ENS 50896: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 03/15/2015 12:27 EDT | | event date = 03/15/2015 12:27 EDT | ||
| last update date = 03/15/2015 | | last update date = 03/15/2015 | ||
| title = Plant Shutdown Due | | title = Plant Shutdown Due to Failure to Restore Containment Fan Cooler Unit | ||
| event text = This 4 hour notification is being made pursuant to the requirements of 10 CFR 50.72(b)(2)(i), for 'The initiation of any nuclear plant shutdown required by the plant's Technical Specifications'. | | event text = This 4 hour notification is being made pursuant to the requirements of 10 CFR 50.72(b)(2)(i), for 'The initiation of any nuclear plant shutdown required by the plant's Technical Specifications'. | ||
Salem Unit 1 has initiated a unit shutdown at 1227 [EDT] in accordance with Technical Specification Action Statement 3.6.2.3, Action A, for inoperability of the 14 Containment Fan Cooler Unit. Technical Specification 3.6.2.3, Action A requires that with one or two Containment Fan Cooler Units inoperable, operability must be restored within 7 days, or be in at least Hot Standby (Mode 3) within the next 6 hours and in Cold Shutdown (Mode 5) within the following 30 hours. | Salem Unit 1 has initiated a unit shutdown at 1227 [EDT] in accordance with Technical Specification Action Statement 3.6.2.3, Action A, for inoperability of the 14 Containment Fan Cooler Unit. Technical Specification 3.6.2.3, Action A requires that with one or two Containment Fan Cooler Units inoperable, operability must be restored within 7 days, or be in at least Hot Standby (Mode 3) within the next 6 hours and in Cold Shutdown (Mode 5) within the following 30 hours. |
Latest revision as of 20:48, 1 March 2018
Where | |
---|---|
Salem New Jersey (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+-2.97 h-0.124 days <br />-0.0177 weeks <br />-0.00407 months <br />) | |
Opened: | John Konovalchick 13:29 Mar 15, 2015 |
NRC Officer: | Daniel Mills |
Last Updated: | Mar 15, 2015 |
50896 - NRC Website
| |