until tie public is afforded bearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank
: you, Name (print):
Signature Nae pin):fi~~,~Signature,
~
~
)
j Date (0
l' 7112 Email:_
Address:
?\\-eA i
d
(',
Name (print): -A I Signature Date Email:
Address:
ILOOI
-Ttr(
Name (print): *-**
*q
-'*Signatu~re' f-Date
!I1 L/
Email:
Address: !*k (11C~4O~t K
/fe4'q (Y
QY
;*O


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident." The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there ae "wDo 'MA,' sotrces the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until tie public is afforded bearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, Name (print): Signature Nae pin):fi~~,~Signature, ~ ~ ) j Date (0 l' 7112 Email:_ _ ___ _ _ _ _ _ _ _ _ _ _Address: ?\-eA i d (', Name (print): -A I Signature Date Email: Address: ILOOI -Ttr(Name (print): f-Date !I1 L/ Email: Address: (11C~4O~t K /fe4'q (Y QY Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there afe "no liej" gnitiion souirces aoDng the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you, Name (print):
$'1 I0 Date Z
Z Email:
Sig natur //a,./
1:::z r,.-A
,.d
,s 9
A Address:
1/
5
'_ (
/
,4.. &#x17d;1_ y'/- ?. ",
A.-?
/
2
(
Name (print):
Signature Name (print):&#xfd;"
3W Signature 4 4'--.
Date 1 IL Email:
JA Vi 21, DN-6_
CAW ?*,'I.coa--
Address:
A,_J.
0
,, e j2,p.n-o,
-(,
Name (prnt):
LAdL it -"- Bm*j**--
Date A 912 Email:_______
I/
Address: I f'6i
>E~k 7&#xfd;_L4 4&#xfd; Sig natu re6//44 IO'1AUt AZ;!.&
/V Y


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there afe "no liej" gnitiion souirces aoDng the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, Name (print): $'1 I0 -.Date Z Z Email: Sig natur //a, ./ 1:::z r,.-A ,.d -. ,s 9 A Address: 1/ 5 '_ ( / ,4 ..1_ y'/- ?. " , A.-? / .2 -(Name (print): Signature Name (print):&#xfd;" 3W Signature 4 4'--. -Date 1 IL Email: JA Vi 21, DN-6_ CAW Address: A,_J.0., , e .-j2,p.n-o, ,. -(, Name (prnt): LAdL it -"- Date A 912 Email:_______
I/Address: I f'6i >E~k 7&#xfd;_L4 4&#xfd;Sig natu re6//44 IO'1AUt AZ;!.&/V Y Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"-
venting system that is not fully hardened against a severe accident.
The plan in the event of a severe accident - which is to vent-dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment 9 failure, and that there are "m)o le*'" ignition soucmes along +he avent path. Neither of these assumptions
,was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operation's publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and unfil the public is afforded hnearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.
Thank you, Name (print):
hIS-a-yk 17
____Signature
&#xfd;a K
2_r,
Email:
(
Date 16, Address:
Name Date Address:t Name (print): T( 4 h
J Signature
,.t 0\\,
Date 6-,
!2_.
Email:
O&#xfd; (A k ra 3
Q xt 4 /I'LA CU Ci(V Address:
Name (print :
L-0 r:* -W ie Date Email:
L/
Signature AA Address:


We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"-
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent-dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public.* The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment 9 failure, and that there are "m)o ignition soucmes along +he avent path. Neither of these assumptions ,was correct during the Fukushima nuclear catastrophe.
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operation's publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and unfil the public is afforded hnearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition.Thank you, Name (print): hIS-a-yk 17____Signature
&#xfd;a K 2_r , Email: (Date 16, Address: Name Date Address:t Name (print): T(4  ---h J Signature
-,.t -0\, Date 6-, !2_. Email: O&#xfd; (A k ra 3 Q xt 4 /I'LA CU , Ci(V Address: Name (print : L-0 -W ie Date " Email: L/Signature AA Address:
Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York  


==Dear Mr. Borchardt:==
==Dear Mr. Borchardt:==
 
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.* The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.* The plan in the event of a severe accident -which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -poses severe risk to workers and the public." The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick.
The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.Thank you, Name (print): .Date C/ t Address: P / t_.*4 1~7- M a f-Signature, , L-.'Email:-'j~Name (print): Be-0S1.Date Ema Email[Address: '_4 C7i'Signaturek  
The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
'4.IA ' 4 I-U~ 1 .,nl Name, (print): C\A L kkA ' ,~ 'k Signature (2 Date. 1 -Email: 0 G&(Q0 (&GtA, Address: 3 j d ' \ " Name (print): ."c-[tf' r -Ce /Date I?7,- k2 0 D Email: Signature Lx Address: /7 "Cc Z7A' "-&#xfd;t/l X/Y}}
Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.
Thank you, Name (print): -,*
Date C/ t Address: P  
/
t_.
*4 1~7-M a f-Signature,  
, L-.'
Email:
-'j~
Name (print):
Be-0S1.
Date Ema Email[
Address:  
'_4 C7i' Signaturek  
'4.IA '
4 I-U~
1  
.,nl Name, (print):
C\\A L
kkA  
,~ 'k Signature (2 Date.
1 Email:
0 G&(Q0 i%3*
(&GtA, Address:
3 j
d  
\\
Name (print):  
."c-[tf' r  
-Ce  
/
Date I?7,-
k2 0 D Email:
Signature Lx Address: /7 "Cc Z7A'  
/*
"-&#xfd;t/l X/Y}}

Latest revision as of 01:07, 12 January 2025

ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, (49 Additional Co-Petitioners)
ML12191A008
Person / Time
Site: FitzPatrick 
Issue date: 06/12/2012
From: Goldberg S, Elias L, Arginsky M
- No Known Affiliation
To: Borchardt R, Bhalchandra Vaidya
NRC/EDO, Office of Nuclear Reactor Regulation
References
2.206, G20120172, OEDO-2012-0147, TAC ME8189
Download: ML12191A008 (1)


Text

{{#Wiki_filter:\\:LelctLS1 (\\JjCk CS , G C-) L() ( ': oI"7 0 Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

C0/-,'EDO -~DEDMVRT DEDR DED04 0 &- euic 1gýJO~j We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there fe "me *We,' b j*,io somwees aorg the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, Name (print): 4"c.~ G~J(oci Signature Date Email:5 ¢,,4i Address: 2 -'* C04i'c/( ,} I! /' Name (print): (AC*,A'L A!.6l'J, Signatur Date (' iý 1-- Email: _AGOJ,'Y (;fr'ai. e--- Address: ?(; 06" { )'J6 Name (print): * - f.\\_J-- Signature______ Date 4511 Email: ci-& u.. Address: Name (print): LL('*"- Date Signature A I Email: _____L_ Addrss: ~ CTh7I t(k Address: ý401 Ul cjjý'j

f. 5 ('0 /V V I

J In I

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "nro ikel'*" ignition soumces a~or9 the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until The public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, Sgtr Name (print):._ Signature Date 6/(7/" Email: A' L6' cJ)h*ILQ (6fr Address: Name (print): '. 4-r LI ,-Signature Date J'-' Email: Address: Name (print): C) /3ibc4.* /7 C __Signature Date I2 Email: Y CI,4Q (h i_.,Co,'- Address: /o/( 1qs,4, < .Yg 5 UO 0 0[7* Name (print):.;1A-._4**,*l .*'"1* t?¢.,_, Signature,..*L*- Date (P~ 2I], Email: -717y¢: 9o(-,) ow~z-co,/ d-Address: d w. W'tCATLCC' q_ 0*:**c i 111*l!! **

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, N Name (print):. Date Lf")t-2"} \\'"F ____Sinature Ve Email: A7 (-3 1 -c, V 6 Address: Name (print): A Si, J Signature ( Date I I 1 l Email: 0 \\.b., I£ -o-uc*iov it

  • i Address: )-Ao-7

£-i %(0, V I /rT-r-J' Name (print):1A Sig S nature_1-- Datefl t-Email: W --- "1'7-*_( 1)v[* Name (print): Date / Address: 1"2-o 0 1 fj4i/itr I

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level.- poses severe risk to workers and the public. P The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petitio),-. I Thank you. k Name (print):. Signature Date b [Nv______ Email: A6 a*'i w" CO i f Address: ~ ~c %\\Q~k'~iCý Name (print): 4:c DVIYA -Signature VUKýf/* Date ý4 11-7 11*2.- Email: e-ZW 1-10 (C* Address: 'U CA, ,A I LaAC Name (print): c-Signature __ ( 6 Date Email: C A Address: \\ AWA L k/\\ tV* zgs Name (print): P Date 7-_ Signature W..A IA," Address: ,, 1 5 Lm AWY4, A\\ tkf41 N'.I

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager Ih the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): "i o2LL Date 060 1 & /> )()i 1 1 6 Signature I

  • c Email:

V) n Vv -I Address: Name (print):.Cl,/ me., AA!, M e Signature L%*,

  1. *A4L-Date
  • i 1

/ Email: h,4rkcli k cA b oa,-L, Address: i 'I o 6 4eN A -_ ý ________________Signature ~ ~ Name (print): Date & 1("n I I-Email: Address: ,A*5-z." i J;, A )Y W 65-IQ Name (print): * ,C. Signature. Date i"4 Email: "66 L Address: S Ci i

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be ad public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, Name (print): S\\J(L" dcAiyu? Signature Date Email: k, -to Address: Name (prin):, Signature Date 717 Email: Address: Name (print): po Mi. 4-A J1 ) Signature Date 6- /7-1t-- Email: / Address: Name (print): "J-!'i t Date c//I'//o-) Address:

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): Date Address: vp *1 £

  • 7 Signature.

E m a i 1 A(k U ~~e( AT9, l'i ~v Name (print): 4

  • /d, V1/1,

/..4-Signature //,i / i Date Y/',7/ / i Email: Address: Name (print)$:--, A X Signature _ A Date 1"1 I I-- Email: Address: Name (print): Keazý,Iiy, T "yVe* Signature Date (,* 2 Emnil: Address:

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A.. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. T h a n k y o u, x 4 Name (print):,. Signature Date ,- z, //f. Email: 7/1 A L~.~. A I. YLI4~ Address: 6/a //~(~-' hbE17 L/ V-- LIC&Y -Address: 3L U 6L Name (print): r -ig n* /,) Signature._.__ Date

I-'

2-Email: 5g*4\\Az 2_ 1& ecC i02 Address: IP)ii, dr

LfAy, I (--) oe Name (print):

VAi 0*/, E Date CO il/ Ema il: Address: 9i-/

5 j(-7 Signature

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the.James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. o The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): f%3_u'I & \\Rp - rt--w2, Signature L L,4 4. Date -Q Email Address: ?-

  • i d
CkGkC4,- M 1_.)

-I\\ Name (print):.sc*t-A ULVA Q-i Date,*--

Ema, o

Signature t.

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for.a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, Name (print): T_~ji __i4~1 K/k /14A I Signature I Date 6-- ) ,- /.-- Email: Address: 2,~ 0 LQ/-(f-IT A]-~N ~' Y )1 Name (print): _ ZX Signatu r.F* Date I Email: 4 Address: .2 A-Name (print)- Signature Date 6 Email: vi' Address: Name (print): Date I I ,J-f E al L/-, Signature A Email: uk I cS&f f m v Address: t_ (V\\A,--- k J i.-.,- L~V ~in )~ IxL4 V 0

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources aýov9 the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print)-2 ' C Signature Date ii Z i Email: Ccýv Address: (5-5--' Name (print): V1 C' (A-* Signature __Z, ZZ ZI Date Email: k n--O. EmaPl: C) ne Address: o-CA* t -*OO £. "t* (.'-7, Name (print): \\* Signature Date r( -. Email: /-.(* '-.'r Address: , 4 4 /1 Name (print): DEmail: Address: z-*-LZl L"1u/ V *L4*'/ (K-p *L /- Signature ca1t <:i-,, GO

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. o The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, ? ý1,111 Name (print): ffý-. Date Address: Q~'~1 fi /'~ Signature____________ email: -'?0_"ij7-3/4t,"- 4' ('d ) e3C_- Email: (2\\j\\ ~ )1 ~D( 0 C Name (print): _ n Date Address: \\ () *

  • , ?

II I ? I i I Name (print): \\'* (P [VCi Signature Date / ('7 ./ Email: C ME,, ) Address: /.V C"4( C\\. Name (print): (T1VSignatufiý:4k Date f~ T(,/ Email: CO~1e()Y ,,"~ Address: 201 lJ-(,4. :4 H17 iOO> 000 t,

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources aiong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, T7DdLJq4/,,, V, W ) o W e t Name (print): / J Date 6 //7,_T2-i Email:*l Address: t- )Iov -2,- 1r-5.. V L4.IA/V/ / )/ Date __ Email:__________________ Address: /0 / /-VL 'y /d f-? Name (print): ( "JX J 4I Signature Date i ( 1 Email:.C-Address: Name (print): 4 (Y Km k 'tl Date '7 Email: M -I' Address: ~G ~1 L Signature 11_ýka C q-7J t

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): 19"/* ¢ ý"P_,DdAavýs Signature ibý 0 1^- wd_11ý Name (print): $9.TdSignature.14 Date k/ 72-Email: "-O Address:, I t-w-1 -K I4 _D -7dOti-Name (print): /1) 6/ Signature / / Date ý // 7 Z //7---- Email: kf. , " /", / Address: £./ FZc MY/..i~_ .l-o*i*-.,)'* f 7 / 6(6/( Name (print):, ! a)\\ ec7'-,S*7 l6-Signature Date ifL /i

m.

email: /k/) -O *

0. n1o--.

j, Address: s., l/ ,.(r. by.l{ 4//-

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there ame "D WeVf'," ignfiom soumrces aDnig tX,'e vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and unfil the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, -?4$r Sinaur Name (print): Signature Name (print): __ ,__v___.e __C-Signature____/______ Date 6 2.- Email: Address: I N. Name (print): f,'1...-. c-'-cZ..* Signatuire.z Date .Email: A /. -KY*.'s-.

  • ,2, ¢J,<.-
  • .--1 Name (print): 64.J*K &.

4i Date &7/ Email:. Address:W'Qt Signature -,/", /1l*

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.* Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, H/ r\\ l,/ 2 A,-AI Name (print): -f 4

  • UJ Signature YG Date Email.

K_4-Aýd Date-0/iL /Ž /*- Email:

  • l

(,*- C,.*.,' C'l Address 2 A-' L/ Name (print): *,., A-- S. L't'" Signature Date,, 1LJ Email: Address: QG>bqt% _"(4 L-0* Name (prin.t): Aj &N-,' A 5,A (/')*t" Signature Date if-IVt-I!- Email: Cz Vf, -I-- C U/Z* *t-*:- Address: Name (print): ckw-IV"-- Signature (0&C. Date LIk1 0,012-Email: v-cxg-4,, w9;L o 00, Q 4pp0 (q Address: I~l Cbz5'* r '.l* (o,*O\\ A

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the. outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I reqipst NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will-be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): I+e\\'AK\\ (*ri A Signature -AA-" Date Em;ail:C kk4UV\\6( (D <ZJ~ I j 0 Address: Name (print): -- A S 0 ,D/ Signature Email: 1447 / 7 ?/u ZCýb12r Add ress: Date b )2 Email: Address: / Name (rint: "tfN Sionature Date (L.- Address: ]"7/I'*.- Email: !J,

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant.is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent, plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): I I.VO (k%( Signature Date Email: tInIp 0P kn,"bJ NAA4S, I Address: (qg,, Name (print): ",1( Vw0 .A Date ,7 7 -H-,ý o d ý e-,ý Signature Email: Address: f2-_

e. -e C-w! o*2(, 0

'.of*/2..*.* /k Name (print): v1(*, d-

  • -¢ 14D f-Signature
  • Date Cktl-/ 1*

'Z. Email: Address: R f etC1-V rcir)~ 1r - OA{Lw~ )ý .AAY \\ A Name (print): Date Email: Address: f O)* ift'l Signature 4 , A) r&~~4d~ ~\\IfOY72U

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level -. poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "io MW*,f" ijition so~rces aýoij tW)e vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, ,o Name (print): (' m Signature-. Date L [-/2e)f.- Email: Address: ---9.

S Ze I

z AbAloý-kpý_ L11710(o Name(print): J i Signature Date ( -0 1L' V2-Email: U J Address: A0 .Vb'V . t&3-it. L-C ( O0 01 Name (print): /iii L () G " -- Signature, / Date &-/"7--b Email: 4/ 61, #r-(0 , iCd.-o Address: J )i,- -LoiT5 (._ Signature Name (print): Date dt Address: -3 Email: 4 Ub-,

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency -enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show thedangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no ýikely" ignition soumes azong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, ~- Name (print): Signatu atXZ. Date3'"/ '??-LO/

  • Email: J-oO*-f/C(..

,.-0, Address: Name (print): u tre Date r - (- E Address: I -,C

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the Jam4s A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "'o ,etj," ýgnffit soouves a~oi~g te vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until The public is afforded bearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and mypdentity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this Ititin. Thank you, Name (print): ýOa_ \\ 0100 Si nature Date Emails: <'e,- 1z <c,---/' -c¢-e Adres -I Name (print): Signature Date to / 71Email: Address: Lr" 4/ k"',, 7s' Name (print): _____/__ __-_Signature Date 1*>. /2-Email: Address: 2*Z/ j'-IL'/ 6¢ y>/ý-.. Name (print): / Signature"" Sigatu~re ý

'Date (7/2 Email:

fI*'* L c (L-i MAI LcWVI Address: .L9_t trA-/Loý. /k _I "- I-WACK--* K5A 'ki-, (9"7 6 o)

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to. suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no inke\\y"

  • gnron sorces atorNg tVe vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.

Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, Name (print): A~ Y, 4'o Wptle-,iq ka L,&Sdignattuure_ Date JL/i. p1 n-En Address: 7C/F7 2)*4Cx nail: "j-2 RAI. woaAg 411:1_ýA VI-X I2~AL~&g~~ Name (print): Signature Date

  • \\

Email:__________ Address: 0, C AkO 3/4v 4A~ Name (print): A e*(,A g [y -L* Date Email:__ Address: P& 9 OkX -{ d/ Signature. uIeci 0<- AW Name (print): L1 ZiA '. S-'--- Signature__i, Date Ema 2cZ eaaWi Address: ID(2 LCJ d 0\\J (2c)

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrck Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the'double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are ",io ý*e*j" ig'i i ent %wgc he 'vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, Name *rint): Date Email:_ '41ý L& 0.1 Signaturee. /41 Address: '**,].. N a me (p rint): e.,<-r, "A/-'*i. s.cb;44*",ýý1 Signaturei,/* "('f DtEmail: 5CtFf4M CO)h I NAýI' Ir 5t!M Address: eeQ;7 Ar' /kV& 7 Name (print): 2 Signature../ Date. 7 Email: Address: VP I. Signature \\. Name (print): Date Email: Address:

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the pubfic is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, __u t.z4L' Name (print): \\, ")4() Signature__ Date L./ -i Email: 4VI -A 7 1 .I C 0VVN, Name (print): _________ -______________Signature Date P/ Z Email _____ Address: P6 &x(5~ 6fa~ k A ? S Name (print): Signature Date Email: Address: Name (print): Signature Date Email: Address:

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. o The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): PO)Y2Y /$b id4(ture Date Email:_ I(A~NV~iZt 7/ ,,TJ2 717Jh'AA Address: - -*-.e. ,\\ .J..k,.-C# f \\ / V/ Name (print): f\\rS '\\Signature Date */_*_ _Email:__ Address: Y1-41 j a-$ )65-1 " ry-kn-N C6, Name (print):

~&-~

Signature Date 6, .Ž.)1.-> Email: Address: ' T-'LI" l-u-IV \\-- Name (print): A W'Y Date 6ý /%- )C Address: Cc czý ýcc ý,ws Signature (0 1c__k Email: C A C:,o -L,'-

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources aiong the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name(print): -o*'y, C-\\L,*' tN SignatureZ A',e-v(.A Date la }6 I V* Email: -+ 0 8 A 4*L,. Address:P6 AH g4 k07

  • ~*~icp~

Name (print): L 1-kef6m~ V ývi Signature ('4W i7 Zz Date Email: Anzkd CO)k Name (print): k P-22 Signature, Date 7 Email: L02 0 e<4 Address: 6(- / 'V ,16W42 "zO*< / Name (print): A XI H Signature Date # W Email: lic(e-T-(- $ )-.f Address: P0 15e, 30 t hA ALmTv A/4A e-*F7

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition.

Thankyou, Name (print):

L&,Vne_- 14.rhý Date 6&/') Signature i ma ffr 0/29 40 v Acvo , 6O0'. Email: Address: Name (print): C 6P 0,jql-ý Date Co 0,0 Email: Address:

  • L GO,*J, JC;i.Ir 1%

Name (print): /1t/eU 4*.- 'A Sign S1,v6e4ct-e's j ,L~ I/ ature Date ~/ I Email: ,.*L 9'6P-> .; t Address: -

  • -r*-

4, e. 9-,6 , A-'/V 7 l'y6c, ý Z,-- Name (print): N 4 Date ( Z4 Address: /2. J! Signature .I i Email: !.i 2 Le/-( i "h -C 7

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): --* 1V(:D,ý) ý C.4:F Signature ~2 ~W~& Date U / 4', Address: P D -u"-)c Email: '~K5 /,fr$ ~ ~C~e2 ~. 46,~2r)iq~ 754-i~ye J~~J-~ J,2o31 Name (print): 4Y__ "_Sg te___,_____._ Date / c-Email: .kLA_- 5 'WA C/A Address: "'W -("5(d*( 3 P A Name (print): f\\ Signature. Date 5* t1,,Email:_______________________________________ Address:6 k 3 I,- Name (print): lr

vla, I

Date 6) () / Email: Address: 3>£1k P.~v Signature L6!, l 4 - 0, KK 4"", ý) u - ýId 1ý- -- \\ 6 l X L'ý Pa. AL. r ý_\\ o c -,,-- D

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show thedangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print):C6t-ZY-- X, r'-ý- Signature Date. Emai A,'J2-J LAit, 1: So 01A-Address: /017-2 6 A 2-_) C. j,- .,0( Name (print):.. < re .t Signature Date**Lt

.('

Email: Address: t-- 7-Name (print): W Date Address: Signature E dail:

  • P0,-

I Signature' Name (print): Zi/-/1,(Y ,C'/'/1/A/' 6621 Date Address:-& R 7 Email: 4' ~26

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission. Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies Upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and.identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): ,,S

  • _, )iL\\

Signature Date ) I, Email:. 0ý )10!ý "2 1,,;, -Z-o, ý C ? 9 Address: - j cj CA 4// 0 Y_ lb I Name (print): Signature Date ~JuV~ r'~Or"~&~ (A~L I Email: rvo r-Address: I-O) £A..- l2-3

Th Name (print)

/ 6 Signature./____.__ DateJj,,, J(4 .0 Email: flA s sc-i f / O--,f [ Address: 57 6 A)c 160 &,2eý

A&

- 04I~L VA-0 Name (print): Kj1* ) Date Email:j* Address: 0 Signature 1/ AldL .b( B A_ A,()() .ýA

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): _ Date (I I-Email: Address: cO" Signature c~c~ r,4 op ýVOr- \\ 'e Ac vtAYA ýý C tOj 1 ( (I cIC1Lib Name (print): ' £ýz(o-0 9-ý-LCY Date 6-*- 1 '(9 Email: Signature~~, "of A~ \\ ooP - yn v Address: ýýk S&Ldk a Co,"A t ~k~w\\ kOhf 7 Name (print): * / -a& / S,' / 'I, q Signature L 'IJ ) _ Date 6/1" )- Address: Email: ?*L. / .(./Z¢* /, 6 .x/( Name (print): 6/ Ali ÷ ÷ L*-'-- (/" Signature Z**1*ZII" Email: o-)c,- )t6 -oa Date I( , j. 2-0{2-Address: A9o 0 i i ý,x/ 44, Aly ' o i 9j -

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): _ (* Signature (...O. ,i..o4 Date G(*-41. Email: ( sf"'sc.O_.c (' ¢iI Address: P. r' Z* T VT Name (print): 0

  1. f<

cQ. iSgar" t Date Email:______________________________ Address:*ll L IAk / ,fi I A Name (print): Sin Ur Date (0 11 Email: r14 ~ C.C{k Addressiab LOC Jt dCL kY tl Name (print): ý,', D)-r. Signature Date / Email: opk Je*,f OiFrJf Address:.: k--, o*4Le;i A)'

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan,- since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "nolikely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): SR t" i5 K '- Signature Date 2./ (4 Email: Address:` R-[/) u,, o:D'i zi (.:* Z*- A)- 0 Name (print): c -c Le Signature 7 Date 2 -( Email:__ Address: (D C9-l T '~/< /.Y Name (print): / -I r C .,S

t.

Signature". Date [ 1 Email: Address: L..o C. 9 Name (print): Y 2.NThJ i*, y ).Af/ Signature Date /17, Email: A W! ('JNN' (J Ct/, U! CA P\\ Address: 22 V '5t N IJ O \\

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): LK> (jk.U-Signature k // o Date ( 1 Z-Email: Address: 6a K "UV+/-Aq( ,., f-ar Name (print): SKt 4 4 t2./ cc-o5* Signature ,&V 4 Date-Email: A Address: IT U Name (print): _S M, Signaturec____ Date -'///A) Email: &'c S" _________/o Address: Name (print): _E -1 ,r,. Ke*-* 5 ifpr - ignature "A'. v-**

  • r'***"-/R Address:

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological-accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): C' IP' "'i CIcL Signature Date 6-Email: C5T eA 1LL(,) N'/VC. /ie, / Address: t3 1-fl,, Je,'/gJ'!"-I. ,/\\/Itl1,, Name (print): 60'J, Signature Z,1cZCL Date 6 7-Email: Address: A) /k2 VA /\\ "/i.0

  • 6a_)

Nam e (print): G aN) - v v.s Signat' re Date ý

1 1 2( -

Email: Address: CA~1~ ~ Name (print). Q*J-',_ ec-.a14-5't ,*s Signature z Date Email: emT /af 5" 7 o c-o, Address: P 4 / o

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): Date &, I 0"O J~qot A0z Signature i, [7-Email: &U/Q 7-c[6I '(-"C C)cVq Address: Jc IL44 Lr ITc-7q$ I I IA Name Signature'rma--: Date UEmail:

  • f'r,~AP'*tl > V7'--
  • -AJ1 9,- err'--

I / Address: Name (p Date A Address: Name (p I rint): M2/,1 A/4 !VA-IVt\\f.0 Signatu4 1, Emal :.Email g rint):x~ Signature Date & I 0t-1L Email: ý- V.." ý. ", s <ip Address:

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. 4 The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety.posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): L -,-- e-Signature ZLI:V Date-z --.v. t &> toi -z._ Email:__ Address: t N/*<sA Name (print): Ja -Signa tureziý2 -*2-.* Datess (ý() (/h-L__ Email:2 Vci Address: (2 N 0- n ,w"* Name (print): KksF6/S-$ 1- ( Signature/ Z*{) 4a, Datedý(%// Email: 51,2, /`_,A, 6-*V` V I.' t~ Address: 33 -7 ekr-Name (print. ý-/X M/D Date Add ress: e~ Lo-ke-, N-ik by ii;i9~~ fcJ/1 Signaturee. Email: 4'

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did notinstall a Direct Torus Vent System as requested by the NRC in.1 989-and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. o The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Name (print): Signatur r Address: dz Name (print): &el Signature_) ý__ Date 1----- E m ail: ./'* -,z /-- j, Name (print): _?C1 Lk r--U. (A n V, Signature Y-a \\)0L..--,c.'-- Date i a-Email: ") U. V

  • 2-11\\0 Address:

(' r 2 LJ1.i (V" II , 7,-- ,n. /". Name (print)://V L. ( L{ .U*,/ (_0 LiL Signature " Date i Email: .f I Address: f() / 0,( L

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to-suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no ýike~y" ignition soaites aýoýN the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, Name (print): P Date 117 1rc iC Signature Email: 41cu'lal-rrtj vh_40& ccN Address: F*77 2-4di.i i-_) i~~e"-cPP !5M, f ~1C~& Name (print): Date U/ I I E! Address: ____Signaure-ts Email: (r v y1J( VYi-(1 C'nLI 0 Q~AL~A ~ o7c( Name (print): '~J4Y/VJ A-c ci#67~ Signature 4,L7 Date 611 //Z Email: o4E'kF-Address: A0 ,H7 DLa,-'O 7" /", / Name (print): bi/TA'- C / Signature - (C" Date 611 7ao-Email: / ou \\/ t, -o. C C),ý, Address: / ýZ I -F U _D o,/-e 0 V/1-L_ C-J F=ý !ý.-T F-I r.=. L b ,/VI- 0r7 0 7 c) Addmss: J77v~o,'Z ~ VJ~S-TPif~.Lb AI\\J c70~

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9,2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upona "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no ikel'y" ignition souyzes aý,ng te vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, Name (print): Name (print):Sign at ure ~K DatesJs Address: ""r Email:________ 0A7 K2626V§ Signatu Name (print): V' 4 .W. C zX6L.- Signatu Date (n 1 Email: Address: L{IL4 L"J*,*:,v~ kJKIC. Address:I-LtIL /- ~f S N Name (print): A a k0 /-S) 4 Signature MAVZ'I, AjjkV17V Date 6 /17 1 Z-Email:I/V) 0 a o co v-- Address: 32-- GerCtv w&c,, / C,_) -\\AeS$ !/J 14iV.* NT 74-90 Name (print): \\_ \\-k.V\\\\ Date Signature Email: Address: /1.1, f Lv*n 01* 1.' Zk I E il

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. o The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources alor9 the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded "nearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process.our request using the 2.206 process, and we understand that under this process, the contents of this message and.my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, Name (print):_ 7 re,/,p 27 -L L-C Date Z 7 /$" 2-Email: f-K_.L Address: 2o-L" ) _ /AJ* *:A, Name (print): DateL C Address: / Signature

  • L

(..,

e.

F, ~ v

  • 114~.~~

,ýý7 Y60.) " /ý-ý 1,-,7-A Signature IT>1I S". e'ri~~ ~~ I y~@( ¶: w f a-Name (print)': A k.'6d(A' gu2,- A.. Signature 0ý_ Date4 Address: Name (print): Date 6LLI Email: Address: /) 1 J (I,

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager in the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition soumoes atorj Vne vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded 'hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, Name (print): Date u /Signature Ema il:. /' Address: .2/ f.- Name (print): S.5i* i ,Signaturq/* ez Date 7 7//._ Email: /jeQ4eV ,2/e ( C4tV1a, do rbQ Address: Name (print): ji 2JI41i I/ zi.- Signature Date 7-Email: /. Address: O/ /7a/*lAV/i,. J ,/ (/.- / ->'7, Name (print): \\".-le3 Cti-Date 6 t " I Email: Address: -7 " 2 leL) P-Qc '..4 Signature (I oi e-m-/7'

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency\\. enforcement petition to suspend the operation of the James.A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that.did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies, upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident.- which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological -accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license Until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): 1121 A Jf Signature Date Email: N P zjw,_cz Address: /5JkT X h4 Name (print): LA Signature Date (V2 Email: Address: Name (print): Signature Date__________ Email:/. 54/6 -/U'tY&'f /-"-" T Address:1.2-0 Name (print): 90 L-.( v*d Signature Date 6 '-O(" Emal:__ Address: I,,--

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. o The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for Z a e Economy is my point of contact for this petition. Thank you, /

    • /

/ /*/ / Name (print): Signature a't_ Date Email: 4*/ Address: Name (print):-, w*',* "{.. 46 e---- Signature Date v l-f._. Email: <* iw .(, OA (q ,'.( Address: L t'/ Name (print): S 01,?4l n Y Signature Date iUo I* f2-Email: (A L Address: 0_ -i )-*. A )___ Name (print): nitiIN 'At Signature DateJj1L L Email:

WrUf.d'(

r~ A -(( e Address: A H I I

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank vou KY? Name (print): Date -4 Z-6 E --1A,, N1i. 7UI1"-tiv -A Signature / nail: C, 19-/'hf& 1.1-ý (\\, _ 4 " Address: (A t.

< I.

L I L) Name(print): A~i'ov Kor2 Wr-*.)4 Signature _________-- Date C7 1 V-- Email: Address: Name (print): A148a Signature Date L/( 7i)t, Email: 1"hYI, "1m 'L (0m, Address: 60( PE'wI 'irioTV i& ( N (aqt~ =4____aI Name (print): lt [j* Date Email: Address: *-A " AA Signature k 1 I. VA r 4 ).Rk, ý (24A 3 ~O~\\AY>. Y\\i1 U,1A2

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there ae "wDo 'MA,' *j-~tior sotrces a~on* the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until tie public is afforded bearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank

you, Name (print):

Signature Nae pin):fi~~,~Signature, ~ ~ ) j Date (0 l' 7112 Email:_ Address: ?\\-eA i d (', Name (print): -A I Signature Date Email: Address: ILOOI -Ttr( Name (print): *-**

  • q

-'*Signatu~re' f-Date !I1 L/ Email: Address: !*k (11C~4O~t K /fe4'q (Y QY

  • O

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there afe "no liej" gnitiion souirces aoDng the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, Name (print): $'1 I0 Date Z Z Email: Sig natur //a,./ 1:::z r,.-A ,.d ,s 9 A Address: 1/ 5 '_ ( / ,4.. Ž1_ y'/- ?. ", A.-? / 2 ( Name (print): Signature Name (print):ý" 3W Signature 4 4'--. Date 1 IL Email: JA Vi 21, DN-6_ CAW ?*,'I.coa-- Address: A,_J. 0 ,, e j2,p.n-o, -(, Name (prnt): LAdL it -"- Bm*j**-- Date A 912 Email:_______ I/ Address: I f'6i >E~k 7ý_L4 4ý Sig natu re6//44 IO'1AUt AZ;!.& /V Y

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing"- venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent-dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment 9 failure, and that there are "m)o le*'" ignition soucmes along +he avent path. Neither of these assumptions ,was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, we request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operation's publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and unfil the public is afforded hnearings to address the unacceptable risks to public health and safety posed by FitzPatrick. We wish the NRC to process our request using the 2.206 process, and we understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is our point of contact for this petition. Thank you, Name (print): hIS-a-yk 17 ____Signature ýa K 2_r, Email: ( Date 16, Address: Name Date Address:t Name (print): T( 4 h J Signature ,.t 0\\, Date 6-, !2_. Email: Oý (A k ra 3 Q xt 4 /I'LA CU Ci(V Address: Name (print : L-0 r:* -W ie Date Email: L/ Signature AA Address:

Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York

Dear Mr. Borchardt:

We wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident. The plan in the event of a severe accident - which is to vent dangerous steam, gases and radiation into the Standby Gas Treatment System building which will blow off the double doors to release a radiological accident to the outside environment at ground level - poses severe risk to workers and the public. The hydrogen explosions at the Fukushima reactors show the dangers posed by the current FitzPatrick venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident. Therefore, I request NRC immediately suspend the FitzPatrick operating license until Entergy Nuclear Operations publicly documents a post-Fukushima re-analysis for the reliability and capability of the FitzPatrick containment vent plan, and until the public is afforded hearings to address the unacceptable risks to public health and safety posed by FitzPatrick. I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public. Jessica Azulay at the Alliance for a Green Economy is my point of contact for this petition. Thank you, Name (print): -,* Date C/ t Address: P / t_.

  • 4 1~7-M a f-Signature,

, L-.' Email: -'j~ Name (print): Be-0S1. Date Ema Email[ Address: '_4 C7i' Signaturek '4.IA ' 4 I-U~ 1 .,nl Name, (print): C\\A L kkA ,~ 'k Signature (2 Date. 1 Email: 0 G&(Q0 i%3* (&GtA, Address: 3 j d \\ Name (print): ."c-[tf' r -Ce / Date I?7,- k2 0 D Email: Signature Lx Address: /7 "Cc Z7A' /* "-ýt/l X/Y}}