{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257  December 4, 2014  Mr. Steven D. Capps Site Vice President
[[Issue date::December 4, 2014]]
Duke Energy Corporation
McGuire Nuclear Station
MG01VP/12700 Hagers Ferry Road
Huntersville, NC  28078  SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000369/2015301 AND 05000370/2015301  Dear Mr. Capps:  In a telephone conversation on November 25, 2014, between Mr. Steven Mosteller, MNS Exam
Team Lead, and Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for
the administration of licensing examinations at William B. McGuire Nuclear Station.  The
operating test is scheduled to be administered during the weeks of April 27 and May 4, 2015.  The written examination is scheduled to be administered the week of May 11, 2015.  The on-site preparatory week is scheduled for the week of March 30, 2015.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, 
"Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory Commission (NRC) Regional office will discuss any changes with your staff that might be necessary before the examinations are administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination. 
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by February 11, 2015.  Mr. Daniel Bacon provided the written examination outline to your staff in September, 2014.  The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by March 13, 2015.  Pursuant to Title
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use.   
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. 
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.  In accordance with ES-302,
S. Capps 2  your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.  Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act  of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by the Office  of Management and Budget (OMB) under approval number 3150-0018, which expires on 
April 30, 2016.  The public reporting burden for this collection of information is estimated to
average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.  Send comments on any aspect of this collection of information,
including suggestions for reducing the burden, to the Information and Records Management
Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will  be available electronically for public inspection in the NRC Public Document Room, or from  the Publicly Available Records (PARS) component of the NRC's Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Web site 
at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  Thank you for your cooperation in this matter.  Mr. Steven Mosteller has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518,
(Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail: eugene.guthrie@nrc.gov).  Sincerely,
/RA/  Eugene F. Guthrie, Chief      Operations Branch 2      Division of Reactor Safety
Docket Nos.  50-369 and 50-370
License Nos.  NPF-9 and NPF-17  cc:  Distribution via Listserv
S. Capps 2  your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. 
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. 
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. 
This letter contains information collections that are subject to the Paperwork Reduction Act  of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by the Office  of Management and Budget (OMB) under approval number 3150-0018, which expires on 
April 30, 2016.  The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.  Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will  be available electronically for public inspection in the NRC Public Document Room, or from  the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site  at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  Thank you for your cooperation in this matter.  Mr. Steven Mosteller has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518, (Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail: eugene.guthrie@nrc.gov).  Sincerely,  /RA/ Eugene F. Guthrie, Chief      Operations Branch 2
      Division of Reactor Safety  Docket Nos.  50-369 and 50-370
License Nos.  NPF-9 and NPF-17  cc:  Distribution via Listserv          PUBLICLY AVAILABLE              NON-PUBLICLY AVAILABLE  SENSITIVE    NON-SENSITIVE        ADAMS:  Yes  ACCESSION NUMBER:      ML14342A873                SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS/OB2 RII:DRS/OB2      SIGNATURE DXB2 EFG      NAME DBacon EGuthrie      DATE 12/  4/2014 12/4/2014     E-MAIL COPY YES NO YES NO YES NO    OFFICIAL RECORD COPY          DOCUMENT NAME:  G:\OLEXAMS\MCGUIRE EXAMINATIONS\INITIAL EXAM 2015-301\CORRESPONDENCE\MCGUIRE 2015-301 CORPORATE NOTIFICATION LETTER.DOCX   


Mr. Steven Site Vice President Duke Energy Corporation McGuire Nuclear Station MG01VP/12700 Hagers Ferry Road Huntersville, NC 28078
SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000369/2015301 AND 05000370/2015301
==Dear Mr. Capps:==
In a telephone conversation on November 25, 2014, between Mr. Steven Mosteller, MNS Exam Team Lead, and Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at William B. McGuire Nuclear Station. The operating test is scheduled to be administered during the weeks of April 27 and May 4, 2015. The written examination is scheduled to be administered the week of May 11, 2015. The on-site preparatory week is scheduled for the week of March 30, 2015.
As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) Regional office will discuss any changes with your staff that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by February 11, 2015. Mr. Daniel Bacon provided the written examination outline to your staff in September, 2014. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by March 13, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Steven Mosteller has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518, (Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail: eugene.guthrie@nrc.gov).
Sincerely,/RA/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety
Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17 cc: Distribution via Listserv your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Steven Mosteller has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518, (Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail: eugene.guthrie@nrc.gov).
Sincerely,/RA/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17 cc: Distribution via Listserv PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: ML14342A873  SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/OB2 RII:DRS/OB2 SIGNATURE DXB2 EFG NAME DBacon EGuthrie DATE 12/ 4/2014 12/4/2014 E-MAIL COPY YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\MCGUIRE EXAMINATIONS\INITIAL EXAM 2015-301\CORRESPONDENCE\MCGUIRE 2015-301 CORPORATE NOTIFICATION LETTER.DOCX
}}
}}

Revision as of 02:16, 22 March 2018

William McGuire Nuclear Station - Notification of Licensed Operator Initial Examination 05000369/2015301 and 05000370/2015301
ML14342A873
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 12/04/2014
From: Guthrie E F
Division of Reactor Safety II
To: Capps S D
Duke Energy Corp
References
50-369/15-301, 50-370/15-301
Download: ML14342A873 (3)


See also: IR 05000369/2015301

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 December 4, 2014 Mr. Steven D. Capps Site Vice President

Duke Energy Corporation

McGuire Nuclear Station

MG01VP/12700 Hagers Ferry Road

Huntersville, NC 28078 SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000369/2015301 AND 05000370/2015301 Dear Mr. Capps: In a telephone conversation on November 25, 2014, between Mr. Steven Mosteller, MNS Exam

Team Lead, and Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for

the administration of licensing examinations at William B. McGuire Nuclear Station. The

operating test is scheduled to be administered during the weeks of April 27 and May 4, 2015. The written examination is scheduled to be administered the week of May 11, 2015. The on-site preparatory week is scheduled for the week of March 30, 2015.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) Regional office will discuss any changes with your staff that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by February 11, 2015. Mr. Daniel Bacon provided the written examination outline to your staff in September, 2014. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by March 13, 2015. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

S. Capps 2 your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on

April 30, 2016. The public reporting burden for this collection of information is estimated to

average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information,

including suggestions for reducing the burden, to the Information and Records Management

Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by

Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents

Access and Management System (ADAMS), accessible from the NRC Web site

at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Steven Mosteller has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518,

(Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail: eugene.guthrie@nrc.gov). Sincerely,

/RA/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety

Docket Nos. 50-369 and 50-370

License Nos. NPF-9 and NPF-17 cc: Distribution via Listserv

S. Capps 2 your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on

April 30, 2016. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Steven Mosteller has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Daniel Bacon at 404-997-4518, (Internet E-mail: daniel.bacon@nrc.gov), or me at 404-997-4662, (Internet E-mail: eugene.guthrie@nrc.gov). Sincerely, /RA/ Eugene F. Guthrie, Chief Operations Branch 2

Division of Reactor Safety Docket Nos. 50-369 and 50-370

License Nos. NPF-9 and NPF-17 cc: Distribution via Listserv PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: ML14342A873 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/OB2 RII:DRS/OB2 SIGNATURE DXB2 EFG NAME DBacon EGuthrie DATE 12/ 4/2014 12/4/2014 E-MAIL COPY YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\MCGUIRE EXAMINATIONS\INITIAL EXAM 2015-301\CORRESPONDENCE\MCGUIRE 2015-301 CORPORATE NOTIFICATION LETTER.DOCX