ML20210P536
| ML20210P536 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 11/24/1982 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Siegel S TOWARD UTILITY RATE NORMALIZATION |
| Shared Package | |
| ML20209B723 | List: |
| References | |
| FOIA-86-151 NUDOCS 8702130409 | |
| Download: ML20210P536 (1) | |
Text
AV Distribution:
T*-
Document Control 50-27S*
NRC PDR*
i
- L PDR*
- PRC System
- NOV 2 41982 LB#3 Reading HDtnton/ECase-DEisenhut/RPurple PPAS TNovak/MStine SHanauer REngelken, Reg. V RMattson RVollmer HDenton i:s. Sylvia 11. Siegel
-LChandler, OELD HThompson Executive Director GKnighton PCheck Toward Utility Rate fiornalization EJordan, IE BSnyder 693 Mission Street
- : W Tay1.or, IE San Francisco, California 94105 HScfiierling JLee *" -
(*w/ incoming)
Dear Ms. Siegel:
MJambor-This letter responds to your request of October 25, 1982 for additional information on the Diablo Canyon design verification program. We have -
not prepared at tnis time a document that compares the scope of activi-ties currently in progress by Pacific Gas and Electric (PG&E) and by the Independent Design Verification Program (IDVP) of Teledyne as the independent auditor with the scope of activities required by the Commission Order and the NRR letter of November 19, 1981.
Copies of both documents are enclosed for your information. Also enclosed is a copy of Comission Paper SECY 82-414 which explains the expansion of the orig'inal seismic design effort, and a copy of the transcript of the Commission meeting on October 20, 1982 at which the. paper was discussed. '
.o-The PG&E corrective action program as discussed in Enclosure 7 of SECY-32-414 is the principal reason for our determination that the design verification effort currently in progress goes beyond the Commission Order.
This program includes a review and reanalysis of all ma.ior safety-related structures and of additional piping systems. These matt'ers v:ere discus' sed at the Commission meeting (see pages 3 through
[
7oftranscript).
Regarding the availability of duplicate transcripts and other do'cuments at our Region V Offices,I suggest that you contact the Public Affairs Officer directly (Telephone 415-943-3700).
I hope that the enclosed transcript meats your immediate needs.
Sincerely, l
0 M * * '. ? se
.it u 8702130409 870203 l
@ ME M 151 PDR Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation
Enclosures:
l As stated
/;
%B@tA%dj&VT +.-
semn3,.g.3.,.zd
,.g.g......g.1......,.g.g....
~
.g.py...p.g......g.........gg.
.......]............
em>
....x...........
!t.*cromsscy.as,veuc:o
- -..=. =
OFFiClAL RECORD COPY usom mi-ux
I
,f
)
l
/
j,,
UNITED STATES ghe.
b
~ 8 NUCLEAR REGULATORY COMMISSION C,
}
n f
.,i WASHINGTON, D. C. 20f 55 t-
,/
e,,,,,
November 26, 1982 Alan 'Roy Dynner, Esq.
Kirkpatrick, Lockhart,. Hill, Christopher & Phillips 1900 M Street, N.W.
Washington, D.C.
20036 In the Matter of -
PACIFIC GAS & ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant Units 1 and 2)
Docket Nos. 50-275 0.L. and 50-323 0.L.
Dear Alan:
In response to your letter of November 11, 1982 this is to advise that the Staff has added Dr. Roesset to its distribution list for items pertinent to the Diablo Canyon IDVP.
In addition, copies of the Interim ' Technical Reports issued by the IDVP to date and of the portions of the PG&E/Bechtel ITP Final Report received thus far have been sent to him. We have also requested that, as a courtesy and to facilitate Dr. Roesset's. timely receipt of IDVP-related documents, the IDVP participants and PG&E/Bechtel also add his name to their distribution lists for appropriate documents.
Sinc rely, e
aw ence Chandler cc:
Bruce Norton, Esq.
~~
Philip A. Crane, Esq.
~
David S. Fleischaker, Esq.
William E. Cooper S
b 4
/p, reeg'o.
UNITED STATES
! $ g%1
.g/
NUCLEAR REGULATORY COMMISSION
,j WASHINGTON, D. C,20555 w
% *.._~
.3 g
/
NOV 2 41987 Ms. Sylvia M. Siegel Executive Director Toward Utility Rate Normalization 693 Mission Street San Francisco, California 94105
Dear Ms. Siegel:
This letter responds to your request of October 25, 1982 for additional,
information on the Diablo Canyon design verification program. We have not _ prepared at this time a document that compares the scope of activi-ties currently in progress by Pacific Gas and Electric (PG&E) and by i.ha Independent Design Verification Program (IDVP) of Teledyne as the independent auditor with the scope of activities required by the Commission Order and the NRR letter of November 19, 1981. Copies of both documents are enclosed for your information. Also enclosed is'a copy of Commission Paper SECY 82-414 which explains the expansion of the original seismic design effort, and a copy of the transcript of the Cogssion meeting on October 20,1982 at which the paper was discussed.
The PG&E-corrective action program as discussed in Enclosure 7 of SECY 82-414 is the principal reason for our determination that the_ design verification effort currently in progress goes beyond the Commission Order. This program includes a review and reanalysis of all major safety-related structures and of additional piping systems, These matters were discussed at the Commission meeting (see pages 3 through 7 of transcript).
Regarding the availability of duplicate transcripts and other documents at our Region V Offices,I suggest that you contact the Public Affairs Officer directly (Telephone 415-943-3700).
I hope that the enclosed transcript meets,your immediate needs.
i Sincerely, t
1 1,
hbb
.bblpli D_arrell G, Eisen\\ut, Director Division of Licensing Office of Nuclear Reactor Regulation Enclos'ures :
,,,,,,_,n,-
7M As stated
- - +
-r-<>
O e
e