| issue date = 02/07/2014
| issue date = 02/07/2014
| title = IR 05000327-13-005, 05000328-13-005; 10/1/2013 - 12/31/2013; Sequoyah Nuclear Plant, Units 1 and 2; Other Activities
| title = IR 05000327-13-005, 05000328-13-005; 10/1/2013 - 12/31/2013; Sequoyah Nuclear Plant, Units 1 and 2; Other Activities
| author name = Bartley J H
| author name = Bartley J
| author affiliation = NRC/RGN-II/DRP/RPB6
| author affiliation = NRC/RGN-II/DRP/RPB6
| addressee name = Shea J W
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000327, 05000328
| docket = 05000327, 05000328
Line 14: Line 14:
| page count = 44
| page count = 44
}}
}}
See also: [[followed by::IR 05000327/2013005]]
See also: [[see also::IR 05000327/2013005]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES  
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257
NUCLEAR REGULATORY COMMISSION  
  February 7, 2014  
REGION II  
 
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
ATLANTA, GEORGIA  30303-1257  
February 7, 2014  
   
   
Mr. Joseph W. Shea  
Mr. Joseph W. Shea  
Line 30: Line 35:
SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC INTEGRATED INSPECTION REPORT  
SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC INTEGRATED INSPECTION REPORT  
05000327/2013005 AND 05000328/2013005   
05000327/2013005 AND 05000328/2013005   
  Dear Mr. Shea:  
   
Dear Mr. Shea:  
   
   
On December 31, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an  
On December 31, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an  
inspection at your Sequoyah Nuclear Plant, Units 1 and 2.  On January 13, 2014, the NRC  
inspection at your Sequoyah Nuclear Plant, Units 1 and 2.  On January 13, 2014, the NRC  
inspectors discussed the results of this inspection with Mr. Carlin and other members of your staff.  Inspectors documented the results of this inspection in the enclosed inspection report.  
inspectors discussed the results of this inspection with Mr. Carlin and other members of your  
staff.  Inspectors documented the results of this inspection in the enclosed inspection report.  
   
   
NRC inspectors documented one self-revealing finding of very low safety significance (Green) in this report.  This finding involved a violation of NRC requirements.  The NRC is treating this  
NRC inspectors documented one self-revealing finding of very low safety significance (Green) in  
this report.  This finding involved a violation of NRC requirements.  The NRC is treating this  
violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the NRC Enforcement  
violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the NRC Enforcement  
Policy.   If you contest the violation or significance of this NCV, you should provide a response within 30  
Policy.
If you contest the violation or significance of this NCV, you should provide a response within 30  
days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear  
days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear  
Regulatory Commission, ATTN:  Document Control Desk, Washington, D.C. 20555-0001; with  
Regulatory Commission, ATTN:  Document Control Desk, Washington, D.C. 20555-0001; with  
copies to the Regional Administrator, Region II; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident Inspector at the Sequoyah Nuclear Plant.   
copies to the Regional Administrator, Region II; the Director, Office of Enforcement, U.S.  
 
Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident  
Inspector at the Sequoyah Nuclear Plant.   
   
   
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your  
If you disagree with a cross-cutting aspect assignment in this report, you should provide a  
disagreement, to the Regional Administrator, Region II, and the NRC Resident Inspector at the Sequoyah Nuclear Plant.  
response within 30 days of the date of this inspection report, with the basis for your  
disagreement, to the Regional Administrator, Region II, and the NRC Resident Inspector at the  
Sequoyah Nuclear Plant.  
   
   
As a result of the Safety Culture Common Language Initiative, the terminology and coding of  
As a result of the Safety Culture Common Language Initiative, the terminology and coding of  
cross-cutting aspects were revised beginning in calendar year (CY) 2014.  New cross-cutting  
cross-cutting aspects were revised beginning in calendar year (CY) 2014.  New cross-cutting  
aspects identified in CY 2014 will be coded under the latest revision to Inspection Manual Chapter (IMC) 0310.  Cross-cutting aspects identified in the last six months of 2013 using the  
aspects identified in CY 2014 will be coded under the latest revision to Inspection Manual  
previous terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310.  The revised cross-cutting aspects will be evaluated for cross-cutting  
Chapter (IMC) 0310.  Cross-cutting aspects identified in the last six months of 2013 using the  
previous terminology will be converted to the latest revision in accordance with the cross-
reference in IMC 0310.  The revised cross-cutting aspects will be evaluated for cross-cutting  
themes and potential substantive cross-cutting issues in accordance with IMC 0305 starting with  
themes and potential substantive cross-cutting issues in accordance with IMC 0305 starting with  
the CY 2014 mid-cycle assessment review.    
the CY 2014 mid-cycle assessment review.  
J. Shea 2  
 
J. Shea  
2  
In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections,
Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its
enclosure, and your response (if any) will be available electronically for public inspection in the
NRCs Public Document Room or from the Publicly Available Records (PARS) component of
NRCs Agencywide Documents Access and Management System (ADAMS).  ADAMS is
accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Sincerely,
   
   
In accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the
/RA/
NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Managem
ent System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
  Sincerely,     
 
          /RA/  
   
      Jonathan H. Bartley, Chief Reactor Projects Branch 6  
   
   
Jonathan H. Bartley, Chief  
Reactor Projects Branch 6  
Division of Reactor Projects
Docket Nos.: 50-327, 50-328
License Nos.: DPR-77, DPR-79
Enclosure:  Inspection Report 05000327/2013005, 05000328/2013005
w/Attachment:  Supplementary Information
cc: via ListServ distribution


Division of Reactor Projects
Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79


_________________________
   
   
Enclosure: Inspection Report 05000327/2013005, 05000328/2013005 w/Attachment:  Supplementary Information
SUNSI REVIEW COMPLETE
cc: via ListServ distribution
FORM 665 ATTACHED
OFFICE
RII:DRP
RII:DRP
RII:DRS
RII:DRS
RII:DRS
RII:DRS
RII:DRP
RII:DRP
SIGNATURE
JHB /RA for/
Via email
BRB /RA for/
ORL /RA for/
BRB /RA for/
BRB /RA for/
JDH /RA/
JHB /RA/
NAME
GSmith
WDeschaine
MSpeck
LLake
RHamilton
RKellner
JHamman
JBartley
DATE
02/07/2014
02/07/2014
02/07/2014
02/07/2014
02/07/2014
02/07/2014
02/07/2014
02/07/2014
E-MAIL COPY?
    YES
NO      YES
NO      YES
NO      YES
NO      YES
NO   
  YES
NO     
  YES
NO   


_________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRS RII:DRS RII:DRS RII:DRS RII:DRP RII:DRP SIGNATURE JHB /RA for/ Via email BRB /RA for/ ORL /RA for/ BRB /RA for/ BRB /RA for/ JDH /RA/ JHB /RA/ NAME GSmith WDeschaine MSpeck LLake RHamilton RKellner JHamman JBartley DATE 02/07/2014 02/07/2014 02/07/2014 02/07/2014 02/07/2014 02/07/2014 02/07/2014 02/07/2014 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO        YES NO     
J. Shea  
J. Shea 3  
3  
   
   
Letter to J.W. Shea from Jonathan H. Bartley dated February 7, 2014  
Letter to J.W. Shea from Jonathan H. Bartley dated February 7, 2014  
  SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC INTEGRATED INSPECTION REPORT  
   
SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC INTEGRATED INSPECTION REPORT  
05000327/2013005 AND 05000328/2013005  
05000327/2013005 AND 05000328/2013005  
   
   
Distribution w/encl
Distribution w/encl:
: C. Evans, RII L. Douglas, RII   
C. Evans, RII  
L. Douglas, RII   
OE Mail  
OE Mail  
RIDSNRRDIRS  
RIDSNRRDIRS  
PUBLIC  
PUBLIC  
RidsNrrPMSequoyah Resource  
RidsNrrPMSequoyah Resource  
 
Enclosure U. S. NUCLEAR REGULATORY COMMISSION
REGION II
  Docket Nos.:  50-327, 50-328
   
   
License Nos.:  DPR-77, DPR-79
   
   
Report Nos.: 05000327/2013005, 05000328/2013005


      Licensee:  Tennessee Valley Authority (TVA)
   
   
  Facility:  Sequoyah Nuclear Plant, Units 1 and 2  
Enclosure
  Location:  Sequoyah Access Road     Soddy-Daisy, TN 37379  
U. S. NUCLEAR REGULATORY COMMISSION
 
REGION II
Docket Nos.: 
50-327, 50-328
   
License Nos.: 
DPR-77, DPR-79
Report Nos.:
05000327/2013005, 05000328/2013005
Licensee:
Tennessee Valley Authority (TVA)
Facility:  
   
Sequoyah Nuclear Plant, Units 1 and 2  
Location:  
   
Sequoyah Access Road  
Soddy-Daisy, TN 37379  
Dates: 
October 1 - December 31, 2013
Inspectors:
G. Smith, Senior Resident Inspector
W. Deschaine, Resident Inspector
M. Speck, Senior Emergency Preparedness Inspector (Sections 
1R04.1 and 1R05)
   
   
Dates:  October 1 - December 31, 2013
   
   
Inspectors:  G. Smith, Senior Resident Inspector    W. Deschaine, Resident Inspector    M. Speck, Senior Emergency Preparedness Inspector (Sections 
L. Lake, Senior Reactor Inspector (Section 1R08)  
1R04.1 and 1R05)    L. Lake, Senior Reactor Inspector (Section 1R08) R. Hamilton, Senior Health Physicist (Section 2RS8)  
R. Hamilton, Senior Health Physicist (Section 2RS8)  
R. Kellner, Health Physicist (Sections 2RS1, 4OA1)  
R. Kellner, Health Physicist (Sections 2RS1, 4OA1)  
  Approved by:  Jonathan H. Bartley, Chief     Reactor Projects Branch 6  Division of Reactor Projects  
 
   
  Enclosure SUMMARY  
Approved by:   
IR 05000327/2013-005, 05000328/2013-005; 10/1/2013 - 12/31/2013; Sequoyah Nuclear Plant, Units 1 and 2; Other Activities
Jonathan H. Bartley, Chief  
Reactor Projects Branch 6  
   
Division of Reactor Projects  
   


Enclosure
SUMMARY
IR 05000327/2013-005, 05000328/2013-005; 10/1/2013 - 12/31/2013; Sequoyah Nuclear Plant,
Units 1 and 2; Other Activities
   
   
The report covered a three-month period of inspection by resident inspectors and announced  
The report covered a three-month period of inspection by resident inspectors and announced  
inspections by regional inspectors.  One self-revealing finding was identified.  The significance  
inspections by regional inspectors.  One self-revealing finding was identified.  The significance  
of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process," (SDP) dated June 2, 2011.  Cross-cutting aspects are determined using IMC 0310, "Components Within the Cross-Cutting Areas,"
of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual  
dated October 28, 2011.  The NRC's program for ov
Chapter (IMC) 0609, "Significance Determination Process," (SDP) dated June 2, 2011.  Cross-
erseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.  
cutting aspects are determined using IMC 0310, Components Within the Cross-Cutting Areas,  
  A. NRC-Identified and Self-Revealing Findings
dated October 28, 2011.  The NRC's program for overseeing the safe operation of commercial  
    Cornerstone:  Mitigating Systems  
nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4,  
  Green: A self-revealing non-cited violation of 10 CFR 50 Appendix B, Criterion XVI, "Corrective Action," was identified for the licensee's failure to promptly correct a  
dated December 2006.  
   
A.  
NRC-Identified and Self-Revealing Findings
Cornerstone:  Mitigating Systems  
   
Green: A self-revealing non-cited violation of 10 CFR 50 Appendix B, Criterion XVI,  
Corrective Action, was identified for the licensees failure to promptly correct a  
condition adverse to quality within a reasonable time.  Timely corrective actions were not  
condition adverse to quality within a reasonable time.  Timely corrective actions were not  
taken to correct a dual position indication (open and closed lights both illuminated) on  
taken to correct a dual position indication (open and closed lights both illuminated) on  
the Unit 1 'A' train residual heat removal (RHR) containment sump suction flow control  
the Unit 1 A train residual heat removal (RHR) containment sump suction flow control  
valve (FCV) 1-FCV-63-72.  This licensee entered this issue into the corrective action program as problem evaluation report (PER) 772193 and performed repairs to the valve to restore the system to operable status.   
valve (FCV) 1-FCV-63-72.  This licensee entered this issue into the corrective action  
 
program as problem evaluation report (PER) 772193 and performed repairs to the valve  
to restore the system to operable status.   
   
   
This finding was determined to be more than minor because it was associated with the  
This finding was determined to be more than minor because it was associated with the  
Design Control attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone's objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core  
Design Control attribute of the Mitigating Systems cornerstone and adversely affected  
damage).  Specifically, the finding reduced the reliability and capability of the 'A' train  
the cornerstones objective to ensure the availability, reliability, and capability of systems  
RHR system to perform its safety function as designed.  The finding required a detailed risk analysis as the 'A' RHR system was inoperable beyond its allowed outage time of 72  
that respond to initiating events to prevent undesirable consequences (i.e., core  
hours.  The detailed risk analysis concluded that the finding was of very low safety significance (Green).  This finding was determined to have a cross-cutting aspect relating to the proper classification, prioritization, and evaluation of operability and  
damage).  Specifically, the finding reduced the reliability and capability of the A train  
RHR system to perform its safety function as designed.  The finding required a detailed  
risk analysis as the A RHR system was inoperable beyond its allowed outage time of 72  
hours.  The detailed risk analysis concluded that the finding was of very low safety  
significance (Green).  This finding was determined to have a cross-cutting aspect  
relating to the proper classification, prioritization, and evaluation of operability and  
reportability of conditions adverse to quality in the Corrective Action component of the  
reportability of conditions adverse to quality in the Corrective Action component of the  
Problem Identification and Resolution area. [P.1(c)] (Section 4OA5)  
Problem Identification and Resolution area. [P.1(c)] (Section 4OA5)  
  B.  Licensee-Identified Violations
   
  None  
B.   
  Enclosure REPORT DETAILS
Licensee-Identified Violations  
  Summary of Plant Status
:  
None  
 
Enclosure  
REPORT DETAILS  
Summary of Plant Status:
   
Unit 1 operated at or near 100 percent rated thermal power (RTP) until September 9, 2013,  
Unit 1 operated at or near 100 percent rated thermal power (RTP) until September 9, 2013,  
when the unit entered a power coast down period until October 14 when the unit shut down for a  
when the unit entered a power coast down period until October 14 when the unit shut down for a  
refueling outage.  Unit 1 returned to 100 percent RTP on November 24 where it operated for the  
refueling outage.  Unit 1 returned to 100 percent RTP on November 24 where it operated for the  
remainder of the inspection period.  
remainder of the inspection period.  
  Unit 2 operated at or near 100 percent RTP for the entire inspection period.
   
  1. REACTOR SAFETY  
Unit 2 operated at or near 100 percent RTP for the entire inspection period.  
  Cornerstones:  Initiating Events, Mitigating Systems, and Barrier Integrity  
  1R01 Adverse Weather Protection
1.  
 
REACTOR SAFETY  
   a.  Inspection Scope
   
  .1 Readiness for Seasonal Extreme Weather Conditions
Cornerstones:  Initiating Events, Mitigating Systems, and Barrier Integrity  
 
   
1R01 Adverse Weather Protection  
   a.   
Inspection Scope  
.1  
Readiness for Seasonal Extreme Weather Conditions  
The inspectors reviewed design features and licensee preparations for protecting the  
The inspectors reviewed design features and licensee preparations for protecting the  
essential raw cooling water (ERCW) intake structure and both Unit 1 and 2 refueling  
essential raw cooling water (ERCW) intake structure and both Unit 1 and 2 refueling  
water storage tanks (RWSTs) from extreme cold and freezing conditions.  The  
water storage tanks (RWSTs) from extreme cold and freezing conditions.  The  
inspectors reviewed the Updated Final Safe
inspectors reviewed the Updated Final Safety Analysis Report (UFSAR) and Technical  
ty Analysis Report (UFSAR) and Technical Specifications (TS), reviewed implementation of licensee freeze protection procedures,  
Specifications (TS), reviewed implementation of licensee freeze protection procedures,  
walked down portions of the systems to assess deficiencies and system readiness for extreme cold weather, and discussed prioritization and status of correcting deficiencies  
walked down portions of the systems to assess deficiencies and system readiness for  
extreme cold weather, and discussed prioritization and status of correcting deficiencies  
with licensee personnel.  Documents reviewed are listed in the Attachment.  The  
with licensee personnel.  Documents reviewed are listed in the Attachment.  The  
inspectors completed one sample.  
inspectors completed one sample.  
   
   
   b.  Findings
   b.   
 
Findings  
  No findings were identified.  
  1R04 Equipment Alignment
   
 
No findings were identified.  
.1 Partial System Walkdown
   
 
1R04 Equipment Alignment  
   a. Inspection Scope     The inspectors performed partial walkdowns of the following three systems to verify the operability of redundant or diverse trains and components when safety equipment was  
.1  
Partial System Walkdown  
   a.  
Inspection Scope  
The inspectors performed partial walkdowns of the following three systems to verify the  
operability of redundant or diverse trains and components when safety equipment was  
inoperable.  The inspectors focused on identification of discrepancies that could impact  
inoperable.  The inspectors focused on identification of discrepancies that could impact  
the function of the system and, therefore, potentially increase risk.  The inspectors  
the function of the system and, therefore, potentially increase risk.  The inspectors  
reviewed applicable operating procedures, walked down control system components, and determined whether selected breakers, valves, and support equipment were in the correct position to support system operation.  The inspectors also verified that the  
reviewed applicable operating procedures, walked down control system components,  
licensee had properly identified and resolved  
and determined whether selected breakers, valves, and support equipment were in the  
equipment alignment problems that could   
correct position to support system operation.  The inspectors also verified that the  
4  Enclosure  cause initiating events or impact the capability of mitigating systems or barriers and entered them into the corrective action program (CAP).  Documents reviewed are listed in the Attachment.  The inspectors completed 3 samples.  
licensee had properly identified and resolved equipment alignment problems that could  
  * Spent fuel pool cooling during core empty period of U1R19  
 
* 1A emergency core cooling train while 1B 669 penetration cooler out-of-service  
   
* 2A auxiliary feed-water and 2A emergency diesel generator while 2B under-voltage coils out-of-service  
4  
   
Enclosure  
   
cause initiating events or impact the capability of mitigating systems or barriers and  
entered them into the corrective action program (CAP).  Documents reviewed are listed  
in the Attachment.  The inspectors completed 3 samples.  
   
*  
Spent fuel pool cooling during core empty period of U1R19  
*  
1A emergency core cooling train while 1B 669 penetration cooler out-of-service  
*  
2A auxiliary feed-water and 2A emergency diesel generator while 2B under-voltage  
coils out-of-service  
.2
Complete System Walkdown
   
   
.2 Complete System Walkdown
   a.  
 
Inspection Scope  
   a. Inspection Scope   The inspectors performed a complete system walkdown of the:  1) emergency gas  
 
The inspectors performed a complete system walkdown of the:  1) emergency gas  
treatment system/auxiliary building gas treat
treatment system/auxiliary building gas treatment system (ABGTS); and 2) auxiliary  
ment system (ABGTS
building ventilation/control building ventilation systems.  The purpose of this inspection  
); and 2) auxiliary building ventilation/control building ventilation systems.  The purpose of this inspection  
was to verify proper equipment alignment, to identify any discrepancies that could impact  
was to verify proper equipment alignment, to identify any discrepancies that could impact  
the function of the system and increase risk, and to verify that the licensee properly identified and resolved equipment alignment problems that could cause events or impact the functional capability of the system.   
the function of the system and increase risk, and to verify that the licensee properly  
  The inspectors reviewed the UFSAR, system procedures, system drawings, and system design documents to determine the correct lineup and then examined system components and their configuration to identify any discrepancies between the existing system equipment lineup and the correct lineup.  During the walkdown, the inspectors  
identified and resolved equipment alignment problems that could cause events or impact  
the functional capability of the system.   
   
The inspectors reviewed the UFSAR, system procedures, system drawings, and system  
design documents to determine the correct lineup and then examined system  
components and their configuration to identify any discrepancies between the existing  
system equipment lineup and the correct lineup.  During the walkdown, the inspectors  
reviewed the following:  
reviewed the following:  
  * Dampers were correctly positioned.  
   
* Electrical power was available as required.  
*  
* Hangers and supports were correctly installed and functional.  
Dampers were correctly positioned.  
* Essential support systems were operational.  
*  
* Ancillary equipment or debris did not interfere with system performance.  
Electrical power was available as required.  
* Breakers were correctly positioned.  
*  
* Major system components were correctly labeled.  
Hangers and supports were correctly installed and functional.  
* Cabinets, cable trays, and conduits were correctly installed and functional.  
*  
* Visible cabling appeared to be in good material condition.  
Essential support systems were operational.  
  In addition, the inspectors reviewed corrective action items and design issues associated  
*  
Ancillary equipment or debris did not interfere with system performance.  
*  
Breakers were correctly positioned.  
*  
Major system components were correctly labeled.  
*  
Cabinets, cable trays, and conduits were correctly installed and functional.  
*  
Visible cabling appeared to be in good material condition.  
   
In addition, the inspectors reviewed corrective action items and design issues associated  
with the systems to determine whether any condition described in those documents  
with the systems to determine whether any condition described in those documents  
 
could adversely impact current system operability.  Documents reviewed are listed in the  
could adversely impact current system operability.  Documents reviewed are listed in the Attachment.  The inspectors completed two samples.  
Attachment.  The inspectors completed two samples.  
  b.
Findings 
   
   
  b. Findings   
No findings were identified.  
No findings were identified.  


 
5  Enclosure 1R05 Fire Protection
5  
  .1 Fire Protection Tours
   
 
Enclosure  
   a. Inspection Scope
1R05 Fire Protection  
  The inspectors conducted a tour of the six areas important to safety listed below to assess the material condition and operational status of fire protection features.  The inspectors evaluated whether: combustibles and ignition sources were controlled in  
accordance with the licensee's administrative procedures; fire detection and suppression  
.1  
Fire Protection Tours  
   a.  
Inspection Scope  
The inspectors conducted a tour of the six areas important to safety listed below to  
assess the material condition and operational status of fire protection features.  The  
inspectors evaluated whether: combustibles and ignition sources were controlled in  
accordance with the licensees administrative procedures; fire detection and suppression  
equipment was available for use; passive fire barriers were maintained in good material  
equipment was available for use; passive fire barriers were maintained in good material  
condition; and compensatory measures for out-of-service, degraded, or inoperable fire protection equipment were implemented in accordance with the licensee's fire plan.  Documents reviewed are listed in the Attachment.  The inspectors completed six  
condition; and compensatory measures for out-of-service, degraded, or inoperable fire  
protection equipment were implemented in accordance with the licensees fire plan.   
Documents reviewed are listed in the Attachment.  The inspectors completed six  
samples.  
samples.  
* Unit 1 Lower Containment Building
* Unit 1 Upper Containment Building
  * Control Building Elevation 685 (Auxiliary Instrument Room)
* Control Building Elevation 706 (Cable Spreading Room)
* ERCW Building - Elevations 688/704/720
* Turbine Building - Elevations 662/685
    b. Findings
  No findings were identified.
   
   
1R06 Flood Protection Measures
*
  .1 Internal Flooding  
Unit 1 Lower Containment Building
    a. Inspection Scope  
*
The inspectors examined internal flood protection measures associated with the 1A and 1B safety injection (SI) pump rooms' internal flood design in order to verify that flood mitigation plans were consistent with the design requirements and risk analysis  
Unit 1 Upper Containment Building 
*
Control Building Elevation 685 (Auxiliary Instrument Room)
*
Control Building Elevation 706 (Cable Spreading Room)
*
ERCW Building - Elevations 688/704/720
*
Turbine Building - Elevations 662/685
  b.
Findings
No findings were identified.
1R06 Flood Protection Measures  
.1  
Internal Flooding
  a.  
Inspection Scope  
The inspectors examined internal flood protection measures associated with the 1A and  
1B safety injection (SI) pump rooms internal flood design in order to verify that flood  
mitigation plans were consistent with the design requirements and risk analysis  
assumptions.  The inspectors verified that equipment essential for reactor shutdown was  
assumptions.  The inspectors verified that equipment essential for reactor shutdown was  
 
properly protected from a flood caused by pipe breaks in the 1A & 1B SI pump room.   
properly protected from a flood caused by pipe breaks in the 1A & 1B SI pump room.  Specifically, the inspectors reviewed the licensee's moderate energy line break flooding study to fully understand the licensee's flood mitigation strategy, reviewed licensee drawings and then verified that the assumptions and results remained valid.  The inspectors walked down the 1A & 1B SI pump room to verify the assumed flooding sources, adequacy of common area drainage, and flood detection instrumentation to  
Specifically, the inspectors reviewed the licensees moderate energy line break flooding  
study to fully understand the licensees flood mitigation strategy, reviewed licensee  
drawings and then verified that the assumptions and results remained valid.  The  
inspectors walked down the 1A & 1B SI pump room to verify the assumed flooding  
sources, adequacy of common area drainage, and flood detection instrumentation to  
ensure that a flooding event would not impact reactor shutdown capabilities.  The  
ensure that a flooding event would not impact reactor shutdown capabilities.  The  
inspectors completed one sample.


inspectors completed one sample.
 
6  Enclosure    b. Findings    No findings were identified. 
   
   
1R08 Non-Destructive Examination  
6
Activities and Welding Activities
 
Enclosure
   a. Inspection Scope
  b.
  From October 21-25, 2013, the inspectors conducted an on-site review of the  
Findings 
implementation of the licensee's in-service inspection (ISI) Program for monitoring  
No findings were identified. 
1R08 Non-Destructive Examination Activities and Welding Activities  
   a.  
Inspection Scope  
From October 21-25, 2013, the inspectors conducted an on-site review of the  
implementation of the licensees in-service inspection (ISI) Program for monitoring  
degradation of the reactor coolant system; emergency feedwater systems, risk-
degradation of the reactor coolant system; emergency feedwater systems, risk-
significant piping and components, and containment systems in Unit 1.  
significant piping and components, and containment systems in Unit 1.  
  The inspectors' activities included a review of non-destructive examinations (NDEs) to  
   
The inspectors activities included a review of non-destructive examinations (NDEs) to  
evaluate compliance with the applicable edition of the American Society of Mechanical  
evaluate compliance with the applicable edition of the American Society of Mechanical  
Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, and to verify that  
Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, and to verify that  
indications and defects were appropriately evaluated and dispositioned in accordance with the requirements of the ASME Code, Section XI, acceptance standards or NRC  
indications and defects were appropriately evaluated and dispositioned in accordance  
with the requirements of the ASME Code, Section XI, acceptance standards or NRC  
approved alternative requirement.  
approved alternative requirement.  
   
   
The inspectors directly observed or reviewed records of the following NDEs mandated  
The inspectors directly observed or reviewed records of the following NDEs mandated  
by the ASME Code to evaluate compliance with the ASME Code Section XI and Section  
by the ASME Code to evaluate compliance with the ASME Code Section XI and Section  
V requirements, and if any indications and defects were detected.  Inspectors also reviewed evaluations of results that were dispositioned in accordance with the ASME Code or an NRC-approved alternative requirement.  
V requirements, and if any indications and defects were detected.  Inspectors also  
 
reviewed evaluations of results that were dispositioned in accordance with the ASME  
* Directly observed:  
Code or an NRC-approved alternative requirement.  
*  
Directly observed:  
o Ultrasonic testing (UT) examinations of the reactor pressure vessel head to shell  
o Ultrasonic testing (UT) examinations of the reactor pressure vessel head to shell  
flange studs  
flange studs  
o General visual examination of the outside surface of the containment shell  
o General visual examination of the outside surface of the containment shell  
  * Reviewed records:  
   
*  
Reviewed records:  
o UT examinations of reactor coolant pump #4 bolting  
o UT examinations of reactor coolant pump #4 bolting  
o VT-3 visual examination of containment penetration bolting   
o VT-3 visual examination of containment penetration bolting   
o Work Order 113312025 modification of component cooling water system piping  
o Work Order 113312025 modification of component cooling water system piping  
  The inspectors reviewed documentation for
   
the repair/replacement of the following pressure boundary welds.  The inspectors evaluated if the licensee applied the pre-service non-destructive examinations and acceptance criteria required by the Construction Code.  In addition, the inspectors reviewed the welding procedure  
The inspectors reviewed documentation for the repair/replacement of the following  
pressure boundary welds.  The inspectors evaluated if the licensee applied the pre-
service non-destructive examinations and acceptance criteria required by the  
Construction Code.  In addition, the inspectors reviewed the welding procedure  
specifications, welder qualifications, welding material certifications, and supporting weld  
specifications, welder qualifications, welding material certifications, and supporting weld  
procedure qualification records to evaluate if the weld procedures were qualified in  
procedure qualification records to evaluate if the weld procedures were qualified in  
accordance with the requirements of the Construction Code and the ASME Code Section XI.  
accordance with the requirements of the Construction Code and the ASME Code  
Section XI.  
   
   
   
   
   
   
 
  7  Enclosure PWR Vessel Upper Head Penetration (VUHP) Inspection Activities:  For the Unit 1 vessel head, a bare metal visual examination and a volumetric examination required in accordance with the requirements of ASME Code Case N-729-1 and 10 CFR  
 
   
7  
   
Enclosure  
PWR Vessel Upper Head Penetration (VUHP) Inspection Activities:  For the Unit 1  
vessel head, a bare metal visual examination and a volumetric examination required in  
accordance with the requirements of ASME Code Case N-729-1 and 10 CFR  
50.55a(g)(6)(ii)(D) were conducted in the previous outage and therefore not required to  
50.55a(g)(6)(ii)(D) were conducted in the previous outage and therefore not required to  
be performed this outage.  
be performed this outage.  
   
   
  Boric Acid Corrosion Control (BACC) Inspection Activities:  The inspectors reviewed the licensee's BACC program activities to ensure implementation with commitments made in response to NRC Generic Letter 88-05, "Boric Acid Corrosion of Carbon Steel Reactor  
   
Pressure Boundary," and applicable industry guidance documents.  Specifically, the  
Boric Acid Corrosion Control (BACC) Inspection Activities:  The inspectors reviewed the  
licensees BACC program activities to ensure implementation with commitments made in  
response to NRC Generic Letter 88-05, Boric Acid Corrosion of Carbon Steel Reactor  
Pressure Boundary, and applicable industry guidance documents.  Specifically, the  
inspectors performed an on-site record review of procedures and the results of the  
inspectors performed an on-site record review of procedures and the results of the  
licensee's containment walkdown inspections performed during the current refueling outage.  The inspectors also reviewed Focused Self-Assessment CRP-ENG-F-13-031 of  
licensees containment walkdown inspections performed during the current refueling  
outage.  The inspectors also reviewed Focused Self-Assessment CRP-ENG-F-13-031 of  
the Boric Acid Program.   
the Boric Acid Program.   
  The inspectors also interviewed the BACC program owner, conducted an independent  
   
walkdown of containment to evaluate compliance with licensee's BACC program requirements, and verified that degraded or non-conforming conditions, such as boric acid leaks, were properly identified and corrected in accordance with the licensee's
The inspectors also interviewed the BACC program owner, conducted an independent  
walkdown of containment to evaluate compliance with licensees BACC program  
requirements, and verified that degraded or non-conforming conditions, such as boric  
acid leaks, were properly identified and corrected in accordance with the licensees
BACC and corrective action programs.  
BACC and corrective action programs.  
   
   
The inspectors reviewed the following evaluations and corrective actions related to  
The inspectors reviewed the following evaluations and corrective actions related to  
evidence of boric acid leakage to evaluate if the corrective actions completed were consistent with the requirements of the ASME Code Section XI and 10 CFR Part 50, Appendix B, Criterion XVI.  
evidence of boric acid leakage to evaluate if the corrective actions completed were  
 
consistent with the requirements of the ASME Code Section XI and 10 CFR Part 50,  
* Problem Event Report (PER) 618770 - Boron buildup on 1B-B SI pump pedestal  
Appendix B, Criterion XVI.  
* PER 691545 - Boric acid build up and wet boric acid are present on transmitter sensing line 1-FT-72-41  
  Steam Generator (SG) Tube Inspection Activities
*  
: There were no SG tube eddy current examinations conducted during this outage.  The inspectors reviewed the following documentation and evaluated them against the  
Problem Event Report (PER) 618770 - Boron buildup on 1B-B SI pump pedestal  
licensee's TS, commitments made to the NRC, ASME Section XI, and Nuclear Energy  
*  
Institute (NEI) 97-06, "Steam Generator Program Guidelines," to ensure that the licensee  
PER 691545 - Boric acid build up and wet boric acid are present on transmitter  
sensing line 1-FT-72-41  
   
Steam Generator (SG) Tube Inspection Activities:
   
There were no SG tube eddy current examinations conducted during this outage.  The  
inspectors reviewed the following documentation and evaluated them against the  
licensees TS, commitments made to the NRC, ASME Section XI, and Nuclear Energy  
Institute (NEI) 97-06, Steam Generator Program Guidelines, to ensure that the licensee  
was in compliance with the schedule to skip the SG eddy current testing inspections for  
was in compliance with the schedule to skip the SG eddy current testing inspections for  
the 1R19 outage:
*
AREVA document # 51-9178898-001, Sequoyah Unit Condition Monitoring for Cycle
18 and Operational Assessment for Cycles 19, 20 and 21 
Identification and Resolution of Problems: 
The inspectors performed a review of selected ISI-related problems that were identified
by the licensee and entered into the corrective action program as PERs.  The inspectors
reviewed the PERs to confirm the licensee had appropriately described the scope of the
problem and had initiated corrective actions.  The review also included the licensees


the 1R19 outage:
* AREVA document # 51-9178898-001, Sequoyah Unit Condition Monitoring for Cycle 18 and Operational Assessment for Cycles 19, 20 and 21 
   
   
Identification and Resolution of Problems
8
:   
   
The inspectors performed a review of selected ISI-related problems that were identified by the licensee and entered into the corrective action program as PERs. The inspectors reviewed the PERs to confirm the licensee had appropriately described the scope of the
Enclosure
problem and had initiated corrective actions.  The review also included the licensee's 
consideration and assessment of operating experience events applicable to the plant.   
8  Enclosure consideration and assessment of operating experience events applicable to the plant.  The inspectors performed this review to ensure compliance with 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action," requirements.  Documents reviewed are  
The inspectors performed this review to ensure compliance with 10 CFR Part 50,  
Appendix B, Criterion XVI, Corrective Action, requirements.  Documents reviewed are  
listed in the Attachment.  
listed in the Attachment.  
   
   
   b. Findings
   b.  
  No findings were identified.  
Findings  
No findings were identified.  
1R11 Licensed Operator Requalification Program   
   
   
1R11 Licensed Operator Requalification Program     
.1   
.1  Quarterly Review of Licensed Operator Requalification
Quarterly Review of Licensed Operator Requalification
      a. Inspection Scope
  The inspectors performed one licensed operator requalification program review.  The  
  a.  
inspectors observed a simulator session on October 9, 2013.  The training scenario involved Just-In-Time Training for Pre-Refueling Outage risk significant activities such as placing the RHR system in service. The ins
Inspection Scope  
pectors observed crew performance in terms of communications; ability to take timely and proper actions; prioritizing, interpreting, and verifying alarms; correct use and implementation of procedures, including the alarm  
The inspectors performed one licensed operator requalification program review.  The  
inspectors observed a simulator session on October 9, 2013.  The training scenario  
involved Just-In-Time Training for Pre-Refueling Outage risk significant activities such as  
placing the RHR system in service. The inspectors observed crew performance in terms  
of communications; ability to take timely and proper actions; prioritizing, interpreting, and  
verifying alarms; correct use and implementation of procedures, including the alarm  
response procedures; timely control board operation and manipulation, including high  
response procedures; timely control board operation and manipulation, including high  
risk operator actions; oversight and direction provided by shift manager, including the ability to identify and implement appropriate TS action; and, group dynamics involved in crew performance.  The inspectors also observed the evaluators' critique and reviewed  
risk operator actions; oversight and direction provided by shift manager, including the  
ability to identify and implement appropriate TS action; and, group dynamics involved in  
crew performance.  The inspectors also observed the evaluators critique and reviewed  
simulator fidelity to verify that it matched actual plant response.  Documents reviewed  
simulator fidelity to verify that it matched actual plant response.  Documents reviewed  
are listed in the Attachment.  The inspectors completed one sample.  
are listed in the Attachment.  The inspectors completed one sample.  
      b. Findings  
   
  b.  
Findings  
No findings were identified.   
No findings were identified.   
 
.2 Quarterly Review of Licensed Operator Performance
.2  
    a. Inspection Scope
Quarterly Review of Licensed Operator Performance  
  The inspectors observed and assessed licensed operator performance in the main  
  a.  
Inspection Scope  
The inspectors observed and assessed licensed operator performance in the main  
control room during periods of heightened activity or risk.  The inspectors reviewed  
control room during periods of heightened activity or risk.  The inspectors reviewed  
various licensee policies and procedures such as OPDP-1, "Conduct of Operations," NPG-SPP-10.0, "Plant Operations," and 0-GO-5, "Normal Power Operation." The inspectors utilized activities such as post-maintenance testing, surveillance testing,  
various licensee policies and procedures such as OPDP-1, Conduct of Operations,  
NPG-SPP-10.0, Plant Operations, and 0-GO-5, Normal Power Operation.  The  
inspectors utilized activities such as post-maintenance testing, surveillance testing,  
unplanned transients, infrequent plant evolutions, plant startups and shutdowns, reactor  
unplanned transients, infrequent plant evolutions, plant startups and shutdowns, reactor  
power and turbine load changes, and refueling and other outage activities to focus on  
power and turbine load changes, and refueling and other outage activities to focus on  
the following conduct of operations as appropriate:  
the following conduct of operations as appropriate:  
*
operator compliance and use of procedures
*
control board manipulations
*
communication between crew members


  * operator compliance and use of procedures
   
* control board manipulations
9
* communication between crew members  
   
Enclosure  
Enclosure  
* use and interpretation of plant instruments, indications, and alarms  
*  
* use of human error prevention techniques  
use and interpretation of plant instruments, indications, and alarms  
* documentation of activities, including initials and sign-offs in procedures  
*  
* supervision of activities, including risk and reactivity management  
use of human error prevention techniques  
* pre-job briefs  
*  
  Specifically, the inspectors observed licensed operator performance during the following activities:  
documentation of activities, including initials and sign-offs in procedures  
 
*  
* Unit 1 reactor shutdown and plant cool down/depressurization  
supervision of activities, including risk and reactivity management  
* Unit 1 refueling and other outage activities  
*  
* Unit 1 startup, including Mode changes  
pre-job briefs  
* Unit 2 down power with turbine in manual for valve testing  
   
  Documents reviewed are listed in the Attachment.  The inspectors completed one  
Specifically, the inspectors observed licensed operator performance during the following  
activities:  
*  
Unit 1 reactor shutdown and plant cool down/depressurization  
*  
Unit 1 refueling and other outage activities  
*  
Unit 1 startup, including Mode changes  
*  
Unit 2 down power with turbine in manual for valve testing  
   
Documents reviewed are listed in the Attachment.  The inspectors completed one  
sample.  
sample.  
    b. Findings
  No findings were identified. 
   
   
.3 Annual Review of Licensee Requalification Examination Results
  b.
 
Findings
   a. Inspection Scope
  On September 13, 2013, the licensee completed the annual requalification operating  
No findings were identified. 
.3  
Annual Review of Licensee Requalification Examination Results  
   a.  
Inspection Scope  
On September 13, 2013, the licensee completed the annual requalification operating  
examinations required to be administered to all licensed operators in accordance with 10  
examinations required to be administered to all licensed operators in accordance with 10  
CFR 55.59(a)(2), "Requalification requirements," of the NRC's "Operators' Licenses."  
CFR 55.59(a)(2), Requalification requirements, of the NRCs Operators Licenses.   
The inspectors performed an in-office review  
The inspectors performed an in-office review of the overall pass/fail results of the  
of the overall pass/fail results of the individual operating examinations and the crew simulator operating examinations in accordance with Inspection Procedure (IP) 71111.11, "Licensed Operator Requalification  
individual operating examinations and the crew simulator operating examinations in  
Program and Licensed Operator Performance." The results were compared to the  
accordance with Inspection Procedure (IP) 71111.11, Licensed Operator Requalification  
thresholds established in Section 3.02, "Requalification Examination Results," of IP  
Program and Licensed Operator Performance.  The results were compared to the  
 
thresholds established in Section 3.02, Requalification Examination Results, of IP  
71111.11.  
71111.11.  
    b. Findings
 
  b.  
  No findings were identified.   
Findings  
   
No findings were identified.   
1R12 Maintenance Effectiveness
  a.
Inspection Scope
The inspectors reviewed five maintenance activities, issues, and/or systems listed below
to verify the effectiveness of the licensees activities in terms of: appropriate work
practices; identifying and addressing common cause failures; scoping in accordance
with 10 CFR 50.65(b); characterizing reliability issues for performance; trending key


   
   
1R12 Maintenance Effectiveness
10
    a. Inspection Scope
   
  The inspectors reviewed five maintenance activities, issues, and/or systems listed below
Enclosure  
to verify the effectiveness of the licensee's activities in terms of: appropriate work
parameters for condition monitoring; charging unavailability for performance;  
practices; identifying and addressing common cause failures; scoping in accordance with 10 CFR 50.65(b); characterizing reliability issues for performance; trending key  
classification in accordance with 10 CFR 50.65(a)(1) or (a)(2); appropriateness of  
10  Enclosure parameters for condition monitoring; charging unavailability for performance; classification in accordance with 10 CFR 50.65(a)(1) or (a)(2); appropriateness of performance criteria for structures, systems, or components (SSCs) and functions  
performance criteria for structures, systems, or components (SSCs) and functions  
classified as (a)(2); and appropriateness of goals and corrective actions for SSCs and  
classified as (a)(2); and appropriateness of goals and corrective actions for SSCs and  
functions classified as (a)(1).  Documents reviewed are listed in the Attachment.  The  
functions classified as (a)(1).  Documents reviewed are listed in the Attachment.  The  
inspectors completed 5 samples.  
inspectors completed 5 samples.  
 
* MR 11th Periodic Assessment Report (PE sample)  
*  
* Cause Determination and Evaluation (CDE) #2700, FCV-63-72 Failure  
MR 11th Periodic Assessment Report (PE sample)  
* CDE #2696, EBGTS 'B' Fan Failure  
*  
* CDE #2686, 'A' Shutdown Boardroom Chiller Failure  
Cause Determination and Evaluation (CDE) #2700, FCV-63-72 Failure  
* CDE #2674, 'B' Main Condenser Test Connection Failure  
*  
    b. Findings
CDE #2696, EBGTS B Fan Failure  
 
*  
CDE #2686, A Shutdown Boardroom Chiller Failure  
*  
CDE #2674, B Main Condenser Test Connection Failure  
  b.  
Findings  
No findings were identified.  
No findings were identified.  
  1R13 Maintenance Risk Assessments and Emergent Work Control
   
 
1R13 Maintenance Risk Assessments and Emergent Work Control  
   a. Inspection Scope
  The inspectors reviewed the following activities to determine whether appropriate risk assessments were performed prior to removing equipment from service for maintenance.  The inspectors evaluated w
   a.  
hether risk assessments were performed as required by 10 CFR 50.65(a)(4), and were accurate and complete.  When emergent  
Inspection Scope  
The inspectors reviewed the following activities to determine whether appropriate risk  
assessments were performed prior to removing equipment from service for  
maintenance.  The inspectors evaluated whether risk assessments were performed as  
required by 10 CFR 50.65(a)(4), and were accurate and complete.  When emergent  
work was performed, the inspectors reviewed whether plant risk was promptly  
work was performed, the inspectors reviewed whether plant risk was promptly  
reassessed and managed.  The inspectors also assessed whether the licensee's risk assessment tool use and risk categories were in accordance with Standard Programs and Processes Procedure NPG-SPP-07.1, "On-Line Work Management," Revision 3,  
reassessed and managed.  The inspectors also assessed whether the licensees risk  
and Instruction 0-TI-DSM-000-007.1, "Risk Assessment Guidelines," Revision 9.   
assessment tool use and risk categories were in accordance with Standard Programs  
and Processes Procedure NPG-SPP-07.1, On-Line Work Management, Revision 3,  
and Instruction 0-TI-DSM-000-007.1, Risk Assessment Guidelines, Revision 9.   
Documents reviewed are listed in the Attachment.  The inspectors completed 2 samples.  
Documents reviewed are listed in the Attachment.  The inspectors completed 2 samples.  
*
Review U1R19 Outage Schedule 
*
Review of risk during ABGTS outage 
  b.
Findings
No findings were identified.
1R15  Operability Determinations and Functionality Assessments
  a.
Inspection Scope
For the eight operability evaluations described in the PERs listed below, the inspectors
evaluated the technical adequacy of the evaluations to ensure that TS operability was
properly justified and the subject component or system remained available, such that no
unrecognized increase in risk occurred.  The inspectors compared the operability


  * Review U1R19 Outage Schedule
   
  * Review of risk during ABGTS outage
11
      b. Findings
   
  No findings were identified.
Enclosure
 
evaluations to UFSAR descriptions to determine if the system or components intended  
  1R15  Operability Determinations and Functionality Assessments
function(s) were adversely impacted.  In addition, the inspectors reviewed compensatory  
 
measures implemented to determine whether the compensatory measures worked as  
  a. Inspection Scope
stated and the measures were adequately controlled.  The inspectors also reviewed a  
  For the eight operability evaluations described in the PERs listed below, the inspectors
evaluated the technical adequacy of the evaluations to ensure that TS operability was
properly justified and the subject component or system remained available, such that no unrecognized increase in risk occurred.  The inspectors compared the operability 
11  Enclosure evaluations to UFSAR descriptions to determine if the system or component's intended function(s) were adversely impacted.  In addition, the inspectors reviewed compensatory measures implemented to determine whether the compensatory measures worked as stated and the measures were adequately controlled.  The inspectors also reviewed a  
sampling of PERs to assess whether the licensee was identifying and correcting any  
sampling of PERs to assess whether the licensee was identifying and correcting any  
deficiencies associated with operability evaluations.  Documents reviewed are listed in  
deficiencies associated with operability evaluations.  Documents reviewed are listed in  
the Attachment.  The inspectors completed 8 samples.  
the Attachment.  The inspectors completed 8 samples.  
  * PER 789552 - Unit 2 Turbine Controls in Manual  
   
* PER 795451 - POE WO 113223153 T1 motor lead pinch  
*  
* PER 799097 - POE TS LCO 3.7.4 action for FCV-67-146  
PER 789552 - Unit 2 Turbine Controls in Manual  
* PER 800432 - POE (ABSCE boundary issue)  
*  
* PER 795433 - PDO (During U1R19 water found leaking out of conduit in bioshield  
PER 795451 - POE WO 113223153 T1 motor lead pinch  
wall) * PER 801415 - PDO EDG 1B 2 sec load sequence  
*  
* PER 803833 - PDO U-1 Rx Head Vent Valve Stroke  
PER 799097 - POE TS LCO 3.7.4 action for FCV-67-146  
* PERs 816731, 815638, 817841 - FEs associated with the Unit 1 loose parts alarm  
*  
    b. Findings
PER 800432 - POE (ABSCE boundary issue)  
 
*  
  No findings were identified.  
PER 795433 - PDO (During U1R19 water found leaking out of conduit in bioshield  
 
wall)  
1R18 Plant Modifications
*  
 
PER 801415 - PDO EDG 1B 2 sec load sequence  
.1 Permanent Modifications
*  
 
PER 803833 - PDO U-1 Rx Head Vent Valve Stroke  
   a. Inspection Scope
*  
  The inspectors reviewed the modification listed below and the associated 10 CFR 50.59  
PERs 816731, 815638, 817841 - FEs associated with the Unit 1 loose parts alarm  
  b.  
Findings  
   
No findings were identified.  
1R18 Plant Modifications  
.1  
Permanent Modifications  
   a.  
Inspection Scope  
The inspectors reviewed the modification listed below and the associated 10 CFR 50.59  
screening, and compared it against the UFSAR and TS to verify whether the  
screening, and compared it against the UFSAR and TS to verify whether the  
modification affected operability or availability of the affected system.  
modification affected operability or availability of the affected system.  
  * DCN 22643 - Replace Pressurizer Power Operated Relief Valves (PORVs)   
   
  Following installation and testing, the inspectors observed indications affected by the modification, discussed them with operators, and verified that the modification was installed properly and its operation did not adversely affect safety system functions.  The inspectors did note that, ultimately, the installed PORVs did not meet the acceptance  
*  
DCN 22643 - Replace Pressurizer Power Operated Relief Valves (PORVs)   
   
Following installation and testing, the inspectors observed indications affected by the  
modification, discussed them with operators, and verified that the modification was  
installed properly and its operation did not adversely affect safety system functions.  The  
inspectors did note that, ultimately, the installed PORVs did not meet the acceptance  
criteria associated with the close stroke time.  As a result, the licensee chose to cut  
criteria associated with the close stroke time.  As a result, the licensee chose to cut  
out/remove the new style PORVs and reinstall the original PORVs prior to plant startup in November 2013.  Documents reviewed are listed in the Attachment.  The inspectors  
out/remove the new style PORVs and reinstall the original PORVs prior to plant startup  
in November 2013.  Documents reviewed are listed in the Attachment.  The inspectors  
completed one sample.  
completed one sample.  
   
   
   b. Findings
   b.  
 
Findings  
No findings were identified.  
No findings were identified.  
 
  12  Enclosure 1R19 Post Maintenance Testing
 
    a. Inspection Scope
   
  The inspectors reviewed the post maintenance tests associated with the nine work  
12  
   
Enclosure  
1R19 Post Maintenance Testing  
  a.  
Inspection Scope  
The inspectors reviewed the post maintenance tests associated with the nine work  
orders (WO) listed below to assess whether procedures and test activities ensured  
orders (WO) listed below to assess whether procedures and test activities ensured  
system operability and functional capability.  The inspectors reviewed the licensee's test procedure to evaluate whether:  the procedure adequately tested the safety function(s) that may have been affected by the maintenance activity; the acceptance criteria in the  
system operability and functional capability.  The inspectors reviewed the licensees test  
procedure to evaluate whether:  the procedure adequately tested the safety function(s)  
that may have been affected by the maintenance activity; the acceptance criteria in the  
procedure were consistent with information in the applicable licensing basis and/or  
procedure were consistent with information in the applicable licensing basis and/or  
design basis documents; and the procedure had been properly reviewed and approved.  The inspectors also witnessed the test or reviewed the test data to determine whether test results adequately demonstrated restoration of the affected safety function(s).  Documents reviewed are listed in the Attachment.  The inspectors completed nine  
design basis documents; and the procedure had been properly reviewed and approved.   
The inspectors also witnessed the test or reviewed the test data to determine whether  
test results adequately demonstrated restoration of the affected safety function(s).   
Documents reviewed are listed in the Attachment.  The inspectors completed nine  
samples.  
samples.  
  * WO 113377829 - Repack Valve (1-LCV-3-175) and perform AIRCET test  
   
* WO 112096045 - Repair isolation check valve (1-VLV-026-1296)  
*  
* WO 111234712 - 5 year PM to swap 480V Shutdown board breaker with a  
WO 113377829 - Repack Valve (1-LCV-3-175) and perform AIRCET test  
*  
WO 112096045 - Repair isolation check valve (1-VLV-026-1296)  
*  
WO 111234712 - 5 year PM to swap 480V Shutdown board breaker with a  
refurbished breaker  
refurbished breaker  
* WO 113806636 - Perform 0-MI-EPM-317-102.0 on CCS pump C-S and  
*  
WO 113806636 - Perform 0-MI-EPM-317-102.0 on CCS pump C-S and  
clean/replace motor air filter  
clean/replace motor air filter  
* WO 114560807 - Centrifugal charging pump (CCP) room cooler fan motor current check, bearing lubrication and cleaning  
*  
* WO 114198329 - EQ maintenance and inspection  
WO 114560807 - Centrifugal charging pump (CCP) room cooler fan motor current  
* WO 113408190 - Change out electrolytic capacitors in the Woodward 2301A  
check, bearing lubrication and cleaning  
*  
WO 114198329 - EQ maintenance and inspection  
*  
WO 113408190 - Change out electrolytic capacitors in the Woodward 2301A  
governor card  
governor card  
* WOs 114306842, 114306841, 114325805, 114325799 - Aux Feedwater valves -  
*  
WOs 114306842, 114306841, 114325805, 114325799 - Aux Feedwater valves -  
836 & 837  
836 & 837  
* WO 113756597 - PORVs - PCV-68-340 & PCV-68-334  
*  
    b. Findings
WO 113756597 - PORVs - PCV-68-340 & PCV-68-334  
  No findings were identified.  
  1R20 Refueling and Other Outage Activities
  b.  
 
Findings  
.1 Unit 1 Refueling Outage Cycle 19
 
No findings were identified.  
   a. Inspection Scope
   
  For the Unit 1 refueling outage that began on October 14, 2013, the inspectors  
1R20 Refueling and Other Outage Activities  
evaluated licensee activities to verify that the licensee considered risk in developing outage schedules, followed risk reduction methods developed to control plant  
.1  
Unit 1 Refueling Outage Cycle 19  
   a.  
Inspection Scope  
For the Unit 1 refueling outage that began on October 14, 2013, the inspectors  
evaluated licensee activities to verify that the licensee considered risk in developing  
outage schedules, followed risk reduction methods developed to control plant  
configuration, developed mitigation strategies for the loss of key safety functions, and  
configuration, developed mitigation strategies for the loss of key safety functions, and  
adhered to operating license and TS requirements that ensure defense-in-depth.  The inspectors also walked down portions of Unit 1 not normally accessible during at-power   
adhered to operating license and TS requirements that ensure defense-in-depth.  The  
13  Enclosure operations to verify that safety-related and risk-significant SSCs were maintained in an operable condition.  Specifically, between October 14 and November 21, the inspectors performed inspections and reviews of the following outage activities.  Documents  
inspectors also walked down portions of Unit 1 not normally accessible during at-power  
 
   
13  
   
Enclosure  
operations to verify that safety-related and risk-significant SSCs were maintained in an  
operable condition.  Specifically, between October 14 and November 21, the inspectors  
performed inspections and reviews of the following outage activities.  Documents  
reviewed are listed in the Attachment.  The inspectors completed one sample.  
reviewed are listed in the Attachment.  The inspectors completed one sample.  
  * Outage Plan.  The inspectors reviewed the outage safety plan and contingency plans to confirm that the licensee had appropriately considered risk, industry experience, and previous site-specific problems in
   
developing and implementing a plan that assured maintenance of defense-in-depth.  
*  
  * Reactor Shutdown.  The inspectors observed the shutdown in the control room from the time the reactor was tripped until operators placed it on the RHR system for decay heat removal to verify that TS cool down restrictions were followed.  The  
Outage Plan.  The inspectors reviewed the outage safety plan and contingency plans  
to confirm that the licensee had appropriately considered risk, industry experience,  
and previous site-specific problems in developing and implementing a plan that  
assured maintenance of defense-in-depth.  
   
*  
Reactor Shutdown.  The inspectors observed the shutdown in the control room from  
the time the reactor was tripped until operators placed it on the RHR system for  
decay heat removal to verify that TS cool down restrictions were followed.  The  
inspectors also toured the lower containment as soon as practicable after reactor  
inspectors also toured the lower containment as soon as practicable after reactor  
shutdown to observe the general condition of the reactor coolant system (RCS) and  
shutdown to observe the general condition of the reactor coolant system (RCS) and  
emergency core cooling system components and to look for indications of previously unidentified leakage inside the polar crane wall.  
emergency core cooling system components and to look for indications of previously  
  * Licensee Control of Outage Activities.  On a daily basis, the inspectors attended the licensee outage turnover meeting, reviewed PERs, and reviewed the defense-in-depth status sheets to verify that status control was commensurate with the outage  
unidentified leakage inside the polar crane wall.  
   
*  
Licensee Control of Outage Activities.  On a daily basis, the inspectors attended the  
licensee outage turnover meeting, reviewed PERs, and reviewed the defense-in-
depth status sheets to verify that status control was commensurate with the outage  
safety plan and in compliance with the applicable TS when taking equipment out of  
safety plan and in compliance with the applicable TS when taking equipment out of  
service.  The inspectors further toured the main control room and areas of the plant daily to ensure that the following key safety functions were maintained in accordance with the outage safety plan and TS:  electrical power, decay heat removal, spent fuel  
service.  The inspectors further toured the main control room and areas of the plant  
daily to ensure that the following key safety functions were maintained in accordance  
with the outage safety plan and TS:  electrical power, decay heat removal, spent fuel  
cooling, inventory control, reactivity control, and containment closure.  The  
cooling, inventory control, reactivity control, and containment closure.  The  
inspectors also observed a tag-out of the "B" Train CCP system to verify that the  
inspectors also observed a tag-out of the B Train CCP system to verify that the  
equipment was appropriately configured to safely support the work and testing.  To  
equipment was appropriately configured to safely support the work and testing.  To  
ensure that RCS level instrumentation was properly installed and configured to give accurate information, the inspectors reviewed the installation of the Mansell level monitoring system.  Specifically, the inspectors discussed the system with engineering, walked it down to verify that it was installed in accordance with  
ensure that RCS level instrumentation was properly installed and configured to give  
accurate information, the inspectors reviewed the installation of the Mansell level  
monitoring system.  Specifically, the inspectors discussed the system with  
engineering, walked it down to verify that it was installed in accordance with  
procedures and adequately protected from inadvertent damage, verified that Mansell  
procedures and adequately protected from inadvertent damage, verified that Mansell  
indication properly overlapped with pressurizer level instruments during pressurizer drain-down, verified that operators properly set level alarms to procedurally required set-points, and verified that the system consistently tracked RCS level while lowering  
indication properly overlapped with pressurizer level instruments during pressurizer  
drain-down, verified that operators properly set level alarms to procedurally required  
set-points, and verified that the system consistently tracked RCS level while lowering  
to reduced inventory conditions.  The inspectors also observed operators compare  
to reduced inventory conditions.  The inspectors also observed operators compare  
the Mansell indications with locally-installed ultrasonic level indicators during entry into reduced inventory conditions.  
the Mansell indications with locally-installed ultrasonic level indicators during entry  
 
into reduced inventory conditions.  
  14  Enclosure  
* Refueling Activities.  The inspectors observed fuel movement at the spent fuel pool and at the refueling cavity in order to verify compliance with TS and that each assembly was properly tracked from core offload to core reload.  In order to verify proper licensee control of foreign material, the inspectors verified that personnel were properly checked before entering any foreign material exclusion (FME) areas,  
   
 
14  
   
Enclosure  
*  
Refueling Activities.  The inspectors observed fuel movement at the spent fuel pool  
and at the refueling cavity in order to verify compliance with TS and that each  
assembly was properly tracked from core offload to core reload.  In order to verify  
proper licensee control of foreign material, the inspectors verified that personnel  
were properly checked before entering any foreign material exclusion (FME) areas,  
reviewed FME procedures, and verified that the licensee followed the procedures.   
reviewed FME procedures, and verified that the licensee followed the procedures.   
To ensure that fuel assemblies were loaded in the core locations specified by the  
To ensure that fuel assemblies were loaded in the core locations specified by the  
design, the inspectors independently reviewed the recording of the licensee's final  
design, the inspectors independently reviewed the recording of the licensees final  
core verification.  
core verification.  
  * Reduced Inventory and Mid-Loop Conditions.  Prior to the outage, the inspectors reviewed the licensee's commitments to Generic Letter 88-17.  Before entering reduced inventory conditions the inspectors verified that these commitments were in  
   
*  
Reduced Inventory and Mid-Loop Conditions.  Prior to the outage, the inspectors  
reviewed the licensees commitments to Generic Letter 88-17.  Before entering  
reduced inventory conditions the inspectors verified that these commitments were in  
place, that plant configuration was in accordance with those commitments, and that  
place, that plant configuration was in accordance with those commitments, and that  
distractions from unexpected conditions or emergent work did not affect operator  
distractions from unexpected conditions or emergent work did not affect operator  
ability to maintain the required reactor vessel level.  Mid-loop conditions were not entered during this outage since SG eddy current testing was not required.  
ability to maintain the required reactor vessel level.  Mid-loop conditions were not  
  * Heat-up and Start-up Activities.  The inspectors toured the containment prior to reactor startup to verify that debris that could affect the performance of the containment sump had not been left in the containment.  The inspectors reviewed  
entered during this outage since SG eddy current testing was not required.  
the licensee's mode-change checklists to ve
   
rify that appropriate prerequisites were met prior to changing TS modes.  To verify RCS integrity and containment integrity, the inspectors further reviewed the licensee's RCS leakage calculations and containment isolation valve lineups.  In order to verify that core operating limit  
*  
Heat-up and Start-up Activities.  The inspectors toured the containment prior to  
reactor startup to verify that debris that could affect the performance of the  
containment sump had not been left in the containment.  The inspectors reviewed  
the licensees mode-change checklists to verify that appropriate prerequisites were  
met prior to changing TS modes.  To verify RCS integrity and containment integrity,  
the inspectors further reviewed the licensees RCS leakage calculations and  
containment isolation valve lineups.  In order to verify that core operating limit  
parameters were consistent with core design, the inspectors also examined portions  
parameters were consistent with core design, the inspectors also examined portions  
of the low power physics testing surveillance.   
of the low power physics testing surveillance.  
   
  b.
Findings
No findings were identified.
1R22 Surveillance Testing
  a.
Inspection Scope
For the twelve surveillance tests identified below, the inspectors assessed whether the
SSCs involved in these tests satisfied the requirements described in the TS surveillance
requirements, the UFSAR, applicable licensee procedures, and whether the tests
demonstrated that the SSCs were capable of performing their intended safety functions. 
This was accomplished by witnessing testing and/or reviewing the test data.  Documents
reviewed are listed in the Attachment.  The inspectors completed twelve samples.
   
   
  b. Findings
  No findings were identified.
   
   
1R22 Surveillance Testing
    a. Inspection Scope
  For the twelve
surveillance tests identified below, the inspectors assessed whether the SSCs involved in these tests satisfied the requirements described in the TS surveillance
requirements, the UFSAR, applicable licensee procedures, and whether the tests demonstrated that the SSCs were capable of performing their intended safety functions.  This was accomplished by witnessing testing and/or reviewing the test data.  Documents
reviewed are listed in the Attachment.  The inspectors completed twelve
samples.   
15  Enclosure
In-Service Tests
:  * 1-SI-SXP-003-202.B, Motor Driven Auxiliary Feedwater Pump 1B-B Comprehensive Performance Test, Revision 7
* 1-SI-SXP-074-202.0, RHR Pump 1A-A and 1B-B Comprehensive Performance and Check Valve Test, Revision 10
RCS leakage test
:  * 0-SI-OPS-068-137.0, Reactor Coolant System Water Inventory, Revision 32
Routine Surveillance Tests
:  * 1-SI-OPS-088-001.0, Phase A Isolation Test, Revision 14
* 1-SI-OPS-082-026A, Loss of Offsite Power with Safety Injection D/G 1A-A Test, Revision 46
* 0-SI-SFT-072-138.0, Unit 1 Containment Spray - Spray Nozzle Test, Revision 6
* 0-SI-SXV-063-203.2, Full Stroking of Safety Injection Cold Leg Accumulator Isolation Valves, Revision 1
Ice Condenser Surveillance Test
:  * 0-SI-MIN-061-105.0, Ice Condenser Ice Weighing, Revision 11
Containment Isolation Valve (CIV) Surveillance Tests
:  * 0-SI-SLT-067-258.2, Containment Isolation Valve Local Leak Rate Test Lower Compartment Essential Raw Cooling Water, Revision 13
* 0-SI-SLT-088-259.4, Upper Personnel Airlock Interlock Operability Test, Revision 2
* 0-SI-SLT-088-259.1, Upper Personnel Airlock Overall Leak Rate Test and General Inspection, Revision 6
* 0-SI-SLT-081-258.1, Containment Isolation Valve Local Leak Rate Test Primary Water System, Revision 5
   
   
  b. Findings
  No findings were identified.


15
Enclosure
In-Service Tests:
*
1-SI-SXP-003-202.B, Motor Driven Auxiliary Feedwater Pump 1B-B Comprehensive
Performance Test, Revision 7
*
1-SI-SXP-074-202.0, RHR Pump 1A-A and 1B-B Comprehensive Performance and
Check Valve Test, Revision 10
RCS leakage test:
*
0-SI-OPS-068-137.0, Reactor Coolant System Water Inventory, Revision 32
Routine Surveillance Tests:
*
1-SI-OPS-088-001.0, Phase A Isolation Test, Revision 14
*
1-SI-OPS-082-026A, Loss of Offsite Power with Safety Injection D/G 1A-A Test,
Revision 46
*
0-SI-SFT-072-138.0, Unit 1 Containment Spray - Spray Nozzle Test, Revision 6
*
0-SI-SXV-063-203.2, Full Stroking of Safety Injection Cold Leg Accumulator Isolation
Valves, Revision 1
Ice Condenser Surveillance Test:
*
0-SI-MIN-061-105.0, Ice Condenser Ice Weighing, Revision 11
Containment Isolation Valve (CIV) Surveillance Tests:
*
0-SI-SLT-067-258.2, Containment Isolation Valve Local Leak Rate Test Lower
Compartment Essential Raw Cooling Water, Revision 13
*
0-SI-SLT-088-259.4, Upper Personnel Airlock Interlock Operability Test, Revision 2
*
0-SI-SLT-088-259.1, Upper Personnel Airlock Overall Leak Rate Test and General
Inspection, Revision 6
*
0-SI-SLT-081-258.1, Containment Isolation Valve Local Leak Rate Test Primary
Water System, Revision 5
  b.
Findings
No findings were identified.
   
   
Cornerstone:  Emergency Preparedness  
Cornerstone:  Emergency Preparedness  
  1EP2 Alert and Notification System Evaluation
   
 
1EP2 Alert and Notification System Evaluation  
   a. Inspection Scope
  The inspectors evaluated the adequacy of the licensee's methods for testing and  
   a.  
maintaining the alert and notification sy
Inspection Scope  
stem in accordance with NRC Inspection  
Procedure 71114, Attachment 02, Alert and Notification System Evaluation.  The   
The inspectors evaluated the adequacy of the licensees methods for testing and  
16  Enclosure applicable planning standard, 10 CFR Part 50.47(b)(5) and its related 10 CFR Part 50, Appendix E, Section IV.D requirements were used as reference criteria.  The criteria contained in NUREG-0654, Criteria for Preparation and Evaluation of Radiological  
maintaining the alert and notification system in accordance with NRC Inspection  
Procedure 71114, Attachment 02, Alert and Notification System Evaluation.  The  
 
   
16  
   
Enclosure  
applicable planning standard, 10 CFR Part 50.47(b)(5) and its related 10 CFR Part 50,  
Appendix E, Section IV.D requirements were used as reference criteria.  The criteria  
contained in NUREG-0654, Criteria for Preparation and Evaluation of Radiological  
Emergency Response Plans and Preparedness in Support of Nuclear Power Plants,  
Emergency Response Plans and Preparedness in Support of Nuclear Power Plants,  
Revision 1, were also used as a reference.   
Revision 1, were also used as a reference.   
  The inspectors reviewed various documents which are listed in the Attachment, interviewed personnel responsible for system performance, and observed aspects of periodic siren maintenance and testing.  This inspection activity satisfied one inspection  
   
The inspectors reviewed various documents which are listed in the Attachment,  
interviewed personnel responsible for system performance, and observed aspects of  
periodic siren maintenance and testing.  This inspection activity satisfied one inspection  
sample for the alert and notification system on a biennial basis.  
sample for the alert and notification system on a biennial basis.  
   
   
   b. Findings
   b.  
  No findings were identified.
Findings  
   
   
1EP3 Emergency Response Organization Staffing and Augmentation System
No findings were identified.
    a. Inspection Scope
  The inspectors reviewed the licensee's Emergency Response Organization (ERO)  
1EP3 Emergency Response Organization Staffing and Augmentation System  
  a.  
Inspection Scope  
The inspectors reviewed the licensees Emergency Response Organization (ERO)  
augmentation staffing requirements and process for notifying the ERO to ensure the  
augmentation staffing requirements and process for notifying the ERO to ensure the  
readiness of key staff for responding to an event and timely facility activation.  The  
readiness of key staff for responding to an event and timely facility activation.  The  
qualification records of key position ERO personnel were reviewed to ensure all ERO qualifications were current.  A sample of problems identified from augmentation drills or system tests performed since the last inspection was reviewed to assess the  
qualification records of key position ERO personnel were reviewed to ensure all ERO  
qualifications were current.  A sample of problems identified from augmentation drills or  
system tests performed since the last inspection was reviewed to assess the  
effectiveness of corrective actions.   
effectiveness of corrective actions.   
  The inspection was conducted in accor
   
dance with NRC Inspection Procedure 71114, Attachment 03, Emergency Response Organization Staffing and Augmentation System.  The applicable planning standard, 10 CFR 50.47(b)(2), and its related 10 CFR 50,  
The inspection was conducted in accordance with NRC Inspection Procedure 71114,  
Attachment 03, Emergency Response Organization Staffing and Augmentation System.   
The applicable planning standard, 10 CFR 50.47(b)(2), and its related 10 CFR 50,  
Appendix E requirements were used as reference criteria.   
Appendix E requirements were used as reference criteria.   
  The inspectors reviewed various documents which are listed in the Attachment.  This  
   
inspection activity satisfied one inspection sample for the ERO staffing and augmentation system on a biennial basis.  
The inspectors reviewed various documents which are listed in the Attachment.  This  
    b. Findings
inspection activity satisfied one inspection sample for the ERO staffing and  
  No findings were identified.  
augmentation system on a biennial basis.  
  1EP4 Emergency Action Level and Emergency Plan Changes
 
  b.  
   a. Inspection Scope
Findings  
  The NRC Office of Nuclear Security and Incident Response headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS   
No findings were identified.  
   
1EP4 Emergency Action Level and Emergency Plan Changes  
   a.  
Inspection Scope  
The NRC Office of Nuclear Security and Incident Response headquarters staff  
performed an in-office review of the latest revisions of various Emergency Plan  
Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS
   


 
17  Enclosure Accession numbers ML12326A678, ML12353A050, ML13025A102, ML13070A025, ML13219A022, and ML13246A091.  
17  
   
Enclosure  
Accession numbers ML12326A678, ML12353A050, ML13025A102, ML13070A025,  
ML13219A022, and ML13246A091.  
   
   
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in  
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in  
the revisions resulted in no reduction in the effectiveness of the Plan, and that the  
the revisions resulted in no reduction in the effectiveness of the Plan, and that the  
revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to  
revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to  
10 CFR Part 50.  The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, these revisions are subject to future inspection.  Documents reviewed are listed in the Attachment.  The  
10 CFR Part 50.  The NRC review was not documented in a safety evaluation report and  
 
did not constitute approval of licensee-generated changes; therefore, these revisions are  
subject to future inspection.  Documents reviewed are listed in the Attachment.  The  
inspectors completed one sample.  
inspectors completed one sample.  
    b. Findings
  No findings were identified.
   
   
1EP5 Maintenance of Emergency Preparedness
  b.
    a.  Inspection Scope
Findings
  The inspectors reviewed the corrective actions identified through the Emergency  
No findings were identified.
1EP5 Maintenance of Emergency Preparedness  
  a.  Inspection Scope  
The inspectors reviewed the corrective actions identified through the Emergency  
Preparedness program to determine the significance of the issues, the completeness  
Preparedness program to determine the significance of the issues, the completeness  
and effectiveness of corrective actions, and to determine if issues were recurring.  The  
and effectiveness of corrective actions, and to determine if issues were recurring.  The  
licensee's post-event after action reports, self-assessments, and audits were reviewed to assess the licensee's ability to be self-critical, thus avoiding complacency and degradation of their emergency preparedness program.  Inspectors reviewed the  
licensees post-event after action reports, self-assessments, and audits were reviewed to  
licensee's 10 CFR 50.54(q) change process, personnel training, and selected  
assess the licensees ability to be self-critical, thus avoiding complacency and  
degradation of their emergency preparedness program.  Inspectors reviewed the  
licensees 10 CFR 50.54(q) change process, personnel training, and selected  
screenings and evaluations to assess adequacy.  The inspectors toured facilities and  
screenings and evaluations to assess adequacy.  The inspectors toured facilities and  
reviewed equipment and facility maintenance records to assess licensee's adequacy in maintaining them. The inspectors evaluated the capabilities of selected radiation monitoring instrumentation to adequately support Emergency Action Level (EAL)  
reviewed equipment and facility maintenance records to assess licensees adequacy in  
 
maintaining them. The inspectors evaluated the capabilities of selected radiation  
declarations.
monitoring instrumentation to adequately support Emergency Action Level (EAL)  
  The inspection was conducted in accordanc
declarations.  
e with NRC Inspection Procedure 71114.05, Maintenance of Emergency Preparedness.  The applicable planning standards, related 10 CFR 50, Appendix E requirements, and 10 CFR 50.54(q) and (t) were used as reference criteria.   
The inspection was conducted in accordance with NRC Inspection Procedure 71114.05,  
Maintenance of Emergency Preparedness.  The applicable planning standards, related  
10 CFR 50, Appendix E requirements, and 10 CFR 50.54(q) and (t) were used as  
reference criteria.
The inspectors reviewed various documents which are listed in the Attachment.  This
inspection activity satisfied one inspection sample for the maintenance of emergency
preparedness on a biennial basis.
  b.
Findings
No findings were identified.
   


   
   
The inspectors reviewed various documents which are listed in the Attachment. This
18
inspection activity satisfied one inspection sample for the maintenance of emergency preparedness on a biennial basis.  
   
Enclosure
2.  
RADIATION SAFETY (RS)
 
Cornerstones:  Occupational Radiation Safety (OS) and Public Radiation Safety (PS)
   
   
  b. Findings
2RS1 Radiological Hazard Assessment and Exposure Controls
    
    
No findings were identified.  
  a.  
 
Inspection Scope
   
   
18  Enclosure 2. RADIATION SAFETY (RS)
  Cornerstones: Occupational Radiation Safety (OS) and Public Radiation Safety (PS)
   
   
2RS1 Radiological Hazard Assessment and Exposure Controls
Hazard Assessment and Instructions to Workers:  During facility tours, the inspectors  
 
directly observed labeling of radioactive material and postings for radiation areas, high  
  a. Inspection Scope
radiation areas (HRAs), and airborne radioactivity areas established within the  
  Hazard Assessment and Instructions to Workers:  During facility tours, the inspectors directly observed labeling of radioactive material and postings for radiation areas, high radiation areas (HRAs), and airborne radioactivity areas established within the  
radiologically controlled area (RCA) of the Unit 1 containment, Unit 1 and Unit 2 auxiliary  
radiologically controlled area (RCA) of the Unit 1 containment, Unit 1 and Unit 2 auxiliary buildings, Independent Spent Fuel Storage Installation (ISFSI), and radioactive waste (radwaste) processing and storage locations.  The inspectors independently measured  
buildings, Independent Spent Fuel Storage Installation (ISFSI), and radioactive waste  
(radwaste) processing and storage locations.  The inspectors independently measured  
radiation dose rates or directly observed conduct of licensee radiation surveys for RCA  
radiation dose rates or directly observed conduct of licensee radiation surveys for RCA  
areas in the Unit 1 containment, Unit 1 and Unit 2 Auxiliary buildings, and ISFSI.  The  
areas in the Unit 1 containment, Unit 1 and Unit 2 Auxiliary buildings, and ISFSI.  The  
inspectors reviewed survey records for several plant areas including surveys for alpha emitters, airborne radioactivity, and pre-job surveys for selected Unit 1 Refueling Outage 19 (U1R19) tasks.  The inspectors also discussed changes to plant operations that could  
inspectors reviewed survey records for several plant areas including surveys for alpha  
emitters, airborne radioactivity, and pre-job surveys for selected Unit 1 Refueling Outage  
19 (U1R19) tasks.  The inspectors also discussed changes to plant operations that could  
contribute to changing radiological conditions since the last inspection and reviewed  
contribute to changing radiological conditions since the last inspection and reviewed  
U1R19 crud burst results and post crud burst dose rate surveys.  For selected U1R19  
U1R19 crud burst results and post crud burst dose rate surveys.  For selected U1R19  
outage jobs, the inspectors attended, or reviewed, pre-job briefings and radiation work  
outage jobs, the inspectors attended, or reviewed, pre-job briefings and radiation work  
permit (RWP) details to assess communication of radiological control requirements and current radiological conditions to workers.  Selected U1R19 work activities included Unit 1 control rod drive mechanism duct work, Unit 1 Refueling Activities, Unit 1 Head O-ring  
permit (RWP) details to assess communication of radiological control requirements and  
current radiological conditions to workers.  Selected U1R19 work activities included Unit  
1 control rod drive mechanism duct work, Unit 1 Refueling Activities, Unit 1 Head O-ring  
Surface Work & Inspection, and work in the Unit 1 Equipment Pit and transfer canal.   
Surface Work & Inspection, and work in the Unit 1 Equipment Pit and transfer canal.   
  Hazard Control and Work Practices:  The inspectors evaluated access barrier effectiveness for selected Unit 1 and Unit 2 Locked High Radiation Area (LHRA) and Very High Radiation Area (VHRA) locations.  Changes to procedural guidance for LHRA  
   
Hazard Control and Work Practices:  The inspectors evaluated access barrier  
effectiveness for selected Unit 1 and Unit 2 Locked High Radiation Area (LHRA) and  
Very High Radiation Area (VHRA) locations.  Changes to procedural guidance for LHRA  
and VHRA controls were discussed with health physics (HP) supervisors.  Controls and  
and VHRA controls were discussed with health physics (HP) supervisors.  Controls and  
their implementation for storage of irradiated material within the spent fuel pool (SFP)  
their implementation for storage of irradiated material within the spent fuel pool (SFP)  
were reviewed and discussed in detail.  Established radiological controls (including  
were reviewed and discussed in detail.  Established radiological controls (including  
airborne controls) were evaluated for selected U1R19 tasks including refueling and reactor cavity work activities, work in auxiliary building HRAs, and radwaste processing and storage.  In addition, licensee controls for areas where dose rates could change  
airborne controls) were evaluated for selected U1R19 tasks including refueling and  
reactor cavity work activities, work in auxiliary building HRAs, and radwaste processing  
and storage.  In addition, licensee controls for areas where dose rates could change  
significantly as a result of plant shutdown and refueling operations were reviewed and  
significantly as a result of plant shutdown and refueling operations were reviewed and  
discussed.   
discussed.   
 
Occupational workers' adherence to selected RWPs and HP technician (HPT)  
Occupational workers adherence to selected RWPs and HP technician (HPT)  
proficiency in providing job coverage were evaluated through direct observations and  
proficiency in providing job coverage were evaluated through direct observations and  
interviews with licensee staff.  Electronic dosimeter (ED) alarm set points and worker  
interviews with licensee staff.  Electronic dosimeter (ED) alarm set points and worker  
stay times were evaluated against area radiation survey results for refueling and reactor cavity work.  ED alarm logs were reviewed and worker response to dose and dose rate  
stay times were evaluated against area radiation survey results for refueling and reactor  
alarms during selected work activities was evaluated.  For HRA tasks involving significant dose rate gradients, e.g. reactor head O-ring work, the inspectors evaluated the use and placement of whole body and extremity dosimetry to monitor worker  
cavity work.  ED alarm logs were reviewed and worker response to dose and dose rate  
exposure.  
alarms during selected work activities was evaluated.  For HRA tasks involving  
  19  Enclosure  Control of Radioactive Material:  The inspectors observed surveys of material and personnel being released from the RCA using small article monitor, personnel  
significant dose rate gradients, e.g. reactor head O-ring work, the inspectors evaluated  
contamination monitor, and portal monitor instruments.  The inspectors reviewed the last two calibration records for selected release point survey instruments and discussed  
the use and placement of whole body and extremity dosimetry to monitor worker  
exposure.  
 
   
19  
   
Enclosure  
   
Control of Radioactive Material:  The inspectors observed surveys of material and  
personnel being released from the RCA using small article monitor, personnel  
contamination monitor, and portal monitor instruments.  The inspectors reviewed the last  
two calibration records for selected release point survey instruments and discussed  
equipment sensitivity, alarm set points, and release program guidance with licensee  
equipment sensitivity, alarm set points, and release program guidance with licensee  
staff.  The inspectors compared recent 10 CFR Part 61 results for the Dry Active Waste  
staff.  The inspectors compared recent 10 CFR Part 61 results for the Dry Active Waste  
(DAW) radioactive waste stream with radionuclides used in calibration sources to evaluate the appropriateness and accuracy of  
(DAW) radioactive waste stream with radionuclides used in calibration sources to  
release survey instrumentation.  The inspectors also reviewed records of leak tests on selected sealed sources and discussed  
evaluate the appropriateness and accuracy of release survey instrumentation.  The  
inspectors also reviewed records of leak tests on selected sealed sources and discussed  
nationally tracked source transactions with licensee staff.  
nationally tracked source transactions with licensee staff.  
   
   
Problem Identification and Resolution:  PERs associated with radiological hazard assessment and control were reviewed and assessed.  The inspectors evaluated the licensee's ability to identify and resolve the issues in accordance with procedure NPG-
Problem Identification and Resolution:  PERs associated with radiological hazard  
SPP-22.300, "Corrective Action Program," Rev. 0.  The inspectors also evaluated the  
assessment and control were reviewed and assessed.  The inspectors evaluated the  
scope of the licensee's internal audit program and reviewed recent assessment results.   
licensees ability to identify and resolve the issues in accordance with procedure NPG-
 
SPP-22.300, Corrective Action Program, Rev. 0.  The inspectors also evaluated the  
Radiation protection activities were evaluated against the requirements of UFSAR Section 12; TS Sections 6.8 and 6.12; 10 CFR Parts 19 and 20; and approved licensee  
scope of the licensees internal audit program and reviewed recent assessment results.   
Radiation protection activities were evaluated against the requirements of UFSAR  
Section 12; TS Sections 6.8 and 6.12; 10 CFR Parts 19 and 20; and approved licensee  
procedures.  Licensee programs for monitoring materials and personnel released from  
procedures.  Licensee programs for monitoring materials and personnel released from  
the RCA were evaluated against 10 CFR Part 20 and IE Circular 81-07, "Control of  
the RCA were evaluated against 10 CFR Part 20 and IE Circular 81-07, Control of  
Radioactively Contaminated Material." Documents reviewed are listed in the  
Radioactively Contaminated Material.  Documents reviewed are listed in the  
Attachment.  The inspectors completed one sample.  
Attachment.  The inspectors completed one sample.  
    b.  Findings
  No findings were identified.  
  b.   
  2RS8 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and  
Findings  
Transportation
 
No findings were identified.  
   a. Inspection Scope  
   
2RS8 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and  
Transportation  
   a.  
Inspection Scope  
Waste Processing and Characterization:  During inspector walkdowns, accessible
sections of the liquid and solid radwaste processing systems were assessed for material
condition and conformance with system design diagrams.  Inspected equipment included
radwaste storage tanks; resin transfer piping, resin, and filter packaging components;
and abandoned boric acid evaporator equipment.  The inspectors discussed component
function, processing system changes, and radwaste program implementation with
licensee staff.
The radionuclide characterizations for 2010, and 2012, for selected waste streams were
reviewed and discussed with Radwaste/Transportation staff.  For primary resin, reactor
coolant system filters, and DAW, the inspectors evaluated analyses for hard-to-detect
nuclides, reviewed the use of scaling factors, and examined quality assurance
comparison results between licensee waste stream characterizations and outside
laboratory data.  Waste stream mixing and concentration averaging methodology for
resins and filters was evaluated and discussed with Radwaste/Transportation staff.  The


   
   
Waste Processing and Characterization:  During inspector walkdowns, accessible sections of the liquid and solid radwaste processing systems were assessed for material condition and conformance with system design diagrams.  Inspected equipment included radwaste storage tanks; resin transfer piping, resin, and filter packaging components;
20
 
and abandoned boric acid evaporator equipment.  The inspectors discussed component function, processing system changes, and radwaste program implementation with licensee staff.
   
   
The radionuclide characterizations for 2010, and 2012, for selected waste streams were reviewed and discussed with Radwaste/Transportation staff.  For primary resin, reactor
Enclosure
coolant system filters, and DAW, the inspectors evaluated analyses for hard-to-detect
inspectors also reviewed the licensees procedural guidance for monitoring changes in  
nuclides, reviewed the use of scaling factors, and examined quality assurance comparison results between licensee waste stream characterizations and outside laboratory data.  Waste stream mixing and concentration averaging methodology for
waste stream isotopic mixtures.  The 10 CFR 61 analysis results were also discussed  
resins and filters was evaluated and discussed with Radwaste/Transportation staff.  The 
20  Enclosure inspectors also reviewed the licensee's procedural guidance for monitoring changes in waste stream isotopic mixtures.  The 10 CFR 61 analysis results were also discussed  
with Chemistry personnel.   
with Chemistry personnel.   
   
   
  Radioactive Material Storage:  During walkdowns of indoor and outdoor radioactive material storage areas, the inspectors observed the physical condition and labeling of  
   
storage containers and the posting of Radioactive Material Areas.  The inspectors also reviewed licensee procedural guidance for storage and monitoring of radioactive  
Radioactive Material Storage:  During walkdowns of indoor and outdoor radioactive  
material storage areas, the inspectors observed the physical condition and labeling of  
storage containers and the posting of Radioactive Material Areas.  The inspectors also  
reviewed licensee procedural guidance for storage and monitoring of radioactive  
material.  
material.  
   
   
  Transportation:  The inspectors observed a shipment of vendor equipment during the week of inspection.  The inspectors reviewed shipping procedure requirements and discussed preparation of shipping documents, package marking and labeling, and interviewed shipping technicians regarding Department of Transportation (DOT)  
   
Transportation:  The inspectors observed a shipment of vendor equipment during the  
week of inspection.  The inspectors reviewed shipping procedure requirements and  
discussed preparation of shipping documents, package marking and labeling, and  
interviewed shipping technicians regarding Department of Transportation (DOT)  
regulations.  
regulations.  
   
   
  Selected shipping records were reviewed for consistency with licensee procedures and compliance with NRC and DOT regulations.  The inspectors reviewed emergency response information, DOT shipping package classification, waste classification, radiation survey results, and evaluated whether receiving licensees were authorized to  
   
Selected shipping records were reviewed for consistency with licensee procedures and  
compliance with NRC and DOT regulations.  The inspectors reviewed emergency  
response information, DOT shipping package classification, waste classification,  
radiation survey results, and evaluated whether receiving licensees were authorized to  
accept the packages.  Licensee procedures for handling shipping containers were  
accept the packages.  Licensee procedures for handling shipping containers were  
compared to Certificate of Compliance requirements and manufacturer  
compared to Certificate of Compliance requirements and manufacturer  
recommendations.  In addition, training records for selected individuals currently qualified to ship radioactive material were reviewed.  
recommendations.  In addition, training records for selected individuals currently  
  Radwaste processing activities and equipment configuration were reviewed for  
qualified to ship radioactive material were reviewed.  
compliance with the licensee's Process Control Program and UFSAR, Chapter 11.   
   
Waste stream characterization analyses were reviewed against regulations detailed in 10 CFR Part 20, 10 CFR Part 61, and guidance provided in the Branch Technical Position on Waste Classification (1983).  Radioactive material and waste storage  
Radwaste processing activities and equipment configuration were reviewed for  
compliance with the licensees Process Control Program and UFSAR, Chapter 11.   
Waste stream characterization analyses were reviewed against regulations detailed in  
10 CFR Part 20, 10 CFR Part 61, and guidance provided in the Branch Technical  
Position on Waste Classification (1983).  Radioactive material and waste storage  
activities were reviewed against the requirements of 10 CFR Part 20.  Transportation  
activities were reviewed against the requirements of 10 CFR Part 20.  Transportation  
program implementation was reviewed against regulations detailed in 10 CFR Part 20,  
program implementation was reviewed against regulations detailed in 10 CFR Part 20,  
10 CFR Part 71, 49 CFR Parts 172-178, as well as the guidance provided in NUREG-
10 CFR Part 71, 49 CFR Parts 172-178, as well as the guidance provided in NUREG-
1608.  Training activities were assessed against 49 CFR Part 172, Subpart H.   
1608.  Training activities were assessed against 49 CFR Part 172, Subpart H.   
  Problem Identification and Resolution:  The inspectors reviewed PERs in the area of radwaste processing and transportation.  The inspectors evaluated the licensee's ability  
Problem Identification and Resolution:  The inspectors reviewed PERs in the area of  
radwaste processing and transportation.  The inspectors evaluated the licensees ability  
to identify and resolve the issues in accordance with procedure NPG-SPP-22.300,.  The  
to identify and resolve the issues in accordance with procedure NPG-SPP-22.300,.  The  
inspectors also evaluated the scope of the licensee's internal audit program and reviewed recent assessment results.  Documents reviewed are listed in the Attachment.  The inspectors completed one sample.  
inspectors also evaluated the scope of the licensees internal audit program and  
reviewed recent assessment results.  Documents reviewed are listed in the Attachment.   
The inspectors completed one sample.  
  b.
Findings
No findings were identified.
 
21
Enclosure
4.
OTHER ACTIVITIES
   
   
  b. Findings
4OA1 Performance Indicator (PI) Verification  
 
No findings were identified.
   a.  
   
Inspection Scope  
21  Enclosure 4. OTHER ACTIVITIES
4OA1 Performance Indicator (PI) Verification
Occupational Radiation Safety Cornerstone:  The inspectors reviewed the Occupational  
 
Exposure Control Effectiveness PI results for the Occupational Radiation Safety  
   a. Inspection Scope
Cornerstone from October 2012 through October 2013.  For the assessment period, the  
  Occupational Radiation Safety Cornerstone:  The inspectors reviewed the Occupational Exposure Control Effectiveness PI results for the Occupational Radiation Safety Cornerstone from October 2012 through October 2013.  For the assessment period, the  
inspectors reviewed ED alarm logs and selected PERs related to controls for exposure  
inspectors reviewed ED alarm logs and selected PERs related to controls for exposure  
significant areas.  The inspectors also reviewed licensee procedural guidance for  
significant areas.  The inspectors also reviewed licensee procedural guidance for  
collecting and documenting PI data.  Documents reviewed are listed in the Attachment.  The inspectors completed one sample.  
collecting and documenting PI data.  Documents reviewed are listed in the Attachment.   
The inspectors completed one sample.  
   
   
Emergency Preparedness Cornerstone
Emergency Preparedness Cornerstone:
* Drill/Exercise Performance (DEP)  
* Emergency Response Organization Drill Participation (ERO)  
* Alert and Notification System Reliability (ANS)  
*  
  For the specified review period, the inspectors examined data reported to the NRC,  
Drill/Exercise Performance (DEP)  
*  
Emergency Response Organization Drill Participation (ERO)  
*  
Alert and Notification System Reliability (ANS)  
   
For the specified review period, the inspectors examined data reported to the NRC,  
procedural guidance for reporting PI information, and records used by the licensee to  
procedural guidance for reporting PI information, and records used by the licensee to  
identify potential PI occurrences.  The inspectors verified the accuracy of the PI for ERO drill and exercise performance through review of a sample of drill and event records.  The inspectors reviewed selected training records to verify the accuracy of the PI for  
identify potential PI occurrences.  The inspectors verified the accuracy of the PI for ERO  
drill and exercise performance through review of a sample of drill and event records.   
The inspectors reviewed selected training records to verify the accuracy of the PI for  
ERO drill participation for personnel assigned to key positions in the ERO.  The  
ERO drill participation for personnel assigned to key positions in the ERO.  The  
inspectors verified the accuracy of the PI for alert and notification system reliability  
inspectors verified the accuracy of the PI for alert and notification system reliability  
through review of a sample of the licensee's records of periodic system tests.  The  
through review of a sample of the licensees records of periodic system tests.  The  
inspectors also interviewed the licensee personnel who were responsible for collecting and evaluating the PI data.  Documents reviewed are listed in the Attachment.  This inspection satisfied three inspection samples for PI verification on an annual basis.  
inspectors also interviewed the licensee personnel who were responsible for collecting  
and evaluating the PI data.  Documents reviewed are listed in the Attachment.  This  
inspection satisfied three inspection samples for PI verification on an annual basis.  
  b.
Findings
No findings were identified.
4OA2 Problem Identification and Resolution
.1
Routine Review
   
   
   b. Findings
   a.  
  No findings were identified.
Inspection Scope
  4OA2 Problem Identification and Resolution
   
 
As required by IP 71152, Problem Identification and Resolution, and in order to help  
.1 Routine Review
    a. Inspection Scope
  As required by IP 71152, "Problem Identification and Resolution," and in order to help  
identify repetitive equipment failures or specific human performance issues for follow-up,  
identify repetitive equipment failures or specific human performance issues for follow-up,  
the inspectors performed a daily screening of items entered into the licensee's CAP.  This was accomplished by reviewing the description of each new PER and attending daily management review committee meetings.     
the inspectors performed a daily screening of items entered into the licensees CAP.   
 
This was accomplished by reviewing the description of each new PER and attending  
  22  Enclosure    b. Findings
daily management review committee meetings.     
  No findings were identified.   
 
   
22  
   
Enclosure  
   b.  
Findings  
No findings were identified.   
.2
Annual Follow-up of Selected Issues
  a.
Inspection Scope   
   
   
.2 Annual Follow-up of Selected Issues
The inspectors performed an in-depth review of PER 665633, NRC identified freeze  
 
protection issues.  The inspectors reviewed the actions taken to determine if the  
  a. Inspection Scope    The inspectors performed an in-depth review of PER 665633, "NRC identified freeze  
protection issues." The inspectors reviewed the actions taken to determine if the  
licensee had adequately addressed the following attributes.  Documents reviewed are  
licensee had adequately addressed the following attributes.  Documents reviewed are  
listed in the Attachment.  The inspectors completed one sample for Annual Follow-up of  
listed in the Attachment.  The inspectors completed one sample for Annual Follow-up of  
Selected Issues.  
Selected Issues.  
  * Complete, accurate and timely identification of the problem  
   
* Evaluation and disposition of operability and reportability issues  
*  
* Consideration of previous failures, extent of condition, generic or common cause  
Complete, accurate and timely identification of the problem  
*  
Evaluation and disposition of operability and reportability issues  
*  
Consideration of previous failures, extent of condition, generic or common cause  
implications  
implications  
* Prioritization and resolution of the issue commensurate with safety significance  
*  
* Identification of the root cause and contributing causes of the problem  
Prioritization and resolution of the issue commensurate with safety significance  
* Identification and implementation of corrective actions commensurate with the safety significance of the issue  
*  
Identification of the root cause and contributing causes of the problem  
*  
Identification and implementation of corrective actions commensurate with the safety  
significance of the issue  
   
   
   b. Findings
   b.  
  No findings were identified.
Findings  
   
   
.3 Semiannual Trend Review  
No findings were identified.
      a. Inspection Scope
  As required by IP 71152, the inspectors performed a review of the licensee's corrective action program and associated documents to identify trends that could indicate the  
.3  
Semiannual Trend Review  
  a.  
Inspection Scope  
As required by IP 71152, the inspectors performed a review of the licensees corrective  
action program and associated documents to identify trends that could indicate the  
existence of a more significant safety issue.  The inspectors review was focused on  
existence of a more significant safety issue.  The inspectors review was focused on  
repetitive equipment issues, but also included licensee trending efforts and licensee human performance results.  The inspectors review nominally considered the twelve-
repetitive equipment issues, but also included licensee trending efforts and licensee  
human performance results.  The inspectors review nominally considered the twelve-
month period of January 2013 through December 2013, although some examples  
month period of January 2013 through December 2013, although some examples  
expanded beyond those dates when the scope of the trend warranted.  Specifically, the  
expanded beyond those dates when the scope of the trend warranted.  Specifically, the  
inspectors considered the results of daily inspector screening discussed in Section  
inspectors considered the results of daily inspector screening discussed in Section  
4OA2.1 and reviewed licensee trend reports for the period in order to determine the existence of any adverse trends that the licensee may not have previously identified.  Documents reviewed are listed in the Attachment.  The inspectors completed one  
4OA2.1 and reviewed licensee trend reports for the period in order to determine the  
existence of any adverse trends that the licensee may not have previously identified.   
Documents reviewed are listed in the Attachment.  The inspectors completed one  
sample for Semiannual Trend Review.   
sample for Semiannual Trend Review.   
  b.
Findings and Observations
No findings were identified.  In general, the licensee had identified trends and


    b. Findings and Observations
   
  No findings were identified.  In general, the licensee had identified trends and  
23  
23  Enclosure appropriately addressed them in their CAP.  The inspectors evaluated the licensee trending methodology and observed that the licensee had performed a detailed review.  The licensee routinely reviewed cause codes, involved organizations, key words, and  
   
Enclosure  
appropriately addressed them in their CAP.  The inspectors evaluated the licensee  
trending methodology and observed that the licensee had performed a detailed review.   
The licensee routinely reviewed cause codes, involved organizations, key words, and  
system links to identify potential trends in their data.  The inspectors compared the  
system links to identify potential trends in their data.  The inspectors compared the  
licensee process results with the results of the inspectors' daily screening.  No  
licensee process results with the results of the inspectors daily screening.  No  
previously unidentified trends of significance were identified.  
previously unidentified trends of significance were identified.  
 
.4 Annual Follow-up of Operator Workarounds
.4  
 
Annual Follow-up of Operator Workarounds  
   a. Inspection Scope
  The inspectors reviewed the operator workaround (OWA) program to verify that OWAs were identified at an appropriate threshold, were entered into the CAP, and that corrective actions were appropriate and timely.  Specifically, the inspectors reviewed the licensee's workaround lists and repair schedules, reviewed CAP word searches,  
   a.  
Inspection Scope  
The inspectors reviewed the operator workaround (OWA) program to verify that OWAs  
were identified at an appropriate threshold, were entered into the CAP, and that  
corrective actions were appropriate and timely.  Specifically, the inspectors reviewed the  
licensees workaround lists and repair schedules, reviewed CAP word searches,  
conducted tours and interviewed operators and operations department support staff.   
conducted tours and interviewed operators and operations department support staff.   
Additionally, the inspectors checked for undocumented workarounds by observing operators perform rounds, reviewed operator deficiency lists, reviewed appropriate system health documents, attended plant health committee meetings, and verified that  
Additionally, the inspectors checked for undocumented workarounds by observing  
operators perform rounds, reviewed operator deficiency lists, reviewed appropriate  
system health documents, attended plant health committee meetings, and verified that  
identified program deficiencies were corrected.  The inspectors evaluated all  
identified program deficiencies were corrected.  The inspectors evaluated all  
workarounds for their aggregate impact.  Documents reviewed are listed in the  
workarounds for their aggregate impact.  Documents reviewed are listed in the  
Attachment.  The inspectors completed one sample for Annual Follow-up of Operator  
Attachment.  The inspectors completed one sample for Annual Follow-up of Operator  
Workarounds.  
Workarounds.  
    b. Findings
  No findings were identified.   
  b.  
  4OA5 Other Activities
Findings  
  .1 (Closed) Unresolved Item (URI) 050000327/2013004-01, Water Intrusion into Actuator of  
Valve 1-FCV-63-72
No findings were identified.   
 
   
   a. Inspection Scope
4OA5 Other Activities  
  The inspectors opened this URI as a result of water intrusion into the actuator of 1-FCV-
 
.1  
63-72, which is the 'A' train containment sump suction for the Unit 1 'A' RHR train.  This issue was noted during an operability inspection conducted last quarter.  The inspectors  
(Closed) Unresolved Item (URI) 050000327/2013004-01, Water Intrusion into Actuator of  
determined more inspection was required in order to resolve the issue.  On August 8, 2013, an operator noted the valve exhibited dual indication and on August 14, a related valve, 1-FCV-74-3, failed its periodic stroke test.  The following day, 1-FCV-63-72 was  
Valve 1-FCV-63-72  
   a.  
Inspection Scope  
The inspectors opened this URI as a result of water intrusion into the actuator of 1-FCV-
63-72, which is the A train containment sump suction for the Unit 1 A RHR train.  This  
issue was noted during an operability inspection conducted last quarter.  The inspectors  
determined more inspection was required in order to resolve the issue.  On August 8,  
2013, an operator noted the valve exhibited dual indication and on August 14, a related  
valve, 1-FCV-74-3, failed its periodic stroke test.  The following day, 1-FCV-63-72 was  
noted to be failed as well due to a large of amount of water buildup in the actuator.  A  
noted to be failed as well due to a large of amount of water buildup in the actuator.  A  
subsequent root cause of the failure was completed during this inspection period and  
subsequent root cause of the failure was completed during this inspection period and  
concluded the water intrusion was due to groundwater which migrated through the wall  
concluded the water intrusion was due to groundwater which migrated through the wall  
of the RHR valve vault room and into the valve conduit.  Although the circumstances regarding the water intrusion may have been beyond the licensee's ability to predict, the  
of the RHR valve vault room and into the valve conduit.  Although the circumstances  
24  Enclosure inspectors noted there were opportunities before August 14 to identify and correct the deficient condition. Thus, the inspectors identified the following non-cited violation (NCV) as discussed below.  Documents reviewed are listed in the Attachment.
regarding the water intrusion may have been beyond the licensees ability to predict, the   


    b. Findings
 
24
Introduction:  A self-revealing Green NCV of 10 CFR 50 Appendix B, Criterion XVI, "Corrective Action," was identified for the licensee's failure to correct a condition adverse to quality within a reasonable amount of time.  Timely corrective actions were not taken  
Enclosure
inspectors noted there were opportunities before August 14 to identify and correct the
deficient condition.  Thus, the inspectors identified the following non-cited violation
(NCV) as discussed below.  Documents reviewed are listed in the Attachment.
  b.  
Findings  
Introduction:  A self-revealing Green NCV of 10 CFR 50 Appendix B, Criterion XVI,  
Corrective Action, was identified for the licensees failure to correct a condition adverse  
to quality within a reasonable amount of time.  Timely corrective actions were not taken  
to correct a dual position indication (open and closed lights both illuminated) on the Unit  
to correct a dual position indication (open and closed lights both illuminated) on the Unit  
1 'A' train RHR containment sump suction flow control valve 1-FCV-63-72.     
1 A train RHR containment sump suction flow control valve 1-FCV-63-72.     
  Description:  On August 8 at 0709, the Unit 1 control room operator noted that valve 1-FCV-63-72 showed dual position indication on the control board.  This valve is the 'A'
   
Description:  On August 8 at 0709, the Unit 1 control room operator noted that valve 1-
FCV-63-72 showed dual position indication on the control board.  This valve is the A  
train RHR suction valve from the reactor containment sump and is normally closed,  
train RHR suction valve from the reactor containment sump and is normally closed,  
showing only a single position indication lamp on the control board.  Valve 1-FCV-63-72  
showing only a single position indication lamp on the control board.  Valve 1-FCV-63-72  
was verified to be locally closed.  No other activities were noted that would have caused the valve to come off its closed seat.  Initial troubleshooting for the dual indication consisted of:  1) a visual inspection of the valve; 2) a visual inspection of the motor control center (MCC) cubicle during an attempted closure of the valve; 3) a review of the  
was verified to be locally closed.  No other activities were noted that would have caused  
the valve to come off its closed seat.  Initial troubleshooting for the dual indication  
consisted of:  1) a visual inspection of the valve; 2) a visual inspection of the motor  
control center (MCC) cubicle during an attempted closure of the valve; 3) a review of the  
wiring diagram by a troubleshooting team; 4) replacement of the MCC light indicating  
wiring diagram by a troubleshooting team; 4) replacement of the MCC light indicating  
bulb; and 5) a visual inspection of the main control room (MCR) hand switch.  Based on the troubleshooting team's analysis of the wiring diagrams, no impact was expected on the interlocks associated with 1-FCV-63-72.  The team initially concluded that the most  
bulb; and 5) a visual inspection of the main control room (MCR) hand switch.  Based on  
the troubleshooting teams analysis of the wiring diagrams, no impact was expected on  
the interlocks associated with 1-FCV-63-72.  The team initially concluded that the most  
likely cause of the indication was a short circuit in the control power indication in the  
likely cause of the indication was a short circuit in the control power indication in the  
MCR valve hand switch.  Based on this conclusion, plus the fact that the valve is not normally stroked at power (due to concerns of accidently transferring borated water from the RWST to the containment sump), the licensee chose not to immediately stroke test 1-FCV-63-72.  Instead, the licensee declared the position indication for the valve  
MCR valve hand switch.  Based on this conclusion, plus the fact that the valve is not  
inoperable per Post Accident Monitoring requirements as delineated in TS 3.9.1.  This was a 30 day limiting condition for operation.  The licensee then began development of a  
normally stroked at power (due to concerns of accidently transferring borated water from  
the RWST to the containment sump), the licensee chose not to immediately stroke test  
1-FCV-63-72.  Instead, the licensee declared the position indication for the valve  
inoperable per Post Accident Monitoring requirements as delineated in TS 3.9.1.  This  
was a 30 day limiting condition for operation.  The licensee then began development of a  
troubleshooting plan which would require more intrusive troubleshooting of the issue  
troubleshooting plan which would require more intrusive troubleshooting of the issue  
starting the following week.  
starting the following week.  
  On August 14 at 2315, during a routine quarterly inservice testing valve stroke activity,  
   
On August 14 at 2315, during a routine quarterly inservice testing valve stroke activity,  
valve 1-FCV-74-3 failed to stroke in the closed direction from the control room.  This  
valve 1-FCV-74-3 failed to stroke in the closed direction from the control room.  This  
 
valve is the A train RHR suction valve from the RWST and is normally open.  Valve 1-
valve is the 'A' train RHR suction valve from the RWST and is normally open.  Valve 1-FCV-74-3 was immediately declared out of service and the 72-hour Emergency Core Cooling Systems (ECCS) TS 3.5.2 action statement was entered.  During troubleshooting, operators attempted to close valve 1-FCV-74-3 remotely from the MCC  
FCV-74-3 was immediately declared out of service and the 72-hour Emergency Core  
Cooling Systems (ECCS) TS 3.5.2 action statement was entered.  During  
troubleshooting, operators attempted to close valve 1-FCV-74-3 remotely from the MCC  
cubicle.  This action blew control power fuses.  The licensee then attempted local  
cubicle.  This action blew control power fuses.  The licensee then attempted local  
manual operation and noted 1-FVC-74-3 could be manually closed without binding.   
manual operation and noted 1-FVC-74-3 could be manually closed without binding.   
 
Valve 1-FCV-74-3 was partially manually closed and then reopened from the MCC  
Valve 1-FCV-74-3 was partially manually closed and then reopened from the MCC without incident.  Due to the relationship between valves 1-FCV-63-72 and 1-FCV-74-3 (interlocks, shared wiring in junction boxes, etc.) the licensee suspected that the failure of valve 1-FCV-74-3 to close and valve 1-FCV-63-72 dual position indication were  
without incident.  Due to the relationship between valves 1-FCV-63-72 and 1-FCV-74-3  
(interlocks, shared wiring in junction boxes, etc.) the licensee suspected that the failure  
of valve 1-FCV-74-3 to close and valve 1-FCV-63-72 dual position indication were  
related.   
related.   


 
25  Enclosure The licensee subsequently opened the 1-FCV-63-72 actuator and noted that a significant amount of water had accumulated inside the actuator.  This water caused significant electrical shorting in the valve control circuit and rendered the valve  
25  
   
Enclosure  
The licensee subsequently opened the 1-FCV-63-72 actuator and noted that a  
significant amount of water had accumulated inside the actuator.  This water caused  
significant electrical shorting in the valve control circuit and rendered the valve  
inoperable.  Also, the water affected valve 1-FCV-74-3, as this valve utilizes contacts  
inoperable.  Also, the water affected valve 1-FCV-74-3, as this valve utilizes contacts  
from valve 1-FCV-63-72 circuitry.  It was noted that a low current short caused the failure  
from valve 1-FCV-63-72 circuitry.  It was noted that a low current short caused the failure  
of the closing coil for valve 1-FCV-74-3.  Following repairs to both 1-FCV-63-72 and       
of the closing coil for valve 1-FCV-74-3.  Following repairs to both 1-FCV-63-72 and       
1-FCV-74-3, the ECCS system was returned to operable status on August 17 at 0200.  
1-FCV-74-3, the ECCS system was returned to operable status on August 17 at 0200.  
  The licensee's past operability determination concluded that 1-FCV-63-72 and 1-FCV-
   
The licensees past operability determination concluded that 1-FCV-63-72 and 1-FCV-
74-3 were likely inoperable beginning on August 8 when 1-FCV-63-72 was noted to have  
74-3 were likely inoperable beginning on August 8 when 1-FCV-63-72 was noted to have  
a dual indication.  Thus the 'A' train ECCS system was most likely inoperable for  
a dual indication.  Thus the A train ECCS system was most likely inoperable for  
approximately nine days, which exceeded the TS allowable outage time.  On October 21, 2013, Licensee Event Report 50-327/2013-003 was submitted as a result of this issue.  The licensee concluded that the source of the water was ground water that had  
approximately nine days, which exceeded the TS allowable outage time.  On October  
21, 2013, Licensee Event Report 50-327/2013-003 was submitted as a result of this  
issue.  The licensee concluded that the source of the water was ground water that had  
migrated through the concrete ceiling that housed the valve and actuator cables.  The  
migrated through the concrete ceiling that housed the valve and actuator cables.  The  
ground water leaked through the threaded penetration seal and inside the conduit and  
ground water leaked through the threaded penetration seal and inside the conduit and  
 
flowed down into the valve actuator.  During the most recent Unit 1 refueling outage in  
flowed down into the valve actuator.  During the most recent Unit 1 refueling outage in November 2013, the licensee redesigned the conduit penetration to prevent the intrusion of moisture into the conduit.  The licensee noted the rate of moisture intrusion was most  
November 2013, the licensee redesigned the conduit penetration to prevent the intrusion  
of moisture into the conduit.  The licensee noted the rate of moisture intrusion was most  
likely higher in the recent months due to a higher than normal amount of rainfall that  
likely higher in the recent months due to a higher than normal amount of rainfall that  
temporarily raised the water table in the vicinity of the plant.  The inspectors also noted  
temporarily raised the water table in the vicinity of the plant.  The inspectors also noted  
that on February 29, 2012, the licensee discovered water buildup in the actuator of 1-
that on February 29, 2012, the licensee discovered water buildup in the actuator of 1-
FCV-63-72.  This deficiency was entered into the CAP; however it appears that this precursor was not adequately evaluated such that continued water intrusion ultimately led to the failure noted on August 8, 2013.  
FCV-63-72.  This deficiency was entered into the CAP; however it appears that this  
 
precursor was not adequately evaluated such that continued water intrusion ultimately  
led to the failure noted on August 8, 2013.  
      
      
Analysis:  The licensee's failure to take timely actions to correct a condition adverse to quality was a performance deficiency.  The inspectors concluded that testing and inspection could have determined that valve 1-FCV-63-72 was inoperable much earlier than August 14 when it was noted that RHR suction valve to the RWST, 1-FCV-74-3, did  
Analysis:  The licensees failure to take timely actions to correct a condition adverse to  
quality was a performance deficiency.  The inspectors concluded that testing and  
inspection could have determined that valve 1-FCV-63-72 was inoperable much earlier  
than August 14 when it was noted that RHR suction valve to the RWST, 1-FCV-74-3, did  
not pass its routine surveillance test.  This finding was determined to be more than minor  
not pass its routine surveillance test.  This finding was determined to be more than minor  
because it was associated with the Design Control attribute of the Mitigating Systems  
because it was associated with the Design Control attribute of the Mitigating Systems  
cornerstone and adversely affected the cornerstone's objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage).  Specifically, the finding reduced the reliability and capability of the 'A' train RHR system to perform its safety function as designed.  Using IMC 0609.04, "Initial Characterization of Findings," dated June 19,  
cornerstone and adversely affected the cornerstones objective to ensure the availability,  
2012, and IMC 0609, Appendix A, Exhibit 4 - "External Events Screening Questions,"
reliability, and capability of systems that respond to initiating events to prevent  
dated June 19, 2012, the finding required a detailed risk analysis as the 'A' RHR system was inoperable beyond its TS-allowed outage time of 72 hours.  The detailed risk analysis concluded that the finding was of very low safety significance (Green).   
undesirable consequences (i.e., core damage).  Specifically, the finding reduced the  
  A Phase 3 analysis was performed by the regional Senior Reactor Analyst to determine the impact of the finding.  The analysis assumed a recoverable failure of the 1-FCV-63-
reliability and capability of the A train RHR system to perform its safety function as  
72 valve, along with a dependent failure of the 1-FCV-74-3 valve.  The major impacts were in the swapover from the RWST to the containment sump as the source of water to   
designed.  Using IMC 0609.04, Initial Characterization of Findings, dated June 19,  
2012, and IMC 0609, Appendix A, Exhibit 4 - External Events Screening Questions,  
dated June 19, 2012, the finding required a detailed risk analysis as the A RHR system  
was inoperable beyond its TS-allowed outage time of 72 hours.  The detailed risk  
analysis concluded that the finding was of very low safety significance (Green).   
   
A Phase 3 analysis was performed by the regional Senior Reactor Analyst to determine  
the impact of the finding.  The analysis assumed a recoverable failure of the 1-FCV-63-
72 valve, along with a dependent failure of the 1-FCV-74-3 valve.  The major impacts  
were in the swapover from the RWST to the containment sump as the source of water to   
 
   
   
 
26
  26  Enclosure mitigate medium and smaller LOCA sequences.  Because of the low exposure time, the availability of the opposite train, and the ability of the operations staff to operate the  
   
Enclosure  
mitigate medium and smaller LOCA sequences.  Because of the low exposure time, the  
availability of the opposite train, and the ability of the operations staff to operate the  
effected valves manually, the finding was determined to be Green.  
effected valves manually, the finding was determined to be Green.  
   
   
The cause of this finding was determined to have a cross-cutting aspect relating to the  
The cause of this finding was determined to have a cross-cutting aspect relating to the  
proper classification, prioritization, and evaluation of operability and reportability of  
proper classification, prioritization, and evaluation of operability and reportability of  
conditions adverse to quality in the Corrective Action component of the Problem Identification and Resolution area, in that, on February 29, 2012, the licensee discovered water buildup in the actuator of 1-FCV-63-72 and did not adequately evaluated the  
conditions adverse to quality in the Corrective Action component of the Problem  
Identification and Resolution area, in that, on February 29, 2012, the licensee discovered  
water buildup in the actuator of 1-FCV-63-72 and did not adequately evaluated the  
condition adverse to quality such that continued water intrusion ultimately led to the  
condition adverse to quality such that continued water intrusion ultimately led to the  
failure noted on August 8, 2013. [P.1(c)]  
failure noted on August 8, 2013. [P.1(c)]  
  Enforcement:  Title 10 of the Code of Federal Regulations Part 50, Appendix B, Criterion XVI, "Corrective Action," requires, in part, that measures shall be established to assure  
Enforcement:  Title 10 of the Code of Federal Regulations Part 50, Appendix B, Criterion  
XVI, Corrective Action, requires, in part, that measures shall be established to assure  
that conditions adverse to quality, such as failures, malfunctions, deficiencies,  
that conditions adverse to quality, such as failures, malfunctions, deficiencies,  
deviations, defective material and equipment, and non-conformances are promptly  
deviations, defective material and equipment, and non-conformances are promptly  
identified and corrected.  Contrary to the above, from August 8 through August 17, 2013, the licensee failed to assure that a condition adverse to quality, the failure of valve FCV-63-72, was corrected in a timely manner.  Specifically, the licensee failed to sufficiently  
identified and corrected.  Contrary to the above, from August 8 through August 17, 2013,  
the licensee failed to assure that a condition adverse to quality, the failure of valve FCV-
63-72, was corrected in a timely manner.  Specifically, the licensee failed to sufficiently  
evaluate and correct a moisture intrusion problem associated with the RHR containment  
evaluate and correct a moisture intrusion problem associated with the RHR containment  
suction motor-operated valve.  Corrective actions taken by the licensee included  
suction motor-operated valve.  Corrective actions taken by the licensee included  
redesigning and modifying the conduit penetration to prevent the intrusion of moisture  
redesigning and modifying the conduit penetration to prevent the intrusion of moisture  
into the conduit.  The violation was entered into the licensee's CAP as PER 772193.  This violation is being treated as an NCV, consistent with Section 2.3.2 of the Enforcement Policy and will be identified as NCV 05000327/2013005-01, "Unit 1 Train  
into the conduit.  The violation was entered into the licensees CAP as PER 772193.   
'A' RHR Containment Suction Valve Failure."
This violation is being treated as an NCV, consistent with Section 2.3.2 of the  
Enforcement Policy and will be identified as NCV 05000327/2013005-01, Unit 1 Train  
A RHR Containment Suction Valve Failure.  
   
   
.2 Quarterly Resident Inspector Observations of Security Personnel and Activities
.2  
    a. Inspection Scope
Quarterly Resident Inspector Observations of Security Personnel and Activities  
  During the inspection period, the inspectors conducted observations of security force  
personnel and activities to ensure that the activities were consistent with licensee security procedures and regulatory requirements relating to nuclear plant security.  These observations took place during both normal and off-normal plant working hours.  
  a.  
  These quarterly resident inspector observations of security force personnel and activities  
Inspection Scope  
During the inspection period, the inspectors conducted observations of security force  
personnel and activities to ensure that the activities were consistent with licensee  
security procedures and regulatory requirements relating to nuclear plant security.   
These observations took place during both normal and off-normal plant working hours.  
   
These quarterly resident inspector observations of security force personnel and activities  
did not constitute any additional inspection samples.  Rather, they were considered an  
did not constitute any additional inspection samples.  Rather, they were considered an  
integral part of the inspectors' normal plant status review and inspection activities.  
integral part of the inspectors normal plant status review and inspection activities.  
    b. Findings
  No findings were identified.  
  b.  
Findings  
No findings were identified.  


   
   
 
27
  27  Enclosure .3 Review of the Operation of an Independent Spent Fuel Storage Installation (ISFSI)
   
(60855.1)     a. Inspection Scope
Enclosure  
  The inspectors performed a walkdown with the field operator of the ISFSI storage pad on  
.3  
December 26, 2013, to verify that operations were conducted in a safe manner in accordance with approved procedures and without undue risk to the health and safety of the public.  The inspectors noted that there were 40 multi-purpose canisters (MPCs)  
Review of the Operation of an Independent Spent Fuel Storage Installation (ISFSI)  
(60855.1)  
  a.  
Inspection Scope  
The inspectors performed a walkdown with the field operator of the ISFSI storage pad on  
December 26, 2013, to verify that operations were conducted in a safe manner in  
accordance with approved procedures and without undue risk to the health and safety of  
the public.  The inspectors noted that there were 40 multi-purpose canisters (MPCs)  
positioned on the ISFSI pad.  The inspectors verified the MPC vents were in good  
positioned on the ISFSI pad.  The inspectors verified the MPC vents were in good  
condition and free of obstruction.  The inspectors also verified natural circulation within  
condition and free of obstruction.  The inspectors also verified natural circulation within  
the MPCs.  The inspectors verified that any ISFSI problems were placed in the CAP.  The inspectors also reviewed ISFSI document control practices to verify that changes to the required ISFSI procedures and equipment were performed in accordance with  
the MPCs.  The inspectors verified that any ISFSI problems were placed in the CAP.   
The inspectors also reviewed ISFSI document control practices to verify that changes to  
the required ISFSI procedures and equipment were performed in accordance with  
guidelines established in local procedures and 10 CFR 72.48.  Documents reviewed are  
guidelines established in local procedures and 10 CFR 72.48.  Documents reviewed are  
listed in the Attachment.  
listed in the Attachment.  
    b. Findings
  No findings were identified.
   
   
4OA6 Meetings
  b.
  .1 Exit Meeting Summary  
Findings
 
  On January 13, 2014, the resident inspectors presented the inspection results to Mr. Carlin and other members of his staff, who acknowledged the finding.  The inspectors  
No findings were identified.
asked the licensee whether any of the material examined during the inspection should be considered proprietary.  No proprietary information was identified.  
  ATTACHMENT:  SUPPLEMENTARY INFORMATION  
4OA6 Meetings  
  Attachment SUPPLEMENTARY INFORMATION
  KEY POINTS OF CONTACT
.1  
  Licensee personnel
Exit Meeting Summary  
J. Alfultis, Director of Modifications & Projects  
   
On January 13, 2014, the resident inspectors presented the inspection results to Mr.  
Carlin and other members of his staff, who acknowledged the finding.  The inspectors  
asked the licensee whether any of the material examined during the inspection should  
be considered proprietary.  No proprietary information was identified.  
   
ATTACHMENT:  SUPPLEMENTARY INFORMATION
 
   
Attachment  
SUPPLEMENTARY INFORMATION  
KEY POINTS OF CONTACT  
Licensee personnel  
J. Alfultis, Director of Modifications & Projects  
J. Carlin, Site Vice President  
J. Carlin, Site Vice President  
J. Cross, Chemistry Manager A. Day, Radiation Protection Manager  
J. Cross, Chemistry Manager  
A. Day, Radiation Protection Manager  
D. Erb, Work Control Manager  
D. Erb, Work Control Manager  
M. Henderson, ISI Program Engineer  
M. Henderson, ISI Program Engineer  
H. Hill, Rad Waste Superintendent  
H. Hill, Rad Waste Superintendent  
J. Johnson, Program Manager Licensing A. Little, Site Security Manager K. Loomis, Boric Acid Program Engineer  
J. Johnson, Program Manager Licensing  
A. Little, Site Security Manager  
K. Loomis, Boric Acid Program Engineer  
T. Marshall, Operations Manager  
T. Marshall, Operations Manager  
M. McBrearty, Licensing Manager  
M. McBrearty, Licensing Manager  
S. McCamy, Quality Assurance Manager S. Mohorn, Rad Waste Superintendent  
S. McCamy, Quality Assurance Manager  
S. Mohorn, Rad Waste Superintendent  
P. Noe, Director Safety and Licensing  
P. Noe, Director Safety and Licensing  
C. Owens, Rad Waste HP  
C. Owens, Rad Waste HP  
W. Pierce, Site Engineering Director  
W. Pierce, Site Engineering Director  
P. Pratt, Manager, Maintenance  
P. Pratt, Manager, Maintenance  
J. Rolph, Radiation Protection Technical Support Superintendent  
J. Rolph, Radiation Protection Technical Support Superintendent  
P. Simmons, Plant Manager K. Smith, Director of Training  
P. Simmons, Plant Manager  
K. Smith, Director of Training  
D. Sutton, Licensing  
D. Sutton, Licensing  
J. Stamey, Rad Waste Health Physicist  
J. Stamey, Rad Waste Health Physicist  
J. Stewart, Chemist  
J. Stewart, Chemist  
 
NRC personnel
S. Lingam, Project Manager, Office of Nuclear Reactor Regulation  
NRC personnel  
S. Lingam, Project Manager, Office of Nuclear Reactor Regulation  
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened and Closed
05000327/2013005-01
NCV
Unit 1 Train A RHR Containment Suction
Valve Failure (Section 4OA5)
Closed
05000327/2013004-01
URI
Water Intrusion Into Actuator of Valve 1-
FCV-63-72 (Section 4OA5)


   
   
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
  Opened and Closed
 
05000327/2013005-01 NCV Unit 1 Train 'A' RHR Containment Suction Valve Failure (Section 4OA5)     
Closed 
05000327/2013004-01  URI  Water Intrusion Into Actuator of Valve 1-
      FCV-63-72 (Section 4OA5)
 
 
  Enclosure LIST OF DOCUMENTS REVIEWED
  Section 1R01:  Adverse Weather Protection      Procedures
0-PI-OPS-006.0, Freeze Protection, Rev. 55
   
   
Service Requests (SRs)
Enclosure
SR 807550  
LIST OF DOCUMENTS REVIEWED
Section 1R01:  Adverse Weather Protection
Procedures
0-PI-OPS-006.0, Freeze Protection, Rev. 55
Service Requests (SRs)  
SR 807550  
SR 825408  
SR 825408  
SR 821489  
SR 821489  
Section 1R04:  Equipment Alignment
Partial System Walkdowns
  Procedures
0-GO-16, System Operability Checklists, Rev. 4
   
   
Other documents
Section 1R04:  Equipment Alignment
UFSAR Section 9  
Partial System Walkdowns
Procedures
0-GO-16, System Operability Checklists, Rev. 4
Other documents  
UFSAR Section 9  
   
   
Procedures
Procedures  
0-SI-OPS-030-021.A, Auxiliary Building Gas Treatment System Train A, Rev. 6  
0-SI-OPS-030-021.A, Auxiliary Building Gas Treatment System Train A, Rev. 6  
0-SI-OPS-030-021.B, Auxiliary Building Gas Treatment System Train B, Rev. 6  
0-SI-OPS-030-021.B, Auxiliary Building Gas Treatment System Train B, Rev. 6  
 
0-SO-30-18, Auxiliary Building Gas Treatment System, Rev. 14  
0-SO-30-18, Auxiliary Building Gas Treatment System, Rev. 14 0-SO-65-1, Emergency Gas Treatment System Air Cleanup and Annulus Vacuum, Rev. 27 0-SO-30-1, Control Building Heating, Air Conditioning, and Ventilation, Rev. 39  
0-SO-65-1, Emergency Gas Treatment System Air Cleanup and Annulus Vacuum, Rev. 27  
 
0-SO-30-1, Control Building Heating, Air Conditioning, and Ventilation, Rev. 39  
0-SO-30-10, Auxiliary Building Ventilation Systems, Rev. 54  
0-SO-30-10, Auxiliary Building Ventilation Systems, Rev. 54  
  Section 1R05:  Fire Protection
   
Procedures
Section 1R05:  Fire Protection  
FPDP-1, Conduct of Fire Protection, Rev. 2  
Procedures  
FPDP-1, Conduct of Fire Protection, Rev. 2  
0-PI-FPU-317-299.W, Att. 8, Shift Check List, Rev. 32  
0-PI-FPU-317-299.W, Att. 8, Shift Check List, Rev. 32  
NPG-SPP-18.4.7, Control of Transient Combustibles, Rev. 0  
NPG-SPP-18.4.7, Control of Transient Combustibles, Rev. 0  
EITP-100, Environmental Compliance, Rev. 6  
EITP-100, Environmental Compliance, Rev. 6  
0-SI-FPU-410-703.0, Inspection of FPR Required Fire Doors, Rev. 5 SQN-FPR-Part-II, SQN Fire Protection Report Part II - Fire Protection Plan, Rev. 28  
0-SI-FPU-410-703.0, Inspection of FPR Required Fire Doors, Rev. 5  
SQN-FPR-Part-II, SQN Fire Protection Report Part II - Fire Protection Plan, Rev. 28  
   
   
Other documents
Other documents  
Fire Protection Pre-Fire Plans for Unit 1 Lower Containment Building  
Fire Protection Pre-Fire Plans for Unit 1 Lower Containment Building  
Fire Protection Pre-Fire Plans for Unit 2 Lower Containment Building  Fire Protection Pre-Fire Plans for Control Building Elevation 685 (Auxilia
Fire Protection Pre-Fire Plans for Unit 2 Lower Containment Building   
ry Instrument Room)  
Fire Protection Pre-Fire Plans for Control Building Elevation 685 (Auxiliary Instrument Room)  
Fire Protection Pre-Fire Plans for Control Building Elevation 706 (Cable Spreading Room) Fire Protection Pre-Fire Plans for ERCW Building - Elevations 688/704/720  
Fire Protection Pre-Fire Plans for Control Building Elevation 706 (Cable Spreading Room)  
Fire Protection Pre-Fire Plans for ERCW Building - Elevations 688/704/720  
Fire Protection Pre-Fire Plans for Turbine Building - Elevations 662/685  
Fire Protection Pre-Fire Plans for Turbine Building - Elevations 662/685  
Section 1R06:  Flood Protection Measures
Work Orders
WO 11108121224, Check Standing Water Level in Manholes/Handholes


  Section 1R06:  Flood Protection Measures
   
Work Orders
3
  WO 11108121224, Check Standing Water Level in Manholes/Handholes
   
Attachment  
Attachment  
Other documents
Other documents  
TVA letter to NRC dated May 4, 2007. TVA response to GL 2007-01  
TVA letter to NRC dated May 4, 2007. TVA response to GL 2007-01  
  Section 1R08:  Inservice Inspection Activities
   
Procedures
Section 1R08:  Inservice Inspection Activities  
N-VT-15 - Visual Examination of Class MC and Metallic Liners of Class CC Components of  
Procedures  
Light-Water cooled Plants, Rev. 11 N-VT-16 - General Visual Examination Containment Vessel Integrity Verification, Rev. 05 N-UT-67 - Generic Procedure for Straight Beam Ultrasonic Examination of Bolts and Studs,  
N-VT-15 - Visual Examination of Class MC and Metallic Liners of Class CC Components of  
Light-Water cooled Plants, Rev. 11  
N-VT-16 - General Visual Examination Containment Vessel Integrity Verification, Rev. 05  
N-UT-67 - Generic Procedure for Straight Beam Ultrasonic Examination of Bolts and Studs,  
Rev. 05  
Rev. 05  
PDI-UT-5 - Generic Procedure for Straight Beam Ultrasonic Examination of Bolts and Studs,  
PDI-UT-5 - Generic Procedure for Straight Beam Ultrasonic Examination of Bolts and Studs,  
Rev. D34 IEP-200 - Qualification and Certification Requirements for TVA Inspection Services Organization (ISO) Nondestructive (NDE) Personnel, Rev. 13  
Rev. D34  
 
IEP-200 - Qualification and Certification Requirements for TVA Inspection Services  
Organization (ISO) Nondestructive (NDE) Personnel, Rev. 13  
   
   
Corrective Action Documents
Corrective Action Documents  
PER 618770 - Boron buildup on 1B-B SIS Pump Pedestal PER 691545 - Boric acid build up and wet boric acid are present on transmitter sensing line       
PER 618770 - Boron buildup on 1B-B SIS Pump Pedestal  
PER 691545 - Boric acid build up and wet boric acid are present on transmitter sensing line       
1-ft-72-41  
1-ft-72-41  
PER 01-010244 - Minor concrete voids in U1C11 Vt-3 inspection  
PER 01-010244 - Minor concrete voids in U1C11 Vt-3 inspection  
PER 169175 - Airline cracks in ceiling beneath reactor cavity and reactor wall  
PER 169175 - Airline cracks in ceiling beneath reactor cavity and reactor wall  
SR 797854 - Hairline cracking in the concrete beneath the fuel transfer canal in lower  
SR 797854 - Hairline cracking in the concrete beneath the fuel transfer canal in lower  
 
containment
containment SR 526607 - Spalling on baseplate of Protection Device No. 1 on Drawing 48N1701-17. SR 797166 - Boric acid on Reactor Coolant Pump #1 on #3 seal  
SR 526607 - Spalling on baseplate of Protection Device No. 1 on Drawing 48N1701-17.  
SR 797166 - Boric acid on Reactor Coolant Pump #1 on #3 seal  
SR 797061 - Boric acid on valve 1-FCV-063-0098  
SR 797061 - Boric acid on valve 1-FCV-063-0098  
SR 797072 - Two areas of white deposit in Fan Room 2  
SR 797072 - Two areas of white deposit in Fan Room 2  
 
Other documents
Other documents  
Periodic Instruction 0-PI-DXI-000-116.2, ASME Section XI IWE/IWL Containment Inservice  
Periodic Instruction 0-PI-DXI-000-116.2, ASME Section XI IWE/IWL Containment Inservice  
Inspection (CSI) Program, Rev. 05  
Inspection (CSI) Program, Rev. 05  
Q-NIC-100 - Written Practice for the Qualification and Certification of Nondestructive  
Q-NIC-100 - Written Practice for the Qualification and Certification of Nondestructive  
Examination (NDE0 Personnel, Rev. 20-TVA  
Examination (NDE0 Personnel, Rev. 20-TVA  
IHI Southwest Technologies, Inc. Operating Procedure 2.0-NDES-001, Nondestructive Examination Personnel Qualification and Certification, Rev. 06 WO 113312025 - Modify Component Cooling Piping to eliminate interference with actuator for  
IHI Southwest Technologies, Inc. Operating Procedure 2.0-NDES-001, Nondestructive  
Examination Personnel Qualification and Certification, Rev. 06  
WO 113312025 - Modify Component Cooling Piping to eliminate interference with actuator for  
1-FC-063-011  
1-FC-063-011  
  Section 1R12:  Maintenance Effectiveness
   
Procedures
Section 1R12:  Maintenance Effectiveness  
TI-4, Maintenance Rule Performance Indicator Monitoring, Trending, and Reporting -  
Procedures  
TI-4, Maintenance Rule Performance Indicator Monitoring, Trending, and Reporting -  
10CFR50.65, Rev. 23  
10CFR50.65, Rev. 23  
Other documents
MR 11th Periodic Assessment Report (PE sample)
Cause Determination and Evaluation (CDE) #2700, FCV-63-72 Failure
CDE #2696, EBGTS B Fan Failure


   
   
Other documents
4
  MR 11th Periodic Assessment Report (PE sample) Cause Determination and Evaluation (CDE) #2700, FCV-63-72 Failure CDE #2696, EBGTS 'B' Fan Failure
   
 
Attachment
 
CDE #2686, A Shutdown Boardroom Chiller Failure  
4  Attachment CDE #2686, 'A' Shutdown Boardroom Chiller Failure CDE #2674, 'B' Main Condenser Test Connection Failure  
CDE #2674, B Main Condenser Test Connection Failure  
  Section 1R13:  Maintenance Risk Assessments and Emergent Work Control
   
Procedures
Section 1R13:  Maintenance Risk Assessments and Emergent Work Control  
0-TI-DSM-000-007.1, Risk Assessment Guidelines, Rev. 9  
Procedures  
NPG-SPP-07.3, Work Activity Risk Management Process, Rev. 3 NPG-SPP-07.2.4, Forced Outage or Short Duration Planned Outage Management, Rev. 0 NPG-SPP-07.2, Outage Management, Rev. 0   
0-TI-DSM-000-007.1, Risk Assessment Guidelines, Rev. 9  
NPG-SPP-07.3, Work Activity Risk Management Process, Rev. 3  
NPG-SPP-07.2.4, Forced Outage or Short Duration Planned Outage Management, Rev. 0  
NPG-SPP-07.2, Outage Management, Rev. 0   
GOI-6, Apparatus Operations, Rev. 142  
GOI-6, Apparatus Operations, Rev. 142  
 
Section 1R15:  Operability Determinations and Functionality Assessments
Section 1R15:  Operability Determinations and Functionality Assessments  
Procedures
Procedures  
NEDP-22, Functional Evaluations, Rev. 9  
NEDP-22, Functional Evaluations, Rev. 9  
 
OPDP-8, Limiting Conditions for Operation Tracking, Rev. 5  
OPDP-8, Limiting Conditions for Operation Tracking, Rev. 5  
NPG-SPP-03.5, Regulatory Reporting Requirements, Rev. 2  
NPG-SPP-03.5, Regulatory Reporting Requirements, Rev. 2  
 
PERs 789552 - Unit 2 Turbine Controls in Manual  
PERs  
789552 - Unit 2 Turbine Controls in Manual  
795451 - POE WO 113223153 T1 motor lead pinch  
795451 - POE WO 113223153 T1 motor lead pinch  
799097 - POE TS LCO 3.7.4 action for FCV-67-146  
799097 - POE TS LCO 3.7.4 action for FCV-67-146  
800432 - POE (ABSCE boundary issue)  
800432 - POE (ABSCE boundary issue)  
795433 - PDO (During U1R19 water found leaking out of conduit in bioshield wall) 801415 - PDO EDG 1B 2 sec load sequence 803833 - PDO U-1 Rx Head Vent Valve Stroke  
795433 - PDO (During U1R19 water found leaking out of conduit in bioshield wall)  
801415 - PDO EDG 1B 2 sec load sequence  
803833 - PDO U-1 Rx Head Vent Valve Stroke  
816731, 815638, 817841 - FEs associated with the Unit 1 loose parts alarm  
816731, 815638, 817841 - FEs associated with the Unit 1 loose parts alarm  
 
Section 1R18:  Plant Modifications
Section 1R18:  Plant Modifications  
Procedures
Procedures  
NPG-SPP-09.3, Plant Modifications and Engineering Change Control, Rev. 4  
NPG-SPP-09.3, Plant Modifications and Engineering Change Control, Rev. 4  
NPG-SPP-09.4, 10 CFR 50.59 Evaluations of Changes, Tests, and Experiments, Rev. 1  
NPG-SPP-09.4, 10 CFR 50.59 Evaluations of Changes, Tests, and Experiments, Rev. 1  
NPG-SPP-09.5, Temporary Alterations, Rev. 0  
NPG-SPP-09.5, Temporary Alterations, Rev. 0  
   
   
Other documents
Other documents  
DCN 22643 - Replace Pressurizer PORVs  
DCN 22643 - Replace Pressurizer PORVs  
  Section 1R19:  Post Maintenance Testing
   
Procedures
Section 1R19:  Post Maintenance Testing  
MMDP-1, Maintenance Management System, Rev. 20 MMDP-3, Guidelines for Planning and Execution of Troubleshooting Activities, Rev. 6 NPG-SPP-6.5, Foreign Material Control, Rev. 0  
Procedures  
MMDP-1, Maintenance Management System, Rev. 20  
MMDP-3, Guidelines for Planning and Execution of Troubleshooting Activities, Rev. 6  
NPG-SPP-6.5, Foreign Material Control, Rev. 0  
NPG-SPP-6.1, Work Order Process Initiation, Rev. 0  
NPG-SPP-6.1, Work Order Process Initiation, Rev. 0  
NPG-SPP-06.3, Pre-/Post-Maintenance Testing, Rev. 0  
NPG-SPP-06.3, Pre-/Post-Maintenance Testing, Rev. 0  
NPG-SPP-06.9, Testing Programs, Rev. 0  
NPG-SPP-06.9, Testing Programs, Rev. 0  
NPG-SPP-06.9.1, Conduct of Testing, Rev. 1 NPG-SPP-06.9.3, Post-Modification Testing, Rev. 0
NPG-SPP-06.9.1, Conduct of Testing, Rev. 1  
 
NPG-SPP-06.9.3, Post-Modification Testing, Rev. 0  
 
  5  Attachment  
Work Orders
 
114306842 - Disassemble and reassemble valve in support of 113716425 114306841 - Remove actuator, install actuator, set up calibration in support of 113716425  
   
5  
   
Attachment  
Work Orders  
114306842 - Disassemble and reassemble valve in support of 113716425  
114306841 - Remove actuator, install actuator, set up calibration in support of 113716425  
114325805 - Disassemble and reassemble valve in support of 113716459  
114325805 - Disassemble and reassemble valve in support of 113716459  
114325799 - Remove and install actuator in support of 113716459  
114325799 - Remove and install actuator in support of 113716459  
113756597 - PORVs - PCV-68-340 & pcv-68-334 Replacement activities  
113756597 - PORVs - PCV-68-340 & pcv-68-334 Replacement activities  
 
113377829 - Repack Valve (1-LCV-3-175) and perform AIRCET test  
113377829 - Repack Valve (1-LCV-3-175) and perform AIRCET test 112096045 - Repair isolation check valve (1-VLV-026-1296) 111234712 - 5 year PM to swap 480V Shutdown board breaker with a refurbished breaker  
112096045 - Repair isolation check valve (1-VLV-026-1296)  
111234712 - 5 year PM to swap 480V Shutdown board breaker with a refurbished breaker  
113806636 - Perform 0-MI-EPM-317-102.0 on CCS pump C-S and clean/replace motor air filter  
113806636 - Perform 0-MI-EPM-317-102.0 on CCS pump C-S and clean/replace motor air filter  
114560807 - CCP room cooler fan motor current check, bearing lubrication and cleaning  
114560807 - CCP room cooler fan motor current check, bearing lubrication and cleaning  
114198329 - EQ maintenance and inspection 113408190 - Change out electrolytic capacitors in the Woodward 2301A governor card  
114198329 - EQ maintenance and inspection  
  Section 1R20:  Refueling and Other Outage Activities
113408190 - Change out electrolytic capacitors in the Woodward 2301A governor card  
Procedures
   
FHI-3, Movement of Fuel, Rev. 65  
Section 1R20:  Refueling and Other Outage Activities  
0-GO-15, Containment Closure Control, Rev. 34 0-GO-13, Reactor Coolant System Drain and Fill Operations, Rev. 71  
Procedures  
FHI-3, Movement of Fuel, Rev. 65  
0-GO-15, Containment Closure Control, Rev. 34  
0-GO-13, Reactor Coolant System Drain and Fill Operations, Rev. 71  
NPG-SPP-08.1, Nuclear Fuel Management, Rev. 00  
NPG-SPP-08.1, Nuclear Fuel Management, Rev. 00  
0-PI-OPS-000-011.0, Containment Access Control During Modes 1-4, Rev. 1  
0-PI-OPS-000-011.0, Containment Access Control During Modes 1-4, Rev. 1  
 
Section 1R22:  Surveillance Testing
Section 1R22:  Surveillance Testing  
Procedures
Procedures  
NPG-SPP-06.9.1, Conduct of Testing, Rev. 8  
NPG-SPP-06.9.1, Conduct of Testing, Rev. 8  
0-SI-SXV-072-266.0, ASME Code Valve Testing, Rev. 12  
0-SI-SXV-072-266.0, ASME Code Valve Testing, Rev. 12  
0-SI-OPS-068-137.0, Reactor Coolant System Water Inventory, Rev. 32
0-SI-OPS-068-137.0, Reactor Coolant System Water Inventory, Rev. 32  
0-SI-SFT-072-138.0, Unit 1 Containment Spray - Spray Nozzle Test, Rev. 6 0-SI-SLT-081-258.1, Unit 1 Primary Water LLRT, Rev. 5 0-SI-SLT-088-259.1, Upper Personnel Airlock Overall Leak Rate Test and General Inspection,  
0-SI-SFT-072-138.0, Unit 1 Containment Spray - Spray Nozzle Test, Rev. 6  
0-SI-SLT-081-258.1, Unit 1 Primary Water LLRT, Rev. 5  
0-SI-SLT-088-259.1, Upper Personnel Airlock Overall Leak Rate Test and General Inspection,  
Rev. 6  
Rev. 6  
0-SI-SLT-088-259.4, Upper Personnel Airlock Interlock Operability Test, Rev. 2  
0-SI-SLT-088-259.4, Upper Personnel Airlock Interlock Operability Test, Rev. 2  
1-SI-SXP-003-202.B, Motor Driven Auxiliary Feedwater Pump 1B-B Comprehensive  
1-SI-SXP-003-202.B, Motor Driven Auxiliary Feedwater Pump 1B-B Comprehensive  
Performance Test, Rev. 7 1-SI-SXP-074-202.0, RHR Pump 1A-A and 1B-B Comprehensive Performance and Check Valve Test, Rev. 10  
Performance Test, Rev. 7  
1-SI-SXP-074-202.0, RHR Pump 1A-A and 1B-B Comprehensive Performance and Check  
Valve Test, Rev. 10  
0-SI-OPS-068-137.0, Reactor Coolant System Water Inventory, Rev. 32  
0-SI-OPS-068-137.0, Reactor Coolant System Water Inventory, Rev. 32  
1-SI-OPS-088-001.0, Phase A Isolation Test, Rev. 14  
1-SI-OPS-088-001.0, Phase A Isolation Test, Rev. 14  
1-SI-OPS-082-026A, Loss of Offsite Power with Safety Injection D/G 1A-A Test, Rev. 46 0-SI-SFT-072-138.0, Unit 1 Containment Spray - Spray Nozzle Test, Rev. 6 0-SI-SXV-063-203.2, Full Stroking of Safety Injection Cold Leg Accumulator Isolation Valves,  
1-SI-OPS-082-026A, Loss of Offsite Power with Safety Injection D/G 1A-A Test, Rev. 46  
0-SI-SFT-072-138.0, Unit 1 Containment Spray - Spray Nozzle Test, Rev. 6  
0-SI-SXV-063-203.2, Full Stroking of Safety Injection Cold Leg Accumulator Isolation Valves,  
Rev. 1  
Rev. 1  
0-SI-MIN-061-105.0, Ice Condenser Ice Weighing, Rev. 11  
0-SI-MIN-061-105.0, Ice Condenser Ice Weighing, Rev. 11  
0-SI-SLT-067-258.2, Containment Isolation Valve Local Leak Rate Test Lower Compartment  
0-SI-SLT-067-258.2, Containment Isolation Valve Local Leak Rate Test Lower Compartment  
Essential Raw Cooling Water, Rev. 13  
Essential Raw Cooling Water, Rev. 13  
  PERs 801081, FME concern while performing air flow test during core reload  
   
  6  Attachment  
PERs  
Other documents
801081, FME concern while performing air flow test during core reload
1-47W437-4, Mechanical Containment Spray System Piping, Rev. 1 1-47W437-5, Mechanical Containment Spray System Piping, Rev. 4  
 
   
6  
   
Attachment  
Other documents  
1-47W437-4, Mechanical Containment Spray System Piping, Rev. 1  
1-47W437-5, Mechanical Containment Spray System Piping, Rev. 4  
1-47W812-1, Flow Diagram Containment Spray System, Rev. 45  
1-47W812-1, Flow Diagram Containment Spray System, Rev. 45  
Technical Specification Surveillance Requirement 4.6.2.1.1.d and 4.6.2.1.2.b  
Technical Specification Surveillance Requirement 4.6.2.1.1.d and 4.6.2.1.2.b  
  Section 1EP2:  Alert and Notification System Evaluation
   
Procedures and Reports
Section 1EP2:  Alert and Notification System Evaluation  
NP-REP, Appendix B, Sequoyah Nuclear Plant Radiological Emergency Plan, Rev. 101  
Procedures and Reports  
NP-REP, Appendix B, Sequoyah Nuclear Plant Radiological Emergency Plan, Rev. 101  
EPFS-9, Inspection, Service, and Maintenance of the Prompt Notification System (PNS) at  
EPFS-9, Inspection, Service, and Maintenance of the Prompt Notification System (PNS) at  
Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants, Rev. 8  
Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants, Rev. 8  
Sequoyah FEMA REP-10 Report, Revision 2 EPDP-10, Facilitation of the ANS and Notification Tests, Rev. 6 EPDP-14, Evaluation of Changes to Alert and Notification Systems (ANS), Rev 0  
Sequoyah FEMA REP-10 Report, Revision 2  
 
EPDP-10, Facilitation of the ANS and Notification Tests, Rev. 6  
EPDP-14, Evaluation of Changes to Alert and Notification Systems (ANS), Rev 0  
   
   
Records and Data
Records and Data  
Weekly Silent Tests, 2011-September 2013 Monthly Siren Tests, October 2011 - October 2013  
Weekly Silent Tests, 2011-September 2013  
Monthly Siren Tests, October 2011 - October 2013  
   
   
Corrective Action documents
Corrective Action documents  
442747; During Monthly Siren Test Five Sirens Did Not Operate  
442747; During Monthly Siren Test Five Sirens Did Not Operate  
521663; Siren Damaged by Storm  
521663; Siren Damaged by Storm  
591666; Two ANS Sirens Failed to Operate During Monthly Test 701363; Siren Relocations Due to Land Owner Rejections 711912; Loss of DC Power Indication for ANS Siren 12  
591666; Two ANS Sirens Failed to Operate During Monthly Test  
701363; Siren Relocations Due to Land Owner Rejections  
711912; Loss of DC Power Indication for ANS Siren 12  
727891; Loss of DC Power Indication for ANS Siren 26  
727891; Loss of DC Power Indication for ANS Siren 26  
751936; Two ANS Sirens Failed to Operate During Monthly Test  
751936; Two ANS Sirens Failed to Operate During Monthly Test  
   
   
Section 1EP3:  Emergency Response Organization Staffing and Augmentation System
Section 1EP3:  Emergency Response Organization Staffing and Augmentation System  
Procedures
Procedures  
TRN-30, Radiological Emergency Preparedness Training, Rev. 24  
TRN-30, Radiological Emergency Preparedness Training, Rev. 24  
EPDP-3, Emergency Plan Exercises and Preparedness Drills, Rev. 7  
EPDP-3, Emergency Plan Exercises and Preparedness Drills, Rev. 7  
EPDP-10, Facilitation of the Alert and Notification System and Pager Tests, Rev. 6  
EPDP-10, Facilitation of the Alert and Notification System and Pager Tests, Rev. 6  
EPIP-3, Alert, Rev 36 EPIP-6, Activation and Operation of the Technical Support Center, Rev. 49  
EPIP-3, Alert, Rev 36  
EPIP-6, Activation and Operation of the Technical Support Center, Rev. 49  
EPIP-7, Activation and Operation of the Operations Support Center, Rev. 28  
EPIP-7, Activation and Operation of the Operations Support Center, Rev. 28  
   
   
Records and Data
Records and Data  
SQN-EP-S-13-02, snapshot self-assessment SCBA Qualification of Site Personnel, March 2013 EPT202.000, ERO Training Plan - TSC Training, Rev. 12 EPT900.010, ERO Training Plan, ERO Fundamentals, Rev. 4  
SQN-EP-S-13-02, snapshot self-assessment SCBA Qualification of Site Personnel, March 2013  
EPT202.000, ERO Training Plan - TSC Training, Rev. 12  
EPT900.010, ERO Training Plan, ERO Fundamentals, Rev. 4  
Radiological Emergency Preparedness Training Oversight Committee minutes 2012/2013  
Radiological Emergency Preparedness Training Oversight Committee minutes 2012/2013  
2012/2013 ERO Augmentation test results  
2012/2013 ERO Augmentation test results  
Results of periodic ERO notification tests  
Results of periodic ERO notification tests  
Corrective Action documents 
786990; TRN error in CECC qualification requirement


  Corrective Action documents
   
  786990; TRN error in CECC qualification requirement
7
 
   
7  Attachment Section 1EP4:  Emergency Action Level and Emergency Plan Changes
Attachment
Change Packages
Section 1EP4:  Emergency Action Level and Emergency Plan Changes  
TVA Radiological Emergency Plan, Revs. 99 and 100  
Change Packages  
EPIP-1, "Emergency Plan Classification Matrix," Revs. 48 and 49  
TVA Radiological Emergency Plan, Revs. 99 and 100  
CECC EPIP-2, "Operations Duty Specialist Procedure for Notification of Unusual Event,"     Rev. 43  
EPIP-1, Emergency Plan Classification Matrix, Revs. 48 and 49  
CECC EPIP-3, "Operations Duty Specialist Procedure for Alert," Rev. 44 CECC EPIP-4, "Operations Duty Specialist Procedure for Site Area Emergency," Rev. 45 CECC EPIP-5, "Operations Duty Specialist
CECC EPIP-2, Operations Duty Specialist Procedure for Notification of Unusual Event,       
Procedure for General Emergency," Rev. 50 CECC EPIP-7, "CECC Radiological Assessment Staff Procedure for Alert, Site Area  
Rev. 43  
Emergency, and General Emergency," Rev. 34  
CECC EPIP-3, Operations Duty Specialist Procedure for Alert, Rev. 44  
TVA Radiological Emergency Plan, Rev. 101 Evacuation Time Estimate Study Update  
CECC EPIP-4, Operations Duty Specialist Procedure for Site Area Emergency, Rev. 45  
  Section 1EP5:  Maintenance of Emergency Preparedness
CECC EPIP-5, Operations Duty Specialist Procedure for General Emergency, Rev. 50  
Procedures
CECC EPIP-7, CECC Radiological Assessment Staff Procedure for Alert, Site Area  
CECC EPIP-9, Emergency Environmental Radiological Monitoring Procedures, Rev. 49 EPDP-17, NPG Emergency Plan Effectiveness Review [10 CFR 50.54(q)], Rev. 3 NPG-SPP-7.1, On-Line Work Management, Rev. 10  
Emergency, and General Emergency, Rev. 34  
TVA Radiological Emergency Plan, Rev. 101  
Evacuation Time Estimate Study Update  
   
Section 1EP5:  Maintenance of Emergency Preparedness  
Procedures  
CECC EPIP-9, Emergency Environmental Radiological Monitoring Procedures, Rev. 49  
EPDP-17, NPG Emergency Plan Effectiveness Review [10 CFR 50.54(q)], Rev. 3  
NPG-SPP-7.1, On-Line Work Management, Rev. 10  
NPG-SPP-18.3.5, Designated Emergency Response Equipment (DERE), Rev. 0  
NPG-SPP-18.3.5, Designated Emergency Response Equipment (DERE), Rev. 0  
NPG-SPP-22.300, Corrective Action Program, Rev. 0  
NPG-SPP-22.300, Corrective Action Program, Rev. 0  
   
   
Records and Data
Records and Data  
Drill and exercise reports 2011-2013 TVA Quality Assurance Audit Report SSA 1203 dated April 16, 2012  
Drill and exercise reports 2011-2013  
TVA Quality Assurance Audit Report SSA 1203 dated April 16, 2012  
TVA Quality Assurance Audit Report SSA 1305 dated June 17, 2013  
TVA Quality Assurance Audit Report SSA 1305 dated June 17, 2013  
Focused Self-Assessment SQN-EP-F-13-001, NRC Inspection Preparation  
Focused Self-Assessment SQN-EP-F-13-001, NRC Inspection Preparation  
SQN QA Quarterly Rating Report August 13, 2013  
SQN QA Quarterly Rating Report August 13, 2013  
 
Corrective Action documents
Corrective Action documents  
571999; Maintenance Personnel Not Evacuated in a Timely Manner During REP Drill  
571999; Maintenance Personnel Not Evacuated in a Timely Manner During REP Drill  
572584; RP Was Slow to Perform Airborne Sampling During REP Drill   
572584; RP Was Slow to Perform Airborne Sampling During REP Drill   
608785; Dose assessment error  
608785; Dose assessment error  
581795; No Additional Fire Brigade Personnel Onsite During REP Drill 582858; TSC SED Filled Out Wrong Form Which Delayed CECC PAR Development 582751; MERT Failed 4 of 6 Drill Objectives  
581795; No Additional Fire Brigade Personnel Onsite During REP Drill  
582858; TSC SED Filled Out Wrong Form Which Delayed CECC PAR Development  
582751; MERT Failed 4 of 6 Drill Objectives  
619808; RP Tech Left Team to Get Equipment During Graded Exercise  
619808; RP Tech Left Team to Get Equipment During Graded Exercise  
619847; Inside Van Tech Did Not Grab All Equipment Required During Graded Exercise  
619847; Inside Van Tech Did Not Grab All Equipment Required During Graded Exercise  
 
695758; MET Unavailable - Lessons Learned  
695758; MET Unavailable - Lessons Learned 704845; Evaluate EPIP-1 Classification of EAL 4.2 for Explosion 708940; Questioned CET Readings During Drill  
704845; Evaluate EPIP-1 Classification of EAL 4.2 for Explosion  
708940; Questioned CET Readings During Drill  
711961; REP Assignment Cannot Meet 1-Hour Requirement to Respond  
711961; REP Assignment Cannot Meet 1-Hour Requirement to Respond  
720352; 8 Personnel Were Not Accounted For During REP Drill  
720352; 8 Personnel Were Not Accounted For During REP Drill  
722951; KI Tablets Should Be Evaluated for Issue Earlier Under Emergency Conditions  
722951; KI Tablets Should Be Evaluated for Issue Earlier Under Emergency Conditions  
732171; Clarify EPDP-11 regarding 10 CFR 50.54(t) requirements 751183; Wrong Pocket Ion Chambers in REP Van #3  
732171; Clarify EPDP-11 regarding 10 CFR 50.54(t) requirements  
751183; Wrong Pocket Ion Chambers in REP Van #3  
 
   
   
 
8
  Attachment  
   
Section 2RS1:  Radiological Hazard Assessment and Exposure Controls
Attachment  
Procedures, Guidance Documents, and Manuals
Section 2RS1:  Radiological Hazard Assessment and Exposure Controls  
NPG-SPP-05.1.1, Alpha Radiation Monitoring Program, Rev. 3  
Procedures, Guidance Documents, and Manuals  
NPG-SPP-05.1.1, Alpha Radiation Monitoring Program, Rev. 3  
NPG-SPP-05.6, Controlling Byproduct and Source Material, Rev. 2  
NPG-SPP-05.6, Controlling Byproduct and Source Material, Rev. 2  
NPG-SPP-22.300, Corrective Action Program, Rev. 0  
NPG-SPP-22.300, Corrective Action Program, Rev. 0  
RCDP-1, Conduct of Radiological Controls, Rev. 5   
RCDP-1, Conduct of Radiological Controls, Rev. 5   
RCI-01, Radiation Protection Program, Rev. 78 RCI-14, Radiation Work Permit (RWP) Program, Rev. 57 RCI-15, Radiological Postings, Rev. 24  
RCI-01, Radiation Protection Program, Rev. 78  
RCI-14, Radiation Work Permit (RWP) Program, Rev. 57  
RCI-15, Radiological Postings, Rev. 24  
RCI-17, Control of Byproduct and Source Material, Rev. 19  
RCI-17, Control of Byproduct and Source Material, Rev. 19  
RCI-18, Vacuum Cleaner Control Within the Radiologically Controlled Area, Rev. 9  
RCI-18, Vacuum Cleaner Control Within the Radiologically Controlled Area, Rev. 9  
RCI-21, Control of Radioactive Materials, Rev. 19 RCI-29, Control of Radiation Protection Keys, Rev. 15 RCI-101, Radiation Operations Routines, Rev. 3  
RCI-21, Control of Radioactive Materials, Rev. 19  
RCI-29, Control of Radiation Protection Keys, Rev. 15  
RCI-101, Radiation Operations Routines, Rev. 3  
RCI-106, Radiation Protection Standards and Expectations, Rev. 3  
RCI-106, Radiation Protection Standards and Expectations, Rev. 3  
RCI-201, Radiation and Contamination Surveys, Rev. 13   
RCI-201, Radiation and Contamination Surveys, Rev. 13  
RCI-202, Airborne Radioactivity Surveys, Rev. 7 RCI-204, Radiological Surveys of Equipment and Materials Leaving the RCA, Rev. 7 RCI-209, Radiological Surveys of Personnel Leaving the RCA or Protected Area, Rev. 3  
   
RCI-202, Airborne Radioactivity Surveys, Rev. 7  
RCI-204, Radiological Surveys of Equipment and Materials Leaving the RCA, Rev. 7  
RCI-209, Radiological Surveys of Personnel Leaving the RCA or Protected Area, Rev. 3  
RCI-301, Radionuclide Tracking and Assessment (RTA) Program, Rev. 2  
RCI-301, Radionuclide Tracking and Assessment (RTA) Program, Rev. 2  
RCI-412, Radiation Protection Surveys during Initial Spent Fuel Assembly Movement, Rev. 1  
RCI-412, Radiation Protection Surveys during Initial Spent Fuel Assembly Movement, Rev. 1  
RCI-417, Radiological Monitoring of the Hydrogen Peroxide Injection Crud Burst, Rev. 1  
RCI-417, Radiological Monitoring of the Hydrogen Peroxide Injection Crud Burst, Rev. 1  
RCTP-106, Special Dosimetry Operations, Rev. 2 0-TI-NUC-000-002.0, Storing Material in Spent Fuel Pool or New Fuel Vault, Rev. 21  
RCTP-106, Special Dosimetry Operations, Rev. 2  
0-TI-NUC-000-002.0, Storing Material in Spent Fuel Pool or New Fuel Vault, Rev. 21  
   
   
Records and Data
Records and Data  
Air Sample Detail Report for 10/13/2013 thru 11/5/2013, 11/5/2103  
Air Sample Detail Report for 10/13/2013 thru 11/5/2013, 11/5/2103  
Air Sample 101713018, U1 Equipment Pit, 10/17/2013 Air Sample 101813018, U1 734' RFF GA, 10/18/2013 Air Sample 102313006, U1 Rx Head Stand, 10/23/2013  
Air Sample 101713018, U1 Equipment Pit, 10/17/2013  
Air Sample 102313014, U1 653' 1B RHR Pump Room, 10/23/2013  
Air Sample 101813018, U1 734 RFF GA, 10/18/2013  
Air Sample 102313023, U1 653' 1B RHR Pump Room, 10/23/2013  
Air Sample 102313006, U1 Rx Head Stand, 10/23/2013  
Air Sample 102313014, U1 653 1B RHR Pump Room, 10/23/2013  
Air Sample 102313023, U1 653 1B RHR Pump Room, 10/23/2013  
Air Sample 102613003, U1 Upper Rx Head O-ring Cleaning, 10/26/2013  
Air Sample 102613003, U1 Upper Rx Head O-ring Cleaning, 10/26/2013  
Air Sample 110213012, U1 Upper GA, 11/2/2013 ALARA Plan 2013-010, Refueling Operations ALARA Plan 2013-011, Mechanical Maintenance Group (MMG)  
Air Sample 110213012, U1 Upper GA, 11/2/2013  
ALARA Plan 2013-010, Refueling Operations  
ALARA Plan 2013-011, Mechanical Maintenance Group (MMG)  
ALARA Plan 2013-018, MODS - Ice Condenser/Snubbers/Insulation/Scaffolds/Painting  
ALARA Plan 2013-018, MODS - Ice Condenser/Snubbers/Insulation/Scaffolds/Painting  
Instrument Calibration/Check Source Certificates: Vendor Source No. I3-328, TVA No. 2530, 7/29/2011 Vendor Source No. I3-329, TVA No. 2531, 7/29/2011 Vendor Source No. I3-330, TVA No. 2532, 7/29/2011  
Instrument Calibration/Check Source Certificates:  
Vendor Source No. I3-328, TVA No. 2530, 7/29/2011  
Vendor Source No. I3-329, TVA No. 2531, 7/29/2011  
Vendor Source No. I3-330, TVA No. 2532, 7/29/2011  
Vendor Source No.G4-975, TVA No. 2483, 10/9/2009  
Vendor Source No.G4-975, TVA No. 2483, 10/9/2009  
Vendor Source No. 92421, TVA No. 2571, 12/7/2012  
Vendor Source No. 92421, TVA No. 2571, 12/7/2012  
Vendor Source No. 52736-185D2, TVA No. 2245, 5/19/2003 Instrument Calibration Records: Canberra GEM-5 Personnel Monitor, Serial No. 0909-179, 3/23/2012 and 3/18/2013 ARGOS-5AB Personnel Monitor, Instrument No. 860587, 5/11/2012 and 5/2/2013  
Vendor Source No. 52736-185D2, TVA No. 2245, 5/19/2003  
iSolo, Instrument No. 860494, 12/6/2012 and 10/11/13   
Instrument Calibration Records:  
9  Attachment Small Article Monitor (Cronos 11), Instrument No. 860653, 8/17/2012 and 7/16/2013 Small Article Monitor (SAM-11), Instrument No. 860325, 7/6/2012 and 11/17/2012 List of Active SQN Temporary Shielding Request Forms (TSRFs), 11/6/2013  
Canberra GEM-5 Personnel Monitor, Serial No. 0909-179, 3/23/2012 and 3/18/2013  
ARGOS-5AB Personnel Monitor, Instrument No. 860587, 5/11/2012 and 5/2/2013  
iSolo, Instrument No. 860494, 12/6/2012 and 10/11/13  
 
   
9  
   
Attachment  
Small Article Monitor (Cronos 11), Instrument No. 860653, 8/17/2012 and 7/16/2013  
Small Article Monitor (SAM-11), Instrument No. 860325, 7/6/2012 and 11/17/2012  
List of Active SQN Temporary Shielding Request Forms (TSRFs), 11/6/2013  
National Source Tracking System Annual Inventory Reconciliation Confirmation, 1/24/2013  
National Source Tracking System Annual Inventory Reconciliation Confirmation, 1/24/2013  
National Source Tracking System Inventory Report, Sequoyah Nuclear Plant, 1/24/2013  
National Source Tracking System Inventory Report, Sequoyah Nuclear Plant, 1/24/2013  
RWP Dose by Work Step Report for ALARA Plans 2013-010 to 2013-021 for the period  
RWP Dose by Work Step Report for ALARA Plans 2013-010 to 2013-021 for the period  
10/14/2013 thru 11/6/2013 RWP Total Dose, Hours and Dose Rate Report for the period 10/14/2013 thru 11/5/2013 RWP Work Step Dose and Dose Rate Alarm Setpoints for RWP 13140052, 11/5/2013  
10/14/2013 thru 11/6/2013  
 
RWP Total Dose, Hours and Dose Rate Report for the period 10/14/2013 thru 11/5/2013  
RWP Work Step Dose and Dose Rate Alarm Setpoints for RWP 13140052, 11/5/2013  
RWP 13120122, U1 Seal Table work  
RWP 13120122, U1 Seal Table work  
RWP 13140002, U1 Upper Containment High Rad Area Mechanical Maintenance  
RWP 13140002, U1 Upper Containment High Rad Area Mechanical Maintenance  
RWP 13140052, HRA U1 Refueling Activities for AREVA and Boilermakers RWP 13140072, U1 HRA MODS Work: Snubbers, Scaffold, Insulation, Painting RWP 13140172, U1 Rx Head Insulation  
RWP 13140052, HRA U1 Refueling Activities for AREVA and Boilermakers  
RWP 13140072, U1 HRA MODS Work: Snubbers, Scaffold, Insulation, Painting  
RWP 13140172, U1 Rx Head Insulation  
RWP 13140252, HRA U1 Upper Containment Rx Cavity  
RWP 13140252, HRA U1 Upper Containment Rx Cavity  
RWP 13140352, U1 HRA Head O-Ring Surface Work & Inspection (Multibadging)  
RWP 13140352, U1 HRA Head O-Ring Surface Work & Inspection (Multibadging)  
RWP 13140353, U1 Equipment Pit - LHRA Vortex Suppressors RWP 13140453, U1 Upper Containment, Rx Cavity, LHRA, CRDM duct work, (Multibadging) Radiological Survey SQN-M-20131014-23 and SQN-M-20131104-2, U1 Containment  
RWP 13140353, U1 Equipment Pit - LHRA Vortex Suppressors  
 
RWP 13140453, U1 Upper Containment, Rx Cavity, LHRA, CRDM duct work, (Multibadging)  
Radiological Survey SQN-M-20131014-23 and SQN-M-20131104-2, U1 Containment  
Equipment Pit  
Equipment Pit  
Radiological Survey SQN-M-20131021-3, SQN-M-20131014-6, SQN-M-20131014-15, and  
Radiological Survey SQN-M-20131021-3, SQN-M-20131014-6, SQN-M-20131014-15, and  
SQN-M-20131014-22, U1 Containment Accumulator Rooms #1, #2, #3, and #4   
SQN-M-20131014-22, U1 Containment Accumulator Rooms #1, #2, #3, and #4   
Radiological Survey SQN-M-20131014-32 and SQN-M-20131017-9, U1 Containment Top of Pressurizer Radiological Survey SQN-M-20130909-1 and SQN-M-20131014-8, U1 Containment Raceway  
Radiological Survey SQN-M-20131014-32 and SQN-M-20131017-9, U1 Containment Top of  
Pressurizer  
Radiological Survey SQN-M-20130909-1 and SQN-M-20131014-8, U1 Containment Raceway  
Radiological Survey SQN-M-20131014-14, SQN-M-20131014-7, and SQN-M-20131014-5, U1  
Radiological Survey SQN-M-20131014-14, SQN-M-20131014-7, and SQN-M-20131014-5, U1  
Containment Steam Generator Primary Platform #1, #2, and #3  
Containment Steam Generator Primary Platform #1, #2, and #3  
Radiological Survey SQN-M-20131014-17 and SQN-M-20131020-7, U1 Containment Inside  
Radiological Survey SQN-M-20131014-17 and SQN-M-20131020-7, U1 Containment Inside  
Polar Crane Wall Radiological Survey SQN-M-20131021-21, SQN-M-20131014-10, and SQN-M-20131014-18,  
Polar Crane Wall  
Radiological Survey SQN-M-20131021-21, SQN-M-20131014-10, and SQN-M-20131014-18,  
U1 Containment RCP Platform #1, #2, and #3   
U1 Containment RCP Platform #1, #2, and #3   
Radiological Survey SQN-M-20131020-16, SQN ISFSI Pad  
Radiological Survey SQN-M-20131020-16, SQN ISFSI Pad  
Radiological Survey SQN-M-20121212-8, U2 Letdown Heat Exchanger Room  
Radiological Survey SQN-M-20121212-8, U2 Letdown Heat Exchanger Room  
Radiological Survey SQN-M-20131014-26, U1 Letdown Heat Exchanger Room Radiological Survey SQN-M-20130502-11 and SQN-M-20131005-1, U1 651' Waste Evaporator Feed Pump Room  
Radiological Survey SQN-M-20131014-26, U1 Letdown Heat Exchanger Room  
Radiological Survey SQN-M-20130502-11 and SQN-M-20131005-1, U1 651' Waste Evaporator  
Feed Pump Room  
Radiological Survey SQN-M-20131018-1 and SQN-M-20131025-1, Radiochemistry Lab  
Radiological Survey SQN-M-20131018-1 and SQN-M-20131025-1, Radiochemistry Lab  
Radiological Survey SQN-M-20130617-3, SQN-M-20131007-1, and SQN-M-20131104-4, Equipment Decon Room Radiological Survey SQN-M-20130823-3, and SQN-M-20131016-24, Spent Fuel Heat  
Radiological Survey SQN-M-20130617-3, SQN-M-20131007-1, and SQN-M-20131104-4,  
Exchanger Room Radiological Survey SQN-M-20130920-5, SQN-M-20131020-4, and SQN-M-20131028-7, Spent  
Equipment Decon Room  
Fuel Pool Area Radiological Survey SQN-M-20131015-8, SQN-M-20131020-9, and SQN-M-20131024-7, 1A RHR Pump Room Radiological Survey SQN-M-20131015-11, SQN-M-20131022-8, and SQN-M-20131023-10, 1B RHR Pump Room Radiological Survey SQN-M-20131101-10, 2B RHR Pump Room
Radiological Survey SQN-M-20130823-3, and SQN-M-20131016-24, Spent Fuel Heat  
10  Attachment Radioactive Sealed Source Leak Test Certification, Source ID 0413-00-00, 7/23/09 and 1/25/10 Sequoyah Nuclear Plant Annual Radionuclide Trending and Assessment Report for 2011, 6/30/2012 Sequoyah Nuclear Plant Annual Radionuclide Trending and Assessment Report for 2012, 4/18/2013 U1R19 Radiation Protection Status Report, 11/5/2013
Exchanger Room  
Radiological Survey SQN-M-20130920-5, SQN-M-20131020-4, and SQN-M-20131028-7, Spent  
Fuel Pool Area  
Radiological Survey SQN-M-20131015-8, SQN-M-20131020-9, and SQN-M-20131024-7, 1A  
RHR Pump Room  
Radiological Survey SQN-M-20131015-11, SQN-M-20131022-8, and SQN-M-20131023-10, 1B  
RHR Pump Room  
Radiological Survey SQN-M-20131101-10, 2B RHR Pump Room  


U1R19 RCS Shutdown Co-58 Activity Graphs (Crud Burst Cleanup), 11/5/2013 U1R19 Crud Burst Cleanup Dose Rate Trending Graphs (1A and 1B RHR Pump and Heat Exchanger rooms, and 690' and 669' Pipe Chases near RHR Lines), 11/5/2013  Waste Stream Report (10 CFR Part 61 Waste Characterization), DAW 10-22-2010, 5/11/2011  
10
Attachment
Radioactive Sealed Source Leak Test Certification, Source ID 0413-00-00, 7/23/09 and 1/25/10
Sequoyah Nuclear Plant Annual Radionuclide Trending and Assessment Report for 2011,
6/30/2012
Sequoyah Nuclear Plant Annual Radionuclide Trending and Assessment Report for 2012,
4/18/2013
U1R19 Radiation Protection Status Report, 11/5/2013
U1R19 RCS Shutdown Co-58 Activity Graphs (Crud Burst Cleanup), 11/5/2013  
U1R19 Crud Burst Cleanup Dose Rate Trending Graphs (1A and 1B RHR Pump and Heat  
Exchanger rooms, and 690 and 669 Pipe Chases near RHR Lines), 11/5/2013   
Waste Stream Report (10 CFR Part 61 Waste Characterization), DAW 10-22-2010, 5/11/2011  
Waste Stream Report (10 CFR Part 61 Waste Characterization), DAW 3-22-2012, 11/4/2012  
Waste Stream Report (10 CFR Part 61 Waste Characterization), DAW 3-22-2012, 11/4/2012  
 
WO 114067330, 0-SI-RCI-000-056.0 Byproduct Material Inventory and Sealed Source Leak  
WO 114067330, 0-SI-RCI-000-056.0 Byproduct Material Inventory and Sealed Source Leak Test, 7/8/2013  
Test, 7/8/2013  
WO 114139751, 0-SI-RCI-000-056.0 Byproduct Material Inventory and Sealed Source Leak Test, 12/17/2012  
WO 114139751, 0-SI-RCI-000-056.0 Byproduct Material Inventory and Sealed Source Leak  
Test, 12/17/2012  
   
   
CAP Documents
CAP Documents  
Apparent Cause Evaluation PER Report, SQN PER 782859, 10/20/2013  Site Audit Report SSA1309, Radiation Protection Sequoyah Nuclear Plant, 9/16/2013  
Apparent Cause Evaluation PER Report, SQN PER 782859, 10/20/2013   
Site Audit Report SSA1309, Radiation Protection Sequoyah Nuclear Plant, 9/16/2013  
TVA Nuclear Power Group Benchmarking Report SQN-RP-I-13-BM09, 8/23/2013  
TVA Nuclear Power Group Benchmarking Report SQN-RP-I-13-BM09, 8/23/2013  
   
   
PERs  PER 626962 PER 629341 PER 657724  
PERs   
PER 626962  
PER 629341  
PER 657724  
PER 659369  
PER 659369  
PER 782859  
PER 782859  
PER 788604 PER 790597 PER 793236  
PER 788604  
PER 790597  
PER 793236  
PER 793935  
PER 793935  
PER 799256  
PER 799256  
PER 802329  
PER 802329  
   
   
Section 2RS8:  Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
Section 2RS8:  Radioactive Solid Waste Processing and Radioactive Material Handling,  
Procedures, Manuals, and Guides
Storage, and Transportation  
Energy Solutions Cask Book for Model 8-120B USA/9168/B(U)  
Procedures, Manuals, and Guides  
Energy Solutions Cask Book for Model 8-120B USA/9168/B(U)  
NPG-SPP-05.7, Radwaste Management, Rev. 0  
NPG-SPP-05.7, Radwaste Management, Rev. 0  
Process Control Program (PCP), Rev. 4  Radioactive Material Shipment Manual (RMSM, Vol.II -Radioactive Material Shipment, Rev. 42 Radioactive Material Shipment Manual (RMSM, Vol.III -Radwaste Shipment, Rev. 39 RCI-06, Receipt of Radioactive Materials, Rev. 19  
Process Control Program (PCP), Rev. 4   
Radioactive Material Shipment Manual (RMSM, Vol.II -Radioactive Material Shipment, Rev. 42  
Radioactive Material Shipment Manual (RMSM, Vol.III -Radwaste Shipment, Rev. 39  
RCI-06, Receipt of Radioactive Materials, Rev. 19  
RCI-21 Control of Radioactive Materials, Rev. 19  
RCI-21 Control of Radioactive Materials, Rev. 19  
RHSI-1, Packaging Dry Active Waste for Shipment to a Waste Processor/Broker or a Commercial Radwaste Burial Facility, Rev. 10 RHSI-1.1, Packaging Filters and Items of High Levels of Radiation, Rev. 6  
RHSI-1, Packaging Dry Active Waste for Shipment to a Waste Processor/Broker or a  
Commercial Radwaste Burial Facility, Rev. 10  
RHSI-1.1, Packaging Filters and Items of High Levels of Radiation, Rev. 6  


 
11  Attachment RHSI-6, Bead Resin Activated Carbon Dewatering Procedure for Energy Solutions 14-215 or  
11  
Smaller Liners, Rev. 8 RHSI-7, Utilization of Polyethylene High Integrity Containers (HICs) and HIC Overpacks, Rev. 9  
   
Attachment  
RHSI-6, Bead Resin Activated Carbon Dewatering Procedure for Energy Solutions 14-215 or  
Smaller Liners, Rev. 8  
RHSI-7, Utilization of Polyethylene High Integrity Containers (HICs) and HIC Overpacks, Rev. 9  
RHSI-11, Control of Radioactive Material and Training, Rev. 6  
RHSI-11, Control of Radioactive Material and Training, Rev. 6  
RHSI-13, Administration and Control of Onsite Storage of Low Level Radioactive Waste, Rev. 4  
RHSI-13, Administration and Control of Onsite Storage of Low Level Radioactive Waste, Rev. 4  
RWTP-100 Attachment A, Radwaste Training Program, Rev. 3  
RWTP-100 Attachment A, Radwaste Training Program, Rev. 3  
 
RWTP-100, Radioactive Material/Waste Shipments, Rev. 7  
RWTP-100, Radioactive Material/Waste Shipments, Rev. 7 RWTP-101, 10 CFR 61 Waste Characterization, Rev. 2  
RWTP-101, 10 CFR 61 Waste Characterization, Rev. 2  
RWTP-102, Use of Casks, Rev. 2  
RWTP-102, Use of Casks, Rev. 2  
0-SO-77-29, Waste Processing, Rev. 9  
0-SO-77-29, Waste Processing, Rev. 9  
0-VI-RCI-077-001.0, Operating Procedure for Duratek Modular Fluidized Transfer Demineralizer System (MFTDS), Rev. 2  
0-VI-RCI-077-001.0, Operating Procedure for Duratek Modular Fluidized Transfer Demineralizer  
  Shipping Records and Radwaste Data
System (MFTDS), Rev. 2  
Two Design Change Notices were reviewed and both have been accomplished.  The first  
   
Shipping Records and Radwaste Data  
Two Design Change Notices were reviewed and both have been accomplished.  The first  
moved Radwaste liquid processing from the railroad bay into the drumming room that was in  
moved Radwaste liquid processing from the railroad bay into the drumming room that was in  
effect at the start of the period which included back to November 2010 and the second established a lift system to be used for the steam generator replacement in 2012 with a closure date of 8/13/2013.  
effect at the start of the period which included back to November 2010 and the second  
 
established a lift system to be used for the steam generator replacement in 2012 with a closure  
date of 8/13/2013.  
   
   
The licensee provided several drawings delineating abandoned equipment.  The inspector  
The licensee provided several drawings delineating abandoned equipment.  The inspector  
chose the abandoned boric acid evaporator system to review.  
chose the abandoned boric acid evaporator system to review.  
 
Shipments:  
Shipments:  SNP-12-0111  (LQ)  SNP-13-0105 (SCO)  
  SNP-12-0111  (LQ)  
  SNP-13-0109 (Type B)   
  SNP-13-0105 (SCO)  
  SNP-13-0109 (Type B)  
   
  SNP-13-0307 (LSA)  
  SNP-13-0307 (LSA)  
  SNP-13-0504 (Type A)  
  SNP-13-0504 (Type A)  
  CAP Documents
   
Site Audit Report SSA1309, Radiation Protection, August 19 through August 30, 2013  
CAP Documents  
Snapshot Self-Assessment Report SQN-RP-S-13-004, Radioactive Solid Waste Processing and Radioactive Material Handling, Storage and Transportation, July 29 through August 9, 2013  
Site Audit Report SSA1309, Radiation Protection, August 19 through August 30, 2013  
 
Snapshot Self-Assessment Report SQN-RP-S-13-004, Radioactive Solid Waste Processing and  
PERs  412285  
Radioactive Material Handling, Storage and Transportation, July 29 through August 9, 2013  
PERs   
412285  
431332  
431332  
488136  
488136  
635127 735591 765281  
635127  
735591  
765281  
767526  
767526  
783784  
783784  
   
  12  Attachment Section 4OA1:  Performance Indicator Verification
Procedures, Manuals, and Guides
NSDP-29, Tracking and Trending and NRC Performance Indicators, Rev. 6  
 
NPG-SPP-02.2, "Performance Indicator Program", Rev. 5  
   
12  
   
Attachment  
Section 4OA1:  Performance Indicator Verification  
Procedures, Manuals, and Guides  
NSDP-29, Tracking and Trending and NRC Performance Indicators, Rev. 6  
NPG-SPP-02.2, Performance Indicator Program, Rev. 5  
RCI-151, Radiation Protection Functional Area Performance Indicators, Rev. 1  
RCI-151, Radiation Protection Functional Area Performance Indicators, Rev. 1  
   
   
PERs  621990 623246  
PERs   
621990  
623246  
626962  
626962  
653648  
653648  
655642 788604 793921  
655642  
788604  
793921  
794437  
794437  
  Section 4OA2:  Problem Identification and Resolution
   
Procedures
Section 4OA2:  Problem Identification and Resolution  
NPG-SPP-03.1, Corrective Action Program, Rev. 1  
Procedures  
 
NPG-SPP-03.1, Corrective Action Program, Rev. 1  
Section 4OA5:  Other Activities
0-GO-17, Spent Fuel/Dry Cask Operations, Rev. 5 NPG-SPP-01.2, Administration of Site Technical Procedures, Rev. 9 NFTP-100, Fuel Selection for Dry MPC Storage, Rev. 5 completed for campaign #6 10CFR 72.48 Screening/Evaluation:  EDC E22443C  
Section 4OA5:  Other Activities  
0-GO-17, Spent Fuel/Dry Cask Operations, Rev. 5  
NPG-SPP-01.2, Administration of Site Technical Procedures, Rev. 9  
NFTP-100, Fuel Selection for Dry MPC Storage, Rev. 5 completed for campaign #6  
10CFR 72.48 Screening/Evaluation:  EDC E22443C  
SQN-DCS-300.11, Supplemental Cooling System Operation, Rev. 9  
SQN-DCS-300.11, Supplemental Cooling System Operation, Rev. 9  
CTP-DCS-100.0, Dry Cask Storage Campaign Guidelines, Rev. 15  
CTP-DCS-100.0, Dry Cask Storage Campaign Guidelines, Rev. 15  
SQN-DCS-200.0, Dry Cask Campaign Review Program, Rev. 4 SQN-DCS-200.2, SQN-MPC-Loading and Transport Operations, Rev. 35
SQN-DCS-200.0, Dry Cask Campaign Review Program, Rev. 4  
Attachment LIST OF ACRONYMS
SQN-DCS-200.2, SQN-MPC-Loading and Transport Operations, Rev. 35  
 
   
   
ABGTS auxiliary building gas treatment system ALARA as low as reasonably achievable  
Attachment
ASME American Society of Mechanical Engineers  
LIST OF ACRONYMS
BACC boric acid corrosion control  
CAP corrective action program  
ABGTS  
CCP centrifugal charging pump CDE cause determination evaluation CFR Code of Federal Regulations  
auxiliary building gas treatment system  
CIV containment isolation valve  
ALARA  
DAW dry active waste  
as low as reasonably achievable  
DOT Department of Transportation ECCS emergency core cooling system ED electronic dosimeter  
ASME  
ERCW  essential raw cooling water   
American Society of Mechanical Engineers  
FCV  flow control valve  
BACC  
FME foreign material exclusion HRA high radiation areas IMC inspection manual chapter  
boric acid corrosion control  
IP inspection procedure  
CAP  
ISFSI independent spent fuel storage installation  
corrective action program  
ISI in-service inspection  
CCP  
MCC motor control center MPC multi-purpose canister NCV non-cited violation  
centrifugal charging pump  
NDE non-destructive examination  
CDE  
NEI Nuclear Energy Institute  
cause determination evaluation  
PER problem evaluation report PORV power operated relief valve Radwaste radioactive waste  
CFR  
RCA radiologically controlled area  
Code of Federal Regulations  
Rev revision  
CIV  
RHR residual heat removal  
containment isolation valve  
RS radiation safety RTP rated thermal power RWP radiation work permit  
DAW  
RWST refueling water storage tank  
dry active waste  
SDP significance determination process  
DOT  
SI safety injection SR service request SSC  structure, system, or component   
Department of Transportation  
TS technical specification  
ECCS  
TVA  Tennessee Valley Authority  
emergency core cooling system  
URI unresolved item  
ED  
UT ultrasonic testing UFSAR Updated Final Safety Analysis Report WO work order
electronic dosimeter  
ERCW   
essential raw cooling water   
FCV  
   
flow control valve  
FME  
foreign material exclusion  
HRA  
high radiation areas  
IMC  
inspection manual chapter  
IP  
inspection procedure  
ISFSI  
independent spent fuel storage installation  
ISI  
in-service inspection  
MCC  
motor control center  
MPC  
multi-purpose canister  
NCV  
non-cited violation  
NDE  
non-destructive examination  
NEI  
Nuclear Energy Institute  
PER  
problem evaluation report  
PORV  
power operated relief valve  
Radwaste  
radioactive waste  
RCA  
radiologically controlled area  
Rev  
revision  
RHR  
residual heat removal  
RS  
radiation safety  
RTP  
rated thermal power  
RWP  
radiation work permit  
RWST  
refueling water storage tank  
SDP  
significance determination process  
SI  
safety injection  
SR  
service request  
SSC   
structure, system, or component   
TS  
technical specification  
TVA   
Tennessee Valley Authority  
URI  
unresolved item  
UT  
ultrasonic testing  
UFSAR  
Updated Final Safety Analysis Report  
WO  
work order
}}
}}

Latest revision as of 23:21, 10 January 2025

IR 05000327-13-005, 05000328-13-005; 10/1/2013 - 12/31/2013; Sequoyah Nuclear Plant, Units 1 and 2; Other Activities
ML14038A346
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/07/2014
From: Bartley J
Reactor Projects Region 2 Branch 6
To: James Shea
Tennessee Valley Authority
References
IR-13-005
Download: ML14038A346 (44)


See also: IR 05000327/2013005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

February 7, 2014

Mr. Joseph W. Shea

Vice President, Nuclear Licensing

Tennessee Valley Authority

1101 Market Street, LP 3D-C

Chattanooga, TN 37402-2801

SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC INTEGRATED INSPECTION REPORT

05000327/2013005 AND 05000328/2013005

Dear Mr. Shea:

On December 31, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an

inspection at your Sequoyah Nuclear Plant, Units 1 and 2. On January 13, 2014, the NRC

inspectors discussed the results of this inspection with Mr. Carlin and other members of your

staff. Inspectors documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented one self-revealing finding of very low safety significance (Green) in

this report. This finding involved a violation of NRC requirements. The NRC is treating this

violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the NRC Enforcement

Policy.

If you contest the violation or significance of this NCV, you should provide a response within 30

days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555-0001; with

copies to the Regional Administrator, Region II; the Director, Office of Enforcement, U.S.

Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident

Inspector at the Sequoyah Nuclear Plant.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a

response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the Regional Administrator, Region II, and the NRC Resident Inspector at the

Sequoyah Nuclear Plant.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of

cross-cutting aspects were revised beginning in calendar year (CY) 2014. New cross-cutting

aspects identified in CY 2014 will be coded under the latest revision to Inspection Manual

Chapter (IMC) 0310. Cross-cutting aspects identified in the last six months of 2013 using the

previous terminology will be converted to the latest revision in accordance with the cross-

reference in IMC 0310. The revised cross-cutting aspects will be evaluated for cross-cutting

themes and potential substantive cross-cutting issues in accordance with IMC 0305 starting with

the CY 2014 mid-cycle assessment review.

J. Shea

2

In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections,

Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its

enclosure, and your response (if any) will be available electronically for public inspection in the

NRCs Public Document Room or from the Publicly Available Records (PARS) component of

NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Sincerely,

/RA/

Jonathan H. Bartley, Chief

Reactor Projects Branch 6

Division of Reactor Projects

Docket Nos.: 50-327, 50-328

License Nos.: DPR-77, DPR-79

Enclosure: Inspection Report 05000327/2013005, 05000328/2013005

w/Attachment: Supplementary Information

cc: via ListServ distribution

_________________________

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII:DRP

RII:DRP

RII:DRS

RII:DRS

RII:DRS

RII:DRS

RII:DRP

RII:DRP

SIGNATURE

JHB /RA for/

Via email

BRB /RA for/

ORL /RA for/

BRB /RA for/

BRB /RA for/

JDH /RA/

JHB /RA/

NAME

GSmith

WDeschaine

MSpeck

LLake

RHamilton

RKellner

JHamman

JBartley

DATE

02/07/2014

02/07/2014

02/07/2014

02/07/2014

02/07/2014

02/07/2014

02/07/2014

02/07/2014

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO

YES

NO

YES

NO

J. Shea

3

Letter to J.W. Shea from Jonathan H. Bartley dated February 7, 2014

SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC INTEGRATED INSPECTION REPORT

05000327/2013005 AND 05000328/2013005

Distribution w/encl:

C. Evans, RII

L. Douglas, RII

OE Mail

RIDSNRRDIRS

PUBLIC

RidsNrrPMSequoyah Resource

Enclosure

U. S. NUCLEAR REGULATORY COMMISSION

REGION II

Docket Nos.:

50-327, 50-328

License Nos.:

DPR-77, DPR-79

Report Nos.:

05000327/2013005, 05000328/2013005

Licensee:

Tennessee Valley Authority (TVA)

Facility:

Sequoyah Nuclear Plant, Units 1 and 2

Location:

Sequoyah Access Road

Soddy-Daisy, TN 37379

Dates:

October 1 - December 31, 2013

Inspectors:

G. Smith, Senior Resident Inspector

W. Deschaine, Resident Inspector

M. Speck, Senior Emergency Preparedness Inspector (Sections

1R04.1 and 1R05)

L. Lake, Senior Reactor Inspector (Section 1R08)

R. Hamilton, Senior Health Physicist (Section 2RS8)

R. Kellner, Health Physicist (Sections 2RS1, 4OA1)

Approved by:

Jonathan H. Bartley, Chief

Reactor Projects Branch 6

Division of Reactor Projects

Enclosure

SUMMARY

IR 05000327/2013-005, 05000328/2013-005; 10/1/2013 - 12/31/2013; Sequoyah Nuclear Plant,

Units 1 and 2; Other Activities

The report covered a three-month period of inspection by resident inspectors and announced

inspections by regional inspectors. One self-revealing finding was identified. The significance

of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual

Chapter (IMC) 0609, "Significance Determination Process," (SDP) dated June 2, 2011. Cross-

cutting aspects are determined using IMC 0310, Components Within the Cross-Cutting Areas,

dated October 28, 2011. The NRC's program for overseeing the safe operation of commercial

nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4,

dated December 2006.

A.

NRC-Identified and Self-Revealing Findings

Cornerstone: Mitigating Systems

Green: A self-revealing non-cited violation of 10 CFR 50 Appendix B, Criterion XVI,

Corrective Action, was identified for the licensees failure to promptly correct a

condition adverse to quality within a reasonable time. Timely corrective actions were not

taken to correct a dual position indication (open and closed lights both illuminated) on

the Unit 1 A train residual heat removal (RHR) containment sump suction flow control

valve (FCV) 1-FCV-63-72. This licensee entered this issue into the corrective action

program as problem evaluation report (PER) 772193 and performed repairs to the valve

to restore the system to operable status.

This finding was determined to be more than minor because it was associated with the

Design Control attribute of the Mitigating Systems cornerstone and adversely affected

the cornerstones objective to ensure the availability, reliability, and capability of systems

that respond to initiating events to prevent undesirable consequences (i.e., core

damage). Specifically, the finding reduced the reliability and capability of the A train

RHR system to perform its safety function as designed. The finding required a detailed

risk analysis as the A RHR system was inoperable beyond its allowed outage time of 72

hours. The detailed risk analysis concluded that the finding was of very low safety

significance (Green). This finding was determined to have a cross-cutting aspect

relating to the proper classification, prioritization, and evaluation of operability and

reportability of conditions adverse to quality in the Corrective Action component of the

Problem Identification and Resolution area. P.1(c) (Section 4OA5)

B.

Licensee-Identified Violations

None

Enclosure

REPORT DETAILS

Summary of Plant Status:

Unit 1 operated at or near 100 percent rated thermal power (RTP) until September 9, 2013,

when the unit entered a power coast down period until October 14 when the unit shut down for a

refueling outage. Unit 1 returned to 100 percent RTP on November 24 where it operated for the

remainder of the inspection period.

Unit 2 operated at or near 100 percent RTP for the entire inspection period.

1.

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

1R01 Adverse Weather Protection

a.

Inspection Scope

.1

Readiness for Seasonal Extreme Weather Conditions

The inspectors reviewed design features and licensee preparations for protecting the

essential raw cooling water (ERCW) intake structure and both Unit 1 and 2 refueling

water storage tanks (RWSTs) from extreme cold and freezing conditions. The

inspectors reviewed the Updated Final Safety Analysis Report (UFSAR) and Technical

Specifications (TS), reviewed implementation of licensee freeze protection procedures,

walked down portions of the systems to assess deficiencies and system readiness for

extreme cold weather, and discussed prioritization and status of correcting deficiencies

with licensee personnel. Documents reviewed are listed in the Attachment. The

inspectors completed one sample.

b.

Findings

No findings were identified.

1R04 Equipment Alignment

.1

Partial System Walkdown

a.

Inspection Scope

The inspectors performed partial walkdowns of the following three systems to verify the

operability of redundant or diverse trains and components when safety equipment was

inoperable. The inspectors focused on identification of discrepancies that could impact

the function of the system and, therefore, potentially increase risk. The inspectors

reviewed applicable operating procedures, walked down control system components,

and determined whether selected breakers, valves, and support equipment were in the

correct position to support system operation. The inspectors also verified that the

licensee had properly identified and resolved equipment alignment problems that could

4

Enclosure

cause initiating events or impact the capability of mitigating systems or barriers and

entered them into the corrective action program (CAP). Documents reviewed are listed

in the Attachment. The inspectors completed 3 samples.

Spent fuel pool cooling during core empty period of U1R19

1A emergency core cooling train while 1B 669 penetration cooler out-of-service

2A auxiliary feed-water and 2A emergency diesel generator while 2B under-voltage

coils out-of-service

.2

Complete System Walkdown

a.

Inspection Scope

The inspectors performed a complete system walkdown of the: 1) emergency gas

treatment system/auxiliary building gas treatment system (ABGTS); and 2) auxiliary

building ventilation/control building ventilation systems. The purpose of this inspection

was to verify proper equipment alignment, to identify any discrepancies that could impact

the function of the system and increase risk, and to verify that the licensee properly

identified and resolved equipment alignment problems that could cause events or impact

the functional capability of the system.

The inspectors reviewed the UFSAR, system procedures, system drawings, and system

design documents to determine the correct lineup and then examined system

components and their configuration to identify any discrepancies between the existing

system equipment lineup and the correct lineup. During the walkdown, the inspectors

reviewed the following:

Dampers were correctly positioned.

Electrical power was available as required.

Hangers and supports were correctly installed and functional.

Essential support systems were operational.

Ancillary equipment or debris did not interfere with system performance.

Breakers were correctly positioned.

Major system components were correctly labeled.

Cabinets, cable trays, and conduits were correctly installed and functional.

Visible cabling appeared to be in good material condition.

In addition, the inspectors reviewed corrective action items and design issues associated

with the systems to determine whether any condition described in those documents

could adversely impact current system operability. Documents reviewed are listed in the

Attachment. The inspectors completed two samples.

b.

Findings

No findings were identified.

5

Enclosure

1R05 Fire Protection

.1

Fire Protection Tours

a.

Inspection Scope

The inspectors conducted a tour of the six areas important to safety listed below to

assess the material condition and operational status of fire protection features. The

inspectors evaluated whether: combustibles and ignition sources were controlled in

accordance with the licensees administrative procedures; fire detection and suppression

equipment was available for use; passive fire barriers were maintained in good material

condition; and compensatory measures for out-of-service, degraded, or inoperable fire

protection equipment were implemented in accordance with the licensees fire plan.

Documents reviewed are listed in the Attachment. The inspectors completed six

samples.

Unit 1 Lower Containment Building

Unit 1 Upper Containment Building

Control Building Elevation 685 (Auxiliary Instrument Room)

Control Building Elevation 706 (Cable Spreading Room)

ERCW Building - Elevations 688/704/720

Turbine Building - Elevations 662/685

b.

Findings

No findings were identified.

1R06 Flood Protection Measures

.1

Internal Flooding

a.

Inspection Scope

The inspectors examined internal flood protection measures associated with the 1A and

1B safety injection (SI) pump rooms internal flood design in order to verify that flood

mitigation plans were consistent with the design requirements and risk analysis

assumptions. The inspectors verified that equipment essential for reactor shutdown was

properly protected from a flood caused by pipe breaks in the 1A & 1B SI pump room.

Specifically, the inspectors reviewed the licensees moderate energy line break flooding

study to fully understand the licensees flood mitigation strategy, reviewed licensee

drawings and then verified that the assumptions and results remained valid. The

inspectors walked down the 1A & 1B SI pump room to verify the assumed flooding

sources, adequacy of common area drainage, and flood detection instrumentation to

ensure that a flooding event would not impact reactor shutdown capabilities. The

inspectors completed one sample.

6

Enclosure

b.

Findings

No findings were identified.

1R08 Non-Destructive Examination Activities and Welding Activities

a.

Inspection Scope

From October 21-25, 2013, the inspectors conducted an on-site review of the

implementation of the licensees in-service inspection (ISI) Program for monitoring

degradation of the reactor coolant system; emergency feedwater systems, risk-

significant piping and components, and containment systems in Unit 1.

The inspectors activities included a review of non-destructive examinations (NDEs) to

evaluate compliance with the applicable edition of the American Society of Mechanical

Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, and to verify that

indications and defects were appropriately evaluated and dispositioned in accordance

with the requirements of the ASME Code,Section XI, acceptance standards or NRC

approved alternative requirement.

The inspectors directly observed or reviewed records of the following NDEs mandated

by the ASME Code to evaluate compliance with the ASME Code Section XI and Section

V requirements, and if any indications and defects were detected. Inspectors also

reviewed evaluations of results that were dispositioned in accordance with the ASME

Code or an NRC-approved alternative requirement.

Directly observed:

o Ultrasonic testing (UT) examinations of the reactor pressure vessel head to shell

flange studs

o General visual examination of the outside surface of the containment shell

Reviewed records:

o UT examinations of reactor coolant pump #4 bolting

o VT-3 visual examination of containment penetration bolting

o Work Order 113312025 modification of component cooling water system piping

The inspectors reviewed documentation for the repair/replacement of the following

pressure boundary welds. The inspectors evaluated if the licensee applied the pre-

service non-destructive examinations and acceptance criteria required by the

Construction Code. In addition, the inspectors reviewed the welding procedure

specifications, welder qualifications, welding material certifications, and supporting weld

procedure qualification records to evaluate if the weld procedures were qualified in

accordance with the requirements of the Construction Code and the ASME Code

Section XI.

7

Enclosure

PWR Vessel Upper Head Penetration (VUHP) Inspection Activities: For the Unit 1

vessel head, a bare metal visual examination and a volumetric examination required in

accordance with the requirements of ASME Code Case N-729-1 and 10 CFR

50.55a(g)(6)(ii)(D) were conducted in the previous outage and therefore not required to

be performed this outage.

Boric Acid Corrosion Control (BACC) Inspection Activities: The inspectors reviewed the

licensees BACC program activities to ensure implementation with commitments made in

response to NRC Generic Letter 88-05, Boric Acid Corrosion of Carbon Steel Reactor

Pressure Boundary, and applicable industry guidance documents. Specifically, the

inspectors performed an on-site record review of procedures and the results of the

licensees containment walkdown inspections performed during the current refueling

outage. The inspectors also reviewed Focused Self-Assessment CRP-ENG-F-13-031 of

the Boric Acid Program.

The inspectors also interviewed the BACC program owner, conducted an independent

walkdown of containment to evaluate compliance with licensees BACC program

requirements, and verified that degraded or non-conforming conditions, such as boric

acid leaks, were properly identified and corrected in accordance with the licensees

BACC and corrective action programs.

The inspectors reviewed the following evaluations and corrective actions related to

evidence of boric acid leakage to evaluate if the corrective actions completed were

consistent with the requirements of the ASME Code Section XI and 10 CFR Part 50,

Appendix B, Criterion XVI.

Problem Event Report (PER) 618770 - Boron buildup on 1B-B SI pump pedestal

PER 691545 - Boric acid build up and wet boric acid are present on transmitter

sensing line 1-FT-72-41

Steam Generator (SG) Tube Inspection Activities:

There were no SG tube eddy current examinations conducted during this outage. The

inspectors reviewed the following documentation and evaluated them against the

licensees TS, commitments made to the NRC, ASME Section XI, and Nuclear Energy

Institute (NEI) 97-06, Steam Generator Program Guidelines, to ensure that the licensee

was in compliance with the schedule to skip the SG eddy current testing inspections for

the 1R19 outage:

AREVA document # 51-9178898-001, Sequoyah Unit Condition Monitoring for Cycle

18 and Operational Assessment for Cycles 19, 20 and 21

Identification and Resolution of Problems:

The inspectors performed a review of selected ISI-related problems that were identified

by the licensee and entered into the corrective action program as PERs. The inspectors

reviewed the PERs to confirm the licensee had appropriately described the scope of the

problem and had initiated corrective actions. The review also included the licensees

8

Enclosure

consideration and assessment of operating experience events applicable to the plant.

The inspectors performed this review to ensure compliance with 10 CFR Part 50,

Appendix B, Criterion XVI, Corrective Action, requirements. Documents reviewed are

listed in the Attachment.

b.

Findings

No findings were identified.

1R11 Licensed Operator Requalification Program

.1

Quarterly Review of Licensed Operator Requalification

a.

Inspection Scope

The inspectors performed one licensed operator requalification program review. The

inspectors observed a simulator session on October 9, 2013. The training scenario

involved Just-In-Time Training for Pre-Refueling Outage risk significant activities such as

placing the RHR system in service. The inspectors observed crew performance in terms

of communications; ability to take timely and proper actions; prioritizing, interpreting, and

verifying alarms; correct use and implementation of procedures, including the alarm

response procedures; timely control board operation and manipulation, including high

risk operator actions; oversight and direction provided by shift manager, including the

ability to identify and implement appropriate TS action; and, group dynamics involved in

crew performance. The inspectors also observed the evaluators critique and reviewed

simulator fidelity to verify that it matched actual plant response. Documents reviewed

are listed in the Attachment. The inspectors completed one sample.

b.

Findings

No findings were identified.

.2

Quarterly Review of Licensed Operator Performance

a.

Inspection Scope

The inspectors observed and assessed licensed operator performance in the main

control room during periods of heightened activity or risk. The inspectors reviewed

various licensee policies and procedures such as OPDP-1, Conduct of Operations,

NPG-SPP-10.0, Plant Operations, and 0-GO-5, Normal Power Operation. The

inspectors utilized activities such as post-maintenance testing, surveillance testing,

unplanned transients, infrequent plant evolutions, plant startups and shutdowns, reactor

power and turbine load changes, and refueling and other outage activities to focus on

the following conduct of operations as appropriate:

operator compliance and use of procedures

control board manipulations

communication between crew members

9

Enclosure

use and interpretation of plant instruments, indications, and alarms

use of human error prevention techniques

documentation of activities, including initials and sign-offs in procedures

supervision of activities, including risk and reactivity management

pre-job briefs

Specifically, the inspectors observed licensed operator performance during the following

activities:

Unit 1 reactor shutdown and plant cool down/depressurization

Unit 1 refueling and other outage activities

Unit 1 startup, including Mode changes

Unit 2 down power with turbine in manual for valve testing

Documents reviewed are listed in the Attachment. The inspectors completed one

sample.

b.

Findings

No findings were identified.

.3

Annual Review of Licensee Requalification Examination Results

a.

Inspection Scope

On September 13, 2013, the licensee completed the annual requalification operating

examinations required to be administered to all licensed operators in accordance with 10

CFR 55.59(a)(2), Requalification requirements, of the NRCs Operators Licenses.

The inspectors performed an in-office review of the overall pass/fail results of the

individual operating examinations and the crew simulator operating examinations in

accordance with Inspection Procedure (IP) 71111.11, Licensed Operator Requalification

Program and Licensed Operator Performance. The results were compared to the

thresholds established in Section 3.02, Requalification Examination Results, of IP

71111.11.

b.

Findings

No findings were identified.

1R12 Maintenance Effectiveness

a.

Inspection Scope

The inspectors reviewed five maintenance activities, issues, and/or systems listed below

to verify the effectiveness of the licensees activities in terms of: appropriate work

practices; identifying and addressing common cause failures; scoping in accordance

with 10 CFR 50.65(b); characterizing reliability issues for performance; trending key

10

Enclosure

parameters for condition monitoring; charging unavailability for performance;

classification in accordance with 10 CFR 50.65(a)(1) or (a)(2); appropriateness of

performance criteria for structures, systems, or components (SSCs) and functions

classified as (a)(2); and appropriateness of goals and corrective actions for SSCs and

functions classified as (a)(1). Documents reviewed are listed in the Attachment. The

inspectors completed 5 samples.

MR 11th Periodic Assessment Report (PE sample)

Cause Determination and Evaluation (CDE) #2700, FCV-63-72 Failure

CDE #2696, EBGTS B Fan Failure

CDE #2686, A Shutdown Boardroom Chiller Failure

CDE #2674, B Main Condenser Test Connection Failure

b.

Findings

No findings were identified.

1R13 Maintenance Risk Assessments and Emergent Work Control

a.

Inspection Scope

The inspectors reviewed the following activities to determine whether appropriate risk

assessments were performed prior to removing equipment from service for

maintenance. The inspectors evaluated whether risk assessments were performed as

required by 10 CFR 50.65(a)(4), and were accurate and complete. When emergent

work was performed, the inspectors reviewed whether plant risk was promptly

reassessed and managed. The inspectors also assessed whether the licensees risk

assessment tool use and risk categories were in accordance with Standard Programs

and Processes Procedure NPG-SPP-07.1, On-Line Work Management, Revision 3,

and Instruction 0-TI-DSM-000-007.1, Risk Assessment Guidelines, Revision 9.

Documents reviewed are listed in the Attachment. The inspectors completed 2 samples.

Review U1R19 Outage Schedule

Review of risk during ABGTS outage

b.

Findings

No findings were identified.

1R15 Operability Determinations and Functionality Assessments

a.

Inspection Scope

For the eight operability evaluations described in the PERs listed below, the inspectors

evaluated the technical adequacy of the evaluations to ensure that TS operability was

properly justified and the subject component or system remained available, such that no

unrecognized increase in risk occurred. The inspectors compared the operability

11

Enclosure

evaluations to UFSAR descriptions to determine if the system or components intended

function(s) were adversely impacted. In addition, the inspectors reviewed compensatory

measures implemented to determine whether the compensatory measures worked as

stated and the measures were adequately controlled. The inspectors also reviewed a

sampling of PERs to assess whether the licensee was identifying and correcting any

deficiencies associated with operability evaluations. Documents reviewed are listed in

the Attachment. The inspectors completed 8 samples.

PER 789552 - Unit 2 Turbine Controls in Manual

PER 795451 - POE WO 113223153 T1 motor lead pinch

PER 799097 - POE TS LCO 3.7.4 action for FCV-67-146

PER 800432 - POE (ABSCE boundary issue)

PER 795433 - PDO (During U1R19 water found leaking out of conduit in bioshield

wall)

PER 801415 - PDO EDG 1B 2 sec load sequence

PER 803833 - PDO U-1 Rx Head Vent Valve Stroke

PERs 816731, 815638, 817841 - FEs associated with the Unit 1 loose parts alarm

b.

Findings

No findings were identified.

1R18 Plant Modifications

.1

Permanent Modifications

a.

Inspection Scope

The inspectors reviewed the modification listed below and the associated 10 CFR 50.59

screening, and compared it against the UFSAR and TS to verify whether the

modification affected operability or availability of the affected system.

DCN 22643 - Replace Pressurizer Power Operated Relief Valves (PORVs)

Following installation and testing, the inspectors observed indications affected by the

modification, discussed them with operators, and verified that the modification was

installed properly and its operation did not adversely affect safety system functions. The

inspectors did note that, ultimately, the installed PORVs did not meet the acceptance

criteria associated with the close stroke time. As a result, the licensee chose to cut

out/remove the new style PORVs and reinstall the original PORVs prior to plant startup

in November 2013. Documents reviewed are listed in the Attachment. The inspectors

completed one sample.

b.

Findings

No findings were identified.

12

Enclosure

1R19 Post Maintenance Testing

a.

Inspection Scope

The inspectors reviewed the post maintenance tests associated with the nine work

orders (WO) listed below to assess whether procedures and test activities ensured

system operability and functional capability. The inspectors reviewed the licensees test

procedure to evaluate whether: the procedure adequately tested the safety function(s)

that may have been affected by the maintenance activity; the acceptance criteria in the

procedure were consistent with information in the applicable licensing basis and/or

design basis documents; and the procedure had been properly reviewed and approved.

The inspectors also witnessed the test or reviewed the test data to determine whether

test results adequately demonstrated restoration of the affected safety function(s).

Documents reviewed are listed in the Attachment. The inspectors completed nine

samples.

WO 113377829 - Repack Valve (1-LCV-3-175) and perform AIRCET test

WO 112096045 - Repair isolation check valve (1-VLV-026-1296)

WO 111234712 - 5 year PM to swap 480V Shutdown board breaker with a

refurbished breaker

WO 113806636 - Perform 0-MI-EPM-317-102.0 on CCS pump C-S and

clean/replace motor air filter

WO 114560807 - Centrifugal charging pump (CCP) room cooler fan motor current

check, bearing lubrication and cleaning

WO 114198329 - EQ maintenance and inspection

WO 113408190 - Change out electrolytic capacitors in the Woodward 2301A

governor card

WOs 114306842, 114306841, 114325805, 114325799 - Aux Feedwater valves -

836 & 837

WO 113756597 - PORVs - PCV-68-340 & PCV-68-334

b.

Findings

No findings were identified.

1R20 Refueling and Other Outage Activities

.1

Unit 1 Refueling Outage Cycle 19

a.

Inspection Scope

For the Unit 1 refueling outage that began on October 14, 2013, the inspectors

evaluated licensee activities to verify that the licensee considered risk in developing

outage schedules, followed risk reduction methods developed to control plant

configuration, developed mitigation strategies for the loss of key safety functions, and

adhered to operating license and TS requirements that ensure defense-in-depth. The

inspectors also walked down portions of Unit 1 not normally accessible during at-power

13

Enclosure

operations to verify that safety-related and risk-significant SSCs were maintained in an

operable condition. Specifically, between October 14 and November 21, the inspectors

performed inspections and reviews of the following outage activities. Documents

reviewed are listed in the Attachment. The inspectors completed one sample.

Outage Plan. The inspectors reviewed the outage safety plan and contingency plans

to confirm that the licensee had appropriately considered risk, industry experience,

and previous site-specific problems in developing and implementing a plan that

assured maintenance of defense-in-depth.

Reactor Shutdown. The inspectors observed the shutdown in the control room from

the time the reactor was tripped until operators placed it on the RHR system for

decay heat removal to verify that TS cool down restrictions were followed. The

inspectors also toured the lower containment as soon as practicable after reactor

shutdown to observe the general condition of the reactor coolant system (RCS) and

emergency core cooling system components and to look for indications of previously

unidentified leakage inside the polar crane wall.

Licensee Control of Outage Activities. On a daily basis, the inspectors attended the

licensee outage turnover meeting, reviewed PERs, and reviewed the defense-in-

depth status sheets to verify that status control was commensurate with the outage

safety plan and in compliance with the applicable TS when taking equipment out of

service. The inspectors further toured the main control room and areas of the plant

daily to ensure that the following key safety functions were maintained in accordance

with the outage safety plan and TS: electrical power, decay heat removal, spent fuel

cooling, inventory control, reactivity control, and containment closure. The

inspectors also observed a tag-out of the B Train CCP system to verify that the

equipment was appropriately configured to safely support the work and testing. To

ensure that RCS level instrumentation was properly installed and configured to give

accurate information, the inspectors reviewed the installation of the Mansell level

monitoring system. Specifically, the inspectors discussed the system with

engineering, walked it down to verify that it was installed in accordance with

procedures and adequately protected from inadvertent damage, verified that Mansell

indication properly overlapped with pressurizer level instruments during pressurizer

drain-down, verified that operators properly set level alarms to procedurally required

set-points, and verified that the system consistently tracked RCS level while lowering

to reduced inventory conditions. The inspectors also observed operators compare

the Mansell indications with locally-installed ultrasonic level indicators during entry

into reduced inventory conditions.

14

Enclosure

Refueling Activities. The inspectors observed fuel movement at the spent fuel pool

and at the refueling cavity in order to verify compliance with TS and that each

assembly was properly tracked from core offload to core reload. In order to verify

proper licensee control of foreign material, the inspectors verified that personnel

were properly checked before entering any foreign material exclusion (FME) areas,

reviewed FME procedures, and verified that the licensee followed the procedures.

To ensure that fuel assemblies were loaded in the core locations specified by the

design, the inspectors independently reviewed the recording of the licensees final

core verification.

Reduced Inventory and Mid-Loop Conditions. Prior to the outage, the inspectors

reviewed the licensees commitments to Generic Letter 88-17. Before entering

reduced inventory conditions the inspectors verified that these commitments were in

place, that plant configuration was in accordance with those commitments, and that

distractions from unexpected conditions or emergent work did not affect operator

ability to maintain the required reactor vessel level. Mid-loop conditions were not

entered during this outage since SG eddy current testing was not required.

Heat-up and Start-up Activities. The inspectors toured the containment prior to

reactor startup to verify that debris that could affect the performance of the

containment sump had not been left in the containment. The inspectors reviewed

the licensees mode-change checklists to verify that appropriate prerequisites were

met prior to changing TS modes. To verify RCS integrity and containment integrity,

the inspectors further reviewed the licensees RCS leakage calculations and

containment isolation valve lineups. In order to verify that core operating limit

parameters were consistent with core design, the inspectors also examined portions

of the low power physics testing surveillance.

b.

Findings

No findings were identified.

1R22 Surveillance Testing

a.

Inspection Scope

For the twelve surveillance tests identified below, the inspectors assessed whether the

SSCs involved in these tests satisfied the requirements described in the TS surveillance

requirements, the UFSAR, applicable licensee procedures, and whether the tests

demonstrated that the SSCs were capable of performing their intended safety functions.

This was accomplished by witnessing testing and/or reviewing the test data. Documents

reviewed are listed in the Attachment. The inspectors completed twelve samples.

15

Enclosure

In-Service Tests:

1-SI-SXP-003-202.B, Motor Driven Auxiliary Feedwater Pump 1B-B Comprehensive

Performance Test, Revision 7

1-SI-SXP-074-202.0, RHR Pump 1A-A and 1B-B Comprehensive Performance and

Check Valve Test, Revision 10

RCS leakage test:

0-SI-OPS-068-137.0, Reactor Coolant System Water Inventory, Revision 32

Routine Surveillance Tests:

1-SI-OPS-088-001.0, Phase A Isolation Test, Revision 14

1-SI-OPS-082-026A, Loss of Offsite Power with Safety Injection D/G 1A-A Test,

Revision 46

0-SI-SFT-072-138.0, Unit 1 Containment Spray - Spray Nozzle Test, Revision 6

0-SI-SXV-063-203.2, Full Stroking of Safety Injection Cold Leg Accumulator Isolation

Valves, Revision 1

Ice Condenser Surveillance Test:

0-SI-MIN-061-105.0, Ice Condenser Ice Weighing, Revision 11

Containment Isolation Valve (CIV) Surveillance Tests:

0-SI-SLT-067-258.2, Containment Isolation Valve Local Leak Rate Test Lower

Compartment Essential Raw Cooling Water, Revision 13

0-SI-SLT-088-259.4, Upper Personnel Airlock Interlock Operability Test, Revision 2

0-SI-SLT-088-259.1, Upper Personnel Airlock Overall Leak Rate Test and General

Inspection, Revision 6

0-SI-SLT-081-258.1, Containment Isolation Valve Local Leak Rate Test Primary

Water System, Revision 5

b.

Findings

No findings were identified.

Cornerstone: Emergency Preparedness

1EP2 Alert and Notification System Evaluation

a.

Inspection Scope

The inspectors evaluated the adequacy of the licensees methods for testing and

maintaining the alert and notification system in accordance with NRC Inspection

Procedure 71114, Attachment 02, Alert and Notification System Evaluation. The

16

Enclosure

applicable planning standard, 10 CFR Part 50.47(b)(5) and its related 10 CFR Part 50,

Appendix E,Section IV.D requirements were used as reference criteria. The criteria

contained in NUREG-0654, Criteria for Preparation and Evaluation of Radiological

Emergency Response Plans and Preparedness in Support of Nuclear Power Plants,

Revision 1, were also used as a reference.

The inspectors reviewed various documents which are listed in the Attachment,

interviewed personnel responsible for system performance, and observed aspects of

periodic siren maintenance and testing. This inspection activity satisfied one inspection

sample for the alert and notification system on a biennial basis.

b.

Findings

No findings were identified.

1EP3 Emergency Response Organization Staffing and Augmentation System

a.

Inspection Scope

The inspectors reviewed the licensees Emergency Response Organization (ERO)

augmentation staffing requirements and process for notifying the ERO to ensure the

readiness of key staff for responding to an event and timely facility activation. The

qualification records of key position ERO personnel were reviewed to ensure all ERO

qualifications were current. A sample of problems identified from augmentation drills or

system tests performed since the last inspection was reviewed to assess the

effectiveness of corrective actions.

The inspection was conducted in accordance with NRC Inspection Procedure 71114,

Attachment 03, Emergency Response Organization Staffing and Augmentation System.

The applicable planning standard, 10 CFR 50.47(b)(2), and its related 10 CFR 50,

Appendix E requirements were used as reference criteria.

The inspectors reviewed various documents which are listed in the Attachment. This

inspection activity satisfied one inspection sample for the ERO staffing and

augmentation system on a biennial basis.

b.

Findings

No findings were identified.

1EP4 Emergency Action Level and Emergency Plan Changes

a.

Inspection Scope

The NRC Office of Nuclear Security and Incident Response headquarters staff

performed an in-office review of the latest revisions of various Emergency Plan

Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS

17

Enclosure

Accession numbers ML12326A678, ML12353A050, ML13025A102, ML13070A025,

ML13219A022, and ML13246A091.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in

the revisions resulted in no reduction in the effectiveness of the Plan, and that the

revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to

10 CFR Part 50. The NRC review was not documented in a safety evaluation report and

did not constitute approval of licensee-generated changes; therefore, these revisions are

subject to future inspection. Documents reviewed are listed in the Attachment. The

inspectors completed one sample.

b.

Findings

No findings were identified.

1EP5 Maintenance of Emergency Preparedness

a. Inspection Scope

The inspectors reviewed the corrective actions identified through the Emergency

Preparedness program to determine the significance of the issues, the completeness

and effectiveness of corrective actions, and to determine if issues were recurring. The

licensees post-event after action reports, self-assessments, and audits were reviewed to

assess the licensees ability to be self-critical, thus avoiding complacency and

degradation of their emergency preparedness program. Inspectors reviewed the

licensees 10 CFR 50.54(q) change process, personnel training, and selected

screenings and evaluations to assess adequacy. The inspectors toured facilities and

reviewed equipment and facility maintenance records to assess licensees adequacy in

maintaining them. The inspectors evaluated the capabilities of selected radiation

monitoring instrumentation to adequately support Emergency Action Level (EAL)

declarations.

The inspection was conducted in accordance with NRC Inspection Procedure 71114.05,

Maintenance of Emergency Preparedness. The applicable planning standards, related

10 CFR 50, Appendix E requirements, and 10 CFR 50.54(q) and (t) were used as

reference criteria.

The inspectors reviewed various documents which are listed in the Attachment. This

inspection activity satisfied one inspection sample for the maintenance of emergency

preparedness on a biennial basis.

b.

Findings

No findings were identified.

18

Enclosure

2.

RADIATION SAFETY (RS)

Cornerstones: Occupational Radiation Safety (OS) and Public Radiation Safety (PS)

2RS1 Radiological Hazard Assessment and Exposure Controls

a.

Inspection Scope

Hazard Assessment and Instructions to Workers: During facility tours, the inspectors

directly observed labeling of radioactive material and postings for radiation areas, high

radiation areas (HRAs), and airborne radioactivity areas established within the

radiologically controlled area (RCA) of the Unit 1 containment, Unit 1 and Unit 2 auxiliary

buildings, Independent Spent Fuel Storage Installation (ISFSI), and radioactive waste

(radwaste) processing and storage locations. The inspectors independently measured

radiation dose rates or directly observed conduct of licensee radiation surveys for RCA

areas in the Unit 1 containment, Unit 1 and Unit 2 Auxiliary buildings, and ISFSI. The

inspectors reviewed survey records for several plant areas including surveys for alpha

emitters, airborne radioactivity, and pre-job surveys for selected Unit 1 Refueling Outage

19 (U1R19) tasks. The inspectors also discussed changes to plant operations that could

contribute to changing radiological conditions since the last inspection and reviewed

U1R19 crud burst results and post crud burst dose rate surveys. For selected U1R19

outage jobs, the inspectors attended, or reviewed, pre-job briefings and radiation work

permit (RWP) details to assess communication of radiological control requirements and

current radiological conditions to workers. Selected U1R19 work activities included Unit

1 control rod drive mechanism duct work, Unit 1 Refueling Activities, Unit 1 Head O-ring

Surface Work & Inspection, and work in the Unit 1 Equipment Pit and transfer canal.

Hazard Control and Work Practices: The inspectors evaluated access barrier

effectiveness for selected Unit 1 and Unit 2 Locked High Radiation Area (LHRA) and

Very High Radiation Area (VHRA) locations. Changes to procedural guidance for LHRA

and VHRA controls were discussed with health physics (HP) supervisors. Controls and

their implementation for storage of irradiated material within the spent fuel pool (SFP)

were reviewed and discussed in detail. Established radiological controls (including

airborne controls) were evaluated for selected U1R19 tasks including refueling and

reactor cavity work activities, work in auxiliary building HRAs, and radwaste processing

and storage. In addition, licensee controls for areas where dose rates could change

significantly as a result of plant shutdown and refueling operations were reviewed and

discussed.

Occupational workers adherence to selected RWPs and HP technician (HPT)

proficiency in providing job coverage were evaluated through direct observations and

interviews with licensee staff. Electronic dosimeter (ED) alarm set points and worker

stay times were evaluated against area radiation survey results for refueling and reactor

cavity work. ED alarm logs were reviewed and worker response to dose and dose rate

alarms during selected work activities was evaluated. For HRA tasks involving

significant dose rate gradients, e.g. reactor head O-ring work, the inspectors evaluated

the use and placement of whole body and extremity dosimetry to monitor worker

exposure.

19

Enclosure

Control of Radioactive Material: The inspectors observed surveys of material and

personnel being released from the RCA using small article monitor, personnel

contamination monitor, and portal monitor instruments. The inspectors reviewed the last

two calibration records for selected release point survey instruments and discussed

equipment sensitivity, alarm set points, and release program guidance with licensee

staff. The inspectors compared recent 10 CFR Part 61 results for the Dry Active Waste

(DAW) radioactive waste stream with radionuclides used in calibration sources to

evaluate the appropriateness and accuracy of release survey instrumentation. The

inspectors also reviewed records of leak tests on selected sealed sources and discussed

nationally tracked source transactions with licensee staff.

Problem Identification and Resolution: PERs associated with radiological hazard

assessment and control were reviewed and assessed. The inspectors evaluated the

licensees ability to identify and resolve the issues in accordance with procedure NPG-

SPP-22.300, Corrective Action Program, Rev. 0. The inspectors also evaluated the

scope of the licensees internal audit program and reviewed recent assessment results.

Radiation protection activities were evaluated against the requirements of UFSAR

Section 12; TS Sections 6.8 and 6.12; 10 CFR Parts 19 and 20; and approved licensee

procedures. Licensee programs for monitoring materials and personnel released from

the RCA were evaluated against 10 CFR Part 20 and IE Circular 81-07, Control of

Radioactively Contaminated Material. Documents reviewed are listed in the

Attachment. The inspectors completed one sample.

b.

Findings

No findings were identified.

2RS8 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and

Transportation

a.

Inspection Scope

Waste Processing and Characterization: During inspector walkdowns, accessible

sections of the liquid and solid radwaste processing systems were assessed for material

condition and conformance with system design diagrams. Inspected equipment included

radwaste storage tanks; resin transfer piping, resin, and filter packaging components;

and abandoned boric acid evaporator equipment. The inspectors discussed component

function, processing system changes, and radwaste program implementation with

licensee staff.

The radionuclide characterizations for 2010, and 2012, for selected waste streams were

reviewed and discussed with Radwaste/Transportation staff. For primary resin, reactor

coolant system filters, and DAW, the inspectors evaluated analyses for hard-to-detect

nuclides, reviewed the use of scaling factors, and examined quality assurance

comparison results between licensee waste stream characterizations and outside

laboratory data. Waste stream mixing and concentration averaging methodology for

resins and filters was evaluated and discussed with Radwaste/Transportation staff. The

20

Enclosure

inspectors also reviewed the licensees procedural guidance for monitoring changes in

waste stream isotopic mixtures. The 10 CFR 61 analysis results were also discussed

with Chemistry personnel.

Radioactive Material Storage: During walkdowns of indoor and outdoor radioactive

material storage areas, the inspectors observed the physical condition and labeling of

storage containers and the posting of Radioactive Material Areas. The inspectors also

reviewed licensee procedural guidance for storage and monitoring of radioactive

material.

Transportation: The inspectors observed a shipment of vendor equipment during the

week of inspection. The inspectors reviewed shipping procedure requirements and

discussed preparation of shipping documents, package marking and labeling, and

interviewed shipping technicians regarding Department of Transportation (DOT)

regulations.

Selected shipping records were reviewed for consistency with licensee procedures and

compliance with NRC and DOT regulations. The inspectors reviewed emergency

response information, DOT shipping package classification, waste classification,

radiation survey results, and evaluated whether receiving licensees were authorized to

accept the packages. Licensee procedures for handling shipping containers were

compared to Certificate of Compliance requirements and manufacturer

recommendations. In addition, training records for selected individuals currently

qualified to ship radioactive material were reviewed.

Radwaste processing activities and equipment configuration were reviewed for

compliance with the licensees Process Control Program and UFSAR, Chapter 11.

Waste stream characterization analyses were reviewed against regulations detailed in

10 CFR Part 20, 10 CFR Part 61, and guidance provided in the Branch Technical

Position on Waste Classification (1983). Radioactive material and waste storage

activities were reviewed against the requirements of 10 CFR Part 20. Transportation

program implementation was reviewed against regulations detailed in 10 CFR Part 20,

10 CFR Part 71, 49 CFR Parts 172-178, as well as the guidance provided in NUREG-

1608. Training activities were assessed against 49 CFR Part 172, Subpart H.

Problem Identification and Resolution: The inspectors reviewed PERs in the area of

radwaste processing and transportation. The inspectors evaluated the licensees ability

to identify and resolve the issues in accordance with procedure NPG-SPP-22.300,. The

inspectors also evaluated the scope of the licensees internal audit program and

reviewed recent assessment results. Documents reviewed are listed in the Attachment.

The inspectors completed one sample.

b.

Findings

No findings were identified.

21

Enclosure

4.

OTHER ACTIVITIES

4OA1 Performance Indicator (PI) Verification

a.

Inspection Scope

Occupational Radiation Safety Cornerstone: The inspectors reviewed the Occupational

Exposure Control Effectiveness PI results for the Occupational Radiation Safety

Cornerstone from October 2012 through October 2013. For the assessment period, the

inspectors reviewed ED alarm logs and selected PERs related to controls for exposure

significant areas. The inspectors also reviewed licensee procedural guidance for

collecting and documenting PI data. Documents reviewed are listed in the Attachment.

The inspectors completed one sample.

Emergency Preparedness Cornerstone:

Drill/Exercise Performance (DEP)

Emergency Response Organization Drill Participation (ERO)

Alert and Notification System Reliability (ANS)

For the specified review period, the inspectors examined data reported to the NRC,

procedural guidance for reporting PI information, and records used by the licensee to

identify potential PI occurrences. The inspectors verified the accuracy of the PI for ERO

drill and exercise performance through review of a sample of drill and event records.

The inspectors reviewed selected training records to verify the accuracy of the PI for

ERO drill participation for personnel assigned to key positions in the ERO. The

inspectors verified the accuracy of the PI for alert and notification system reliability

through review of a sample of the licensees records of periodic system tests. The

inspectors also interviewed the licensee personnel who were responsible for collecting

and evaluating the PI data. Documents reviewed are listed in the Attachment. This

inspection satisfied three inspection samples for PI verification on an annual basis.

b.

Findings

No findings were identified.

4OA2 Problem Identification and Resolution

.1

Routine Review

a.

Inspection Scope

As required by IP 71152, Problem Identification and Resolution, and in order to help

identify repetitive equipment failures or specific human performance issues for follow-up,

the inspectors performed a daily screening of items entered into the licensees CAP.

This was accomplished by reviewing the description of each new PER and attending

daily management review committee meetings.

22

Enclosure

b.

Findings

No findings were identified.

.2

Annual Follow-up of Selected Issues

a.

Inspection Scope

The inspectors performed an in-depth review of PER 665633, NRC identified freeze

protection issues. The inspectors reviewed the actions taken to determine if the

licensee had adequately addressed the following attributes. Documents reviewed are

listed in the Attachment. The inspectors completed one sample for Annual Follow-up of

Selected Issues.

Complete, accurate and timely identification of the problem

Evaluation and disposition of operability and reportability issues

Consideration of previous failures, extent of condition, generic or common cause

implications

Prioritization and resolution of the issue commensurate with safety significance

Identification of the root cause and contributing causes of the problem

Identification and implementation of corrective actions commensurate with the safety

significance of the issue

b.

Findings

No findings were identified.

.3

Semiannual Trend Review

a.

Inspection Scope

As required by IP 71152, the inspectors performed a review of the licensees corrective

action program and associated documents to identify trends that could indicate the

existence of a more significant safety issue. The inspectors review was focused on

repetitive equipment issues, but also included licensee trending efforts and licensee

human performance results. The inspectors review nominally considered the twelve-

month period of January 2013 through December 2013, although some examples

expanded beyond those dates when the scope of the trend warranted. Specifically, the

inspectors considered the results of daily inspector screening discussed in Section

4OA2.1 and reviewed licensee trend reports for the period in order to determine the

existence of any adverse trends that the licensee may not have previously identified.

Documents reviewed are listed in the Attachment. The inspectors completed one

sample for Semiannual Trend Review.

b.

Findings and Observations

No findings were identified. In general, the licensee had identified trends and

23

Enclosure

appropriately addressed them in their CAP. The inspectors evaluated the licensee

trending methodology and observed that the licensee had performed a detailed review.

The licensee routinely reviewed cause codes, involved organizations, key words, and

system links to identify potential trends in their data. The inspectors compared the

licensee process results with the results of the inspectors daily screening. No

previously unidentified trends of significance were identified.

.4

Annual Follow-up of Operator Workarounds

a.

Inspection Scope

The inspectors reviewed the operator workaround (OWA) program to verify that OWAs

were identified at an appropriate threshold, were entered into the CAP, and that

corrective actions were appropriate and timely. Specifically, the inspectors reviewed the

licensees workaround lists and repair schedules, reviewed CAP word searches,

conducted tours and interviewed operators and operations department support staff.

Additionally, the inspectors checked for undocumented workarounds by observing

operators perform rounds, reviewed operator deficiency lists, reviewed appropriate

system health documents, attended plant health committee meetings, and verified that

identified program deficiencies were corrected. The inspectors evaluated all

workarounds for their aggregate impact. Documents reviewed are listed in the

Attachment. The inspectors completed one sample for Annual Follow-up of Operator

Workarounds.

b.

Findings

No findings were identified.

4OA5 Other Activities

.1

(Closed) Unresolved Item (URI) 050000327/2013004-01, Water Intrusion into Actuator of

Valve 1-FCV-63-72

a.

Inspection Scope

The inspectors opened this URI as a result of water intrusion into the actuator of 1-FCV-

63-72, which is the A train containment sump suction for the Unit 1 A RHR train. This

issue was noted during an operability inspection conducted last quarter. The inspectors

determined more inspection was required in order to resolve the issue. On August 8,

2013, an operator noted the valve exhibited dual indication and on August 14, a related

valve, 1-FCV-74-3, failed its periodic stroke test. The following day, 1-FCV-63-72 was

noted to be failed as well due to a large of amount of water buildup in the actuator. A

subsequent root cause of the failure was completed during this inspection period and

concluded the water intrusion was due to groundwater which migrated through the wall

of the RHR valve vault room and into the valve conduit. Although the circumstances

regarding the water intrusion may have been beyond the licensees ability to predict, the

24

Enclosure

inspectors noted there were opportunities before August 14 to identify and correct the

deficient condition. Thus, the inspectors identified the following non-cited violation

(NCV) as discussed below. Documents reviewed are listed in the Attachment.

b.

Findings

Introduction: A self-revealing Green NCV of 10 CFR 50 Appendix B, Criterion XVI,

Corrective Action, was identified for the licensees failure to correct a condition adverse

to quality within a reasonable amount of time. Timely corrective actions were not taken

to correct a dual position indication (open and closed lights both illuminated) on the Unit

1 A train RHR containment sump suction flow control valve 1-FCV-63-72.

Description: On August 8 at 0709, the Unit 1 control room operator noted that valve 1-

FCV-63-72 showed dual position indication on the control board. This valve is the A

train RHR suction valve from the reactor containment sump and is normally closed,

showing only a single position indication lamp on the control board. Valve 1-FCV-63-72

was verified to be locally closed. No other activities were noted that would have caused

the valve to come off its closed seat. Initial troubleshooting for the dual indication

consisted of: 1) a visual inspection of the valve; 2) a visual inspection of the motor

control center (MCC) cubicle during an attempted closure of the valve; 3) a review of the

wiring diagram by a troubleshooting team; 4) replacement of the MCC light indicating

bulb; and 5) a visual inspection of the main control room (MCR) hand switch. Based on

the troubleshooting teams analysis of the wiring diagrams, no impact was expected on

the interlocks associated with 1-FCV-63-72. The team initially concluded that the most

likely cause of the indication was a short circuit in the control power indication in the

MCR valve hand switch. Based on this conclusion, plus the fact that the valve is not

normally stroked at power (due to concerns of accidently transferring borated water from

the RWST to the containment sump), the licensee chose not to immediately stroke test

1-FCV-63-72. Instead, the licensee declared the position indication for the valve

inoperable per Post Accident Monitoring requirements as delineated in TS 3.9.1. This

was a 30 day limiting condition for operation. The licensee then began development of a

troubleshooting plan which would require more intrusive troubleshooting of the issue

starting the following week.

On August 14 at 2315, during a routine quarterly inservice testing valve stroke activity,

valve 1-FCV-74-3 failed to stroke in the closed direction from the control room. This

valve is the A train RHR suction valve from the RWST and is normally open. Valve 1-

FCV-74-3 was immediately declared out of service and the 72-hour Emergency Core

Cooling Systems (ECCS) TS 3.5.2 action statement was entered. During

troubleshooting, operators attempted to close valve 1-FCV-74-3 remotely from the MCC

cubicle. This action blew control power fuses. The licensee then attempted local

manual operation and noted 1-FVC-74-3 could be manually closed without binding.

Valve 1-FCV-74-3 was partially manually closed and then reopened from the MCC

without incident. Due to the relationship between valves 1-FCV-63-72 and 1-FCV-74-3

(interlocks, shared wiring in junction boxes, etc.) the licensee suspected that the failure

of valve 1-FCV-74-3 to close and valve 1-FCV-63-72 dual position indication were

related.

25

Enclosure

The licensee subsequently opened the 1-FCV-63-72 actuator and noted that a

significant amount of water had accumulated inside the actuator. This water caused

significant electrical shorting in the valve control circuit and rendered the valve

inoperable. Also, the water affected valve 1-FCV-74-3, as this valve utilizes contacts

from valve 1-FCV-63-72 circuitry. It was noted that a low current short caused the failure

of the closing coil for valve 1-FCV-74-3. Following repairs to both 1-FCV-63-72 and

1-FCV-74-3, the ECCS system was returned to operable status on August 17 at 0200.

The licensees past operability determination concluded that 1-FCV-63-72 and 1-FCV-

74-3 were likely inoperable beginning on August 8 when 1-FCV-63-72 was noted to have

a dual indication. Thus the A train ECCS system was most likely inoperable for

approximately nine days, which exceeded the TS allowable outage time. On October

21, 2013, Licensee Event Report 50-327/2013-003 was submitted as a result of this

issue. The licensee concluded that the source of the water was ground water that had

migrated through the concrete ceiling that housed the valve and actuator cables. The

ground water leaked through the threaded penetration seal and inside the conduit and

flowed down into the valve actuator. During the most recent Unit 1 refueling outage in

November 2013, the licensee redesigned the conduit penetration to prevent the intrusion

of moisture into the conduit. The licensee noted the rate of moisture intrusion was most

likely higher in the recent months due to a higher than normal amount of rainfall that

temporarily raised the water table in the vicinity of the plant. The inspectors also noted

that on February 29, 2012, the licensee discovered water buildup in the actuator of 1-

FCV-63-72. This deficiency was entered into the CAP; however it appears that this

precursor was not adequately evaluated such that continued water intrusion ultimately

led to the failure noted on August 8, 2013.

Analysis: The licensees failure to take timely actions to correct a condition adverse to

quality was a performance deficiency. The inspectors concluded that testing and

inspection could have determined that valve 1-FCV-63-72 was inoperable much earlier

than August 14 when it was noted that RHR suction valve to the RWST, 1-FCV-74-3, did

not pass its routine surveillance test. This finding was determined to be more than minor

because it was associated with the Design Control attribute of the Mitigating Systems

cornerstone and adversely affected the cornerstones objective to ensure the availability,

reliability, and capability of systems that respond to initiating events to prevent

undesirable consequences (i.e., core damage). Specifically, the finding reduced the

reliability and capability of the A train RHR system to perform its safety function as

designed. Using IMC 0609.04, Initial Characterization of Findings, dated June 19,

2012, and IMC 0609, Appendix A, Exhibit 4 - External Events Screening Questions,

dated June 19, 2012, the finding required a detailed risk analysis as the A RHR system

was inoperable beyond its TS-allowed outage time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The detailed risk

analysis concluded that the finding was of very low safety significance (Green).

A Phase 3 analysis was performed by the regional Senior Reactor Analyst to determine

the impact of the finding. The analysis assumed a recoverable failure of the 1-FCV-63-

72 valve, along with a dependent failure of the 1-FCV-74-3 valve. The major impacts

were in the swapover from the RWST to the containment sump as the source of water to

26

Enclosure

mitigate medium and smaller LOCA sequences. Because of the low exposure time, the

availability of the opposite train, and the ability of the operations staff to operate the

effected valves manually, the finding was determined to be Green.

The cause of this finding was determined to have a cross-cutting aspect relating to the

proper classification, prioritization, and evaluation of operability and reportability of

conditions adverse to quality in the Corrective Action component of the Problem

Identification and Resolution area, in that, on February 29, 2012, the licensee discovered

water buildup in the actuator of 1-FCV-63-72 and did not adequately evaluated the

condition adverse to quality such that continued water intrusion ultimately led to the

failure noted on August 8, 2013. P.1(c)

Enforcement: Title 10 of the Code of Federal Regulations Part 50, Appendix B, Criterion

XVI, Corrective Action, requires, in part, that measures shall be established to assure

that conditions adverse to quality, such as failures, malfunctions, deficiencies,

deviations, defective material and equipment, and non-conformances are promptly

identified and corrected. Contrary to the above, from August 8 through August 17, 2013,

the licensee failed to assure that a condition adverse to quality, the failure of valve FCV-

63-72, was corrected in a timely manner. Specifically, the licensee failed to sufficiently

evaluate and correct a moisture intrusion problem associated with the RHR containment

suction motor-operated valve. Corrective actions taken by the licensee included

redesigning and modifying the conduit penetration to prevent the intrusion of moisture

into the conduit. The violation was entered into the licensees CAP as PER 772193.

This violation is being treated as an NCV, consistent with Section 2.3.2 of the

Enforcement Policy and will be identified as NCV 05000327/2013005-01, Unit 1 Train

A RHR Containment Suction Valve Failure.

.2

Quarterly Resident Inspector Observations of Security Personnel and Activities

a.

Inspection Scope

During the inspection period, the inspectors conducted observations of security force

personnel and activities to ensure that the activities were consistent with licensee

security procedures and regulatory requirements relating to nuclear plant security.

These observations took place during both normal and off-normal plant working hours.

These quarterly resident inspector observations of security force personnel and activities

did not constitute any additional inspection samples. Rather, they were considered an

integral part of the inspectors normal plant status review and inspection activities.

b.

Findings

No findings were identified.

27

Enclosure

.3

Review of the Operation of an Independent Spent Fuel Storage Installation (ISFSI)

(60855.1)

a.

Inspection Scope

The inspectors performed a walkdown with the field operator of the ISFSI storage pad on

December 26, 2013, to verify that operations were conducted in a safe manner in

accordance with approved procedures and without undue risk to the health and safety of

the public. The inspectors noted that there were 40 multi-purpose canisters (MPCs)

positioned on the ISFSI pad. The inspectors verified the MPC vents were in good

condition and free of obstruction. The inspectors also verified natural circulation within

the MPCs. The inspectors verified that any ISFSI problems were placed in the CAP.

The inspectors also reviewed ISFSI document control practices to verify that changes to

the required ISFSI procedures and equipment were performed in accordance with

guidelines established in local procedures and 10 CFR 72.48. Documents reviewed are

listed in the Attachment.

b.

Findings

No findings were identified.

4OA6 Meetings

.1

Exit Meeting Summary

On January 13, 2014, the resident inspectors presented the inspection results to Mr.

Carlin and other members of his staff, who acknowledged the finding. The inspectors

asked the licensee whether any of the material examined during the inspection should

be considered proprietary. No proprietary information was identified.

ATTACHMENT: SUPPLEMENTARY INFORMATION

Attachment

SUPPLEMENTARY INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

J. Alfultis, Director of Modifications & Projects

J. Carlin, Site Vice President

J. Cross, Chemistry Manager

A. Day, Radiation Protection Manager

D. Erb, Work Control Manager

M. Henderson, ISI Program Engineer

H. Hill, Rad Waste Superintendent

J. Johnson, Program Manager Licensing

A. Little, Site Security Manager

K. Loomis, Boric Acid Program Engineer

T. Marshall, Operations Manager

M. McBrearty, Licensing Manager

S. McCamy, Quality Assurance Manager

S. Mohorn, Rad Waste Superintendent

P. Noe, Director Safety and Licensing

C. Owens, Rad Waste HP

W. Pierce, Site Engineering Director

P. Pratt, Manager, Maintenance

J. Rolph, Radiation Protection Technical Support Superintendent

P. Simmons, Plant Manager

K. Smith, Director of Training

D. Sutton, Licensing

J. Stamey, Rad Waste Health Physicist

J. Stewart, Chemist

NRC personnel

S. Lingam, Project Manager, Office of Nuclear Reactor Regulation

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened and Closed 05000327/2013005-01

NCV

Unit 1 Train A RHR Containment Suction

Valve Failure (Section 4OA5)

Closed 05000327/2013004-01

URI

Water Intrusion Into Actuator of Valve 1-

FCV-63-72 (Section 4OA5)

Enclosure

LIST OF DOCUMENTS REVIEWED

Section 1R01: Adverse Weather Protection

Procedures

0-PI-OPS-006.0, Freeze Protection, Rev. 55

Service Requests (SRs)

SR 807550

SR 825408

SR 821489

Section 1R04: Equipment Alignment

Partial System Walkdowns

Procedures

0-GO-16, System Operability Checklists, Rev. 4

Other documents

UFSAR Section 9

Procedures

0-SI-OPS-030-021.A, Auxiliary Building Gas Treatment System Train A, Rev. 6

0-SI-OPS-030-021.B, Auxiliary Building Gas Treatment System Train B, Rev. 6

0-SO-30-18, Auxiliary Building Gas Treatment System, Rev. 14

0-SO-65-1, Emergency Gas Treatment System Air Cleanup and Annulus Vacuum, Rev. 27

0-SO-30-1, Control Building Heating, Air Conditioning, and Ventilation, Rev. 39

0-SO-30-10, Auxiliary Building Ventilation Systems, Rev. 54

Section 1R05: Fire Protection

Procedures

FPDP-1, Conduct of Fire Protection, Rev. 2

0-PI-FPU-317-299.W, Att. 8, Shift Check List, Rev. 32

NPG-SPP-18.4.7, Control of Transient Combustibles, Rev. 0

EITP-100, Environmental Compliance, Rev. 6

0-SI-FPU-410-703.0, Inspection of FPR Required Fire Doors, Rev. 5

SQN-FPR-Part-II, SQN Fire Protection Report Part II - Fire Protection Plan, Rev. 28

Other documents

Fire Protection Pre-Fire Plans for Unit 1 Lower Containment Building

Fire Protection Pre-Fire Plans for Unit 2 Lower Containment Building

Fire Protection Pre-Fire Plans for Control Building Elevation 685 (Auxiliary Instrument Room)

Fire Protection Pre-Fire Plans for Control Building Elevation 706 (Cable Spreading Room)

Fire Protection Pre-Fire Plans for ERCW Building - Elevations 688/704/720

Fire Protection Pre-Fire Plans for Turbine Building - Elevations 662/685

Section 1R06: Flood Protection Measures

Work Orders

WO 11108121224, Check Standing Water Level in Manholes/Handholes

3

Attachment

Other documents

TVA letter to NRC dated May 4, 2007. TVA response to GL 2007-01

Section 1R08: Inservice Inspection Activities

Procedures

N-VT-15 - Visual Examination of Class MC and Metallic Liners of Class CC Components of

Light-Water cooled Plants, Rev. 11

N-VT-16 - General Visual Examination Containment Vessel Integrity Verification, Rev. 05

N-UT-67 - Generic Procedure for Straight Beam Ultrasonic Examination of Bolts and Studs,

Rev. 05

PDI-UT-5 - Generic Procedure for Straight Beam Ultrasonic Examination of Bolts and Studs,

Rev. D34

IEP-200 - Qualification and Certification Requirements for TVA Inspection Services

Organization (ISO) Nondestructive (NDE) Personnel, Rev. 13

Corrective Action Documents

PER 618770 - Boron buildup on 1B-B SIS Pump Pedestal

PER 691545 - Boric acid build up and wet boric acid are present on transmitter sensing line

1-ft-72-41

PER 01-010244 - Minor concrete voids in U1C11 Vt-3 inspection

PER 169175 - Airline cracks in ceiling beneath reactor cavity and reactor wall

SR 797854 - Hairline cracking in the concrete beneath the fuel transfer canal in lower

containment

SR 526607 - Spalling on baseplate of Protection Device No. 1 on Drawing 48N1701-17.

SR 797166 - Boric acid on Reactor Coolant Pump #1 on #3 seal

SR 797061 - Boric acid on valve 1-FCV-063-0098

SR 797072 - Two areas of white deposit in Fan Room 2

Other documents

Periodic Instruction 0-PI-DXI-000-116.2, ASME Section XI IWE/IWL Containment Inservice

Inspection (CSI) Program, Rev. 05

Q-NIC-100 - Written Practice for the Qualification and Certification of Nondestructive

Examination (NDE0 Personnel, Rev. 20-TVA

IHI Southwest Technologies, Inc. Operating Procedure 2.0-NDES-001, Nondestructive

Examination Personnel Qualification and Certification, Rev. 06

WO 113312025 - Modify Component Cooling Piping to eliminate interference with actuator for

1-FC-063-011

Section 1R12: Maintenance Effectiveness

Procedures

TI-4, Maintenance Rule Performance Indicator Monitoring, Trending, and Reporting -

10CFR50.65, Rev. 23

Other documents

MR 11th Periodic Assessment Report (PE sample)

Cause Determination and Evaluation (CDE) #2700, FCV-63-72 Failure

CDE #2696, EBGTS B Fan Failure

4

Attachment

CDE #2686, A Shutdown Boardroom Chiller Failure

CDE #2674, B Main Condenser Test Connection Failure

Section 1R13: Maintenance Risk Assessments and Emergent Work Control

Procedures

0-TI-DSM-000-007.1, Risk Assessment Guidelines, Rev. 9

NPG-SPP-07.3, Work Activity Risk Management Process, Rev. 3

NPG-SPP-07.2.4, Forced Outage or Short Duration Planned Outage Management, Rev. 0

NPG-SPP-07.2, Outage Management, Rev. 0

GOI-6, Apparatus Operations, Rev. 142

Section 1R15: Operability Determinations and Functionality Assessments

Procedures

NEDP-22, Functional Evaluations, Rev. 9

OPDP-8, Limiting Conditions for Operation Tracking, Rev. 5

NPG-SPP-03.5, Regulatory Reporting Requirements, Rev. 2

PERs

789552 - Unit 2 Turbine Controls in Manual

795451 - POE WO 113223153 T1 motor lead pinch

799097 - POE TS LCO 3.7.4 action for FCV-67-146

800432 - POE (ABSCE boundary issue)

795433 - PDO (During U1R19 water found leaking out of conduit in bioshield wall)

801415 - PDO EDG 1B 2 sec load sequence

803833 - PDO U-1 Rx Head Vent Valve Stroke

816731, 815638, 817841 - FEs associated with the Unit 1 loose parts alarm

Section 1R18: Plant Modifications

Procedures

NPG-SPP-09.3, Plant Modifications and Engineering Change Control, Rev. 4

NPG-SPP-09.4, 10 CFR 50.59 Evaluations of Changes, Tests, and Experiments, Rev. 1

NPG-SPP-09.5, Temporary Alterations, Rev. 0

Other documents

DCN 22643 - Replace Pressurizer PORVs

Section 1R19: Post Maintenance Testing

Procedures

MMDP-1, Maintenance Management System, Rev. 20

MMDP-3, Guidelines for Planning and Execution of Troubleshooting Activities, Rev. 6

NPG-SPP-6.5, Foreign Material Control, Rev. 0

NPG-SPP-6.1, Work Order Process Initiation, Rev. 0

NPG-SPP-06.3, Pre-/Post-Maintenance Testing, Rev. 0

NPG-SPP-06.9, Testing Programs, Rev. 0

NPG-SPP-06.9.1, Conduct of Testing, Rev. 1

NPG-SPP-06.9.3, Post-Modification Testing, Rev. 0

5

Attachment

Work Orders

114306842 - Disassemble and reassemble valve in support of 113716425

114306841 - Remove actuator, install actuator, set up calibration in support of 113716425

114325805 - Disassemble and reassemble valve in support of 113716459

114325799 - Remove and install actuator in support of 113716459

113756597 - PORVs - PCV-68-340 & pcv-68-334 Replacement activities

113377829 - Repack Valve (1-LCV-3-175) and perform AIRCET test

112096045 - Repair isolation check valve (1-VLV-026-1296)

111234712 - 5 year PM to swap 480V Shutdown board breaker with a refurbished breaker

113806636 - Perform 0-MI-EPM-317-102.0 on CCS pump C-S and clean/replace motor air filter

114560807 - CCP room cooler fan motor current check, bearing lubrication and cleaning

114198329 - EQ maintenance and inspection

113408190 - Change out electrolytic capacitors in the Woodward 2301A governor card

Section 1R20: Refueling and Other Outage Activities

Procedures

FHI-3, Movement of Fuel, Rev. 65

0-GO-15, Containment Closure Control, Rev. 34

0-GO-13, Reactor Coolant System Drain and Fill Operations, Rev. 71

NPG-SPP-08.1, Nuclear Fuel Management, Rev. 00

0-PI-OPS-000-011.0, Containment Access Control During Modes 1-4, Rev. 1

Section 1R22: Surveillance Testing

Procedures

NPG-SPP-06.9.1, Conduct of Testing, Rev. 8

0-SI-SXV-072-266.0, ASME Code Valve Testing, Rev. 12

0-SI-OPS-068-137.0, Reactor Coolant System Water Inventory, Rev. 32

0-SI-SFT-072-138.0, Unit 1 Containment Spray - Spray Nozzle Test, Rev. 6

0-SI-SLT-081-258.1, Unit 1 Primary Water LLRT, Rev. 5

0-SI-SLT-088-259.1, Upper Personnel Airlock Overall Leak Rate Test and General Inspection,

Rev. 6

0-SI-SLT-088-259.4, Upper Personnel Airlock Interlock Operability Test, Rev. 2

1-SI-SXP-003-202.B, Motor Driven Auxiliary Feedwater Pump 1B-B Comprehensive

Performance Test, Rev. 7

1-SI-SXP-074-202.0, RHR Pump 1A-A and 1B-B Comprehensive Performance and Check

Valve Test, Rev. 10

0-SI-OPS-068-137.0, Reactor Coolant System Water Inventory, Rev. 32

1-SI-OPS-088-001.0, Phase A Isolation Test, Rev. 14

1-SI-OPS-082-026A, Loss of Offsite Power with Safety Injection D/G 1A-A Test, Rev. 46

0-SI-SFT-072-138.0, Unit 1 Containment Spray - Spray Nozzle Test, Rev. 6

0-SI-SXV-063-203.2, Full Stroking of Safety Injection Cold Leg Accumulator Isolation Valves,

Rev. 1

0-SI-MIN-061-105.0, Ice Condenser Ice Weighing, Rev. 11

0-SI-SLT-067-258.2, Containment Isolation Valve Local Leak Rate Test Lower Compartment

Essential Raw Cooling Water, Rev. 13

PERs

801081, FME concern while performing air flow test during core reload

6

Attachment

Other documents

1-47W437-4, Mechanical Containment Spray System Piping, Rev. 1

1-47W437-5, Mechanical Containment Spray System Piping, Rev. 4

1-47W812-1, Flow Diagram Containment Spray System, Rev. 45

Technical Specification Surveillance Requirement 4.6.2.1.1.d and 4.6.2.1.2.b

Section 1EP2: Alert and Notification System Evaluation

Procedures and Reports

NP-REP, Appendix B, Sequoyah Nuclear Plant Radiological Emergency Plan, Rev. 101

EPFS-9, Inspection, Service, and Maintenance of the Prompt Notification System (PNS) at

Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants, Rev. 8

Sequoyah FEMA REP-10 Report, Revision 2

EPDP-10, Facilitation of the ANS and Notification Tests, Rev. 6

EPDP-14, Evaluation of Changes to Alert and Notification Systems (ANS), Rev 0

Records and Data

Weekly Silent Tests, 2011-September 2013

Monthly Siren Tests, October 2011 - October 2013

Corrective Action documents

442747; During Monthly Siren Test Five Sirens Did Not Operate

521663; Siren Damaged by Storm

591666; Two ANS Sirens Failed to Operate During Monthly Test

701363; Siren Relocations Due to Land Owner Rejections

711912; Loss of DC Power Indication for ANS Siren 12

727891; Loss of DC Power Indication for ANS Siren 26

751936; Two ANS Sirens Failed to Operate During Monthly Test

Section 1EP3: Emergency Response Organization Staffing and Augmentation System

Procedures

TRN-30, Radiological Emergency Preparedness Training, Rev. 24

EPDP-3, Emergency Plan Exercises and Preparedness Drills, Rev. 7

EPDP-10, Facilitation of the Alert and Notification System and Pager Tests, Rev. 6

EPIP-3, Alert, Rev 36

EPIP-6, Activation and Operation of the Technical Support Center, Rev. 49

EPIP-7, Activation and Operation of the Operations Support Center, Rev. 28

Records and Data

SQN-EP-S-13-02, snapshot self-assessment SCBA Qualification of Site Personnel, March 2013

EPT202.000, ERO Training Plan - TSC Training, Rev. 12

EPT900.010, ERO Training Plan, ERO Fundamentals, Rev. 4

Radiological Emergency Preparedness Training Oversight Committee minutes 2012/2013

2012/2013 ERO Augmentation test results

Results of periodic ERO notification tests

Corrective Action documents

786990; TRN error in CECC qualification requirement

7

Attachment

Section 1EP4: Emergency Action Level and Emergency Plan Changes

Change Packages

TVA Radiological Emergency Plan, Revs. 99 and 100

EPIP-1, Emergency Plan Classification Matrix, Revs. 48 and 49

CECC EPIP-2, Operations Duty Specialist Procedure for Notification of Unusual Event,

Rev. 43

CECC EPIP-3, Operations Duty Specialist Procedure for Alert, Rev. 44

CECC EPIP-4, Operations Duty Specialist Procedure for Site Area Emergency, Rev. 45

CECC EPIP-5, Operations Duty Specialist Procedure for General Emergency, Rev. 50

CECC EPIP-7, CECC Radiological Assessment Staff Procedure for Alert, Site Area

Emergency, and General Emergency, Rev. 34

TVA Radiological Emergency Plan, Rev. 101

Evacuation Time Estimate Study Update

Section 1EP5: Maintenance of Emergency Preparedness

Procedures

CECC EPIP-9, Emergency Environmental Radiological Monitoring Procedures, Rev. 49

EPDP-17, NPG Emergency Plan Effectiveness Review [10 CFR 50.54(q)], Rev. 3

NPG-SPP-7.1, On-Line Work Management, Rev. 10

NPG-SPP-18.3.5, Designated Emergency Response Equipment (DERE), Rev. 0

NPG-SPP-22.300, Corrective Action Program, Rev. 0

Records and Data

Drill and exercise reports 2011-2013

TVA Quality Assurance Audit Report SSA 1203 dated April 16, 2012

TVA Quality Assurance Audit Report SSA 1305 dated June 17, 2013

Focused Self-Assessment SQN-EP-F-13-001, NRC Inspection Preparation

SQN QA Quarterly Rating Report August 13, 2013

Corrective Action documents

571999; Maintenance Personnel Not Evacuated in a Timely Manner During REP Drill

572584; RP Was Slow to Perform Airborne Sampling During REP Drill

608785; Dose assessment error

581795; No Additional Fire Brigade Personnel Onsite During REP Drill

582858; TSC SED Filled Out Wrong Form Which Delayed CECC PAR Development

582751; MERT Failed 4 of 6 Drill Objectives

619808; RP Tech Left Team to Get Equipment During Graded Exercise

619847; Inside Van Tech Did Not Grab All Equipment Required During Graded Exercise

695758; MET Unavailable - Lessons Learned

704845; Evaluate EPIP-1 Classification of EAL 4.2 for Explosion

708940; Questioned CET Readings During Drill

711961; REP Assignment Cannot Meet 1-Hour Requirement to Respond

720352; 8 Personnel Were Not Accounted For During REP Drill

722951; KI Tablets Should Be Evaluated for Issue Earlier Under Emergency Conditions

732171; Clarify EPDP-11 regarding 10 CFR 50.54(t) requirements

751183; Wrong Pocket Ion Chambers in REP Van #3

8

Attachment

Section 2RS1: Radiological Hazard Assessment and Exposure Controls

Procedures, Guidance Documents, and Manuals

NPG-SPP-05.1.1, Alpha Radiation Monitoring Program, Rev. 3

NPG-SPP-05.6, Controlling Byproduct and Source Material, Rev. 2

NPG-SPP-22.300, Corrective Action Program, Rev. 0

RCDP-1, Conduct of Radiological Controls, Rev. 5

RCI-01, Radiation Protection Program, Rev. 78

RCI-14, Radiation Work Permit (RWP) Program, Rev. 57

RCI-15, Radiological Postings, Rev. 24

RCI-17, Control of Byproduct and Source Material, Rev. 19

RCI-18, Vacuum Cleaner Control Within the Radiologically Controlled Area, Rev. 9

RCI-21, Control of Radioactive Materials, Rev. 19

RCI-29, Control of Radiation Protection Keys, Rev. 15

RCI-101, Radiation Operations Routines, Rev. 3

RCI-106, Radiation Protection Standards and Expectations, Rev. 3

RCI-201, Radiation and Contamination Surveys, Rev. 13

RCI-202, Airborne Radioactivity Surveys, Rev. 7

RCI-204, Radiological Surveys of Equipment and Materials Leaving the RCA, Rev. 7

RCI-209, Radiological Surveys of Personnel Leaving the RCA or Protected Area, Rev. 3

RCI-301, Radionuclide Tracking and Assessment (RTA) Program, Rev. 2

RCI-412, Radiation Protection Surveys during Initial Spent Fuel Assembly Movement, Rev. 1

RCI-417, Radiological Monitoring of the Hydrogen Peroxide Injection Crud Burst, Rev. 1

RCTP-106, Special Dosimetry Operations, Rev. 2

0-TI-NUC-000-002.0, Storing Material in Spent Fuel Pool or New Fuel Vault, Rev. 21

Records and Data

Air Sample Detail Report for 10/13/2013 thru 11/5/2013, 11/5/2103

Air Sample 101713018, U1 Equipment Pit, 10/17/2013

Air Sample 101813018, U1 734 RFF GA, 10/18/2013

Air Sample 102313006, U1 Rx Head Stand, 10/23/2013

Air Sample 102313014, U1 653 1B RHR Pump Room, 10/23/2013

Air Sample 102313023, U1 653 1B RHR Pump Room, 10/23/2013

Air Sample 102613003, U1 Upper Rx Head O-ring Cleaning, 10/26/2013

Air Sample 110213012, U1 Upper GA, 11/2/2013

ALARA Plan 2013-010, Refueling Operations

ALARA Plan 2013-011, Mechanical Maintenance Group (MMG)

ALARA Plan 2013-018, MODS - Ice Condenser/Snubbers/Insulation/Scaffolds/Painting

Instrument Calibration/Check Source Certificates:

Vendor Source No. I3-328, TVA No. 2530, 7/29/2011

Vendor Source No. I3-329, TVA No. 2531, 7/29/2011

Vendor Source No. I3-330, TVA No. 2532, 7/29/2011

Vendor Source No.G4-975, TVA No. 2483, 10/9/2009

Vendor Source No. 92421, TVA No. 2571, 12/7/2012

Vendor Source No. 52736-185D2, TVA No. 2245, 5/19/2003

Instrument Calibration Records:

Canberra GEM-5 Personnel Monitor, Serial No. 0909-179, 3/23/2012 and 3/18/2013

ARGOS-5AB Personnel Monitor, Instrument No. 860587, 5/11/2012 and 5/2/2013

iSolo, Instrument No. 860494, 12/6/2012 and 10/11/13

9

Attachment

Small Article Monitor (Cronos 11), Instrument No. 860653, 8/17/2012 and 7/16/2013

Small Article Monitor (SAM-11), Instrument No. 860325, 7/6/2012 and 11/17/2012

List of Active SQN Temporary Shielding Request Forms (TSRFs), 11/6/2013

National Source Tracking System Annual Inventory Reconciliation Confirmation, 1/24/2013

National Source Tracking System Inventory Report, Sequoyah Nuclear Plant, 1/24/2013

RWP Dose by Work Step Report for ALARA Plans 2013-010 to 2013-021 for the period

10/14/2013 thru 11/6/2013

RWP Total Dose, Hours and Dose Rate Report for the period 10/14/2013 thru 11/5/2013

RWP Work Step Dose and Dose Rate Alarm Setpoints for RWP 13140052, 11/5/2013

RWP 13120122, U1 Seal Table work

RWP 13140002, U1 Upper Containment High Rad Area Mechanical Maintenance

RWP 13140052, HRA U1 Refueling Activities for AREVA and Boilermakers

RWP 13140072, U1 HRA MODS Work: Snubbers, Scaffold, Insulation, Painting

RWP 13140172, U1 Rx Head Insulation

RWP 13140252, HRA U1 Upper Containment Rx Cavity

RWP 13140352, U1 HRA Head O-Ring Surface Work & Inspection (Multibadging)

RWP 13140353, U1 Equipment Pit - LHRA Vortex Suppressors

RWP 13140453, U1 Upper Containment, Rx Cavity, LHRA, CRDM duct work, (Multibadging)

Radiological Survey SQN-M-20131014-23 and SQN-M-20131104-2, U1 Containment

Equipment Pit

Radiological Survey SQN-M-20131021-3, SQN-M-20131014-6, SQN-M-20131014-15, and

SQN-M-20131014-22, U1 Containment Accumulator Rooms #1, #2, #3, and #4

Radiological Survey SQN-M-20131014-32 and SQN-M-20131017-9, U1 Containment Top of

Pressurizer

Radiological Survey SQN-M-20130909-1 and SQN-M-20131014-8, U1 Containment Raceway

Radiological Survey SQN-M-20131014-14, SQN-M-20131014-7, and SQN-M-20131014-5, U1

Containment Steam Generator Primary Platform #1, #2, and #3

Radiological Survey SQN-M-20131014-17 and SQN-M-20131020-7, U1 Containment Inside

Polar Crane Wall

Radiological Survey SQN-M-20131021-21, SQN-M-20131014-10, and SQN-M-20131014-18,

U1 Containment RCP Platform #1, #2, and #3

Radiological Survey SQN-M-20131020-16, SQN ISFSI Pad

Radiological Survey SQN-M-20121212-8, U2 Letdown Heat Exchanger Room

Radiological Survey SQN-M-20131014-26, U1 Letdown Heat Exchanger Room

Radiological Survey SQN-M-20130502-11 and SQN-M-20131005-1, U1 651' Waste Evaporator

Feed Pump Room

Radiological Survey SQN-M-20131018-1 and SQN-M-20131025-1, Radiochemistry Lab

Radiological Survey SQN-M-20130617-3, SQN-M-20131007-1, and SQN-M-20131104-4,

Equipment Decon Room

Radiological Survey SQN-M-20130823-3, and SQN-M-20131016-24, Spent Fuel Heat

Exchanger Room

Radiological Survey SQN-M-20130920-5, SQN-M-20131020-4, and SQN-M-20131028-7, Spent

Fuel Pool Area

Radiological Survey SQN-M-20131015-8, SQN-M-20131020-9, and SQN-M-20131024-7, 1A

RHR Pump Room

Radiological Survey SQN-M-20131015-11, SQN-M-20131022-8, and SQN-M-20131023-10, 1B

RHR Pump Room

Radiological Survey SQN-M-20131101-10, 2B RHR Pump Room

10

Attachment

Radioactive Sealed Source Leak Test Certification, Source ID 0413-00-00, 7/23/09 and 1/25/10

Sequoyah Nuclear Plant Annual Radionuclide Trending and Assessment Report for 2011,

6/30/2012

Sequoyah Nuclear Plant Annual Radionuclide Trending and Assessment Report for 2012,

4/18/2013

U1R19 Radiation Protection Status Report, 11/5/2013

U1R19 RCS Shutdown Co-58 Activity Graphs (Crud Burst Cleanup), 11/5/2013

U1R19 Crud Burst Cleanup Dose Rate Trending Graphs (1A and 1B RHR Pump and Heat

Exchanger rooms, and 690 and 669 Pipe Chases near RHR Lines), 11/5/2013

Waste Stream Report (10 CFR Part 61 Waste Characterization), DAW 10-22-2010, 5/11/2011

Waste Stream Report (10 CFR Part 61 Waste Characterization), DAW 3-22-2012, 11/4/2012

WO 114067330, 0-SI-RCI-000-056.0 Byproduct Material Inventory and Sealed Source Leak

Test, 7/8/2013

WO 114139751, 0-SI-RCI-000-056.0 Byproduct Material Inventory and Sealed Source Leak

Test, 12/17/2012

CAP Documents

Apparent Cause Evaluation PER Report, SQN PER 782859, 10/20/2013

Site Audit Report SSA1309, Radiation Protection Sequoyah Nuclear Plant, 9/16/2013

TVA Nuclear Power Group Benchmarking Report SQN-RP-I-13-BM09, 8/23/2013

PERs

PER 626962

PER 629341

PER 657724

PER 659369

PER 782859

PER 788604

PER 790597

PER 793236

PER 793935

PER 799256

PER 802329

Section 2RS8: Radioactive Solid Waste Processing and Radioactive Material Handling,

Storage, and Transportation

Procedures, Manuals, and Guides

Energy Solutions Cask Book for Model 8-120B USA/9168/B(U)

NPG-SPP-05.7, Radwaste Management, Rev. 0

Process Control Program (PCP), Rev. 4

Radioactive Material Shipment Manual (RMSM, Vol.II -Radioactive Material Shipment, Rev. 42

Radioactive Material Shipment Manual (RMSM, Vol.III -Radwaste Shipment, Rev. 39

RCI-06, Receipt of Radioactive Materials, Rev. 19

RCI-21 Control of Radioactive Materials, Rev. 19

RHSI-1, Packaging Dry Active Waste for Shipment to a Waste Processor/Broker or a

Commercial Radwaste Burial Facility, Rev. 10

RHSI-1.1, Packaging Filters and Items of High Levels of Radiation, Rev. 6

11

Attachment

RHSI-6, Bead Resin Activated Carbon Dewatering Procedure for Energy Solutions14-215 or

Smaller Liners, Rev. 8

RHSI-7, Utilization of Polyethylene High Integrity Containers (HICs) and HIC Overpacks, Rev. 9

RHSI-11, Control of Radioactive Material and Training, Rev. 6

RHSI-13, Administration and Control of Onsite Storage of Low Level Radioactive Waste, Rev. 4

RWTP-100 Attachment A, Radwaste Training Program, Rev. 3

RWTP-100, Radioactive Material/Waste Shipments, Rev. 7

RWTP-101, 10 CFR 61 Waste Characterization, Rev. 2

RWTP-102, Use of Casks, Rev. 2

0-SO-77-29, Waste Processing, Rev. 9

0-VI-RCI-077-001.0, Operating Procedure for Duratek Modular Fluidized Transfer Demineralizer

System (MFTDS), Rev. 2

Shipping Records and Radwaste Data

Two Design Change Notices were reviewed and both have been accomplished. The first

moved Radwaste liquid processing from the railroad bay into the drumming room that was in

effect at the start of the period which included back to November 2010 and the second

established a lift system to be used for the steam generator replacement in 2012 with a closure

date of 8/13/2013.

The licensee provided several drawings delineating abandoned equipment. The inspector

chose the abandoned boric acid evaporator system to review.

Shipments:

SNP-12-0111 (LQ)

SNP-13-0105 (SCO)

SNP-13-0109 (Type B)

SNP-13-0307 (LSA)

SNP-13-0504 (Type A)

CAP Documents

Site Audit Report SSA1309, Radiation Protection, August 19 through August 30, 2013

Snapshot Self-Assessment Report SQN-RP-S-13-004, Radioactive Solid Waste Processing and

Radioactive Material Handling, Storage and Transportation, July 29 through August 9, 2013

PERs

412285

431332

488136

635127

735591

765281

767526

783784

12

Attachment

Section 4OA1: Performance Indicator Verification

Procedures, Manuals, and Guides

NSDP-29, Tracking and Trending and NRC Performance Indicators, Rev. 6

NPG-SPP-02.2, Performance Indicator Program, Rev. 5

RCI-151, Radiation Protection Functional Area Performance Indicators, Rev. 1

PERs

621990

623246

626962

653648

655642

788604

793921

794437

Section 4OA2: Problem Identification and Resolution

Procedures

NPG-SPP-03.1, Corrective Action Program, Rev. 1

Section 4OA5: Other Activities

0-GO-17, Spent Fuel/Dry Cask Operations, Rev. 5

NPG-SPP-01.2, Administration of Site Technical Procedures, Rev. 9

NFTP-100, Fuel Selection for Dry MPC Storage, Rev. 5 completed for campaign #6

10CFR 72.48 Screening/Evaluation: EDC E22443C

SQN-DCS-300.11, Supplemental Cooling System Operation, Rev. 9

CTP-DCS-100.0, Dry Cask Storage Campaign Guidelines, Rev. 15

SQN-DCS-200.0, Dry Cask Campaign Review Program, Rev. 4

SQN-DCS-200.2, SQN-MPC-Loading and Transport Operations, Rev. 35

Attachment

LIST OF ACRONYMS

ABGTS

auxiliary building gas treatment system

ALARA

as low as reasonably achievable

ASME

American Society of Mechanical Engineers

BACC

boric acid corrosion control

CAP

corrective action program

CCP

centrifugal charging pump

CDE

cause determination evaluation

CFR

Code of Federal Regulations

CIV

containment isolation valve

DAW

dry active waste

DOT

Department of Transportation

ECCS

emergency core cooling system

ED

electronic dosimeter

ERCW

essential raw cooling water

FCV

flow control valve

FME

foreign material exclusion

HRA

high radiation areas

IMC

inspection manual chapter

IP

inspection procedure

ISFSI

independent spent fuel storage installation

ISI

in-service inspection

MCC

motor control center

MPC

multi-purpose canister

NCV

non-cited violation

NDE

non-destructive examination

NEI

Nuclear Energy Institute

PER

problem evaluation report

PORV

power operated relief valve

Radwaste

radioactive waste

RCA

radiologically controlled area

Rev

revision

RHR

residual heat removal

RS

radiation safety

RTP

rated thermal power

RWP

radiation work permit

RWST

refueling water storage tank

SDP

significance determination process

SI

safety injection

SR

service request

SSC

structure, system, or component

TS

technical specification

TVA

Tennessee Valley Authority

URI

unresolved item

UT

ultrasonic testing

UFSAR

Updated Final Safety Analysis Report

WO

work order