| event date = 03/23/2012 14:28 EDT | | event date = 03/23/2012 14:28 EDT | ||
| last update date = 03/23/2012 | | last update date = 03/23/2012 | ||
| title = Turbine Trip Followed | | title = Turbine Trip Followed by Automatic Reactor Trip | ||
| event text = Salem Unit 2 has experienced an automatic reactor trip at 1428 hours on 3/23/12. | | event text = Salem Unit 2 has experienced an automatic reactor trip at 1428 hours on 3/23/12. | ||
Salem Unit 2 tripped due to a turbine trip above [permissive] P-9. All shutdown and control rods fully inserted on the reactor trip. | Salem Unit 2 tripped due to a turbine trip above [permissive] P-9. All shutdown and control rods fully inserted on the reactor trip. |
Latest revision as of 21:04, 1 March 2018
ENS Event | |
---|---|
18:28 Mar 23, 2012 | |
Title | Turbine Trip Followed by Automatic Reactor Trip |
Event Description | Salem Unit 2 has experienced an automatic reactor trip at 1428 hours0.0165 days <br />0.397 hours <br />0.00236 weeks <br />5.43354e-4 months <br /> on 3/23/12.
Salem Unit 2 tripped due to a turbine trip above [permissive] P-9. All shutdown and control rods fully inserted on the reactor trip. At the time of the trip 22 station power transformer [SPT], the 2F and 2G 4KV group buses were not energized causing a loss of 23 and 24 reactor coolant pumps. The auxiliary feedwater (AFW) system auto-started to provide feed to the steam generators. The crew entered EOP-TRIP-1, then transitioned to the EOP-TRIP-2 and stabilized the plant. Salem Unit 2 is currently in Mode 3 at normal operating temperature and pressure with 21 and 22 reactor coolant pumps in service. There are no shutdown technical specifications in effect. All ECCS and ESF systems are available. Decay heat removal is being provided by 21 and 22 AFW pumps and the main steam dump system. The plant is aligned with a normal electrical line-up from offsite power sources with the exception of 22 SPT. Restoration of the 22 SPT and 2F and 2G 4KV group buses is in progress. There were no personnel injuries associated with this event. This event is reportable per 10 CFR 50.72 (b)(3)(iv)(A) due to the auto-start of the auxiliary feed water pumps. The licensee notified the NRC Resident Inspector. The licensee will notify Lower Alloways Creek Township and the States of New Jersey and Delaware. The licensee anticipates making a press release.
During the post trip review ... two additional AFW pump start signals were identified. At 1429 hrs. EDT with RCPs 23 and 24 tripped the 21 and 22 steam generators (SG) dipped below the lo-lo level setpoints and caused an AFW actuation to occur. At 1457 hrs. EDT 23 turbine driven AFW pump was stopped in accordance with operating procedures. At 1509 hrs. EDT the 21 SG cleared the low level setpoint and at 1513 hrs. EDT the 22 SG cleared the low level setpoint. At 1523 hrs. EDT the 22 SG dipped below the lo-lo level setpoint and caused an AFW actuation to occur. The two motor drive AFW pumps continued to run throughout this event. The licensee notified the NRC Resident Inspector and will notify Lower Alloways Creek Township and the States of New Jersey and Delaware. Notified R1DO (Schmidt). |
Where | |
---|---|
Salem New Jersey (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-1.47 h-0.0613 days <br />-0.00875 weeks <br />-0.00201 months <br />) | |
Opened: | John Osborne 17:00 Mar 23, 2012 |
NRC Officer: | Pete Snyder |
Last Updated: | Mar 23, 2012 |
47766 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 47766\u003C/a\u003E - \u003Ca href=\"/Salem\" title=\"Salem\"\u003ESalem\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETurbine Trip Followed by Automatic Reactor Trip\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 47766 - Salem\n","link":"","lat":39.46302222222222,"lon":-75.53561388888889,"icon":"/w/images/c/cc/PSEG_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | A/R |
Before | Power Operation (100 %) |
After | Hot Standby (0 %) |
Salem with 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
WEEKMONTHYEARENS 562862022-12-24T07:22:00024 December 2022 07:22:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip ENS 546072020-03-25T04:56:00025 March 2020 04:56:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Trip Due to Failure of a Rod Control Motor Generator ENS 542112019-08-11T12:14:00011 August 2019 12:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Feedwater Regulating Valve Malfunction ENS 538522019-01-31T08:01:00031 January 2019 08:01:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip - Circulating Water Icing Conditions ENS 536062018-09-14T04:00:00014 September 2018 04:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to a Failure of the Steam Generator Feed Regulating Valve ENS 533862018-05-07T07:25:0007 May 2018 07:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip ENS 526812017-04-14T17:57:00014 April 2017 17:57:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Emergency Diesel Generator Start Due to Loss of a 4160 V Bus ENS 522132016-08-31T19:11:00031 August 2016 19:11:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Low Reactor Coolant Flow ENS 520482016-06-28T08:23:00028 June 2016 08:23:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Main Generator Protection Signal ENS 517382016-02-16T13:27:00016 February 2016 13:27:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Auxiliary Feedwater Pump Auto Start Due to Feed Pump Trip ENS 517342016-02-15T01:58:00015 February 2016 01:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Main Generator Protection Trip ENS 517082016-02-04T16:21:0004 February 2016 16:21:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Main Turbine Trip ENS 512902015-08-05T19:38:0005 August 2015 19:38:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Low Reactor Coolant Flow ENS 505502014-10-20T00:51:00020 October 2014 00:51:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Resulting in Aux Feedwater Actuation ENS 500922014-05-07T08:56:0007 May 2014 08:56:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Trip Due to Generator Protection Relay ENS 500322014-04-14T01:13:00014 April 2014 01:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip Due to Actuation of Main Generator Protection Relay ENS 500122014-04-09T01:14:0009 April 2014 01:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Manually Tripped Following the Loss of an Operating Steam Generator Feed Pump (Sgfp) ENS 497802014-01-31T15:01:00031 January 2014 15:01:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip ENS 486172012-12-21T10:28:00021 December 2012 10:28:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Automatic Reactor Trip on Turbine Trip ENS 485342012-11-25T16:30:00025 November 2012 16:30:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Steam Generator Feedwater Regulator Valve Not Responding to Demand Signal ENS 484572012-10-30T05:09:00030 October 2012 05:09:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip from 100% Power ENS 478742012-04-30T14:18:00030 April 2012 14:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Unusual Event Due to a Potential Fire in Containment ENS 477662012-03-23T18:28:00023 March 2012 18:28:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Turbine Trip Followed by Automatic Reactor Trip ENS 469922011-06-26T04:00:00026 June 2011 04:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Loss of Reactor Coolant Pump ENS 467742011-04-21T20:01:00021 April 2011 20:01:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Circulating Water Pumps Out of Service ENS 463372010-10-17T09:12:00017 October 2010 09:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to 4 Kv Group Bus Undervoltage Condition ENS 463362010-10-16T03:21:00016 October 2010 03:21:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to a Turbine Trip ENS 460752010-07-07T15:17:0007 July 2010 15:17:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Caused by Main Generator and Turbine Trip ENS 458482010-04-16T20:41:00016 April 2010 20:41:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Emergency Diesel Generator Start Due to Loss of a 4160 V Bus ENS 456472010-01-21T23:20:00021 January 2010 23:20:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Low Steam Generator Water Level ENS 456042010-01-03T13:04:0003 January 2010 13:04:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Circulators After Uptake of River Ice ENS 446292008-11-05T05:57:0005 November 2008 05:57:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Emergency Diesel Generator Start Due to Unexpected Esf Signal ENS 438732007-12-28T22:54:00028 December 2007 22:54:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Trip on Failure of Station Power Transformer ENS 435502007-08-06T17:10:0006 August 2007 17:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip Due to Spurious Interlock Signal to Feedwater Regulating Valves ENS 433822007-05-24T06:32:00024 May 2007 06:32:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Trip on Low Steam Generator Water Level ENS 433292007-04-30T19:02:00030 April 2007 19:02:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Trip Due to Grass Intrusion Into Circulating Water Intake Structure ENS 433172007-04-25T02:48:00025 April 2007 02:48:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Trip Due to Loss of Circulators ENS 432592007-03-28T00:50:00028 March 2007 00:50:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Low Steam Generator Water Level Initiated Auxiliary Feedwater Signal and a Reactor Trip Signal ENS 429462006-10-30T01:11:00030 October 2006 01:11:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Start of Auxiliary Feedwater During Msiv Testing ENS 428642006-09-26T19:13:00026 September 2006 19:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip Due to Reactor Coolant Pump Seal Leakage. ENS 423952006-03-08T16:09:0008 March 2006 16:09:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip as a Result of a Turbine Generator Trip ENS 410282004-09-09T05:06:0009 September 2004 05:06:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Turbine Trip/Reactor Trip ENS 408752004-07-15T23:44:00015 July 2004 23:44:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Trip from 8% Power Due to Lowering Water Level on 23 Steam Generator ENS 408652004-07-13T17:05:00013 July 2004 17:05:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Low Low Steam Generator Water Level. ENS 406652004-04-11T04:23:00011 April 2004 04:23:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Plant Had a Valid Esf Signal to Start 1C Emergency Diesel Generator ENS 406392004-04-03T15:50:0003 April 2004 15:50:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Actuation of Auxiliary Feedwater System During Maintenance ENS 403502003-11-23T10:19:00023 November 2003 10:19:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Was Manually Tripped After a Control Rod Dropped During Low Power Physics ENS 397132003-03-29T09:42:00029 March 2003 09:42:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation 2022-12-24T07:22:00 | |