ML20210P155

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for Records Re Diablo Canyon.Forwards App J Documents.App I & J Documents Available in PDR
ML20210P155
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/03/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Holmes G
MHB TECHNICAL ASSOCIATES
Shared Package
ML20209B723 List:
References
FOIA-86-151 NUDOCS 8702130319
Download: ML20210P155 (4)


Text

V V }

U.S. NUCLEAR RE!ULATORY C2MMISSION NRc Foia Lioutsi muuser.isi p " % ,A . FOIA-86-151 aseOssa Tves

- # I RESPONSE TO FREEDOM OF l N^'

I X I ^'

(%e f' e INFORMATION ACT (FOIA) REQUEST ,

S3 W DOCELT NUMBERt$l ur oppoceans i

REQUESTER Mr. Gregory A. Holmes PART l.-RECORDS RELEASED OR NOT LOCATED 15ee checked boxes)

No agency records subsect to the request have been located.

No additional agency records sub tect to the request have been located.

Agency records subrect to the request that are identded in Appendia $ are already available for public irspecton and copymg in the NRC Public Document Room, X 1717 H Street, N.W., Weehington, DC.

Agency records subsect to the request that are identifed in Appendia are being made available for public inspecten and copying in the NRC Pubhc Document X Room, i7i7 H Str.et, N.W., Washington, DC, in a folder under this FOIA number and requester name.

The nonpropretary version of the proposal (s) that you agreed to accept in a telephone conversation with a member of my staff is now being made available for public inspecten and coying at the NRC Public Document Room,1717 H Street, N W., Washington, DC,in a folder under this FOIA number and requester name.

Enclosed is informaton on how you r.iar obtain access to and the charges for copying records placed in the NRC Public Document Room,1717 H Street, N.W., Washington, DC.

Agency records subject to the request are ordosed. Any applic.sble charge for copes of the records provided and payment procedures are noted in the comments section.

Recort. subject to the request have been referred to another Federal agencybes) for review and direct response to you.

In view of NRC's response to this request, no further acton is being taken on appeal letter dated PART ll.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain informaton in the requested records is being withheld from public disclosure pursuant to the FOIA exemptions desenbod in and for the reasons stated in Part 11, sec-tions B, C, and D. Any released portions of the documents for which only part of the record is being withheld are being made available for public inspection and copying in ths NRC Public Document Room,1717 H Street, N.W., Washington, DC, in a folder under this FOIA number and requester name.

Comments SIG JAKE. D! RECTOR. OlV1 10 OF RULES N RECORDS

- ~ FA V L f::: .

8702130314 F 8702@

PDR _, g S t PDR s

HOLMES NRC FORM 464 iPart U 4 12

i be WW$g TECHNICAL CONSUL TANTS Date G. Bndenbaugh Richard B Hubbard 1723 Hamilton Avenue-Suite K San Jose, Caldornia 95125 Gregory C. Minor March 4, 1986 Phone:(408) 266 2716 Mr. Donnie H. Grimsley, Director Division of Rules and Records ggg Office of Administration , .

b, *t^ : 8UN U.S. Nuclear Regulatory Commission ACI BEQUEST Washington, D.C. 20555 h p gf g RE: FOIA REQUEST S WJ-/M

Dear Mr. Grimsley:

Pursuant to the Freedom of Information Act, please make available at the Commission's Washington, D.C., Public Document Room single copies of records in the following categories:

A.

From the Chron Files of Mr. Hans Schierling from September 1, 1981, through December 31, 1983, all records concerning in any way the Diablo Canyon Nuclear Power Plant, Units 1 and/or 2.

B. From the Reading Files of Mr. Hans Schierling from September 1, 1981, through December 31, 1983, all records concerning in any way the Diablo Canyon Nuclear Power Plant, Units 1 and/or 2.

Please provide partial responses as batches of documents become available.

If.you have any questions concerning this request, please contact me at the telephone number given above. Your prompt attention to this request will be appreciated.

w Very Truly Yours, re o A. Holmes Associate Consultant r 7q ;; ./T L P.

q _ _ _ _ .

m i F0!A-86-151-APPENDIX I Date Description

1. 6/11/82 Letter from H. Denton to D. Fleischaker re letter dated 5/4/82 concerning 4/30/82 meeting. (4 pages) ANO: 8206230329
2. 9/8/82 Letter from H. Denton to W. Cooper regarding procedures proposed in letter dated April 5, 1982. (2 pages) ANO: 8210080350
3. 9/10/82 " Staff Exceptions to Initial Decision of August 31, 1982 and Motion to Toll the Schedule for Briefing the Appeal."

(4 pages) AN0: 8209140107

4. 9/14/82 Letter from P. T. Ellis to H. Schierling - Corrections to a Pre-sentation Error and to the Transcript of the September 1,1982 NRC-PG&E-IDVP meeting. (4 pages) AN0: 8209200339
5. 9/17/82 " Motion for Clarification of the Licensing Board's Initial Decision dated August 31, 1982. (10 pages) AN0: 8209210290
6. 9/29/82 Letter from H. Denton to W. Cooper pertaining to a continuing con-cern regarding the need to assure the independence of Teledyne Engineering Services. (3pages) AN0: 8210010149
7. 10/6/82 Letter to W. Cooper from D. Eisenhut - assess the basic cause of design errors. (3 pages) AN0: 8211030421
8. 10/12/82 Letter behalf to of W.

the Cooper State offrom H. Brown California. (4 recuesting)information 3

pages ANO: 8210290097 on

9. 11/3/82 Letter from T. Novak to W. Cooper regarding ITR-1 through ITR-5.

(18 pages) ANO: 8211170450 10.11/12/82 "NRC Staff Brief in Support of Exeception." (24 pages)

ANO: 8211160230

11. 12/1/82 Letter from A. Johnson to R. Hubbard - MHB (Hubbard) letter dated 11/23/82. (7 pages) ANO: 8212230306
12. 12/3/82 Teledyne Transmittal from W. Cooper to H. Schierling requesting information on containment annulus structure. (3 pages)

AN0: 8212100291

13. 12/14- Teledyne Meeting Notice - Discussion of RLCA RFIS in San Francisco.

12/15/82 (5 pages) AN0: 8212140278

14. 12/30/82 Notice of Appearance (Stark). (3 pages) ANO: 8301040002
15. 1/25/83 NoticeofAppearance(L. Chandler). (3 pages) AN0: 8301260298
16. 12/20/82 Teledyne Transmittal from Cooper to H. Schierling - Copy of Meeting Notes for December 2, 1982 Meeting at TES (4 pages)

ANO: 8301040553

b-y F01A-86-151 APPENDIX'J

-Date- Description

1. 9/9/81 ASLAB Decisior. (653) - security plan issues (3.pages)
2. 12/10/81 Letter from H. Denton to J.-Reynolds, Diablo Canyon Seismic Verification Program. (4pages)
3. 12/10/81 Letter from H. Denton to E. Brown, Diablo Canyon Seismic Veri-

'fication Program. (4 pages)

4. 12/30/81 Letter from R. Engelken to P. Crane, regarding draft reports sub-mitted by R. L. Cloud Associates. (2 pages)
5. 5/18/82 ' Meeting Sumary - April 30, 1982 Discussion of Role of Bechtel in

- Completion- of Diablo Canyon. (16 pages)

6. 6/22/82- R. L. Cloud Associates - Interim Technical Report, Independent Verification Program (P105-4-839-010) of Design Analysis Hosgri Spectra, submitted by W. E. Cooper. (55.pages) 1 7. 9/10/82 ' Letter from M. Reich, BNL, to P. T. Kuo listing computer print-outs oelivered on 9/8/82. (4 pages) 6, )/13/82 R. L. Cloud and Associates Interim Technical Report, Small Bore Piping (IDVP Designation: P-105-4-839-030). (17 pages)
9. 10/5/82 Letter to W. Cooper from J. Kerrigan responding to letter dated
8/3/82 for information regarding the Brookhaven Report. (6 pages)

-10. 10/6/82 Letter to.W. Cooper from D. Eisenhut - exit meeting on Phase II (7pages)

~

l CRH Auduts.

-.11. 10/21/82 Teledyne Meeting Announcement - Stone and Webster, Boston, MA (E01-8001 through 8006), DCNP-IDVP. (6 pages)

12. 10/29/82 Letter from E. Dennison to G. Maneatis, H. Denton and R. Engelken

- Interim Technical Report No. 10, Analysis of Hostri Spectra.

(20pages) i

13. 10/29/82 Letter from A. Johnson to H. Brown responding to letter dated 10/12/82. (4 pages)
14. 11/1/82 Letter from W. Cooper to Maneatis, Denton and Engelken - Revised TES personnel assignments. (3 pages) 15.~11/4/82 Stone & Webster Notes of Conference (from F. Sestak to W. Cooper)

Independent Design Verification Program, Phase II. (6pages) t

.~

F01A-86-151 Appendix J (continued)

22. 12/1/82 Letter from E. Dennison to R. Fray - Proposed agenda for the first IDVP design - DCP mechanical group. (2 pages)
23. 12/2/82 Letter from R. Reedy to Mr. Schierling - information on tele-copier add TWX numbers. (1page)
24. 12/6/82 Teledyne transmittal from W. Cooper to H. Schierling -

December 2, 1982 meeting notes. (7 pages) 25, 12/7/82 R. L. Cloud - Interim Technical Report, piping (1DVP Designation:

P-105-4-839-012 and -017). (92 pages)

26. 12/8/82 Letter frcm D. Eisenhut to Dr. J. Roesset - recent letter to Palladino regarding seismic qualification. (2 pages)
27. 12/10/82 Letter from J. Krechting transmitting "SWEC December semimonthly Report." (3 pages)
28. 12/28/82 Letter from G. Moore to W. Cooper - Seismic Analysis of the Con-tainment Annulus Structure. (36 pages)
29. 1/10/83 Letter from G. Moore to W. Cooper - Meeting notes for IDVP/DCP Meeting, January 4 and 5, 1983, Boston, MA. (15pages)
30. 1/21/83 Notice of Withdrawal (D. Hassell). (8 pages)
31. 1/25/83 Letter from B. Lew to Management Team - documents the status responses to BNL information requests. (12 pages) i