ML20210P550: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:i\
{{#Wiki_filter:i\\
i                       G   1 j=                                     ,
i G
l sto8E a wEssTE3 EN!mEE;mG CoIPoRATioN
l 1
j=
sto8E a wEssTE3 EN!mEE;mG CoIPoRATioN
[
[
Copies to:
Copies to:
RRFray                        HBrown s/
s/
s((     V j
j RRFray HBrown s((
BNorton                      DSGeorgiou TES Document Control RBHubbard                                  k
V k
* g /,'f 4W '{U(
* g /,'f 4W '{U(
(c/o WECooper)                 JRPhillips WECooper                      JRReynolds                          g U fT{1- -
BNorton DSGeorgiou TES Document Control RBHubbard (c/o WECooper)
                                                                                      .      /
JRPhillips
ETDenison                     pSFleischaker                         ,
/
RFRe'edy                     /HSchierling (2)                           V ACGehr                         JRoesset Mr. G.A. Manmatis Senior Vice President                               November 30, 1982 Far411 ties Development                                     '
g U {1- -
J.O. No. 14296 Pacific Gas and Electric Company                                     DCS-177 77 Beale Street San Francisco, CA 94106 Mr. H.R. Denton, Director
WECooper JRReynolds fT ETDenison pSFleischaker RFRe'edy
          ' Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenus Bethesda, MD 20114 Mr. R.H. Enga n=a, Regional Administrator Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suita 210 Walnut Creek, CA 94956 Docket No. 50-275 Diablo Canyon Unit 1 License No. DPR-76 Dear Sirst CONTROL PANEL WIRING SEPARATION REQUEST POR INFORMATION l           T m nTNE ENGINEERING SERVICES l           DIABLO CANTON NUCLEAR POWER PLANT - UNIT 1 l
/HSchierling (2)
i PG&E requested additional information on EDI 8057 at the IDVP/DCP meeting on l         . November 4, 1982. The additional information requested was for a list of specific _
V ACGehr JRoesset Mr. G.A. Manmatis Senior Vice President November 30, 1982 Far411 ties Development J.O. No. 14296 Pacific Gas and Electric Company DCS-177 77 Beale Street San Francisco, CA 94106 Mr. H.R. Denton, Director
l           deviations ftom FSAR separation criteria for control panel wiring. The following t
' Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenus Bethesda, MD 20114 Mr. R.H. Enga n=a, Regional Administrator Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suita 210 Walnut Creek, CA 94956 Docket No. 50-275 Diablo Canyon Unit 1 License No. DPR-76 Dear Sirst CONTROL PANEL WIRING SEPARATION REQUEST POR INFORMATION l
list provides locations where specific deviations were observed. Field verification i           of panels was limited to random sampling (within) each of the associated panels of the systems under review, therefore, there may be other instances of separa-l tion critaria violations within the same as well as other panels.
T m nTNE ENGINEERING SERVICES l
l l
DIABLO CANTON NUCLEAR POWER PLANT - UNIT 1 l
Separation Criteria                       Location of Violation A. Circuits of mutually redundant         l' . Control relay cabinet No. 2 systems shall not be connected         2. Control room ventilation auxiliary to the same terminal block                   relay panel 8702130415 870203 PDR     FOIA HOLMESB6-151 y
PG&E requested additional information on EDI 8057 at the IDVP/DCP meeting on l
PDR _
. November 4, 1982. The additional information requested was for a list of specific _
i l
deviations ftom FSAR separation criteria for control panel wiring. The following list provides locations where specific deviations were observed. Field verification t
i of panels was limited to random sampling (within) each of the associated panels of l
the systems under review, therefore, there may be other instances of separa-l tion critaria violations within the same as well as other panels.
l Separation Criteria Location of Violation A.
Circuits of mutually redundant l'. Control relay cabinet No. 2 systems shall not be connected 2.
Control room ventilation auxiliary to the same terminal block relay panel 8702130415 870203 PDR FOIA y
HOLMESB6-151 PDR _


p.
p.
\       .                                                          -
\\
Separation Criteria                     Location of Violation B. Exposed wiring at and connections       1. Ect shutdown panel to devices and instruments shall       2. Main control board VB-3 be separated by at least 5 inches       3. Main feedpump control panel
Separation Criteria Location of Violation B.
: 4. Control room ventilation chlorine and radiation monitor rack
Exposed wiring at and connections 1.
: 5. Control room ventilation auxiliary relay panel C. Mutually redundant circuits in         1. Hot shutdown panel panels shall be separated by one       2. Main feedpump control panel of the eight methods listed in         3. Control room ventilation and radiation FSAR section 8.3.3                           monitoring panel b
Ect shutdown panel to devices and instruments shall 2.
If'you have any questions concerning the above,       please do not hesitate to contact me.
Main control board VB-3 be separated by at least 5 inches 3.
Very truly yours,                                             ,
Main feedpump control panel 4.
b              )
Control room ventilation chlorine and radiation monitor rack 5.
              . h echt roject Engineer, Diablo Canyon Nuclear Power Plant 4
Control room ventilation auxiliary relay panel C.
Mutually redundant circuits in 1.
Hot shutdown panel panels shall be separated by one 2.
Main feedpump control panel of the eight methods listed in 3.
Control room ventilation and radiation FSAR section 8.3.3 monitoring panel b
If'you have any questions concerning the above, please do not hesitate to contact me.
Very truly yours, b
)
h echt roject Engineer, Diablo Canyon Nuclear Power Plant 4
9 m
9 m
m O
m O


j'*
ocQ j'
            ~
\\
~
* STONE & WESSTER EN2iNEE%ipeG CCT.Po2ATICN
* STONE & WESSTER EN2iNEE%ipeG CCT.Po2ATICN
                                                              \
,+
ocQ                _
Copies to
  ,+         Copies to                                                                                     .
,f j
                                                                                                                  ,f             j
.g V
  '            RRFray                           HBrown                                                         s .g          V BNorton                          DSGeorgiou
RRFray HBrown s
[,f Au {' U(
[,f Au {' U(
TES Document Control RDHubbard (c/o WECooper)                   JRPhillips                                                     k*
BNorton DSGeorgiou TES Document Control RDHubbard k*
WECooper ETDenison JRReynolds JSFleischaker C
(c/o WECooper)
                                                                                                                >sg U '{ v.           ( '/
JRPhillips C g U '{v. ( '/
RFRe'edy                     /HSchierling (2)                                                             b ACGehr                           JRoesset Mr. G.A. Maneatis, Senior Vice President                                                               November 30, 1982 Pae414 ties Development                                                                               J.O. No. 14296 Pacific Gas and Electric Company                                                                     DCS-177 77 Beale Street San Francisco, CA 94106 Mr. B.R. Denton, Director Office of Nuclear Reactor Regulation U.S. lenet... Regulatory Co e sion 7920 Norfolk Avenue Bethesda, MD 20114 Mr. R.R. Eng=11 ==, Regia ==1 Administrator                                     -
WECooper JRReynolds
Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, CA 94956 Docket No. 50-275 Diablo Canyon Unit 1 License No. DPR-76
>s ETDenison JSFleischaker RFRe'edy
/HSchierling (2) b ACGehr JRoesset Mr. G.A. Maneatis, Senior Vice President November 30, 1982 Pae414 ties Development J.O. No. 14296 Pacific Gas and Electric Company DCS-177 77 Beale Street San Francisco, CA 94106 Mr. B.R. Denton, Director Office of Nuclear Reactor Regulation U.S. lenet... Regulatory Co e sion 7920 Norfolk Avenue Bethesda, MD 20114 Mr. R.R. Eng=11==, Regia==1 Administrator Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, CA 94956 Docket No. 50-275 Diablo Canyon Unit 1 License No. DPR-76


==Dear Sirs:==
==Dear Sirs:==
CONTROL PANEL WIRING SEPARATION REQUEST POR INFORMATION TELEDYNE ENGINEERING SERVICES DIABLO CANYON NUCLEAR POWER PLANT - UNIT 1 PG&E requested additional information on EDI 8057 at the IDVP/DCP meeting on November 4, 1982. The additional information requested was for a list of specific -
CONTROL PANEL WIRING SEPARATION REQUEST POR INFORMATION TELEDYNE ENGINEERING SERVICES DIABLO CANYON NUCLEAR POWER PLANT - UNIT 1 PG&E requested additional information on EDI 8057 at the IDVP/DCP meeting on November 4, 1982. The additional information requested was for a list of specific -
deviations from FSAR separation criteria for control panel wiring. The following list provides locations where specific deviations were observed. Field verificatlon                                                         !
deviations from FSAR separation criteria for control panel wiring. The following list provides locations where specific deviations were observed. Field verificatlon of panels was limited to random sampling (within) each of the associated panels of l
of panels was limited to random sampling (within) each of the associated panels of l                                                       '
the systems under review, therefore, there may be other instances of separa-tion criteria violations within the same as well as other panels.
the systems under review,               therefore,                   there may be other instances of separa-l                tion criteria violations within the same as well as other panels.
l Separation Criteria Location of Violation A.
l Separation Criteria                                                 Location of Violation A. Circuits of mutually redundant                                   l' . Cotitrol relay cabinet No. 2                                   i systems shall not be connected                                   2. Control room ventilation auxiliary                           ,
Circuits of mutually redundant l'. Cotitrol relay cabinet No. 2 i
to the same terminal block                                             relay panel                                                   l 1                    l d                !
systems shall not be connected 2.
l
Control room ventilation auxiliary to the same terminal block relay panel 1d


If
If
      ,/ ... '''         .
,/... '''
Separation Criteria                                                       Location of Violation B. Exposed wiring at and connections                                         1. Hot shutdown panel to devices and instruments shall                                         2. Main control board VB-3 be separated by at least 5 inches                                         3. Main feedpump control panel
Separation Criteria Location of Violation B.
: 4. Control room ventilation chlorine and radiation monitor rack
Exposed wiring at and connections 1.
: 5. Control room ventilation auxiliary relay panel C. Mutually redundant circuits in                                           1. Hot shutdown panel panels shall be separated by one                                         2. Main feedpump control panel of the eight methods listed in                                           3. Control room ventilation and radiation FSAR section 8.3.3                                                           monitoring panel If 'you have any questions concerning the                                       above,   please do not hesitate to contact me.
Hot shutdown panel to devices and instruments shall 2.
Very truly yours,                                                                                ,
Main control board VB-3 be separated by at least 5 inches 3.
                          'I
Main feedpump control panel 4.
                              .    . scht
Control room ventilation chlorine and radiation monitor rack 5.
                                            )
Control room ventilation auxiliary relay panel C.
oject Engineer, Diablo Canyon Nuclear Power Plant i
Mutually redundant circuits in 1.
Hot shutdown panel panels shall be separated by one 2.
Main feedpump control panel of the eight methods listed in 3.
Control room ventilation and radiation FSAR section 8.3.3 monitoring panel If 'you have any questions concerning the
: above, please do not hesitate to contact me.
Very truly yours,
'I
)
scht oject Engineer, Diablo Canyon Nuclear Power Plant i
O e
O e


fc      h0 SERT, L CLOUD ASSOCIATES. INC.                                 ,
h0 SERT, L CLOUD ASSOCIATES. INC.
ISB UNIVERSITY AYENUE 4 A MKELEY. CALIFORNIA .4710
fc ISB UNIVERSITY AYENUE 4 A MKELEY. CALIFORNIA.4710
              . 4: s > . i.. ..
. 4: s >. i....
P105-4 December 1, 1982 Mr. Roy Fray Diablo Canyon Verification Coordinator Pacific Gas and Electric Company 45 Fremont Street 23rd Floor, Section A-17 San Francisco, CA 94105
P105-4 December 1, 1982 Mr. Roy Fray Diablo Canyon Verification Coordinator Pacific Gas and Electric Company 45 Fremont Street 23rd Floor, Section A-17 San Francisco, CA 94105


==Dear Mr. Fray:==
==Dear Mr. Fray:==
 
Enclosed please find a proposed agenda for the first IDVP design office verification.
Enclosed please find a proposed agenda for the first IDVP design office verification. This verification will be limited to the
This verification will be limited to the
            . control of spectra within the DCP mechanical group.    .
. control of spectra within the DCP mechanical group.
For administrative and scheduling purposes, the date and topic
For administrative and scheduling purposes, the date and topic
          - .have been discussed with E. Connell, III dnd yourself from the DCP, W. Cooper from TES and P. T. Kuo and J. Knight from the NRC.
-.have been discussed with E. Connell, III dnd yourself from the DCP, W. Cooper from TES and P. T. Kuo and J. Knight from the NRC.
Your confirmation of the proposed date is awaited.
Your confirmation of the proposed date is awaited.
Since ely yours,
Since ely yours,
                                          /k~
/k~
EdwardDenison(
EdwardDenison(
ED:mk cc:       W. Cooper F. Sestak R. Reedy H. Schierlit.g v'           .
~
J. Knight P. T. Kuo Enclosure q7,Y I
ED:mk cc:
W. Cooper F. Sestak R. Reedy H. Schierlit.g v' J. Knight P. T. Kuo Enclosure q7,Y I


                .fu.                                              .
.fu.
                        ~ fr L             .
~ fr L
                                      .'              .s,.                                                           ,
.s,.
                            *              ~
'. i
    '. i s, . -
~
            ~
s,. -
IDVP Desion Office Verification Date: December 20, 1982
IDVP Desion Office Verification
                                      ~ Time: 9:00 AM to 12:00 PM, 1:00 PM to 5:00 PM Place: DCP Offices, San Francisco
~
                  .                      Purpcse:- RLCA will conduct the first IDVP Design office Verification in accordance with
Date: December 20, 1982
                              .                          ITR #8 (Verification Program for PGandE       .
~ Time: 9:00 AM to 12:00 PM, 1:00 PM to 5:00 PM Place: DCP Offices, San Francisco Purpcse:- RLCA will conduct the first IDVP Design office Verification in accordance with ITR #8 (Verification Program for PGandE Corrective
Corrective
* Action),. Revision G.
* Action),. Revision G.              .


==Subject:==
==Subject:==
This design. office verification will~be
This design. office verification will~be limited to the mechanical group's control of.the Hosgri (DCM C-17, Revisions 0 through 4)' and non-Hosgri (DCM C-25, Revision 0 and DCM C-30, Revisions 0 and 1) spectra. This includes seismic inputs into qualification analyses and discussions with supervisors and engineers responsible for the work. These discussions will focus
                            -                            limited to the mechanical group's control
~~
                                                    . of .the Hosgri (DCM C-17, Revisions 0             .
solely on technical interface control.
through 4)' and non-Hosgri (DCM C-25, Revision 0 and DCM C-30, Revisions 0 and 1)
                            ..                            spectra. This includes seismic inputs into qualification analyses and discussions with
                              ~~
supervisors and engineers responsible for the work. These discussions will focus solely on technical interface control.
Completed work to be examined:
Completed work to be examined:
Calculation M-144, Revisions 0 and 1 (DCM C-17, Revisions 0 and 1).
Calculation M-144, Revisions 0 and 1 (DCM C-17, Revisions 0 and 1).
In progress work to be examined:
In progress work to be examined:
M-144 type calculations for DCM C-17, Revisions 2.through 4, DCM C-15, Revision 0, and DCM C-30, Revisions 1 and 2.
M-144 type calculations for DCM C-17, Revisions 2.through 4, DCM C-15, Revision 0, and DCM C-30, Revisions 1 and 2.
h e}}
h e
.}}

Latest revision as of 01:46, 6 December 2024

Provides List of Locations Where Specific Deviations from FSAR Separation Criteria for Control Panel Wiring Observed, in Response to Util 821104 Request
ML20210P550
Person / Time
Site: Diablo Canyon 
Issue date: 11/30/1982
From: Krechting J
STONE & WEBSTER ENGINEERING CORP.
To: Harold Denton, Engelken R, Maneatis G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation, PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20209B723 List:
References
FOIA-86-151 DCS-177, NUDOCS 8702130415
Download: ML20210P550 (6)


Text

i\\

i G

l 1

j=

sto8E a wEssTE3 EN!mEE;mG CoIPoRATioN

[

Copies to:

s/

j RRFray HBrown s((

V k

  • g /,'f 4W '{U(

BNorton DSGeorgiou TES Document Control RBHubbard (c/o WECooper)

JRPhillips

/

g U {1- -

WECooper JRReynolds fT ETDenison pSFleischaker RFRe'edy

/HSchierling (2)

V ACGehr JRoesset Mr. G.A. Manmatis Senior Vice President November 30, 1982 Far411 ties Development J.O. No. 14296 Pacific Gas and Electric Company DCS-177 77 Beale Street San Francisco, CA 94106 Mr. H.R. Denton, Director

' Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenus Bethesda, MD 20114 Mr. R.H. Enga n=a, Regional Administrator Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suita 210 Walnut Creek, CA 94956 Docket No. 50-275 Diablo Canyon Unit 1 License No. DPR-76 Dear Sirst CONTROL PANEL WIRING SEPARATION REQUEST POR INFORMATION l

T m nTNE ENGINEERING SERVICES l

DIABLO CANTON NUCLEAR POWER PLANT - UNIT 1 l

PG&E requested additional information on EDI 8057 at the IDVP/DCP meeting on l

. November 4, 1982. The additional information requested was for a list of specific _

i l

deviations ftom FSAR separation criteria for control panel wiring. The following list provides locations where specific deviations were observed. Field verification t

i of panels was limited to random sampling (within) each of the associated panels of l

the systems under review, therefore, there may be other instances of separa-l tion critaria violations within the same as well as other panels.

l Separation Criteria Location of Violation A.

Circuits of mutually redundant l'. Control relay cabinet No. 2 systems shall not be connected 2.

Control room ventilation auxiliary to the same terminal block relay panel 8702130415 870203 PDR FOIA y

HOLMESB6-151 PDR _

p.

\\

Separation Criteria Location of Violation B.

Exposed wiring at and connections 1.

Ect shutdown panel to devices and instruments shall 2.

Main control board VB-3 be separated by at least 5 inches 3.

Main feedpump control panel 4.

Control room ventilation chlorine and radiation monitor rack 5.

Control room ventilation auxiliary relay panel C.

Mutually redundant circuits in 1.

Hot shutdown panel panels shall be separated by one 2.

Main feedpump control panel of the eight methods listed in 3.

Control room ventilation and radiation FSAR section 8.3.3 monitoring panel b

If'you have any questions concerning the above, please do not hesitate to contact me.

Very truly yours, b

)

h echt roject Engineer, Diablo Canyon Nuclear Power Plant 4

9 m

m O

ocQ j'

\\

~

  • STONE & WESSTER EN2iNEE%ipeG CCT.Po2ATICN

,+

Copies to

,f j

.g V

RRFray HBrown s

[,f Au {' U(

BNorton DSGeorgiou TES Document Control RDHubbard k*

(c/o WECooper)

JRPhillips C g U '{v. ( '/

WECooper JRReynolds

>s ETDenison JSFleischaker RFRe'edy

/HSchierling (2) b ACGehr JRoesset Mr. G.A. Maneatis, Senior Vice President November 30, 1982 Pae414 ties Development J.O. No. 14296 Pacific Gas and Electric Company DCS-177 77 Beale Street San Francisco, CA 94106 Mr. B.R. Denton, Director Office of Nuclear Reactor Regulation U.S. lenet... Regulatory Co e sion 7920 Norfolk Avenue Bethesda, MD 20114 Mr. R.R. Eng=11==, Regia==1 Administrator Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, CA 94956 Docket No. 50-275 Diablo Canyon Unit 1 License No. DPR-76

Dear Sirs:

CONTROL PANEL WIRING SEPARATION REQUEST POR INFORMATION TELEDYNE ENGINEERING SERVICES DIABLO CANYON NUCLEAR POWER PLANT - UNIT 1 PG&E requested additional information on EDI 8057 at the IDVP/DCP meeting on November 4, 1982. The additional information requested was for a list of specific -

deviations from FSAR separation criteria for control panel wiring. The following list provides locations where specific deviations were observed. Field verificatlon of panels was limited to random sampling (within) each of the associated panels of l

the systems under review, therefore, there may be other instances of separa-tion criteria violations within the same as well as other panels.

l Separation Criteria Location of Violation A.

Circuits of mutually redundant l'. Cotitrol relay cabinet No. 2 i

systems shall not be connected 2.

Control room ventilation auxiliary to the same terminal block relay panel 1d

If

,/...

Separation Criteria Location of Violation B.

Exposed wiring at and connections 1.

Hot shutdown panel to devices and instruments shall 2.

Main control board VB-3 be separated by at least 5 inches 3.

Main feedpump control panel 4.

Control room ventilation chlorine and radiation monitor rack 5.

Control room ventilation auxiliary relay panel C.

Mutually redundant circuits in 1.

Hot shutdown panel panels shall be separated by one 2.

Main feedpump control panel of the eight methods listed in 3.

Control room ventilation and radiation FSAR section 8.3.3 monitoring panel If 'you have any questions concerning the

above, please do not hesitate to contact me.

Very truly yours,

'I

)

scht oject Engineer, Diablo Canyon Nuclear Power Plant i

O e

h0 SERT, L CLOUD ASSOCIATES. INC.

fc ISB UNIVERSITY AYENUE 4 A MKELEY. CALIFORNIA.4710

. 4: s >. i....

P105-4 December 1, 1982 Mr. Roy Fray Diablo Canyon Verification Coordinator Pacific Gas and Electric Company 45 Fremont Street 23rd Floor, Section A-17 San Francisco, CA 94105

Dear Mr. Fray:

Enclosed please find a proposed agenda for the first IDVP design office verification.

This verification will be limited to the

. control of spectra within the DCP mechanical group.

For administrative and scheduling purposes, the date and topic

-.have been discussed with E. Connell, III dnd yourself from the DCP, W. Cooper from TES and P. T. Kuo and J. Knight from the NRC.

Your confirmation of the proposed date is awaited.

Since ely yours,

/k~

EdwardDenison(

~

ED:mk cc:

W. Cooper F. Sestak R. Reedy H. Schierlit.g v' J. Knight P. T. Kuo Enclosure q7,Y I

.fu.

~ fr L

.s,.

'. i

~

s,. -

IDVP Desion Office Verification

~

Date: December 20, 1982

~ Time: 9:00 AM to 12:00 PM, 1:00 PM to 5:00 PM Place: DCP Offices, San Francisco Purpcse:- RLCA will conduct the first IDVP Design office Verification in accordance with ITR #8 (Verification Program for PGandE Corrective

  • Action),. Revision G.

Subject:

This design. office verification will~be limited to the mechanical group's control of.the Hosgri (DCM C-17, Revisions 0 through 4)' and non-Hosgri (DCM C-25, Revision 0 and DCM C-30, Revisions 0 and 1) spectra. This includes seismic inputs into qualification analyses and discussions with supervisors and engineers responsible for the work. These discussions will focus

~~

solely on technical interface control.

Completed work to be examined:

Calculation M-144, Revisions 0 and 1 (DCM C-17, Revisions 0 and 1).

In progress work to be examined:

M-144 type calculations for DCM C-17, Revisions 2.through 4, DCM C-15, Revision 0, and DCM C-30, Revisions 1 and 2.

h e

.