John T. Conway, Senior Vice President  and Chief Nuclear Officer Pacific Gas and Electric Company 77 Beale Street, B32
San Francisco, CA  94105  SUBJECT: DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2013301; 05000323/2013301  Dear Mr. Conway:  In a telephone conversation on January 25, 2012 between Messrs. Ron Fortier, Senior Instructor and Steve Garchow, Chief Examiner, arrangements were made for the administration
of licensing examinations at Diablo Canyon Power Plant during the week(s) of November 26 and December 3, 2012.  As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory Commission (NRC) will prepare the written examination and will coordinate the development of
the operating test based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.  Your staff will be given the opportunity to review the examinations during the week of July 20, 2012.  To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by September 7, 2012.  The operating tests and supporting reference materials
identified in Attachment 3 to ES-201 will be due by October 5, 2012.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines and tests before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use.]  We request that any personal, proprietary, sensitive unclassified, or safeguards
information in your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.  In addition, your support for on-site validation of the examinations is required during the week of November 5, 2012. 
  UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
Mr. Conway - 2 -  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.  In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.  Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.  To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement
may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.  This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013.  The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.  Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access
and Management System (ADAMS).  ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.     
Mr. Conway - 3 -  Thank you for your cooperation in this matter.  Mr. Fortier has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at 817-200-
1159.        Sincerely,        /RA/        Mark S. Haire, Chief Operations Branch      Division of Reactor Safety 
Dockets:  50-275; 50-323 Licenses:  DPR-80; DPR-82  Electronic Distribution for Diablo Canyon   
Mr. Conway - 4 -  Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov) Acting DRS Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Patrick.Louden@nrc.gov) Senior Resident Inspector (Michael.Peck@nrc.gov) Resident Inspector (Laura.Micewski@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov) Project Engineer, DRP/B (Nestor.Makris@nrc.gov) DC Administrative Assistant (Vacant) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Joseph.Sebrosky@nrc.gov)
Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource  RIV/ETA: OEDO (Michael.McCoppin@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov) 
   
  R:\_REACTORS\DC\2012\DC-2012-11-Corporation Notification Letter (2).docx ADAMS Accession No.: ML12180A603 ADAMS:   No      # Yes # SUNSI Review Complete Reviewer Initials: SMG  #  Publicly Available #  Non-Sensitive    Non-publicly Available  Sensitive RIV: DRS/OPS  RIV: DRS/BC OPS SGarchow  MHaire /RA/  /RA/  06/27/2012  06/28/2012 OFFICIAL RECORD COPY                                        T=Telephone          E=E-mail        F=Fax 


John T. Conway, Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company 77 Beale Street, B32 San Francisco, CA 94105
SUBJECT: DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2013301; 05000323/2013301
==Dear Mr. Conway:==
In a telephone conversation on January 25, 2012 between Messrs. Ron Fortier, Senior Instructor and Steve Garchow, Chief Examiner, arrangements were made for the administration of licensing examinations at Diablo Canyon Power Plant during the week(s) of November 26 and December 3, 2012. As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory Commission (NRC) will prepare the written examination and will coordinate the development of the operating test based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. Your staff will be given the opportunity to review the examinations during the week of July 20, 2012. To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by September 7, 2012. The operating tests and supporting reference materials identified in Attachment 3 to ES-201 will be due by October 5, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.] We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of November 5, 2012.
M In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
M Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at 817-200-
1159.
Sincerely,/RA/ Mark S. Haire, Chief Operations Branch Division of Reactor Safety Dockets: 50-275; 50-323 Licenses: DPR-80; DPR-82 Electronic Distribution for Diablo Canyon M Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov) Acting DRS Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Patrick.Louden@nrc.gov) Senior Resident Inspector (Michael.Peck@nrc.gov) Resident Inspector (Laura.Micewski@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov) Project Engineer, DRP/B (Nestor.Makris@nrc.gov) DC Administrative Assistant (Vacant) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Joseph.Sebrosky@nrc.gov)
Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource RIV/ETA: OEDO (Michael.McCoppin@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov)
R:\_REACTORS\DC\2012\DC-2012-11-Corporation Notification Letter (2).docx ADAMS Accession No.: ML12180A603 ADAMS: No # Yes # SUNSI Review Complete Reviewer Initials: SMG # Publicly Available # Non-Sensitive Non-publicly Available Sensitive RIV: DRS/OPS RIV: DRS/BC OPS SGarchow MHaire /RA/ /RA/ 06/27/2012 06/28/2012 OFFICIAL RECORD COPY  T=Telephone E=E-mail F=Fax
}}
}}

Revision as of 14:18, 28 March 2018

Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Notification of NRC Initial Operator Licensing Examination 05000275/2013301; 05000323/2013301
ML12180A603
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/28/2012
From: Haire M S
Operations Branch IV
To: Conway J T
Pacific Gas & Electric Co
vlm/Garchow S M
References
50-275/13-301, 50-323/13-301
Download: ML12180A603 (4)


See also: IR 05000275/2013301

Text

June 28, 2012

John T. Conway, Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company 77 Beale Street, B32

San Francisco, CA 94105 SUBJECT: DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000275/2013301; 05000323/2013301 Dear Mr. Conway: In a telephone conversation on January 25, 2012 between Messrs. Ron Fortier, Senior Instructor and Steve Garchow, Chief Examiner, arrangements were made for the administration

of licensing examinations at Diablo Canyon Power Plant during the week(s) of November 26 and December 3, 2012. As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory Commission (NRC) will prepare the written examination and will coordinate the development of

the operating test based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. Your staff will be given the opportunity to review the examinations during the week of July 20, 2012. To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by September 7, 2012. The operating tests and supporting reference materials

identified in Attachment 3 to ES-201 will be due by October 5, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.] We request that any personal, proprietary, sensitive unclassified, or safeguards

information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of November 5, 2012.

UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511

Mr. Conway - 2 - In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Mr. Conway - 3 - Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at 817-200-

1159. Sincerely, /RA/ Mark S. Haire, Chief Operations Branch Division of Reactor Safety

Dockets: 50-275; 50-323 Licenses: DPR-80; DPR-82 Electronic Distribution for Diablo Canyon

Mr. Conway - 4 - Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov) Acting DRS Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Patrick.Louden@nrc.gov) Senior Resident Inspector (Michael.Peck@nrc.gov) Resident Inspector (Laura.Micewski@nrc.gov)

Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov) Project Engineer, DRP/B (Nestor.Makris@nrc.gov) DC Administrative Assistant (Vacant) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Joseph.Sebrosky@nrc.gov)

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource RIV/ETA: OEDO (Michael.McCoppin@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov)

R:\_REACTORS\DC\2012\DC-2012-11-Corporation Notification Letter (2).docx ADAMS Accession No.: ML12180A603 ADAMS: No # Yes # SUNSI Review Complete Reviewer Initials: SMG # Publicly Available # Non-Sensitive Non-publicly Available Sensitive RIV: DRS/OPS RIV: DRS/BC OPS SGarchow MHaire /RA/ /RA/ 06/27/2012 06/28/2012 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax