ENS 41692: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 05/12/2005 04:11 EDT
| event date = 05/12/2005 04:11 EDT
| last update date = 05/13/2005
| last update date = 05/13/2005
| title = Technical Specification Required Shutdown Due To Loss Of Emergency Bus E1
| title = Technical Specification Required Shutdown Due to Loss of Emergency Bus E1
| event text = On May 12, 2005, at 0411 hours, electrical power was lost to the 4160 VAC Emergency Bus E1. Emergency Diesel Generator 1 was inoperable for maintenance at the time of the electrical power loss. This power loss to Emergency Bus E1 affected both Units 1 and 2.
| event text = On May 12, 2005, at 0411 hours, electrical power was lost to the 4160 VAC Emergency Bus E1. Emergency Diesel Generator 1 was inoperable for maintenance at the time of the electrical power loss. This power loss to Emergency Bus E1 affected both Units 1 and 2.
Unit 1
Unit 1

Latest revision as of 21:21, 1 March 2018

ENS 41692 +/-
Where
Brunswick Duke Energy icon.png
North Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown

10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident

10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
LER: 05000325/LER-2005-004
Time - Person (Reporting Time:+3.18 h0.133 days <br />0.0189 weeks <br />0.00436 months <br />)
Opened: Dave Jester
11:22 May 12, 2005
NRC Officer: Wesley Held
Last Updated: May 13, 2005
41692 - NRC Website
Loading map...