ML20235C907: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 20: Line 20:


=Text=
=Text=
{{#Wiki_filter:,                                                                                             _                              _ _ - _ _ _ - _ _  -
{{#Wiki_filter:,
      '.(
'.(
(
(
                          %                                    UNITED STATES i
I[D-UNITED STATES i
I[D- i   ;  .
ATOMIC ENERGY COMMISSION
ATOMIC ENERGY COMMISSION
              . r'/ ~T o #
. r'/ ~T o i
WASHINGTON. O.C. 20545                         FIINE'O KCBS                              i
FIINE'O KCBS i
              \;*-='%' f                                                                           _        q" MAR 2 61974       Pht''
WASHINGTON. O.C. 20545
Docket No. STN 50-447                                                                it M'iq-c p
\\;*- %' f q
5.o       -a 7',
='
MAR 2 61974 Pht''
M'iq-c 5.o it
-a Docket No. STN 50-447 p
g.
g.
: 2. w           wr       m.                       ;
7',
: 2. w wr m.
rfi"!
rfi"!
:. 2 n, o
:. 2 n,
General Electric Company                                                                   _o g g.',         8-ATTN: Mr. John A. Hinds, Manager                                         ce               iG Safety and Licensing                                                   C 175 Curtner Avenue                                                        [Ed
_o o
* e" San Jose, California 95114                                       '              '
General Electric Company g g.',
Gentlemen:                                                                                                                 !
8-ATTN:
a In order that we may continue our review of you( rGESSA_Pfapplication additional information on those matters set fortn in the enclosure is needed.
Mr. John A. Hinds, Manager ce iG Safety and Licensing
To maintain our licensing review schedule, we will need a completely adequate response by May 9, 1974. Please inform us within 7 days after receipt of this letter of your confirmation of the schedule or the date you will be able to neet.               If you cannot meet our specified date or if your reply is not fully responsive to our requests, it is highly likely that the overall schedule for completing the licensing review for this project will have to be extended.                   Since reassignment
[Ed C
                        .of the staff's efforts will require completion of the new assignment prior to returning to this project, the amount of extension will most likely be greater than the extent of delay in your response.                                                               )
e" 175 Curtner Avenue San Jose, California 95114 Gentlemen:
In order that we may continue our review of you( rGESSA_Pfapplication a
additional information on those matters set fortn in the enclosure is needed.
To maintain our licensing review schedule, we will need a completely adequate response by May 9, 1974. Please inform us within 7 days after receipt of this letter of your confirmation of the schedule or the date you will be able to neet.
If you cannot meet our specified date or if your reply is not fully responsive to our requests, it is highly likely that the overall schedule for completing the licensing review for this project will have to be extended.
Since reassignment
.of the staff's efforts will require completion of the new assignment prior to returning to this project, the amount of extension will most
)
likely be greater than the extent of delay in your response.
{
{
l The questions in the enclosure have been grouped by sections that correspond to the relevant sections of GESSAR, and the question numbers                                                   ]
l The questions in the enclosure have been grouped by sections that
continue consecutively from previous letters.                                                                               '
]
correspond to the relevant sections of GESSAR, and the question numbers continue consecutively from previous letters.
Please contact us if you desire additional discussion or clarification of the material requested.
Please contact us if you desire additional discussion or clarification of the material requested.
Sincerely,                                                               4 j
4 Sincerely, j
                                                                              . ,5 5     r-                       .
.,5 5 r-
U                                  ;fi /Z       /  Y.
;fi /Z Y.
QU O~               en       'i~
U
ohn F. Stolz, Chief L,i'cht Water Reactors Project Branch 2-1 Directorate of Licensing
/
QU ~
en
'i~
O ohn F. Stolz, Chief L,i'cht Water Reactors Project Branch 2-1 Directorate of Licensing


==Enclosure:==
==Enclosure:==
 
GESSAR Request for Additional Information I
GESSAR Request for Additional Information I                       cc:   (see next page) m          .
cc:
                                                      ,n.',c~ y 2 ,' (t.s. '' @g Q ing)                 .
(see next page)
8707090574 870623                                              '
',c~ y 2,' (t.s. '' @g Q in g) 8707090574 870623 m
,n..
y n j,3 S{h,(
t
t
                                                                            ~1                         jj PDR FOIA THOMASB7-40             PDR               ,  ;          ..,"  y n j,3      S{h ,(          , , .
~1 jj PDR FOIA THOMASB7-40 PDR "ga M0]) k L,.)
                                                                        "ga                                                                   -
U,J "
M0]) k L,.)           U,J "
L___ _-- -
L___ _-- -


    .          (. t L
(.
t L
i 0
i 0
Cencral Electric Company                   MAR 2 01974                 J cc: Mr. W. Gilbert, Manager         "
Cencral Electric Company MAR 2 01974 J
Safety and Standards General Electric Company i
cc:
175 Curtner Avenue l                         San Jose, California 95114                         -
Mr. W. Gilbert, Manager Safety and Standards General Electric Company i
Mr. L. Gifford, Manager           .
175 Curtner Avenue l
Regulatory Operations Unit           -
San Jose, California 95114 Mr. L. Gifford, Manager Regulatory Operations Unit General Electric Company 4720 Montgomery Lane i
General Electric Company 4720 Montgomery Lane                                                   i l
l Bethesda, Maryland 20014 M
Bethesda, Maryland 20014 M
h i
h i
I 1
I 1
Line 80: Line 97:
_________-_______a
_________-_______a


        <    Ls
Ls
          *          .g
.g s N ENCLOSUPI v
      >                            s N
ENCLOSUPI v
REQUEST FOR ADDITIONAL INFORMATION GENEPJJ., ELECTRIC CO>fPANY GESSAR PLANT a
REQUEST FOR ADDITIONAL INFORMATION GENEPJJ., ELECTRIC CO>fPANY GESSAR PLANT a
DOCKET NO. STN 50-447 I
DOCKET NO. STN 50-447 i
i e
i i
i i
e i
i I
i i
j l
I j
u_ _ _ _ _ _ - -
l u_ _ _ _ _ _ - -               _    __  _                                          1
1


a''b -
a''b a
a 30                 Design of Structures. Comnonents, Iouinment and Srstems 3 160             The analysis of containment vacuum breaker sizing presented in response to question 3 133 requires the followin6 additiona:
30 Design of Structures. Comnonents, Iouinment and Srstems 3 160 The analysis of containment vacuum breaker sizing presented in response to question 3 133 requires the followin6 additiona:
3                             information:
3 information:
a)   clarify the inconsistency between Table 3.8 4 and Table 6.2-19                                                                                       .
a) clarify the inconsistency between Table 3.8 4 and Table 6.2-19 b) specify the signals which actuate the containment, spray system and describe the operation of the time delay device which trecludes simultaneous operation of both i
b)   specify the signals which actuate the containment, spray system and describe the operation of the time delay f2 i
f core and containment sprays.
device which trecludes simultaneous operation of both core and containment sprays.                             -
2 c.)
c.) specif r the flow area of the vacuum breaiers in teres of h/ Nri'.
specif r the flow area of the vacuum breaiers in teres of h/ Nri'.
1 d)   justify your assumption of an air-vapor mixture flowing through the drywell vacuun breakers since air-only flow would re.nove more noncondensibles from the containment.
1 d) justify your assumption of an air-vapor mixture flowing through the drywell vacuun breakers since air-only flow would re.nove more noncondensibles from the containment.
e)   in regard to Figure 3.8-34, discuss the reasons for the drywell pressure lassing.the containment pressure by a
e) in regard to Figure 3.8-34, discuss the reasons for the drywell pressure lassing.the containment pressure by more than 0 5 psi, the setpoint. for the drywell vacuum a
more than 0 5 psi, the setpoint. for the drywell vacuum broa':e rs.                                                                 ,
broa':e rs.
f) discuss the steam condensation rates which were assicned to the containment sprays and heat sinks.
f) discuss the steam condensation rates which were assicned to the containment sprays and heat sinks.
g)   for t .e ;ostulat4:d rupture of t?.e Reactor '.7ater Cleanup System (7llCU) line it appears t5at the displacement of containment air into the drywell could cenerate a high drywell pressure signal and cause isolation of the r.otor operated valves which are in series with the coats. intent vacuum brea::ers as discussed on page 3.8-4h of GESSA2.
g) for t.e ;ostulat4:d rupture of t?.e Reactor '.7ater Cleanup System (7llCU) line it appears t5at the displacement of containment air into the drywell could cenerate a high drywell pressure signal and cause isolation of the r.otor operated valves which are in series with the coats. intent vacuum brea::ers as discussed on page 3.8-4h of GESSA2.
Containment spray operation could reduce the containment pressure below atmospheric. The preseure could go be.Jond the containment design nesative internal pressure of
Containment spray operation could reduce the containment pressure below atmospheric.
                                    -0.8psig (P 3. ^-4) since the spra,"s would not affect the drywell pressure, and the isolation signal to t'e motor operated valves would be caintaired. Discuss the need for and availability of containment vacuum relief under these conditions.
The preseure could go be.Jond the containment design nesative internal pressure of
3.161             Section 3.8.31.1 of GTSSAR, " Description of the Drywell                                                   {
-0.8psig (P 3. ^-4) since the spra,"s would not affect the drywell pressure, and the isolation signal to t'e motor operated valves would be caintaired.
Vacuun Relief Syster", discusses protection of the. containment                                             j
Discuss the need for and availability of containment vacuum relief under these conditions.
                              . vessel and co"tain: cent vacuum breakers,                                   Clarify tnis                   ;
3.161 Section 3.8.31.1 of GTSSAR, " Description of the Drywell
                              ; apparent dicerepancy.
{
            '3.162             Your resfonse to question 3.82 concerning the effects of post-LOCA suppression pool swell has not been subcitted.
Vacuun Relief Syster", discusses protection of the. containment j
In your resjonse, describe t'.e analytical :.:ethods which were used to deter:uine the dynaaic loads and how there loadc were incorporated in the structural design. Trevide the magnitudes of these loads used in the structural analysis
. vessel and co"tain: cent vacuum breakers, Clarify tnis
; apparent dicerepancy.
'3.162 Your resfonse to question 3.82 concerning the effects of post-LOCA suppression pool swell has not been subcitted.
In your resjonse, describe t'.e analytical :.:ethods which were used to deter:uine the dynaaic loads and how there loadc were incorporated in the structural design.
Trevide the magnitudes of these loads used in the structural analysis


> t c                                                                                                                             1
t c 1
      ..                                                                                            .                                1 e3e                                                                           i conducted by the structural designer.                   Specifically consider the . following:-
1 e3e i
a)   pool swell due to drywell air carryover; b)   impingement effects during vent clearing and vent flow; I
conducted by the structural designer.
c) seismic induced pool motion;                                                                                       j 1
Specifically consider the. following:-
d) , circumferential or radial pool wave effects d ue to non-                                                         )
a) pool swell due to drywell air carryover; b) impingement effects during vent clearing and vent flow; I
uniform vent flow and/or non-uniform air addition to the pool.                                         j                                                           q
c) seismic induced pool motion; j
  '3 16'2.1   For the circumferential or radial pool wave effects' dis-'                                                       ,
1 d), circumferential or radial pool wave effects d ue to non-
cussed in d) ahove, discuss the otential for transient vent                                                           ;
)
uncovery or pool separation and re;ultant steam bypass of                                                             l the. suppression pool.                       '
uniform vent flow and/or non-uniform air addition to the pool.
3 162.2     Provide similar information as outlined in 3.162 for the case of a small break LOCA followed by actuation of the Automatic Depressurization System (ADS).
j q
3.163   s  section 311.2.1.3.2 of G2SSAR indicates the local environ-ment for a steam line break inside the containment and out-side the dryttell.               Indicate wPat equipment will be subject-to these effects of the steam line treak environment and how thoce environmental conditions ciere considered in the development of the environmental envelopes for eac'h of the e ffec ted equipr.cnt.               In addition,. discuss the considerations given in- the selection of the environmental envelhpes for                                                     '
'3 16'2.1 For the circumferential or radial pool wave effects' dis-'
the effects of localized steam impingement and/or spray water cuch a.; that which . night occur to couipment located in the containment as a result of direct drywell bypass.
cussed in d) ahove, discuss the otential for transient vent uncovery or pool separation and re;ultant steam bypass of l
3 164       Table 3.11.1 in CTSSAR lists the accident environment for safety related systems located in the drywell.                     Justify                                             1
the. suppression pool.
              -3 psig as the assumed minimum pressure f or the drywell                                                             i since the drywell relief valves are not designed as engineered safety features.               It is our position that 30 psig s!;euld be used for the maximum design internal pressure. Also revise page 3 11-7 to be consistent with these values. The ecm-bustible gas control systets should be included in Table 3 11.2.
3 162.2 Provide similar information as outlined in 3.162 for the case of a small break LOCA followed by actuation of the Automatic Depressurization System (ADS).
3 165       The response to suestion 3 68 is incomplete.                     The magnitude and the oscillatory nature of the LCCA forces are not pre-sentod-in Figure 4.2-10 as stated in Section 3 0.1 5 Deceribe the LOCA fo*cing function acting on reactor internal structures.     In adddtion, since :.00A and SSE may not be
3.163 section 311.2.1.3.2 of G2SSAR indicates the local environ-s ment for a steam line break inside the containment and out-side the dryttell.
-              entirely uncorrelated, the rule of using square r ot of the                                                         ,
Indicate wPat equipment will be subject-to these effects of the steam line treak environment and how thoce environmental conditions ciere considered in the development of the environmental envelopes for eac'h of the e ffec ted equipr.cnt.
sum of squares may not be justifiable. The acceptable I
In addition,. discuss the considerations given in-the selection of the environmental envelhpes for the effects of localized steam impingement and/or spray water cuch a.; that which. night occur to couipment located in the containment as a result of direct drywell bypass.
3 164 Table 3.11.1 in CTSSAR lists the accident environment for safety related systems located in the drywell.
Justify 1
-3 psig as the assumed minimum pressure f or the drywell i
since the drywell relief valves are not designed as engineered safety features.
It is our position that 30 psig s!;euld be used for the maximum design internal pressure.
Also revise page 3 11-7 to be consistent with these values.
The ecm-bustible gas control systets should be included in Table 3 11.2.
3 165 The response to suestion 3 68 is incomplete.
The magnitude and the oscillatory nature of the LCCA forces are not pre-sentod-in Figure 4.2-10 as stated in Section 3 0.1 5 Deceribe the LOCA fo*cing function acting on reactor internal structures.
In adddtion, since :.00A and SSE may not be entirely uncorrelated, the rule of using square r ot of the sum of squares may not be justifiable.
The acceptable I
i
i
__.__m_____.___     __________----_-_--
__.__m_____.___


            , . t'                 i,         .
,. t' i,
                                                                                                                                                -l
-l
          .                        .;                                                                                                                                                                                                 l 1
.; l 1
I combi' nation numerical.        of LOO.i and superposition    of maximumSSE effects     is considered as' linear responses.
combi' nation of LOO.i and SSE effects is considered as' linear I
e 3 166                     The. response to Question 3.55, referenced G.E.. Topical Report NEDE-10813, Pipe-Rupture    Movement."  "PDA- Pipe Dynamic Analysis Progran for
e numerical. superposition of maximum responses.
                                                                                    .A preliminary staff review cf this report has resulted in the following questions:
3 166 The. response to Question 3.55, referenced G.E.. Topical Report NEDE-10813, "PDA-Pipe Dynamic Analysis Progran for Pipe-Rupture Movement.".A preliminary staff review cf this report has resulted in the following questions:
3.166.1                 '
3.166.1 The sinplified system rodhling of the piping and the re-asstatedin"EDE-lOY13maybeacceptable.straint for corputinr th 1
The sinplified system rodhling of the piping and the re-                                             1 asstatedin"EDE-lOY13maybeacceptable.straint                                         for However nunerical   corputinr  th examples providing comparison with representative so,lutiens                                         ;
However nunerical examples providing comparison with representative so,lutiens using nore rigorous dynamic analysia and/or suitable enperi-mental results are necessary to der.onstrate the adequacy of the prorosed methods, The staff requires a cercittent to provide representative numerical examples durin.; the PSAR stage of individual plant reviews to justify ~the simplified analytical models ecployed, 3.166.2" As indicated in NEDE-10313, the pipe whip restraint desirn i
using nore rigorous dynamic analysia and/or suitable enperi-                                           !
is based on analyses using an enorgy balance approach, che state of ::aximum stress or strain of the restraint is based on the computed aximum: deformation at the end of the first
mental     results are of the prorosed          necessary to der.onstrate the adequacy methods,               The staff requires a cercittent to provide representative numerical examples durin.; the PSAR stage of individual plant reviews to justify ~the simplified analytical models ecployed, 3.166.2"                   As indicated in NEDE-10313, the pipe whip restraint desirn i
;~
is based on analyses using an enorgy balance approach, che
quarter cycle of the. response.
;~                                        state on the of   ::aximum stress or strain of the restraint is based computed quarter cycle of the    aximum:
'ionever, in certain circ';.-
                                                                    . response.      deformation at the end of the first
stances nanicum deformation may occur latar than the first quarter c;cle of response.
                                                                                            'ionever, in certain circ'; .-
'/!e agree that the rebound si:nld not cause uajor concern when the restraint remains elastic and will still have ample desicn margin to absorb additi nal energy.
stances nanicum deformation may occur latar than the first quarter c;cle of response. '/!e agree that the rebound si:nld not cause uajor concern when the restraint remains elastic and will still have ample desicn margin to absorb additi nal energy.                                                                                                   !
However, reben.nd may cause a problem if the restrair.t i
However, reben.nd may cause a problem if the restrair.t elastic state.fsesign reaches'its                   limit but the bro':en pipe is still in t'.e                               i i
reaches'its fsesign limit but the bro':en pipe is still in t'.e i
                                                              .In addition some studies indicate t' at re-bound     may occur due to the e,ffects of the 1-itial tr=nsient of the jet thrust.
elastic state.
.In addition some studies indicate t' at re-bound may occur due to the e,ffects of the 1-itial tr=nsient of the jet thrust.
An arrlification factor of 'l.2 s5 ?uld 3
An arrlification factor of 'l.2 s5 ?uld 3
therefore te a r. plied to the jet tPrust in addition to the
therefore te a r. plied to the jet tPrust in addition to the thrust coefficient.
                        '              thrust coefficient. The staff will reon                                                                 I a thrust force az;11fication                     factor not'lessire athan corrittent1.2 cust   that be ceployed to determine the forces to be used in rectraint design.                                                                                                 l 3.167                       Table 3.2.1 indicates the only seistic Category I source of makeup water is the R"R system. It is our position that a fuel pool rater makeup source independent of the ?".2 shculd be provided which n:ets the seis.?.ic Category I require:.e:t.
The staff will reon I
a thrust force az;11fication factor not' ire a corrittent that less than 1.2 cust be ceployed to determine the forces to be used in rectraint l
design.
3.167 Table 3.2.1 indicates the only seistic Category I source of makeup water is the R"R system.
It is our position that a fuel pool rater makeup source independent of the ?".2 shculd be provided which n:ets the seis.?.ic Category I require:.e:t.
i
i
                                                                                                                                                  )
)
l l                                                                                                   .
l l
{                                 .
{
F*
F*
l 1
l 1
: s.                                                                     !
 
6.0             EncinmereTSafety Features                                                         t 6.90 The Pressure Suppression Containment System (PSCS) anal:* sis code contains a subprogram for vent clearing.
s.
is also used to compare with the test results. This           sub:.rcirar Describe the numerical solution method that is employed in this sub-prosram         and supply a justification for the nodalization that has been colected. Discuss the e:mected accuracy of the solution that is obtained by the numerical solution 1.et'.ed.
6.0 EncinmereTSafety Features t
What other method            assurances corresponds        areset to the  there that the numerical of equations           solution to be a 1ved?
6.90 The Pressure Suppression Containment System (PSCS) anal:* sis code contains a subprogram for vent clearing.
6.91 In a letter from J. A. Hinds to 2.C. De?oung dated Ja .uary 30, 1974 jou have described the analytical modeling used to calculate the blow-down from a postulated recirculation line break for drywell pressare response analyses. The codel is to seperated its treatmer.t  intoof s' th ort and long-term periods ' tith res;ect loop side of the breel,t.e mass         flow from The *.:odel     the recirculation applies a flow coeffi:1e .t         1 of 0 5 to the 1:cody correlation for the loop side nr.til                           :
is also used to compare with the test results. This sub:.rcirar Describe the numerical solution method that is employed in this sub-prosram and supply a justification for the nodalization that has been colected.
the inte: rated mass releave equals the iritial loop esas inventory.         After depletion, the loop-ride unss fic; is based o- i<cody flow t5 rough an arca equivalent to ten jet pump nozzles and the cleanup line. .7e have . reviewed the above modeling techniques and currently believe that:
Discuss the e:mected accuracy of the solution that is obtained by the numerical solution 1.et'.ed.
a)     The assumption of jet pump-cleanup line restricted f' o is acceptable it       the lo.c term.
What other assurances are there that the numerical solution method corresponds to the set of equations to be a 1ved?
b)                                                                                     !
6.91 In a letter from J. A. Hinds to 2.C. De?oung dated Ja.uary 30, 1974 jou have described the analytical modeling used to calculate the blow-down from a postulated recirculation line break for drywell pressare response analyses.
The     use of the 0 5 coefficient in the short tert is not acceptable and the following alternate assumptions should j
The codel is seperated into s' ort and long-term periods ' tith res;ect to its treatmer.t of th loop side of the breel,t.e mass flow from the recirculation 1
be considered for the short term:
The *.:odel applies a flow coeffi:1e.t of 0 5 to the 1:cody correlation for the loop side nr.til the inte: rated mass releave equals the iritial loop esas inventory.
: 1)     the recirculation loop should be modeled as a single and separate volume with the initial subceoled :a:sr mass aid energy equal to the inventory of the 1 cop.
After depletion, the loop-ride unss fic; is based o-i<cody flow t5 rough an arca equivalent to ten jet pump nozzles and the cleanup line.
.7e have. reviewed the above modeling techniques and currently believe that:
a)
The assumption of jet pump-cleanup line restricted f' o is acceptable it the lo.c term.
b)
The use of the 0 5 coefficient in the short tert is not j
acceptable and the following alternate assumptions should be considered for the short term:
1) the recirculation loop should be modeled as a single and separate volume with the initial subceoled :a:sr mass aid energy equal to the inventory of the 1 cop.
ii) the break area associated with this tolute should equal the area of the recirculation pipe.
ii) the break area associated with this tolute should equal the area of the recirculation pipe.
{
{
iii)     the mass flux out the break should be co=puted based on the Moody correlation.
iii) the mass flux out the break should be co=puted based on the Moody correlation.
iv)     mass addition to the volume should be eemputed based on the arca of ten jet pump nozz1cs and t'. e cle nup line with the corresponding differential presse.re between the reactor vessel cnd the single node simulation of the recirculation loop.
iv) mass addition to the volume should be eemputed based on the arca of ten jet pump nozz1cs and t'. e cle nup line with the corresponding differential presse.re between the reactor vessel cnd the single node simulation of the recirculation loop.
4
4


              -.. (   C-                                                                                                             l j,..
(
C-l
. j,..
1
1
      -c
-c i
                                        %                                                                                          i The above model should be used until the mass flow out the break is rectricted by flow t'rouch the jet pump nozzles                                           !
The above model should be used until the mass flow out the break is rectricted by flow t'rouch the jet pump nozzles and the cleanup line, at which time the long-term nod'el becor.es appropriate.
and the cleanup line, at which time the long-term nod'el becor.es appropriate. In either case the total ~ mass and energy addition to the drywell is tFe sum         of the cohtri-                                   i butions from the recirculation loop side and reactor. vessel                                       !
In either case the total ~ mass and energy addition to the drywell is tFe sum of the cohtri-i butions from the recirculation loop side and reactor. vessel side of the break as describcd in the.above referenced letter.
side of the break as describcd in the.above referenced letter.                                                                                             ;
Therefore, in regard to the G3SSAR application i
Therefore, in regard to the G3SSAR application provide the following information:
provide the following information:
i I                               1. A table of blowdown mess and enersy rates at various time incremental steps for a recirculation break hased on the atove specified codeling techniquas. Show separately t'e contributions fron the vessel and loop
I 1.
                                    . sides of the break.
A table of blowdown mess and enersy rates at various time incremental steps for a recirculation break hased on the atove specified codeling techniquas.
: 2.                                             '
Show separately t'e contributions fron the vessel and loop
Based on the above blowdown data, provid'e the drywell
. sides of the break.
                        ,            pressure response as a function of time.       -
2.
6 92           Frovide the data used in your c:mputation of c'ontainaent pressure, ct the conditions of pod: contain=ent pressure, usin; tho equct$ons from the long-tors analysis in GESS;.2 i
Based on the above blowdown data, provid'e the drywell pressure response as a function of time.
6 92 Frovide the data used in your c:mputation of c'ontainaent pressure, ct the conditions of pod: contain=ent pressure, usin; tho equct$ons from the long-tors analysis in GESS;.2 i
Section 6.2.1 3.7.
Section 6.2.1 3.7.
6.93           'Vith res7ect to ."our res onse to question 6.27 provide the results of an analysis of containment pressure and te''.pers.t"re as a function of time for the following postulated conditions:
6.93
'Vith res7ect to."our res onse to question 6.27 provide the results of an analysis of containment pressure and te''.pers.t"re as a function of time for the following postulated conditions:
a) a small prinary system bren't which results in the maximuu duration of blowdown.
a) a small prinary system bren't which results in the maximuu duration of blowdown.
i b)     existence of bypass leakage between the drywel l
i b) l existence of bypass leakage between the drywel containmentequivalentto-approximatelyoneft}and (A/s/?).
containmentequivalentto-approximatelyoneft}and (A/s/?).
c)' continuous operation of the contcirmont spray system.
c)' continuous operation of the contcirmont spray system.
Specify any initial       conditions or assumptions used in the analysis pace 6.2-67).
Specify any initial conditions or assumptions used in the analysis which are not consistent with Table 6.2.1,B (on pace 6.2-67).
which are not consistent with Table 6.2.1,B (on i
i 6.94 Specify the value of the inte of peak containment pressure.: rated decay heat at the time i
6.94           Specify the value of the inte of peak containment pressure.: rated decay heat at the time                                           i Also revise items 14 and 15 in Table 6.2-15 to express 1 *a--atoA                                                                 l requested by 7.uestion 6.70.               values in Stu's as 6.95           The analysis of contain:.ent spray condensing capability                                               .
Also revise items 14 and 15 l
                                                                                                                                    )
in Table 6.2-15 to express 1 *a--atoA values in Stu's as requested by 7.uestion 6.70.
6.95 The analysis of contain:.ent spray condensing capability
)
presentad in response to Question 6.63 s'ould be based on e
presentad in response to Question 6.63 s'ould be based on e


            ,          t .
t.
      <                                                                                                          l
l r.
: r.                                                                                       '
7-l 1100F service water and a heat 'exchancer capacity which is consistent with the data provided in Table 6.2.1.
7-l 1100F service water and a heat 'exchancer capacity which is consistent with the data provided in Table 6.2.1. In addition, justify your assumption of 75% spray efficiency considering the effects of the steam / air ratio in the containment.
In addition, justify your assumption of 75% spray efficiency considering the effects of the steam / air ratio in the containment.
16.96                 The following inconsistencies have been noted in GESSAR regarding the lons-term containment response.and RHR heat                     i exchanger capabilities.           Revise G S.9AR as @ pro
16.96 The following inconsistencies have been noted in GESSAR regarding the lons-term containment response.and RHR heat i
                                . provide. consistent information in these areas:priate to a)         Table '6.2-15 indicates the time of containrcent peak pressure as 30,560 seconds //hich is not consistent tiith         i Table 6.2.4, page 6.2-64 or Figure 6.2-11.
exchanger capabilities.
b)         The RHR heat receval rate shown on Figure.6.2-14 is not consistent with the heat removal rate c mputed using a              the data on page 6.2-65 and a peak pool temperature
Revise G S.9AR as @ pro
                                              'of 1790 F (Table 6.2-3).
. provide. consistent information in these areas:priate to a)
c)         The data in (b) above is not consistent with the decay           .
Table '6.2-15 indicates the time of containrcent peak i
heat rate at the time of peak contnine.ent pressure as shown in Table 5.2-15.                                  .
pressure as 30,560 seconds //hich is not consistent tiith Table 6.2.4, page 6.2-64 or Figure 6.2-11.
6.97               From the design data provided in Table 6.2-1 and our recent discussions with you, plants referencing GISS!.R will have the option of selecting one of three RHR heat exc' ranger designs de;endiig on site service teter tetparature. In addition, your res ense to Question 6.87 indicates that t're heat removal capabilities of the varicus heat exchangers will not be equivalent and therefore the tines and values of peak containment pressure and peak pool temperature will be a function of the particular heat exchanger desisn.
b)
Therefore to establish the tir..es and values of containment pea'c pressure and . temperature for each alternate desi n, provide containment response analyses               for the heat exchancer designs corresponds.; to 700 F and 900 F service rater. If the RER heat exchanger size will be based on some fourth RER design provide the containment response analysis for that size also.
The RHR heat receval rate shown on Figure.6.2-14 is not consistent with the heat removal rate c mputed using the data on page 6.2-65 and a peak pool temperature a
1 6.98'             As requested by Questions 6.9 and 6.60, analyses of all I                                subcompartments within the drywell and containment should be provided.             Subcompartments "thich have been identified on other similar plants include the sacrificial shield                   the drywell head recion, and compartments which contain ung,ucrded
'of 179 F (Table 6.2-3).
        ,                      R?lCU lines.           To ensure that a complete resfonse is provided           ;
0 c)
9 I
The data in (b) above is not consistent with the decay heat rate at the time of peak contnine.ent pressure as shown in Table 5.2-15.
I,.....-.......           -    .. . . .                  -
6.97 From the design data provided in Table 6.2-1 and our recent discussions with you, plants referencing GISS!.R will have the option of selecting one of three RHR heat exc' ranger designs de;endiig on site service teter tetparature.
                                                                  '--      --      -  - - - ~
In addition, your res ense to Question 6.87 indicates that t're heat removal capabilities of the varicus heat exchangers will not be equivalent and therefore the tines and values of peak containment pressure and peak pool temperature will be a function of the particular heat exchanger desisn.
Therefore to establish the tir..es and values of containment pea'c pressure and. temperature for each alternate desi n, provide containment response analyses for the heat exchancer designs corresponds.; to 700 0
F and 90 F service rater.
If the RER heat exchanger size will be based on some fourth RER design provide the containment response analysis for that size also.
1 6.98' As requested by Questions 6.9 and 6.60, analyses of all subcompartments within the drywell and containment should I
be provided.
Subcompartments "thich have been identified on other similar plants include the sacrificial shield the drywell head recion, and compartments which contain ung,ucrded R?lCU lines.
To ensure that a complete resfonse is provided 9
I I,.....-.......
- - - ~


            . :t E -.                                                                          .
. :t E -.
I I
I I
                                                                                              )
)
1 1
1 1
L                                                                                                                                                           s l                                                                                          .
L l s
l.
l.
at this stace of the. review, our information requirements for each subcompartuent are listed below:
at this stace of the. review, our information requirements for each subcompartuent are listed below:
a)         the blowdown rates and' energies (note Question 6.91
a) the blowdown rates and' energies (note Question 6.91
                              .above, for a recirculation line rupture);
.above, for a recirculation line rupture);
* b)         the total-vent area;               .
b) the total-vent area; c)- the coreportment free volume; d)- - the peak ' calculated differential pressure and time at which the peak occurs; e) the design differential pressure; f) the' analytical methods used to deter: cine-the pressure response 1 cluding a description of the computer codes l
c)- the coreportment free volume; d)- - the peak ' calculated differential pressure and time at which the peak occurs;         .,
used; g) the values for flow coefficients used in c'ompartcent i
e)       the design differential pressure; f)       the' analytical methods used to deter: cine- the pressure
analysis and the basis for the selection of flow co-officients and h) a flow or bubble dingraa showing compartment voluuss, how they interconnect with other conp?rtments, and the flow areas throu-h their interconnecting pathways.
* response used; 1 cluding a description of the computer codes l g)     the values for flow coefficients used in c'ompartcent       i analysis and the basis for the selection of flow co-officients and h)   a flow or bubble dingraa showing compartment voluuss, how they interconnect with other conp?rtments, and the flow areas throu-h their interconnecting pathways.
6.99 specify the design temperature and tressure. Tor the guard-pipes provided on high energy lines passing through the containment.
6.99     specify the design temperature and tressure . Tor the guard-pipes provided on high energy lines passing through the containment.           Also provide a list of all hi;h energy lines and their sizes that are equipped with a guard pipe.
Also provide a list of all hi;h energy lines and their sizes that are equipped with a guard pipe.
6.100     Your'res:onset'o Cuestion 6.57 is not cot;1ete. Provide the following information concerning postulated ruptures-of Reactor ?!ater Cleanup System lines in the containment, a) Specify the peak containment pressur6 associated with the worst R!CU line rupture.
6.100 Your'res:onse 'o Cuestion 6.57 is not cot;1ete.
b)   If orifices are provided in the R''!CU system to linit blowdown- flow rates, specify the diaceter of the orific es.                                                         i i
Provide t
c)   Describe the leak detection and isolation systems which
the following information concerning postulated ruptures-of Reactor ?!ater Cleanup System lines in the containment, a)
                            . are rupture. relied on to ter.T.inate blowdown from a RICU line Specify the lapse tiues associated with ench system.
Specify the peak containment pressur6 associated with the worst R!CU line rupture.
                                                            .                                  i i
b)
If orifices are provided in the R''!CU system to linit blowdown-flow rates, specify the diaceter of the orific es.
i i
c)
Describe the leak detection and isolation systems which are relied on to ter.T.inate blowdown from a RICU line
. rupture.
Specify the lapse tiues associated with ench system.
i i
l
l


                    .      ( .
(
i:
i:
I I
I.
6.101-     Your' response to' Question 6.62 is not complete. Provide the following additional information concerning the arranfe-ment of RH3 suction and return lines:
6.101-Your' response to' Question 6.62 is not complete.
a)   verify' that the EHR test lines shown in Figure 5.5-la               s i
Provide the following additional information concerning the arranfe-ment of RH3 suction and return lines:
represent the post-accident EUR flow path.         '
a) verify' that the EHR test lines shown in Figure 5.5-la i
b)   justify your assumption of a homogeneous pool volute in Section 6.2.1.3.7 considering that all the IHR                     (
s represent the post-accident EUR flow path.
* suction and return lines are located in a one third                     i secter of the pool and that follocling post-accident pool drawdown the height of water above the suction lines'do not clearly encure mixing.                                   '
b) justify your assumption of a homogeneous pool volute in Section 6.2.1.3.7 considering that all the IHR
                      -6.102       Your restonse to Question 5.'61 does not justify the anal" sis             1 of drywell depressurization that is used in GCSSAR. Exa: .ples of the deficiencies we have noted are the following:
(
1 1)     Initial' suppression pool ' temperature should be 1100 F to       -
suction and return lines are located in a one third i
be consistent with Table 6.2.1.                                         '
secter of the pool and that follocling post-accident pool drawdown the height of water above the suction lines'do not clearly encure mixing.
2). No     justification is provided for the spray efficiency assu.:.ed in the analysis.
-6.102 Your restonse to Question 5.'61 does not justify the anal" sis 1
of drywell depressurization that is used in GCSSAR.
Exa:.ples of the deficiencies we have noted are the following:
1 1)
Initial' suppression pool ' temperature should be 110 F to 0
a be consistent with Table 6.2.1.
2). No justification is provided for the spray efficiency assu.:.ed in the analysis.
3)' Credit is taken for vacuum breaker operation although it is not a design basis for the vacuut breakers.
3)' Credit is taken for vacuum breaker operation although it is not a design basis for the vacuut breakers.
In response to the above co:ments provide either (1) t additional and cotulete substantiation of your current analyais or (2) provide a revised analysis showins the                       i slowest possible depressurization time for the drytell a:d indicate its 1:.: pact on peak eniculated containment pressure.               !
In response to the above co:ments provide either (1) t additional and cotulete substantiation of your current analyais or (2) provide a revised analysis showins the i
Also specify the peak contal". ment pressure for the assump-tion of all drywell noncondensibles rennining in the con-                     -
slowest possible depressurization time for the drytell a:d indicate its 1:.: pact on peak eniculated containment pressure.
tainaent for the duration of the long-term transient.
Also specify the peak contal". ment pressure for the assump-tion of all drywell noncondensibles rennining in the con-tainaent for the duration of the long-term transient.
                                                                                                                )
)
    .              -6.103-       Figure 6.2.lc provided in res;cnse to Que.stion 6.74.1 does not adequately define the secondary containment boundary.                     i Frovide t'ris information on drawin.;s of comparable detail as Ficures 1.2-2 throush 1.2-B in CISSAR.
-6.103-Figure 6.2.lc provided in res;cnse to Que.stion 6.74.1 does not adequately define the secondary containment boundary.
1 6.104       Your response to Question 6.74.2 is not adequate. provide the prorosed allowable limit for t':e fraction of total con-                 f  '
i Frovide t'ris information on drawin.;s of comparable detail as Ficures 1.2-2 throush 1.2-B in CISSAR.
tainment leakace which could brpass the Standby Gas Treat-ment System filters.
1 6.104 Your response to Question 6.74.2 is not adequate.
6.103       Your responses to Questions 6.7541 and 6.75.2 are not n
provide f
the prorosed allowable limit for t':e fraction of total con-tainment leakace which could brpass the Standby Gas Treat-ment System filters.
6.103 Your responses to Questions 6.7541 and 6.75.2 are not n
l
l


      .A   s L                                                                                                                     l adequate.     As requested, indicate those lines, by reference to Table 6.2 9, that c ould be open to the containment or drywell atmosphere and interface with the outside atmosphere following a loss-of-coolant accident. Also indicate the number and type of leakage barriers w'-ich are assumed to be available considering a single active failure.
.A s
                                              ,                                                                        I 6.106     Your response to Euestion 6.79 does.not adequately justify.                                         1 l
. L adequate.
the separation or protection against such things as fires,                                           )
As requested, indicate those lines, by reference to Table 6.2 9, that c ould be open to the containment or drywell atmosphere and interface with the outside atmosphere following a loss-of-coolant accident.
flooding, missilos,etc. pf Standby Gas Treatment System (SGTE'                                       !
Also indicate the number and type of leakage barriers w'-ich are assumed to be available considering a single active failure.
components. Discuss th6 adec,uacy of the design with respect i
1 6.106 Your response to Euestion 6.79 does.not adequately justify.
to the separation and protection of the 53TS fans, and the                                         !
the separation or protection against such things as fires,
protection afforded the SGTS ducting from the shield building to the SGTS fans, filter trains and to the plant disch?.rge point.                                                                                               l 6.107     Your response to questi'on 6.78 states that"a separate decay heat removal fan is provided for the Standby Gas Treattent
)
              , System (SGTS). This fan should be indicated on Figure 6.5-1.
flooding, missilos,etc. pf Standby Gas Treatment System (SGTE' components.
In addition, justify al. lowing the SGTS filter carbon tem-                                         I pcratures to reach 3100F (desorption temperature is 2750F) before actuating'the fire protection system.
Discuss th6 adec,uacy of the design with respect i
6.108     Provide the following hdditional information with rerard to the Standby Cas Treatment System (SGTS):
to the separation and protection of the 53TS fans, and the protection afforded the SGTS ducting from the shield building to the SGTS fans, filter trains and to the plant disch?.rge point.
6.108.1   Face 6.5-2 of GTSSAR indicates that the SGTS starts auto-matica11y following a "LCCA" signal.       Specify the signals (e.s., high drywell r;rescure, low water level) which are used to indicate a loss'-af-coolant accident.
l 6.107 Your response to questi'on 6.78 states that"a separate decay heat removal fan is provided for the Standby Gas Treattent System (SGTS).
6.103.2   Page 6.5-8 of GESfAR states that failure of the SGTS different pressure controller wou'.4 cause negative pressures within the secondary containme;;t to increase but remain beloi. the design differential pressure, 3 psid, of the auxiliary build-ing.     Specify the caxixum negative pressures that could occur and the design differential pressures of the ICCS pump roo s, shield building annulus, and fuel building.
This fan should be indicated on Figure 6.5-1.
6.109     !ith respect to GESSAR Section 6.2.5 3 3 5, discuss the potential for stray water to accumulate in containment sub-compartments and t'rereby provide a source of hydrogen - If the subeccpartments are not provided with sufficient mining, loca'_
In addition, justify al. lowing the SGTS filter carbon tem-I pcratures to reach 3100F (desorption temperature is 2750F) before actuating'the fire protection system.
concentrations could exceed 4 volume percent. Discuss how ye; design will prevent local subcompartuents from exceeding a hydrogen concentration of 4 vol,ume percent.
6.108 Provide the following hdditional information with rerard to the Standby Cas Treatment System (SGTS):
6.110     ?!ith respect to the analysis of dryrell mixing prior to the start of the hydrogen mixing system, presented in GESSAR Section 6.2 5 3.3.1, discuss the f ollowing:
6.108.1 Face 6.5-2 of GTSSAR indicates that the SGTS starts auto-matica11y following a "LCCA" signal.
s
Specify the signals (e.s., high drywell r;rescure, low water level) which are used to indicate a loss'-af-coolant accident.
* 4
6.103.2 Page 6.5-8 of GESfAR states that failure of the SGTS different pressure controller wou'.4 cause negative pressures within the secondary containme;;t to increase but remain beloi. the design differential pressure, 3 psid, of the auxiliary build-ing.
                                                                              ._ _ _ . . . __________._________a
Specify the caxixum negative pressures that could occur and the design differential pressures of the ICCS pump roo s, shield building annulus, and fuel building.
6.109
!ith respect to GESSAR Section 6.2.5 3 3 5, discuss the potential for stray water to accumulate in containment sub-compartments and t'rereby provide a source of hydrogen - If the subeccpartments are not provided with sufficient mining, loca'_
concentrations could exceed 4 volume percent.
Discuss how ye; design will prevent local subcompartuents from exceeding a hydrogen concentration of 4 vol,ume percent.
6.110
?!ith respect to the analysis of dryrell mixing prior to the start of the hydrogen mixing system, presented in GESSAR Section 6.2 5 3.3.1, discuss the f ollowing:
s 4
__________._________a


x :o s                                               -
x :o s t'
t L
L l '
l                                                 l                 -
l l'
l'          6.110.1-   It-is our position that the .~.ixing system should have the capability to start at'10 minutes followins a LOCA.
6.110.1-It-is our position that the.~.ixing system should have the capability to start at'10 minutes followins a LOCA.
Evaluate the potential for fla mable hydrogen mixtures exiting the reactor vessel assuming hydrogen generation rates which would yield a 4 v/o hydrogen concentration in the drywell at 10 minutes.
Evaluate the potential for fla mable hydrogen mixtures exiting the reactor vessel assuming hydrogen generation rates which would yield a 4 v/o hydrogen concentration in the drywell at 10 minutes.
6.110.2   Assuming no bulk     steaming in the reactor vessel,-discuss s
6.110.2 Assuming no bulk steaming in the reactor vessel,-discuss t,he' tanner Sy.w ich dilution or depletion of the steam s
t,he' tanner Sy.w   ich dilution or depletion of the steam inventory in the vessel dote was considered.
inventory in the vessel dote was considered.
16.110 3     Discuss the potential for condensation of the entrained steam along the flow path from the vessel dose 1to the brea%
16.110 3 Discuss the potential for condensation of the entrained steam along the flow path from the vessel dose 1to the brea%
in the recirculation line.
in the recirculation line.
6.111'     In' the discuscion' of containment mixing prior to the start of the hydroren mixin     system, prese-ted in G"5SAR Section a
6.111' In' the discuscion' of containment mixing prior to the start of the hydroren mixin system, prese-ted in G"5SAR Section 6.2 5 3 3 3, the a.nproach taien was.to estnblish the a
6.2 5 3 3 3, the a.nproach taien was.to estnblish the existence of turbulent natural convecticn at t.he suppression-pool surface. Further substantiate your analysis as follor:s:
existence of turbulent natural convecticn at t.he suppression-pool surface.
        '6.111.1     Justify the selection of the full peel width as the char-acterictic len. th s asscciatei with the Grashof number.
Further substantiate your analysis as follor:s:
6.111.2     E:: tend your analysis to include the calculation of a cass transfer coefficient and show that the resultint mass trens-port will disperse the hydrosen'conerated at the pool surft:e.
'6.111.1 Justify the selection of the full peel width as the char-acterictic len. th asscciatei with the Grashof number.
6.111 3     Justify your contention on pase 6.2-60s that the containment will have turbulent natural convection since it annears                                                         1 that the analysis applies only in the vicinity of the p ol
s 6.111.2 E:: tend your analysis to include the calculation of a cass transfer coefficient and show that the resultint mass trens-port will disperse the hydrosen'conerated at the pool surft:e.
                                                                                        ~
6.111 3 Justify your contention on pase 6.2-60s that the containment will have turbulent natural convection since it annears 1
that the analysis applies only in the vicinity of the p ol
~
surface.
surface.
6.111 4     Discuss the validity of your assumption of a sufficient temperature difference between the pool and containment atnosphere to t%.e . time period after n'-ich the suppression pool has reached its peak temperature.
6.111 4 Discuss the validity of your assumption of a sufficient temperature difference between the pool and containment atnosphere to t%.e. time period after n'-ich the suppression pool has reached its peak temperature.
6.112       Your response to questf on 6.S3 does not adequstely jurtify that the single sat.pling point availcble in the drywell and containment (followins a cinrle failure) is capable                                                         {
6.112 Your response to questf on 6.S3 does not adequstely jurtify that the single sat.pling point availcble in the drywell and containment (followins a cinrle failure) is capable
of detectinc non-uniform hydrogen concentrations. It is our position that each redundant hydrogen analyzer unit should sauple a :.initum of two locations in sach the drywell and containment and that tS ere locations be justi-                                                       :
{
fled to be rey.-esentative of the bulk atr.nspheric conditions within each volut.:e.                                                                                           l 8
of detectinc non-uniform hydrogen concentrations.
1
It is our position that each redundant hydrogen analyzer unit should sauple a :.initum of two locations in sach the drywell and containment and that tS ere locations be justi-fled to be rey.-esentative of the bulk atr.nspheric conditions l
within each volut.:e.
8 1


      ...O         .
...O 6.113 Spebify the size and location of the hydrosen mixins syster inlet penetrations.
6.113 Spebify inlet  penetrations. the size and             location of the hydrosen mixins syster 6.114 Discuss the separation and protectimn criteria which are applicable recombiner system.          to the lines and components of the t" ernal 6.115
6.114 Discuss the separation and protectimn criteria which are applicable to the lines and components of the t" ernal recombiner system.
    .                                                                  Your response to question 6.35 indicates that corrosien : f zine and alur.inum naterials itithin the containment f llorin-a loss-of-coolant of    hydro;en.                              accident has been considered as a source which could be present t'e environment.
6.115 Your response to question 6.35 indicates that corrosien : f zine and alur.inum naterials itithin the containment f llorin-a loss-of-coolant accident has been considered as a source of hydro;en.
Discuss            in thesource  post-accident               (s) of corrosive              containment                       arents 6.116 Your respense to questien 6.84 states that tfree inMrico'cs onlyincor; are                            oratedand      in the hydrogen                                   uining syste.T desig. ' ore ter
Discuss t'e source (s) of corrosive arents which could be present in the post-accident containment environment.
                                "                                              tbc cecond                             third     are described.
6.116 Your respense to questien 6.84 states that tfree inMrico'cs are incor; orated in the hydrogen uining syste.T desig. ' ore ter only tbc cecond and third are described.
interlock.                                                                                                            Specify the first 6.117 Provide t' e raximum allowable suppression pool tempere.ture for both LOCA and relief valve operation co-ditions. List the initial terpcrature and taximum tee.perature in:"e..en:s for normal o;eration and LOCA energy additions.
Specify the first interlock.
6.118 Yle haveCection G2SSAR                            noted the     5.2.4, followin:
6.117 Provide t' e raximum allowable suppression pool tempere.ture for both LOCA and relief valve operation co-ditions.
Containmentadditional                              d ficiencies Isolation               Systems, in plesse                                   ,
the initial terpcrature and taximum tee.perature in:"e..en:s List for normal o;eration and LOCA energy additions.
revise GIGSAR to acconcodate these contents:                                                                                                                                           i a) the purce exhaust line shottn on Figure 9 4-5b sSc:1d                                                                                                                   !
6.118 Yle have noted the followin: additional d ficiencies in G2SSAR Cection 5.2.4, Containment Isolation Systems, plesse i
be incluged in Table 6.2 9 and Figure 6.2-15 b) the drywell purce line, penetration 31 in Table                                                                                                             <.2 9 is shown to be norually open.
revise GIGSAR to acconcodate these contents:
a) the purce exhaust line shottn on Figure 9 4-5b sSc:1d be incluged in Table 6.2 9 and Figure 6.2-15 b) the drywell purce line, penetration 31 in Table <.2 9
is shown to be norually open.
be closed during normal operation.?le require this line to c) 6.2-15 do not asree with Figure 6.2-16.the co. buctible Cas I
be closed during normal operation.?le require this line to c) 6.2-15 do not asree with Figure 6.2-16.the co. buctible Cas I
1 6.119                                                                                                                                                                                                                                           {
1
It is our position that protective screen assemblies should                                                                                                                                 l be provided around the containment heat removal pipin-suction of preventins            points debris        in the suppression frou e .tering                            pool theand sk.ould 're capC:le impair the performance of system pumps,pipins                                                                         valves,thich                                          heatcould ex-chancers or spray nozzles.
{
The desica of tS e screened area should be larce enouch to assure a low approacP velocity and preclude against                      it.                clo:31ng of the screening by lebris beinc c';: n_
6.119 It is our position that protective screen assemblies should l
be provided around the containment heat removal pipin-suction points in the suppression pool and sk.ould 're capC:le of preventins debris frou e.tering the impair the performance of system pumps,pipins thich could valves, heat ex-chancers or spray nozzles.
The desica of tS e screened area should be larce enouch to assure a low approacP velocity and preclude clo:31ng of the screening by lebris beinc c';: n_
against it.
Describe how your design moets this requirement.
Describe how your design moets this requirement.
__        _ _ _ _ _ - - - - - - - - - - - - - - - - - - ' - - ~       _ _ _ _ _ _ -          -- ---          -- -    - - - - - - - - - - - - - - - -          _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ - - - - - - - - - - - -    -      ---
_ _ _ _ _ - - - - - - - - - - - - - - - - - - ' - - ~


q
q
: s.    .- i e                                                                                                                           .
.- i s.
('                                                                                                                 r     ,
e
                                                                                                                            ]
('
6.120'             In the. event' of high radiation in the containment nurge the shield building annulus,: the ECCS pu.'p rooms,'and t'de                             i
r
                                  , fuel buildinc, you state that the exhausts are directed to                               )
]
the standby nas.treatet.ent system (SGTS).                         To. meet the         i "as lov; as practicable" guidelines, the containmentcbu11 ding                           1
6.120' In the. event' of high radiation in the containment nurge the shield building annulus,: the ECCS pu.'p rooms,'and t'de
                                    . ventilation exhaust and the dry *:: ell purse exhaust should                         d be treated to remove radiciodine.- The combined car >acit~y                             i of' these ventilation systems far e:.:ceeds the. treathent                               l capability of the .?~TS. Additional means of reducine the releases. of radioactive v.aterials in raseous effluenEs from the plant ventilation systems need to be trovided in'either the G3 or bop design..                     ,
, fuel buildinc, you state that the exhausts are directed to
)
the standby nas.treatet.ent system (SGTS).
To. meet the i
"as lov; as practicable" guidelines, the containmentcbu11 ding 1
. ventilation exhaust and the dry *:: ell purse exhaust should d
be treated to remove radiciodine.- The combined car >acit~y i
of' these ventilation systems far e:.:ceeds the. treathent capability of the.?~TS.
Additional means of reducine the releases. of radioactive v.aterials in raseous effluenEs from the plant ventilation systems need to be trovided in'either the G3 or bop design..
6.121.
6.121.
It is our position that ' esign   d        e::ternal cressure of the dryttell s,nould be 21 psid as noted on pa'ge 6.2-56.. Table 6.2.1 chows 20 psia.                                                                 jl
It is our position that ' esign e::ternal cressure of the d
            -6.122                 Your' response'to cuestion 6.69 stated that the details
dryttell s,nould be 21 psid as noted on pa'ge 6.2-56..
                                  -regarding tne routing of the safety relief valve discharge piping vo the suppression pool ; tere not available It is our.?ositien that this piping should not penetrate.the dr"-
Table 6.2.1 chows 20 psia.
viell above tno level of the suppression pool. DatM' r tbde pipes s'ould he routed down bety:een the weir wall a.!.d tb3
jl
                                  . r;. before discharging into;the pool outside of the i
-6.122 Your' response'to cuestion 6.69 stated that the details
l i
-regarding tne routing of the safety relief valve discharge piping vo the suppression pool ; tere not available It is our.?ositien that this piping should not penetrate.the dr"-
1 I
viell above tno level of the suppression pool.
DatM' r tbde pipes s'ould he routed down bety:een the weir wall a.!.d tb3
. r;.
before discharging into;the pool outside of the i
i 1
J 4
J 4
-._--:____        -L-._   - . .
-L-._


        ..      w 9.0               Au"iliary Systems
w
          -9;49                                                                     t
' 9.0 Au"iliary Systems
            ^'
-9;49 The description of the Fuel Building Pressure Control System t
The description of the Fuel Building Pressure Control System presented follows:
^'
in GZSSAR Section 9 4.6 requires clarification as a)   . list any sections of the Fuel- Building which are not maintained at negative pressure during normal operation, b) specify the magnitude of the negative pressure which is maintained durinC normal operation and following a 100A.
presented in GZSSAR Section 9 4.6 requires clarification as follows:
c) the response to Question 6 44 stated that the Fuel Building Pressure Control.5ystem maintains the SGTS rooms at necative pressure during normal operation and following an accident. .This does not appear to be consistent with Figure '9 4-6 which shows the SGTS roots connected directly to the SGTS.
a)
9 50           "
. list any sections of the Fuel-Building which are not maintained at negative pressure during normal operation, b) specify the magnitude of the negative pressure which is maintained durinC normal operation and following a 100A.
The description of the Auxilinry 3uilding ventilation
c) the response to Question 6 44 stated that the Fuel Building Pressure Control.5ystem maintains the SGTS rooms at necative pressure during normal operation and following an accident..This does not appear to be consistent with Figure '9 4-6 which shows the SGTS roots connected directly to the SGTS.
                                                                  ~
9 50 The description of the Auxilinry 3uilding ventilation
~
system presented in GISSAR Section 9 4.2 requires clarificatier as follows:
system presented in GISSAR Section 9 4.2 requires clarificatier as follows:
a)   specifylthe magnitude of the negative pressure main-tained and        in the ECCS following  a LOCA.pump rooms durins normal operation b) provide similar information for this system as requested in Question 6.106.
a) specifylthe magnitude of the negative pressure main-tained in the ECCS pump rooms durins normal operation and following a LOCA.
9 51               The description of the shield annulus recirculation and exhaust s;ste.a presented in GTSSAR'Section 9.4.5.3 req' tires clarification as follows:
b) provide similar information for this system as requested in Question 6.106.
i 9 51.1             Specify the marnitude of t're ne ative pressure maintained in the annulus during normal operation.
9 51 The description of the shield annulus recirculation and exhaust s;ste.a presented in GTSSAR'Section 9.4.5.3 req' tires clarification as follows:
9 52.2             Describe the operation of_the system following a LoCA as-to the fractions of flow which are recirculated and exSausted to t' SGTS'and the negative pressures which are taintained.
i 9 51.1 Specify the marnitude of t're ne ative pressure maintained in the annulus during normal operation.
9 5L3               Justify the adequacy of the system design considering the active the top'of failure    of the the doce       valve9in4-5a).
9 52.2 Describe the operation of_the system following a LoCA as-to the fractions of flow which are recirculated and exSausted to t' SGTS'and the negative pressures which are taintained.
(Figure      the recirculation line at
9 5L3 Justify the adequacy of the system design considering the active failure of the valve in the recirculation line at the top'of the doce (Figure 9 4-5a).
      .9 5L4               Provido     nimilar information for this system as requested in       '
.9 5L4 Provido nimilar information for this system as requested in Question 6.106.
Question 6.106.
f
f


F
F
      . - 7.
. - 7.
I     i
I i
                                                    - .15 -
-.15 -
9 52         Chemical treatment of the closed coo 11n7 water system is discussed in Response 9 20.2 show how this is accomplished. Modify Fi6ure 9.2-2a,b,or e to 9.53         Page 9.4-2 states t' cat Figure 9 4-1 will. be ~ revised. . Fro-vide this ficure so that our review of.your response to question 9.30 can proceed. -
9 52 Chemical treatment of the closed coo 11n7 water system is discussed in Response 9 20.2 Modify Fi6ure 9.2-2a,b,or e to show how this is accomplished.
l 9 54           Incorporate the information siven in response to question 9 20.1 (concerning the design data of the major components of the closed portions        cooling water system) into the applicable of GESSAR.                                                                                                                 '
9.53 Page 9.4-2 states t' cat Figure 9 4-1 will. be ~ revised.. Fro-vide this ficure so that our review of.your response to question 9.30 can proceed. -
l 9 55                                                                                                                                               !
l 9 54 Incorporate the information siven in response to question 9 20.1 (concerning the design data of the major components of the closed cooling water system) into the applicable portions of GESSAR.
Response 9 20.3 states the heat exchan. ers for the fuel pool coolinc and cleanup s.ystem and the drywell. atmosphere cooling coils will not be cooled by the closed cooling etater (as shown     in Figure 9.2-2d) but rather by the standby service water systen.                                                                                                                         ;
l 9 55 Response 9 20.3 states the heat exchan. ers for the fuel pool coolinc and cleanup s.ystem and the drywell. atmosphere cooling coils will not be cooled by the closed cooling etater (as shown in Figure 9.2-2d) but rather by the standby service water systen.
item.            Clarify your position with respect to this                                                             -
Clarify your position with respect to this item.
d       .
d 1
1 s
s e
e e
e
__    _ _ . . _ - - -              -                                              ---}}
---}}

Latest revision as of 06:04, 3 December 2024

Forwards Request for Addl Info Needed to Continue Review of Gessar Application,Including Discussion of Steam Condensation Rates Assigned to Containment Sprays & Heat Sinks.Info Requested by 740509
ML20235C907
Person / Time
Site: 05000000, 05000447
Issue date: 03/26/1974
From: Stolz J
US ATOMIC ENERGY COMMISSION (AEC)
To: Hinds J
GENERAL ELECTRIC CO.
Shared Package
ML20234E460 List: ... further results
References
FOIA-87-40 NUDOCS 8707090574
Download: ML20235C907 (17)


Text

,

'.(

(

I[D-UNITED STATES i

ATOMIC ENERGY COMMISSION

. r'/ ~T o i

FIINE'O KCBS i

WASHINGTON. O.C. 20545

\\;*- %' f q

='

MAR 2 61974 Pht

M'iq-c 5.o it

-a Docket No. STN 50-447 p

g.

7',

2. w wr m.

rfi"!

. 2 n,

_o o

General Electric Company g g.',

8-ATTN:

Mr. John A. Hinds, Manager ce iG Safety and Licensing

[Ed C

e" 175 Curtner Avenue San Jose, California 95114 Gentlemen:

In order that we may continue our review of you( rGESSA_Pfapplication a

additional information on those matters set fortn in the enclosure is needed.

To maintain our licensing review schedule, we will need a completely adequate response by May 9, 1974. Please inform us within 7 days after receipt of this letter of your confirmation of the schedule or the date you will be able to neet.

If you cannot meet our specified date or if your reply is not fully responsive to our requests, it is highly likely that the overall schedule for completing the licensing review for this project will have to be extended.

Since reassignment

.of the staff's efforts will require completion of the new assignment prior to returning to this project, the amount of extension will most

)

likely be greater than the extent of delay in your response.

{

l The questions in the enclosure have been grouped by sections that

]

correspond to the relevant sections of GESSAR, and the question numbers continue consecutively from previous letters.

Please contact us if you desire additional discussion or clarification of the material requested.

4 Sincerely, j

.,5 5 r-

fi /Z Y.

U

/

QU ~

en

'i~

O ohn F. Stolz, Chief L,i'cht Water Reactors Project Branch 2-1 Directorate of Licensing

Enclosure:

GESSAR Request for Additional Information I

cc:

(see next page)

',c~ y 2,' (t.s. @g Q in g) 8707090574 870623 m

,n..

y n j,3 S{h,(

t

~1 jj PDR FOIA THOMASB7-40 PDR "ga M0]) k L,.)

U,J "

L___ _-- -

(.

t L

i 0

Cencral Electric Company MAR 2 01974 J

cc:

Mr. W. Gilbert, Manager Safety and Standards General Electric Company i

175 Curtner Avenue l

San Jose, California 95114 Mr. L. Gifford, Manager Regulatory Operations Unit General Electric Company 4720 Montgomery Lane i

l Bethesda, Maryland 20014 M

h i

I 1

l 1

i 1

1 1

I l

i l

_________-_______a

Ls

.g s N ENCLOSUPI v

REQUEST FOR ADDITIONAL INFORMATION GENEPJJ., ELECTRIC CO>fPANY GESSAR PLANT a

DOCKET NO. STN 50-447 i

i e

i i

i I

j l

u_ _ _ _ _ _ - -

1

ab a

30 Design of Structures. Comnonents, Iouinment and Srstems 3 160 The analysis of containment vacuum breaker sizing presented in response to question 3 133 requires the followin6 additiona:

3 information:

a) clarify the inconsistency between Table 3.8 4 and Table 6.2-19 b) specify the signals which actuate the containment, spray system and describe the operation of the time delay device which trecludes simultaneous operation of both i

f core and containment sprays.

2 c.)

specif r the flow area of the vacuum breaiers in teres of h/ Nri'.

1 d) justify your assumption of an air-vapor mixture flowing through the drywell vacuun breakers since air-only flow would re.nove more noncondensibles from the containment.

e) in regard to Figure 3.8-34, discuss the reasons for the drywell pressure lassing.the containment pressure by more than 0 5 psi, the setpoint. for the drywell vacuum a

broa':e rs.

f) discuss the steam condensation rates which were assicned to the containment sprays and heat sinks.

g) for t.e ;ostulat4:d rupture of t?.e Reactor '.7ater Cleanup System (7llCU) line it appears t5at the displacement of containment air into the drywell could cenerate a high drywell pressure signal and cause isolation of the r.otor operated valves which are in series with the coats. intent vacuum brea::ers as discussed on page 3.8-4h of GESSA2.

Containment spray operation could reduce the containment pressure below atmospheric.

The preseure could go be.Jond the containment design nesative internal pressure of

-0.8psig (P 3. ^-4) since the spra,"s would not affect the drywell pressure, and the isolation signal to t'e motor operated valves would be caintaired.

Discuss the need for and availability of containment vacuum relief under these conditions.

3.161 Section 3.8.31.1 of GTSSAR, " Description of the Drywell

{

Vacuun Relief Syster", discusses protection of the. containment j

. vessel and co"tain: cent vacuum breakers, Clarify tnis

apparent dicerepancy.

'3.162 Your resfonse to question 3.82 concerning the effects of post-LOCA suppression pool swell has not been subcitted.

In your resjonse, describe t'.e analytical :.:ethods which were used to deter:uine the dynaaic loads and how there loadc were incorporated in the structural design.

Trevide the magnitudes of these loads used in the structural analysis

t c 1

1 e3e i

conducted by the structural designer.

Specifically consider the. following:-

a) pool swell due to drywell air carryover; b) impingement effects during vent clearing and vent flow; I

c) seismic induced pool motion; j

1 d), circumferential or radial pool wave effects d ue to non-

)

uniform vent flow and/or non-uniform air addition to the pool.

j q

'3 16'2.1 For the circumferential or radial pool wave effects' dis-'

cussed in d) ahove, discuss the otential for transient vent uncovery or pool separation and re;ultant steam bypass of l

the. suppression pool.

3 162.2 Provide similar information as outlined in 3.162 for the case of a small break LOCA followed by actuation of the Automatic Depressurization System (ADS).

3.163 section 311.2.1.3.2 of G2SSAR indicates the local environ-s ment for a steam line break inside the containment and out-side the dryttell.

Indicate wPat equipment will be subject-to these effects of the steam line treak environment and how thoce environmental conditions ciere considered in the development of the environmental envelopes for eac'h of the e ffec ted equipr.cnt.

In addition,. discuss the considerations given in-the selection of the environmental envelhpes for the effects of localized steam impingement and/or spray water cuch a.; that which. night occur to couipment located in the containment as a result of direct drywell bypass.

3 164 Table 3.11.1 in CTSSAR lists the accident environment for safety related systems located in the drywell.

Justify 1

-3 psig as the assumed minimum pressure f or the drywell i

since the drywell relief valves are not designed as engineered safety features.

It is our position that 30 psig s!;euld be used for the maximum design internal pressure.

Also revise page 3 11-7 to be consistent with these values.

The ecm-bustible gas control systets should be included in Table 3 11.2.

3 165 The response to suestion 3 68 is incomplete.

The magnitude and the oscillatory nature of the LCCA forces are not pre-sentod-in Figure 4.2-10 as stated in Section 3 0.1 5 Deceribe the LOCA fo*cing function acting on reactor internal structures.

In adddtion, since :.00A and SSE may not be entirely uncorrelated, the rule of using square r ot of the sum of squares may not be justifiable.

The acceptable I

i

__.__m_____.___

,. t' i,

-l

.; l 1

combi' nation of LOO.i and SSE effects is considered as' linear I

e numerical. superposition of maximum responses.

3 166 The. response to Question 3.55, referenced G.E.. Topical Report NEDE-10813, "PDA-Pipe Dynamic Analysis Progran for Pipe-Rupture Movement.".A preliminary staff review cf this report has resulted in the following questions:

3.166.1 The sinplified system rodhling of the piping and the re-asstatedin"EDE-lOY13maybeacceptable.straint for corputinr th 1

However nunerical examples providing comparison with representative so,lutiens using nore rigorous dynamic analysia and/or suitable enperi-mental results are necessary to der.onstrate the adequacy of the prorosed methods, The staff requires a cercittent to provide representative numerical examples durin.; the PSAR stage of individual plant reviews to justify ~the simplified analytical models ecployed, 3.166.2" As indicated in NEDE-10313, the pipe whip restraint desirn i

is based on analyses using an enorgy balance approach, che state of ::aximum stress or strain of the restraint is based on the computed aximum: deformation at the end of the first

~

quarter cycle of the. response.

'ionever, in certain circ';.-

stances nanicum deformation may occur latar than the first quarter c;cle of response.

'/!e agree that the rebound si:nld not cause uajor concern when the restraint remains elastic and will still have ample desicn margin to absorb additi nal energy.

However, reben.nd may cause a problem if the restrair.t i

reaches'its fsesign limit but the bro':en pipe is still in t'.e i

elastic state.

.In addition some studies indicate t' at re-bound may occur due to the e,ffects of the 1-itial tr=nsient of the jet thrust.

An arrlification factor of 'l.2 s5 ?uld 3

therefore te a r. plied to the jet tPrust in addition to the thrust coefficient.

The staff will reon I

a thrust force az;11fication factor not' ire a corrittent that less than 1.2 cust be ceployed to determine the forces to be used in rectraint l

design.

3.167 Table 3.2.1 indicates the only seistic Category I source of makeup water is the R"R system.

It is our position that a fuel pool rater makeup source independent of the ?".2 shculd be provided which n:ets the seis.?.ic Category I require:.e:t.

i

)

l l

{

F*

l 1

s.

6.0 EncinmereTSafety Features t

6.90 The Pressure Suppression Containment System (PSCS) anal:* sis code contains a subprogram for vent clearing.

is also used to compare with the test results. This sub:.rcirar Describe the numerical solution method that is employed in this sub-prosram and supply a justification for the nodalization that has been colected.

Discuss the e:mected accuracy of the solution that is obtained by the numerical solution 1.et'.ed.

What other assurances are there that the numerical solution method corresponds to the set of equations to be a 1ved?

6.91 In a letter from J. A. Hinds to 2.C. De?oung dated Ja.uary 30, 1974 jou have described the analytical modeling used to calculate the blow-down from a postulated recirculation line break for drywell pressare response analyses.

The codel is seperated into s' ort and long-term periods ' tith res;ect to its treatmer.t of th loop side of the breel,t.e mass flow from the recirculation 1

The *.:odel applies a flow coeffi:1e.t of 0 5 to the 1:cody correlation for the loop side nr.til the inte: rated mass releave equals the iritial loop esas inventory.

After depletion, the loop-ride unss fic; is based o-i<cody flow t5 rough an arca equivalent to ten jet pump nozzles and the cleanup line.

.7e have. reviewed the above modeling techniques and currently believe that:

a)

The assumption of jet pump-cleanup line restricted f' o is acceptable it the lo.c term.

b)

The use of the 0 5 coefficient in the short tert is not j

acceptable and the following alternate assumptions should be considered for the short term:

1) the recirculation loop should be modeled as a single and separate volume with the initial subceoled :a:sr mass aid energy equal to the inventory of the 1 cop.

ii) the break area associated with this tolute should equal the area of the recirculation pipe.

{

iii) the mass flux out the break should be co=puted based on the Moody correlation.

iv) mass addition to the volume should be eemputed based on the arca of ten jet pump nozz1cs and t'. e cle nup line with the corresponding differential presse.re between the reactor vessel cnd the single node simulation of the recirculation loop.

4

(

C-l

. j,..

1

-c i

The above model should be used until the mass flow out the break is rectricted by flow t'rouch the jet pump nozzles and the cleanup line, at which time the long-term nod'el becor.es appropriate.

In either case the total ~ mass and energy addition to the drywell is tFe sum of the cohtri-i butions from the recirculation loop side and reactor. vessel side of the break as describcd in the.above referenced letter.

Therefore, in regard to the G3SSAR application i

provide the following information:

I 1.

A table of blowdown mess and enersy rates at various time incremental steps for a recirculation break hased on the atove specified codeling techniquas.

Show separately t'e contributions fron the vessel and loop

. sides of the break.

2.

Based on the above blowdown data, provid'e the drywell pressure response as a function of time.

6 92 Frovide the data used in your c:mputation of c'ontainaent pressure, ct the conditions of pod: contain=ent pressure, usin; tho equct$ons from the long-tors analysis in GESS;.2 i

Section 6.2.1 3.7.

6.93

'Vith res7ect to."our res onse to question 6.27 provide the results of an analysis of containment pressure and te.pers.t"re as a function of time for the following postulated conditions:

a) a small prinary system bren't which results in the maximuu duration of blowdown.

i b) l existence of bypass leakage between the drywel containmentequivalentto-approximatelyoneft}and (A/s/?).

c)' continuous operation of the contcirmont spray system.

Specify any initial conditions or assumptions used in the analysis which are not consistent with Table 6.2.1,B (on pace 6.2-67).

i 6.94 Specify the value of the inte of peak containment pressure.: rated decay heat at the time i

Also revise items 14 and 15 l

in Table 6.2-15 to express 1 *a--atoA values in Stu's as requested by 7.uestion 6.70.

6.95 The analysis of contain:.ent spray condensing capability

)

presentad in response to Question 6.63 s'ould be based on e

t.

l r.

7-l 1100F service water and a heat 'exchancer capacity which is consistent with the data provided in Table 6.2.1.

In addition, justify your assumption of 75% spray efficiency considering the effects of the steam / air ratio in the containment.

16.96 The following inconsistencies have been noted in GESSAR regarding the lons-term containment response.and RHR heat i

exchanger capabilities.

Revise G S.9AR as @ pro

. provide. consistent information in these areas:priate to a)

Table '6.2-15 indicates the time of containrcent peak i

pressure as 30,560 seconds //hich is not consistent tiith Table 6.2.4, page 6.2-64 or Figure 6.2-11.

b)

The RHR heat receval rate shown on Figure.6.2-14 is not consistent with the heat removal rate c mputed using the data on page 6.2-65 and a peak pool temperature a

'of 179 F (Table 6.2-3).

0 c)

The data in (b) above is not consistent with the decay heat rate at the time of peak contnine.ent pressure as shown in Table 5.2-15.

6.97 From the design data provided in Table 6.2-1 and our recent discussions with you, plants referencing GISS!.R will have the option of selecting one of three RHR heat exc' ranger designs de;endiig on site service teter tetparature.

In addition, your res ense to Question 6.87 indicates that t're heat removal capabilities of the varicus heat exchangers will not be equivalent and therefore the tines and values of peak containment pressure and peak pool temperature will be a function of the particular heat exchanger desisn.

Therefore to establish the tir..es and values of containment pea'c pressure and. temperature for each alternate desi n, provide containment response analyses for the heat exchancer designs corresponds.; to 700 0

F and 90 F service rater.

If the RER heat exchanger size will be based on some fourth RER design provide the containment response analysis for that size also.

1 6.98' As requested by Questions 6.9 and 6.60, analyses of all subcompartments within the drywell and containment should I

be provided.

Subcompartments "thich have been identified on other similar plants include the sacrificial shield the drywell head recion, and compartments which contain ung,ucrded R?lCU lines.

To ensure that a complete resfonse is provided 9

I I,.....-.......

- - - ~

. :t E -.

I I

)

1 1

L l s

l.

at this stace of the. review, our information requirements for each subcompartuent are listed below:

a) the blowdown rates and' energies (note Question 6.91

.above, for a recirculation line rupture);

b) the total-vent area; c)- the coreportment free volume; d)- - the peak ' calculated differential pressure and time at which the peak occurs; e) the design differential pressure; f) the' analytical methods used to deter: cine-the pressure response 1 cluding a description of the computer codes l

used; g) the values for flow coefficients used in c'ompartcent i

analysis and the basis for the selection of flow co-officients and h) a flow or bubble dingraa showing compartment voluuss, how they interconnect with other conp?rtments, and the flow areas throu-h their interconnecting pathways.

6.99 specify the design temperature and tressure. Tor the guard-pipes provided on high energy lines passing through the containment.

Also provide a list of all hi;h energy lines and their sizes that are equipped with a guard pipe.

6.100 Your'res:onse 'o Cuestion 6.57 is not cot;1ete.

Provide t

the following information concerning postulated ruptures-of Reactor ?!ater Cleanup System lines in the containment, a)

Specify the peak containment pressur6 associated with the worst R!CU line rupture.

b)

If orifices are provided in the R!CU system to linit blowdown-flow rates, specify the diaceter of the orific es.

i i

c)

Describe the leak detection and isolation systems which are relied on to ter.T.inate blowdown from a RICU line

. rupture.

Specify the lapse tiues associated with ench system.

i i

l

(

i:

I.

6.101-Your' response to' Question 6.62 is not complete.

Provide the following additional information concerning the arranfe-ment of RH3 suction and return lines:

a) verify' that the EHR test lines shown in Figure 5.5-la i

s represent the post-accident EUR flow path.

b) justify your assumption of a homogeneous pool volute in Section 6.2.1.3.7 considering that all the IHR

(

suction and return lines are located in a one third i

secter of the pool and that follocling post-accident pool drawdown the height of water above the suction lines'do not clearly encure mixing.

-6.102 Your restonse to Question 5.'61 does not justify the anal" sis 1

of drywell depressurization that is used in GCSSAR.

Exa:.ples of the deficiencies we have noted are the following:

1 1)

Initial' suppression pool ' temperature should be 110 F to 0

a be consistent with Table 6.2.1.

2). No justification is provided for the spray efficiency assu.:.ed in the analysis.

3)' Credit is taken for vacuum breaker operation although it is not a design basis for the vacuut breakers.

In response to the above co:ments provide either (1) t additional and cotulete substantiation of your current analyais or (2) provide a revised analysis showins the i

slowest possible depressurization time for the drytell a:d indicate its 1:.: pact on peak eniculated containment pressure.

Also specify the peak contal". ment pressure for the assump-tion of all drywell noncondensibles rennining in the con-tainaent for the duration of the long-term transient.

)

-6.103-Figure 6.2.lc provided in res;cnse to Que.stion 6.74.1 does not adequately define the secondary containment boundary.

i Frovide t'ris information on drawin.;s of comparable detail as Ficures 1.2-2 throush 1.2-B in CISSAR.

1 6.104 Your response to Question 6.74.2 is not adequate.

provide f

the prorosed allowable limit for t':e fraction of total con-tainment leakace which could brpass the Standby Gas Treat-ment System filters.

6.103 Your responses to Questions 6.7541 and 6.75.2 are not n

l

.A s

. L adequate.

As requested, indicate those lines, by reference to Table 6.2 9, that c ould be open to the containment or drywell atmosphere and interface with the outside atmosphere following a loss-of-coolant accident.

Also indicate the number and type of leakage barriers w'-ich are assumed to be available considering a single active failure.

1 6.106 Your response to Euestion 6.79 does.not adequately justify.

the separation or protection against such things as fires,

)

flooding, missilos,etc. pf Standby Gas Treatment System (SGTE' components.

Discuss th6 adec,uacy of the design with respect i

to the separation and protection of the 53TS fans, and the protection afforded the SGTS ducting from the shield building to the SGTS fans, filter trains and to the plant disch?.rge point.

l 6.107 Your response to questi'on 6.78 states that"a separate decay heat removal fan is provided for the Standby Gas Treattent System (SGTS).

This fan should be indicated on Figure 6.5-1.

In addition, justify al. lowing the SGTS filter carbon tem-I pcratures to reach 3100F (desorption temperature is 2750F) before actuating'the fire protection system.

6.108 Provide the following hdditional information with rerard to the Standby Cas Treatment System (SGTS):

6.108.1 Face 6.5-2 of GTSSAR indicates that the SGTS starts auto-matica11y following a "LCCA" signal.

Specify the signals (e.s., high drywell r;rescure, low water level) which are used to indicate a loss'-af-coolant accident.

6.103.2 Page 6.5-8 of GESfAR states that failure of the SGTS different pressure controller wou'.4 cause negative pressures within the secondary containme;;t to increase but remain beloi. the design differential pressure, 3 psid, of the auxiliary build-ing.

Specify the caxixum negative pressures that could occur and the design differential pressures of the ICCS pump roo s, shield building annulus, and fuel building.

6.109

!ith respect to GESSAR Section 6.2.5 3 3 5, discuss the potential for stray water to accumulate in containment sub-compartments and t'rereby provide a source of hydrogen - If the subeccpartments are not provided with sufficient mining, loca'_

concentrations could exceed 4 volume percent.

Discuss how ye; design will prevent local subcompartuents from exceeding a hydrogen concentration of 4 vol,ume percent.

6.110

?!ith respect to the analysis of dryrell mixing prior to the start of the hydrogen mixing system, presented in GESSAR Section 6.2 5 3.3.1, discuss the f ollowing:

s 4

__________._________a

x :o s t'

L l '

l l'

6.110.1-It-is our position that the.~.ixing system should have the capability to start at'10 minutes followins a LOCA.

Evaluate the potential for fla mable hydrogen mixtures exiting the reactor vessel assuming hydrogen generation rates which would yield a 4 v/o hydrogen concentration in the drywell at 10 minutes.

6.110.2 Assuming no bulk steaming in the reactor vessel,-discuss t,he' tanner Sy.w ich dilution or depletion of the steam s

inventory in the vessel dote was considered.

16.110 3 Discuss the potential for condensation of the entrained steam along the flow path from the vessel dose 1to the brea%

in the recirculation line.

6.111' In' the discuscion' of containment mixing prior to the start of the hydroren mixin system, prese-ted in G"5SAR Section 6.2 5 3 3 3, the a.nproach taien was.to estnblish the a

existence of turbulent natural convecticn at t.he suppression-pool surface.

Further substantiate your analysis as follor:s:

'6.111.1 Justify the selection of the full peel width as the char-acterictic len. th asscciatei with the Grashof number.

s 6.111.2 E:: tend your analysis to include the calculation of a cass transfer coefficient and show that the resultint mass trens-port will disperse the hydrosen'conerated at the pool surft:e.

6.111 3 Justify your contention on pase 6.2-60s that the containment will have turbulent natural convection since it annears 1

that the analysis applies only in the vicinity of the p ol

~

surface.

6.111 4 Discuss the validity of your assumption of a sufficient temperature difference between the pool and containment atnosphere to t%.e. time period after n'-ich the suppression pool has reached its peak temperature.

6.112 Your response to questf on 6.S3 does not adequstely jurtify that the single sat.pling point availcble in the drywell and containment (followins a cinrle failure) is capable

{

of detectinc non-uniform hydrogen concentrations.

It is our position that each redundant hydrogen analyzer unit should sauple a :.initum of two locations in sach the drywell and containment and that tS ere locations be justi-fled to be rey.-esentative of the bulk atr.nspheric conditions l

within each volut.:e.

8 1

...O 6.113 Spebify the size and location of the hydrosen mixins syster inlet penetrations.

6.114 Discuss the separation and protectimn criteria which are applicable to the lines and components of the t" ernal recombiner system.

6.115 Your response to question 6.35 indicates that corrosien : f zine and alur.inum naterials itithin the containment f llorin-a loss-of-coolant accident has been considered as a source of hydro;en.

Discuss t'e source (s) of corrosive arents which could be present in the post-accident containment environment.

6.116 Your respense to questien 6.84 states that tfree inMrico'cs are incor; orated in the hydrogen uining syste.T desig. ' ore ter only tbc cecond and third are described.

Specify the first interlock.

6.117 Provide t' e raximum allowable suppression pool tempere.ture for both LOCA and relief valve operation co-ditions.

the initial terpcrature and taximum tee.perature in:"e..en:s List for normal o;eration and LOCA energy additions.

6.118 Yle have noted the followin: additional d ficiencies in G2SSAR Cection 5.2.4, Containment Isolation Systems, plesse i

revise GIGSAR to acconcodate these contents:

a) the purce exhaust line shottn on Figure 9 4-5b sSc:1d be incluged in Table 6.2 9 and Figure 6.2-15 b) the drywell purce line, penetration 31 in Table <.2 9

is shown to be norually open.

be closed during normal operation.?le require this line to c) 6.2-15 do not asree with Figure 6.2-16.the co. buctible Cas I

1

{

6.119 It is our position that protective screen assemblies should l

be provided around the containment heat removal pipin-suction points in the suppression pool and sk.ould 're capC:le of preventins debris frou e.tering the impair the performance of system pumps,pipins thich could valves, heat ex-chancers or spray nozzles.

The desica of tS e screened area should be larce enouch to assure a low approacP velocity and preclude clo:31ng of the screening by lebris beinc c';: n_

against it.

Describe how your design moets this requirement.

_ _ _ _ _ - - - - - - - - - - - - - - - - - - ' - - ~

q

.- i s.

e

('

r

]

6.120' In the. event' of high radiation in the containment nurge the shield building annulus,: the ECCS pu.'p rooms,'and t'de

, fuel buildinc, you state that the exhausts are directed to

)

the standby nas.treatet.ent system (SGTS).

To. meet the i

"as lov; as practicable" guidelines, the containmentcbu11 ding 1

. ventilation exhaust and the dry *:: ell purse exhaust should d

be treated to remove radiciodine.- The combined car >acit~y i

of' these ventilation systems far e:.:ceeds the. treathent capability of the.?~TS.

Additional means of reducine the releases. of radioactive v.aterials in raseous effluenEs from the plant ventilation systems need to be trovided in'either the G3 or bop design..

6.121.

It is our position that ' esign e::ternal cressure of the d

dryttell s,nould be 21 psid as noted on pa'ge 6.2-56..

Table 6.2.1 chows 20 psia.

jl

-6.122 Your' response'to cuestion 6.69 stated that the details

-regarding tne routing of the safety relief valve discharge piping vo the suppression pool ; tere not available It is our.?ositien that this piping should not penetrate.the dr"-

viell above tno level of the suppression pool.

DatM' r tbde pipes s'ould he routed down bety:een the weir wall a.!.d tb3

. r;.

before discharging into;the pool outside of the i

i 1

J 4

-L-._

w

' 9.0 Au"iliary Systems

-9;49 The description of the Fuel Building Pressure Control System t

^'

presented in GZSSAR Section 9 4.6 requires clarification as follows:

a)

. list any sections of the Fuel-Building which are not maintained at negative pressure during normal operation, b) specify the magnitude of the negative pressure which is maintained durinC normal operation and following a 100A.

c) the response to Question 6 44 stated that the Fuel Building Pressure Control.5ystem maintains the SGTS rooms at necative pressure during normal operation and following an accident..This does not appear to be consistent with Figure '9 4-6 which shows the SGTS roots connected directly to the SGTS.

9 50 The description of the Auxilinry 3uilding ventilation

~

system presented in GISSAR Section 9 4.2 requires clarificatier as follows:

a) specifylthe magnitude of the negative pressure main-tained in the ECCS pump rooms durins normal operation and following a LOCA.

b) provide similar information for this system as requested in Question 6.106.

9 51 The description of the shield annulus recirculation and exhaust s;ste.a presented in GTSSAR'Section 9.4.5.3 req' tires clarification as follows:

i 9 51.1 Specify the marnitude of t're ne ative pressure maintained in the annulus during normal operation.

9 52.2 Describe the operation of_the system following a LoCA as-to the fractions of flow which are recirculated and exSausted to t' SGTS'and the negative pressures which are taintained.

9 5L3 Justify the adequacy of the system design considering the active failure of the valve in the recirculation line at the top'of the doce (Figure 9 4-5a).

.9 5L4 Provido nimilar information for this system as requested in Question 6.106.

f

F

. - 7.

I i

-.15 -

9 52 Chemical treatment of the closed coo 11n7 water system is discussed in Response 9 20.2 Modify Fi6ure 9.2-2a,b,or e to show how this is accomplished.

9.53 Page 9.4-2 states t' cat Figure 9 4-1 will. be ~ revised.. Fro-vide this ficure so that our review of.your response to question 9.30 can proceed. -

l 9 54 Incorporate the information siven in response to question 9 20.1 (concerning the design data of the major components of the closed cooling water system) into the applicable portions of GESSAR.

l 9 55 Response 9 20.3 states the heat exchan. ers for the fuel pool coolinc and cleanup s.ystem and the drywell. atmosphere cooling coils will not be cooled by the closed cooling etater (as shown in Figure 9.2-2d) but rather by the standby service water systen.

Clarify your position with respect to this item.

d 1

s e

e

---