IR 05000263/2014407: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 12/18/2014 | | issue date = 12/18/2014 | ||
| title = IR 05000263/2014407, on 11/17/2014 - 11/18/2014, Monticello Nuclear Generating Plant, Routine Security Baseline Inspection. (Cover Letter Only) | | title = IR 05000263/2014407, on 11/17/2014 - 11/18/2014, Monticello Nuclear Generating Plant, Routine Security Baseline Inspection. (Cover Letter Only) | ||
| author name = Orth S | | author name = Orth S | ||
| author affiliation = NRC/RGN-III/DRS/PSB | | author affiliation = NRC/RGN-III/DRS/PSB | ||
| addressee name = Fili K | | addressee name = Fili K | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:December 18, 2014 | ||
==SUBJECT:== | |||
MONTICELLO NUCLEAR GENERATING PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000263/2014407 | |||
==Dear Ms. Fili:== | |||
On November 18, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Monticello Nuclear Generating Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. | |||
The enclosed inspection report documents the inspection results, which were discussed on November 18, 2014, with Mr. H. Hanson, and other members of your staff. | |||
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
No findings were identified during this inspection. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). | |||
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | |||
Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | |||
Sincerely, | Sincerely, | ||
/RA/ Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 | /RA/ | ||
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 | |||
Nonpublic Enclosure: | Nonpublic Enclosure: | ||
IR 05000263/2014407; w/Attachment: Supplemental Information cc w/encl: N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR T. Dimitriadis, RI B. Desai, RII C. Pederson, RIII D. Roberts, RIII M. Haire, RIV | IR 05000263/2014407; w/Attachment: Supplemental Information | ||
cc w/encl: N. Simonian, NSIR/DSO/DDSO/ST | |||
E. Wharton, NSIR | |||
T. Dimitriadis, RI | |||
B. Desai, RII | |||
C. Pederson, RIII | |||
D. Roberts, RIII | |||
M. Haire, RIV | |||
cc w/o encl: Distribution via LISTSERV | cc w/o encl: Distribution via LISTSERV | ||
}} | }} | ||
Latest revision as of 15:23, 10 January 2025
| ML14352A451 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 12/18/2014 |
| From: | Steven Orth Plant Support Branch II |
| To: | Fili K Northern States Power Co |
| References | |
| IR 2014407 | |
| Download: ML14352A451 (3) | |
Text
December 18, 2014
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000263/2014407
Dear Ms. Fili:
On November 18, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Monticello Nuclear Generating Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.
The enclosed inspection report documents the inspection results, which were discussed on November 18, 2014, with Mr. H. Hanson, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22
Nonpublic Enclosure:
IR 05000263/2014407; w/Attachment: Supplemental Information
cc w/encl: N. Simonian, NSIR/DSO/DDSO/ST
E. Wharton, NSIR
T. Dimitriadis, RI
B. Desai, RII
C. Pederson, RIII
D. Roberts, RIII
M. Haire, RIV
cc w/o encl: Distribution via LISTSERV